You are on page 1of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. : REF. DWG DWG.

TITLE ITEMS

FRONTIER EGRON BUILDING 16 June 2010 3 August 2010 4 August 2010

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS : CE-2 : GENERAL LAYOUT @ PLANT ELEV. 0.00M : AREAS Warehouse Office Meeting Room Forklift Station / Battery Charger Electrical Room A/C Mat Stor AHU Room NDC Warehouse Packaging Change parts and mechanic workbench Lift Corridor Stairwell-1 Utility Room-1 shoe change Lecithin Dosing NDC Egron Sieve Cleaning Laminate Feeding Station AC AHU AD Heating Coil Utility Room-2 Stairwell-2 Covered Walkway Wet Tipping Station Dry Tipping Station NDC Stripping station Stripping Pre-mix preparation room NDC Process Room Butter Oil Handling Butter Oil Heating & Storage Pump Area NDC Liquid Handling Loading Bay Rapid Shutter Dock Leveller REF. DWG DWG. TITLE ITEMS : CE-3 : FLOOR PLAN @ ELEV. 0.0M : ENLARGED PLAN SAME DETAILS AS ABOVE : CE-4 : INT. 1ST FLOOR PLAN ELEV. 4.0M : AREAS AHU Room Blower Discharge Side Blower Room Filling Room Seismic Joint

Columns on GL 69 to be aligned to GL 68' Columns on GL Za' to be aligned to GL Ya Sheet CE-3 indicates a column on Grid Ia (NDC Liquid Handling Station 1&2) but no structural plan on sheet S-6

REF. DWG DWG. TITLE ITEMS

Columns on GL 69 to be aligned to GL 68' Columns on GL Za' to be aligned to GL Ya

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 1 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. :

FRONTIER EGRON BUILDING 16 June 2010 3 August 2010 4 August 2010

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS REF. DWG DWG. TITLE ITEMS : CE-5 : FIRST FLOOR FLOOR PLAN ELEV. 8.0M : AREAS Filling Machine Silos Big Bag Silo Powder Silo Room Hallway Fine Separators AHU Silo Room Secondary Air Fans 1 Control Room Roof Deck 900mm High Parapet Wall Blower Room MCC Ingredients handling MDWT Room Office Area 1 Office Area 2 AHU Blower Room AHU Sipping : CE-6 : INT. 2ND FLOOR PLAN (ELEV. +11.50M) : AREAS Powder Silo Room Filter Room Roof Deck elev. 8.0M Roof Deck elev. 10.0M 900mm High Parapet Wall : CE-7 : SECOND FLOOR PLAN @ ELEV. 15.0M : AREAS Powder Silo Room Hallway Egron Air Heater Air Passage Server Room AHU Raw Mat. Roof Deck elev. 8.0M Roof Deck elev. 10.0M MCC Room : CE-8 : THIRD FLOOR PLAN @ ELEV. 18.50M : AREAS Powder Silo Room Hallway MCC Control Room Main Distribution Panels Rm. Trafo Vault Rm Roof Deck

GL 72-78 has no structural plan on sheet 24

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE ITEMS

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 2 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. :

FRONTIER EGRON BUILDING 16 June 2010 3 August 2010 4 August 2010

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS REF. DWG DWG. TITLE ITEMS : CE-9 : FOURTH FLOOR PLAN @ ELEV. 22.10M : AREAS Powder Silo Room Hallway Roof Deck Stair Chimney Lift FIFTH FLOOR PLAN @ ELEV. 29.60M AREAS Powder Silo Room Hallway Fine Separator Egron Exhaust Fans REF. DWG DWG. TITLE ITEMS : CE-10 : INT. SIXTH FLOOR PLAN @ ELEV. 33.0M : AREAS Roof Deck Lift Hallway Egron Stair SIXTH FLOOR PLAN @ ELEV. 36.50M AREAS Roof Deck Lift Hallway Exhaust Air Fans Nossle Cooling Fan Secondary Air Fan 2 Air Passage REF. DWG DWG. TITLE ITEMS : CE-11 : ROOF DECK @ ELEV. 43.0M : AREAS Roof Deck Roof Deck over Stair : CE-12 : SECTION THRU "A" : : CE-13 : SECTION THRU "B" : : CE-14 : SECTION THRU "C" : : CE-15 : SECTION THRU "D" :

REF. DWG DWG. TITLE ITEMS REF. DWG DWG. TITLE ITEMS REF. DWG DWG. TITLE ITEMS REF. DWG DWG. TITLE ITEMS

NO CALL-OUTS

SHOWS A BASEMENT BUT NO DIMENSION

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 3 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. : REF. DWG DWG. TITLE ITEMS REF. DWG DWG. TITLE ITEMS

FRONTIER EGRON BUILDING 16 June 2010 3 August 2010 4 August 2010

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS : CE-16 : SECTION THRU "E" : : CE-17 : SECTION THRU "F" : Ground Flr Elev. 0.0m Nat Ground Flr Elev. -1.3 M Basement Elev. -3.0 M Basement Elev. -4.5 M : CE-20 : STAIR PLANS & SECTIONS : : CE-21 : STAIR DETAILS : Top Rail SS.304 Flat Bar 10mm thk Mid. Rail SS.304 Flat Bar 10mm thk Rail Post SS.304 Flat Bar 10mm thk 12mm rebar Nosing Bars 12mm rebar Hor Bars 16mm rebar Top & Bot Bars 16mm rebar Dowel Bars 10mm rebar Dowel Bars to nosing L 50x50x6mm thk Nosing Protection REF. DWG DWG. TITLE ITEMS REF. DWG DWG. TITLE ITEMS REF. DWG DWG. TITLE ITEMS : CE-22 & CE-23 : STAIR PLANS : : CE-24 : SECTION - C & C" : : CE-25 : STAIR PLANS : @ El. 0 @ El. 4 @ El. 8 @ El. 11.50 : CE-26 : STAIR PLANS : @ El. 15 @ El. 18.5 @ El. 22.10 @ El. 25 MISSING SHEETS: CE-18 & 19 NO CALL-OUTS

REF. DWG DWG. TITLE ITEMS REF. DWG DWG. TITLE ITEMS

NO STAIR DESIGNATIONS NO CALL-OUTS FOR FINISHES

NO STAIR DESIGNATIONS NO CALL-OUTS FOR FINISHES

REF. DWG DWG. TITLE ITEMS

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 4 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. : REF. DWG DWG. TITLE ITEMS

FRONTIER EGRON BUILDING 16 June 2010 3 August 2010 4 August 2010

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS : CE-27 : STAIR PLANS : @ El. 29.6 @ El. 33 @ El. 36.5 : CE-28 : SECTION - A : Section of Stairs showing no. Of steps : CE-29 : STAIR PLANS : @ El. 22.10 @ El. 29.5 @ El. 34 @ El. 38.5 @ El. 43 150mm thk DAM REF. DWG DWG. TITLE ITEMS : CE-30 : SECTION - C : DAM Detail 10mm Bar Door Frame : S-1 : GENERAL NOTES : Grade 40 rebars Notice of pouring at least 4 days wet curing min of 10 days Footings, FTB Columns Beams and Girders CHB Load Bearing Wall Floor Slab 4000 psi 4000 psi 4000 psi 1000 psi 4000 psi

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE ITEMS

NOTES ON CONCRETE SLABS Bars along the shorter span shall be placed below those along the long span at the center and over at the supports. Temperature bars for slab shall be generally placed near the face in tension and shall not be be less than 0.0025xBT SCHEDULE OF MIN. SLAB REINFORCEMENT Thickness Minimum Temperature Bars 100mm 10 @ 275mm each way 112.5 10 @ 238mm each way 125 10 @ 212mm each way 137.5 10 @ 188mm each way 150 10 @ 175mm each way Provide extra reinforcements for corner slab (two adj discont edges as shown below) 10mm top & bot bars @ 0.20m oc. NOTES ON FOOTINGS Footing shall rest at least 1.50m below finished grade line unless otherwise indicated.

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 5 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. :

FRONTIER EGRON BUILDING 16 June 2010 3 August 2010 4 August 2010

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS MASONRY UNITS SCHEDULE OF CHB AND CERAMIC BLOCK REINFORCEMENT THK HOR VERT NOTES 75mm 10mm every 3 layer 10mm @ 600mm oc A. Min laps at splice = 0.25m 100mm 10mm @ 600mm oc B. Provide right angled reinforcement @ corners 0.92m long 1500mm 12mm @ 600mm oc C. Where CHB or ceramic block walls adjoin col RC Beams & Wall dowels with the same as vert or hor reinf shall be provided 200mm 12mm every 3 layer 10mm @ 600mm oc PROVIDE HOR AND VERT STIFFENER BEAMS AND COLUMNS AT 3000mm OC. TYP NOTES ON CONCRETE WALLS Wall Thk Hor 100mm 10 @ 250mm oc 125mm 10 @ 200mm oc 150mm 12 @ 250mm oc 175mm 12 @ 250mm oc 200mm 10 @ 250mm oc 225mm 10 @ 200mm oc 250mm 12 @ 300mm oc

Vert 10 @ 300mm oc 10 @ 250mm oc 12 @ 300mm oc 12 @ 250mm oc 10 @ 300mm ocef 10 @ 250mm ocef 12 @ 350mm ocef

Remarks Hor Bars @ center, vert bars stag outside Both Faces hor bars shall be outside

min cover 25mm All openings in walls 250mm or larger shall be reinforced around with 2-20 Bars for 225mm, 175mm, 150mm walls. Use 2-16mm bars for 125mm and 100mm walls use 2-12mm bars All wall spanning openings shall have vertical reinf bent 2-bars U-form like stirrups and spaced according to the schedule unless otherwise noted Provide framing stiffener columns and stiffener beams not more than 3.0m apart. Stiffener columns shall have a width equal to the wall thickness but not less than 115mm. 200x175mm stiffener cols, beams with 4-12mm with 10mm ties @ 200mm oc. NOTES ON COLUMNS AND PEDESTALS 1. For all tied columns and pedestals provide extra 4 sets of ties at 100mm oc for column reinf just above the floor, just below the girder, and at construction joints. NOTES ON BEAMS AND GIRDERS 1. If beam reinforcing bars end in a wall, the clear distance from the bar to the farther face of the wall shall not be less than 25mm. Embedment length shall be shown in table "A" for tension bars and Table "B" for compression bars. 2. When a beam crosses a girder, rest beam bars on top of girder bars, beam reinforcing bars shall be symmetrical about the centerline whenever possible. REINFORCING CONCRETE LINTEL BEAM IN CONCRETE BLOCK WALLS Clear Span L Total Length L+40 m 1.2 1.5 1.8 2.1 2.4 2.7 3 3.3 3.6 1.6 1.9 2.2 2.5 2.8 3.1 3.4 3.7 4 Min. Fc' Mpa Height of Lintel cm 19.08 19.08 19.08 19.08 19.08 19.08 29.08 29.08 29.08 Reinf. Bot 1-10 1-10 1-10 1-16 1-16 1-20 1-16 1-16 1-16 Wt of LB Top 1-10 1-10 1-10 1-10 1-10 1-10 1-10 1-10 1-10 170 203 235 266 299 331 544 592 640

13.8 13.8 13.8 17.2 17.2 17.2 17.2 17.2 17.2

NOTES ON SLAB ON GRADE Addition of 15% flyash type "F" by weight of cement shall be made on the slab concrete Continuous wet curing of concrete by ponding shall be done for at least 14 days warehouse slab shall be burnished floor finish. STRUCTURAL STEEL Wide flange, angles, channels, plates shall be ASTM A36. Built up members shall be ASTM A36 All bolts, nuts, and washers shall conform to A307 or A325 unless otherwise indicated. Anchor bolts shall likewise be of equal strength as A325 bolts of the same size. QUALITY CONTROL Every batch of structural steel shape for fabrication shall have the manufacturer's mill certificate showing their chemical and physical properties. Use E70 Electrodes for all welds in structural steel

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 6 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. : REF. DWG DWG. TITLE ITEMS

FRONTIER EGRON BUILDING 16 June 2010 3 August 2010 4 August 2010

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS : S-2 : GENERAL NOTES : Column typical section details Column splice Details/Ties location Bending pattern for ties of column : S-3 : GENERAL NOTES : DEVELOPMENT LENGTH Rebar splices devt shall not be placed in the area of maximum stress Devt for top reinf of beam and slab shall be placed at midspan Devt for bot reinf shall be placed at the support area Devt shall not be placed in the area where main beam and secondary beam intersect. : S-4 : GENERAL NOTES : Reinforcement detail of wall intersection (non shearwall) CONCRETE COVER FOR REINFORCMENT Structural Element Condition Slab and Walls Concrete not exposed to weather or in contact with ground Concrete exposed to earth or weather 36 and smaller 20 through 36 16, W31 or 31 wire and smaller Primary reinforcement Ties, stirrups, spirals 16, W31 or 31 wire and smaller 20 through 36 16, W31 or 31 wire and smaller 20 through 36 36 and smaller all diameters

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE ITEMS

Minimum Concrete Cover (mm) CIP Conc (non prestressed) 25 50 40 40 40 50 50 15 20 70

Prestressed 20 50

Beam and Column

Concrete not exposed to weather or in contact with ground Concrete exposed to earth or weather

40 20 40 10 db but not less than 20 20 70

Shells, folded plate members Precast Wall Panels Concrete in contact with earth

Concrete not exposed to weather or in contact with ground Concrete exposed to earth or weather Concrete cast against and permanently exposed to earth

Concrete cover is measured from the concrete surface to the outer most surface of the steel to which the cover requirement applies. REF. DWG DWG. TITLE ITEMS : S-5 : GUIDE ON BURIED CREEK WORKS : Buried creek materials shall be overexcavated and replaced by cyclopean concrete under the direction of the Engineer of Record. Cyclopean concrete shall consist of equipment dumped cobbles which shall be grouted in layers of max 1.0 m thick. Cement grout mix shall be type 1P cement sand and water based on the following proportions C:S:W 1:2:1 with plasticizer. Unit rate quantities shall be as per bid item entry. Pay item for cement grout shall be based on bag of cement used.

