You are on page 1of 42

FTCO

AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.


Mechanical Department PROJECT NAME :GRAIN SOILS PROJECT NO : PREPARED BY : ENGR. SALLAM CHECKED BY : ENGR. AHSAN ALI LOONA
TITLE : HOT WATER DEMAND CALCULATION
From ASPE Data Book Table 4-6 page 4-15 Occupancy : Office Building

All Buildings
ROOM NAME: ROOM NO. Fixture Demand L/H 7.6 22.7 113.6 75.7 37.9 378.6 UNIT NO.

TYPE
Private Lavatory public Lavatory shower kitchen sink jointer sink DISHWASHER Possible Max.Demand (LPH) = Demand factor Storage factor

= =

Pro. max. demand (LPH)=D. factor*po. max.Demand Possible Max.Demand (LPH)=

All Buildings 2 No. OF EWH 1 No.Of Fix. Total L/H 15 114.00 87 1974.90 4 454.40 21 1589.70 17 644.30 2 757.20 5534.50 0.30 2.00 1660.35

C Tempreture Out Tempreture in Tempreture Diff.


Tout= Tin = T rise= 60 20 40

40.00 0.46 1.00 0.95 4.18 81.17 3320.70

C
L/S Kg/L kj/(kg.k) KW

m= Probable max.Demand in L/s P= Density of water = 1 kg/L n= Thermal efficiency = Cp=specific heat of water = pi(kw )= (m*cp*p*trise)/n 1 95 4.18

storage tank capacity(Litters)=Prob.Max.Demand*storage factor

Liters

FTCO
AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.
Mechanical Department PROJECT NAME :GRAIN SOILS PREPARED BY : ENGR. SALLAM CHECKED BY : ENGR. AHSAN ALI LOONA TITLE : COLD WATER LOAD CALCULATION RISER NO. ROOM NO. Fixture QTY 34 69 25 114 4 21 17 20 9 Total All Building All Building TOTAL CW FU 34 69 25 114 8 31.5 51 20 9 361.5 115 7.5 4 2.5

From UPC Table A-2 & CHART( A-3, A-5) TYPE OF FIXTURE PUBLIC & PRIVATE FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM

Fixture type Estern WC Western WC Bedit Lavatory Shower Kitchen sink Service sink Hose Bibb Faucet

CW FU 1 1 1 1 2 1.5 3 1 1
SUB- TOTAL FU DEMAND GPM PIPE VELOCITY(FPS) PIPE FRICTION LOSS(psi/100) PIPE SIZE (in)

Legend :

C W = Cold water FU =fixture unit

FTCO
AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.
Mechanical Department PROJECT NAME :GRAIN SOILS PROJECT NO : PREPARED BY : ENGR. SALLAM CHECKED BY : ENGR. AHSAN ALI LOONA TITLE : COLD WATER LOAD CALCULATION RISER NO. ROOM NO. 1 All Building TOTAL Fixture QTY 0 3 3 5 0 0 0 10 0 Total CW FU 0 3 3 5 0 0 0 10 0 21

From UPC Table A-2 & CHART( A-3, A-5) TYPE OF FIXTURE PUBLIC & PRIVATE FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM

Fixture type Estern WC Western WC Bedit Lavatory Shower Kitchen sink Service sink Hose Bibb Faucet

CW FU 1 1 1 1 2 1.5 3 1 2
SUB- TOTAL FU

DEMAND GPM PIPE VELOCITY(FPS) PIPE FRICTION LOSS(psi/100) PIPE SIZE (in)

15 5.5 6.5 1 Legend :


C W = Cold water FU =fixture unit

FTCO
AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.
Mechanical Department PROJECT NAME :GRAIN SOILS PROJECT NO : PREPARED BY : ENGR. SALLAM CHECKED BY : ENGR. AHSAN ALI LOONA TITLE : COLD WATER LOAD CALCULATION RISER NO. ROOM NO. 2 All Building TOTAL Fixture QTY 11 23 5 CW FU 11 23 5

From UPC Table A-2 & CHART( A-3, A-5) TYPE OF FIXTURE PUBLIC & PRIVATE FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM

Fixture type Estern WC Western WC Bedit

CW FU 1 1 1

Lavatory Shower Kitchen sink Service sink Hose Bibb Faucet

1 2 1.5 3 1 2
SUB- TOTAL FU DEMAND GPM PIPE VELOCITY(FPS) PIPE FRICTION LOSS(psi/100) PIPE SIZE (in)

