You are on page 1of 25

SHEEPSHEAD BAY DISTRICT

RECONSTRUCTION OF THE SPECIAL

Barrycenter Diagrams

95.9

376
63.14

119.4

50

Legal Diagrams
146.96
168. 75
100

60.21

95.9

376
63.14

146.96

75 168.

119.4

50

100

Existing Marina Bulkhead High Waterline Pierhead Pier

Current conditions

Public Plaza Dock 1 Water Access WorkShop Water Access Garage Central Circulation Public Plaza Dock 3 Green space Dock 2 WorkShop

Central Circulation Garage Water Access

Green space Dock 3

Bubble Diagrams

Access Diagrams

Barrycenter Diagram Superimposed to community

Analysis Diagrams

Barrycenter Diagrams derivatives

Tides Analysis Diagrams

Tides Analysis to Site and Time

New Bulkhead after Analyis

Base Floor Level

Public Ramp Level

You might also like