PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER

BLOCK A ( FOUR BEDROOM DUPLEX ) ELEMENT Nr. 1 SUBSTRUCTURE (ALL PROVISIONAL) D20: Excavation and Filling. A B Excavate topsoil average depth not exceeding 150mm Excavating trenches, width exceeding 0.3m maximum depth not exceeding 1.50m C Excavating pits (38nr), maximum depth not exceeding 2.00m D Dispose excavated materials off site, in spoil heap away from site E Filling to excavations, thickness exceeding 250mm, materials arising from excavations F G 150mm laterite filling in layers Filling to make up levels, thickness not exceeding 150mm, hardcore materials obtained off site H J Level and compact bottom of excavation Dieldrex or other equal and approved antitermite treatment solution spread to faces of excavations E10: In situ concrete Plain in situ concrete (1:10)-40mm aggregate K Blinding beds, thickness not exceeding 50mm Plain in situ concrete (1:3:6)-20mm aggregate L Foundations Reinforced in situ concrete (1:2:4)-19mm aggregate M N P Q Beds/ attached steps (150mm thick) Column bases Column (62nos) Circular Column 450mm Diameter (2nos) Carried to collection 92 26 4 1 m3 m3 m3 m3 38,000.00 38,000.00 38,000.00 38,000.00 3,496,000.00 988,000.00 152,000.00 38,000.00 8,592,370.00 141 m
3

640

m2

40.00

25,600.00

631

575.00

362,825.00

85

575.00

48,875.00

107

220.00

23,540.00

138 86

m3 m3

180.00 1,350.00

24,840.00 116,100.00

86 1,212

m3 m2

2,100.00 40.00

180,600.00 48,480.00

1,212

55.00

66,660.00

57

m2

1,050.00

59,850.00

21,000.00

2,961,000.00

4 BEDROOM DUPLEX 1

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER

E20: Formwork for in situ concrete Plain vertical sawn formwork A B Edges of beds, height not exceeding 250mm Sides of column E30: Reinforcement for in situ concrete High tensile bars to BS 4449, straight 20mm Diameter 16mm Diameter 12mm Diameter Mild steel bars to BS 4449, bent. F 10mm Diameter Fabric mesh A192 weighting 42kg/m2 laid as detailed in manufacturer's manual G Ground floor bed/Attached ramp F10: Brick/Block walling Sandcrete blockwork in stretcher bond bedded in cement and sand mortar mix (1:6) flush pointed, filled solid with lean concrete H Walls, 230mm thick vertical 845 m2 3,800.00 3,211,000.00 669 m2 850.00 568,650.00 0.460 t 240,000.00 110,400.00 22 71 m2 m
2

1,450.00 1,450.00

31,900.00 102,950.00

C D E

1.260 0.390 0.550

t t t

240,000.00 240,000.00 240,000.00

302,400.00 93,600.00 132,000.00

EXTERNAL RENDERING J 15mm thick cement and sand (1:4) smooth rendering to face of the wall PAINTING AND DECORATION K Prepare prime and apply one undercoat and two finishing coats of high quality "DULUX" emulsion paint on rendered wall (rate including floating) 53 m2 1,200.00 63,600.00 53 m2 650.00 34,450.00

Carried to collection

4,650,950.00

4 BEDROOM DUPLEX 2

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER

Collection

Page 01

8,592,370.00

Page 02

4,650,950.00

SUBSTRUCTURE CARRIED TO SUMMARY

13,243,320.00

4 BEDROOM DUPLEX 3

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER

ELEMENT Nr. 2 FRAMES E10: In situ concrete Reinforced in situ concrete (1:2:4)-19mm aggregate A B C D Columns Circular Columns Beams Roof beams/ concrete fascia 31 6 8 4 m3 m3 m3 m3 38,000.00 38,000.00 38,000.00 38,000.00 1,178,000.00 228,000.00 304,000.00 152,000.00

E20: Formwork for in situ concrete Plain vertical sawn formwork E F G H Columns Circular Columns Beams Roof beams/ concrete fascia 539 146 421 88 m2 m2 m2 m2 1,450.00 1,450.00 1,450.00 1,450.00 781,550.00 211,700.00 610,450.00 127,600.00

J K L

E30: Reinforcement for in situ concrete High tensile bars to BS 4449, straight. 20mm Diameter 16mm Diameter 12mm Diameter Mild steel bars to BS 4449, bent.

3.630 4.210 8.960

t t t

240,000.00 240,000.00 240,000.00

871,200.00 1,010,400.00 2,150,400.00

10mm Diameter

7.120

240,000.00

1,708,800.00

FRAMES CARRIED TO SUMMARY

9,334,100.00

4 BEDROOM DUPLEX 4

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER

ELEMENT Nr. 3 STAIRCASES E10: In situ concrete Reinforced in situ concrete (1:2:4)-19mm aggregate A B C D Staircases (flight) Landings Steps Beams Plain vertical sawn formwork: E F G H J K Soffits of landings Soffits of flight Sides of beams Edges of suspended slabs Stairflights Steps Reinforcement for in situ concrete High tensile bars to BS 4449, straight and vertical. L M N 16mm Diameter 12mm Diameter 10mm Diameter Plastered/Rendered/Roughcast coatings 12mm thick cement and sand (1:3) rendering P Q R Landings soffit, width exceeding 300mm Stairflight soffit, width exceeding 300mm Strings 83 498 144 m
2

4 3 2 2

m3 m3 m3 m3

38,000.00 38,000.00 38,000.00 38,000.00

152,000.00 114,000.00 76,000.00 76,000.00

83 44 6 14 24 24

m2 m2 m2 m m m

1,450.00 1,450.00 1,450.00 400.00 400.00 400.00

120,350.00 63,800.00 8,700.00 5,600.00 9,600.00 9,600.00

1.330 1.240 1.000

t t t

240,000.00 240,000.00 240,000.00

319,200.00 297,600.00 240,000.00

650.00 650.00 225.00

53,950.00 323,700.00 32,400.00

m2 m

Carried to collection

1,902,500.00

4 BEDROOM DUPLEX 5

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER

Sand cement/Concrete/Granolithic screeds/flooring 25mm thick cement and sand (1:4) screeded floor A B Landing floors Treads, 300mm wide 12mm thick cement and sand (1:3) rendering C Risers; plain, 150mm high Stone/ConcreteQuarry/Ceramic tilling/Mosaic Granite floor tilling on cement and sand bed D E F G Landing Floors Skirtings Treads to steps Risers to steps Painting/Clear finishing prepare and apply 3 coats of emulsion paints to floated surfaces, rate including floating to Architect's details. H Rendered surfaces, width exceeding 300mm Stairs/Walkways/Balustrades J Stair Balustrades; 1000mm high purpose made designed balustrade in 75mm diameter stainless steel pipes complying to Architect's details embedded into concrete Stainless steel handrails consisting of 75mm x 75mm top and bottom rail complete with bolts and nuts screwed to steel wall bracket 23 m2 1,200.00 27,600.00 36 276 129 300 m2 m m m 8,000.00 650.00 1,950.00 975.00 288,000.00 179,400.00 251,550.00 292,500.00 310 m 180.00 55,800.00 36 258 m2 m 830.00 250.00 29,880.00 64,500.00

468

4,800.00

2,246,400.00

552

3,700.00

2,042,400.00

Carried to collection

5,478,030.00

Collection Page 05 Page 06 1,902,500.00 5,478,030.00

STAIRCASES CARRIED TO SUMMARY

7,380,530.00

4 BEDROOM DUPLEX 6

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER

ELEMENT Nr. 4 UPPER FLOORS E10: In situ concrete Reinforced in situ concrete (1:2:4)-19mm aggregate A Slabs thickness, 150-450mm, sloping not exceeding 150 E30: Reinforcement for in situ concrete High tensile bars to BS 4449, straight. B C 12mm Diameter 10mm Diameter E20: Formwork for in situ concrete Plain vertical sawn formwork to the following D Edges of suspended slabs, height 150- 250mm Plain sawn formwork comprises of verical struts and runners E Soffit of slabs, slab thickness not exceeding 450mm, horizontal, height to soffit not exceeding 4.50m 1,112 m
2

114

m3

38,000.00

4,332,000.00

13.60 9.57

t t

240,000.00 240,000.00

3,264,000.00 2,296,800.00

121

250.00

30,250.00

1,450.00

1,612,400.00

UPPER FLOORS CARRIED TO SUMMARY

11,535,450.00

4 BEDROOM DUPLEX 7

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER

ELEMENT Nr. 5 ROOF G20: Carpentary/Timber framing/First fixing Sawn treated hardwood in pitched roof members A B C D Tie beams 150 x 50mm Struts 150 x 50mm Rafters 150 x 50mm Purlins 75 x 50mm H72: Aluminium sheet coverings/flashings 0.55mm coloured approved stone coated aluminium coverings laid to slope not exceeding 50 degrees from the horizontal with one and half corrugation side lap and 200m end lap and fixed in accordance to manufacturers instruction (measured nett) to timber purlins at approved general spacing E F G Pitched covering Ridge cappings, girth 600mm Hip capping, girth 600mm 2,322 528 487 m2 m m 3,500.00 2,100.00 2,100.00 8,127,000.00 1,108,800.00 1,022,700.00 1,162 5,128 1,648 3,821 m m m m 380.00 380.00 380.00 260.00 441,560.00 1,948,640.00 626,240.00 993,460.00

ROOF CARRIED TO SUMMARY

14,268,400.00

4 BEDROOM DUPLEX 8

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER

ELEMENT Nr. 6 INTERNAL AND EXTERNAL WALLS F10: Brick/Block walling Hollow Sandcrete blockwork in stretcher bond bedded in cement and sand mortar mix (1:6) flush pointed. A B Walls, 230mm thick vertical Dwarf walls 4,891 187 m2 m
2

3,200.00 3,200.00

15,651,200.00 598,400.00

INTERNAL AND EXTERNAL WALLS CARRIED TO SUMMARY

16,249,600.00

4 BEDROOM DUPLEX 9

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER

ELEMENT Nr. 7 DOORS AND WINDOWS E10: In situ concrete Reinforced in situ concrete (1:2:4)-19mm aggregate A Lintels E20: Formwork for in situ concrete Plain vertical sawn formwork B Lintels E30: Reinforcement for in situ concrete High tensile bars to BS 4449, straight. C 12mm Diameter Mild steel bars to BS 4449, bent. D 10mm Diameter DOORS L21: Metal doors/shutters/hatches purpose made decorative steel HPI security doors with steel frame in autobase paint built into blockwork and concrete surround, bedded and pointed in cement and sand mortar with mastic sealant complete with all necessary ironmongery E F Door, size 1200 x 2100mm high Door, size 900 x 2100mm high L20: Timber doors/shutters/hatches 50mm thick polished hardwood timber panel door including 225mm wide treated wrought finished hardwood door frame complete with architraves and ironmongery, all complying to Architect's details G H Door, size 900 x 2100mm high Door, size 750 x 2100mm high 48 48 nr nr 30,000.00 30,000.00 1,440,000.00 1,440,000.00 10 10 nr nr 96,500.00 78,500.00 965,000.00 785,000.00 0.965 t 240,000.00 231,600.00 1.238 t 240,000.00 297,120.00 372 m2 1,450.00 539,400.00 12 m3 38,000.00 456,000.00

Carried to collection

6,154,120.00

4 BEDROOM DUPLEX 10

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER

WINDOWS L11: Metal windows/rooflights/sceens/louvres White powder coated aluminium casement windows in 5mm thick tinted glass complete with fly screen and burglar bars fit to detail A B B Windows size, 1200 x 1500mm high Windows size, 900 x 900mm high Windows size, 600 x 600mm high 50 24 25 nr nr nr 58,050.00 48,375.00 32,375.00 2,902,500.00 1,161,000.00 809,375.00

