You are on page 1of 292

LEAP CONBOX v10.00.01.

00 Tutorials

LEAP CONBOX

CIP Reinforced or Post-Tensioned Box Girder and Slab Bridge Design

Tutorials

Bentley Systems, Inc.


www.bentley.com

TRADEMARK NOTICE
Bentley, the "B" Bentley logo, and LEAP CONBOX are registered or non-registered trademarks
of Bentley Systems, Inc. or Bentley Software, Inc. All other marks are the property of their
respective owners.
RESTRICTED RIGHTS LEGENDS
If this software is acquired for or on behalf of the United States of America, its agencies and/or
instrumentalities ("U.S. Government"), it is provided with restricted rights. This software and
accompanying documentation are "commercial computer software" and "commercial computer
software documentation," respectively, pursuant to 48 C.F.R. 12.212 and 227.7202, and
"restricted computer software" pursuant to 48 C.F.R. 52.227-19(a), as applicable. Use,
modification, reproduction, release, performance, display or disclosure of this software and
accompanying documentation by the U.S. Government are subject to restrictions as set forth in
this Agreement and pursuant to 48 C.F.R. 12.212, 52.227-19, 227.7202, and 1852.227-86, as
applicable. Contractor/Manufacturer is Bentley Systems, Incorporated, 685 Stockton Drive,
Exton, PA 19341-0678.
Unpublished - rights reserved under the Copyright Laws of the United States and International
treaties.
COPYRIGHT NOTICE
2011, Bentley Systems, Incorporated. All Rights Reserved. Including software, file formats,
and audiovisual displays; may only be used pursuant to applicable software license agreement;
contains confidential and proprietary information of Bentley Systems, Incorporated and/or third
parties which is protected by copyright and trade secret law and may not be provided or
otherwise made available without proper authorization.
DISCLAIMER
Although this program has been written and tested by Bentley Systems, Inc., no warranty,
expressed or implied, is made as to the accuracy or functioning of the program and related
program material. In no event will Bentley System, Inc. be liable for any damages, including,
without limitation, incidental and consequential damages and damages for lost data or profits,
arising out of the use of or inability to use the licensed program.

Version:

LEAP CONBOXv10.00.01.00

Editor:

Robert Prancevic

Contributing Authors: Dave Hansen


Craig Harrington PE
Jon Lea
Shri Bhide SE, PE, PhD

Tutorial

This volume consists of tutorial sessions for CONBOX. These seven tutorials are
designed to familiarize users with CONBOXs capabilities through a hands-on
approach. Each tutorial takes you through the entire design session, screen by screen.

Tutorial One
Check of a 3-Span (70' 110' 80') Reinforced Concrete Cast-in-Place
Box Girder (AASHTO Standard) (U.S. Units)

Tutorial Two
Design of a 2-Span Post-Tensioned Cast-in-Place Concrete Box Girder
(AASHTO Standard) (U.S. Units)

Tutorial Three
Check of a 3-Span Cast-In-Place Post-Tensioned Concrete Haunched Slab
(AASHTO LRFD) (Metric Units)

Tutorial Four
Check of an 8-Span Post-Tensioned Prestressed Concrete Box Girder Bridge
(AASHTO Standard) (U.S. Units)

Tutorial Five
Check of an 8-Span Post-Tensioned Prestressed Concrete Box Girder Bridge
(AASHTO LRFD) (U.S. Units)

Tutorial Six
Rating of a 2-Span Post-Tensioned Cast-in-Place Concrete Box Girder (AASHTO
Standard-LFDR) (U.S. Units)

Tutorial Seven
Rating of a 3-Span Cast-in-Place Post-Tensioned Haunched Slab (AASHTO Load and
Resistance Factor Rating-LRFR) (Metric Units)
To assist you in completing the tutorials, we have included output generated from each
tutorial. Upon completing these tutorials, you should be familiar with most of the
features in this program.

LEAP CONBOXv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Tutorial / T-1

T-2 / Tutorial

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Check of a 3-Span (70 110 80) Reinforced


Concrete Cast-in-Place Box Girder (AASHTO
Standard) (U.S. Units)

This CONBOX tutorial takes you through a cast-in-place reinforced concrete box girder
design, step-by-step. In this tutorial, you will be designing in accordance with the AASHTO
Standard Design Specifications using Load Factor methodology.
The information for this tutorial is contained in an input file called Tutor1.cbx. As an
alternative to inputting all the information from scratch, as directed in this tutorial, you can
load this file and only work on the sections you wish. To load this file, select the Open
command from the File menu. Browse to the CONBOX/Examples subdirectory, if it is not
already showing, and select the file Tutor1.cbx.
This tutorial follows the 3-span (70' 110' 80') example provided in Caltrans Bridge
Design Practice Manual, Section 2.0.0, pages 2-4 through 2-77.

LEAP CONBOX v10.00.01.00

Tutorial One / T1-1

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Diagrams

Diagrams

260'-0"

70'-0"

110'-0"

20'

4' -0"

80'-0"

20'

4' -0"

FIGURE T1-1. Elevation View

T1-2 / Tutorial One

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher..

Diagrams

FIGURE T1-2. Typical Section

LEAP CONBOX v10.00.01.00

Tutorial One / T1-3

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Diagrams

FIGURE T1-3. Longitudinal Reinforcing at Midspan

T1-4 / Tutorial One

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher..

Diagrams

C
L Bent
Cont

CL Exterior Girder

18

14

17

15
11

Cont

42
10

35

Cont
10

35
11

Typical
Interior Bay

42

17

15
10

35
11

42
18
18

14
CL Interior Girders 14
11

42
10

35
17

15
11

42
10

Cont 35

Bent -- Top Slab Reinforcement


All bars are #10.
All bars shall be evenly spaced within limits shown.
Numbers at ends of bars represent distances from bent centerline.
FIGURE T1-4. Longitudinal Reinforcing at Bent

LEAP CONBOX v10.00.01.00

Tutorial One / T1-5

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Diagrams

Bent

C
L Brg. Abt.
Span 1 (70')
17 @ 23.117647"

32.75'

17 @ 12"

27 @ 9"

17.00'

20.25'

Bent

Bent
Span 2 (110')
26 @ 9"

16 @ 12"

16.00'

19.50'

19 @ 23.526316"

17 @ 12"

27 @ 9"

37.25'

17.00'

20.25'

Bent

C
L Brg. Abt.
Span 3 (80')
27 @ 9"

17 @ 12"

22 @ 23.318182"

20.25'

17.00'

42.75'

Stirrup Schedule: #5 bars (2 legs per web/girder)


FIGURE T1-5. Stirrup Schedule

T1-6 / Tutorial One

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher..

Problem Data

Problem Data
Concrete Material Properties
Unit Weight (PCF)
E-Modulus, E28 (ksi)
Poissons Ratio
Thermal Coeff. (F)
fci (ksi)
fc (ksi)
Humidity (%)
Ultimate Creep Coeff.
Ultimate Shrinkage Strain

CIP Box Girder

Integral Pier

150
3250
0.20

150
3250
0.20
--

6 10-6
3.25
3.25
70
Program Calculated
Program Calculated

-3.25
----

Design Specifications
AASHTO Standard

Units
U.S. (English)

Loss Type/Material Model


Lump Sum

20 ksi

Rebar Information
fy =

60 ksi
User-Defined
(Refer to Fig. T1-3, Fig. T1-4, and also to Caltrans Bridge Design
Practice Manual, pages 2-15 through 2-18.)

Stirrup Information
fy =

60 ksi
User-Defined
(Refer to Fig. T1-5 and also to Caltrans Bridge Design Practice
Manual, page 2-49 for stirrup spacing and layout for Span 2.)

Superimposed Dead Loads


A.C. Overlay

Assume 35 psf; w = 0.035[43.5 - 2(1.75)] = 1.400 klf

Concrete Barrier

2 rails 2.61 ft2 0.15 kcf = 0.783 klf

Live Load
HS20-44
Permit Vehicles

LEAP CONBOX v10.00.01.00

P5, P7, P9, P11, and P13

Tutorial One / T1-7

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 1: Start the Program

Live Load Distribution Factor


Program Computed Assume distribution factor based on full bridge. Refer to AASHTO
Standard Table 3.23.1.

Overall Deck Width

43.5
= 3.107 lanes
2(7.0)

(Refer to Caltrans Bridge Design Practice Manual, Figure 2, page 113.)

Load Combinations
Final

Final Without Sway

Dead Loads

Live Loads

Self Weight
A.C. Overlay
Concrete Barrier
N/A

N/A

HS20 Truck + Lane


Permit Vehicles

Step 1: Start the Program


Start CONBOX as you would any other application using Microsoft Windows. By
default, the program installs in Programs > LEAP Software Bentley> LEAP CONBOX.
To open, click the Start button, select Programs, then LEAP Software Bentley, and then
select LEAP CONBOX.
When the CONBOX splash screen appears, click the START button to clear the screen and
view the Project tab.

FIGURE T1-6. CONBOX Splash Screen

Step 2: Complete the Project Information


The Project tab allows you to enter general information about the project and select the
analysis options, design specifications, units, and loss type. You can return to this tab at any
time and make changes.

T1-8 / Tutorial One

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher..

Step 3: Define the Bridge Connections

FIGURE T1-7. Project Tab

Complete the Project tab by entering the information shown in Fig. T1-7.
For this tutorial, you will be analyzing and designing the concrete box girder using the Full Width
Only option.

Step 3: Define the Bridge Connections


GEOMETRY TAB
For this tutorial, there is no specific alignment provided; therefore, CONBOX will use its
default alignment (N 90 E). You will skip the Alignment button and can now create and/or
modify the bridge connections by clicking the Layout button on this tab to open the Bridge
Component Layout dialog box.

