You are on page 1of 1

Project: Location: Owner: Designer:

PROPOSED OFFICE WAREHOUSE BUILDING Sterling Business Park, Marilao, Bulacan Mr. Soh Beng Seng Arch. Danny Joe O. Cajucom, uap

OWNERS SUPPLIED ITEMS


1. General Requirements 1.1. Building Permit shall be owners account, contractors leg work 1.2. Occupancy Permit shall be owners account, contractors leg work 2. Architectural 2.1. All tiles shall be owners supply, installation by contractor 2.2. Tiles on all toilets and wash area are 1.50mts height, 300mm x 300mm ceramic tile. above tiles is plastered painted finish 2.3. Laminated wood flooring shall be owners supply and installation, contractor will prepare the flooring, cement plastered smooth finish 2.4. All locksets shall be owners supply, installation by contractor 2.5. Cabinetry and reception desk table shall be owners supply 2.6. Epoxy paint finish shall be owners supply, contractor will prepare the flooring, cement plastered smooth finish. 2.7. All furniture is owners supply. 3. Electrical 3.1. Air-conditioning units shall be owners supply and installation 3.2. Generator set unit shall be owners supply and installation 3.3. Intercom and telephone shall be owners account 4. Plumbing 4.1. All toilet fixtures and accessories shall be owners supply, installation by contractor

You might also like