REF. DWG DWG. TITLE ITEMS

: S-6 : FOUNDATION PLAN : Footing Column F-10 C-1 F-9 C-1 F-5 C-3 F-10 C-1 F-1 C-4 F-10 C-2 F-3 C-2 F-7 C-1 F-7 C-2 F-2 C-2

QTY F-1 F-2 F-3 F-4 F-5 F-6 F-7 F-8 F-9 F-10 1 1 1 1 1 2 3 4 3 5 C-1 C-2 C-3 C-4 C-5 C-6 C-7 C-8 C-9 C-10

QTY 22 3 2 2 4 27 14 8 5

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 7 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. :

FRONTIER EGRON BUILDING 16 June 2010 3 August 2010 4 August 2010 F-8 F-4 F-9 NONE NONE NONE NONE NONE NONE C-1 C-1 C-2 C-6 C-7 C-8 C-9 C-10 C-11 C-11 C-12 C-13 C-14 C-15

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS 27 8 NO FOOTING DESIGNATION NO FOOTING DESIGNATION NO FOOTING DESIGNATION NO FOOTING DESIGNATION NO FOOTING DESIGNATION NO FOOTING DESIGNATION

SC SC-1 Footing Tie Beam FTB-1: L=6 L=8 L=7 L=4 L=11.9 FTB-2: L=9 L=8 L=7 L=6 L=11 L=11 QTY 17 6 1 3 1 18 6 3 1 3 1

FTB-3: FTB-4:

Shear Wall SW-1 SW-2 SW-3 WF-1 Seismic Joint REF. DWG DWG. TITLE ITEMS : S-7 : SLAB ON GRADE : Construction Joint Detail Waiting Rebars for boundary element to be encased in lean concrete Isolation Joint EWWM 6x6xW4xW4 150mm thk CHB Load Bearing Wall plastered on both sides Seismic Joint : S-8 : TYP. COL/FTG. DET. SCHED OF FOOTINGS, SLAB ON GRADE DETAIL, JOINT DETAILS : Elastomeric joint sealant Non-extruding type joint filler 8 mil thk polyethylene vapor barrier 150mm thk gravel base course compacted to 95% MDD based on ASTM D-698 to slab on grade 200mm thk gravel base course compacted to 95% MDD based on ASTM D-698 to footing 75mm clear Subgrade compacted to 95% MDD based on ASTM D-698 Footing schedule F-1 to F-10

REF. DWG DWG. TITLE ITEMS

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 8 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. :

FRONTIER EGRON BUILDING 16 June 2010 3 August 2010 4 August 2010

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS NOTE: Footing subgrade: remove all localized soft spots and replace with engineered granular fill compacted to 95% MDD based on ASTM D-698 Swelling soils prevalent in area. Remove and replace with engineered fill. Provide 15% flyash to attain denser mix fc'=27.6 MPa Saw cut for transverse dummy groove joint shall be done by diamond saw cutter before concrete has sufficiently hardened. Sawed joint to be filled with field molded elastomeric sealant, 6mm groove Longitudinal Construction Joint Detail: waterproof paper sheath after greasing rod sealant CIP portion of dowel D25mm D25mm plain rod @300mm o.c. Typ. Isolation Joint 10mm rebars Non-extruding type joint filler, 9mm groove Joint Sealant REF. DWG DWG. TITLE ITEMS : S-9 : SCHEDULE OF COLUMNS : 10mm def. Bar 25mm def. Bar : S-10 : FTB DETAIL, WF DETAIL, SCHEDULE OF COLUMNS : 10mm def. Bar 25mm def. Bar Elastomeric joint sealant Non-extruding type joint filler 8 mil thk polyethylene vapor barrier 100mm thk gravel base course compacted to 95% MDD based on ASTM D-698 to slab on grade 150mm thk CHB Wall (exterior) 12mm vert bar @600mm o.c. 12mm hor bar @ every 3 layers of CHB Plastered finish Mortar Seating 100mm thk CHB Wall (interior) 10mm vert bar @600mm o.c. 10mm hor bar @ every 3 layers of CHB Plastered bothways Mortar Seating WF-1 8 mil thk polyethylene vapor barrier REF. DWG DWG. TITLE ITEMS : S-11 : SHEARWALL FOUNDATION DETAILS : 25mm rebar : S-12; S-13; S-14 : SHEARWALL - 1a DETAILS; 1b; 1c : 12mm rebar Boundary hoops 16mm rebar Horizontal Bars

REF. DWG DWG. TITLE ITEMS

THICKNESS OF GRAVEL BED ON THIS SHEET CONFLICTS WITH S-8 150mm thk CHB Load Bearing as stated on sheet S-7. verify.

REF. DWG DWG. TITLE ITEMS

SHEARWALL CALL-OUTS ON SHEET S-6 ARE SW-1, SW-2, & SW-3

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 9 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. :

FRONTIER EGRON BUILDING 16 June 2010 3 August 2010 4 August 2010 20mm rebar Vertical Bars 25mm rebar Vertical Bars 325mm thk shearwall from foundation to el. 4.0m 250mm thk shearwall from El. 4.0m to El. 43.0m

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

REF. DWG DWG. TITLE ITEMS

: S-15 : SHEARWALL 1a, 2a, & 3a SECTION DETAILS : 12mm Web Hoop Ties 12mm Ties @ every 3rd bar @ 300mm oc. (Vertical) 20mm rebar 25mm rebar : S-16 : SHEARWALL 2a DETAILS : 12mm rebar 16mm rebar 20mm rebar 25mm rebar : S-17 : SHEARWALL 2b DETAILS : 12mm rebar 16mm rebar 20mm rebar 25mm rebar 350mm thk shearwall from El. 0.0m to el. 11.5m 300mm thk shearwall from El. 11.5m to El. 22.10m 250mm thk shearwall from El. 22.10m to El. 43.0m : S-18 : SHEARWALL 2c DETAILS BOUNDARY ELEMENT DETAILS STIFFENER ZONE DETAILS : SHEARWALL 2c DETAILS 16mm rebar 25mm rebar 350mm thk shearwall from foundation to el. 4.0m 300mm thk shearwall from El. 4.0m to El. 11.5m BOUNDARY ELEMENT DETAILS 12mm rebar 25mm rebar STIFFENER ZONE DETAILS 12mm rebar

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE

ITEMS

REF. DWG DWG. TITLE ITEMS

: S-19 : SHEARWALL SECTION DETAILS SHEARWALL ELEVATION DETAILS : 12mm rebar 20mm rebar 25mm rebar : S-20 : SHEARWALL OPENING DETAILS :

REF. DWG DWG. TITLE ITEMS

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 10 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. :

FRONTIER EGRON BUILDING 16 June 2010 3 August 2010 4 August 2010 TYPE I: 2850mmx2800mm Opening TYPE II: 1850mmx1200mm Opening TYPE III: 1850mmx1200mm Opening 16mm rebar 25mm rebar

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

REF. DWG DWG. TITLE ITEMS

: S-21 : TYPICAL SHEARWALL CONNECTIONS :

NO CALL-OUTS

REF. DWG DWG. TITLE ITEMS

: S-22 : INT. 1ST FLOOR FRAMING PLAN (ELEV. 4.0M) SHOWING BEAM DESIGNATIONS : BEAM 1iB-1 1iB-2 1iB-3 1iB-4 1iB-5 1iB-6 1iB-7 1iB-8 1iB-9 1iB-10 1iB-11 1iB-12 1iB-13 1iB-14 1iG-1 1iG-2 1iG-3 1iG-4 1iG-5 1iG-6 1iG-7 1iG-8 1iG-9 1iG-10 1iG-11 1iG-12

SOME BEAMS HAVE NO CALL-OUTS

REF. DWG DWG. TITLE ITEMS

: S-23 : INT. 1ST FLOOR FRAMING PLAN (ELEV. 4.0M) SHOWING BEAM DESIGNATIONS : 1iS1 1iS2 1iS3 1iS4 1iS5 8S11 S1 S2 S5 S6 : S-24

SOME BEAMS HAVE NO CALL-OUTS

REF. DWG

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 11 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. : DWG. TITLE ITEMS : :

FRONTIER EGRON BUILDING 16 June 2010 3 August 2010 4 August 2010 FIRST FLOOR FRAMING PLAN @ ELEV. 8.0M SHOWING BEAM DESIGNATIONS 1B-1 1B-2 1B-3 1B-4 1B-5 1B-6 1B-7 1B-8 1B-9 1B-10 1B-11 1B-12 1B-13 1B-14 1B-15 1B-16 1B-17 1B-18 1B-19 1B-20 1B-21 1B-22 1B-23 1B-24 1B-25 1B-26 1B-27 1B-28 1G-1 1G-2 1G-3 1G-4 1G-5 1G-6 1G-7 1G-8 1G-9 1G-10 1G-11 1G-12 1G-13 1G-14 1G-15 1G-16 1G-17 1G-18 1G-19 1G-20 1G-21 1G-22 1G-23 1G-24 1G-25 1G-26 1G-27 1G-28 1G-29

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 12 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. :

FRONTIER EGRON BUILDING 16 June 2010 3 August 2010 4 August 2010 1G-30 1G-31 1G-32 DG-1 DG-2 DG-3 DG-4 DG-5 DG-6 DG-7 DG-8 DG-9 DB-1 DB-2 DB-3 TG-1 TG-2 TG-3 TG-4

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

TB-1 TB-2 TB-3 TB-4 REF. DWG DWG. TITLE ITEMS : S-25 : FIRST FLOOR FRAMING PLAN @ ELEV. 8.0M SHOWING SLAB DESIGNATIONS : 1S1 1S2 1S3 1S4 1S5 1S6 1S7 1S8 1S9 1S10 1S11 1S12 1S13 1S14 : S-26 : INT. 2ND FLOOR FRAMING PLAN @ ELEV. 11.50M SHOWING BEAM DESIGNATIONS : 2iB-1 2iB-2 2iB-3 2iB-4 2iB-5 2iB-6 2iB-7 2iB-8 2iB-9

REF. DWG DWG. TITLE ITEMS

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 13 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. :

FRONTIER EGRON BUILDING 16 June 2010 3 August 2010 4 August 2010 2iB-10 2iB-11 2iB-12 2iB-13 2iB-14 2iB-15 2iB-16 2iB-17 2iB-18 RDG-1 RDG-2 RDG-3 RDG-4 RDB-1

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

REF. DWG DWG. TITLE ITEMS

: S-27 : INT. 2ND FLOOR FRAMING PLAN @ ELEV. 11.50M SHOWING SLAB DESIGNATIONS : 2iS1 2iS2 2iS3 2iS4 2iS5 2iS6 2iS7 S1 S2 S3 S4 S5 S6 S7

REF. DWG DWG. TITLE ITEMS

: S-28 : SECOND FLOOR FRAMING PLAN @ ELEV. 15.0M : Roof 2B-1 2B-2 2B-3 2B-4 2B-5 2B-6 2B-7 2B-8 2B-9 2B-10 2B-11 2B-12 2B-13 2B-14 2B-15 2B-16 2B-17 2B-18 2B-19

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 14 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. :

FRONTIER EGRON BUILDING 16 June 2010 3 August 2010 4 August 2010 2B-20 2B-21 2B-22 2B-23 2G-1 2G-2 2G-3 2G-4 2G-5 2G-6 2G-7 2G-8 2G-9 2G-10 2G-11 2G-12 2G-13 2G-14 2G-15 2G-16 2G-17 2G-18 2G-19 2G-20 2G-21 2G-22 2G-23 2G-24

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

REF. DWG DWG. TITLE ITEMS

: S-29 : SECOND FLOOR FRAMING PLAN @ ELEV. 15.0M SHOWING SLAB DESIGNATIONS : 2S1 2S2 2S3 2S4 2S5 2S6 2S7 2S8 2S9 2S10 2S11 2S12 : S-30 : THIRD FLOOR FRAMING PLAN @ ELEV. 18.50M SHOWING BEAM DESIGNATIONS : 3B-1 3B-2 3B-3 3B-4 3B-5 3B-6 3B-7 3B-8 3B-9 3B-10

REF. DWG DWG. TITLE ITEMS

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 15 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. :

FRONTIER EGRON BUILDING 16 June 2010 3 August 2010 4 August 2010 3B-11 3B-12 3B-13 3B-14 3dB-1 3dB-2 3dB-3 3dB-4 3dB-5 3dB-6 3dB-7 3dB-8 3dB-9 3dB-10 3G-1 3G-2 3G-3 3G-4 3G-5 3G-6 3G-7 3G-8 3dG-1 3dG-2 3dG-3 3dG-4 3dG-5 3dG-6

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

REF. DWG DWG. TITLE ITEMS

: S-31 : THIRD FLOOR FRAMING PLAN @ ELEV. 18.50M SHOWING SLAB DESIGNATIONS : 3S1 3S2 3S3 3S4 3S5 3dS1 3dS2 3dS3 3dS4 3dS5 3dS6 3dS7 3dS8 3dS9

REF. DWG DWG. TITLE ITEMS

: S-32 : FOURTH FLOOR FRAMING PLAN @ ELEV. 22.10M SHOWING BEAM DESIGNATIONS : 4iB-1 4iB-2 4iB-3 4iB-4 4iB-5

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 16 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. :

FRONTIER EGRON BUILDING 16 June 2010 3 August 2010 4 August 2010 4iB-6 4iB-7 4iB-8 4iB-9 4iB-10 4iB-11 4iB-12 4iB-13 4iB-14 4iB-15 4iB-16 4iB-17 4iG-1 4iG-2 4iG-3 4iG-4 4iG-5 4iG-6 4iG-7 4iG-8 4iG-9 4iG-10 4iG-11 4iG-12 FOURTH FLOOR FRAMING PLAN @ ELEV. 25.0M SHOWING SLAB DESIGNATIONS 4B-1 4B-2 4B-3 4B-4 4B-5 4B-6 4B-7 4B-8 4B-9 4B-10 4B-11 4B-12 4B-13 4B-14 4G-1 4G-2 4G-3 4G-4 4G-5 4G-6 4G-7 4G-8 4dB-1 4dB-2 4dB-3 4dB-4 4dB-5 4dB-6 4dB-7 4dB-8

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 17 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. :

FRONTIER EGRON BUILDING 16 June 2010 3 August 2010 4 August 2010 4dB-9 4dG-1 4dG-2 4dG-3 4dG-4 4dG-5 4dG-6 4dG-7 4dG-8

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

REF. DWG DWG. TITLE ITEMS

: S-33 : FOURTH FLOOR FRAMING PLAN @ ELEV. 22.10M SHOWING SLAB DESIGNATIONS : 4iS1 4iS2 4iS3 4iS4 4iS5 4iS6 4iS7 4iS8 4iS9 4iS10 4iS11 4iS12 4iS13 4iS14 4iS15 FOURTH FLOOR FRAMING PLAN @ ELEV. 25.0M SHOWING SLAB DESIGNATIONS 4S1 4S2 4S3 4S4 4S5 4S6 4S7 4S8 4S9 4S10 4dS1 4dS2 4dS3 4G900mm High parapet wall NO GIRDER DESIGNATION

REF. DWG DWG. TITLE ITEMS

: S-34 : FIFTH FLOOR FRAMING PLAN @ ELEV. 29.60M SHOWING BEAM DESIGNATIONS : 5B-1 5B-2 5B-3 5B-4

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 18 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. :

FRONTIER EGRON BUILDING 16 June 2010 3 August 2010 4 August 2010 5B-5 5B-6 5B-7 5B-8 5B-9 5B-10 5B-11 5B-12 5B-13 5B-14 5B-15 5B-16 5B-17 5B-18 5B-19 5B-20

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

5G-1 5G-2 5G-3 5G-4 5G-5 5G-6 5G-7 5G-8 5G-9 5G-10 5G-11 5G-12 INT. SIXTH FLOOR FRAMING PLAN @ ELEV. 33.0M SHOWING BEAM DESIGNATIONS 6iB-1 6iB-2 6iB-3 6iB-4 6iB-5 6iB-6 6iB-7 6iB-8 6iB-9 6iB-10 6iB-11 6iB-12 6iB-13 6iB-14 6iB-15 6iB-16 6iB-17 6iB-18

6iG-1 6iG-2 6iG-3 6iG-4 6iG-5 6iG-6 6iG-7

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 19 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. :

FRONTIER EGRON BUILDING 16 June 2010 3 August 2010 4 August 2010 6iG-8 6iG-9 6iG-10 6iG-11 6iG-12 6iG-13 6iG-14 45T

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

REF. DWG DWG. TITLE ITEMS

: S-35 : FIFTH FLOOR FRAMING PLAN @ ELEV. 29.60M SHOWING SLAB DESIGNATIONS : 5S1 5S2 5S3 5S4 5S5 5S6 5S7 5S8 5S9 INT. SIXTH FLOOR FRAMING PLAN @ ELEV. 33.0M SHOWING SLAB DESIGNATIONS 6iS1 6iS2 6iS3 6iS4 6iS5 6iS6 6iS7 6iS8 6iS9

REF. DWG DWG. TITLE ITEMS

: S-36 : SIXTH FLOOR FRAMING PLAN @ ELEV. 36.50M SHOWING BEAM DESIGNATIONS : 6B-1 6B-2 6B-3 6B-4 6B-5 6B-6 6B-7 6B-8 6B-9 6B-10 6B-11 6B-12 6B-13 6B-14 6B-15 6B-16 6B-17

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 20 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. :