FIGURE T1-8. Geometry Tab

LEAP CONBOX v10.00.01.00

Tutorial One / T1-9

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 3: Define the Bridge Connections

BRIDGE COMPONENT LAYOUT DIALOG BOX


The Bridge Component Layout dialog box allows you to define the physical location,
bearing, and connection types for abutments, piers (bents), and span hinges as well as the
stationing for the begin bridge and the end bridge.
NOTE: Refer to Fig. T1-1: Elevation View on page T1-2 for additional data input.

FIGURE T1-9. Bridge Component Layout Dialog Box

This bridge has two abutments and two piers/bents. Both the abutments and the piers are
perpendicular to the bridge alignment. The program automatically creates rows for the
begin bridge and end bridge. For the steps listed below, refer to Fig. T1-9 to view a
completed screen shot.
Perform the following steps to specify the bridge layout and connection information:
1.

In the grid, select the Begin Bridge row by clicking anywhere in the row and enter
0 in the Station field.

2.

Select the End Bridge row by clicking anywhere in the row and enter 260 in the
Station field. This value is the sum of the three span lengths.

3.

While in the Begin Bridge row, click the Add Abutment button to add an abutment
after the Begin Bridge row and complete the fields to define the first abutment.

4.

T1-10 / Tutorial One

Enter Abutment in the Ref. Name field.

Enter 0 in the Station field.

Enter N 0 00 00.00 W (or NORMAL for the default 90 skew) in the


Bearing field.

Select Pin from the drop-down list in the Connection field.

Click the Add Abutment button to add the second abutment and complete the
fields to define it.

Enter Abutment in the Ref. Name field.

Enter 260 in the Station field.

Enter N 0 00 00.00 W (or NORMAL for the default 90 skew) in the


Bearing field.

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher..

Step 4: Define the Cross Section Layout and Materials

5.

6.

7.

Select Roller from the drop-down list in the Connection field.

While in the first abutment row, click the Add Pier button and complete the fields
to define the first pier.

Enter Bent in the Ref. Name field.

The program automatically adds a pier in the center of the bridge. However,
according to this example, the first pier needs to be at 70 ft. Enter 70 in the
Station field.

Enter N 0 00 00.00 W (or NORMAL for the default 90 skew) in the


Bearing field.

Select Fix from the drop-down list in the Connection field.

Click the Add Pier button to add the second pier and complete the fields to define
it.

Enter Bent in the Ref. Name field.

According to this example, the second pier needs to be at 180 ft. Enter 180 in
the Station field.

Enter N 0 00 00.00 W (or NORMAL for the default 90 skew) in the


Bearing field.

Select Fix from the drop-down list in the Connection field.

Click the OK button to return to the Geometry tab.

Step 4: Define the Cross Section Layout and Materials


GEOMETRY TAB
Once you have defined the bridge layout, you can create and/or modify the superstructure
cross section and layout by clicking the Cross Section button on this tab to open the Cross
Section Layout dialog box.

CROSS SECTION LAYOUT DIALOG BOX


The Cross Section Layout dialog box allows you to define the cross sectional dimensions
and their variation along the bridge.

FIGURE T1-10. Cross Section Layout Dialog Box

LEAP CONBOX v10.00.01.00

Tutorial One / T1-11

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 4: Define the Cross Section Layout and Materials

This bridge is comprised of a constant depth prismatic section with an interior web flare
from the face of the pier diaphragm in Span 2 (only) for a length of 7 ft. (9.25 ft. from the
centerline of the bent). By default, the program creates a beginning cross section. You
should define section and material properties for the beginning section first by clicking the
Section button under the Section Def field to open the Multi-Cell CIP Box Section dialog
box.
You will be utilizing the Recall and Variant section types to complete the layout for this tutorial.

MULTI-CELL CIP BOX SECTION DIALOG BOX


The Multi-Cell CIP Box Section dialog box allows you to define cross section variations.
NOTE: Refer to Fig. T1-1: Elevation View and Fig. T1-2: Typical Section for additional
data input.

FIGURE T1-11. Multi-Cell CIP Box Section Dialog Box

This bridge is symmetrical; therefore, use the same material and section properties for the
sections. Define the section properties by entering the information as shown in Fig. T1-11.
To define the concrete material properties for the superstructure cross section, click the
Material button to open the Concrete Material dialog box.

CONCRETE MATERIAL DIALOG BOX


This dialog box allows you to define the concrete material for the superstructure cross
section. Define the material properties for this bridge by entering the information as shown
in Fig. T1-12. When you are done, click the OK button to return to the Multi-Cell CIP Box
Section dialog box.
NOTE: Refer to the Problem Data beginning on page T1-7 for additional data input.

T1-12 / Tutorial One

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher..

Step 4: Define the Cross Section Layout and Materials

FIGURE T1-12. Concrete Material Dialog Box (Cross Section)

MULTI-CELL CIP BOX SECTION DIALOG BOX


Once you have completed defining the material and section properties for this segment,
click the OK button to return to the Cross Section Layout dialog box.

CROSS SECTION LAYOUT DIALOG BOX


When you return to the Cross Section Layout dialog box, you need to define the remaining
cross sections.
NOTE: Refer to Fig. T1-1: Elevation View and Fig. T1-2: Typical Section for cross section
information.

FIGURE T1-13. Cross Section Layout Dialog Box (Completed)

While in the Beg Section row, click the Recall Section button. This action copies the
section properties for the Beg Section to the recalled section. Next you will define the
interior web flare section. Click the Add Variant button and enter the data as shown in Fig.
T1-13. Make sure the I-Web thickness is 10.0 inches. Define the remaining sections by
clicking the Recall Section button and Add Variant button and entering the information as
shown in Fig. T1-13. When you are done, click the OK button to return to the Geometry tab.

LEAP CONBOX v10.00.01.00

Tutorial One / T1-13

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 5: Define the Piers and Columns

Step 5: Define the Piers and Columns


GEOMETRY TAB
Once you have defined the cross section layout and materials, you can create and/or modify
the piers and columns by clicking the Pier button on this tab to open the Pier and Column
Definitions dialog box.

PIER AND COLUMN DEFINITIONS DIALOG BOX


The Pier and Column Definitions dialog box allows you to define single or multicolumn
piers (bents).
NOTE: Refer to Fig. T1-2: Typical Section on page T1-3 for additional data input.

FIGURE T1-14. Pier and Column Definitions Dialog Box

By default, CONBOX creates a pier with the name Typ2Col. Rename this pier to Bent
to match the pier referenced in the Bridge Component Layout dialog box in order to place
the defined pier at a stationing along the bridge. Note that not all piers need to be referenced
in the Bridge Component Layout dialog box, thus allowing you to define a variety of
different piers and selectively use them.
For this tutorial, however, the piers contain an 8 ft. prismatic column with a 12 ft. upper
parabolic flare that is not one of the predefined column types; therefore, you must create a
user-defined column type by clicking the Column Types button to open the Column
Definition dialog box.

COLUMN DEFINITION DIALOG BOX


This dialog box allows you to create, modify, or delete user-defined, nonstandard column
shapes.
NOTE: Refer to Fig. T1-2: Typical Section on page T1-3 for additional data input.

T1-14 / Tutorial One

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher..

Step 5: Define the Piers and Columns

FIGURE T1-15. Column Definition Dialog Box

Define the column by entering the information as shown in Fig. T1-15. Click the Add
Section button to add the parabolic variation section. Once you are done, click the OK
button to return to the Pier and Column Definitions dialog box.

PIER AND COLUMN DEFINITIONS DIALOG BOX


Specify the column length by entering 20 in the Len field located in the Columns for Pier
Definition grid as shown in Fig. T1-14. Add the user-defined column you created by selecting
Columns from the Column Type drop-down list and Pin from the Support drop-down list. Next
you need to define the concrete material properties for the column by clicking the Material
button in the grid to open to Concrete Material dialog box.

CONCRETE MATERIAL DIALOG BOX


This dialog box allows you to define the concrete material for the columns. Define the
material properties for the appropriate column by entering the information as shown in Fig.
T1-16. When you are done, click the OK] button to return to the Pier and Column
Definitions dialog box.
NOTE: Refer to the Problem Data beginning on T1-7 for additional data input.

FIGURE T1-16. Concrete Material Dialog Box (Piers)

NOTE: Only the appropriate concrete material properties will be available.

LEAP CONBOX v10.00.01.00

Tutorial One / T1-15

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 6: Define the Longitudinal Rebar

PIER AND COLUMN DEFINITIONS DIALOG BOX


Once you have completed defining the piers and columns for this bridge, click the OK
button to return to the Geometry tab.
.

At this point, it would be a good idea to save your project. Select the Save As option from the File
menu. Enter the file name you want to save your data to (e.g., MyTutor1) in the File Name field
and click the Save button. The default extension is *.cbx

Step 6: Define the Longitudinal Rebar


MODEL TAB
The Model tab allows you to modify the plane frame analytical model by specifying
additional details about the superstructure, the longitudinal rebar, and the stirrups.

FIGURE T1-17. Model Tab

The span distances, bearing, and connection information was entered previously in the Bridge
Component Layout dialog box (Layout button on the Geometry tab). Since you will not be
making any changes to this information, you can skip the Superstructure button.

Since this is a reinforced concrete box girder bridge, you do not need to enter any post-tension
information; therefore, you can skip the Tendons button.

You can define the longitudinal rebar by clicking the Long. Rebar button to open the
Longitudinal Rebar Definitions dialog box.

LONGITUDINAL REBAR DEFINITIONS DIALOG BOX


This dialog box allows you to define the longitudinal rebar for the bridge.
NOTE: Refer to Fig. T1-3: Longitudinal Reinforcing at Midspan and Fig. T1-4:
Longitudinal Reinforcing at Bent for additional data input.

