You are on page 1of 3

A PICTORIAL VIEW OF SITE READY FOR INSTALLATIONS: 1.0 SITE ID: 2.

0 PICTURES SHOWING SITE STATUS:

Site Access.

Picture showing the Guard House and steps.

Gate, Chillers and IPMS Installed.

Front View of Site.

End View of Site Showing Generators and Canopy.

View showing Fuel Tank and Generator

View showing IPMS and Battery Chiller.

Tower at Height.

3.0 Site Equipment and Electrical Readings:

You might also like