44 4 11 1 0 9 Total

44 8 16.5 3 0 18 128.5 50 8.2 8 1.5

FTCO
AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.
Mechanical Department PROJECT NAME :GRAIN SOILS PROJECT NO : PREPARED BY : ENGR. SALLAM CHECKED BY : ENGR. AHSAN ALI LOONA TITLE : COLD WATER LOAD CALCULATION RISER NO. ROOM NO. 3 All Building TOTAL Fixture QTY 5 11 CW FU 5 11

From UPC Table A-2 & CHART( A-3, A-5) TYPE OF FIXTURE PUBLIC & PRIVATE FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM

Fixture type Estern WC Western WC

CW FU 1 1

Bedit Lavatory Shower Kitchen sink Service sink Hose Bibb Faucet

1 1 2 1.5 1.5 1 2
SUB- TOTAL FU DEMAND GPM PIPE VELOCITY(FPS) PIPE FRICTION LOSS(psi/100) PIPE SIZE (in)

5 17 0 2 0 10 0 Total

5 17 0 3 0 10 0 51 40 6.5 5.5 1.5

Legend :
C W = Cold water FU =fixture unit

FTCO
AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.
Mechanical Department PROJECT NAME :GRAIN SOILS PROJECT NO : PREPARED BY : ENGR. SALLAM CHECKED BY : ENGR. AHSAN ALI LOONA TITLE : COLD WATER LOAD CALCULATION RISER NO. ROOM NO. 4 All Building

From UPC Table A-2 & CHART( A-3, A-5) TYPE OF FIXTURE PUBLIC & PRIVATE

FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM

TOTAL Fixture QTY 18 21 1 36 0 8 16 0 0 Total CW FU 18 21 1 36 0 12 48 0 0 136 60 10 12 1.5

Fixture type Estern WC Western WC Bedit Lavatory Shower Kitchen sink Service sink Hose Bibb Faucet

CW FU 1 1 1 1 2 1.5 3 1 2
SUB- TOTAL FU DEMAND GPM PIPE VELOCITY(FPS) PIPE FRICTION LOSS(psi/100) PIPE SIZE (in)

Legend :
C W = Cold water FU =fixture unit

FTCO
AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.
Mechanical Department PROJECT NAME :GRAIN SOILS PROJECT NO : PREPARED BY : ENGR. SALLAM CHECKED BY : ENGR. AHSAN ALI LOONA TITLE : GRAY WATER LOAD CALCULATION
PUBLIC & PRIVATE

From UPC Table A-2 & CHART( A-3, A-5) TYPE OF FIXTURE

RISER NO. ROOM NO.

All Building All Building TOTAL Fixture QTY 34 69 Total CW FU 170 172.5 342.5 115 7.5 4 2.5

FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM

Fixture type Estern WC Western WC

CW FU 5 2.5
SUB- TOTAL FU DEMAND GPM PIPE VELOCITY(FPS) PIPE FRICTION LOSS(psi/100) PIPE SIZE (in)

(63mm)

Legend :
G W =gray water FU =fixture unit

(63mm)

FTCO
AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.
Mechanical Department PROJECT NAME :GRAIN SOILS PROJECT NO : PREPARED BY : ENGR. SALLAM CHECKED BY : ENGR. AHSAN ALI LOONA TITLE : GRAY WATER LOAD CALCULATION
PUBLIC & PRIVATE

From UPC Table A-2 & CHART( A-3, A-5) TYPE OF FIXTURE

RISER NO. ROOM NO.

1 All Building TOTAL Fixture QTY 0 3 Total CW FU 0 7.5 7.5 15 5.7 6.5 1

FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM

Fixture type Estern WC Western WC

CW FU 5 2.5
SUB- TOTAL FU DEMAND GPM PIPE VELOCITY(FPS) PIPE FRICTION LOSS(psi/100) PIPE SIZE (in)

(25mm)

Legend :
G W =gray water FU =fixture unit

FTCO
AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.
Mechanical Department (25mm) PROJECT NAME :GRAIN SOILS PROJECT NO : PREPARED BY : ENGR. SALLAM CHECKED BY : ENGR. AHSAN ALI LOONA

TITLE

: GRAY WATER LOAD CALCULATION RISER NO. ROOM NO. 2 All Building TOTAL Fixture QTY 11 23 Total CW FU 55 57.5 112.5 55 9.5 10 1.5
PUBLIC & PRIVATE

From UPC Table A-2 & CHART( A-3, A-5) TYPE OF FIXTURE

FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM

Fixture type Estern WC Western WC

CW FU 5 2.5
SUB- TOTAL FU DEMAND GPM PIPE VELOCITY(FPS) PIPE FRICTION LOSS(psi/100) PIPE SIZE (in)

(40mm)

Legend :
G W =gray water FU =fixture unit

FTCO

AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.