T1-16 / Tutorial One

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher..

Step 6: Define the Longitudinal Rebar

FIGURE T1-18. Longitudinal Rebar Definitions Dialog Box

Enter the longitudinal rebar as shown in the following table. When you are done, click the
OK button to return to the Model tab. Notice that the longitudinal rebar displays in red in
both the elevation and section views of the bridge. Use the View Control feature to move
ahead on the bridge and follow the rebar along the cross section of the structure.
Rebar
Loc

Number of
Bars

Bar
Size

Rebar
Cover

Reference
Type

Ref Num

Ref Start
Distance

Ref End
Distance
--

Bottom

#7

2.0

Continuous

--

--

Bottom

10

#10

2.0

Continuous

--

--

--

Bottom

#10

2.0

Bridge

--

0.0

70.0

Bottom

#10

2.0

Bridge

--

180.0

260.0

Bottom

#10

2.0

Bridge

--

70.0

180.0

Bottom

#10

2.0

Bridge

--

87.0

145.0

Bottom

#10

2.0

Bridge

--

104.0

162.0

Bottom

#10

2.0

Bridge

--

94.0

152.0

Bottom

#10

2.0

Bridge

--

98.0

156.0

Bottom

#10

2.0

Bridge

--

120.0

130.0

Bottom

#10

2.0

Bridge

--

205.0

260.0

Bottom

#10

2.0

Bridge

--

194.0

250.0

Bottom

#10

2.0

Bridge

--

201.0

257.0

Bottom

#10

2.0

Bridge

--

217.0

240.0

Bottom

#10

2.0

Bridge

--

0.0

50.0

Bottom

#10

2.0

Bridge

--

5.0

56.0

Bottom

#10

2.0

Bridge

--

0.0

54.0

Bottom

#10

2.0

Bridge

--

15.0

38.0

Top

10

#10

2.75

Support

-14.0

18.0

Top

10

#10

2.75

Support

-17.0

15.0

Top

18

#10

2.75

Support

-11.0

42.0

Top

18

#10

2.75

Support

-35.0

10.0

Top

10

#10

2.75

Support

-18.0

14.0

Top

10

#10

2.75

Support

-15.0

17.0

Top

18

#10

2.75

Support

-42.0

11.0

Top

18

#10

2.75

Support

-10.0

35.0

Top

12

#10

2.75

Continuous

--

--

--

LEAP CONBOX v10.00.01.00

Tutorial One / T1-17

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 7: Define the Stirrups

Step 7: Define the Stirrups


MODEL TAB
Once you have defined the longitudinal rebar, you can define the stirrups by clicking the
Stirrups button to open the Stirrup Definitions dialog box.

STIRRUP DEFINITIONS DIALOG BOX


This dialog box allows you to define the vertical reinforcement (i.e., stirrups).
NOTE: Refer to Fig. T1-5: Stirrup Schedule on page T1-6 for additional data input.

FIGURE T1-19. Stirrup Definitions Dialog Box

Once you have entered the data as shown in Fig. T1-19, click the OK button to return to the
Model tab. Notice that the stirrups display in yellow in the elevation view of the bridge.
.

At this point, it would be a good idea to save your project. Select the Save As option from the File
menu. Enter the file name you want to save your data to (e.g., MyTutor1) in the File Name field
and click the Save button. The default extension is *.cbx

Step 8: Define the Dead Loads for the Analysis


LOADS/ANALYSIS TAB
The Loads/Analysis tab allows you to specify load combinations (LFD) to be used in the
analysis. For this tutorial, you will be adding the following loads:

T1-18 / Tutorial One

Dead Loads: Intrinsic Self Weight, A.C. Overlay, and Concrete Barrier

Live Loads: HS20 Truck + Lane and Permit Vehicles P5, P7, P9, P11, P13

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher..

Step 8: Define the Dead Loads for the Analysis

FIGURE T1-20. Loads/Analysis Tab

You will not be using the Initial analysis case for a reinforced concrete box girder section design.

Select the Final analysis case and define the dead loads for this tutorial by right-clicking the
Dead Load/DC Group option on the right panel and selecting Add DC/DL. Double-click the
load to open the Dead Loads dialog box.

DEAD LOADS DIALOG BOX


This dialog box allows you to define the dead loads for the analysis. Since this is a
reinforced concrete bridge with no post-tensioning, there is no need to create separate
definitions for the dead loads; therefore, you will define the intrinsic self-weight, A.C.
Overlay, and concrete barrier in the same dead load. Define the dead load by completing
this dialog box as shown in Fig. T1-21. Add the intrinsic self-weight of the cross section by
selecting the Include Self-Weight option.
NOTE: Refer to the Problem Data beginning on page T1-7 for additional data input.

FIGURE T1-21. Dead Loads Dialog Box

Once you are done, click the OK button to return to the Loads/Analysis tab.

LEAP CONBOX v10.00.01.00

Tutorial One / T1-19

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 9: Define the Live Loads for the Analysis

Step 9: Define the Live Loads for the Analysis


LOADS/ANALYSIS TAB
Once you have defined the dead loads, notice that the dead load has been added to the
right side of the window and that it is now represented in the graphic window for the
bridge as shown in Fig. T1-22.

FIGURE T1-22. Loads/Analysis Tab (Dead Loads Added)

Select the Final w/o Sway analysis case and define the HS20 Truck + Lane Load by
expanding the Live Load Groups located under Locked Library Loads. Select the
predefined HS20 Truck + Lane load, then drag and drop it anywhere within the Tutor 1
Loads. Notice that this load is added to the Live Load Group. In the Live Load Group
for this tutorial, double-click the HS20 Truck + Lane Load to open the Live Load dialog
box.
NOTE: The Locked Library Loads can be viewed or modified by selecting Vehicle from
the Libraries menu to open the Vehicle Library.

LIVE LOAD DIALOG BOX (HS20 TRUCK + LANE LOAD)


This dialog box allows you to add or modify live loads for the analysis. Verify that the
definition for this load appears as shown in Fig. T1-23.

FIGURE T1-23. Live Load Dialog Box (HS20 Truck + Lane)

LEAP CONBOXv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

/ T1-20

Step 9: Define the Live Loads for the Analysis

Once you are done, click the OK button to return to the Loads/Analysis tab.

LOADS/ANALYSIS TAB
Define the Permit Vehicles Load by selecting the P5, P7, P9, P11, and P13 Load located
in the Live Load Groups listed under Locked Library Loads. Drag and drop this load
anywhere within the Tutor 1 Loads. Notice that this load is added to the Live Load
Group. In the Live Load Group for this tutorial, double-click the load to open the Live
Load dialog box.

LIVE LOAD DIALOG BOX (PERMIT VEHICLES LOAD)


Verify that the definition for this load appears as shown in Fig. T1-24. Once you are
done, click the OK button to return to the Loads/Analysis tab.

FIGURE T1-24. Live Load Dialog Box (Permit Vehicles Load)

LOADS/ANALYSIS TAB
Notice that both live loads have been added to the right panel and that they are
represented in the graphic window as shown in Fig. T1-25.

FIGURE T1-25. Loads/Analysis Tab (Live Loads Added)

T1-21 /

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 10: Define the Load Combination Factors for the Analysis

At this point, it would be a good idea to save your project. Select the Save As option from the File
menu. Enter the file name you want to save your data to (e.g., MyTutor1) in the File Name field
and click the Save button. The default extension is *.cbx

Step 10: Define the Load Combination Factors for the Analysis
LOADS/ANALYSIS TAB
Once you have defined the loads for the analysis, you need to add the combination
factors to be used for the each analysis case. The only load combination needed is for
the Final without Sway analysis case, select Final w/o Sway from the Case drop-down
list, right-click in the left panel, and select Add Combination to add a load combination.

LFD LOAD COMBINATION FACTORS DIALOG BOX (LFD 1 (FINAL W/O SWAY)
The first combination for this analysis will be for LFD Group I. To define this
combination, double-click the load combination, Comb-1. Complete the LFD Load
Combination Factors dialog box as shown in Fig. T1-26.

FIGURE T1-26. LFD Load Combination Factors Dialog Box

Once you are done, click the OK button to return to the Loads/Analysis tab.

LOADS/ANALYSIS TAB (ADD DEAD LOADS TO A LOAD COMBINATION)


Once you have created the LFD 1 (Final w/o Sway) combination, select the
SW_AC_RAIL load in the right panel, then drag and drop it anywhere within the
combination. Notice that this load is added to the Dead Load/DC Group in the
combination as shown in Fig. T1-27.

LEAP CONBOXv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

/ T1-22

Step 10: Define the Load Combination Factors for the Analysis

FIGURE T1-27. Loads/Analysis Tab (LFD 1 (Final w/o Sway) Combination Added)

Repeat the steps defined above to add additional loads to this combination and to create
the LFD 1B (Final w/o Sway) and SLD 1 (Final w/o Sway) load combinations. Leave
the parameters in the LFD Load Combination Factors dialog box as the default for all
combination types. Refer to the following table for additional input information.
AASHTO
Combination
Type

Combination Name

Purpose

Defined Loads to Include


Dead Load (SW_AC_RAIL)

Live Loads

Intrinsic
A.C. Concrete HS20 Truck + Permit
Self Weight Overlay Barrier H20/HS20 Lane Trucks
Final Without (w/o) Sway
SLD Group I

SLD 1 (Final w/o Sway)

Crack Control

LFD Group I

LFD 1 (Final w/o Sway)

Strength Design (Std)

LFD Group IB

LFD 1B (Final w/o Sway)

Strength Design (Permit)

At this point, it would be a good idea to save your project. Select the Save As option from the File
menu. Enter the file name you want to save your data to (e.g., MyTutor1) in the File Name field
and click the Save button. The default extension is *.cbx

T1-23 /

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 11: Check the Design Parameters

Step 11: Check the Design Parameters


Select Design Parameters from the Settings menu to open the Design Parameters dialog
box. This dialog box allows you to view and/or edit the settings of the design
parameters.

