You are on page 1of 5

POWER SYSTEM OPERATION CORPORATION LIMITED.

SOUTHERN REGIONAL LOAD DESPATCH CENTRE

DAILY OPERATION REPORT


POWER SUPPLY POSITION IN SOUTHERN REGION FOR 03-SEP-2012

DATE OF REPORTING : 04-SEP-2012 AT 06:00HRS

1. REGIONAL AVAILABILITY
EVENING PEAK (19:00HRS)
AVAILABILITY
(MW)*

SHORTAGE
(MW)#

27885

3453

NIGHT OFF-PEAK (03:00HRS)*

DAY ENERGY (MU)

FREQUENCY (Hz)

AVAILABILITY
(MW)*

SHORTAGE
(MW)#

FREQUENCY (Hz)

MET

SHORTAGE #

49.78

23260

2400

50.33

631.50

69.72

* MW Availabilty indicated above includes SR ISTS Loss.


2 A. STATE DEMAND (ENERGY - MU)

#Shortage is calculated at 50 Hz which is the sum of Load Shedding and Frequency Correction at 50 Hz.

STATE

THERMAL

HYDRO

GAS/NAPTH
A/ DIESEL

WIND

OTHERS

NET SCH
(FROM GRID)

DRAWAL
(FROM GRID)

AVAILABILITY

DEMAND
MET

SHORTAGE #

AP

102.90

6.01

26.27

2.35

6.31

61.84

65.73

205.68

209.57

40.19

KAR

30.10

20.96

21.30

21.16

15.86

26.07

23.21

135.45

132.59

12.34

KERALA

0.00

16.21

1.76

0.50

0.05

29.72

34.60

48.24

53.12

0.46

TN

65.35

7.83

9.16

75.32

22.11

48.15

50.75

227.92

230.52

16.24

PONDY

0.00

0.00

0.00

0.00

0.00

5.99

5.70

5.99

5.70

0.49

TOTAL

198.35

51.01

58.49

99.33

44.33

171.77

179.99

623.28

631.50

69.72

# The accuracy of shortage computation depends on timely load shedding details furnished in the web directly by constitutents
2 B. STATE DEMAND (MW) & ENERGY FORECAST (MU)
19:00 HRS PEAK

03:00 HRS OFF-PEAK

DAY PEAK

DAY ENERGY (MU)

STATE

DEMAND
MET

SHORTAGE #

DEMAND
MET

SHORTAGE #

DEMAND
MET

TIME

SHORTAGE#

FORECAST

DEVIATION
FROM
FORECAST
(ACTUAL +
LS FORECAST)

AP

8714

1077

8576

2000

9645

06:00

1000

264.00

-14.78

KAR

5902

552

4388

300

6222

19:00

525

165.00

-20.41

KER

3045

102

1647

3097

19:00

92

48.55

4.90

TN

9602

1681

8358

100

10238

13:30

1596

245.64

0.63

PONDY

272

42

210

277

18.44

41

6.44

-0.26

SR ISTS LOSS

350

--

81

--

--

--

--

--

--

SR

27885

3453

23260

2400

28616

19:20

3453

729.63

-29.92

DAY ENERGY
(MU)

AVG MW

3. GENERATION :
STATION

INSTALLED
CAPACITY(MW)

19:00HRS
PEAK MW

03:00HRS
OFF-PEAK MW

DAY PEAK
MW

HRS

ANDHRA PRADESH
Vijayawada TPS

1760

953

1011

1095

05:57

23.08

962

Kothagudam TPS

1720

1111

1132

1132

03:00

27.99

1166

Rayalaseema TPS

1050

876

885

885

03:00

20.27

845

Simhadri (IPP)

1000

955

817

963

19:02

19.43

810

Kakatiya TPP

500

415

436

459

18:01

9.59

399

Other Thermal*

137

218

190

218

19:00

2.54

106

Total Thermal

6167

4528

4471

--

--

102.90

4288
--

N'Sagar

816

14

21

29

14:40

--

Srisailam LB (Gen)

900

--

--

136

05:56

0.04

Srisailam RB

770

100

--

279

05:09

0.49

20

Srisailam LB (Pump)

900

--

--

--

--

--

--

Lower Sileru

460

122

--

201

19:48

1.90

79

Upper Sileru

240

--

--

59

10:24

0.03

Other Hydro

749

228

103

--

--

3.55

148

Total Hydro

3935

464

124

--

--

6.01

249

Vijjeswaram Gas

272

145

120

147

18:34

3.19

133

Reliance Energy Ltd.