FRONTIER EGRON BUILDING 16 June 2010 3 August 2010 4 August 2010 6G-1 6G-2 6G-3 6G-4 6G-5 6G-6 6G-7 6G-8 6G-9 6G-10 6G-11 ROOF DECK FRAMING PLAN @ ELEV. 43.0M SHOWING BEAM DESIGNATIONS RdB-1 RdB-2 RdB-3 RdB-4 RdB-5 RdB-6 RdG-1 RdG-2 RdG-3 RdG-4 RdG-5 RdG-6 RdG-7 RdG-8 RdG-9 RdG-10 RdG-11 RdG-12 RdG-13

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

REF. DWG DWG. TITLE ITEMS

: S-37 : SIXTH FLOOR FRAMING PLAN @ ELEV. 36.50M SHOWING SLAB DESIGNATIONS : 6S1 6S2 6S3 6S4 6S5 6S6 6S7 6S8 6S9 ROOF DECK FRAMING PLAN @ ELEV. 43.0M SHOWING SLAB DESIGNATIONS RdS1 RdS2 RdS3 RdS4

REF. DWG DWG. TITLE

: S-38; S-39; S-40; S-41; S-42; S-43; S-44; S-45; S-46; S-47; S-48; S-49 : SCHEDULE OF BEAMS AND GIRDER

MISSING SHEETS: S-50 AND S-51

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 21 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. : ITEMS :

FRONTIER EGRON BUILDING 16 June 2010 3 August 2010 4 August 2010

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS 10mm rebar 12mm rebar 20mm rebar 25mm rebar REF. DWG DWG. TITLE ITEMS : S-52 TO S-62 : SCHEDULE OF SLABS : 10mm rebar 12mm rebar : S-63 : MODULE SECTIONS : SC-1 Module Sectins @ Grid Za' Module Sectins @ Grid Ya' min 300mm dowel extension : S-65 : MODULE SECTIONS : Module Sectins @ Grid Xa' : S-66 : MODULE SECTIONS : Module Sectins @ Grid Wa' : S-67 : MODULE SECTIONS : Module Sectins @ Grid Va' : S-68 : MODULE SECTIONS : Module Sectins @ Grid Ta : S-69 : MODULE SECTIONS : Module Sectins @ Grid Ta' : S-70 : MODULE SECTIONS : Module Sectins @ Grid Sa' : S-71 : MODULE SECTIONS : Module Sectins @ Grid Ra' : S-73 : MODULE SECTIONS : Module Sectins @ Grid Pa : S-74

REF. DWG DWG. TITLE ITEMS

NO CALL-OUTS

REF. DWG DWG. TITLE ITEMS

MISSING SHEETS: S-64

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE ITEMS

MISSING SHEETS: S-72

REF. DWG

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 22 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. : DWG. TITLE ITEMS : :

FRONTIER EGRON BUILDING 16 June 2010 3 August 2010 4 August 2010 MODULE SECTIONS Module Sectins @ Grid Oa Module Sectins @ Grid Ma

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 23 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. : REF. DWG DWG. TITLE ITEMS

FRONTIER EGRON BUILDING 7 July 2010 3 August 2010 4 August 2010

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS : CE-2 : GENERAL LAYOUT @ PLANT ELEV. 0.00M : AREAS Warehouse Office Meeting Room Forklift Station / Battery Charger Electrical Room A/C Mat Stor AHU Room NDC Warehouse Packaging Change parts and mechanic workbench Lift Corridor Stairwell-1 Utility Room-1 shoe change Lecithin Dosing NDC Egron Sieve Cleaning Laminate Feeding Station AC AHU AD Heating Coil Utility Room-2 Stairwell-2 Covered Walkway Wet Tipping Station Dry Tipping Station NDC Stripping station Stripping Pre-mix preparation room NDC Process Room Butter Oil Handling Butter Oil Heating & Storage Pump Area NDC Liquid Handling Loading Bay Rapid Shutter Dock Leveller REF. DWG DWG. TITLE ITEMS : CE-3 : FLOOR PLAN @ ELEV. 0.0M : ENLARGED PLAN SAME DETAILS AS ABOVE : CE-4 : INT. 1ST FLOOR PLAN ELEV. 4.0M : AREAS AHU Room Blower Discharge Side Blower Room Filling Room Seismic Joint

Columns on GL 69 to be aligned to GL 68' Columns on GL Za' to be aligned to GL Ya Sheet CE-3 indicates a column on Grid Ia (NDC Liquid Handling Station 1&2) but no structural plan on sheet S-6

REF. DWG DWG. TITLE ITEMS

Columns on GL 69 to be aligned to GL 68' Columns on GL Za' to be aligned to GL Ya

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 24 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. :

FRONTIER EGRON BUILDING 7 July 2010 3 August 2010 4 August 2010

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS REF. DWG DWG. TITLE ITEMS : CE-5 : FIRST FLOOR FLOOR PLAN ELEV. 8.0M : AREAS Filling Machine Silos Big Bag Silo Powder Silo Room Hallway Fine Separators AHU Silo Room Secondary Air Fans 1 Control Room Roof Deck 900mm High Parapet Wall Blower Room MCC Ingredients handling MDWT Room Office Area 1 Office Area 2 AHU Blower Room AHU Sipping : CE-6 : INT. 2ND FLOOR PLAN (ELEV. +11.50M) : AREAS Powder Silo Room Filter Room Roof Deck elev. 8.0M Roof Deck elev. 10.0M 900mm High Parapet Wall : CE-7 : SECOND FLOOR PLAN @ ELEV. 15.0M : AREAS Powder Silo Room Hallway Egron Air Heater Air Passage Server Room AHU Raw Mat. Roof Deck elev. 8.0M Roof Deck elev. 10.0M MCC Room : CE-8 : THIRD FLOOR PLAN @ ELEV. 18.50M : AREAS Powder Silo Room Hallway MCC Control Room Main Distribution Panels Rm. Trafo Vault Rm Roof Deck

GL 72-78 has no structural plan on sheet 24

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE ITEMS

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 25 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. :

FRONTIER EGRON BUILDING 7 July 2010 3 August 2010 4 August 2010

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS REF. DWG DWG. TITLE ITEMS : CE-9 : FOURTH FLOOR PLAN @ ELEV. 22.10M : AREAS Powder Silo Room Hallway Roof Deck Stair Chimney Lift FIFTH FLOOR PLAN @ ELEV. 29.60M AREAS Powder Silo Room Hallway Fine Separator Egron Exhaust Fans REF. DWG DWG. TITLE ITEMS : CE-10 : INT. SIXTH FLOOR PLAN @ ELEV. 33.0M : AREAS Roof Deck Lift Hallway Egron Stair SIXTH FLOOR PLAN @ ELEV. 36.50M AREAS Roof Deck Lift Hallway Exhaust Air Fans Nossle Cooling Fan Secondary Air Fan 2 Air Passage REF. DWG DWG. TITLE ITEMS : CE-11 : ROOF DECK @ ELEV. 43.0M : AREAS Roof Deck Roof Deck over Stair : CE-12 : SECTION THRU "A" : : CE-13 : SECTION THRU "B" : : CE-14 : SECTION THRU "C" : : CE-15 : SECTION THRU "D" :

REF. DWG DWG. TITLE ITEMS REF. DWG DWG. TITLE ITEMS REF. DWG DWG. TITLE ITEMS REF. DWG DWG. TITLE ITEMS

NO CALL-OUTS

SHOWS A BASEMENT BUT NO DIMENSION

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 26 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. : REF. DWG DWG. TITLE ITEMS REF. DWG DWG. TITLE ITEMS

FRONTIER EGRON BUILDING 7 July 2010 3 August 2010 4 August 2010

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS : CE-16 : SECTION THRU "E" : : CE-17 : SECTION THRU "F" : Ground Flr Elev. 0.0m Nat Ground Flr Elev. -1.3 M Basement Elev. -3.0 M Basement Elev. -4.5 M : CE-20 : STAIR PLANS & SECTIONS : : CE-21 : STAIR DETAILS : Top Rail SS.304 Flat Bar 10mm thk Mid. Rail SS.304 Flat Bar 10mm thk Rail Post SS.304 Flat Bar 10mm thk 12mm rebar Nosing Bars 12mm rebar Hor Bars 16mm rebar Top & Bot Bars 16mm rebar Dowel Bars 10mm rebar Dowel Bars to nosing L 50x50x6mm thk Nosing Protection REF. DWG DWG. TITLE ITEMS REF. DWG DWG. TITLE ITEMS REF. DWG DWG. TITLE ITEMS : CE-22 & CE-23 : STAIR PLANS : : CE-24 : SECTION - C & C" : : CE-25 : STAIR PLANS : @ El. 0 @ El. 4 @ El. 8 @ El. 11.50 : CE-26 : STAIR PLANS : @ El. 15 @ El. 18.5 @ El. 22.10 @ El. 25 MISSING SHEETS: CE-18 & 19 NO CALL-OUTS

REF. DWG DWG. TITLE ITEMS REF. DWG DWG. TITLE ITEMS

NO STAIR DESIGNATIONS NO CALL-OUTS FOR FINISHES

NO STAIR DESIGNATIONS NO CALL-OUTS FOR FINISHES

REF. DWG DWG. TITLE ITEMS

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 27 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. : REF. DWG DWG. TITLE ITEMS

FRONTIER EGRON BUILDING 7 July 2010 3 August 2010 4 August 2010

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS : CE-27 : STAIR PLANS : @ El. 29.6 @ El. 33 @ El. 36.5 : CE-28 : SECTION - A : Section of Stairs showing no. Of steps : CE-29 : STAIR PLANS : @ El. 22.10 @ El. 29.5 @ El. 34 @ El. 38.5 @ El. 43 150mm thk DAM REF. DWG DWG. TITLE ITEMS : CE-30 : SECTION - C : DAM Detail 10mm Bar Door Frame : S-1 : GENERAL NOTES : Grade 40 rebars Notice of pouring at least 4 days wet curing min of 10 days Footings, FTB Columns Beams and Girders CHB Load Bearing Wall Floor Slab 4000 psi 4000 psi 4000 psi 1000 psi 4000 psi

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE ITEMS

NOTES ON CONCRETE SLABS Bars along the shorter span shall be placed below those along the long span at the center and over at the supports. Temperature bars for slab shall be generally placed near the face in tension and shall not be be less than 0.0025xBT SCHEDULE OF MIN. SLAB REINFORCEMENT Thickness Minimum Temperature Bars 100mm 10 @ 275mm each way 112.5 10 @ 238mm each way 125 10 @ 212mm each way 137.5 10 @ 188mm each way 150 10 @ 175mm each way Provide extra reinforcements for corner slab (two adj discont edges as shown below) 10mm top & bot bars @ 0.20m oc. NOTES ON FOOTINGS Footing shall rest at least 1.50m below finished grade line unless otherwise indicated.

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 28 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. :

FRONTIER EGRON BUILDING 7 July 2010 3 August 2010 4 August 2010

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS MASONRY UNITS SCHEDULE OF CHB AND CERAMIC BLOCK REINFORCEMENT THK HOR VERT NOTES 75mm 10mm every 3 layer 10mm @ 600mm oc A. Min laps at splice = 0.25m 100mm 10mm @ 600mm oc B. Provide right angled reinforcement @ corners 0.92m long 1500mm 12mm @ 600mm oc C. Where CHB or ceramic block walls adjoin col RC Beams & Wall dowels with the same as vert or hor reinf shall be provided 200mm 12mm every 3 layer 10mm @ 600mm oc PROVIDE HOR AND VERT STIFFENER BEAMS AND COLUMNS AT 3000mm OC. TYP NOTES ON CONCRETE WALLS Wall Thk Hor 100mm 10 @ 250mm oc 125mm 10 @ 200mm oc 150mm 12 @ 250mm oc 175mm 12 @ 250mm oc 200mm 10 @ 250mm oc 225mm 10 @ 200mm oc 250mm 12 @ 300mm oc

Vert 10 @ 300mm oc 10 @ 250mm oc 12 @ 300mm oc 12 @ 250mm oc 10 @ 300mm ocef 10 @ 250mm ocef 12 @ 350mm ocef

Remarks Hor Bars @ center, vert bars stag outside Both Faces hor bars shall be outside

min cover 25mm All openings in walls 250mm or larger shall be reinforced around with 2-20 Bars for 225mm, 175mm, 150mm walls. Use 2-16mm bars for 125mm and 100mm walls use 2-12mm bars All wall spanning openings shall have vertical reinf bent 2-bars U-form like stirrups and spaced according to the schedule unless otherwise noted Provide framing stiffener columns and stiffener beams not more than 3.0m apart. Stiffener columns shall have a width equal to the wall thickness but not less than 115mm. 200x175mm stiffener cols, beams with 4-12mm with 10mm ties @ 200mm oc. NOTES ON COLUMNS AND PEDESTALS 1. For all tied columns and pedestals provide extra 4 sets of ties at 100mm oc for column reinf just above the floor, just below the girder, and at construction joints. NOTES ON BEAMS AND GIRDERS 1. If beam reinforcing bars end in a wall, the clear distance from the bar to the farther face of the wall shall not be less than 25mm. Embedment length shall be shown in table "A" for tension bars and Table "B" for compression bars. 2. When a beam crosses a girder, rest beam bars on top of girder bars, beam reinforcing bars shall be symmetrical about the centerline whenever possible. REINFORCING CONCRETE LINTEL BEAM IN CONCRETE BLOCK WALLS Clear Span L Total Length L+40 m 1.2 1.5 1.8 2.1 2.4 2.7 3 3.3 3.6 1.6 1.9 2.2 2.5 2.8 3.1 3.4 3.7 4 Min. Fc' Mpa Height of Lintel cm 19.08 19.08 19.08 19.08 19.08 19.08 29.08 29.08 29.08 Reinf. Bot 1-10 1-10 1-10 1-16 1-16 1-20 1-16 1-16 1-16 Wt of LB Top 1-10 1-10 1-10 1-10 1-10 1-10 1-10 1-10 1-10 170 203 235 266 299 331 544 592 640

13.8 13.8 13.8 17.2 17.2 17.2 17.2 17.2 17.2

NOTES ON SLAB ON GRADE Addition of 15% flyash type "F" by weight of cement shall be made on the slab concrete Continuous wet curing of concrete by ponding shall be done for at least 14 days warehouse slab shall be burnished floor finish. STRUCTURAL STEEL Wide flange, angles, channels, plates shall be ASTM A36. Built up members shall be ASTM A36 All bolts, nuts, and washers shall conform to A307 or A325 unless otherwise indicated. Anchor bolts shall likewise be of equal strength as A325 bolts of the same size. QUALITY CONTROL Every batch of structural steel shape for fabrication shall have the manufacturer's mill certificate showing their chemical and physical properties. Use E70 Electrodes for all welds in structural steel

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 29 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. : REF. DWG DWG. TITLE ITEMS

FRONTIER EGRON BUILDING 7 July 2010 3 August 2010 4 August 2010

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS : S-2 : GENERAL NOTES : Column typical section details Column splice Details/Ties location Bending pattern for ties of column : S-3 : GENERAL NOTES : DEVELOPMENT LENGTH Rebar splices devt shall not be placed in the area of maximum stress Devt for top reinf of beam and slab shall be placed at midspan Devt for bot reinf shall be placed at the support area Devt shall not be placed in the area where main beam and secondary beam intersect. : S-4 : GENERAL NOTES : Reinforcement detail of wall intersection (non shearwall) CONCRETE COVER FOR REINFORCMENT Structural Element Condition Slab and Walls Concrete not exposed to weather or in contact with ground Concrete exposed to earth or weather 36 and smaller 20 through 36 16, W31 or 31 wire and smaller Primary reinforcement Ties, stirrups, spirals 16, W31 or 31 wire and smaller 20 through 36 16, W31 or 31 wire and smaller 20 through 36 36 and smaller all diameters

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE ITEMS

Minimum Concrete Cover (mm) CIP Conc (non prestressed) 25 50 40 40 40 50 50 15 20 70

Prestressed 20 50

Beam and Column

Concrete not exposed to weather or in contact with ground Concrete exposed to earth or weather

40 20 40 10 db but not less than 20 20 70

Shells, folded plate members Precast Wall Panels Concrete in contact with earth

Concrete not exposed to weather or in contact with ground Concrete exposed to earth or weather Concrete cast against and permanently exposed to earth

Concrete cover is measured from the concrete surface to the outer most surface of the steel to which the cover requirement applies. REF. DWG DWG. TITLE ITEMS : S-5 : GUIDE ON BURIED CREEK WORKS : Buried creek materials shall be overexcavated and replaced by cyclopean concrete under the direction of the Engineer of Record. Cyclopean concrete shall consist of equipment dumped cobbles which shall be grouted in layers of max 1.0 m thick. Cement grout mix shall be type 1P cement sand and water based on the following proportions C:S:W 1:2:1 with plasticizer. Unit rate quantities shall be as per bid item entry. Pay item for cement grout shall be based on bag of cement used.