FIGURE T1-28. Design Parameters Dialog Box

Use the default allowable stress factors, RC Resistance Factors, and the plane frame
model by clicking the Use Defaults button. When you are done, click the OK button to
return to the program.
The PT Resistance Factors will not be used by the program for this tutorial since no
post-tension tendon data has been defined.

Step 12: Run the Analysis


LOADS/ANALYSIS TAB
You will be using the program-computed live load distribution factors according to AASHTO;
therefore, skip the Live Load Distribution Factors button.

After defining the load combinations, you can perform an analysis of the structure by
clicking the Run Analysis button. After performing the analysis, the default analysis
result text/graphic report displays in the Analysis Results screen.

LEAP CONBOXv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

/ T1-24

Step 13: View the Design Results

ANALYSIS RESULTS SCREEN


This screen displays automatically after performing the analysis and presents you with
the analysis results.

FIGURE T1-29. Analysis Results Screen (Text Format)

This screen allows you to view, print, save, or copy (in text or Microsoft
Excel formats) structure responses to all loads, load cases, and load
combination. Click to close this screen and return to the Loads/Analysis tab.
.

At this point, it would be a good idea to save your project. Select the Save As option from the File
menu. Enter the file name you want to save your data to (e.g., MyTutor1) in the File Name field
and click the Save button. The default extension is *.cbx

Step 13: View the Design Results


DESIGN TAB
This tab allows you to verify the design results and assists you in designing the layout
of your rebar and stirrups, if necessary. After running the analysis, click the Design
Results button to open the Design Results screen.
Since you previously entered the longitudinal rebar and stirrup layout in the Model tab, you can
skip the Rebar and Stirrups buttons. For additional information on how to use these buttons,
refer to Steps 15 and 16 for this tutorial.

T1-25 /

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 13: View the Design Results

FIGURE T1-30. Design Tab

DESIGN RESULTS SCREEN


This screen displays automatically after computing the design and presents you with
the design results.

FIGURE T1-31. Design Results Screen (Text Format)

Using this screen, you can display the design results in either a text or graphic format,
view the design results for an analysis case, view the design results for a load
combination, or view the design results by response type. You can also print your
design results by right-clicking this screen and selecting the Print option. Click to
close this screen and return to the Design tab.

LEAP CONBOXv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

/ T1-26

Step 14: Print the Reports

Step 14: Print the Reports


The input of Tutorial 1 is completed. To print the output of the project, select Print from
the File menu to open the Print Report Manager dialog box.

PRINT REPORT MANAGER


For this tutorial, print to a file all the model reports, analysis results, design/check
reports, and miscellaneous reports as shown in Fig. T1-32. Click the Create Reports
button to send the selected output to a text file.

FIGURE T1-32. Print Report Manager

Refer to page T1-31 for a printout of the output for Tutorial 1 according to the options
selected above.
.

At this point, it would be a good idea to save your project. Select the Save As option from the File
menu. Enter the file name you want to save your data to (e.g., MyTutor1) in the File Name field
and click the Save button. The default extension is *.cbx

Step 15: Automatically Design the Longitudinal Rebar (Optional)


DESIGN TAB
CONBOX has the ability to automatically design the rebar for your bridge. Although
the actual steps of Tutorial 1 are complete, you can design the rebar for the bridge and
compare it with the information you previously entered in the Model tab by clicking the
Rebar button to open the Longitudinal Rebar dialog box.

LONGITUDINAL REBAR DIALOG BOX


This dialog box assists you in designing the longitudinal rebar for the bridge. CONBOX
does not automatically determine the controlling load combination. It is the users
responsibility to make this determination.

T1-27 /

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 15: Automatically Design the Longitudinal Rebar (Optional)

The purpose of this optional step is to demonstrate one of the advanced features. Make sure that
you have saved your Tutorial 1 file prior to automatically designing the rebar. Use of this dialog
box will delete any rebar you previously entered in the Model tab; therefore, do not save your file
after completing this step.

The As required curve shown in this graph is intended to be an estimate of what is adequate for
the design. Use the Design Results to confirm that the rebar you provided in the Model tab meets
the design requirements.

FIGURE T1-33. Longitudinal Rebar Dialog Box (Design)

For this tutorial, however, the controlling load combination is LFD 1B (Final w/o
Sway). Select this load combination and enter the design method, No. of Bars with a
solution increment of 5, #10 bar size, and 2.0 in. clearance as shown in Fig. T1-33.
Click the Auto-Design button. When the following message displays, select OK.

FIGURE T1-34. Auto Design Rebar Warning Message

This deletes the rebar you entered into the Design tab. Verify that the automatic design
(As provided) meets the As required.

LEAP CONBOXv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

/ T1-28

Step 16: Automatically Design the Stirrups (Optional)

FIGURE T1-35. Completed Auto Design Rebar

If you want to verify the ultimate design capacity and include the longitudinal rebar
provided by the program, click the OK button. When asked if you want to copy the
rebar to the model, select Yes.

Step 16: Automatically Design the Stirrups (Optional)


DESIGN TAB
CONBOX has the ability to automatically design the stirrups for your bridge. Although
the actual steps of Tutorial 1 are complete, you can design the stirrups for the bridge
and compare it with the information you previously entered in the Model tab by
clicking the Stirrups button to open the Stirrups dialog box.

STIRRUPS DIALOG BOX


This dialog box assists you in designing the stirrups for the bridge. CONBOX does not
automatically determine the controlling load combination. It is the users responsibility
to make this determination.
The purpose of this optional step is to demonstrate one of the advanced features. Make sure that
you have saved your Tutorial 1 file prior to automatically designing the stirrups. Use of this
dialog box will delete any stirrups you previously entered in the Model tab; therefore, do not save
your file after completing this step.

The Av/s required curve shown in this graph is intended to be an estimate of what is adequate for
the design. Use the Design Results to confirm that the rebar you provided in the Model tab meets
the design requirements.

T1-29 /

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 16: Automatically Design the Stirrups (Optional)

FIGURE T1-36. Stirrups Dialog Box (Design)

For this tutorial, however, the controlling load combination is LFD 1B (Final w/o
Sway). Select this load combination and enter the stirrup spacing, #5 bar size, and 10
legs as shown in Fig. T1-36. Click the Auto-Design button. When the following
message displays, select OK.

FIGURE T1-37. Auto Design Stirrups Warning Message

This action deletes any stirrup data you provided in the Design tab. Verify that the
automatic design (Av/s provided) meets the Av/s required in the graph. If it does, copy
the stirrup design into your bridge by clicking the Copy to Model button. When you
are done, click the OK button to accept these changes and return to the Design tab.
Alternatively, you can click the Cancel button to discard these changes and return to
the Design tab.
In order to generate reports that includes the rebar and stirrup information, you will need to run
the analysis again (Loads tab, Step 12, page T1-24) and then print the final reports.

If you have stepped through the optional Steps 15 and 16 and do not want to save the Tutor 1
input file modifications, select Exit from the File menu and select No if prompted to save your
changes. To save the changes, select Save As from the File menu and rename the file to
AutoDesign Tutor1.cbx.

LEAP CONBOXv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

/ T1-30

Step 16: Automatically Design the Stirrups (Optional)

T1-31 /

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
1 of
1
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2.cbx
Combined Summary - Box Girder
Stage Final
POI
Location ............ Min C/D Ratios ............
(ft)
Moment
Shear
St-Ten
St-Cmp LL-Def
-------- -------- ---------------- ------ -----Sp1.000
0.00 999.99
1.00d 999.99
2.37 999.00
Sp1.010
16.20
1.17
1.02d 999.99
1.87
2.86
Sp1.020
32.40
1.01
1.00d
66.10
1.63
1.51
Sp1.030
48.60
0.90*
1.00d
2.33
1.50
1.11
Sp1.040
64.80
0.86*
1.50d
1.67
1.45
0.96*
Sp1.050
81.00
0.88*
1.00d
2.04
1.47
0.93*
Sp1.060
97.20
0.97*
1.00d
16.18
1.59
1.04
Sp1.070
113.40
1.28
1.00d 999.99
1.85
1.30
Sp1.080
129.60
0.00*
1.00d 999.99
2.10
1.96
Sp1.090
145.80
1.00*
1.00d 999.99
1.43
4.18
Sp1.100
162.00
0.79*
1.00d
0.00*
1.31 263.62
Sp2.000
162.00
0.84*
1.00d
0.00*
1.35 242.52
Sp2.010
177.00
0.87*
1.00d 999.99
1.35
4.76
Sp2.020
192.00
0.00*
1.00d 999.99
1.80
2.26
Sp2.030
207.00
0.00*
1.08d 999.99
2.44
1.52
Sp2.040
222.00
1.18
1.00d 999.99
2.06
1.22
Sp2.050
237.00
1.05
1.00d 999.99
1.88
1.10
Sp2.060
252.00
1.02
1.73d
10.56
1.82
1.13
Sp2.070
267.00
1.06
1.00d
57.08
1.85
1.31
Sp2.080
282.00
1.19
1.00d 999.99
1.96
1.79
Sp2.090
297.00
1.25
1.12d 999.99
2.17
3.38
Sp2.100
312.00
0.00*
1.02d 999.99
2.59 999.00
Notes
C: Crack Control did not pass.
d: Shear reinforcement was designed.
L: Asfy-Actual < Asfy-Required.