Carried to collection

4,872,875.00

Collection

Page 10

6,154,120.00

Page 11

4,872,875.00

DOORS AND WINDOWS CARRIED TO SUMMARY

11,026,995.00

4 BEDROOM DUPLEX 11

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER

ELEMENT Nr.8 FIXTURES AND FITTINGS N10: General fixtures/furnishings/equipment Wardrobes Composite wardrobe units, in veneer-finished laminated particle board or other approved materials, comprising compartments fitted with shelves and door leaves with and including all necessary iron mongery; all to Architect's details A Wardrobe size 2100mm length x 3000mm high x 600mm deep; self closing Wardrobe size 1800mm length x 3000mm high x 600mm deep; self closing Kitchen carbinet unit C 7600mm long x 600mm deep x 750mm high; L-shaped kitchen carbinet in accordance to Architect's details Store shelve unit D 2270mm long x 450mm deep x 1750mm high; U-shaped and 3-tiers shelve unit in accordance to Architect's details Railings to Balcony and walls E Allow provisional sum of N500,000.00 for railings to balconys and walls in accordance to Architect's details

nr

220,000.00

1,100,000.00

15

nr

175,000.00

2,625,000.00

nr

450,000.00

450,000.00

nr

120,000.00

120,000.00

sum

500,000.00

FIXTURES AND FITTINGS CARRIED TO SUMMARY

4,795,000.00

4 BEDROOM DUPLEX 12

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER

ELEMENT Nr. 9 WALL FINISHES M20: Plastered/Rendered/Roughcast coatings 12mm thick cement and sand (1:3) floated smooth synthetic rendering to general surfaces complying to Architect's details. A B C Walls; externally Walls; internally Reveals, width not exceeding 300mm 12mm thick cement and sand (1:4) floated backing to general surfaces to receive further finishes D E F G Walls; externally Walls; internally Reveals, width not exceeding 300mm Plaster impression M40: Stone/ConcreteQuarry/Ceramic tilling/Mosaic High quality glazed ceramic wall tilling on cement and sand backing H J Walls; internally Reveals, width not exceeding 300mm Patterned crack tiles on cement and sand backing K Walls; externally 28 m
2

1,538 5,210 1,458

m2 m2 m

650.00 650.00 210.00

999,700.00 3,386,500.00 306,180.00

112 86 48 111

m2 m2 m m

650.00 650.00 200.00 450.00

72,800.00 55,900.00 9,600.00 49,950.00

1,368 296

m2 m

2,300.00 690.00

3,146,400.00 204,240.00

2,850.00

79,800.00

Carried to collection

8,311,070.00

4 BEDROOM DUPLEX 13

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER

M60: Painting/Clear finishing Vinyl mat emulsion paint as manufactured by Portland or CAPL in 3 coats to floated surfaces, rate including POP floating to Architect's details. A B C D Rendered surfaces, externally Rendered surfaces, internally Plaster impression Reveals, width not exceeding 300mm 1538 5210 111 316 m
2

1,200.00 1,200.00 350.00 400.00

1,845,600.00 6,252,000.00 38,850.00 126,400.00

m2 m m

Carried to collection

8,262,850.00

Collection

Page 13

8,311,070.00

Page 14

8,262,850.00

WALL FINISHES CARRIED TO SUMMARY

16,573,920.00

4 BEDROOM DUPLEX 14

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER

ELEMENT Nr. 10 CEILING FINISHES G20: Carpentary/Timber framing/First fixing Sawn treated hardwood in ceiling members A Noggins 50 x 50mm K40: Suspended ceilings Plaster of Paris ceiling finishes with centre rosette hunged to 50x50mm timber noggins (measured separately) including cornics fixed in accordance to the manufacturer's instructions. B Ceiling lining 3,060 m
2

1,256

240.00

301,440.00

3,600.00

11,016,000.00

CEILING FINISHES CARRIED TO SUMMARY

11,317,440.00

4 BEDROOM DUPLEX 15

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER

ELEMENT Nr.11 FLOOR FINISHES M10: Sand cement/Concrete/Granolithic screeds/flooring 42mm thick cement and sand (1:4) floated bed to general surfaces to receive further finishes A Floors, level and to falls only not exceeding 15 from horinzontal M40: Stone/ConcreteQuarry/Ceramic tilling/Mosaic Patterned Granite floor finish on cement and sand bed B Floors; level and to falls only not exceeding 15 from horinzontal C Skirtings; height 100mm including backing Glazed vitrified ceramic floor tilling on cement and sand bed D Floors; level and to falls only not exceeding 150 from horinzontal E Skirtings; height 100mm including backing Unglazed ceramic tilling on cement and sand bed in toilet areas F Floors; level and to falls only not exceeding 150 from horinzontal G Skirtings; height 100mm including backing 61 111 m2 m 3,200.00 320.00 195,200.00 35,520.00 984 1,518 m2 m 3,800.00 380.00 3,739,200.00 576,840.00 690 768 m2 m 6,500.00 650.00 4,485,000.00 499,200.00
0 0

2,040

m2

830.00

1,693,200.00

FLOOR FINISHES CARRIED TO SUMMARY

11,224,160.00

4 BEDROOM DUPLEX 16

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER

ELEMENT Nr. 12 ELECTRICAL SERVICES V20: LV Distribution Equipment; Metal clad Main Distrbution Board surface/ flush type as manufacured by FEDERAL ELECTRIC or MEM or BILLS including all MCB, back outlet connections to flush adaptable boxes, earth bonding, labels and fixing in accordance with manufacturer's instructions MV PANEL A 100A TPN MCCB main distribution panel (MV panel) comprising 2no 60A MCCB, 1no spare and circuit breaker 100A change over switch 100A main fuse switch Y61: HV/LV cable and wiring Cables; PVC insulated cable as manufactured by NOCACO or approved equal drawn into conduits or ducts or laid down into trunking or laid in trenches including cable loops, terminations, glands and all other accessories D E 4 x 150mm2 PVC/SWA/PVC copper cable 4 x 100mm2 PVC/SWA/PVC copper cable DISTRIBUTION BOARDS TP&N MCB Distribution Board complete with 100A integral incoming isolator and comprising 6nr 10A stablock; 8nr 20A stablock; 12nr 30A stablock, 1nr 45A stablock and 3nr spares ways F 100A 12-Way Equipment; Metal clad isolating pattern switches or ELCB as manufactured by FEDERAL ELECTRICAL, MEM or BILLS including all necessary fuse links with quick make and quick breaks contacts and fixing in accordance with manufacturer's instructions G 100A TP&N ELCB 5 nr 20,000.00 100,000.00 5 nr 35,000.00 175,000.00 121 132 m m 9,500.00 6,000.00 1,149,500.00 792,000.00

5 5 5

nr nr nr

250,000.00 35,000.00 27,000.00

1,250,000.00 175,000.00 135,000.00

B C

Carried to collection

3,776,500.00

4 BEDROOM DUPLEX 17

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER

Y60: Conduit and cable trunking Conduit; straight PVC pipe with flange joints in chases/floor screeds with and inlcuding conduit boxes, locknuts, brushes, couplers, bends, reducers, cutting and other necessary accessories, rates including making good surfaces disturbed. A 25mm Diameter Y61: HV/LV cable and wiring Cables; PVC insulated cable as manufactured by NOCACO or approved equal drawn into conduits or ducts or laid down into trunking or laid in trenches including cable loops, terminations, glands and all other accessories B C 4 x 6mm2 single core PVC copper cable 1 x 10mm2 single core PVC copper cable LUMINAIRES AND LAMPS V21: General lighting Lamp and luminaires; lighting fittings as manufactured by ABB or ASTRA or THORN or approved equal fixed to soffit including all necessary for complete installation D E F G H J K L 250w prismatic wall mounted halogen flood light fitting 1 x 40w; 1200mm flourescent fittings 60w wall bracket luminaires 1 x 60w screw neck lighting fittings 1 x 60w downlight luminaire fittings 60w ceiling mounted bowl head lighting fitting 40w, 40 bulbs ceiling hunged chandelier fittings "NEWCLIME" ceiling fan complete with regulator 72 24 360 72 72 168 12 36 nr nr nr nr nr nr nr nr 5,200.00 3,800.00 2,100.00 2,500.00 2,500.00 2,800.00 120,000.00 6,000.00 374,400.00 91,200.00 756,000.00 180,000.00 180,000.00 470,400.00 1,440,000.00 216,000.00 1,840 986 m m 180.00 180.00 331,200.00 177,480.00 2,873 m 75.00 215,475.00

Carried to collection

4,432,155.00

4 BEDROOM DUPLEX 18

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER

Y74: Accessories for Electrical services Accessories as manufactured by MK or ABB or MEM including steel knock-out boxes fixed to form complete A B C D E F G H 5A 1 gang 1 way switch 5A 1 gang 2 way switch 5A 2 gang 2 way switch 5A 3 gang 2 way switch Bedside switch Dimmer switch 240v fire alarm bell Break glass V22: General LV Power Ancillaries; low voltage power socket outlets switches and contactors as manufactured by MK or ABB or MEM or approved equal complete with accessories J K L M N P Q R 13A single switched socket outlets 13A Twin switched socket outlets 15A Single switched socket outlets Air conditioning 20A water heater switch 45A cooker control unit with light/ 13A socket outlets Telephone outlet Television outlet Satellite outlet 192 192 48 25 5 30 30 30 nr nr nr nr nr nr nr nr 600.00 850.00 1,500.00 1,500.00 9,500.00 750.00 750.00 750.00 115,200.00 163,200.00 72,000.00 37,500.00 47,500.00 22,500.00 22,500.00 22,500.00 216 84 132 24 20 12 5 5 nr nr nr nr nr nr nr nr 600.00 600.00 900.00 900.00 500.00 800.00 7,500.00 5,000.00 129,600.00 50,400.00 118,800.00 21,600.00 10,000.00 9,600.00 37,500.00 25,000.00

Carried to collection

905,400.00

4 BEDROOM DUPLEX 19

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER

Y60: Conduit and cable trunking Conduit; straight PVC pipe with flange joints in chases/floor screeds with and inlcuding conduit boxes, locknuts, brushes, couplers, bends, reducers, cutting and other necessary accessories, rates including making good surfaces disturbed. A 20mm Diameter Y61: HV/LV cable and wiring Cables; PVC insulated cable as manufactured by NOCACO or approved equal drawn into conduits or ducts or laid down into trunking or laid in trenches including cable loops, terminations, glands and all other accessories B C D E F G H 3 x 1.5mm single core PVC copper cable - Lighting 3 x 2.5mm single core PVC copper cable - Sockets 3 x 4mm2 PVC cable copper - Air conditioning 3 x 6mm2 single core PVC copper cable - Cooker sockets 1.0mm2 single core PVC copper cable TV outlets 1.0mm2 single core PVC copper cable Telephone outlets 1.0mm2 single core PVC copper cable Satellite outlets Installation generally; supply, install, connect up and commission the complete earthing of the whole installation as at the main disribution panel, switch boards, distribution boards, generator room, transformer substation, etc. J Earthing and bonding; 25 x 3 copper tape and 600 x 600mm mat forming a basket and bonded to foundation reinforcement complete with salt and charcoal applied as specified W52: Lightning protection K lightning protector/arrestor complete applied as specified 5 nr 45,000.00 225,000.00
2 2

20,190

70.00

1,413,300.00

2,088 12,528 2,022 522 468 468 468

m m m m m m m

200.00 240.00 270.00 375.00 120.00 90.00 85.00

417,600.00 3,006,720.00 545,940.00 195,750.00 56,160.00 42,120.00 39,780.00

nr

65,000.00

325,000.00

Carried to collection

6,267,370.00

4 BEDROOM DUPLEX 20

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER

Collection

Page 17

3,776,500.00

Page 18

4,432,155.00

Page 19

905,400.00

Page 20

6,267,370.00

ELECTRICAL SERVICES CARRIED TO SUMMARY

15,381,425.00

4 BEDROOM DUPLEX 21

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER

ELEMENT Nr. 13 PLUMBING AND MECHANICAL SERVICES All materials supplied and installed shall be done in accordance with technical specification for mechanical installation as contained in the contract document. P30: Trenches/Pipeways/Pits for buried Engineering services A Excavating trenches for services 500mm nominal size; 500mm average depth from 150mm below existing ground level; backfilling with selected excavated materials; disposal of surplus excavated materials Y10: Pipelines Straight galvanised iron pipe to BS 425 in chases/trenches/floor screeds B C D E F G 25mm Diameter - Cold water supply 19mm Diameter - cold water supply 13mm Diameter - Hot and Cold water supply Non return valve Gate Valve Water meter Extra over galvanized iron pipes; fittings, not exceeding 65mm diameter 25mm Diameter fittings H J K L M Elbows Equal tees Reducing tees Union connector Nipple 300 168 66 114 120 nr nr nr nr nr 230.00 280.00 280.00 250.00 120.00 69,000.00 47,040.00 18,480.00 28,500.00 14,400.00 534 1,332 1,254 24 30 6 m m m nr nr nr 400.00 320.00 320.00 3,000.00 3,000.00 12,500.00 213,600.00 426,240.00 401,280.00 72,000.00 90,000.00 75,000.00