220

--

--

--

--

1.72

71

Jegrupadu

217

130

129

133

21:56

3.14

131

Spectrum

208

79

72

81

10:29

2.99

124

LANCO

351

--

--

--

--

3.90

163

Vemegiri (GMR)

370

294

294

298

09:34

7.09

295

Jegrupadu Ext.

220

--

--

--

--

--

--

Konaseema

445

171

--

171

19:00

1.23

51

Gauthami

464

--

214

221

00:00

1.46

61

GMR(BRG)

237

66

67

68

02:31

1.55

65

Other Gas/Naptha/Diesel

69

--

--

--

--

--

--

Total Gas/Naptha/Diesel

3073

885

896

--

--

26.27

1094

Wind

216

123

155

155

03:00

2.35

98

Others

532

45

45

45

19:00

6.31

263

Total AP

13923

6045

5691

--

--

143.84

5992

* The genaration includes the injection of CPPs for which installed capacity not considerd due to variable nature.

Page 1 of 16

STATION

INSTALLED
CAPACITY(MW)

19:00HRS
PEAK MW

03:00HRS
OFF-PEAK MW

Raichur TPS

1720

635

Bellary TPS

1000

--

UPCL(IPP)

600

Total Thermal

DAY PEAK

DAY ENERGY
(MU)

AVG MW

00:09

16.58

691

09:20

6.35

264

402

03:00

7.17

299

1335

--

--

30.10

1254

342

101

587

07:23

4.80

200

--

--

237

18:56

0.22

450

146

450

20:53

5.85

244

MW

HRS

933

1085

--

433

309

402

3320

944

Sharavathi

1035

Nagjher

885

Varahi

460

KARNATAKA

Other Hydro

1768

948

508

--

--

10.09

420

Total Hydro

4148

1740

755

--

--

20.96

873

Yelehanka Diesel

128

16

13

16

14:56

0.38

16

Jindal

1390

904

764

1033

22:15

20.92

872

Other Gas/Naptha/Diesel

107

--

--

--

--

--

--

Total Gas/Naptha/Diesel

1625

920

777

--

--

21.30

888
882

Wind

1818

1018

804

1177

15:51

21.16

Others

692

253

226

253

19:00

15.86

661

Total KAR

11603

4875

3897

--

--

109.38

4558

110

KERALA
Iddukki

780

610

26

610

19:00

2.64

Sabarigiri

280

223

--

224

19:22

0.78

33

Lower Periyar

180

166

107

168

17:07

3.67

153

Other Hydro

749

512

231

--

--

9.12

380

Total Hydro

1989

1511

364

--

--

16.21

676

Kayamkulam

360

154

--

155

19:24

1.05

44

Reliance Energy Ltd

157

--

--

--

--

--

--

Brahmapuram DPP

107

40

--

40

19:39

0.18

Kozhikode DPP

128

66

--

67

19:29

0.53

22

Other Gas/Naptha/Diesel

22

--

--

--

--

--

--

Total Gas/Naptha/Diesel

774

260

--

--

--

1.76

73
21

Wind

35

--

--

--

--

0.50

Others

20

--

--

--

--

0.05

Total KER

2818

1771

364

--

--

18.52

772

TAMILNADU
Ennore TPS

450

70

72

75

03:14

2.03

85

North Chennai TPS

630

380

374

385

00:27

9.93

414

Tutucorin TPS

1050

744

734

750

19:25

18.92

788

Mettur TPS

840

760

767

781

14:39

19.73

822

Neyveli-I (IPP)

600

381

378

381

19:00

8.74

364

ST-CMS

250

219

221

227

11:09

6.00

250

Other Thermal

--

--

--

--

--

--

--

Total TN Thermal

3820

2554

2546

--

--

65.35

2723

Kadamparai (G)

400

201

--

204

19:02

1.29

54

Kadamparai (P)

400

--

--

--

--

0.95

40

Other Hydro

1824

407

118

--

--

6.54

273

Total TN Hydro

2224

608

118

--

--

7.83

327

Basin Bridge

120

--

--

--

--

--

--

Kovilkalappal

108

86

86

86

00:00

2.12

88

Kuttalam

101

--

--

--

--

--

--

Valattur(Stg 1&2)

187

--

--

--

--

1.47

61

Samalpatty

106

12

12

12

03:36

0.24

10

P P Nallur

331

--

--

--

--

--

--

Madurai Power CL

106

13

12

13

19:09

0.25

11

GMR Vasavi

196

81

47

82

18:46

1.29

54

Other Gas/Naptha/Diesel

1477

1025

1031

1031

03:00

3.79

158

Total Gas/Naptha/Diesel

2732

1217

1188

--

--

9.16

382

Wind

7040

2889

2040

3858

11:37

75.32

3138

Others

806

42

42

42

19:00

22.11

921

Total TN

16622

7310

5934

--

--

179.77

7491

Page 2 of 16

STATION

INSTALLED
CAPACITY(MW)

