You are on page 1of 3

^SAFE GUARD SAFTEY AND SECURITY ENGINEERING

FIRE FIGHTING CONTRACTOR^


HYDRAULIC CALCULATION FOR
SPRINKLER SYSTEM
PROJECT: EMIRATES CATERING FACILITY EXTENSION BUILDING
DATE: AUG 6, 2011
- DESIGN DATA DESIGN STANDARD

: NFPA-13

HAZARD OCCUPANCY

: EXPANDED OUTBAND CHILLER

SPRINKLER HAZARD OCCUPANCY

: ORDIANRY HAZARD GROUP-2

DESIGN DENSITY

: 8.1 LPM PER SQ.M

MAX. COVERAGE OF SPRINKLER

: 9 SQ.M

AREA OF APPLICATION

: 232 SQ.M

NUMBER OF SPRINKLER CALCULATED

: 25 SPRINKLERS

FLOW AND PRESSURE REQ. AT TAPPING POINT

: 4672.7 LPM @ 5.89 BAR

FIRE PROTECTION CONTRACTOR

AUTHORITY HAVING JURISDICTION

: DUBAI CIVIL DEFENCE

SAFE GUARD SAFETY AND


SECURITY ENGINEERING

CALCULATIONS BY HASS COMPUTER PROGRAM


HRS SYSTEMS, INC.
ATLANTA, GA 30084

SPRINKLER SYSTEM HYDRAULIC ANALYSIS


Page 2
DATE: 8/6/2011Z:\DESIGN PROJECTS\007 PHDR 2011 - DESIGN PROJECTS\0489 EMIRATES CATERING FACILI
JOB TITLE: EMIRATES CATERING FACILITY EXTENSION BUILDING
WATER SUPPLY DATA
SOURCE
NODE
TAG

STATIC
PRESS.
(BAR)

SOURCE

(N/A)

RESID.
PRESS.
(BAR)
0.00

FLOW
(LPM)

AVAIL.
PRESS.
(BAR)

(N/A)

0.000

TOTAL
@ DEMAND
(LPM)
4672.7

REQ'D
PRESS.
(BAR)
5.892

AGGREGATE FLOW ANALYSIS:


TOTAL
TOTAL
OTHER
TOTAL

FLOW AT SOURCE
4672.7 LPM
HOSE STREAM ALLOWANCE AT SOURCE
0.0 LPM
HOSE STREAM ALLOWANCES
0.0 LPM
DISCHARGE FROM ACTIVE SPRINKLERS 4672.7 LPM

NODE ANALYSIS DATA


NODE TAG
ELEVATION
(M)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

112.55
112.55
112.55
112.55
112.55
112.55
112.55
112.55
112.55
112.55
112.55
112.55
112.55
112.55
112.55
112.55
112.55
112.55
112.55
112.55
112.55
112.55
112.55
112.55
112.55
112.55
112.55
112.55
112.55
112.55
112.55
112.55
112.55
112.55
112.55
112.35
112.35
112.35
112.35
112.35

NODE TYPE
K=161.00
K=161.00
K=161.00
K=161.00
K=161.00
K=161.00
K=161.00
K=161.00
K=161.00
K=161.00
K=161.00
K=161.00
K=161.00
K=161.00
K=161.00
K=161.00
K=161.00
K=161.00
K=161.00
K=161.00
K=161.00
K=161.00
K=161.00
K=161.00
K=161.00
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

PRESSURE
(BAR)
1.501
1.612
1.295
1.517
1.845
1.380
1.615
1.963
1.451
1.698
2.063
0.772
0.768
0.808
0.943
0.992
1.087
1.144
1.428
1.670
0.836
0.984
1.249
1.871
1.950
2.274
1.732
1.981
2.107
2.213
0.892
1.093
1.259
2.178
2.449
1.963
2.163
2.298
2.413
0.909

DISCHARGE
(L/MIN)
197.2
204.4
183.2
198.3
218.7
189.1
204.6
225.6
193.9
209.8
231.2
141.5
141.1
144.8
156.3
160.4
167.9
172.2
192.4
208.1
147.2
159.7
179.9
220.2
224.8
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

SPRINKLER SYSTEM HYDRAULIC ANALYSIS


Page 3
DATE: 8/6/2011Z:\DESIGN PROJECTS\007 PHDR 2011 - DESIGN PROJECTS\0489 EMIRATES CATERING FACILI
JOB TITLE: EMIRATES CATERING FACILITY EXTENSION BUILDING
NODE ANALYSIS DATA
NODE TAG
ELEVATION
NODE TYPE
PRESSURE
DISCHARGE
(M)
(BAR)
(L/MIN)
41
42
43
44
45
46
47
48
49
SOURCE

112.35
112.35
112.35
112.35
112.35
112.35
112.35
112.00
107.30
100.60

- - - - - - - - - - - - - - - - - - - - - - - - - - - SOURCE

1.024
1.249
1.434
2.442
2.450
2.482
3.277
3.750
4.315
5.892

- - - - - - - - - - - - - - - - - - 4672.7