1,284

150.00

192,600.00

Carried to collection

1,648,140.00

4 BEDROOM DUPLEX 22

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER

19mm Diameter fittings A B C D E Elbows Equal tees Reducing tees Union connector Nipple 13mm Diameter fittings F G H J K Elbows Equal tees Reducing tees Union connector Nipple Y25: General pipeline equipment Equipment; supply, install and connect up pipeline equipment as manufactured by Eago or other approved equal with all necessary accessories for complete installation L Double trap coloured syphonic water closet with horizontal outlet with close couple 9 litres cistern and plastic cover complete with fittings wash hand basin 620 x 500mm with 3 taphole oval pedestal, starlite 12mm mixer with pop up waste accessories complete with wash-top to Architect's details Purposed made quality Jacuzzi set complete with all necessary accessories Pressed steel bath tub size; 1700 x 700mm with telephone shower Double drainer double bowl kitchen sink 750mm x 750mm shower tray complete with all neccesary Accessories 89 82 41 27 55 nr nr nr nr nr 200.00 250.00 250.00 230.00 120.00 17,800.00 20,500.00 10,250.00 6,210.00 6,600.00 86 48 14 78 51 nr nr nr nr nr 200.00 250.00 250.00 230.00 120.00 17,200.00 12,000.00 3,500.00 17,940.00 6,120.00

25

nr

25,500.00

637,500.00

25

nr

14,500.00

362,500.00

nr

350,000.00

1,750,000.00

5 5

nr nr

27,000.00 19,000.00

135,000.00 95,000.00

R S

20

nr

8,500.00

170,000.00

Carried to collection

3,268,120.00

4 BEDROOM DUPLEX 23

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER

Y25: General pipeline equipment A B C D E F G Vitreous china toilet roll holder fixed to wall Stainless steel towel holder fixed to wall Mirror; 4mm silvered float glass size 600 x 450mm high 50 litres ARISTON electric water heater Soap dish Soap Dispenser Hand dryer Straight UPVC pipes in chases/trenches/floor screeds H J K 100mm Diameter 75mm Diameter 50mm Diameter Extra over PVC pipes; fittings, exceeding 65mm diameter 100mm Diameter L M N P Q R UPVC elbow PVC tee WC connection sleeve Y radius bend Pam connector Cleaning eye 75mm Diameter S T U V UPVC elbow PVC tee Pam connector Cleaning eye Carried to collection 80 65 55 41 nr nr nr nr 320.00 370.00 500.00 400.00 25,600.00 24,050.00 27,500.00 16,400.00 2,532,825.00 44 36 12 15 35 44 nr nr nr nr nr nr 350.00 400.00 1,450.00 625.00 560.00 450.00 15,400.00 14,400.00 17,400.00 9,375.00 19,600.00 19,800.00 465 360 210 m m m 520.00 450.00 450.00 241,800.00 162,000.00 94,500.00 30 30 30 30 30 30 30 nr nr nr nr nr nr nr 3,000.00 3,000.00 7,000.00 27,000.00 2,000.00 6,500.00 13,000.00 90,000.00 90,000.00 210,000.00 810,000.00 60,000.00 195,000.00 390,000.00

4 BEDROOM DUPLEX 24

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER

50mm Diameter A B C UPVC elbow PVC tee Cleaning eye Y11: Pipework ancillaries D Traps; 50mm diameter UPVC floor drains grouted to floor bed Manholes/ Inspection Chamber E Manhole size 500 x 500 x 600mm deep internally constructed of 150mm thick concrete(1:3:6) base, 150mm thick sandcrete blockwork filled solid with lean concrete, 75mm thick concrete(1:3:6) benching and forming 150mm diameter half round channel, covered with cast iron, internal faces rendered in water proof cement sand mortar(1:3) including excavation, backfilling and disposal of surplus excavated materials U60: Air conditioning Units F Allow a provisional sum of N800,000.00 for pipe work and ancillaries in connection to Air Conditioning to be expended in accordance to Engineer's instructions Fire Fighting System Equipment; supply, install, connect up and commission fire fighting system as manufactured by ANGUS or other approved equal complete with piping/trunking as specified including all necessary accessories G Fire extinguisher; ABC 9Kg capacity general purpose dry powder type 240v fire alarm bell Break glass fire alarm outdoor siren 53 34 35 nr nr nr 280.00 320.00 400.00 14,840.00 10,880.00 14,000.00

14

nr

1,250.00

17,500.00

36

nr

25,000.00

900,000.00

sum

800,000.00

6 6 6 6

nr nr nr nr

16,500.00 7,500.00 5,500.00 10,550.00

99,000.00 45,000.00 33,000.00 63,300.00

H J K

Carried to collection

1,997,520.00

4 BEDROOM DUPLEX 25

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER

Collection

Page 22

1,648,140.00

Page 23

3,268,120.00

Page 24

2,532,825.00

Page 25

1,997,520.00

PLUMBING AND MECHANICAL SERVICES CARRIED TO SUMMARY

9,446,605.00

4 BEDROOM DUPLEX 26

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER

SUMMARY 1 2 3 4 5 6 7 8 9 10 11 12 13 SUBSTRUCTURE FRAMES STAIRCASES UPPER FLOORS ROOF INTERNAL AND EXTERNAL WALLS DOORS AND WINDOWS FITTINGS AND FIXTURES WALL FINISHES CEILING FINISHES FLOOR FINISHES ELECTRICAL SERVICES PLUMBING AND MECHANICAL SERVICES 13,243,320.00 9,334,100.00 7,380,530.00 11,535,450.00 14,268,400.00 16,249,600.00 11,026,995.00 4,795,000.00 16,573,920.00 11,317,440.00 11,224,160.00 15,381,425.00 9,446,605.00

FOUR BEDROOM SEMI-DETACHED DUPLEX (5Nos) Total carried to General Summary

151,776,945.00

4 BEDROOM DUPLEX 27

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

GENERAL SUMMARY

PRELIMINARIES

114,877,755.25

POLICE/FIRE SERVICE POST

NR

7,490,575.00

7,490,575.00

SHOPPING CENTER

NR

1,190,064,530.00

1,190,064,530.00

SPORT CENTER (All- Provisional) Subject to Measurement

SUM

450,000,000.00

EXTERNAL WORKS Parking and Fencing and external Drainage system (All- Provisional) Subject to Measurement

SUM

650,000,000.00

2,412,432,860.25

CONTINGENCIES

50,000,000.00 2,462,432,860.25

ADD VAT 5%

123,121,643.01

TOTAL COST OF CONSTRUCTION

2,585,554,503.26

28

GENERAL SUMMARY

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

NO BILL NO. 1

DESCRIPTION

GENERAL CONDITIONS AND PRELIMINARIES CONDITIONS OF CONTRACT The Contractor is deemed to have carefully examined the Conditions of Contract of the Tender Documents and included against all the obligations and liabilities. The Conditions of Contract are the Standard Form of Building Contract in Nigeria for use with Quantities/ Federal Ministry of Works & Housing "LUMP SUM CONTRACT"; severally amended to suit local conditions and the peculiarities of the Works. Allow for complying with the requirements of the following clauses:CLAUSE Nr. 1. Contractor's Obligations 2. Consultants' Instructions. 3. Contract Documents.

4. Statutory Obligations, Notices, Fees and Charges. The Contractor should allow here or in his rates for any fees and charges legally demandable under this clause. 5. Levels and Setting out of the Works. 6. Materials, goods and workmanship to conform to description, testing and inspection. 7. Royalties and patent rights. 8. Foreman-in-charge. 9. Access for Architect/Supervising Officer to the works. 10. Clerk of works 11. Variations, Provisional and Prime Costs Sums. 12. Contract Bills. 13. Contract Sum. 14. Unfixed goods and materials 15. Practical completion and defects liability.

To Collection

PRELIMINARIES 29

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

NO Conditions of Contract (contd.) Clause No. 16. Sectional completion. 17. Assignment or Sub-letting.

DESCRIPTION

18. Injury to persons send property and Employer's indemnity. 19. Insurance against injury to persons and property Provide a provisional sum of N for Insurances under 19(2) (a) whereby the Employer and the Contractor are Jointly indemnified up to the sum of N 20. Insurance of the Works against Fire etc. 21. Possession, completion and postpoment. 22. Damages for non-completion 23. Extension of time. 24. Loss and expenses caused by disturbances of regular progress of the Works 25. Determination by the Employer. 26. Determination by the Contractor. 27. Nominated Sub-contractor. 28. Nominated Suppliers 29. Artists and Tradesmen. 30. Certificates and Payments. 31. Fluctuations. 32. Outbreaks of Hostilities. 33. War Damage. 34. Antiquities. 35. Arbitration. To Collection N

PRELIMINARIES 30

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

NO Preliminaries. Names of Parties The Employer is

DESCRIPTION

INVESTRITE AND ABUJA MUNICIPAL AREA COUNCIL

The Architectr is: SHUAFEM CONSTRUCTION ASSOCIATES LIMITED

The Structural Engineer is: PRODEM LIMITED

The Quantity Surveyor is: JESIM LIMITED

The Electrical & Mechanical Engineers are: PRODEM LIMITED

To Collection

PRELIMINARIES 31

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

NO Preliminaries.

DESCRIPTION

Site Location This work is to be carried out at a site located at The Contractor is deemed to have inspected the site and taken notice of the site conditions as no claim arising from lack of knowledge of same will be entertainedd by the employer. Site Visit and Scope of Works. The contractor is advised to visit and inspect the site and make himself thoroughly and completely informed as to the condition of the site in its present state, the nature of the ground and full extent and character of the Works to be executed, means of access and storage space, the conditions affecting the supply of labour and the availability and supply of water. No claim for extra payment above the Contract Sum will be paid to the Contractor for want of knowledge of any conditions affecting the execution of the Works. A brief outline of the scope of the works appears immediately inside the front cover of this document and the Contractor is to allow here any sum in respect of the scope of nature of the Works. Bills of Quantities.

The pricing, Moneying out and totalling in these Bills of Quantities is to be in INK throughout and is to be in Nigerian Currency. The bills of quantities shall not be used for ordering materials. Any discripances found between the quantities or descriptions in the Bills and those to be ordered are reported to the Quantity Surveyor immediately. The Contractor will be deemed to have included in his tender for the obligations and requirements of all items in these Contract Documents whether or not he has placed a rate or price against the items. Drawings.

All drawings, tracings, photo prints, etc., are the sole property of the Architect/S.O and must be returned to him upon completion of the works. The Contractor shall check the whole of the dimensions on site and if any discripancy is found between the drawings and conditions on site, he shall notify the Architect/S.O immediately and request instructions.

To Collection

PRELIMINARIES 32

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

NO Preliminaries.