19:00HRS
PEAK MW

03:00HRS
OFF-PEAK MW

Ramagundam,NTPC

2600

1960

Neyveli TPS II

1470

837

Neyveli TPS I (EXP)

420

Madras APS

DAY PEAK

DAY ENERGY
(MU)

AVG MW

02:58

47.10

1963

11:40

19.04

793

385

09:29

9.23

384

301

320

14:04

7.18

299

287

282

296

09:26

7.13

297

440

290

292

297

23:53

6.90

288

Neyveli TPS II (EXP)

--

--

--

--

--

--

--

Talcher II, NTPC

2000

1346

1181

1474

20:45

29.41

1225

MW

HRS

1960

1960

780

907

381

378

440

304

Kaiga STGI

440

Kaiga Unit 3 & 4

CENTRAL SECTOR (ISGS)

Simhadri II, NTPC

500

386

472

485

01:03

12.85

535

Total ISGS

8310

5791

5646

--

--

138.84

5784

Vallur

500

--

--

--

--

--

--

Total JV

500

--

--

--

--

--

--

JOINT VENTURE

IPP UNDER OPEN ACCESS


LKPPL

366

169

163

178

18:57

3.89

162

SIMHAPURI

300

128

125

131

21:17

2.98

124

MEENAKSHI

--

--

--

--

--

1.24

52

Total IPP

666

297

288

--

--

8.11

338
8265

Total State Thermal

13307

8026

8352

--

--

198.35

Total ISGS Thermal

6990

4910

4771

--

--

117.63

4900

Total Thermal

20297

12936

13123

--

--

315.98

13165

Total Hydro

12296

4323

1361

--

--

51.01

2125

*Total Gas/Naptha/Diesel

8570

3451

3024

--

--

62.38

2599

Total Nuclear

1320

881

875

--

--

21.21

884

Total Wind

9109

4030

2999

--

--

99.33

4139
1847

Total Others

2050

340

313

--

--

44.33

Inter-regional (Except Talcher II)

--

1572

1638

--

--

37.31

1555

Grand Total

53642

27533

23333

--

--

631.50

26313

* Total Gas/ naptha/Diesel includes pondy Karaikal Power Plant of 32.5 MW

4 A. INTER-REGIONAL EXCHANGES & HVDC - PHYSICAL FLOWS [IMPORT(+)/EXPORT(-)]


MAX INTER-CHANGE (MW)

ELEMENT

19:00 HRS PEAK


MW

03:00 HRS OFFPEAK MW

IMPORT

Bhadrawati B2B

985

982

Gazuwaka B2B

301

301

Talcher-Kolar

1632

Talcher Stage II I/C

286

ENERGY (MU)

TIME

EXPORT

TIME

1000

0000

--

--

301

19:30

--

--

7.302

1536

1750

1945

--

--

37.851

355

--

--

--

--

8.441

22.922

4 B. INTER-REGIONAL EXCHANGES - SCHEDULES, WHEELING, UI & TALCHER AC I/C


ISGS Schedule
Talcher
Stage II
to SR

Bilaterals of SR
constituents

Power Exchange

Wheeling through
SR

Through Through Through ER to SR


ER ISGS Through
ER
WR
ER
WR

27.191

2.390

15.723

0.000

0.000

0.000

0.000

WR to
SR

Diversion of SR
power

IR Schedule

Through Through ER to SR
ER
WR

0.000

0.000

0.000

15.159

Net UI

Inter-Regional

WR to
SR

ER to SR

WR to
SR

Schedule
(Total)

Flow
(Total)

23.207

0.585

-0.285

38.366

38.665

5. FREQUENCY PROFILE
% OF TIME
RANGE

<48.5 Hz

<48.8 Hz

<49.0 Hz

<49.2 Hz

<49.5 Hz

<49.7 Hz

49.5 To 50.2 Hz

>50 Hz

>50.2 Hz

0.0

0.0

0.0

0.0

0.1

8.3

93.7

37.0

6.2

Instantenous Maximum

Instantenous Minimum

Block Maximum

Block Minimum

Day Avg

Hz

TIME

Hz

TIME

Hz

TIME

Hz

TIME

Hz

Frequency
Variation
Index

50.54

24:00

49.49

6:34

50.31

24:00

49.56

6:45

49.94

0.34

Std. Var.
0.17

Page 3 of 16

6. SHORT TERM OPEN ACCESS TRANSACTION


WHEELING
NAME OF THE TRANSACTION

BILATERAL
ER END

WR END

NAME OF THE TRANSACTION

MU

PEAK
(MW)