REF. DWG DWG. TITLE ITEMS

: S-6 : FOUNDATION PLAN : Footing Column F-10 C-1 F-9 C-1 F-5 C-3 F-10 C-1 F-1 C-4 F-10 C-2 F-3 C-2 F-7 C-1 F-7 C-2 F-2 C-2

QTY F-1 F-2 F-3 F-4 F-5 F-6 F-7 F-8 F-9 F-10 1 1 1 1 1 2 3 4 3 5 C-1 C-2 C-3 C-4 C-5 C-6 C-7 C-8 C-9 C-10

QTY 22 3 2 2 4 27 14 8 5

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 30 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. :

FRONTIER EGRON BUILDING 7 July 2010 3 August 2010 4 August 2010 F-8 F-4 F-9 NONE NONE NONE NONE NONE NONE C-1 C-1 C-2 C-6 C-7 C-8 C-9 C-10 C-11 C-11 C-12 C-13 C-14 C-15

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS 27 8 NO FOOTING DESIGNATION NO FOOTING DESIGNATION NO FOOTING DESIGNATION NO FOOTING DESIGNATION NO FOOTING DESIGNATION NO FOOTING DESIGNATION

SC SC-1 Footing Tie Beam FTB-1: L=6 L=8 L=7 L=4 L=11.9 FTB-2: L=9 L=8 L=7 L=6 L=11 L=11 QTY 17 6 1 3 1 18 6 3 1 3 1

FTB-3: FTB-4:

Shear Wall SW-1 SW-2 SW-3 WF-1 Seismic Joint REF. DWG DWG. TITLE ITEMS : S-7 : SLAB ON GRADE : Construction Joint Detail Waiting Rebars for boundary element to be encased in lean concrete Isolation Joint EWWM 6x6xW4xW4 150mm thk CHB Load Bearing Wall plastered on both sides Seismic Joint : S-8 : TYP. COL/FTG. DET. SCHED OF FOOTINGS, SLAB ON GRADE DETAIL, JOINT DETAILS : Elastomeric joint sealant Non-extruding type joint filler 8 mil thk polyethylene vapor barrier 150mm thk gravel base course compacted to 95% MDD based on ASTM D-698 to slab on grade 200mm thk gravel base course compacted to 95% MDD based on ASTM D-698 to footing 75mm clear Subgrade compacted to 95% MDD based on ASTM D-698 Footing schedule F-1 to F-10

REF. DWG DWG. TITLE ITEMS

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 31 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. :

FRONTIER EGRON BUILDING 7 July 2010 3 August 2010 4 August 2010

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS NOTE: Footing subgrade: remove all localized soft spots and replace with engineered granular fill compacted to 95% MDD based on ASTM D-698 Swelling soils prevalent in area. Remove and replace with engineered fill. Provide 15% flyash to attain denser mix fc'=27.6 MPa Saw cut for transverse dummy groove joint shall be done by diamond saw cutter before concrete has sufficiently hardened. Sawed joint to be filled with field molded elastomeric sealant, 6mm groove Longitudinal Construction Joint Detail: waterproof paper sheath after greasing rod sealant CIP portion of dowel D25mm D25mm plain rod @300mm o.c. Typ. Isolation Joint 10mm rebars Non-extruding type joint filler, 9mm groove Joint Sealant REF. DWG DWG. TITLE ITEMS : S-9 : SCHEDULE OF COLUMNS : 10mm def. Bar 25mm def. Bar : S-10 : FTB DETAIL, WF DETAIL, SCHEDULE OF COLUMNS : 10mm def. Bar 25mm def. Bar Elastomeric joint sealant Non-extruding type joint filler 8 mil thk polyethylene vapor barrier 100mm thk gravel base course compacted to 95% MDD based on ASTM D-698 to slab on grade 150mm thk CHB Wall (exterior) 12mm vert bar @600mm o.c. 12mm hor bar @ every 3 layers of CHB Plastered finish Mortar Seating 100mm thk CHB Wall (interior) 10mm vert bar @600mm o.c. 10mm hor bar @ every 3 layers of CHB Plastered bothways Mortar Seating WF-1 8 mil thk polyethylene vapor barrier REF. DWG DWG. TITLE ITEMS : S-11 : SHEARWALL FOUNDATION DETAILS : 25mm rebar : S-12; S-13; S-14 : SHEARWALL - 1a DETAILS; 1b; 1c : 12mm rebar Boundary hoops 16mm rebar Horizontal Bars

REF. DWG DWG. TITLE ITEMS

THICKNESS OF GRAVEL BED ON THIS SHEET CONFLICTS WITH S-8 150mm thk CHB Load Bearing as stated on sheet S-7. verify.

REF. DWG DWG. TITLE ITEMS

SHEARWALL CALL-OUTS ON SHEET S-6 ARE SW-1, SW-2, & SW-3

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 32 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. :

FRONTIER EGRON BUILDING 7 July 2010 3 August 2010 4 August 2010 20mm rebar Vertical Bars 25mm rebar Vertical Bars 325mm thk shearwall from foundation to el. 4.0m 250mm thk shearwall from El. 4.0m to El. 43.0m

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

REF. DWG DWG. TITLE ITEMS

: S-15 : SHEARWALL 1a, 2a, & 3a SECTION DETAILS : 12mm Web Hoop Ties 12mm Ties @ every 3rd bar @ 300mm oc. (Vertical) 20mm rebar 25mm rebar : S-16 : SHEARWALL 2a DETAILS : 12mm rebar 16mm rebar 20mm rebar 25mm rebar : S-17 : SHEARWALL 2b DETAILS : 12mm rebar 16mm rebar 20mm rebar 25mm rebar 350mm thk shearwall from El. 0.0m to el. 11.5m 300mm thk shearwall from El. 11.5m to El. 22.10m 250mm thk shearwall from El. 22.10m to El. 43.0m : S-18 : SHEARWALL 2c DETAILS BOUNDARY ELEMENT DETAILS STIFFENER ZONE DETAILS : SHEARWALL 2c DETAILS 16mm rebar 25mm rebar 350mm thk shearwall from foundation to el. 4.0m 300mm thk shearwall from El. 4.0m to El. 11.5m BOUNDARY ELEMENT DETAILS 12mm rebar 25mm rebar STIFFENER ZONE DETAILS 12mm rebar

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE

ITEMS

REF. DWG DWG. TITLE ITEMS

: S-19 : SHEARWALL SECTION DETAILS SHEARWALL ELEVATION DETAILS : 12mm rebar 20mm rebar 25mm rebar : S-20 : SHEARWALL OPENING DETAILS :

REF. DWG DWG. TITLE ITEMS

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 33 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. :

FRONTIER EGRON BUILDING 7 July 2010 3 August 2010 4 August 2010 TYPE I: 2850mmx2800mm Opening TYPE II: 1850mmx1200mm Opening TYPE III: 1850mmx1200mm Opening 16mm rebar 25mm rebar

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

REF. DWG DWG. TITLE ITEMS

: S-21 : TYPICAL SHEARWALL CONNECTIONS :

NO CALL-OUTS

REF. DWG DWG. TITLE ITEMS

: S-22 : INT. 1ST FLOOR FRAMING PLAN (ELEV. 4.0M) SHOWING BEAM DESIGNATIONS : BEAM 1iB-1 1iB-2 1iB-3 1iB-4 1iB-5 1iB-6 1iB-7 1iB-8 1iB-9 1iB-10 1iB-11 1iB-12 1iB-13 1iB-14 1iG-1 1iG-2 1iG-3 1iG-4 1iG-5 1iG-6 1iG-7 1iG-8 1iG-9 1iG-10 1iG-11 1iG-12

SOME BEAMS HAVE NO CALL-OUTS

REF. DWG DWG. TITLE ITEMS

: S-23 : INT. 1ST FLOOR FRAMING PLAN (ELEV. 4.0M) SHOWING BEAM DESIGNATIONS : 1iS1 1iS2 1iS3 1iS4 1iS5 8S11 S1 S2 S5 S6 : S-24

SOME BEAMS HAVE NO CALL-OUTS

REF. DWG

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 34 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. : DWG. TITLE ITEMS : :

FRONTIER EGRON BUILDING 7 July 2010 3 August 2010 4 August 2010 FIRST FLOOR FRAMING PLAN @ ELEV. 8.0M SHOWING BEAM DESIGNATIONS 1B-1 1B-2 1B-3 1B-4 1B-5 1B-6 1B-7 1B-8 1B-9 1B-10 1B-11 1B-12 1B-13 1B-14 1B-15 1B-16 1B-17 1B-18 1B-19 1B-20 1B-21 1B-22 1B-23 1B-24 1B-25 1B-26 1B-27 1B-28 1G-1 1G-2 1G-3 1G-4 1G-5 1G-6 1G-7 1G-8 1G-9 1G-10 1G-11 1G-12 1G-13 1G-14 1G-15 1G-16 1G-17 1G-18 1G-19 1G-20 1G-21 1G-22 1G-23 1G-24 1G-25 1G-26 1G-27 1G-28 1G-29

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 35 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. :

FRONTIER EGRON BUILDING 7 July 2010 3 August 2010 4 August 2010 1G-30 1G-31 1G-32 DG-1 DG-2 DG-3 DG-4 DG-5 DG-6 DG-7 DG-8 DG-9 DB-1 DB-2 DB-3 TG-1 TG-2 TG-3 TG-4

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

TB-1 TB-2 TB-3 TB-4 REF. DWG DWG. TITLE ITEMS : S-25 : FIRST FLOOR FRAMING PLAN @ ELEV. 8.0M SHOWING SLAB DESIGNATIONS : 1S1 1S2 1S3 1S4 1S5 1S6 1S7 1S8 1S9 1S10 1S11 1S12 1S13 1S14 : S-26 : INT. 2ND FLOOR FRAMING PLAN @ ELEV. 11.50M SHOWING BEAM DESIGNATIONS : 2iB-1 2iB-2 2iB-3 2iB-4 2iB-5 2iB-6 2iB-7 2iB-8 2iB-9

REF. DWG DWG. TITLE ITEMS

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 36 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. :

FRONTIER EGRON BUILDING 7 July 2010 3 August 2010 4 August 2010 2iB-10 2iB-11 2iB-12 2iB-13 2iB-14 2iB-15 2iB-16 2iB-17 2iB-18 RDG-1 RDG-2 RDG-3 RDG-4 RDB-1

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

REF. DWG DWG. TITLE ITEMS

: S-27 : INT. 2ND FLOOR FRAMING PLAN @ ELEV. 11.50M SHOWING SLAB DESIGNATIONS : 2iS1 2iS2 2iS3 2iS4 2iS5 2iS6 2iS7 S1 S2 S3 S4 S5 S6 S7

REF. DWG DWG. TITLE ITEMS

: S-28 : SECOND FLOOR FRAMING PLAN @ ELEV. 15.0M : Roof 2B-1 2B-2 2B-3 2B-4 2B-5 2B-6 2B-7 2B-8 2B-9 2B-10 2B-11 2B-12 2B-13 2B-14 2B-15 2B-16 2B-17 2B-18 2B-19

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 37 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. :

FRONTIER EGRON BUILDING 7 July 2010 3 August 2010 4 August 2010 2B-20 2B-21 2B-22 2B-23 2G-1 2G-2 2G-3 2G-4 2G-5 2G-6 2G-7 2G-8 2G-9 2G-10 2G-11 2G-12 2G-13 2G-14 2G-15 2G-16 2G-17 2G-18 2G-19 2G-20 2G-21 2G-22 2G-23 2G-24

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

REF. DWG DWG. TITLE ITEMS

: S-29 : SECOND FLOOR FRAMING PLAN @ ELEV. 15.0M SHOWING SLAB DESIGNATIONS : 2S1 2S2 2S3 2S4 2S5 2S6 2S7 2S8 2S9 2S10 2S11 2S12 : S-30 : THIRD FLOOR FRAMING PLAN @ ELEV. 18.50M SHOWING BEAM DESIGNATIONS : 3B-1 3B-2 3B-3 3B-4 3B-5 3B-6 3B-7 3B-8 3B-9 3B-10

REF. DWG DWG. TITLE ITEMS

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 38 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. :

FRONTIER EGRON BUILDING 7 July 2010 3 August 2010 4 August 2010 3B-11 3B-12 3B-13 3B-14 3dB-1 3dB-2 3dB-3 3dB-4 3dB-5 3dB-6 3dB-7 3dB-8 3dB-9 3dB-10 3G-1 3G-2 3G-3 3G-4 3G-5 3G-6 3G-7 3G-8 3dG-1 3dG-2 3dG-3 3dG-4 3dG-5 3dG-6

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

REF. DWG DWG. TITLE ITEMS

: S-31 : THIRD FLOOR FRAMING PLAN @ ELEV. 18.50M SHOWING SLAB DESIGNATIONS : 3S1 3S2 3S3 3S4 3S5 3dS1 3dS2 3dS3 3dS4 3dS5 3dS6 3dS7 3dS8 3dS9

REF. DWG DWG. TITLE ITEMS

: S-32 : FOURTH FLOOR FRAMING PLAN @ ELEV. 22.10M SHOWING BEAM DESIGNATIONS : 4iB-1 4iB-2 4iB-3 4iB-4 4iB-5

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 39 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. :

FRONTIER EGRON BUILDING 7 July 2010 3 August 2010 4 August 2010 4iB-6 4iB-7 4iB-8 4iB-9 4iB-10 4iB-11 4iB-12 4iB-13 4iB-14 4iB-15 4iB-16 4iB-17 4iG-1 4iG-2 4iG-3 4iG-4 4iG-5 4iG-6 4iG-7 4iG-8 4iG-9 4iG-10 4iG-11 4iG-12 FOURTH FLOOR FRAMING PLAN @ ELEV. 25.0M SHOWING SLAB DESIGNATIONS 4B-1 4B-2 4B-3 4B-4 4B-5 4B-6 4B-7 4B-8 4B-9 4B-10 4B-11 4B-12 4B-13 4B-14 4G-1 4G-2 4G-3 4G-4 4G-5 4G-6 4G-7 4G-8 4dB-1 4dB-2 4dB-3 4dB-4 4dB-5 4dB-6 4dB-7 4dB-8

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 40 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. :

FRONTIER EGRON BUILDING 7 July 2010 3 August 2010 4 August 2010 4dB-9 4dG-1 4dG-2 4dG-3 4dG-4 4dG-5 4dG-6 4dG-7 4dG-8