DESCRIPTION

Drawings (Contd.) The Contractor shall provide and do everything necessary for the proper execution of the works according to the true intent and meaning of the drawings, whether the same may or may not be particularly shown on the drawings, provided that same is reasonably to be inferred therefrom. Figured dimensions are to be followed in preference to scaled dimensions. Allow for mounting one complete set of drawings on plywood or other suitable rigid panels and keeping them on site throughout the Contract period. The Contractor shall give adequate advance notice to the Architect/S.O of requirements with regards to instructions, etc. and in the absence of advance written notification to the contrary it will be assumed that the progress of the Works is not affected by the want of such notification. Insurance Declaration On signing the contract, the Contractor shall obtain from his insurers and lodge with the Architect/S.O. a declaration that the insurance provided is strictly in accordance with clauses of the conditions of contract. Setting Out The Contractor shall accurately set out the works and include for providing all pegs, templates, instruments and labour necessary for so doing and as required by the Architect/S.O for checking this Works. Excavation shall not be commenced until the permission of the Architect/S.O. is obtained. Allow for providing when required on the site a "Dumpy" or Precise type level, complete with tripod and staff and allow for the free use of the leveling equipment by the Architect/S.O, Engineer or Quantity Surveyor. Site Accommodation Allow for providing a suitable weather proof office on the site for the use of the Foreman-in-charge and other site staff and include for providing necessary furniture and lighting and clear away on completion. Allow for providing a suitable weather proof office on the site for the use of the Clerk of Works and consultants and large enough for the holding of site meetings and include for providing necessary furniture and lighting and clear away on completion. Allow for providing a temporary hut for the Watchman complete with lighting and necessary furniture and clear away on completion. To Collection N

PRELIMINARIES 33

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

NO Preliminaries. Site Accommodation (contd.) A

DESCRIPTION

Allow for providing and maintaining all necessary temporary Buildings for storage and protection of goods and materials on site and other work that may be brought or executed on the site including the tools and materials of sub-contractors and remove on completion. Sheds for the storage of cement are to have floors raised from ground. Electricity

Allow for providing all temporary lighting and power for the works including that for use by special tradesmen and sub-contractors; paying all fees and charges and providing all necessary temporary mains and clearing away and making good on completion. Water

Allow for providing all water required for the works including that for sub-contractors. The water is to be clean, fresh water. Allow for executing all temporary plumbing and paying all fees and charges incurred in the connection and supply of the water for building purposes and the removal of all temporary plumbing on completion. Temporary Works

The Contractor shall ensure that all temporary electrical, water and other installations are executed in accordance with the requirements of the Authorities concerned. Temporary Fencing and Access Roads.

Allow for all necessary temporary access roads, crossroads, crossovers, gangways, gates, entrances and the like required, maintain and clear away and make good on completion. Allow for adequate temporary security fencing to the perimeter of site, maintain and clear away and make good on completion. Welfare and Safety.

Allow for providing adequate latrine accommodation and keeping same in a clean and sanitary condition to the satisfaction of the Health Authorities and clearing away latrines and soil whenever necessary and making good all works disturbed.

To Collection

PRELIMINARIES 34

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

NO Preliminaries. Welfare and Safety (Contd.) A

DESCRIPTION

Allow for providing sheds and workshops for the use of the workmen on the site and maintaining and subsequently dismantling and carting away on completion and allow for providing and maintaining welfare and safety measures and amenities of a suitable standard approved by the Architect/S.O. or required by the authorities. The Contractor is to provide on site a First Aid Box or Cupboard prominently marked with the words "First Aid" for the purpose of treating any of his employees injured on site. The contents of this box or cupboard are to comply in all respects with the Factories Ordinance. The Contractor is to ensure that there is always adequate stocks in the First Aid Box or Cupboard which is to be produced and opened for the inspection of the Architect/ S.O. on request. Watching and Lighting

Allow for providing all necessary guards, day and night watchmen and lighting for the protection of the works and the safety of the public. Hoardings and Barreirs

Allow for providing all fans, gantries, hoardings guard rails, barriers, or any other form of special protection to all sides of the buildings and site as necessary to protect adjoining property, persons, vehicles and the like from injury. Ordering of Materials

Upon receipt of the order to commence the works, the contracttor shall immediately place orders for all the required materials and will be held responsible for any delays occurring due to the late placing of such orders. The contractor shall, if so requested by the Architect/S.O. make available to him all documents in connection with the ordering of materials for the works, showing agreed delivery dates, sources of supply and the like. If upon receiving quotations for any materials required for the works it appears that delivery by the dates quoted will delay the works, the contractor shall inform the Architect/S.O. of this fact before placing the orders.

To Collection

PRELIMINARIES 35

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

NO Preliminaries. Time and Progress A

DESCRIPTION

The works shall be proceeded with in such sections and sequences as will affect completion of all works within the time for completion or as directed by the Architect/S.O. Immediately upon signing the Contract, or before signing the Contract, if requested, the Contractor shall in collaboration with Sub-Contractors submit to the Architect/S.O. for acceptance programmed and progress charts to cover all activities on the site and shall record progress thereon throughout the execution of the works. The Contractor shall arrange for representatives to attend site meetings as and when reasonably required by the Architect/ S.O. and shall provide seating and other necessary facilities for such meetings. The Contractor's attention is drawn to his responsibility for the co - ordination and programming of sub-contractor's work. The Contractor is expected to arrange suitable programmes with his sub-contractors and to check regularly that such programmes are adhered to. Where delays arise in connection with sub - con tract works, the Contractor will be expected to have been aware of such at an early stage and to have taken appropriate action defined in the sub - contract document by the giving of such notices as may be required in preparation for determination of same. Determination shall not be affected without the prior consent of the Architect/S.O. but requests for extensions of the Contract period on the grounds of delay by sub - contractor will not be considered unless the contractor can establish requirements. Materials found on the site

Any sand, laterite, gravel, or other building materials discovered on the site shall be property of the Employer and shall not be used in the construction of the Works without the prior written consent of the Architect/S.O. The market price of the materials so used shall be allowed to the Employer by the Contractor and the Contract Sum adjusted accordingly. Precious articles or antiquities found on the site shall be the property of the Employer and shall be handed over to the Architect/S.O

To Collection

PRELIMINARIES 36

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

NO Scaffolding and Plant A

DESCRIPTION

Allow for providing all scaffolding, hoists, tackle and other plant, profiles, templates, centerings and equipment generally required for the proper, safe and efficient execution of the works and providing all labour and things required by the Architect/S.O. for testing and measuring the Works and for weighting, measuring or testing the efficiency of any portion of the works. The Contractor is particularly to note that scaffolding, staging and the like is to be provided both for the execution of his own work and that of sub - contractors employed under this Contract, including that required solely for the execution of work by sub - contractors. Allow for providing all gangways, walkways, planking, deckings, temporary platforms, etc. necessary to construct and afford access to or between all parts of the works. Records

Allow for keeping such books, accounts and other documents and records as are necessary to show the increases in costs incurred or the reductions obtained under Clause 31 of the Conditions of Contract and furnishing such books, accounts documents and records to the Quantity Surveyor or other person authorised to receive them at monthly intervals or as requested throughout the duration of the Contract. In the event of adjustments arising under Clause 31 of the Conditions of Contract, the Contractor shall submit monthly fully priced out and totalled, statements showing the total adjustments claimed, together with separate sheets relating individually to the various sub-contractors. Protection of the works

Allow for covering up and protecting from injury from weather or from any cause, all new work, also for supplying all temporary doors, protection to windows and any other requisite protection for the whole of the works executed whether by the Contractor or special tradesmen or sub-contractors and any damage caused must be made good by the Contractor at his own expense. During inclement weather the Contractor shall suspend such parts of the Works for such time as the Architect/S.O. may decide and shall protect from injury all works then in the course of erection.

To Collection

PRELIMINARIES 37

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

NO Preliminaries. Tests and Samples A

DESCRIPTION

Allow for carrying out tests of any materials, either before or after use in the works and for providing samples of all materials and specimens of colours for approval as required by the Architect/S.O. or Engineer before or application in the Works. Covering Up

No work shall be covered up until it has been examined and approved by the Architect/S.O. In the case of work executed against provisional quantities in the Bills of Quantities (and therefore subject to measurement) the Contractor shall notify the Quantity Surveyor before proceeding to cover up the Works. Opening Up.

The Contractor shall, at the request of the Architect/S.O. open up for inspection any work covered; and should the Contractor refuse or fail to comply with such request, the Architect/S.O. may employ other workmen to open up same. If the said work has been covered in contravention of the Architect/S.O.'s Instructions and if on being opened up it be found not in accordance with the drawings or instructions of the Architect/ S.O. , the expenses of opening up and covering up again, whether done by the Contractor or other workmen, shall be borne by, or recoverable from the Contractor or may be deducted as aforesaid. If the work has not been covered up in contravention of such instructions and be found in accordance with the said drawings, etc. , then the expenses aforesaid shall be borne by the Employer and be added to the Contract Sum. Existing Installations

Allow for protecting and maintaining all pipes, ducts and cables met in excavations, for keeping all ditches, gullies and channels clear and unobstructed and for making good any damaged caused to public or private roads, paths, kerbs and drains and paying all costs and charges incurred. Temporary Storm Water Drainage.

Allow for ensuring that the whole of the site is kept free from the risk of stormwater flooding and providing such temporary ditches, gullies and the like as may be necessary and for subsequently backfilling such excavations and making good. Any damage arising from non-compliance with this clause is to be made good at the Contractor's own expense.

To Collection

PRELIMINARIES 38

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

NO Preliminaries. Prevention of Nuisance A

DESCRIPTION

Allow for taking all necessary precautions with regard to the order and method of execution of the work to avoid causing disturbance or nuisance to the users and occupiers of existing buildings and premises adjacent to the Works and for complying with any directions of the Architect/S.O. in this respect. Access for Workmen

The Contractor shall at all times give access to workmen employed by the Employer or by local or other authorities or any other parties and use of proper, sufficient, and if required, special scaffolding, hoists and ladders and provide them with water and lighting, etc. Delays

The Contractor will be deemed to have made allowance for all delays caused by difficulty in obtaining labour and materials or suspension of part or the whole of the Works due to adverse weather conditions. Overtime and Completion

The whole of the Works are to be completed by the time stated in the Contract and no extra will be allowed in respect of overtime paid to achieve this. In the event of the Works falling behind programme for reasons other than those which would entitle the Contractor to an extension of time under the Conditions of Contract, then the Contractor shall, if so instructed by the Architect/S.O. arrange, at no extra cost, double-shift working on the site until such time as progress on the site is in accordance with the programme. If overtime is specifically ordered in writing by the Architect/S.O. in respect of extra works, the net extra costs, over and above normal daily rates, will be paid to the Contractor. Dismissal by Request

The Contractor shall, on written request of the Architect/S.O. or his representative on the site, immediately dismiss from the Works any person employed by him thereon who may, in the opinion of the Architect/S.O be incompetent or misconduct himself and such person shall not again be employed on the Works without the written permission of the Architect/S.O.

To Collection

PRELIMINARIES 39

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

NO Preliminaries. Imported Materials A

DESCRIPTION

Where materials are to be supplied from outside Nigeria, the cost of such materials C.I.F., Apapa Docks together with landing charges, duty and other Government taxes will be set against the P.C or Provisional Sum included in the Bills of Quantities. The Contractor will be required to collect and clear the materials from Apapa Docks, handle, load and transport them to the site and will be responsible for any loss or damage to the materials after they are landed; an item for this is included in the Bills of Quantities after the relevant P.C Sums. Prime Cost Sums

The following items in connection with prime cost sums are in addition to the Contractor's obligations described elsewhere (for example, provision of scaffolding, etc.) Receipted vouchers for all articles for which prime cost amounts are included in the Bills of Quantities must be produced at the final settlement of accounts and the final certificate will not be issued until such receipts have been produced. The Contractor shall allow for checking Nominated Suppliers' invoices and quotations, etc., before placing orders in respect of P.C Items and shall be solely responsible for ensuring that all materials so ordered are sufficient and correct in quantity and contain due allowance for waste, etc. The Contractor shall allow for checking all materials supplied by the Nominated Suppliers at the time of receipt on site, unpacking, re-packing and taking all necessary action in respect of insurance claims and the re-ordering of broken or damaged articles. Where the Contractor is required to 'Fix Only' materials supplied by Nominated Suppliers or others, the rates inserted in the Bills of Quantities are to allow for taking delivery, stacking, storing and protecting until required, assembling as necessary and getting into position before fixing.

To Collection

PRELIMINARIES 40

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

NO Preliminaries. Prime Cost Sums (cont'd) A

DESCRIPTION

Where the term 'attendance' or 'attend upon' is used in the Bills of Quantities in connection with Nominated Sub-Contractor's work, or work executed by others, the Contractor shall allow for the use of standing scaffolding, canteens, sanitary accommodation, office accommodation, space for storage of plant and materials and for providing light and water and clearing away rubbish and for taking delivery of all materials when received on the site, unloading, handling, stacking or storing until required and hoisting into position. The Contractor shall allow for affording maximum co-operation in arranging that builder's work is carried out, as far as possible to suit the convenience of the Sub-contractors. The Contractor shall obtain from the sub-contractors their requireements for recesses, chases, holes and the like so that these may be formed correctly as the work proceeds. No extra charge will be allowed for cutting chases, holes, etc., out of proper sequence. Provisional Sums

Work executed against provisional sums shall be measured and valued in accordance with clause 11 of the Conditions of Contract with the exception that the cost of materials falling within the scope of P.C items elsewhere in the Bills of Quantities will be offset against those P.C items. Omission of P.C or Provisional Sums

The Employer reserves the right to omit any P.C or Provisional Sum from the Contract and no claim for loss of profit arising from such omissions will be entertained. Direct Payment by Employer for Items covered by P.C or Provisional Sums.