OFF-PEAK
(MW)

APTRANSCO TOTAL EXPORT

0.000

JINDALPOW-APCPDCL(JPL)(73.63MW)(ER-SR)

0.962

73.630

73.630

STERENERGY-APCPDCL(PTC)(34.355426MW)(ER-SR)

0.414

34.355

34.355

GRIDCO-APPCC(NVVN)(150MW)(ER-SR)

3.600

150.000

150.000

JSWEL-APCPDCL(JSWPTC)(350MW)(SR-SR)

8.400

350.000

350.000

SIMHAPURI-APCPDCL(PTC)(85.33MW)(SR-SR)

2.048

85.330

85.330

SIL-APCPDCL(PTC)(30MW)(SR-SR)

0.720

30.000

30.000

SIMHAPURI-APCPDCL(PTC)(37.65MW)(SR-SR)

0.904

37.650

37.650

LKPPL-APCPDCL(NETS)(166.6MW)(SR-SR)

3.998

166.600

166.600

JSWEL-JSWCEMENT(JSWPTC)(10.5MW)(SR-SR)

0.105

10.500

10.500

APTRANSCO TOTAL IMPORT

21.151

JSWEL-APCPDCL(JSWPTC)(350MW)(SR-SR)

8.400

350.000

350.000

SIL-APCPDCL(PTC)(30MW)(SR-SR)

0.720

30.000

30.000

JSWEL-JSWSMETTUR(JSWPTC)(1.05MW)(SR-SR)

0.021

1.050

1.050

JSWEL-JSWSMETTUR(JSWPTC)(2.08MW)(SR-SR)

0.008

2.080

0.000

JSWEL-JSWCEMENT(JSWPTC)(10.5MW)(SR-SR)

0.105

10.500

10.500

KPTCL TOTAL EXPORT

9.254

KPTCL TOTAL IMPORT

0.000

KSEB TOTAL EXPORT

0.000

KARCHWANG-KSEB(NVVN)(24.82MW)(ER-SR)

0.324

24.820

24.820

STERENERGY-KSEB(NVVN)(37.19114MW)(ER-SR)

0.449

37.191

37.191

CSPDCL-KSEB(NVVN)(12.37MW)(ER-SR)

0.162

12.370

12.370

ADHPL-KSEB(PTC)(24.54MW)(ER-SR)

0.321

24.540

24.540

JINDALPOW-KSEB(PTC)(24.54MW)(ER-SR)

0.321

24.540

24.540

STERENERGY-KSEB(NVVN)(77.98749984MW)(ER-SR)

0.835

77.987

77.987

KARCHWANG-KSEB(NVVN)(53.53MW)(ER-SR)

0.569

53.530

53.530

STERENERGY-KSEB(NVVN)(25.99297282MW)(ER-SR)

0.276

25.993

25.993

KARCHWANG-KSEB(IEX)(53.53MW)(ER-SR)

0.605

53.530

53.530

MPTRADECO-KSEB(IEX)(107.05MW)(ER-SR)

1.209

107.050

107.050

KSEB TOTAL IMPORT

5.071

TNEB TOTAL EXPORT

0.000

LANCOANPAR-TNEB(NETS)(23.24MW)(ER-SR)

0.304

23.240

23.240

SHRECEMTPS-TANGEDCO(SHREECEM)(49.08MW)(ER-SR)

0.642

49.080

49.080

STERENERGY-TANGEDCO(NVVN)(73.63139MW)(ER-SR)

0.888

73.631

73.631

KARCHWANG-TANGEDCO(NVVN)(61.35MW)(ER-SR)

0.802

61.350

61.350

KARCHWANG-TANGEDCO(PTC)(73.63MW)(ER-SR)

0.962

73.630

73.630

SHRECEMTPS-TANGEDCO(SHREECEM)(57.42MW)(ER-SR)

0.653

57.420

57.420

KARCHWANG-TANGEDCO(NVVN)(133.81MW)(ER-SR)

1.425

133.810

133.810

JSWEL-JSWSMETTUR(JSWPTC)(1.05MW)(SR-SR)

0.021

1.050

1.050

JSWEL-JSWSMETTUR(JSWPTC)(2.08MW)(SR-SR)

