You are on page 1of 37

2

1.
2.

1.
2.

3.
4.

( )


1.
2.

3.
4.
5.
6.

( )
7.
8.
9.
10.
11.
12.
13.
14.

Dowel

( )
15.
16.
17.
18.
19.
20.
21.


Offset


Blow
Count

Blow Count


1.
2.

3.
4.

5.
6.




Offset

( )
7.
8.

9.
10.
11.

12.


Blow Count

Blow Count


1.
2.

3.
4.

Blow Count

1 30 Blow Count
Blow
Count 30


1.

2.

(Static
Load Test)



2.5-3
(S = 2.5-3D)


2
1. (Dry Process)
2. (Wet Process or Slurry
Method)

(Dry Process)


0.35-0.60 .

(Stiff Clay)


(Bucket)
(Tripod)


1.
2.

3.

4.




6

24


1.
2.
3.
4.
5.
6.
7.


1.

2.
3.
4.
5.


6.
7.
8.

0.50
4050
Polymer based Slurry Bentonite
Slurry
Tremie Pipe


1.

2.
3.
4.


(Seismic Test)
(Coring Test)
(Concrete Test Hammer)


1.

2.

3.


1.
2.
3.

4.
5.

6.


1.
2.
3.

4.
5.
6.
7.
8.
9.

You might also like