The Employer reserves the right to supply and pay direct for any items covered in this Contract by P.C or Provisional Sums. No adjustment will be made to the Contractor's profit and attendance on P.C Sums (whether expressed as a lump sum or as a percentage) should this right be exercised.

To Collection

PRELIMINARIES 41

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

NO Preliminaries. Advertisements A

DESCRIPTION

The Contractor shall not display, or permit the display of any advertisement within the boundaries of the site or upon any temporary fencing, hoardings, plant, etc., save upon the written instructions of the Architect/S.O. Site Board

Provide and erect a site board showing the title of the Contract, names and addresses of the Consultants, Nominated Suppliers and Sub-Contractors and such other information as may be required by the Architect/S.O who shall approve the design layout and colours of the board. Lettering shall be 'cut-out' plywood or plastic of an approved thickness, and shall be 100mm high for the main title, and 50mm or 38mm high elsewhere. The whole board shall be maintained in good condition, repainted as necessary, and removed when no longer required. Clearing of Rubbish

Allow for clearing away all shavings, cuttings and other rubbish as it accumulates from time to time during the progress of the Works and on completion, including that of sub-contractors and special tradesmen and the disposal of all materials condemned by the Architect/S.O. Clearing on Completion

Allow for cleaning down the whole of the premises including cleaning glass both sides and cleaning off all floors, pavings, metalwork, finishings and fittings throughout, touching up generally and removing all stains, dirt and surplus materials and rubbish and leaving the Works and site in a clean and tidy condition and ready for immediate use, with all damage to property, roads, paths and drains, etc., made good to the satisfaction of the Architect/S.O. Defects after Completion

Allow for inspecting the Works at the end of the Defects Liability Period and making good all defects in accordance with clause 15 of the Conditions of Contract. Allow also for inspecting and making good such defects as may be of an urgent nature during the Defects Liability Period.

To Collection

PRELIMINARIES 42

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

NO Preliminaries.

DESCRIPTION

Exterminate and Prevent Pests Allow for effectively destroying all vermin, insects and pests to the whole area of the site and taking all preventive measures to maintain the site in a clean and sanitary condition to the satisfaction of the Architect/S.O. (See also item in "work below ground floor slab" of each building for special treatment of ground under buildings) Advance Payment/Performance Bond Allow for providing an Advance Payment/Performance Bond obtainable from an approved Bank or Insurance Company. Project Vehicle Allow for provion of an approved 2Nrs Hilux car as consultants' project Vehicle including fueling and maitaining, driver salaries etc. throughout the duration of the project, and shall be handed over to client on completion of the project. To Collection Below COLLECTION Page Prel/1 Page Prel/2 Page Prel/3 Page Prel/4 Page Prel/5 Page Prel/6 Page Prel/7 Page Prel/8 Page Prel/9 Page Prel/10 Page Prel/11 Page Prel/12 Page Prel/13 Page Prel/14 Page Prel/15 Preliminaries Carried to Grand Summary 114,877,755.25

21,000,000.00

PRELIMINARIES 43

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

POLICE POST/FIRE OFFICE SUBSTRUCTURE (ALL PROVISIONAL) Excavations and Earthwork A Excavate topsoil to remove vegetable top soil maximum depth not exceeding 150mm and cart away to a distance of 2.00m from site Excavate trench for foundation starting from stripped level not exceeding 1.50m deep. C Ditto pit to receive column bases Filling D E Remove surplus excavated material and cart away from site Return fill and ram excavated material around pits and Foundation. F Approved imported laterite hardcore filling well rammed and consilidated in layers in 150mm layers. 101 m2 1,350.00 136,350.00 28 m
3 2

119

50.00

5,950.00

50 22

m m

575.00 575.00

28,750.00 12,650.00

11

220.00

2,420.00

180.00

5,040.00

Surface Treatment G Level and compact bottom of excavation to receive concrete. H Prepare and apply "Dieldrex" 20 anti-terminate treatment to sides and bottom of excavation. 151 m2 55.00 8,305.00 56 m2 40.00 2,240.00

To Collections

201,705.00

POLICE/FIRE SERVICE POST44

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

substructure cont'd concrete Work Insitu Concrete mix 1:10 aggregate in A 50mm thick blinding plain insitu concrete Grade 20 developing crushing strenght of 21N/mm2 in 28 days in: B Foundation trenches Reinforced in-situ concrete (grade 25) developing strenght of 21N/mm2 at 28 days in: C D E F Column Base Column Ground Beam 150mm bed 1 1 1 2 5 Reinforcement Round hot rolled tensile deformed bar reinforcement to BS4449 and 4461 including all necessary cuttings, bends, hooks, tying, wires etc. Column Bases G 12mm diameter bar Column H J 16mm diameter bar 10mm diameter bar Ground Beam K L 16mm diameter bar 10mm diameter bar Slab Single layer BRC mesh reinforcement to BS 4483 reference A193 weighing 3,02Kg/m2 laid in bed with 150mm side and end laps (measured nett) in: M Floor Slab 119 m2 1,150.00 136,850.00 120 98 Kg Kg 300.00 300.00 36,000.00 29,400.00 110 76 Kg Kg 300.00 300.00 33,000.00 22,800.00 86 Kg 300.00 25,800.00 m m
3

73

m2

2,100.00

35,700.00

17

42,000.00

42,000.00

42,000.00 m3 m3

210,000.00

To Collections 571,550.00

POLICE/FIRE SERVICE POST45

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

Substructure cont'd Formwork Sawn formwork to A. B Sides of Columns base Sides of column 2 3 5 C Sides floor bed 150mm high 15 m 400.00 6,000.00 m2 1,650.00 m2 8,250.00

Blockwork sandcrete hollow blocks with cavities filled solid with plain in situ concrete (1:4:8) - 100mm aggregate D 230mm walls 10 m
2

4,800.00

48,000.00

To Collections

62,250.00

COLLECTIONS PAGE 1 201,705.00

PAGE 2

571,550.00

PAGE 3

62,250.00

SUBSTRUCTURE CARRIED TO SUMMARY

835,505.00

POLICE/FIRE SERVICE POST46

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

CONCRETE WORK Reinforced in-situ concrete (grade 25) developing strenght of 2/mm2 at 28 days in: A B Column Roof Beam Reinforcement Round hot rolled tensile deformed bar reinforcement to BS 4449 and 4461 including all necessary cuttings, bends hooks, tying wires etc. in Column C D 16mm Diameter 10mm Diameter Roof Beam E F 16mm Diameter 10mm Diameter 165 87 Kg Kg 300.00 300.00 49,500.00 26,100.00 180 90 Kg Kg 300.00 300.00 54,000.00 27,000.00 1 1 m m
3

42,000.00 42,000.00

42,000.00 42,000.00

Sawn Formwork G H Sides of Column Sides and Soffit of roof beam 3 19 m2 m 1,650.00 360.00 4,950.00 6,840.00

252,390.00 CONCRETE WORK CARRIED TO SUMMARY

POLICE/FIRE SERVICE POST47

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

BLOCKWORK

Sandcrete hollow block in blocks sizes 450 x 230mm high built in cement mortar (1:4) A 230mm thick wall 380 m2 3,800.00 1,444,000.00

BLOCKWORK CARRIED TO SUMMARY

1,444,000.00

POLICE/FIRE SERVICE POST48

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

ROOFING Aluminium roofing sheets 0.55mm gauge longspan aluminium roofing sheets fixed to timber purlin with hooks and bolts in accordance with the manufactures instruction A B C D Roofing Ridge capping 700mm girth Gutter valley 700mm girth 450mm flashing twice bent one end dressed over and other end turned in groove in blockwork 212 12 34 22 m
2

4,850.00 2,450.00 2,450.00 1,650.00

1,028,200.00 29,400.00 83,300.00 36,300.00

m m m

ROOFING CARRIED TO SUMMARY

1,177,200.00

POLICE/FIRE SERVICE POST49

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

CARPENTARY AND JOINERY

Treated Sawn Hardwood A B C D E F 150 x 50mm Rafters at 1200mm centres 150 x 50mm Tie beams at 1200mm centres 150 x 50mm King post at 1200mm centres 100 x 50mm struts 50 x 75mm purlins at 900mm centres 50 x 50mm Noggins at 600mm centres 211 186 24 18 21 176 m m m m m m 380.00 380.00 380.00 320.00 260.00 240.00 80,180.00 70,680.00 9,120.00 5,760.00 5,460.00 42,240.00

CARPENTARY & JOINERY CARRIED TO SUMMARY

213,440.00

POLICE/FIRE SERVICE POST50

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

DOORS AND WINDOWS HARDWOOD TIMBER 44mm Thick solid core veneer plywood polished flush doors complete with metal frame and high quality lock set (measured separately), Doors 900 x 2100mm high Door 750 x 2100mm high Supply and fix approved ironmongery to doors C D 75 toilet privacy bolts Cylinder lockset or other equal and approved type with lever handle furniture 6 E Plastic door stopper screwed to floor 6 No No 6,500.00 600.00 39,000.00 3,600.00 6 No 4,500.00 27,000.00

A B

4 2

No No

30,000.00 30,000.00

120,000.00 60,000.00

WINDOWS ALUMINIUM SLIDING WINDOWS F Composite window overall size 900x 1200mm high comprising sliding window size 900 x 1200 Fixed to block work and concrete Ditto 600 x 600mm ditto 6 2 No No 20,000.00 12,500.00 120,000.00 25,000.00

BURGLAR PROOFING TO WINDOWS Fabricate and install complete Mild Steel bars consisting of 16mm high tensile vertical and horizontal bars welded together including priming in red oxide paint and one finishing coat gloss paint. H J 1200 x 900mm high. 600 x 600mm high 6 2 No No 9,500.00 7,500.00 57,000.00 15,000.00

DOORS AND WINDOWS CARRIED TO SUMMARY

466,600.00

POLICE/FIRE SERVICE POST51

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

PLUMBING AND ENGINEERING INSTALLATIONS SANITARY APPLIANCES Supply anf fix the following sanitary fittings in accordance with the manufacturer's instructions TWYFORD Vitreous china low level water Closet white suite with "P" trap or equal approved type by "CCA" complete with all necessary accessories TWYFORD 560 x 405mm Wash Hand basin complete with pedestal and all accessories 750 x 750mm shower tray complete with all necessary accessories approved by 'CCA' Towel rail Chrome plated steel rail and holder; Screwed to wall with and including drive screws Toilet roll holder; stainless stell with a wooden thief proof holder fixed to wall Mirrow; 4mm silvered floated glass; 600 x 450mm with arised edges Floor drain; stainless steel; mounted flush with floor finish and 50mm low level S-trap COLD WATER SUPPLY Trenches/Pipesways/Pits for buried Engineering Services H Excavating trenches for services 500mm norminal size: 500mm average depth from 150mm below excavated materials; disposal of surplus excavated materials

Nr

28,000.00

56,000.00

Nr

18,000.00

36,000.00

Nr

20,000.00

40,000.00

Nr

3,500.00

7,000.00

Nr

1,400.00

2,800.00

Nr

5,500.00

11,000.00

Nr

1,500.00

3,000.00

148

350.00

51,800.00

Pipelines
J K L M Straight galvanised iron pipe in chases/trenches/ Floor screed 38mm Diameter 25mm Diameter 19mm Diameter 13mm Diameter Extra over 38mm UPVC Pipe; for Fittings Elbows;38 Equal tee;38x38x38 Reducing Tee;38x38x25 Union Connector;38 Sockets;25 Extra over 25mm UPVC Pipe; for Fittings Elbows;25 Reducing Tee;25x25x19 To Collections 18 21 14 8 m m m m 1,200.00 900.00 410.00 240.00 21,600.00 18,900.00 5,740.00 1,920.00