Bentley Exton Office

| Sheet
1 of 2
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2.cbx
Combined Stress Check - Box Girder
Stage Final: SLD 1 (Final w/o Sway)
POI
Location Max-Ten Loc All-Ten Ratio Max-Cmp Loc All-Cmp Ratio
(ft)
(ksi)
(ksi)
(ksi)
(ksi)
-------- -------- ------- ---- ------- ------ ------- ---- ------- -----Sp1.000
0.00
0.00
N/A 999.99
-0.67 Bm-B
-2.40
3.56
Sp1.010
16.20
0.00
N/A 999.99
-1.00 Bm-T
-2.40
2.41
Sp1.020
32.40
0.01 Bm-B
0.38 66.10
-1.22 Bm-T
-2.40
1.96
Sp1.030
48.60
0.16 Bm-B
0.38
2.33
-1.36 Bm-T
-2.40
1.77
Sp1.040
64.80
0.23 Bm-B
0.38
1.67
-1.42 Bm-T
-2.40
1.69
Sp1.050
81.00
0.19 Bm-B
0.38
2.04
-1.40 Bm-T
-2.40
1.72
Sp1.060
97.20
0.02 Bm-B
0.38 16.18
-1.28 Bm-T
-2.40
1.88
Sp1.070
113.40
0.00
N/A 999.99
-1.07 Bm-T
-2.40
2.24
Sp1.080
129.60
0.00
N/A 999.99
-0.93 Bm-B
-2.40
2.59
Sp1.090
145.80
0.00
N/A 999.99
-1.42 Bm-B
-2.40
1.69
Sp1.100
162.00
0.44 Bm-T
0.38
0.86*
-1.59 Bm-B
-2.40
1.51
Sp2.000
162.00
0.40 Bm-T
0.38
0.95*
-1.55 Bm-B
-2.40
1.55
Sp2.010
177.00
0.00
N/A 999.99
-1.49 Bm-B
-2.40
1.61
Sp2.020
192.00
0.00
N/A 999.99
-1.08 Bm-B
-2.40
2.22
Sp2.030
207.00
0.00
N/A 999.99
-0.85 Bm-T
-2.40
2.82
Sp2.040
222.00
0.00
N/A 999.99
-1.03 Bm-T
-2.40
2.33
Sp2.050
237.00
0.00
N/A 999.99
-1.14 Bm-T
-2.40
2.11
Sp2.060
252.00
0.04 Bm-B
0.38 10.56
-1.17 Bm-T
-2.40
2.05
Sp2.070
267.00
0.01 Bm-B
0.38 57.08
-1.14 Bm-T
-2.40
2.11
Sp2.080
282.00
0.00
N/A 999.99
-1.04 Bm-T
-2.40
2.31
Sp2.090
297.00
0.00
N/A 999.99
-0.87 Bm-T
-2.40
2.76
Sp2.100
312.00
0.00
N/A 999.99
-0.62 Bm-B
-2.40
3.89
***** End of Report *****
Spec: AASHTO Standard

Units: US (English)

Loss: Lump Sum

***** End of Report *****


Spec: AASHTO Standard

Loss: Lump Sum

| Sheet

1 of

Output

Tutorial One / T1-31

Bentley Exton Office

Units: US (English)

T1-32 / Tutorial One

Bentley Exton Office

| Sheet
1 of
1
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2.cbx
Combined Stress Check - Box Girder
Stage Final: 1/2(PS + Perm) + LL(SLD 1 (Final w/o Sway)):3
POI
Location Max-Ten Loc All-Ten Ratio Max-Cmp Loc All-Cmp Ratio
(ft)
(ksi)
(ksi)
(ksi)
(ksi)
-------- -------- ------- ---- ------- ------ ------- ---- ------- -----Sp1.000
0.00 ------- ---- ------- ------0.34 Bm-B
-1.60
4.75
Sp1.010
16.20 ------- ---- ------- ------0.57 Bm-T
-1.60
2.81
Sp1.020
32.40 ------- ---- ------- ------0.73 Bm-T
-1.60
2.19
Sp1.030
48.60 ------- ---- ------- ------0.83 Bm-T
-1.60
1.94
Sp1.040
64.80 ------- ---- ------- ------0.87 Bm-T
-1.60
1.84
Sp1.050
81.00 ------- ---- ------- ------0.85 Bm-T
-1.60
1.88
Sp1.060
97.20 ------- ---- ------- ------0.77 Bm-T
-1.60
2.07
Sp1.070
113.40 ------- ---- ------- ------0.64 Bm-T
-1.60
2.50
Sp1.080
129.60 ------- ---- ------- ------0.54 Bm-B
-1.60
2.94
Sp1.090
145.80 ------- ---- ------- ------0.86 Bm-B
-1.60
1.87
Sp1.100
162.00 ------- ---- ------- ------0.98 Bm-B
-1.60
1.63
Sp2.000
162.00 ------- ---- ------- ------0.96 Bm-B
-1.60
1.67
Sp2.010
177.00 ------- ---- ------- ------0.90 Bm-B
-1.60
1.78
Sp2.020
192.00 ------- ---- ------- ------0.64 Bm-B
-1.60
2.51
Sp2.030
207.00 ------- ---- ------- ------0.52 Bm-T
-1.60
3.05
Sp2.040
222.00 ------- ---- ------- ------0.64 Bm-T
-1.60
2.49
Sp2.050
237.00 ------- ---- ------- ------0.71 Bm-T
-1.60
2.25
Sp2.060
252.00 ------- ---- ------- ------0.73 Bm-T
-1.60
2.19
Sp2.070
267.00 ------- ---- ------- ------0.71 Bm-T
-1.60
2.27
Sp2.080
282.00 ------- ---- ------- ------0.63 Bm-T
-1.60
2.53
Sp2.090
297.00 ------- ---- ------- ------0.50 Bm-T
-1.60
3.20
Sp2.100
312.00 ------- ---- ------- ------0.31 Bm-B
-1.60
5.18

***** End of Report *****


Spec: AASHTO Standard

LEAP CONBOXv10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
1 of
1
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2.cbx
Combined Stress Check - Box Girder
Stage Final: PS + Perm(SLD 1 (Final w/o Sway)):3
POI
Location Max-Ten Loc All-Ten Ratio Max-Cmp Loc All-Cmp Ratio
(ft)
(ksi)
(ksi)
(ksi)
(ksi)
-------- -------- ------- ---- ------- ------ ------- ---- ------- -----Sp1.000
0.00
0.00
N/A 999.99
-0.67 Bm-B
-1.60
2.37
Sp1.010
16.20
0.00
N/A 999.99
-0.85 Bm-T
-1.60
1.87
Sp1.020
32.40
0.00
N/A 999.99
-0.98 Bm-T
-1.60
1.63
Sp1.030
48.60
0.00
N/A 999.99
-1.07 Bm-T
-1.60
1.50
Sp1.040
64.80
0.00
N/A 999.99
-1.10 Bm-T
-1.60
1.45
Sp1.050
81.00
0.00
N/A 999.99
-1.09 Bm-T
-1.60
1.47
Sp1.060
97.20
0.00
N/A 999.99
-1.01 Bm-T
-1.60
1.59
Sp1.070
113.40
0.00
N/A 999.99
-0.87 Bm-T
-1.60
1.85
Sp1.080
129.60
0.00
N/A 999.99
-0.76 Bm-B
-1.60
2.10
Sp1.090
145.80
0.00
N/A 999.99
-1.12 Bm-B
-1.60
1.43
Sp1.100
162.00
0.08 Bm-T
0.00
0.00*
-1.22 Bm-B
-1.60
1.31
Sp2.000
162.00
0.04 Bm-T
0.00
0.00*
-1.19 Bm-B
-1.60
1.35
Sp2.010
177.00
0.00
N/A 999.99
-1.18 Bm-B
-1.60
1.35
Sp2.020
192.00
0.00
N/A 999.99
-0.89 Bm-B
-1.60
1.80
Sp2.030
207.00
0.00
N/A 999.99
-0.65 Bm-T
-1.60
2.44
Sp2.040
222.00
0.00
N/A 999.99
-0.78 Bm-T
-1.60
2.06
Sp2.050
237.00
0.00
N/A 999.99
-0.85 Bm-T
-1.60
1.88
Sp2.060
252.00
0.00
N/A 999.99
-0.88 Bm-T
-1.60
1.82
Sp2.070
267.00
0.00
N/A 999.99
-0.86 Bm-T
-1.60
1.85
Sp2.080
282.00
0.00
N/A 999.99
-0.82 Bm-T
-1.60
1.96
Sp2.090
297.00
0.00
N/A 999.99
-0.74 Bm-T
-1.60
2.17
Sp2.100
312.00
0.00
N/A 999.99
-0.62 Bm-B
-1.60
2.59

Units: US (English)

Loss: Lump Sum

***** End of Report *****


Spec: AASHTO Standard

Units: US (English)