Mechanical Department PROJECT NAME :GRAIN SOILS PROJECT NO : PREPARED BY : ENGR. SALLAM CHECKED BY : ENGR. AHSAN ALI LOONA TITLE (40mm) : GRAY WATER LOAD CALCULATION RISER NO. ROOM NO. 3 All Building

From UPC Table A-2 & CHART( A-3, A-5) TYPE OF FIXTURE PUBLIC & PRIVATE

FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM

TOTAL Fixture QTY 5 11 Total CW FU 25 27.5 52.5 40 7 6 1.5

Fixture type Estern WC Western WC

CW FU 5 2.5
SUB- TOTAL FU DEMAND GPM PIPE VELOCITY(FPS) PIPE FRICTION LOSS(psi/100) PIPE SIZE (in)

(40mm)

Legend :
G W =gray water FU =fixture unit

FTCO

AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.


Mechanical Department PROJECT NAME :GRAIN SOILS PROJECT NO : PREPARED BY : ENGR. SALLAM CHECKED BY : ENGR. AHSAN ALI LOONA TITLE : GRAY WATER LOAD CALCULATION RISER NO. ROOM NO. 4 All Building TOTAL Fixture QTY 18 21 Total CW FU 90 52.5 142.5 60 10 12 1.5 Legend :
G W =gray water FU =fixture unit

From UPC Table A-2 & CHART( A-3, A-5) TYPE OF FIXTURE PUBLIC & PRIVATE

(40mm)
FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM

Fixture type Estern WC Western WC

CW FU 5 2.5
SUB- TOTAL FU DEMAND GPM PIPE VELOCITY(FPS) PIPE FRICTION LOSS(psi/100) PIPE SIZE (in)

(40mm)

(40mm)

FTCO
Mechanical Department PROJECT NAME :GRAIN SOILS PROJECT NO : PREPARED BY : ENGR. SALLAM CHECKED BY : ENGR. AHSAN ALI LOONA TITLE : PLUMBING FIXTURE LOAD CALCULATION

AL-FOUZAN TRADING AND GENERAL CONST

RISER NO. TYPE OF FIXTURE PUBLIC & PRIVATE ROOM NAME FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC ROOM SYSTEMNO. Fixture CW D Fixture type FU FU QTY Estern WC 1 8 2 Western WC 1 5.5 1 Bedit 1 1 0 Lavatory 1 1 4 Shower 2 2 3 Kitchen sink 1.5 2 1 Service sink 1.5 2 1 washing machine 4 4 1 D.F. 0.75 1 1 SUB- TOTAL FU Total
From UPC Table A-2&7-3 & CHART A-5 DEMAND GPM PIPE VELOCITY(FPS)

All Buildin All Buildin All Buildin TOTAL

PIPE FRICTION LOSS(psi/100) PIPE SIZE (mm)

Legend :
WS = water supply

D = Drain

CW = Cold Water

FTCO
AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.
Mechanical Department PROJECT NAME :GRAIN SOILS PROJECT NO : PREPARED BY : ENGR. SALLAM CHECKED BY : ENGR. AHSAN ALI LOONA
TITLE : HOT WATER DEMAND CALCULATION
From ASPE Data Book Table 4-6 page 4-15

NG AND GENERAL CONSTRUCTION CO.

All Building All Building All Building TOTAL CW D FU FU 2 16 1 5.5 0 0 4 4 6 6 1.5 2 1.5 2 4 4 0.75 1 20.75 40.5 35 47 2.5

Occupancy : Office Building

ROOM NAME: ROOM NO. Fixture Private Lavatory public Lavatory shower kitchen sink jointer sink Demand L/H 7.6 22.7 113.6 75.7 37.9 UNIT NO.