N P Q R S T U

5 16 12 8 12 8 8

Nr Nr Nr Nr Nr Nr Nr

180.00 180.00 180.00 180.00 180.00 180.00 180.00

900.00 2,880.00 2,160.00 1,440.00 2,160.00 1,440.00 1,440.00 268,180.00

POLICE/FIRE SERVICE POST52

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

A B

Union Connector;25 Sockets;25 Extra over 19mm UPVC Pipe; for Fittings

8 6

Nr Nr

180.00 180.00

1,440.00 1,080.00

C D E F G

Elbows;19 Equal tee;19x19x19 Reducing Tee;19x19x13 Union Connector;19 Sockets;19 Extra over 13mm UPVC Pipe; for Fittings

6 8 1 4 6

Nr Nr Nr Nr Nr

80.00 80.00 80.00 80.00 80.00

480.00 640.00 80.00 320.00 480.00

H J K L M

Elbows;13 Equal tee;13x13x13 Nipples; 13 Union Connector;13 Sockets;13

8 4 2 8 5

Nr Nr Nr Nr Nr

80.00 80.00 80.00 80.00 80.00

640.00 320.00 160.00 640.00 400.00

Pipework Ancillaries
N Gate valve; 19mm; bronze body; with 2 nr connections to galvanised mild steel pipe Stop cork; 13mm; bronze body; with 2 nr connections to galvanised mild steel pipe WASTE WATER INSTALLATION Pipe work The following in approved PVC waste water discharge pipe with and including all accessories to match Q R 100mm Diameter 32mm Diameter Extra over PVC Discharge pipe S T U 100 x 100mm WC connector 32 x 32mm elbow Tee 50 x 50mm Inspection Chamber 450 x 450 x 450mm high inspection chamber with blockwall on reinforced 100mm thick concrete base and including precast 75mm thidk reinforced concrete cover. 1 4 3 Nr Nr Nr 800.00 800.00 800.00 800.00 3,200.00 2,400.00 97 13 m m 700.00 550.00 67,900.00 7,150.00 3 Nr 2,000.00 6,000.00

Nr

800.00

6,400.00

Nr

30,000.00

60,000.00

To Collections

160,530.00

POLICE/FIRE SERVICE POST53

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

TESTING AND COMMISSIONING A Test the entire installation in accordance with the Enginner's specification Preparing Drawings;information required in the Engineer's specification;3Nr copies;1Nr negative and 2Nr prints; binding into two sets;for the Employer.

100,000.00

50,000.00

To collections

150,000.00

COLLECTIONS PAGE 9 PAGE 10 PAGE 11 268,180.00 160,530.00 150,000.00

PLUMBING AND ENGINEERING INSTALLATIONS CARRIED TO SUMMARY

578,710.00

POLICE/FIRE SERVICE POST54

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

ELECTRICAL ENGINEERING INSTALLATIONS Accessories fo Electrical Services


ACCESSORIES; LIGHTING SWITCHES; AS SPECIFIED RATE TO INCLUDE GALVANISED STEEL KNOCKOUT BOX SET IN MORTICES IN WALL; (FLUSH MOUNTED)

A B C D

1 gang 1 way "MEM' or equal approved 1 gang 2 way Ditto 2 gang 2 way Ditto 3 gang 2 way Ditto CONDUIT AND CABLE TRUNKING CABLE AND CONDUIT IN FINAL CIRCUIT;RADIAL MAIN CIRCUIT; PVC INSULATED AND COLOUR CODED CABLE TO BS 6004 TABLE 1A; DRAWN INTO AND INCLUDING 20MM DIAMETER HEAVY GUAGE PVC CONDUIT; RATE TO INCLUDE FOR ALL CABLE ANCILLARIES DEEMED NECCESARY FOR A COMPLETE INSTALLATION

4 4 2 2

Nr Nr Nr Nr

2,500.00 2,500.00 2,500.00 2,500.00

10,000.00 10,000.00 5,000.00 5,000.00

E F

3Nr single Core 2.5mm2 Cables 3Nr single Core 4mm2 Cables
ACCESSORIES; SOCKETS; AS SPECIFIED RATE TO INCLUDE GALVANISED STEEL KNOCKOUT BOX SET IN MORTICES IN WALL; (FLUSH MOUNTED)

110 46

m m

1,250.00 1,800.00

137,500.00 82,800.00

G H J K

13A 1 gang Double Pole "MEM' or equal approved 13A 2 gang Double Pole "MEM' or equal approved 20A 3 pin 1 gang Double Pole "MEM' or equal approved 15A 3 pin 1 gang Double Pole "MEM' or equal approved Fittings and Accessories

3 1 1 1

Nr Nr Nr Nr

2,500.00 2,500.00 3,200.00 2,800.00

7,500.00 2,500.00 3,200.00 2,800.00

L M

1 x 18W Flourscent, Ceiling Mounted with Diffuser

Nr

1,800.00

1,800.00

Surface mounted Twin Flourscent with Opal Diffuser with 1 x 36 TLD Flourescent N Surface mounted Single Flourscent with Opal Diffuser with 1 x 18 TLD Flourescent P Q Ceiling Mounted Fitting in Die cast Aluminium Satin Glass With Aluminium reflector R S Compact Flourescent wall Mirrow Light Newclime celing fan complete with regulators Recessed Vertical Downlighter witrh High Frequency Electronic ballast

Nr

3,500.00

3,500.00

1 1

Nr Nr

3,500.00 2,400.00

3,500.00 2,400.00

1 1 1

Nr Nr
Nr

2,900.00 1,200.00 9,500.00

2,900.00 1,200.00 9,500.00

ELECTRICAL ENGINEERING INSTALLATIONS: Carried to Summary

291,100.00

POLICE/FIRE SERVICE POST55

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

ELEMENT NO. 8 FLOOR, WALL AND CEILING FINISHINGS FLOOR FINISHES INTERNAL WORKS 300 x 300 x 8mm Vitrified ceramic floor tiles laid on cement and sand screeded bed (measured separately) Ditto 19x150mm skirting Ditto treads 300mm wide Cement and sand (1:3) beds and backings D E F 42mm Screeded bed to receive vitrified ceramic floor tiles Ditto screeded bed to receive treads 12mm floated backing EXTERNAL WORKS 300 x 300 x 8mm Vitrified ceramic floor tiles laid on cement and sand screeded bed (measured separately) Ditto 19x150mm skirting Ditto treads 300mm wide Cement and sand (1:3) bed 42mm Screeded bed to receive vitrified ceramic floor tiles Ditto screeded bed to receive treads 12mm floated backing WALL FINISHES Internal works 12mm cement and sand (1:4) smooth rendering to N P Q Walls Surfaces not exceeding 100 -200mm wide Ditto not exceeding 300mm wide GLAZED WALL TILES 200 x 200x6mm Colour glazed wall tiles fixed with approved adhesive on cement and sand floated backing (measured separately) Ditto reveals100-200mm wide Ditto 19x150mm Apron Ditto risers 150mm high Cement and sand (1:3) beds and backings 12mm floated backing to receive glazed ceramic wall tiles (measured separately) W X Y Ditto reveals100-200mm wide Ditto 19x150mm Apron Ditto risers 150mm high To collection 134 10 3 m
2

A.

134 19 6

3,800.00 1,500.00 1,850.00

509,200.00 28,500.00 11,100.00

B C

m m

134 6 19

630.00 465.00 465.00

84,420.00 2,790.00 8,835.00

m m

4 6 4

m2 m m

3,800.00 1,500.00 1,850.00

15,200.00 9,000.00 7,400.00

H J

K L M

4 4 6

m2 m m

630.00 465.00 465.00

2,520.00 1,860.00 2,790.00

450.00 90.00 135.00

60,300.00 900.00 405.00

m m

12 5 4 2

m2 m m m m2 m m m

3,500.00 1,500.00 1,500.00 1,500.00

42,000.00 7,500.00 6,000.00 3,000.00

S T U V

12 5 4 2

450.00 90.00 90.00 90.00

5,400.00 450.00 360.00 180.00 810,110.00

POLICE/FIRE SERVICE POST56

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

ELEMENT NO. 8 continued External works 12mm cement and sand (1:4) smooth rendering to: A C D E F 200 x 200x6mm Colour glazed wall tiles fixed with approved adhesive on cement and sand floated backing (measured separately) on risers 150mm high Cement and sand (1:3) beds and backings G 12mm floated backing to receive glazed ceramic tiles riser 150mm high (m/s) Ceiling Finishes Internal works ALUMINIUM SUSPENDED CEILING SYSTEM H 600 x 600mm Aluminium suspended ceiling in concealed grids; suspended ceiling tiles or other equal and approved External works J 600 x 600mm Aluminium suspended ceiling in concealed grids; suspended ceiling tiles or other equal and approved 12mm cement and sand (1:4) smooth rendering on: 10 m 90.00 900.00 10 m 1,500.00 15,000.00 Walls Sides not exceeding 200mm width Ditto not exceeding 300mm wide Isolated circular columns 150 radius GLAZED WALL TILES 224 6 3 5 m2 m m m 450.00 90.00 135.00 135.00 100,800.00 540.00 405.00 675.00

134

m2

4,800.00

643,200.00

27

m2

4,800.00

129,600.00

Protect all works in this section To Collection

Item 891,120.00

COLLECTIONS PAGE 13 810,110.00

PAGE 14

891,120.00

FLOOR, WALL AND CEILING FINISHINGS: Carried to Summary

1,701,230.00

POLICE/FIRE SERVICE POST57

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

ELEMENT NO 10 PAINTING AND DECORATING INTERNAL WORK Prepare and aply two undercoats and one finishings coat of emulsion paint on: A Walls External works Prepare and aply chemical dcor glossy textured paint from approved manufacturer on: B Rendered walls 224 m
2

134

1,200.00

160,800.00

1,650.00

369,600.00

PAINTING AND DECORATING Carried to Summary

530,400.00

POLICE/FIRE SERVICE POST58

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

SUMMARY A SUBSTRUCTURE 835,505.00

FRAME

252,390.00

INTERNAL AND EXTERNAL WALLS

1,444,000.00

ROOF AND ROOF COVERINGS

1,177,200.00

CARPENTARY AND JOINERY

213,440.00

DOORS, WINDOWS AND IRONMONGERY

466,600.00

PLUMBING AND ENGINEERING INSTALLATIONS

578,710.00

ELECTRICAL INSTALLATIONS

291,100.00

FLOOR, WALLS AND CEILING FINISHINGS

1,701,230.00

PAINTING AND DECORATING

530,400.00

POLICE/FIRE POST

7,490,575.00

POLICE/FIRE SERVICE POST59

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SHOPPING MALL ELEMENT Nr. 1 BLOCK A SUBSTRUCTURE (ALL PROVISIONAL) D20: Excavation and Filling. A B Excavate topsoil average depth not exceeding 150mm Excavating trenches, width exceeding 0.3m maximum depth not exceeding 1.50m C Excavating pits (900nr), maximum depth not exceeding 2.00m D Dispose excavated materials off site, in spoil heap away from site E Filling to excavations, thickness exceeding 250mm, materials arising from excavations F G 150mm laterite filling in layers Filling to make up levels, thickness not exceeding 150mm, hardcore materials obtained off site H J Level and compact bottom of excavation Dieldrex or other equal and approved antitermite treatment solution spread to faces of excavations E10: In situ concrete Plain in situ concrete (1:10)-40mm aggregate K Blinding beds, thickness not exceeding 50mm Plain in situ concrete (1:3:6)-20mm aggregate L Foundations Reinforced in situ concrete (1:2:4)-19mm aggregate M N P Beds/ attached steps (150mm thick) Column bases Column (900nos) 1,360 1311 211 m
3

22,500

40.00

900,000.00

4,575

m3

575.00

2,630,625.00

4,050

m3

575.00

2,328,750.00

5,111

m3

220.00

1,124,420.00

3,514 86

m3 m3

180.00 1,350.00

632,520.00 116,100.00

1,410 1,321

2,100.00 40.00

2,961,000.00 52,840.00

m2

1,321

55.00

72,655.00

57

m2

2,100.00

119,700.00

701

42,000.00

29,442,000.00

42,000.00 42,000.00 42,000.00

57,120,000.00 55,062,000.00 8,862,000.00

m3 m
3

Carried to collection

161,424,610.00

SHOPPING MALL 60

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

E20: Formwork for in situ concrete Plain vertical sawn formwork A B Edges of beds, height not exceeding 250mm Sides of column E30: Reinforcement for in situ concrete High tensile bars to BS 4449, straight 20mm Diameter 16mm Diameter 12mm Diameter Mild steel bars to BS 4449, bent. F 10mm Diameter Fabric mesh A192 weighting 42kg/m2 laid as detailed in manufacturer's manual G Ground floor bed/Attached ramp F10: Brick/Block walling Sandcrete blockwork in stretcher bond bedded in cement and sand mortar mix (1:6) flush pointed, filled solid with lean concrete H Walls, 230mm thick vertical 7,112 m2 4,800.00 34,137,600.00 9,831 m2 1,150.00 11,305,650.00 8.123 t 300,000.00 2,436,900.00 544 1,242 m m
2