0.008

2.080

0.000

TNEB TOTAL IMPORT

5.705

GOA TOTAL EXPORT

0.000

GOA TOTAL IMPORT

0.000

LKPPL-APCPDCL(NETS)(166.6MW)(SR-SR)

3.998

166.600

166.600

LKPPL TOTAL EXPORT

3.998

Page 4 of 16

7. VOLTAGE LEVEL AT CRITICAL SUB STATION


% OF TIME
SUBSTATION

400 KV

<380 KV

<390 KV

>420 KV

>430 KV

HYDERABAD

0.00

0.00

98.96

GOOTY

0.00

0.00

VIJAYWADA

0.00

KOLAR

MAXIMUM

220 KV / 230 KV
MINIMUM

MAXIMUM

MINIMUM

KV

TIME

KV

TIME

KV

TIME

KV

TIME

10.07

435

0000

420

0700

234

0000

224

0700

59.03

2.15

432

0000

414

0700

243

0000

233

0700

0.00

98.82

12.78

433

0000

421

0700

236

0000

213

0600

0.00

0.00

5.42

0.00

423

0400

397

1000

224

0500

209

0800

BANGALORE

0.00

0.76

0.07

0.00

419

0400

390

1000

225

0100

201

0700

HIRIYUR

0.00

0.00

57.85

0.07

428

0400

413

0900

236

0000

224

0700

CHENNAI

0.14

10.69

0.00

0.00

414

0400

380

1000

230

0000

216

1600

TRICHY

1.60

28.54

0.00

0.00

406

0000

380

1000

230

0000

214

1000

TRIVENDRAM

0.00

4.38

0.07

0.00

423

0300

390

0900

232

0300

213

0900

8. MAJOR RESERVOIR PARTICULARS


DESIGNED

PRESENT

LAST YEAR

LAST DAY

MONTH

RESERVOIR

MDDL
(Mts)

FRL (Mts)

Energy
(MU)

Level (Mts)

Energy
(MU)

Level (Mts)

Energy
(MU)

Inflow
(Mus)

Usage
(Mus)

Prog. Inflow
(Mus)

Prog. Usage
(Mus)

JALAPUT

818.39

838.40

534

834.45

370

836.49

452

2.98

1.76

8.38

3.52

SRISAILAM

243.84

270.70

--

255.97

269.57

0.00

0.98

0.00

2.29

N.SAGAR

149.30

179.90

--

155.39

172.94

0.00

0.00

0.00

0.00

LINGANAMAKKI

522.73

554.50

4557

549.89

3202

552.72

4011

46.93

5.24

104.25

12.08

SUPA

495.00

564.00

3159

545.10

1654

555.20

2391

17.54

0.17

34.92

0.34

IDUKKI

694.94

732.43

2148

708.62

579

727.56

1789

14.05

2.52

30.24

5.58

KAKKI

908.30

981.45

916

957.92

322

975.94

717

10.20

2.91

19.11

4.53

NILAGIRIS

--

--

1504

0.00

621

0.00

1238

19.78

0.68

46.17

1.69

TOTAL

--

--

12818

--

6748

--

10598

111.48

14.26

243.07

30.03

Note: The Reservoirs data are of previous day and Cumulative figures for the month is upto previous day

9. DETAILS OF OVER DRAWAL WHEN EXCESS OF 3% OF SCHEDULE OVER A DAY WHEN FREQUENCY < 49.7 HZ
CONSTITUENTS

AP

KARNATAKA

KERALA

TAMILNADU

PONDY

AVERAGE MW ( F<49.7)

190.14

0.00

154.20

165.86

17.27

OD MU'S ( F<49.7)

0.24

0.00

0.19

0.12

0.00

OD NO OF BLOCK( F<49.7)

GENERATOR

NLCII

NLCEXPI

RSTP

SEPL

LANCO

AVERAGE MW ( F<49.7)

34.75

0.00

0.00

0.00

0.00

Under Injection MU'S ( F<49.7)

0.03

0.00

0.00

0.00

0.00

Under Injection NO OF BLOCK( F<49.7)

Note: Over drawal/Under Injection computed above for the day is the average MW value of all the time blocks during which the BENEFICIARY/BUYER was over drawing at freq. below 49.7Hz AND the total
over drawal/Under Injection of the day while freq.was below 49.7Hz was exceeding 3% of the respective schedule.

10. SIGNIFICANT EVENTS (IF ANY) :

11. SYSTEM CONSTRAINTS (IF ANY) :


12. WEATHER CONDITIONS:
RAINS IN AP AND NORTH KARNATAKA.

Page 5 of 16

You might also like