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

REF. DWG DWG. TITLE ITEMS

: S-33 : FOURTH FLOOR FRAMING PLAN @ ELEV. 22.10M SHOWING SLAB DESIGNATIONS : 4iS1 4iS2 4iS3 4iS4 4iS5 4iS6 4iS7 4iS8 4iS9 4iS10 4iS11 4iS12 4iS13 4iS14 4iS15 FOURTH FLOOR FRAMING PLAN @ ELEV. 25.0M SHOWING SLAB DESIGNATIONS 4S1 4S2 4S3 4S4 4S5 4S6 4S7 4S8 4S9 4S10 4dS1 4dS2 4dS3 4G900mm High parapet wall NO GIRDER DESIGNATION

REF. DWG DWG. TITLE ITEMS

: S-34 : FIFTH FLOOR FRAMING PLAN @ ELEV. 29.60M SHOWING BEAM DESIGNATIONS : 5B-1 5B-2 5B-3 5B-4

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 41 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. :

FRONTIER EGRON BUILDING 7 July 2010 3 August 2010 4 August 2010 5B-5 5B-6 5B-7 5B-8 5B-9 5B-10 5B-11 5B-12 5B-13 5B-14 5B-15 5B-16 5B-17 5B-18 5B-19 5B-20

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

5G-1 5G-2 5G-3 5G-4 5G-5 5G-6 5G-7 5G-8 5G-9 5G-10 5G-11 5G-12 INT. SIXTH FLOOR FRAMING PLAN @ ELEV. 33.0M SHOWING BEAM DESIGNATIONS 6iB-1 6iB-2 6iB-3 6iB-4 6iB-5 6iB-6 6iB-7 6iB-8 6iB-9 6iB-10 6iB-11 6iB-12 6iB-13 6iB-14 6iB-15 6iB-16 6iB-17 6iB-18

6iG-1 6iG-2 6iG-3 6iG-4 6iG-5 6iG-6 6iG-7

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 42 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. :

FRONTIER EGRON BUILDING 7 July 2010 3 August 2010 4 August 2010 6iG-8 6iG-9 6iG-10 6iG-11 6iG-12 6iG-13 6iG-14 45T

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

REF. DWG DWG. TITLE ITEMS

: S-35 : FIFTH FLOOR FRAMING PLAN @ ELEV. 29.60M SHOWING SLAB DESIGNATIONS : 5S1 5S2 5S3 5S4 5S5 5S6 5S7 5S8 5S9 INT. SIXTH FLOOR FRAMING PLAN @ ELEV. 33.0M SHOWING SLAB DESIGNATIONS 6iS1 6iS2 6iS3 6iS4 6iS5 6iS6 6iS7 6iS8 6iS9

REF. DWG DWG. TITLE ITEMS

: S-36 : SIXTH FLOOR FRAMING PLAN @ ELEV. 36.50M SHOWING BEAM DESIGNATIONS : 6B-1 6B-2 6B-3 6B-4 6B-5 6B-6 6B-7 6B-8 6B-9 6B-10 6B-11 6B-12 6B-13 6B-14 6B-15 6B-16 6B-17

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 43 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. :

FRONTIER EGRON BUILDING 7 July 2010 3 August 2010 4 August 2010 6G-1 6G-2 6G-3 6G-4 6G-5 6G-6 6G-7 6G-8 6G-9 6G-10 6G-11 ROOF DECK FRAMING PLAN @ ELEV. 43.0M SHOWING BEAM DESIGNATIONS RdB-1 RdB-2 RdB-3 RdB-4 RdB-5 RdB-6 RdG-1 RdG-2 RdG-3 RdG-4 RdG-5 RdG-6 RdG-7 RdG-8 RdG-9 RdG-10 RdG-11 RdG-12 RdG-13

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

REF. DWG DWG. TITLE ITEMS

: S-37 : SIXTH FLOOR FRAMING PLAN @ ELEV. 36.50M SHOWING SLAB DESIGNATIONS : 6S1 6S2 6S3 6S4 6S5 6S6 6S7 6S8 6S9 ROOF DECK FRAMING PLAN @ ELEV. 43.0M SHOWING SLAB DESIGNATIONS RdS1 RdS2 RdS3 RdS4

REF. DWG DWG. TITLE

: S-38; S-39; S-40; S-41; S-42; S-43; S-44; S-45; S-46; S-47; S-48; S-49 : SCHEDULE OF BEAMS AND GIRDER

MISSING SHEETS: S-50 AND S-51

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 44 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. : ITEMS :

FRONTIER EGRON BUILDING 7 July 2010 3 August 2010 4 August 2010

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS 10mm rebar 12mm rebar 20mm rebar 25mm rebar REF. DWG DWG. TITLE ITEMS : S-52 TO S-62 : SCHEDULE OF SLABS : 10mm rebar 12mm rebar : S-63 : MODULE SECTIONS : SC-1 Module Sectins @ Grid Za' Module Sectins @ Grid Ya' min 300mm dowel extension : S-65 : MODULE SECTIONS : Module Sectins @ Grid Xa' : S-66 : MODULE SECTIONS : Module Sectins @ Grid Wa' : S-67 : MODULE SECTIONS : Module Sectins @ Grid Va' : S-68 : MODULE SECTIONS : Module Sectins @ Grid Ta : S-69 : MODULE SECTIONS : Module Sectins @ Grid Ta' : S-70 : MODULE SECTIONS : Module Sectins @ Grid Sa' : S-71 : MODULE SECTIONS : Module Sectins @ Grid Ra' : S-73 : MODULE SECTIONS : Module Sectins @ Grid Pa : S-74

REF. DWG DWG. TITLE ITEMS

NO CALL-OUTS

REF. DWG DWG. TITLE ITEMS

MISSING SHEETS: S-64

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE ITEMS

MISSING SHEETS: S-72

REF. DWG

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 45 of 217

PROJECT : DATE ISSUED : DATE START : DATE FIN. : DWG. TITLE ITEMS : :

FRONTIER EGRON BUILDING 7 July 2010 3 August 2010 4 August 2010 MODULE SECTIONS Module Sectins @ Grid Oa Module Sectins @ Grid Ma

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 46 of 217

PROJECT : FRONTIER EGRON BUILDING DATE ISSUED : 6 August 2010 DATE START : 10 August 2010 DATE FIN. : REF. DWG DWG. TITLE ITEMS : CE-2 : GENERAL LAYOUT @ PLANT ELEV. 0.00M : AREAS Warehouse Office Meeting Room Forklift Station / Battery Charger Electrical Room A/C Mat Stor AHU Room NDC Warehouse Packaging Change parts and mechanic workbench Lift Corridor Stairwell-1 Utility Room-1 shoe change Lecithin Dosing NDC Egron Sieve Cleaning Laminate Feeding Station AC AHU AD Heating Coil Utility Room-2 Stairwell-2 Covered Walkway Wet Tipping Station Dry Tipping Station NDC Stripping station Stripping Pre-mix preparation room NDC Process Room Butter Oil Handling Butter Oil Heating & Storage Pump Area NDC Liquid Handling Loading Bay Rapid Shutter Dock Leveller REF. DWG DWG. TITLE ITEMS : CE-3 : FLOOR PLAN @ ELEV. 0.0M : ENLARGED PLAN SAME DETAILS AS ABOVE : CE-4 : INT. 1ST FLOOR PLAN ELEV. 4.0M : AREAS AHU Room Blower Discharge Side Blower Room Filling Room Seismic Joint

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

Columns on GL 69 to be aligned to GL 68' Columns on GL Za' to be aligned to GL Ya Sheet CE-3 indicates a column on Grid Ia (NDC Liquid Handling Station 1&2) but no structural plan on sheet S-6

REF. DWG DWG. TITLE ITEMS

Columns on GL 69 to be aligned to GL 68' Columns on GL Za' to be aligned to GL Ya

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 47 of 217

PROJECT : FRONTIER EGRON BUILDING DATE ISSUED : 6 August 2010 DATE START : 10 August 2010 DATE FIN. :

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS REF. DWG DWG. TITLE ITEMS : CE-5 : FIRST FLOOR FLOOR PLAN ELEV. 8.0M : AREAS Filling Machine Silos Big Bag Silo Powder Silo Room Hallway Fine Separators AHU Silo Room Secondary Air Fans 1 Control Room Roof Deck 900mm High Parapet Wall Blower Room MCC Ingredients handling MDWT Room Office Area 1 Office Area 2 AHU Blower Room AHU Sipping : CE-6 : INT. 2ND FLOOR PLAN (ELEV. +11.50M) : AREAS Powder Silo Room Filter Room Roof Deck elev. 8.0M Roof Deck elev. 10.0M 900mm High Parapet Wall : CE-7 : SECOND FLOOR PLAN @ ELEV. 15.0M : AREAS Powder Silo Room Hallway Egron Air Heater Air Passage Server Room AHU Raw Mat. Roof Deck elev. 8.0M Roof Deck elev. 10.0M MCC Room : CE-8 : THIRD FLOOR PLAN @ ELEV. 18.50M : AREAS Powder Silo Room Hallway MCC Control Room Main Distribution Panels Rm. Trafo Vault Rm Roof Deck

GL 72-78 has no structural plan on sheet 24

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE ITEMS

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 48 of 217

PROJECT : FRONTIER EGRON BUILDING DATE ISSUED : 6 August 2010 DATE START : 10 August 2010 DATE FIN. :

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS REF. DWG DWG. TITLE ITEMS : CE-9 : FOURTH FLOOR PLAN @ ELEV. 22.10M : AREAS Powder Silo Room Hallway Roof Deck Stair Chimney Lift FIFTH FLOOR PLAN @ ELEV. 29.60M AREAS Powder Silo Room Hallway Fine Separator Egron Exhaust Fans REF. DWG DWG. TITLE ITEMS : CE-10 : INT. SIXTH FLOOR PLAN @ ELEV. 33.0M : AREAS Roof Deck Lift Hallway Egron Stair SIXTH FLOOR PLAN @ ELEV. 36.50M AREAS Roof Deck Lift Hallway Exhaust Air Fans Nossle Cooling Fan Secondary Air Fan 2 Air Passage REF. DWG DWG. TITLE ITEMS : CE-11 : ROOF DECK @ ELEV. 43.0M : AREAS Roof Deck Roof Deck over Stair : CE-12 : SECTION THRU "A" : : CE-13 : SECTION THRU "B" : : CE-14 : SECTION THRU "C" : : CE-15 : SECTION THRU "D" :

REF. DWG DWG. TITLE ITEMS REF. DWG DWG. TITLE ITEMS REF. DWG DWG. TITLE ITEMS REF. DWG DWG. TITLE ITEMS

NO CALL-OUTS

SHOWS A BASEMENT BUT NO DIMENSION

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 49 of 217

PROJECT : FRONTIER EGRON BUILDING DATE ISSUED : 6 August 2010 DATE START : 10 August 2010 DATE FIN. : REF. DWG DWG. TITLE ITEMS REF. DWG DWG. TITLE ITEMS : CE-16 : SECTION THRU "E" : : CE-17 : SECTION THRU "F" : Ground Flr Elev. 0.0m Nat Ground Flr Elev. -1.3 M Basement Elev. -3.0 M Basement Elev. -4.5 M : CE-20 : STAIR PLANS & SECTIONS : : CE-21 : STAIR DETAILS : Top Rail SS.304 Flat Bar 10mm thk Mid. Rail SS.304 Flat Bar 10mm thk Rail Post SS.304 Flat Bar 10mm thk 12mm rebar Nosing Bars 12mm rebar Hor Bars 16mm rebar Top & Bot Bars 16mm rebar Dowel Bars 10mm rebar Dowel Bars to nosing L 50x50x6mm thk Nosing Protection REF. DWG DWG. TITLE ITEMS REF. DWG DWG. TITLE ITEMS REF. DWG DWG. TITLE ITEMS : CE-22 & CE-23 : STAIR PLANS : : CE-24 : SECTION - C & C" : : CE-25 : STAIR PLANS : @ El. 0 @ El. 4 @ El. 8 @ El. 11.50 : CE-26 : STAIR PLANS : @ El. 15 @ El. 18.5 @ El. 22.10 @ El. 25

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

REF. DWG DWG. TITLE ITEMS REF. DWG DWG. TITLE ITEMS

MISSING SHEETS: CE-18 & 19 NO CALL-OUTS

NO STAIR DESIGNATIONS NO CALL-OUTS FOR FINISHES

NO STAIR DESIGNATIONS NO CALL-OUTS FOR FINISHES

REF. DWG DWG. TITLE ITEMS

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 50 of 217

PROJECT : FRONTIER EGRON BUILDING DATE ISSUED : 6 August 2010 DATE START : 10 August 2010 DATE FIN. : REF. DWG DWG. TITLE ITEMS : CE-27 : STAIR PLANS : @ El. 29.6 @ El. 33 @ El. 36.5 : CE-28 : SECTION - A : Section of Stairs showing no. Of steps : CE-29 : STAIR PLANS : @ El. 22.10 @ El. 29.5 @ El. 34 @ El. 38.5 @ El. 43 150mm thk DAM REF. DWG DWG. TITLE ITEMS : CE-30 : SECTION - C : DAM Detail 10mm Bar Door Frame : S-1 : GENERAL NOTES : Grade 40 rebars Notice of pouring at least 4 days wet curing min of 10 days Footings, FTB Columns Beams and Girders CHB Load Bearing Wall Floor Slab 4000 psi 4000 psi 4000 psi 1000 psi 4000 psi

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE ITEMS

NOTES ON CONCRETE SLABS Bars along the shorter span shall be placed below those along the long span at the center and over at the supports. Temperature bars for slab shall be generally placed near the face in tension and shall not be be less than 0.0025xBT SCHEDULE OF MIN. SLAB REINFORCEMENT Thickness Minimum Temperature Bars 100mm 10 @ 275mm each way 112.5 10 @ 238mm each way 125 10 @ 212mm each way 137.5 10 @ 188mm each way 150 10 @ 175mm each way Provide extra reinforcements for corner slab (two adj discont edges as shown below) 10mm top & bot bars @ 0.20m oc. NOTES ON FOOTINGS Footing shall rest at least 1.50m below finished grade line unless otherwise indicated.