1,650.00 1,650.00

897,600.00 2,049,300.00

C D E

121.110 14.812 6.411

t t t

300,000.00 300,000.00 300,000.00

36,333,000.00 4,443,600.00 1,923,300.00

EXTERNAL RENDERING J 15mm thick cement and sand (1:4) smooth rendering to face of the wall PAINTING AND DECORATION K Prepare prime and apply one undercoat and two finishing coats of high quality "DULUX" emulsion paint on rendered wall (rate including floating) 912 m2 1,650.00 1,504,800.00 912 m
2

650.00

592,800.00

Carried to collection

95,624,550.00

SHOPPING MALL 61

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

Collection

Page 01

161,424,610.00

Page 02

95,624,550.00

SUBSTRUCTURE CARRIED TO SUMMARY

257,049,160.00

SHOPPING MALL 62

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

ELEMENT Nr. 2 FRAMES E10: In situ concrete Reinforced in situ concrete (1:2:4)-19mm aggregate A C D Columns Beams Roof beams/ concrete fascia 312 61 26 m m
3

42,000.00 42,000.00 42,000.00

13,104,000.00 2,562,000.00 1,092,000.00

m3

E20: Formwork for in situ concrete Plain vertical sawn formwork E G H Columns Beams Roof beams/ concrete fascia 5,921 562 343 m2 m2 m2 1,650.00 1,650.00 1,650.00 9,769,650.00 927,300.00 565,950.00

J K L

E30: Reinforcement for in situ concrete High tensile bars to BS 4449, straight. 20mm Diameter 16mm Diameter 12mm Diameter Mild steel bars to BS 4449, bent.

18.110 29.710 19.910

t t t

300,000.00 300,000.00 300,000.00

5,433,000.00 8,913,000.00 5,973,000.00

10mm Diameter

29.180

300,000.00

8,754,000.00

FRAMES CARRIED TO SUMMARY

57,093,900.00

SHOPPING MALL 63

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

ELEMENT Nr. 3 STAIRCASES E10: In situ concrete Reinforced in situ concrete (1:2:4)-19mm aggregate A B C D Staircases (flight) Landings Steps Beams Plain vertical sawn formwork: E F G H J K Soffits of landings Soffits of flight Sides of beams Edges of suspended slabs Stairflights Steps Reinforcement for in situ concrete High tensile bars to BS 4449, straight and vertical. L M N 16mm Diameter 12mm Diameter 10mm Diameter Plastered/Rendered/Roughcast coatings 12mm thick cement and sand (1:3) rendering P Q R Landings soffit, width exceeding 300mm Stairflight soffit, width exceeding 300mm Strings 344 498 211 m m
2

18 12 8 11

m m

42,000.00 42,000.00 42,000.00 42,000.00

756,000.00 504,000.00 336,000.00 462,000.00

m3 m
3

104 132 24 64 128 321

m2 m2 m2 m m m

1,650.00 1,650.00 1,650.00 400.00 400.00 400.00

171,600.00 217,800.00 39,600.00 25,600.00 51,200.00 128,400.00

1.480 5.012 0.913

t t t

300,000.00 300,000.00 300,000.00

444,000.00 1,503,600.00 273,900.00

650.00 650.00 225.00

223,600.00 323,700.00 47,475.00

Carried to collection

5,508,475.00

SHOPPING MALL 64

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

Sand cement/Concrete/Granolithic screeds/flooring 25mm thick cement and sand (1:4) screeded floor A B Landing floors Treads, 300mm wide 12mm thick cement and sand (1:3) rendering C Risers; plain, 150mm high Stone/ConcreteQuarry/Ceramic tilling/Mosaic Granite floor tilling on cement and sand bed D E F G Landing Floors Skirtings Treads to steps Risers to steps Painting/Clear finishing prepare and apply 3 coats of emulsion paints to floated surfaces, rate including floating to Architect's details. H Rendered surfaces, width exceeding 300mm Stairs/Walkways/Balustrades J Stair Balustrades; 1000mm high purpose made designed balustrade in 75mm diameter stainless steel pipes complying to Architect's details embedded into concrete Stainless steel handrails consisting of 75mm x 75mm top and bottom rail complete with bolts and nuts screwed to steel wall bracket 141 m2 1,650.00 232,650.00 112 411 308 321 m2 m m m 8,500.00 650.00 1,950.00 975.00 952,000.00 267,150.00 600,600.00 312,975.00 481 m 180.00 86,580.00 112 347 m2 m 830.00 250.00 92,960.00 86,750.00

1,811

5,700.00

10,322,700.00

2,911

4,800.00

13,972,800.00

Carried to collection

26,927,165.00

Collection Page 05 Page 06 5,508,475.00 26,927,165.00

STAIRCASES CARRIED TO SUMMARY

32,435,640.00

SHOPPING MALL 65

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

ELEMENT Nr. 4 UPPER FLOORS E10: In situ concrete Reinforced in situ concrete (1:2:4)-19mm aggregate A Slabs thickness, 150-450mm, sloping not exceeding 15 E30: Reinforcement for in situ concrete High tensile bars to BS 4449, straight. B C 12mm Diameter 10mm Diameter E20: Formwork for in situ concrete Plain vertical sawn formwork to the following D Edges of suspended slabs, height 150- 250mm Plain sawn formwork comprises of verical struts and runners E Soffit of slabs, slab thickness not exceeding 450mm, horizontal, height to soffit not exceeding 4.50m 9,067 m2 1,650.00 14,960,550.00 2,176 m 350.00 761,600.00 191.86 51.40 t t 300,000.00 300,000.00 57,558,000.00 15,420,000.00
0

1,360

42,000.00

57,120,000.00

UPPER FLOORS CARRIED TO SUMMARY

145,820,150.00

SHOPPING MALL 66

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

ELEMENT Nr. 5 ROOF G20: Carpentary/Timber framing/First fixing Sawn treated hardwood in pitched roof members A B C D Tie beams 150 x 50mm Struts 150 x 50mm Rafters 150 x 50mm Purlins 75 x 50mm H72: Aluminium sheet coverings/flashings 0.55mm coloured approved stone coated aluminium coverings laid to slope not exceeding 50 degrees from the horizontal with one and half corrugation side lap and 200m end lap and fixed in accordance to manufacturers instruction (measured nett) to timber purlins at approved general spacing E F G Pitched covering Ridge cappings, girth 600mm Hip capping, girth 600mm 4,821 811 521 m2 m m 4,850.00 2,450.00 2,450.00 23,381,850.00 1,986,950.00 1,276,450.00 4,118 9,711 8,717 7,231 m m m m 380.00 380.00 380.00 260.00 1,564,840.00 3,690,180.00 3,312,460.00 1,880,060.00

ROOF CARRIED TO SUMMARY

37,092,790.00

SHOPPING MALL 67

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

ELEMENT Nr. 6 INTERNAL AND EXTERNAL WALLS F10: Brick/Block walling Hollow Sandcrete blockwork in stretcher bond bedded in cement and sand mortar mix (1:6) flush pointed. A B Walls, 230mm thick vertical Dwarf walls 18,648 5,128 m
2

3,800.00 3,800.00

70,862,400.00 19,486,400.00

m2

INTERNAL AND EXTERNAL WALLS CARRIED TO SUMMARY

90,348,800.00

SHOPPING MALL 68

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

ELEMENT Nr. 7 DOORS AND WINDOWS E10: In situ concrete Reinforced in situ concrete (1:2:4)-19mm aggregate A Lintels E20: Formwork for in situ concrete Plain vertical sawn formwork B Lintels E30: Reinforcement for in situ concrete High tensile bars to BS 4449, straight. C 12mm Diameter Mild steel bars to BS 4449, bent. D 10mm Diameter DOORS L21: Metal doors/shutters/hatches purpose made decorative steel HPI security doors with steel frame in autobase paint built into blockwork and concrete surround, bedded and pointed in cement and sand mortar with mastic sealant complete with all necessary ironmongery E F Door, size 1800 x 2100mm high Door, size 900 x 2100mm high L20: Timber doors/shutters/hatches 50mm thick polished hardwood timber panel door including 225mm wide treated wrought finished hardwood door frame complete with architraves and ironmongery, all complying to Architect's details H J Door, size 900 x 2100mm high Door, size 750 x 2100mm high 20 590 nr nr 45,000.00 38,500.00 900,000.00 22,715,000.00 522 12 nr nr 165,000.00 78,500.00 86,130,000.00 942,000.00 4.612 t 300,000.00 1,383,600.00 3.310 t 300,000.00 993,000.00 614 m2 1,650.00 1,013,100.00 33 m
3

42,000.00

1,386,000.00

Carried to collection

115,462,700.00

SHOPPING MALL 69

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

WINDOWS L11: Metal windows/rooflights/sceens/louvres White powder coated aluminium casement windows in 5mm thick tinted glass complete with fly screen and burglar bars fit to detail A B C Windows size, 1500 x 1200mm high Windows size, 1200 x 1200mm high Windows size, 600 x 900mm high 150 32 704 nr nr nr 88,500.00 54,000.00 20,250.00 13,275,000.00 1,728,000.00 14,256,000.00

Carried to collection

29,259,000.00

Collection

Page 10

115,462,700.00

Page 11

29,259,000.00

DOORS AND WINDOWS CARRIED TO SUMMARY

144,721,700.00

SHOPPING MALL 70

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

ELEMENT Nr. 8 WALL FINISHES M20: Plastered/Rendered/Roughcast coatings 12mm thick cement and sand (1:3) floated smooth synthetic rendering to general surfaces complying to Architect's details. A B C Walls; externally Walls; internally Reveals, width not exceeding 300mm 12mm thick cement and sand (1:4) floated backing to general surfaces to receive further finishes D E F G Walls; externally Walls; internally Reveals, width not exceeding 300mm Plaster impression 44 1,121 68 19 m2 m2 m m 650.00 650.00 200.00 450.00 28,600.00 728,650.00 13,600.00 8,550.00 16,512 28,112 5,116 m2 m2 m 650.00 650.00 210.00 10,732,800.00 18,272,800.00 1,074,360.00

Carried to collection

30,859,360.00

SHOPPING MALL 71

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY M60: Painting/Clear finishing Vinyl mat emulsion paint as manufactured by Portland or CAPL in 3 coats to floated surfaces, rate including POP floating to Architect's details. A B C D Rendered surfaces, externally Rendered surfaces, internally Plaster impression Reveals, width not exceeding 300mm 16,512 28,112 19 316 m2 m
2

1,650.00 1,650.00 350.00 400.00

27,244,800.00 46,384,800.00 6,650.00 126,400.00

m m

Carried to collection

73,762,650.00

Collection

Page 13

30,859,360.00

Page 14

73,762,650.00

WALL FINISHES CARRIED TO SUMMARY

104,622,010.00

SHOPPING MALL 72

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY ELEMENT Nr. 10 CEILING FINISHES G20: Carpentary/Timber framing/First fixing Sawn treated hardwood in ceiling members A Noggins 50 x 50mm K40: Asbestos ceilings Asbestos ceiling finishes with centre rosette hunged to 50x50mm timber noggins (measured separately) including cornics fixed in accordance to the manufacturer's instructions. B Ceiling lining 9,067 m2 1,650.00 14,960,550.00 12,694 m 280.00 3,554,320.00

CEILING FINISHES CARRIED TO SUMMARY

18,514,870.00

SHOPPING MALL 73

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY ELEMENT Nr.11 FLOOR FINISHES M10: Sand cement/Concrete/Granolithic screeds/flooring 42mm thick cement and sand (1:4) floated bed to general surfaces to receive further finishes A Floors, level and to falls only not exceeding 150 from horinzontal M40: Stone/ConcreteQuarry/Ceramic tilling/Mosaic Patterned Granite floor finish on cement and sand bed B Floors; level and to falls only not exceeding 15 from horinzontal C Skirtings; height 100mm including backing Glazed vitrified ceramic floor tilling on cement and sand bed D Floors; level and to falls only not exceeding 150 from horinzontal Skirtings; height 100mm including backing Unglazed ceramic tilling on cement and sand bed in toilet areas F Floors; level and to falls only not exceeding 15 from horinzontal 681 m
2 0 0