First Basemant Floor ClinicToilet Guard Toilet B 03 B 56 EWH 1 EWH 2 No.Of Fix. Total L/H No.Of Fix. 0 0 1 1 22.7 0 0 0 0 0 0 0 1 37.9 0 60.6 0.3 2 18.18 L/H

Possible Max.Demand (LPH)= Demand factor = Storage factor = Pro. max. demand (LPH)=D. factor*po. max.Demand

0.6 50

C 100 Tempreture Out Tout=


55 10 45

Tempreture inTin = Tempreture Diff. T rise= D = Drain CW = Cold Water


m= Probable max.Demand in L/s P= Density of water =1 kg/L 1 n= Thermal efficiency= Cp=specific heat of water = pi(kw)=(m*cp*p*trise)/n

45 0.00505 1
L/S Kg/L

95 4.18

0.95 4.18 0.9999 36.36

storage tank capacity(Gallons)=Prob.Max.Demand*storage factor storage tank capacity(Litters)=Prob.Max.Demand*storage factor Heaters selection based on A.O.Smith catalogue

Model No. Available storage tank capacity (Gallons) Recovery rate (GPH) Elemant Power Dimensions (Diameter.Height) mm

FTCO
AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.
Mechanical Department PROJECT NAME :GRAIN SOILS PROJECT NO : PREPARED BY : ENGR. SALLAM CHECKED BY : ENGR. AHSAN ALI LOONA
TITLE : HOT WATER DEMAND CALCULATION
From ASPE Data Book Table 4-6 page 4-15 Occupancy : Office Building

Guard Toilet EWH 2


Total L/H

7.6 0 0 0 0 7.6 0.3 2 2.28

First Floor Tr.Manager Toilet 106 EWH3 No.Of Fix. Total L/H 1 7.6 0 0 0 0 0 0 0 0 L/H 7.6 0.3 2 2.28 L/H

All Buildings
ROOM NAME: ROOM NO. Fixture Private Lavatory public Lavatory shower kitchen sink jointer sink Demand L/H 7.6 22.7 113.6 75.7 37.9 UNIT NO.

2 No. OF EWH 1 No.Of Fix. Total L/H 13 98.80 75 1702.50 2 227.20 21 1589.70 17 644.30 4262.50 0.30 2.00 639.38

Possible Max.Demand (LPH)= Demand factor Storage factor

= =

Pro. max. demand (LPH)=D. factor*po. max.Demand

C Tempreture Out
Tout= 65 20 45

Tempreture inTin = C 0.000633 1


kj/(kg.k) KW

45
L/S Kg/L

C 0.000633 1
kj/(kg.k) KW

45
L/S Kg/L

Tempreture Diff. T rise=

45.00 0.09 1.00


L/S Kg/L

m= Probable max.Demand in L/s P= Density of water =1 kg/L 1 n= Thermal efficiency= kj/(kg.k) KW Cp=specific heat of water = pi(kw)=(m*cp*p*trise)/n 95 4.18

0.95 4.18 0.1254 4.56

0.95 4.18 0.1254 4.56

0.95 4.18 17.58 1278.75

storage tank capacity(Gallons)=Prob.Max.Demand*storage factor

Liters

Liters

Liters

storage tank capacity(Litters)=Prob.Max.Demand*storage factor Heaters selection based on A.O.Smith catalogue

Model No. Available storage tank capacity (Gallons) Recovery rate (GPH) Elemant Power Dimensions (Diameter.Height) mm

FTCO
AL-FOUZAN TRADING AND GENERAL CONSTRUCTION CO.
Mechanical Department PROJECT NAME :GRAIN SOILS PROJECT NO : PREPARED BY : ENGR. SALLAM CHECKED BY : ENGR. AHSAN ALI LOONA TITLE : PLUMBING FIXTURE LOAD CALCULATION (W.SUPPLY&DRIANGE)

BUILDING NO. TYPE OF FIXTURE PUBLIC & PRIVATE ROOM NAME FLUSH TANK FOR WWC & FLUSH VALVE FOR EWC SYSTEM ROOM NO. Fixture CW D type FU FU Estern WC 1 8 Western WC 1 5.5 WASHING MACH. 4 4 Lavatory 1 1 Shower 2 2 Kitchen sink 1.5 2 D.F. 0.75 0.75
From UPC Table A-2&7-3 & CHART A-5 SUB- TOTAL FU DEMAND GPM PIPE VELOCITY(FPS) PIPE FRICTION LOSS(psi/100) PIPE SIZE (mm)

62
All Building All Building TOTAL CW FU 4 8 32 16 24 6 3 90 65 7 3.5 50

Fixture QTY 4 8 8 16 12 4 4 Total

D FU 32 44 32 16 24 8 3 156 80

100

Legend :

WS = water supply

D = Drain

CW = Cold Water

kj/(kg.k) KW