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 51 of 217

PROJECT : FRONTIER EGRON BUILDING DATE ISSUED : 6 August 2010 DATE START : 10 August 2010 DATE FIN. :

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS MASONRY UNITS SCHEDULE OF CHB AND CERAMIC BLOCK REINFORCEMENT THK HOR VERT NOTES 75mm 10mm every 3 layer 10mm @ 600mm oc A. Min laps at splice = 0.25m 100mm 10mm @ 600mm oc B. Provide right angled reinforcement @ corners 0.92m long 1500mm 12mm @ 600mm oc C. Where CHB or ceramic block walls adjoin col RC Beams & Wall dowels with the same as vert or hor reinf shall be provided 200mm 12mm every 3 layer 10mm @ 600mm oc PROVIDE HOR AND VERT STIFFENER BEAMS AND COLUMNS AT 3000mm OC. TYP NOTES ON CONCRETE WALLS Wall Thk Hor 100mm 10 @ 250mm oc 125mm 10 @ 200mm oc 150mm 12 @ 250mm oc 175mm 12 @ 250mm oc 200mm 10 @ 250mm oc 225mm 10 @ 200mm oc 250mm 12 @ 300mm oc

Vert 10 @ 300mm oc 10 @ 250mm oc 12 @ 300mm oc 12 @ 250mm oc 10 @ 300mm ocef 10 @ 250mm ocef 12 @ 350mm ocef

Remarks Hor Bars @ center, vert bars stag outside Both Faces hor bars shall be outside

min cover 25mm All openings in walls 250mm or larger shall be reinforced around with 2-20 Bars for 225mm, 175mm, 150mm walls. Use 2-16mm bars for 125mm and 100mm walls use 2-12mm bars All wall spanning openings shall have vertical reinf bent 2-bars U-form like stirrups and spaced according to the schedule unless otherwise noted Provide framing stiffener columns and stiffener beams not more than 3.0m apart. Stiffener columns shall have a width equal to the wall thickness but not less than 115mm. 200x175mm stiffener cols, beams with 4-12mm with 10mm ties @ 200mm oc. NOTES ON COLUMNS AND PEDESTALS 1. For all tied columns and pedestals provide extra 4 sets of ties at 100mm oc for column reinf just above the floor, just below the girder, and at construction joints. NOTES ON BEAMS AND GIRDERS 1. If beam reinforcing bars end in a wall, the clear distance from the bar to the farther face of the wall shall not be less than 25mm. Embedment length shall be shown in table "A" for tension bars and Table "B" for compression bars. 2. When a beam crosses a girder, rest beam bars on top of girder bars, beam reinforcing bars shall be symmetrical about the centerline whenever possible. REINFORCING CONCRETE LINTEL BEAM IN CONCRETE BLOCK WALLS Clear Span L Total Length L+40 m 1.2 1.5 1.8 2.1 2.4 2.7 3 3.3 3.6 1.6 1.9 2.2 2.5 2.8 3.1 3.4 3.7 4 Min. Fc' Mpa Height of Lintel cm 19.08 19.08 19.08 19.08 19.08 19.08 29.08 29.08 29.08 Reinf. Bot 1-10 1-10 1-10 1-16 1-16 1-20 1-16 1-16 1-16 Wt of LB Top 1-10 1-10 1-10 1-10 1-10 1-10 1-10 1-10 1-10 170 203 235 266 299 331 544 592 640

13.8 13.8 13.8 17.2 17.2 17.2 17.2 17.2 17.2

NOTES ON SLAB ON GRADE Addition of 15% flyash type "F" by weight of cement shall be made on the slab concrete Continuous wet curing of concrete by ponding shall be done for at least 14 days warehouse slab shall be burnished floor finish. STRUCTURAL STEEL Wide flange, angles, channels, plates shall be ASTM A36. Built up members shall be ASTM A36 All bolts, nuts, and washers shall conform to A307 or A325 unless otherwise indicated. Anchor bolts shall likewise be of equal strength as A325 bolts of the same size. QUALITY CONTROL Every batch of structural steel shape for fabrication shall have the manufacturer's mill certificate showing their chemical and physical properties. Use E70 Electrodes for all welds in structural steel

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 52 of 217

PROJECT : FRONTIER EGRON BUILDING DATE ISSUED : 6 August 2010 DATE START : 10 August 2010 DATE FIN. : REF. DWG DWG. TITLE ITEMS : S-2 : GENERAL NOTES : Column typical section details Column splice Details/Ties location Bending pattern for ties of column

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

REF. DWG DWG. TITLE ITEMS

: S-3 : GENERAL NOTES : DEVELOPMENT LENGTH Rebar splices devt shall not be placed in the area of maximum stress Devt for top reinf of beam and slab shall be placed at midspan Devt for bot reinf shall be placed at the support area Devt shall not be placed in the area where main beam and secondary beam intersect. : S-4 : GENERAL NOTES : Reinforcement detail of wall intersection (non shearwall) CONCRETE COVER FOR REINFORCMENT Structural Element Condition Slab and Walls Concrete not exposed to weather or in contact with ground Concrete exposed to earth or weather 36 and smaller 20 through 36 16, W31 or 31 wire and smaller Primary reinforcement Ties, stirrups, spirals 16, W31 or 31 wire and smaller 20 through 36 16, W31 or 31 wire and smaller 20 through 36 36 and smaller all diameters

REF. DWG DWG. TITLE ITEMS

Minimum Concrete Cover (mm) CIP Conc (non prestressed) 25 50 40 40 40 50 50 15 20 70

Prestressed 20 50

Beam and Column

Concrete not exposed to weather or in contact with ground Concrete exposed to earth or weather

40 20 40 10 db but not less than 20 20 70

Shells, folded plate members Precast Wall Panels Concrete in contact with earth

Concrete not exposed to weather or in contact with ground Concrete exposed to earth or weather Concrete cast against and permanently exposed to earth

Concrete cover is measured from the concrete surface to the outer most surface of the steel to which the cover requirement applies. REF. DWG DWG. TITLE ITEMS : S-5 : GUIDE ON BURIED CREEK WORKS : Buried creek materials shall be overexcavated and replaced by cyclopean concrete under the direction of the Engineer of Record. Cyclopean concrete shall consist of equipment dumped cobbles which shall be grouted in layers of max 1.0 m thick. Cement grout mix shall be type 1P cement sand and water based on the following proportions C:S:W 1:2:1 with plasticizer. Unit rate quantities shall be as per bid item entry. Pay item for cement grout shall be based on bag of cement used.

REF. DWG DWG. TITLE ITEMS

: S-6 : FOUNDATION PLAN : Footing Column F-10 C-1 F-9 C-1 F-5 C-3 F-10 C-1 F-1 C-4 F-10 C-2 F-3 C-2 F-7 C-1 F-7 C-2 F-2 C-2

QTY F-1 F-2 F-3 F-4 F-5 F-6 F-7 F-8 F-9 F-10 1 1 1 1 1 2 3 4 3 5 C-1 C-2 C-3 C-4 C-5 C-6 C-7 C-8 C-9 C-10

QTY 22 3 2 2 4 27 14 8 5

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 53 of 217

PROJECT : FRONTIER EGRON BUILDING DATE ISSUED : 6 August 2010 DATE START : 10 August 2010 DATE FIN. : F-8 F-4 F-9 NONE NONE NONE NONE NONE NONE C-1 C-1 C-2 C-6 C-7 C-8 C-9 C-10 C-11 C-11 C-12 C-13 C-14 C-15

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS 27 8 NO FOOTING DESIGNATION NO FOOTING DESIGNATION NO FOOTING DESIGNATION NO FOOTING DESIGNATION NO FOOTING DESIGNATION NO FOOTING DESIGNATION

SC SC-1 Footing Tie Beam FTB-1: L=6 L=8 L=7 L=4 L=11.9 FTB-2: L=9 L=8 L=7 L=6 L=11 L=11 QTY 17 6 1 3 1 18 6 3 1 3 1

FTB-3: FTB-4:

Shear Wall SW-1 SW-2 SW-3 WF-1 Seismic Joint REF. DWG DWG. TITLE ITEMS : S-7 : SLAB ON GRADE : Construction Joint Detail Waiting Rebars for boundary element to be encased in lean concrete Isolation Joint EWWM 6x6xW4xW4 150mm thk CHB Load Bearing Wall plastered on both sides Seismic Joint : S-8 : TYP. COL/FTG. DET. SCHED OF FOOTINGS, SLAB ON GRADE DETAIL, JOINT DETAILS : Elastomeric joint sealant Non-extruding type joint filler 8 mil thk polyethylene vapor barrier 150mm thk gravel base course compacted to 95% MDD based on ASTM D-698 to slab on grade 200mm thk gravel base course compacted to 95% MDD based on ASTM D-698 to footing 75mm clear Subgrade compacted to 95% MDD based on ASTM D-698 Footing schedule F-1 to F-10

REF. DWG DWG. TITLE ITEMS

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 54 of 217

PROJECT : FRONTIER EGRON BUILDING DATE ISSUED : 6 August 2010 DATE START : 10 August 2010 DATE FIN. :

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS NOTE: Footing subgrade: remove all localized soft spots and replace with engineered granular fill compacted to 95% MDD based on ASTM D-698 Swelling soils prevalent in area. Remove and replace with engineered fill. Provide 15% flyash to attain denser mix fc'=27.6 MPa Saw cut for transverse dummy groove joint shall be done by diamond saw cutter before concrete has sufficiently hardened. Sawed joint to be filled with field molded elastomeric sealant, 6mm groove Longitudinal Construction Joint Detail: waterproof paper sheath after greasing rod sealant CIP portion of dowel D25mm D25mm plain rod @300mm o.c. Typ. Isolation Joint 10mm rebars Non-extruding type joint filler, 9mm groove Joint Sealant REF. DWG DWG. TITLE ITEMS : S-9 : SCHEDULE OF COLUMNS : 10mm def. Bar 25mm def. Bar : S-10 : FTB DETAIL, WF DETAIL, SCHEDULE OF COLUMNS : 10mm def. Bar 25mm def. Bar Elastomeric joint sealant Non-extruding type joint filler 8 mil thk polyethylene vapor barrier 100mm thk gravel base course compacted to 95% MDD based on ASTM D-698 to slab on grade 150mm thk CHB Wall (exterior) 12mm vert bar @600mm o.c. 12mm hor bar @ every 3 layers of CHB Plastered finish Mortar Seating 100mm thk CHB Wall (interior) 10mm vert bar @600mm o.c. 10mm hor bar @ every 3 layers of CHB Plastered bothways Mortar Seating WF-1 8 mil thk polyethylene vapor barrier REF. DWG DWG. TITLE ITEMS : S-11 : SHEARWALL FOUNDATION DETAILS : 25mm rebar : S-12; S-13; S-14 : SHEARWALL - 1a DETAILS; 1b; 1c : 12mm rebar Boundary hoops 16mm rebar Horizontal Bars

REF. DWG DWG. TITLE ITEMS

THICKNESS OF GRAVEL BED ON THIS SHEET CONFLICTS WITH S-8 150mm thk CHB Load Bearing as stated on sheet S-7. verify.

REF. DWG DWG. TITLE ITEMS

SHEARWALL CALL-OUTS ON SHEET S-6 ARE SW-1, SW-2, & SW-3

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 55 of 217

PROJECT : FRONTIER EGRON BUILDING DATE ISSUED : 6 August 2010 DATE START : 10 August 2010 DATE FIN. : 20mm rebar Vertical Bars 25mm rebar Vertical Bars 325mm thk shearwall from foundation to el. 4.0m 250mm thk shearwall from El. 4.0m to El. 43.0m REF. DWG DWG. TITLE ITEMS : S-15 : SHEARWALL 1a, 2a, & 3a SECTION DETAILS : 12mm Web Hoop Ties 12mm Ties @ every 3rd bar @ 300mm oc. (Vertical) 20mm rebar 25mm rebar : S-16 : SHEARWALL 2a DETAILS : 12mm rebar 16mm rebar 20mm rebar 25mm rebar : S-17 : SHEARWALL 2b DETAILS : 12mm rebar 16mm rebar 20mm rebar 25mm rebar 350mm thk shearwall from El. 0.0m to el. 11.5m 300mm thk shearwall from El. 11.5m to El. 22.10m 250mm thk shearwall from El. 22.10m to El. 43.0m : S-18 : SHEARWALL 2c DETAILS BOUNDARY ELEMENT DETAILS STIFFENER ZONE DETAILS : SHEARWALL 2c DETAILS 16mm rebar 25mm rebar 350mm thk shearwall from foundation to el. 4.0m 300mm thk shearwall from El. 4.0m to El. 11.5m BOUNDARY ELEMENT DETAILS 12mm rebar 25mm rebar STIFFENER ZONE DETAILS 12mm rebar REF. DWG DWG. TITLE ITEMS : S-19 : SHEARWALL SECTION DETAILS SHEARWALL ELEVATION DETAILS : 12mm rebar 20mm rebar 25mm rebar : S-20 : SHEARWALL OPENING DETAILS :

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE

ITEMS

REF. DWG DWG. TITLE ITEMS

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 56 of 217

PROJECT : FRONTIER EGRON BUILDING DATE ISSUED : 6 August 2010 DATE START : 10 August 2010 DATE FIN. : TYPE I: 2850mmx2800mm Opening TYPE II: 1850mmx1200mm Opening TYPE III: 1850mmx1200mm Opening 16mm rebar 25mm rebar REF. DWG DWG. TITLE ITEMS : S-21 : TYPICAL SHEARWALL CONNECTIONS :

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

NO CALL-OUTS

REF. DWG DWG. TITLE ITEMS

: S-22 : INT. 1ST FLOOR FRAMING PLAN (ELEV. 4.0M) SHOWING BEAM DESIGNATIONS : BEAM 1iB-1 1iB-2 1iB-3 1iB-4 1iB-5 1iB-6 1iB-7 1iB-8 1iB-9 1iB-10 1iB-11 1iB-12 1iB-13 1iB-14 1iG-1 1iG-2 1iG-3 1iG-4 1iG-5 1iG-6 1iG-7 1iG-8 1iG-9 1iG-10 1iG-11 1iG-12

SOME BEAMS HAVE NO CALL-OUTS

REF. DWG DWG. TITLE ITEMS

: S-23 : INT. 1ST FLOOR FRAMING PLAN (ELEV. 4.0M) SHOWING BEAM DESIGNATIONS : 1iS1 1iS2 1iS3 1iS4 1iS5 8S11 S1 S2 S5 S6 : S-24

SOME BEAMS HAVE NO CALL-OUTS

REF. DWG

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 57 of 217

PROJECT : FRONTIER EGRON BUILDING DATE ISSUED : 6 August 2010 DATE START : 10 August 2010 DATE FIN. : DWG. TITLE ITEMS : : 1B-1 1B-2 1B-3 1B-4 1B-5 1B-6 1B-7 1B-8 1B-9 1B-10 1B-11 1B-12 1B-13 1B-14 1B-15 1B-16 1B-17 1B-18 1B-19 1B-20 1B-21 1B-22 1B-23 1B-24 1B-25 1B-26 1B-27 1B-28 1G-1 1G-2 1G-3 1G-4 1G-5 1G-6 1G-7 1G-8 1G-9 1G-10 1G-11 1G-12 1G-13 1G-14 1G-15 1G-16 1G-17 1G-18 1G-19 1G-20 1G-21 1G-22 1G-23 1G-24 1G-25 1G-26 1G-27 1G-28 1G-29 FIRST FLOOR FRAMING PLAN @ ELEV. 8.0M SHOWING BEAM DESIGNATIONS

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 58 of 217

PROJECT : FRONTIER EGRON BUILDING DATE ISSUED : 6 August 2010 DATE START : 10 August 2010 DATE FIN. : 1G-30 1G-31 1G-32 DG-1 DG-2 DG-3 DG-4 DG-5 DG-6 DG-7 DG-8 DG-9 DB-1 DB-2 DB-3 TG-1 TG-2 TG-3 TG-4

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

TB-1 TB-2 TB-3 TB-4 REF. DWG DWG. TITLE ITEMS : S-25 : FIRST FLOOR FRAMING PLAN @ ELEV. 8.0M SHOWING SLAB DESIGNATIONS : 1S1 1S2 1S3 1S4 1S5 1S6 1S7 1S8 1S9 1S10 1S11 1S12 1S13 1S14 : S-26 : INT. 2ND FLOOR FRAMING PLAN @ ELEV. 11.50M SHOWING BEAM DESIGNATIONS : 2iB-1 2iB-2 2iB-3 2iB-4 2iB-5 2iB-6 2iB-7 2iB-8 2iB-9

REF. DWG DWG. TITLE ITEMS

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 59 of 217

PROJECT : FRONTIER EGRON BUILDING DATE ISSUED : 6 August 2010 DATE START : 10 August 2010 DATE FIN. : 2iB-10 2iB-11 2iB-12 2iB-13 2iB-14 2iB-15 2iB-16 2iB-17 2iB-18 RDG-1 RDG-2 RDG-3 RDG-4 RDB-1 REF. DWG DWG. TITLE ITEMS : S-27 : INT. 2ND FLOOR FRAMING PLAN @ ELEV. 11.50M SHOWING SLAB DESIGNATIONS : 2iS1 2iS2 2iS3 2iS4 2iS5 2iS6 2iS7 S1 S2 S3 S4 S5 S6 S7 REF. DWG DWG. TITLE ITEMS : S-28 : SECOND FLOOR FRAMING PLAN @ ELEV. 15.0M : Roof 2B-1 2B-2 2B-3 2B-4 2B-5 2B-6 2B-7 2B-8 2B-9 2B-10 2B-11 2B-12 2B-13 2B-14 2B-15 2B-16 2B-17 2B-18 2B-19