18,134

m2

830.00

15,051,220.00

231 421

m2 m

8,500.00 650.00

1,963,500.00 273,650.00

17,222 6,722

m2 m

3,800.00 380.00

65,443,600.00 2,554,360.00

3,200.00

2,179,200.00

FLOOR FINISHES CARRIED TO SUMMARY

87,465,530.00

SHOPPING MALL 74

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY ELEMENT Nr. 12 ELECTRICAL SERVICES V20: LV Distribution Equipment; Metal clad Main Distrbution Board surface/ flush type as manufacured by FEDERAL ELECTRIC or MEM or BILLS including all MCB, back outlet connections to flush adaptable boxes, earth bonding, labels and fixing in accordance with manufacturer's instructions MV PANEL A 100A TPN MCCB main distribution panel (MV panel) comprising 2no 60A MCCB, 1no spare and circuit breaker 100A change over switch 100A main fuse switch Y61: HV/LV cable and wiring Cables; PVC insulated cable as manufactured by NOCACO or approved equal drawn into conduits or ducts or laid down into trunking or laid in trenches including cable loops, terminations, glands and all other accessories D E 4 x 150mm2 PVC/SWA/PVC copper cable 4 x 100mm2 PVC/SWA/PVC copper cable DISTRIBUTION BOARDS TP&N MCB Distribution Board complete with 100A integral incoming isolator and comprising 6nr 10A stablock; 8nr 20A stablock; 12nr 30A stablock, 1nr 45A stablock and 3nr spares ways F 100A 12-Way Equipment; Metal clad isolating pattern switches or ELCB as manufactured by FEDERAL ELECTRICAL, MEM or BILLS including all necessary fuse links with quick make and quick breaks contacts and fixing in accordance with manufacturer's instructions G 100A TP&N ELCB 162 nr 20,000.00 3,240,000.00 482 nr 40,000.00 19,280,000.00 6,512 1,411 m m 12,500.00 8,500.00 81,400,000.00 11,993,500.00

8 121 80

nr nr nr

300,000.00 35,000.00 27,000.00

2,400,000.00 4,235,000.00 2,160,000.00

B C

Carried to collection

124,708,500.00

SHOPPING MALL 75

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY Y60: Conduit and cable trunking Conduit; straight PVC pipe with flange joints in chases/floor screeds with and inlcuding conduit boxes, locknuts, brushes, couplers, bends, reducers, cutting and other necessary accessories, rates including making good surfaces disturbed. A 25mm Diameter Y61: HV/LV cable and wiring Cables; PVC insulated cable as manufactured by NOCACO or approved equal drawn into conduits or ducts or laid down into trunking or laid in trenches including cable loops, terminations, glands and all other accessories B C 4 x 6mm2 single core PVC copper cable 1 x 10mm2 single core PVC copper cable LUMINAIRES AND LAMPS V21: General lighting Lamp and luminaires; lighting fittings as manufactured by ABB or ASTRA or THORN or approved equal fixed to soffit including all necessary for complete installation D E F G 250w prismatic wall mounted halogen flood light fitting 1 x 40w; 1200mm flourescent fittings 60w ceiling mounted bowl head lighting fitting "NEWCLIME" ceiling fan complete with regulator 432 211 162 512 nr nr nr nr 8,000.00 3,800.00 2,800.00 8,500.00 3,456,000.00 801,800.00 453,600.00 4,352,000.00 14,993 8,761 m m 220.00 220.00 3,298,460.00 1,927,420.00 18,916 m 120.00 2,269,920.00

Carried to collection

16,559,200.00

SHOPPING MALL 76

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY Y74: Accessories for Electrical services Accessories as manufactured by MK or ABB or MEM including steel knock-out boxes fixed to form complete A B C D E F 5A 1 gang 1 way switch 5A 1 gang 2 way switch 5A 2 gang 2 way switch 5A 3 gang 2 way switch 240v fire alarm bell Break glass V22: General LV Power Ancillaries; low voltage power socket outlets switches and contactors as manufactured by MK or ABB or MEM or approved equal complete with accessories G H 13A single switched socket outlets 13A Twin switched socket outlets 543 543 nr nr 1,200.00 1,200.00 651,600.00 651,600.00 216 84 132 24 16 16 nr nr nr nr nr nr 1,200.00 1,200.00 1,200.00 1,200.00 7,500.00 5,000.00 259,200.00 100,800.00 158,400.00 28,800.00 120,000.00 80,000.00

Carried to collection

2,050,400.00

SHOPPING MALL 77

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

Y60: Conduit and cable trunking Conduit; straight PVC pipe with flange joints in chases/floor screeds with and inlcuding conduit boxes, locknuts, brushes, couplers, bends, reducers, cutting and other necessary accessories, rates including making good surfaces disturbed. A 20mm Diameter Y61: HV/LV cable and wiring Cables; PVC insulated cable as manufactured by NOCACO or approved equal drawn into conduits or ducts or laid down into trunking or laid in trenches including cable loops, terminations, glands and all other accessories B C 3 x 1.5mm single core PVC copper cable - Lighting 3 x 2.5mm2 single core PVC copper cable - Sockets
2

26,531

70.00

1,857,170.00

12,479 14,052

m m

650.00 480.00

8,111,350.00 6,744,960.00

Installation generally; supply, install, connect up and commission the complete earthing of the whole installation as at the main disribution panel, switch boards, distribution boards, generator room, transformer substation, etc. J Earthing and bonding; 25 x 3 copper tape and 600 x 600mm mat forming a basket and bonded to foundation reinforcement complete with salt and charcoal applied as specified W52: Lightning protection K lightning protector/arrestor complete applied as specified 12 nr 80,000.00 960,000.00

12

nr

120,000.00

1,440,000.00

Carried to collection

19,113,480.00

SHOPPING MALL 78

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY Collection

Page 17

124,708,500.00

Page 18

16,559,200.00

Page 19

2,050,400.00

Page 20

19,113,480.00

ELECTRICAL SERVICES CARRIED TO SUMMARY

162,431,580.00

SHOPPING MALL 79

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY ELEMENT Nr. 13 PLUMBING AND MECHANICAL SERVICES All materials supplied and installed shall be done in accordance with technical specification for mechanical installation as contained in the contract document. P30: Trenches/Pipeways/Pits for buried Engineering services A Excavating trenches for services 500mm nominal size; 500mm average depth from 150mm below existing ground level; backfilling with selected excavated materials; disposal of surplus excavated materials Y10: Pipelines Straight galvanised iron pipe to BS 425 in chases/trenches/floor screeds B C D E F 19mm Diameter - cold water supply 13mm Diameter - Hot and Cold water supply Non return valve Gate Valve Water meter Extra over galvanized iron pipes; fittings, not exceeding 65mm diameter 25mm Diameter fittings H J K L M Elbows Equal tees Reducing tees Union connector Nipple 310 211 61 81 112 nr nr nr nr nr 230.00 280.00 280.00 250.00 120.00 71,300.00 59,080.00 17,080.00 20,250.00 13,440.00 2,461 821 45 33 18 m m nr nr nr 320.00 320.00 3,000.00 3,000.00 12,500.00 787,520.00 262,720.00 135,000.00 99,000.00 225,000.00

6,211

250.00

1,552,750.00

Carried to collection

3,243,140.00

SHOPPING MALL 80

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY 19mm Diameter fittings A B C D E Elbows Equal tees Reducing tees Union connector Nipple 13mm Diameter fittings F G H J K Elbows Equal tees Reducing tees Union connector Nipple Y25: General pipeline equipment Equipment; supply, install and connect up pipeline equipment as manufactured by Eago or other approved equal with all necessary accessories for complete installation L Double trap coloured syphonic water closet with horizontal outlet with close couple 9 litres cistern and plastic cover complete with fittings wash hand basin 620 x 500mm with 3 taphole oval pedestal, starlite 12mm mixer with pop up waste accessories complete with wash-top to Architect's details 44 61 38 65 82 nr nr nr nr nr 200.00 250.00 250.00 230.00 120.00 8,800.00 15,250.00 9,500.00 14,950.00 9,840.00 24 13 21 32 21 nr nr nr nr nr 200.00 250.00 250.00 230.00 120.00 4,800.00 3,250.00 5,250.00 7,360.00 2,520.00

536

nr

32,000.00

17,152,000.00

536

nr

25,500.00

13,668,000.00

Carried to collection

30,901,520.00

SHOPPING MALL 81

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY Y25: General pipeline equipment A B C Vitreous china toilet roll holder fixed to wall Mirror; 4mm silvered float glass size 600 x 450mm high Hand dryer Straight UPVC pipes in chases/trenches/floor screeds H J K 100mm Diameter 75mm Diameter 50mm Diameter Extra over PVC pipes; fittings, exceeding 65mm diameter 100mm Diameter L M N P Q R UPVC elbow PVC tee WC connection sleeve Y radius bend Pam connector Cleaning eye 75mm Diameter S T U V UPVC elbow PVC tee Pam connector Cleaning eye 112 86 55 42 nr nr nr nr 320.00 370.00 500.00 400.00 35,840.00 31,820.00 27,500.00 16,800.00 98 48 32 36 61 44 nr nr nr nr nr nr 350.00 400.00 1,450.00 625.00 560.00 450.00 34,300.00 19,200.00 46,400.00 22,500.00 34,160.00 19,800.00 4,932 2,612 4,118 m m m 520.00 450.00 450.00 2,564,640.00 1,175,400.00 1,853,100.00 536 481 12 nr nr nr 3,000.00 7,000.00 13,000.00 1,608,000.00 3,367,000.00 156,000.00

Carried to collection

11,012,460.00

SHOPPING MALL 82

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY 50mm Diameter A B C UPVC elbow PVC tee Cleaning eye Y11: Pipework ancillaries D Traps; 50mm diameter UPVC floor drains grouted to floor bed Manholes/ Inspection Chamber E Manhole size 500 x 500 x 600mm deep internally constructed of 150mm thick concrete(1:3:6) base, 150mm thick sandcrete blockwork filled solid with lean concrete, 75mm thick concrete(1:3:6) benching and forming 150mm diameter half round channel, covered with cast iron, internal faces rendered in water proof cement sand mortar(1:3) including excavation, backfilling and disposal of surplus excavated materials 27 21 21 nr nr nr 280.00 320.00 400.00 7,560.00 6,720.00 8,400.00

432

nr

1,250.00

540,000.00

191

nr

30,000.00

5,730,000.00

Fire Fighting System Equipment; supply, install, connect up and commission fire fighting system as manufactured by ANGUS or other approved equal complete with piping/trunking as specified including all necessary accessories G Fire extinguisher; ABC 9Kg capacity general purpose dry powder type 240v fire alarm bell Break glass fire alarm outdoor siren

44 6 22 12

nr nr nr nr

16,500.00 7,500.00 5,500.00 10,550.00

726,000.00 45,000.00 121,000.00 126,600.00

H J K

Carried to collection

7,311,280.00

SHOPPING MALL 83

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY

Collection

Page 22

3,243,140.00

Page 23

30,901,520.00

Page 24

11,012,460.00

Page 25

7,311,280.00

PLUMBING AND MECHANICAL SERVICES CARRIED TO SUMMARY

52,468,400.00

SHOPPING MALL 84

PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SUMMARY 1 2 3 4 5 6 7 8 9 SUBSTRUCTURE FRAMES STAIRCASES UPPER FLOORS ROOF INTERNAL AND EXTERNAL WALLS DOORS AND WINDOWS WALL FINISHES CEILING FINISHES 257,049,160.00 57,093,900.00 32,435,640.00 145,820,150.00 37,092,790.00 90,348,800.00 144,721,700.00 104,622,010.00 18,514,870.00 87,465,530.00 162,431,580.00 52,468,400.00

10 FLOOR FINISHES 11 ELECTRICAL SERVICES 12 PLUMBING AND MECHANICAL SERVICES

SHOPPING CENTER Total carried to General Summary

1,190,064,530.00

SHOPPING MALL 85