Loss: Lump Sum

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
1 of
2
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2.cbx
Combined Flexure Check - Box Girder
Stage Final: LFD 1 (Final w/o Sway)
POI
Location
Mu-Max Phi*Mn-Pos
1.2*M-Cr
Cap/Mu
Mu-Min Phi*Mn-Neg
(ft)
(kip-ft)
(kip-ft)
(kip-ft)
-------- -------- ---------- ---------- --------------Sp1.000
0.00
0.01 22,971.46
21,456.92
999.99
0.00
0.00
0.00
999.99
Sp1.010
16.20
20,249.59 34,214.45
29,239.01
1.27
0.00
0.00
0.00
999.99
Sp1.020
32.40
34,571.21 42,269.80
34,671.38
1.22
0.00
0.00
0.00
999.99
Sp1.030
48.60
43,129.75 47,108.25
37,642.44
1.09
0.00
0.00
0.00
999.99
Sp1.040
64.80
46,372.71 48,721.69
38,046.98
1.05
0.00
0.00
0.00
999.99
Sp1.050
81.00
44,179.40 47,467.47
36,075.31
1.07
0.00
0.00
0.00
999.99
Sp1.060
97.20
36,579.73 43,705.97
32,016.94
1.19
0.00
0.00
0.00
999.99
Sp1.070
113.40
24,140.82 37,441.51
25,636.44
1.46
0.00
0.00
0.00
999.99
Sp1.080
129.60
7,090.09 28,686.72
17,158.83
3.04
-4,080.77
0.00
0.00
0.00 *
Sp1.090
145.80
0.00
0.00
0.00
999.99
-26,022.66 -35,257.70 -43,966.24
1.02
Sp1.100
162.00
0.00
0.00
0.00
999.99
-55,031.00 -45,296.83 -54,016.74
0.82 *
Sp2.000
162.00
0.00
0.00
0.00
999.99
-53,635.61 -45,296.83 -53,824.51
0.84 *
Sp2.010
177.00
0.00
0.00
0.00
999.99
-28,102.11 -35,257.51 -42,784.75
0.94 *
Sp2.020
192.00
3,214.09 28,686.85
16,185.79
6.71
-8,824.02
0.00
0.00
0.00 *
Sp2.030
207.00
18,551.08 37,441.61
23,849.33
1.57
0.00
0.00
0.00
999.99
Sp2.040
222.00
29,790.13 43,706.04
29,575.02
1.47
0.00
0.00
0.00
999.99
Spec: AASHTO Standard

Units: US (English)

Bentley Exton Office

| Sheet
2 of
2
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2.cbx
Sp2.050
237.00
36,612.45 47,467.51
33,376.28
1.30
0.00
0.00
0.00
999.99
Sp2.060
252.00
38,957.96 48,721.69
35,268.91
1.25
0.00
0.00
0.00
999.99
Sp2.070
267.00
36,644.08 47,108.21
34,980.46
1.29
0.00
0.00
0.00
999.99
Sp2.080
282.00
29,536.80 42,269.72
32,341.86
1.31
0.00
0.00
0.00
999.99
Sp2.090
297.00
17,371.37 34,214.33
27,448.61
1.48
0.00
0.00
0.00
999.99
Sp2.100
312.00
0.00 22,971.46
20,402.61
999.99
-2.93
0.00
0.00
0.00 *
***** End of Report *****
Spec: AASHTO Standard

Units: US (English)

Loss: Lump Sum

Loss: Lump Sum

Output

Tutorial One / T1-33

T1-34 / Tutorial One

Spec: AASHTO Standard

LEAP CONBOXv10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
1 of
2
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2.cbx
Combined Flexure Check - Box Girder
Stage Final: LFD 1B (Final w/o Sway)
POI
Location
Mu-Max Phi*Mn-Pos
1.2*M-Cr
Cap/Mu
Mu-Min Phi*Mn-Neg
(ft)
(kip-ft)
(kip-ft)
(kip-ft)
-------- -------- ---------- ---------- --------------Sp1.000
0.00
0.01 22,971.46
21,456.92
999.99
0.00
0.00
0.00
999.99
Sp1.010
16.20
24,388.28 34,214.45
29,239.01
1.17
0.00
0.00
0.00
999.99
Sp1.020
32.40
41,832.72 42,269.80
34,671.38
1.01
0.00
0.00
0.00
999.99
Sp1.030
48.60
52,337.20 47,108.25
37,642.44
0.90 *
0.00
0.00
0.00
999.99
Sp1.040
64.80
56,431.90 48,721.69
38,046.98
0.86 *
0.00
0.00
0.00
999.99
Sp1.050
81.00
53,987.69 47,467.47
36,075.31
0.88 *
0.00
0.00
0.00
999.99
Sp1.060
97.20
44,940.52 43,705.97
32,016.94
0.97 *
0.00
0.00
0.00
999.99
Sp1.070
113.40
29,349.19 37,441.51
25,636.44
1.28
0.00
0.00
0.00
999.99
Sp1.080
129.60
7,807.64 28,686.72
17,158.83
2.76
-7,965.74
0.00
0.00
0.00 *
Sp1.090
145.80
0.00
0.00
0.00
999.99
-26,610.77 -35,257.70 -43,966.24
1.00 *
Sp1.100
162.00
0.00
0.00
0.00
999.99
-57,139.09 -45,296.83 -54,016.74
0.79 *
Sp2.000
162.00
0.00
0.00
0.00
999.99
-53,018.84 -45,296.83 -53,824.51
0.84 *
Sp2.010
177.00
0.00
0.00
0.00
999.99
-30,503.63 -35,257.51 -42,784.75
0.87 *
Sp2.020
192.00
3,969.89 28,686.85
16,185.79
5.43
-13,664.49
0.00
0.00
0.00 *
Sp2.030
207.00
23,177.86 37,441.61
23,849.33
1.57
-187.89
0.00
0.00
0.00 *
Sp2.040
222.00
37,107.35 43,706.04
29,575.02
1.18
0.00
0.00
0.00
999.99
Units: US (English)

Loss: Lump Sum

Bentley Exton Office

| Sheet
2 of
2
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2.cbx
Sp2.050
237.00
45,285.51 47,467.51
33,376.28
1.05
0.00
0.00
0.00
999.99
Sp2.060
252.00
47,743.83 48,721.69
35,268.91
1.02
0.00
0.00
0.00
999.99
Sp2.070
267.00
44,446.06 47,108.21
34,980.46
1.06
0.00
0.00
0.00
999.99
Sp2.080
282.00
35,663.22 42,269.72
32,341.86
1.19
0.00
0.00
0.00
999.99
Sp2.090
297.00
20,867.41 34,214.33
27,448.61
1.25
0.00
0.00
0.00
999.99
Sp2.100
312.00
0.00 22,971.46
20,402.61
999.99
-2.93
0.00
0.00
0.00 *
***** End of Report *****
Spec: AASHTO Standard

Units: US (English)

Loss: Lump Sum ................

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
1 of
2
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2.cbx
Combined Shear Check - Box Girder
Stage Final: LFD 1 (Final w/o Sway)
POI
Location
Vu-Max
Conc Mom
Av/S-prov
Vc
Vs-req
Vs-prov Cap-prov/Vu
Vu-Min
(ft)
(kip)
(kip-ft)
(in)
(kip)
(kip)
(kip)
-------- -------- ---------- ---------- ------- --------- ---------- --------- -----Sp1.000
0.00
-935.68
0.01
0.4775m 1,772.11
148.98
N/A
1.85f
-1,457.75
0.01
0.4775m 1,772.11
148.98
N/A
1.19f
Sp1.010
16.20
-678.32 16,407.78
0.4775m 1,419.09
148.98
N/A
2.08f
-1,132.40 20,248.59
0.4775m 1,419.09
148.98
N/A
1.25f
Sp1.020
32.40
-398.43 28,857.34
0.4775m
771.98
148.98
N/A
2.08f
-831.13 34,568.45
0.4856m
771.98
151.50
N/A
1.00f
Sp1.030
48.60
-95.72 41,830.71
0.4775m
432.38
152.74
N/A
5.50f
-531.36 43,071.54
0.4940m
432.38
158.02
N/A
1.00f
Sp1.040
64.80
211.01 45,569.24
0.4775m
338.84
157.57
N/A
2.12f
-233.88 45,926.68
0.4775m
338.84
157.57
N/A
1.91f
Sp1.050
81.00
516.64 43,687.19
0.4775m
429.72
153.82
N/A
1.02f
60.46 43,360.81
0.4775m
429.72
153.82
N/A
8.69f
Sp1.060
97.20
810.01 36,419.11
0.5528m
727.56
172.46
N/A
1.00f
354.47 35,661.60
0.4775m
727.56
148.98
N/A
2.23f
Sp1.070
113.40
1,114.33 19,285.88
0.4775m 1,268.33
148.98
N/A
1.14f
640.76 23,180.05
0.4775m 1,268.33
148.98
N/A
1.99f
Sp1.080
129.60
1,427.48
1,342.23
0.4775m 1,701.57
148.98
N/A
1.17f
918.89
6,325.29
0.4775m 1,701.57
148.98
N/A
1.81f
Sp1.090
145.80
1,742.12 -22,146.57
0.7091m 1,714.45
221.24
N/A
1.00f
1,188.73 -14,486.13
0.4775m 1,714.45
148.98
N/A
1.41f
Sp1.100
162.00
2,075.97 -51,236.46
3.0754m 1,337.89
968.76
N/A
1.00f
1,460.43 -37,580.89
0.9042m 1,337.89
284.82
N/A
1.00f
Sp2.000
162.00 -1,381.21 -36,566.34
0.5852m 1,350.35
184.33
N/A
1.00f
-1,978.88 -49,887.78
2.6934m 1,350.35
848.41
N/A
1.00f
Sp2.010
177.00 -1,128.65 -16,200.20
0.4775m 1,533.78
148.98
N/A
1.34f
-1,668.47 -24,211.49
1.0259m 1,533.78
320.08
N/A
1.00f
Sp2.020
192.00
-876.00
2,354.07
0.4775m 1,445.58
148.98
N/A
1.64f
-1,375.96 -3,380.43
0.4775m 1,445.58
148.98
N/A
1.04f
Sp2.030
207.00
-615.35 17,528.73
0.4775m 1,425.57
148.98
N/A
2.30f
-1,084.86 12,684.42
0.4775m 1,425.57
148.98
N/A
1.31f
Sp2.040
222.00
-346.61 28,875.86
0.4775m
881.73
148.98
N/A
2.68f
-800.30 29,645.42
0.4775m
881.73
148.98
N/A
1.16f
Spec: AASHTO Standard

Units: US (English)

