You are on page 1of 12

Exercise No.

Estimating And Costing

Exercise No. 3
1.0 Title:
TAKING OUT QUANTITIES FOR SMALL R.C.C. STRUCTURE SUCH AS HALL.

2.0

Prior Concept :
Units of measurements of various items of work.

3.0

New Concepts :
3.1 Propositions
Proposition 1 : Length of straight Bar with Hooks at both ends

S = End cover

L = Clear span FIGURE 3.1 Fig. of Beam Length of straight Bar (main) b = End Bearing

= Clear span + 2X (End Bearing) - 2 X End cover+2 X 9d = ( L +2 X b ) -2 X s + 2 X 9d, where d is diameter of bar.

Proposition 2 = Length of Bent up Bar with hooks at both ends

FIGURE 3.2 Additional length due to inclination = 1.414x - x = 0.414x = center to center distance between top portion & bottom portion of bars. = Total depth of beam - (Top & Bottom cover) - half dia. of main bar at top - half dia. of main bar at bottom Length of bent up bar = length of straight Bar + 2 (Additional length due to inclination) = ( L +2 X b ) -2 X s + 2 X 9d +2X 0.414x .'. x Proposition 3 :- Length of stirrups (Mild Steel) Depth of stirrups = Total Depth - Top cover - Bottom Cover Width stirrups = Total width - 2 (Side cover) Length of stirrups = 2 (Depth of stirrups) + 2 (Width of stirrups) + Length of hook (15 cm / 24 x ) where - diameter of bar Proposition 4 :- Number of stirrups Total length - 2 x end cover No. of stirrups = ---------------------------------------- + 1 Spacing

18

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION

Estimating And Costing

Exercise No. 3

Proposition 5 :- Weight of bar Weight of bar per running meter = C/s Area of bar x density of bar = (2) x 7850 kg/m3 4 = 2 Kg/m where is in 'mm' 162 Proposition 6 :- Quantity of Bar Quantity of Reinforcement = No. of Bars x Length of Bar x Wt of bar in Kg/m Note : Standard length of one Reinforcement bar = 12m Proposition 7 :- Lap length Lap length in column = 45 Lap length in beam and slab = 69 is in 'mm' Proposition 8 :- Quantity of Form work 1) For RCC Beam Quantity = (b+2d) x l

Sq. meter

2)

For RCC Rectangular Column Quantity = 2 (l+b) x h Sq. meter

3)

For RCC Circular Column Quantity = x d x h Sq. meter

3.2

General concept of structure :-

4.0

Learning Objectives:
4.1 Intellectual Skills:
(i) To understand the procedure of calculation of quantities of steel, concrete & form work. To develop ability to calculate the quantities of steel, concrete , form work and entering them in a measurement sheet. 19

4.2

Motor Skills:
(i)

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION

Exercise No. 3

Estimating And Costing

5.0

Procedure :1) 2) 3) 4) 5) 6) 7) 8) 9) 10) 11) Study the given drawings carefully. Finalise the items of the work with their units of measurements. Prepare the check list of the items. Write brief description of each item of the work on the measurement sheet. Calculate length, width & depth of different components for calculation of quantity of concrete & form work. Calculate the quantity of form work for beam, column. (One sample). Enter the length, width/breath & depth/height in measurement sheet for concrete & form work item. Prepare bar bending schedule. Calculate the length of bars of different diameter in different components such as slab, beam, column, footing etc. Calculate the number of bars of different diameter in different components. Enter the number, length & weight of bar for different bars in different components in Bar bending schedule. Calculate the quantities of items of the work in the measurement sheet.

20

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION

Estimating And Costing

Exercise No. 3

6.0

Observation & Calculation


MEASUREMENT SHEET (Student to write description)

Name of work: .................

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION

21

Exercise No. 3

Estimating And Costing

MEASUREMENT SHEET (Student to write description) Name of work: .................

22

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION

Estimating And Costing

Exercise No. 3

MEASUREMENT SHEET (Student to write description) Name of work: .................

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION

23

Exercise No. 3

Estimating And Costing

MEASUREMENT SHEET (Student to write description) Name of work: .................

24

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION

Estimating And Costing

Exercise No. 3

MEASUREMENT SHEET (Student to write description) Name of work: .................

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION

25

Exercise No. 3

Estimating And Costing

BAR BENDING SCHEDULE

26

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION

Estimating And Costing

Exercise No. 3

BAR BENDING SCHEDULE

Total Quantity =

Quintal

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION

27

Exercise No. 3

Estimating And Costing

7.0

Result :The quantities of each items of work are calculated and entered in measurement sheet against each item with their unit of measurement

8.0

Questions :Note: Distribute 3-5 questions to each student for writing the answers in the manual. 1) A R.C.C. simply supported beam of size 280 mm x 620 mm is reinforced with 4 Nos. of 18 mm diameter main bars. Main bars are placed in one row and two bars are bent up. Two anchor bars are provided at top and are of 12 mm diameter. 6 mm diameter stirrups are provided at 150 mm c/c. The span of beam is 5.5 m and end bearing is 25 cm. Calculate the total quantity of steel reinforcement. Calculate the quantity of the formwork for the beam in Problem 1. A R.C.C. simply supported slab of clear size 3.1 m X 6.3 m is reinforced with 12 mm diameter bars with spacing of 12 cm c/c.. Alternate bars are bent up. Distribution steel is of 6 mm diameter with spacing of 14 cm c/c.Thickness of slab is 10 cm. Bearing of slab is 15 cm. I) Prepare bar bending schedule ii) calculate the quantity of reinforcement. Calculate the quantity of formwork for the above problem. Calculate the quantity of concrete for the beam in problem 1. How Steel quantity is calculated by using percentages? Compare the quantity of steel reinforcement for column footings calculated by bar bending schedule and by percentages. Compare the quantity of steel reinforcement for column calculated by bar bending schedule and by percentages. Compare the quantity of steel reinforcement for Beam calculated by bar bending schedule and by percentages. Compare the quantity of steel reinforcement for Slab calculated by bar bending schedule and by percentages.

2) 3)

4) 5) 6) 7) 8) 9) 10)

9.0

Answer :-

28

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION

Estimating And Costing

Exercise No. 3

(Space for Answers)

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION

29