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 60 of 217

PROJECT : FRONTIER EGRON BUILDING DATE ISSUED : 6 August 2010 DATE START : 10 August 2010 DATE FIN. : 2B-20 2B-21 2B-22 2B-23 2G-1 2G-2 2G-3 2G-4 2G-5 2G-6 2G-7 2G-8 2G-9 2G-10 2G-11 2G-12 2G-13 2G-14 2G-15 2G-16 2G-17 2G-18 2G-19 2G-20 2G-21 2G-22 2G-23 2G-24 REF. DWG DWG. TITLE ITEMS : S-29 : SECOND FLOOR FRAMING PLAN @ ELEV. 15.0M SHOWING SLAB DESIGNATIONS : 2S1 2S2 2S3 2S4 2S5 2S6 2S7 2S8 2S9 2S10 2S11 2S12 : S-30 : THIRD FLOOR FRAMING PLAN @ ELEV. 18.50M SHOWING BEAM DESIGNATIONS : 3B-1 3B-2 3B-3 3B-4 3B-5 3B-6 3B-7 3B-8 3B-9 3B-10

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

REF. DWG DWG. TITLE ITEMS

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 61 of 217

PROJECT : FRONTIER EGRON BUILDING DATE ISSUED : 6 August 2010 DATE START : 10 August 2010 DATE FIN. : 3B-11 3B-12 3B-13 3B-14 3dB-1 3dB-2 3dB-3 3dB-4 3dB-5 3dB-6 3dB-7 3dB-8 3dB-9 3dB-10 3G-1 3G-2 3G-3 3G-4 3G-5 3G-6 3G-7 3G-8 3dG-1 3dG-2 3dG-3 3dG-4 3dG-5 3dG-6 REF. DWG DWG. TITLE ITEMS : S-31 : THIRD FLOOR FRAMING PLAN @ ELEV. 18.50M SHOWING SLAB DESIGNATIONS : 3S1 3S2 3S3 3S4 3S5 3dS1 3dS2 3dS3 3dS4 3dS5 3dS6 3dS7 3dS8 3dS9 REF. DWG DWG. TITLE ITEMS : S-32 : FOURTH FLOOR FRAMING PLAN @ ELEV. 22.10M SHOWING BEAM DESIGNATIONS : 4iB-1 4iB-2 4iB-3 4iB-4 4iB-5

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 62 of 217

PROJECT : FRONTIER EGRON BUILDING DATE ISSUED : 6 August 2010 DATE START : 10 August 2010 DATE FIN. : 4iB-6 4iB-7 4iB-8 4iB-9 4iB-10 4iB-11 4iB-12 4iB-13 4iB-14 4iB-15 4iB-16 4iB-17 4iG-1 4iG-2 4iG-3 4iG-4 4iG-5 4iG-6 4iG-7 4iG-8 4iG-9 4iG-10 4iG-11 4iG-12 FOURTH FLOOR FRAMING PLAN @ ELEV. 25.0M SHOWING SLAB DESIGNATIONS 4B-1 4B-2 4B-3 4B-4 4B-5 4B-6 4B-7 4B-8 4B-9 4B-10 4B-11 4B-12 4B-13 4B-14 4G-1 4G-2 4G-3 4G-4 4G-5 4G-6 4G-7 4G-8 4dB-1 4dB-2 4dB-3 4dB-4 4dB-5 4dB-6 4dB-7 4dB-8

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 63 of 217

PROJECT : FRONTIER EGRON BUILDING DATE ISSUED : 6 August 2010 DATE START : 10 August 2010 DATE FIN. : 4dB-9 4dG-1 4dG-2 4dG-3 4dG-4 4dG-5 4dG-6 4dG-7 4dG-8

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

REF. DWG DWG. TITLE ITEMS

: S-33 : FOURTH FLOOR FRAMING PLAN @ ELEV. 22.10M SHOWING SLAB DESIGNATIONS : 4iS1 4iS2 4iS3 4iS4 4iS5 4iS6 4iS7 4iS8 4iS9 4iS10 4iS11 4iS12 4iS13 4iS14 4iS15 FOURTH FLOOR FRAMING PLAN @ ELEV. 25.0M SHOWING SLAB DESIGNATIONS 4S1 4S2 4S3 4S4 4S5 4S6 4S7 4S8 4S9 4S10 4dS1 4dS2 4dS3 4G900mm High parapet wall NO GIRDER DESIGNATION

REF. DWG DWG. TITLE ITEMS

: S-34 : FIFTH FLOOR FRAMING PLAN @ ELEV. 29.60M SHOWING BEAM DESIGNATIONS : 5B-1 5B-2 5B-3 5B-4

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 64 of 217

PROJECT : FRONTIER EGRON BUILDING DATE ISSUED : 6 August 2010 DATE START : 10 August 2010 DATE FIN. : 5B-5 5B-6 5B-7 5B-8 5B-9 5B-10 5B-11 5B-12 5B-13 5B-14 5B-15 5B-16 5B-17 5B-18 5B-19 5B-20

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

5G-1 5G-2 5G-3 5G-4 5G-5 5G-6 5G-7 5G-8 5G-9 5G-10 5G-11 5G-12 INT. SIXTH FLOOR FRAMING PLAN @ ELEV. 33.0M SHOWING BEAM DESIGNATIONS 6iB-1 6iB-2 6iB-3 6iB-4 6iB-5 6iB-6 6iB-7 6iB-8 6iB-9 6iB-10 6iB-11 6iB-12 6iB-13 6iB-14 6iB-15 6iB-16 6iB-17 6iB-18

6iG-1 6iG-2 6iG-3 6iG-4 6iG-5 6iG-6 6iG-7

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 65 of 217

PROJECT : FRONTIER EGRON BUILDING DATE ISSUED : 6 August 2010 DATE START : 10 August 2010 DATE FIN. : 6iG-8 6iG-9 6iG-10 6iG-11 6iG-12 6iG-13 6iG-14 45T

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

REF. DWG DWG. TITLE ITEMS

: S-35 : FIFTH FLOOR FRAMING PLAN @ ELEV. 29.60M SHOWING SLAB DESIGNATIONS : 5S1 5S2 5S3 5S4 5S5 5S6 5S7 5S8 5S9 INT. SIXTH FLOOR FRAMING PLAN @ ELEV. 33.0M SHOWING SLAB DESIGNATIONS 6iS1 6iS2 6iS3 6iS4 6iS5 6iS6 6iS7 6iS8 6iS9

REF. DWG DWG. TITLE ITEMS

: S-36 : SIXTH FLOOR FRAMING PLAN @ ELEV. 36.50M SHOWING BEAM DESIGNATIONS : 6B-1 6B-2 6B-3 6B-4 6B-5 6B-6 6B-7 6B-8 6B-9 6B-10 6B-11 6B-12 6B-13 6B-14 6B-15 6B-16 6B-17

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 66 of 217

PROJECT : FRONTIER EGRON BUILDING DATE ISSUED : 6 August 2010 DATE START : 10 August 2010 DATE FIN. : 6G-1 6G-2 6G-3 6G-4 6G-5 6G-6 6G-7 6G-8 6G-9 6G-10 6G-11 ROOF DECK FRAMING PLAN @ ELEV. 43.0M SHOWING BEAM DESIGNATIONS RdB-1 RdB-2 RdB-3 RdB-4 RdB-5 RdB-6 RdG-1 RdG-2 RdG-3 RdG-4 RdG-5 RdG-6 RdG-7 RdG-8 RdG-9 RdG-10 RdG-11 RdG-12 RdG-13

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

REF. DWG DWG. TITLE ITEMS

: S-37 : SIXTH FLOOR FRAMING PLAN @ ELEV. 36.50M SHOWING SLAB DESIGNATIONS : 6S1 6S2 6S3 6S4 6S5 6S6 6S7 6S8 6S9 ROOF DECK FRAMING PLAN @ ELEV. 43.0M SHOWING SLAB DESIGNATIONS RdS1 RdS2 RdS3 RdS4

REF. DWG DWG. TITLE

: S-38; S-39; S-40; S-41; S-42; S-43; S-44; S-45; S-46; S-47; S-48; S-49 : SCHEDULE OF BEAMS AND GIRDER

MISSING SHEETS: S-50 AND S-51

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 67 of 217

PROJECT : FRONTIER EGRON BUILDING DATE ISSUED : 6 August 2010 DATE START : 10 August 2010 DATE FIN. : ITEMS : 10mm rebar 12mm rebar 20mm rebar 25mm rebar REF. DWG DWG. TITLE ITEMS : S-52 TO S-62 : SCHEDULE OF SLABS : 10mm rebar 12mm rebar : S-63 : MODULE SECTIONS : SC-1 Module Sectins @ Grid Za' Module Sectins @ Grid Ya' min 300mm dowel extension : S-65 : MODULE SECTIONS : Module Sectins @ Grid Xa' : S-66 : MODULE SECTIONS : Module Sectins @ Grid Wa' : S-67 : MODULE SECTIONS : Module Sectins @ Grid Va' : S-68 : MODULE SECTIONS : Module Sectins @ Grid Ta : S-69 : MODULE SECTIONS : Module Sectins @ Grid Ta' : S-70 : MODULE SECTIONS : Module Sectins @ Grid Sa' : S-71 : MODULE SECTIONS : Module Sectins @ Grid Ra' : S-73 : MODULE SECTIONS : Module Sectins @ Grid Pa : S-74

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

REF. DWG DWG. TITLE ITEMS

NO CALL-OUTS

REF. DWG DWG. TITLE ITEMS

MISSING SHEETS: S-64

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE ITEMS

REF. DWG DWG. TITLE ITEMS

MISSING SHEETS: S-72

REF. DWG

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 68 of 217

PROJECT : FRONTIER EGRON BUILDING DATE ISSUED : 6 August 2010 DATE START : 10 August 2010 DATE FIN. : DWG. TITLE ITEMS : : MODULE SECTIONS Module Sectins @ Grid Oa Module Sectins @ Grid Ma

PURPOSE OF ISSUANCE: CHECKPRINT

COMMENTS

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office //mrg

Page 69 of 217

Project Location

: EGRON BUILDING : Tanauan, Batangas DIMENSIONS LENGTH WIDTH HEIGHT NO. FACTOR TIMESING

Prepared By : Job No. :

Dars 003 QUANTITY

ITEM

REF.

DESCRIPTION / ANNOTATION

UNIT

LENGTH

AREA

VOLUME

WEIGHT

NO.

I.

GROUND FLOOR PLAN ELEV. 0.0M Elev. Filling /Packing, Big Bag Filling Change Parts & Mechanic Workbench Lift Shoe Change near sieve cleaning Corridor Stairway near shoe change Utility Room AD heating Shoe Change near lecithin tipping Lecithin Tipping Storage for Sieve Moduls Sieve Cleaning Fluidbed Laminate Feeding Station AHU, AD Heating Coil Utility Room near lecithin tipping Shoe Change near lift Stairway near corridor Hallway BBI: MSK (Future) / BBI: Malto dextrin (Future) Dry Tipping Station ( BBI ) Concrete Bench Stripping Area Shoe Change near stripping area Room near pre-mix prepn. RM Pre-mix Prepn. RM. NDC (Future) Wet tiping station (NDC & BBI) AHU - Preblend NDC Process RM. Room near NDC Process RM. Stair Way near NDC Process RM. NDC CIP Sta. NDC Stripping Station Butter Oil Heating & Storage Butter Oil handling NDC Liquid handling Pump Area Warehouse Office Meeting Room Forlift Station / Battery Charger Electrical Room A/C mat. Store AHU Room NDC Warehouse Loading Area TOTAL GROUND FLOOR AREA

5.11 546.40 50.77 11.20 27.89 75.32 45.90 24.52 18.30 36.60 30.91 67.54 339.03 63.56 150.40 31.46 46.15 35.06 770.56 151.99 121.61 9.61 64.35 15.50 57.06 165.63 238.59 190.39 172.61 379.19 33.82 16.43 160.01 129.98 219.60 148.84 435.60 108.00 56.01 24.61 68.21 36.00 72.00 25.20 6,921.12 1,180.49 13,579.12

\\vboxsrv\conversion_tmp\scratch_4\123367954.xls.ms_office mrg_1/8/2013

70 of 70

Project Location

: :

EGRON BUILDING Tanauan, Batangas DIMENSIONS LENGTH WIDTH

ITEM

REF.

DESCRIPTION / ANNOTATION

UNIT

I.

2ND FLOOR PLAN Future Powder Silo Room Lift Hallway Stairway near lift room Finished Product, Sito (NDC / BBI) Room near finished product silo (ndc/bbi) Room near air heater Air Heater Egron MCC / CTRL Room / Server Room Stair Way near ahu AHU Raw Mat Future near AHU Stairway near Future TOTAL 2ND FLOOR AREA ROOF DECK

Prepared By : Job No. : DIMENSIONS HEIGHT NO. FACTOR TIMESING LENGTH

Dars 003 QUANTITY AREA VOLUME WEIGHT

159.05 11.90 140.00 52.70 175.30 87.48 63.60 174.92 242.55 302.45 72.00 48.00 75.90 14.71 1,620.55 3,633.00

NO.

Project Location

: :

EGRON BUILDING Tanauan, Batangas DIMENSIONS LENGTH WIDTH

ITEM

REF.

DESCRIPTION / ANNOTATION

UNIT

I.

3RD FLOOR PLAN Powder Silo Room Lift Hallway Stairway near lift room Big Bag Silo Room near finished product silo (ndc/bbi) Room near air heater Air Heater Egron MCC / CTRL Room Hallway near trafo vault rm & main distribution panels rm. Main Distribution Panels Rm. Trafo Vault Rm. TOTAL 3RD FLOOR AREA ROOF DECK

Prepared By : Job No. : DIMENSIONS HEIGHT NO. FACTOR TIMESING LENGTH

Dars 003 QUANTITY AREA VOLUME WEIGHT NO.

159.05 11.90 140.00 52.70 175.30 87.48 63.60 174.92 242.55 61.20 38.59 74.48 77.49 1,359.25 261.30

Project Location

: :

EGRON BUILDING Tanauan, Batangas DIMENSIONS LENGTH WIDTH

ITEM

REF.

DESCRIPTION / ANNOTATION

UNIT

I.

4th FLOOR PLAN Powder Silo Room Preliminary Detail 1 Preliminary Detail 2 Egron Hallway Lift Stairway near hallway Stairway near Near Preliminary TOTAL 4th FLOOR AREA ROOF DECK

Prepared By : Job No. : DIMENSIONS HEIGHT NO. FACTOR TIMESING LENGTH

Dars 003 QUANTITY AREA VOLUME WEIGHT NO.

159.09 101.72 67.96 242.55 146.24 11.90 45.30 19.48 794.24 574.85

Project Location

: :

EGRON BUILDING Tanauan, Batangas DIMENSIONS LENGTH WIDTH

ITEM

REF.

DESCRIPTION / ANNOTATION

UNIT

I.

5th FLOOR PLAN Powder Silo Room Preliminary Detail Room near Preliminary Detail Fine Separator Hallway Lift Stairway near hallway Stairway near Near Preliminary TOTAL 5th FLOOR AREA ROOF DECK

Prepared By : Job No. : DIMENSIONS HEIGHT NO. FACTOR TIMESING LENGTH

Dars 003 QUANTITY AREA VOLUME WEIGHT NO.

159.09 101.72 67.96 242.55 146.24 11.90 45.30 19.48 794.24 574.85

Project Location

: :

EGRON BUILDING Tanauan, Batangas DIMENSIONS LENGTH WIDTH

ITEM

REF.