Bentley Exton Office

| Sheet
2 of
2
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2.cbx
Sp2.050
237.00
-70.28 36,033.85
0.4775m
574.00
153.82
N/A
9.32f
-524.35 36,343.31
0.4775m
574.00
153.82
N/A
1.25f
Sp2.060
252.00
206.07 38,691.31
0.4775m
338.84
157.57
N/A
2.17f
-236.66 38,300.08
0.4775m
338.84
157.57
N/A
1.89f
Sp2.070
267.00
485.31 36,592.72
0.4775m
438.84
152.74
N/A
1.10f
51.91 35,310.77
0.4775m
438.84
152.74
N/A 10.26f
Sp2.080
282.00
766.72 29,536.17
0.4775m
783.98
148.98
N/A
1.10f
322.95 23,809.50
0.4775m
783.98
148.98
N/A
2.60f
Sp2.090
297.00
1,049.69 17,371.09
0.4775m 1,437.96
148.98
N/A
1.36f
583.77 13,619.14
0.4775m 1,437.96
148.98
N/A
2.45f
Sp2.100
312.00
1,339.60
-2.93
0.4775m 1,716.40
148.98
N/A
1.25f
819.30
-2.93
0.4775m 1,716.40
148.98
N/A
2.05f
Notes
(*): Factored shear stress exceeds 0.18fcbvdv. Use Strut and Tie Method if beam
end not integral with support. LRFD 5.8.3.2.
(f): Design failed!
(L): Asfy-Actual < Asfy-Required.
(m): Av/S-provided was changed to equal Av/S-minimum.
(!): Must provide Minimum transverse reinforcement per LRFD 5.8.2.4
(X): Max Vs exceeded. LRFD Eq. 5.8.3.3-2.
(z): Zero tension steel T/B.
***** End of Report *****
Spec: AASHTO Standard

Units: US (English)

Loss: Lump Sum

Loss: Lump Sum

Output

Tutorial One / T1-35

T1-36 / Tutorial One

Spec: AASHTO Standard

LEAP CONBOXv10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
1 of
2
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2.cbx
Combined Shear Check - Box Girder
Stage Final: LFD 1B (Final w/o Sway)
POI
Location
Vu-Max
Conc Mom
Av/S-prov
Vc
Vs-req
Vs-prov Cap-prov/Vu
Vu-Min
(ft)
(kip)
(kip-ft)
(in)
(kip)
(kip)
(kip)
-------- -------- ---------- ---------- ------- --------- ---------- --------- -----Sp1.000
0.00
-907.18
0.01
0.4775m 1,772.11
148.98
N/A
1.91f
-1,773.25
0.01
0.6351m 1,772.11
198.16
N/A
1.00f
Sp1.010
16.20
-664.43 12,735.25
0.4775m 1,431.47
148.98
N/A
2.14f
-1,390.14 24,388.28
0.4775m 1,431.47
148.98
N/A
1.02f
Sp1.020
32.40
-420.47 30,697.44
0.4775m
730.62
148.98
N/A
1.88f
-1,014.81 40,411.93
1.2723m
730.62
396.95
N/A
1.00f
Sp1.030
48.60
-105.92 41,024.09
0.4775m
392.40
152.74
N/A
4.63f
-649.55 48,651.74
1.0295m
392.40
329.32
N/A
1.00f
Sp1.040
64.80
232.12 46,663.65
0.4775m
338.84
157.57
N/A
1.92f
-296.92 49,848.65
0.4775m
338.84
157.57
N/A
1.50f
Sp1.050
81.00
593.66 46,717.09
0.7026m
433.29
226.34
N/A
1.00f
35.70 45,261.79
0.4775m
433.29
153.82
N/A 14.80f
Sp1.060
97.20
963.39 40,400.78
1.0839m
732.26
338.19
N/A
1.00f
352.77 35,822.84
0.4775m
732.26
148.98
N/A
2.25f
Sp1.070
113.40
1,342.76 27,030.56
0.8578m 1,224.31
267.65
N/A
1.00f
648.92 22,281.87
0.4775m 1,224.31
148.98
N/A
1.90f
Sp1.080
129.60
1,719.82
6,367.99
2.0010m 1,286.62
624.30
N/A
1.00f
927.11
5,280.11
0.4775m 1,286.62
148.98
N/A
1.39f
Sp1.090
145.80
2,083.26 -21,060.48
3.3085m 1,282.49 1,032.26
N/A
1.00f
1,194.86 -15,373.11
0.4775m 1,282.49
148.98
N/A
1.08f
Sp1.100
162.00
2,450.42 -54,495.24
4.3962m 1,337.89 1,384.81
N/A
1.00f
1,460.46 -37,584.79
0.9043m 1,337.89
284.84
N/A
1.00f
Sp2.000
162.00 -1,381.24 -36,570.36
0.5853m 1,350.35
184.36
N/A
1.00f
-2,339.26 -51,286.25
3.9646m 1,350.35 1,248.84
N/A
1.00f
Sp2.010
177.00 -1,136.15 -17,204.29
0.4775m 1,174.81
148.98
N/A
1.05f
-1,986.92 -21,478.29
3.3105m 1,174.81 1,032.88
N/A
1.00f
Sp2.020
192.00
-885.21
1,305.68
0.4775m 1,124.28
148.98
N/A
1.29f
-1,637.97
2,818.77
2.2298m 1,124.28
695.70
N/A
1.00f
Sp2.030
207.00
-626.17 16,431.95
0.4775m 1,386.27
148.98
N/A
2.21f
-1,279.25 20,974.08
0.4775m 1,386.27
148.98
N/A
1.08f
Sp2.040
222.00
-349.09 28,667.98
0.4775m
796.67
148.98
N/A
2.44f
-921.01 32,647.76
0.7265m
796.67
226.67
N/A
1.00f
Units: US (English)

Loss: Lump Sum ................

Bentley Exton Office

| Sheet
2 of
2
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2.cbx
Sp2.050
237.00
-52.41 37,318.96
0.4775m
477.00
153.82
N/A 10.83f
-580.23 38,410.60
0.5206m
477.00
167.70
N/A
1.00f
Sp2.060
252.00
257.64 41,673.38
0.4775m
338.84
157.57
N/A
1.73f
-246.60 38,738.24
0.4775m
338.84
157.57
N/A
1.81f
Sp2.070
267.00
585.66 40,983.13
0.7663m
405.61
245.13
N/A
1.00f
65.99 34,281.67
0.4775m
405.61
152.74
N/A
7.61f
Sp2.080
282.00
930.24 34,351.65
0.9466m
738.27
295.33
N/A
1.00f
332.38 16,747.53
0.4775m
738.27
148.98
N/A
2.40f
Sp2.090
297.00
1,284.82 20,867.41
0.4775m 1,450.12
148.98
N/A
1.12f
557.50 10,053.57
0.4775m 1,450.12
148.98
N/A
2.58f
Sp2.100
312.00
1,647.28
-2.93
0.4775m 1,716.40
148.98
N/A
1.02f
782.52
-2.93
0.4775m 1,716.40
148.98
N/A
2.15f
Notes
(*): Factored shear stress exceeds 0.18fcbvdv. Use Strut and Tie Method if beam
end not integral with support. LRFD 5.8.3.2.
(f): Design failed!
(L): Asfy-Actual < Asfy-Required.
(m): Av/S-provided was changed to equal Av/S-minimum.
(!): Must provide Minimum transverse reinforcement per LRFD 5.8.2.4
(X): Max Vs exceeded. LRFD Eq. 5.8.3.3-2.
(z): Zero tension steel T/B.
***** End of Report *****

Spec: AASHTO Standard

Units: US (English)

Loss: Lump Sum

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
1 of
1
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2.cbx
Design Parameters - LFD
Design Requirements - Box Girder
Governing LC
Required
Provided
--------------- ------------------------------ -------------- -------------P-Jack for Tendons (kips):
Tendon-1
PS + Perm(SLD 1 (Final w/o Sway)):3
7,936.73
7,570.00*
f'ci (ksi)
SLD 1 (Initial)
1.582
3.500
f'c (ksi)
PS + Perm(SLD 1 (Final w/o Sway)):3
3.004
4.000
Notes
(*): Provided is less than Required.
Loss-Type Selected: Lump Sum
Allowable/Limiting Stress Factors
Compression
Tension
----------------------------------Permanent+LL
0.60*f'c (psi)
6.00*sqrt(f'c (psi))
PS+Perm
0.40*f'c (psi)
0.00*sqrt(f'c (psi))
1/2 (PS+Perm)+LL
0.40*f'c (psi)
Cracking Tension
7.50*sqrt(f'c (psi))
Release
0.60*f'c (psi)
3.00*sqrt(f'c (psi)) Max 200.00 (psi)
Resistance Factors
PT
RC
-------- ----------Flexure
0.95
0.90
Shear
0.90
0.85
***** End of Report *****

Output

Tutorial One / T1-37

Output

T1-38 / Tutorial One

LEAP CONBOXv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Design of a 2-Span Post-Tensioned


Cast-in-Place Concrete Box Girder
(AASHTO Standard) (U.S. Units)

This CONBOX tutorial takes you through a design, step-by-step and illustrates some of the
basic features of the program. In this tutorial, you will be designing in accordance with the
AASHTO Standard Design Specifications.
The information for this tutorial is contained in an input file called Tutor2.cbx. As an
alternative to inputting all the information from scratch, as directed in this tutorial, you can
load this file and only work on the sections you wish. To load this file, select the Open
command from the File menu. Browse to the CONBOX/Examples subdirectory, if it is not
already showing, and select the file Tutor2.cbx.
This tutorial follows the 2-span (162 150) example provided in Caltrans Bridge Design
Practice Manual, Section 3.4, pages 3-36 through 3-102.

