Professional Documents
Culture Documents
INFORME N 1
PROYECTO:
CONTRATO:
Dif.
CURVA AVANCE FINANCIERO
100.00%
90.00%
80.00%
70.00%
60.00%
50.00%
40.00%
Avance
30.00%
20.00%
10.00%
28/06/2013
14/06/2013
31/05/2013
Avances Real
17/05/2013
Avances Prog.
03/05/2013
19/04/2013
05/04/2013
0.00%
22/03/2013
0.00%
-2.30%
4.84%
9.67%
15.30%
21.26%
27.10%
32.61%
40.25%
47.98%
55.80%
63.96%
72.98%
81.61%
87.86%
93.30%
97.16%
99.35%
100.00%
08/03/2013
Real
0.00%
3.63%
22/02/2013
22/02/13
01/03/13
08/03/13
15/03/13
22/03/13
29/03/13
05/04/13
12/04/13
19/04/13
26/04/13
03/05/13
10/05/13
17/05/13
24/05/13
31/05/13
07/06/13
14/06/13
21/06/13
28/06/13
Avances
Prog.
0.00%
1.33%
4.84%
9.67%
15.30%
21.26%
27.10%
32.61%
40.25%
47.98%
55.80%
63.96%
72.98%
81.61%
87.86%
93.30%
97.16%
99.35%
100.00%
Avance Porcentual
Fecha de
control
0
Nombre contrato
INFORME N
PROYECTO:
CONTRATO:
Nombre contrato
Fecha de Control
tem
Cdigo
Avance
Fsico
Dato
Por
ejecutar
Form.
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
DESIGNACIN
Dato
Suministro de Caneras
Caeras HDPE PE80 PN6 D= 450 mm
Ca. Acero ASTM e=9,52mm D=600 mm
0.0
0.0
0.0
0.0
Dato
Total ($)
Incidencia
Fecha
trmino
Tiempo
transc.
Avance
Prog.
#DIV/0!
Real
120
26-Feb-13
25-Jun-13
Form.
Form.
Dato
Dato
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Form.
Form.
Form.
#DIV/0!
Form.
SUMINISTRO ESSBIO
Obras de Hormign
C. Inspeccin Dc = 1,30m Tipo "a" Hm = 3,59 m
Hormign de Refuerzo Cruce de Caeras
Tapas Circulares de Hormign
Suministro de Escalines
Plano de Construccin
Planos de construccin y recepcin de obras
0.0
Dato
P. U. ($)
0.0
0.0
Dato
Cant.
Excavacin en Zanja de 0 a 2 m.
Excavacin en Zanja de 2 a 4 m con Entibacin
Excavacin en Zanja de 4 a 6 m con Entibacin
Cama de Apoyo
Relleno Seleccionado
Relleno Superior de Excavaciones
Retiro de Excedentes
Agotamiento Napa Fretica
0.0
Unid
DATO