DESCRIPTION / ANNOTATION

UNIT

I.

6th FLOOR PLAN Preliminary Detail Room near Preliminary Detail Exhaust air Fans Nossle Cooling Fan / Secondary Air Fan 2 Lift Stairway near hallway Hallway TOTAL 6th FLOOR AREA ROOF DECK

Prepared By : Job No. : DIMENSIONS HEIGHT NO. FACTOR TIMESING LENGTH

Dars 003 QUANTITY AREA VOLUME WEIGHT NO.

101.72 67.96 106.54 126.12 11.90 45.30 146.24 605.79 159.09

`` Project Location

: :

EGRON BUILDING Tanauan, Batangas DIMENSIONS LENGTH WIDTH

ITEM

REF.

DESCRIPTION / ANNOTATION

UNIT

ROOF DECK

Prepared By : Job No. : DIMENSIONS HEIGHT NO. FACTOR TIMESING LENGTH

Dars 003 QUANTITY AREA VOLUME WEIGHT NO.

643.30

Project Location

: :

EGRON BUILDING Tanauan, Batangas DIMENSIONS LENGTH WIDTH

ITEM

REF.

DESCRIPTION / ANNOTATION

UNIT

I.

INTERIOR 1ST FLOOR Blower Room Stairway @ int. First floor Lift AHU Roots Blower Room MCC Room for filling / packing DPP / Pre-Blend Tipping Room TOTAL INTERIOR 1ST FLOOR

II.

INTERIOR 2ND FLOOR Future Bbi / NDC Filter Room Stairway @ int. Second floor TOTAL INTERIOR 2ND FLOOR

III.

INTERIOR 6TH FLOOR Egron Hallway Lift Room near lift Stair near hallway TOTAL INTERIOR 6TH FLOOR

Prepared By : Job No. : DIMENSIONS HEIGHT NO. FACTOR TIMESING LENGTH

Dars 003 QUANTITY AREA VOLUME WEIGHT NO.

167.61 119.66 60.74 83.33 49.60 34.77 93.62 609.33

92.12 219.36 20.01 331.49

101.44 79.62 11.11 66.05 48.96 307.18

Project Location

: :

EGRON BUILDING Tanauan, Batangas

ITEM

REF.

DESCRIPTION / ANNOTATION

I.

GROUND FLOOR (ELEV. + 0.0 MTS) INTERIOR WALLS Filling /Packing, Big Bag Filling Change Parts & Mechanic Workbench Lift

Shoe Change near sieve cleaning Corridor Stairway near corridor Utility near corridor Utility Room corridor Fluidbed Hallway Lecithine tipping Shoe change bet. Utility & Lecithine Sieve Room Shoe Change near sieve cleaning

Stair near shoe chage & utility Utility Near AD heating AC AHU / AD heating coil Laminate Feeding Pump Area Liquid Handling Future Room Stripping Area Shoe Change Room near wet tipping Pre-mix room Room near Dry Tipping Station

Dry tipping Station Wet Tipping station Butter Oil Handling Butter Oil Heating & Storage Process Room Room nnear Process room Cip Station Exterior of hallway Exterior of Filling near dry tipping TOTAL WALL AREA

II.

GROUND FLOOR (ELEV. + 0.0 MTS) TOTAL EXTERIOR WALL AREA INT. IST FLOOR PLAN (ELEV. @ +4.00MTS) INTERIOR WALLS Roots Blower Room Lift MCC Room Stair way Room near Blower PPP Pre-Blend Tipping Utility

III.

Shoe Change bet. Utility & lecithine Lecithine Room Cprridor Liquid Handling Pump Area Sieve Hallway Process Room Cip Room Fluidbed Blower Room Stairs

Dry Tipping Staion Wet Tipping Station Premix Room Butter Handling Butter Oil Heating & Storage TOTAL WALL AREA IV. INT. IST FLOOR PLAN (ELEV. @ +4.00MTS) TOTAL EXTERIOR WALL AREA IST FLOOR PLAN (ELEV. @ +8.00MTS)

V.

INTERIOR WALLS Powder Silo Machine Lift Room near lift Hallway Shoe change near Control room Control Room NDC / BBI Room near Control room Stairs near BBI / NDC Stairs near shoe change Room near shoe change Stairs near explosion Room

Secondary Room Explosion Supression Room Way near Control Room Room near MDWT Stair near Hallway MDWT Room 1 MDWT Room 2 Office Area MCC Room Blower Room Stair near Lift Room near Secondary Air Fan

FFA Tipping Egron TOTAL WALL AREA VI. IST FLOOR PLAN (ELEV. @ +8.00MTS) TOTAL EXTERIOR WALL AREA INT. 2ND FLOOR PLAN (ELEV. @ +11.50MTS) INTERIOR WALLS Powder Silo Machine Lift

VII.

Room near lift Hallway Shoe change FFA tipping Egron Control Room NDC / BBI Stairs near NDC / BBI Room near NDC / BBI Stairs near Contol room Room near filter room Room near filters

Stairs Filter Room Stairs near Hallway TOTAL WALL AREA VIII. INT. 2ND FLOOR PLAN (ELEV. @ +11.50MTS) TOTAL EXTERIOR WALL AREA 2ND FLOOR PLAN (ELEV. @ +15.00MTS) INTERIOR WALLS Powder Silo

IX.

Big Bag Silo lift Room near lift Hallway AHU Egron Room near Air Heating Air Heating Romm MCC / CTRL Room Room near Server Room Stair near AHU BBI / NDC

Stair near BBI / NDC TOTAL WALL AREA X. INT. 2ND FLOOR PLAN (ELEV. @ +15.00MTS) TOTAL EXTERIOR WALL AREA ELEVATION 18.5 - 20.00 MCC BBI / NDC TOTAL WALL AREA

XI.

XII.

THIRD FLOOR PLAN (ELEV. @ 18.50 MTS) INTERIOR WALLS Egron AHU Big Bag Silo Powder Silo lift Room near lift Hallway Stair near Hallway Room near Air Heater

Air Heater Way near Panel Room MCC / AHU Main Distribution Trafo TOTAL WALL AREA XIII. THIRD FLOOR PLAN (ELEV. @ 18.50 MTS) TOTAL EXTERIOR WALL AREA FOURTH FLOOR PLAN (ELEV. @ 22.10 MTS)

XIV.

INTERIOR WALLS Powder Silo lift Room near lift Hallway Stair near Hallway Preliminary Detail Room near Egron Egron Preliminary Detail Room TOTAL WALL AREA

XV.

FOURTH FLOOR PLAN (ELEV. @ 22.10 MTS) TOTAL EXTERIOR WALL AREA FIFTH FLOOR PLAN (ELEV. @ 29.60 MTS) INTERIOR WALLS Powder Silo lift Room near lift Hallway Stair near Hallway Preliminary Detail Room near Egron Egron

XVI.

Preliminary Detail Room TOTAL WALL AREA XVII. FIFTH FLOOR PLAN (ELEV. @ 29.60 MTS) TOTAL EXTERIOR WALL AREA INT. SIXTH FLOOR PLAN (ELEV. @ 33.00 MTS) INTERIOR WALLS Egron Hallway Room near lift

XVIII.

Stair near Hallway lift Preliminary Detail Room Room near Egron TOTAL WALL AREA XIX. INT. SIXTH FLOOR PLAN (ELEV. @ 33.00 MTS) TOTAL EXTERIOR WALL AREA SIXTH FLOOR PLAN (ELEV. @ 36.50 MTS) INTERIOR WALLS

XX.

Preliminary Detail Room Preliminary Detail Room near Egron lift Room near lift Hallway Stair near Hallway Exhaust Air fans Room near Exhaust Air fans TOTAL WALL AREA XXI. SIXTH FLOOR PLAN (ELEV. @ 36.50 MTS)

TOTAL EXTERIOR WALL AREA

Total interior wall area Total exterior wall area

Prepared By :

UNIT

DIMENSIONS LENGTH WIDTH HEIGHT NO. FACTOR TIMESING

Prepared By : Job No. :

Dars 003 QUANTITY

LENGTH

WALL AREA

VOLUME WEIGHT

NO.

816.42 102.48 46.62

128.33 226.93 98.09 80.80 82.89 231.55 318.58 159.34 91.29 60.78 150.63 86.91

124.08 75.53 239.67 158.98 118.80 283.40 187.40 296.24 60.18 268.09 208.46 175.22

176.42 260.11 182.89 48.40 332.86 116.15 195.99 59.70 372.96 6,623.14

1,035.48

102.08 186.71 107.07 102.49 150.58 158.42 85.20

69.60 93.60 245.20 354.25 189.60 156.40 1,257.24 337.27 200.40 323.20 216.65 136.20

183.20 262.42 217.40 96.80 96.80 5,328.76

1,734.82

421.78 40.29 165.03 294.91 87.31 364.91 129.82 53.91 70.56 34.92 58.28

208.71 345.30 274.68 142.20 152.73 14.06 14.06 144.92 138.39 429.39 124.39 131.76

124.89 222.48 4,189.70

1,036.38

429.50 44.07

171.07 316.12 53.16 129.30 227.10 1,277.20 132.13 56.22 88.20 197.33 90.62 190.00

91.72 468.50 158.57 4,120.80

751.74

175.92

194.33 40.29 166.66 180.11 129.15 222.69 113.37 210.84 290.12 90.23 79.28 129.29

52.50 2,074.75

618.81 92.25 56.40

148.65

226.03 97.92 200.07 435.05 41.55 171.55 314.00 160.77 121.14

221.40 298.54 148.88 164.03 163.33 2,764.25

636.47

562.18 54.14 220.42 404.34 206.07 166.50 284.40 180.08 2,078.13

589.09

562.18 54.14 220.42 404.34 206.07 166.50 284.40

180.08 2,078.13

589.09

185.72 404.34 220.42

206.07 54.14 166.50 120.80 1,357.99

455.09

257.73 241.80 81.85 317.70 587.08 294.44 256.40 283.83 2,320.83

687.65

33,085.11 8,134.60

Project Location

: :

EGRON BUILDING Tanauan, Batangas

ITEM

REF.

DESCRIPTION / ANNOTATION

UNIT

DIMENS LENGTH WIDTH

INT. IST FLOOR PLAN (ELEV. @ +4.00MTS) AHU IST FLOOR PLAN (ELEV. @ +8.00MTS) Roof Deck @ Elev. +6.00m. (Above Butter Oil Handling) Roof Deck @ Elev. +8.00m. (Above Process) AHU 2ND FLOOR PLAN (ELEV. @ +15.00MTS) Roof Deck AHU AHU Raw Mat. THIRD FLOOR PLAN (ELEV. @ 18.50 MTS) MCC / AHU Control Rm. AHU ELEV. @ 20.00 MTS Roof Deck ELEV. @ 22.00 MTS Roof Deck ELEV. @ 25.00 MTS Roof Deck INT. SIXTH FLOOR PLAN (ELEV. @ 33.00 MTS) Roof Deck ROOF DECK (ELEV. @ 43.00 MTS)

TOTAL AREA OF WATER PROOFING

Prepared By : Job No. : DIMENSIONS HEIGHT NO. FACTOR TIMESING LENGTH

Dars 003 QUANTITY AREA VOLUME WEIGHT NO.

94.63

385.20 849.60 94.63

3,773.70 94.63 53.12

65.36 94.63

254.40

78.51

519.67

162.56 682.66

7,203.29

Project Location

: :

EGRON BUILDING Tanauan, Batangas DIMENSIONS LENGTH WIDTH

ITEM

REF.

DESCRIPTION / ANNOTATION

UNIT

I.

1ST FLOOR PLAN Powder Silo Machine Lift Room near lift Hallway Shoe change near Control room Control Room NDC / BBI Room near Control room Stairs near BBI / NDC Stairs near shoe change Room near shoe change Stairs near explosion Room Secondary Room Explosion Supression Room Way near Control Room Room near MDWT Stair near Hallway MDWT Room 1 MDWT Room 2 Office Area MCC Room Blower Room Room near Secondary Air Fan FFA Tipping Egron TOTAL 2ND FLOOR AREA ROOF DECK

Prepared By : Job No. : DIMENSIONS HEIGHT NO. FACTOR TIMESING LENGTH

Dars 003 QUANTITY AREA VOLUME WEIGHT NO.

591.99 9.88 57.72 93.43 19.96 297.87 70.90 12.87 25.24 5.65 13.41 143.20 151.19 111.47 61.75 45.30 23.96 23.95 115.30 81.45 796.52 83.33 84.99 242.55 3,163.86 3,633.00

Project Location

: EGRON BUILDING : Tanauan, Batangas

ITEM

REF.

DESCRIPTION / ANNOTATION

UNIT

DIM LENGTH

STAIR @ SECTION A GRID 48-50 STAIR @ SECTION C GRID 51-52 STAIR @ SECTION C GRID 53-54 STAIR @ BASEMENT SECTION B GRID 46-47 STAIR @ ELEV +0.00 SECTION B GRID 49-50 STAIR @ ELEV +0.00 SECTION B GRID 51-52 STAIR @ ELEV +0.00 SECTION B GRID 53-54 STAIR @ ELEV +0.00 SECTION B GRID 54-55 STAIR @ ELEV +0.00 SECTION B GRID 57-59 STAIR @ ELEV +20.00 - +25.00 SECTION B GRID 52-53 STAIR @ ELEV +0.00 - +4 SECTION C GRID 45-47 STAIR @ ELEV +0.00 - +4 SECTION C GRID 47-48 STAIR @ ELEV +0.00 - +4 SECTION C GRID 57-59 STAIR @ ELEV +25.00 - +43.00 SECTION B GRID 50-51

Prepared By : Job No. : DIMENSIONS WIDTH HEIGHT NO. FACTOR TIMESING LENGTH

Dars 003 QUANTITY AREA 69.27 36.90 27.36 7.22 14.44 7.22 3.61 3.61 7.39 11.34 15.12 15.12 33.68 7.39 VOLUME WEIGHT

Y NO.

Project Location

: :

EGRON BUILDING Tanauan, Batangas

ITEM

REF.

DESCRIPTION / ANNOTATION

I.

GROUND FLOOR (ELEV. + 0.0 MTS) DOOR Double Panel Door Single panel Door Roll Up

Auto Roller Door INT. IST FLOOR PLAN (ELEV. @ +4.00MTS) DOOR Double Panel Door Single panel Door IST FLOOR PLAN (ELEV. @ +8.00MTS) DOOR Double Panel Door Single panel Door

INT. 2ND FLOOR PLAN (ELEV. @ +11.50MTS) DOOR Single panel Door 2ND FLOOR PLAN (ELEV. @ +15.00MTS) DOOR Double Panel Door Single panel Door THIRD FLOOR PLAN (ELEV. @ 18.50 MTS) DOOR Double Panel Door

Single panel Door FOURTH FLOOR PLAN (ELEV. @ 22.10 MTS) DOOR Double Panel Door Single panel Door FIFTH FLOOR PLAN (ELEV. @ 29.60 MTS) DOOR Double Panel Door Single panel Door

INT. SIXTH FLOOR PLAN (ELEV. @ 33.00 MTS) DOOR Double Panel Door Single panel Door SIXTH FLOOR PLAN (ELEV. @ 36.50 MTS) DOOR Double Panel Door Single panel Door

Prepared By :

UNIT

DIMENSIONS LENGTH WIDTH HEIGHT NO. FACTOR TIMESING

3.00

2.50

5.50

4.00

11.50MTS)

@ 33.00 MTS)

Prepared By : Job No. :

Dars 003 QUANTITY

LENGTH

AREA

VOLUME WEIGHT

NO.

20.00 21.00 4.00

3.00

1.00 5.00

10.00 16.00

8.00

6.00 4.00

5.00

5.00

3.00 4.00

2.00 3.00

2.00 2.00

2.00 2.00