LEAP CONBOXv10.00.01.00

Tutorial Two / T2-1

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Diagrams

Diagrams

162' -0"

150'-0"

L = 28'
I = 96 ft4

FIGURE T2-1. Elevation View

37'-6"
3 @ 9' -6" = 28'-6"
CL Web 1

1'-9"

CL Web 2

7"

6'-6"

3" FUTURE A.C. OVERLAY

8 1/8"

4'-6"

4'-6"
CL Web 3

CL Web 4

4" FILLETS (TYP)

1' -0"
6 3/8" @ Midspan
1' -0" @ Bent

1' -0" TYP

FIGURE T2-2. Typical Section


(Post-Tensioning Ducts Not Shown)

CL
Abut. 1

CL
BENT 2

15.00'

16.20'
64.80'

81.00'

0.40L

0.50L

CL
Abut. 3

0.10L 0.10L

75.00'

60.00'

0.50L

0.40L

3.70' 2.80'

1.25'
PARABOLIC PATH BTW. POINTS SHOWN

1.00'

1.00'

FIGURE T2-3. Longitudinal Section and Post-Tensioning Layout

T2-2 / Tutorial Two

LEAP CONBOXv10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Problem Data

Problem Data
Concrete Material Properties
Unit Weight (PCF)
E-Modulus, E28 (ksi)
Poissons Ratio
Thermal Coeff. (F)
fci (ksi)
fc (ksi)
Humidity (%)
Ultimate Creep Coeff.
Ultimate Shrinkage Strain

CIP Box Girder

Integral Pier

150
3600
0.20

150
3250
0.20
--

6 10-6
3.5
4.0
70
Program Calculated
Program Calculated

-3.25
----

Design Specifications
AASHTO Standard

Units
U.S. (English)

Loss Type/Material Model


Lump Sum

20 ksi

Horizontal Offset
0.00

Pier Information
Izz

96 ft4

Iyy

1944 ft4

Area

72.0 ft2

P/T Tendons
Strand Type

- 270 ksi Low Relaxation (Es = 28,500 ksi)

Tendon Type

Unknown

Friction Coeff.

0.20

Wobble Coeff. (1/ft) 0.0002


Relaxation

0 ksi

Jack Type

Left

Force Type

Force

Left Force

7570 kips per tendon

Left Set

0.375

Right Force

N/A

Right Set

N/A

LEAP CONBOXv10.00.01.00

Tutorial Two / T2-3

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 1: Start the Program

Live Load
HS20-44
Permit Trucks

P5, P7, P9, P11, and P13

Live Load Distribution Factor


2.68 lanes

Assume distribution factor based on full bridge.

Overall Deck Width

37.5
= 2.68 lanes
14

Caltrans Bridge Design Practice Manual, Figure 2, Section 3.4.3.3


(page 1-13)

Additional Dead Loads


A.C. Overlay

Assume 35 psf; w = 0.035[37.5 - 2(1.75)] = 1.190 klf

Concrete Barrier

Assume 392 psf; w = 0.392 2 = 0.784 klf

Load Combinations

Initial
Final Without Sway

Dead Loads

Superimposed
Dead Loads

Live Loads

Self Weight
Self Weight

N/A
A.C. Overlay
Concrete Barrier

N/A
HS20 Truck + Lane
Permit Vehicles

Step 1: Start the Program


Start CONBOX as you would any other application using Microsoft Windows. By
default, the program installs in Programs > LEAP Software > CONBOX. To open, click
the Start button, select Programs, then LEAP Software, and then select CONBOX.
When the CONBOX splash screen appears, click the START button to clear the screen and
view the Project tab.

FIGURE T2-4. CONBOX Splash Screen

T2-4 / Tutorial Two

LEAP CONBOXv10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 2: Complete the Project Information

Step 2: Complete the Project Information


The Project tab allows you to enter general information about the project and select the
analysis options, design specifications, units, and loss type. You can return to this tab at any
time and make changes.

FIGURE T2-5. Project Tab

Complete the Project tab by entering the information shown in Fig. T2-5.
For this tutorial, you will be analyzing and designing the concrete box girder using the Full
Width Only option.

LEAP CONBOXv10.00.01.00

Tutorial Two / T2-5

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 3: Define the Bridge Connections

Step 3: Define the Bridge Connections


GEOMETRY TAB
The Geometry tab allows you to input the physical properties of the bridge, including
bridge alignment, layout, cross section information, and pier/column properties. Using this
tab, you can create, modify, or delete elements of your bridge description.

FIGURE T2-6. Geometry Tab

If there is no specific alignment provided, CONBOX will use its default alignment (N 90 E).
You can now create and/or modify the bridge connections by clicking the Layout button on
this tab to open the Bridge Component Layout dialog box.

BRIDGE COMPONENT LAYOUT DIALOG BOX


The Bridge Component Layout dialog box allows you to define the physical location,
bearing, and connection types for abutments, piers (bents), and span hinges as well as the
stationing for the begin bridge and the end bridge.
NOTE: Refer to Fig. T2-1: Elevation View on page T2-2 for additional data input.

FIGURE T2-7. Bridge Component Layout Dialog Box

T2-6 / Tutorial Two

LEAP CONBOXv10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 4: Define the Cross Section Layout and Materials

This bridge has two abutments and one pier/bent. Both the abutments and the pier are
perpendicular to the bridge alignment. The program automatically creates rows for the
beginning and end of the bridge. For the steps listed below, refer to Fig. T2-7 to view the
completed screen.
Perform the following steps to specify the bridge layout and connection information:
1.

In the grid, select the Begin Bridge row by clicking anywhere in the row and enter
0 in the Station field.

2.

Select the End Bridge row by clicking anywhere in the row and enter 312 in the
Station field. This value is the sum of both span lengths.

3.

While in the Begin Bridge row, click the Add Abutment button to add Abutment 1
after the Begin Bridge row and complete the fields to define Abutment 1.

4.

5.

6.

Enter Abutment 1 in the Ref. Name field.

Enter 0 in the Station field.

Enter N 0 00 00.00 W (or NORMAL for the default 90 skew) in the


Bearing field.

Select Roller from the drop-down list in the Connection field.

Click the Add Abutment button to add Abutment 3 and complete the fields to
define it.

Enter Abutment 3 in the Ref. Name field.

Enter 312 in the Station field.

Enter N 0 00 00.00 W (or NORMAL for the default 90 skew) in the


Bearing field.

Select Roller from the drop-down list in the Connection field.

While in the Abutment 1 row, click the Add Pier button and complete the fields to
define the pier.

Enter Bent 2 in the Ref. Name field.

According to this example, the pier needs to be at 162 ft. Enter 162 in the
Station field.

Enter N 0 00 00.00 W (or NORMAL for the default 90 skew) in the


Bearing field.

Select Fix from the drop-down list in the Connection field.

Click the OK button to return to the Geometry tab.

Step 4: Define the Cross Section Layout and Materials


GEOMETRY TAB
Once you have defined the bridge layout, you can create and/or modify the superstructure
cross section and layout by clicking the Cross Section button on this tab to open the Cross
Section Layout dialog box.

CROSS SECTION LAYOUT DIALOG BOX


The Cross Section Layout dialog box allows you to define the bridge cross section.
NOTE: Refer to Fig. T2-2: Typical Section on page T2-2 for additional data input.

LEAP CONBOXv10.00.01.00

Tutorial Two / T2-7

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 4: Define the Cross Section Layout and Materials

FIGURE T2-8. Cross Section Layout Dialog Box

This bridge is comprised of a prismatic section that has a soffit flare between 0.9L (Span 1)
to 0.1L (Span 2) along the bridge length. By default, the program creates a beginning cross
section. You should define the section properties for the begin section first by clicking the
Section button under the Section Def field to open the Multi-Cell CIP Box Section dialog
box.

MULTI-CELL CIP BOX SECTION DIALOG BOX


The Multi-Cell CIP Box Section dialog box allows you to define cross section dimensions.
NOTE: Refer to Fig. T2-2: Typical Section on page T2-2 for additional data input.

FIGURE T2-9. Multi-Cell CIP Box Section Dialog Box

T2-8 / Tutorial Two

LEAP CONBOXv10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 4: Define the Cross Section Layout and Materials

Define the section properties by entering the dimensions as shown in Fig. T2-9. To define
the concrete material properties, click the Material button to open the Concrete Material
dialog box.

CONCRETE MATERIAL DIALOG BOX


This dialog box allows you to define the material for the superstructure cross section.
Define the material properties for this bridge by entering the information as shown in Fig.
T2-10. When you are done, click the OK button to return to the Multi-Cell CIP Box Section
dialog box.
NOTE: Refer to the Problem Data beginning on page T2-3 for additional data input.

FIGURE T2-10. Concrete Material Dialog Box (Cross Section)

MULTI-CELL CIP BOX SECTION DIALOG BOX


Once you have completed defining the material and section properties for this segment,
click the OK button to return to the Cross Section Layout dialog box.

CROSS SECTION LAYOUT DIALOG BOX


When you return to this dialog box, you need to define the remaining cross sections.
You will be utilizing the Recall and Variant section types to complete the layout for this tutorial.

While in the Beg Section row, click the Recall Section button. This action copies the
section properties for the Beg Section to the recalled section. Enter 148.5 ft. in the Loc in
Span field. Select Constant from the Section Variation drop-down list.
Next, you will define the soffit flare section. Click the Add Variant button and enter the
data as shown in Fig. T2-11. Make sure the B-Slab thickness is 12.0 inches. Define the last
two sections by clicking the Recall Section button and entering the information as shown
in Fig. T2-11.
NOTE: Refer to Fig. T2-2: Typical Section on page T2-2 for soffit flare and cross section
information.

LEAP CONBOXv10.00.01.00

Tutorial Two / T2-9

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 5: Define the Piers and Columns

FIGURE T2-11. Cross Section Layout Dialog Box (Completed)

When you are done, click the OK button to return to the Geometry tab.

Step 5: Define the Piers and Columns


GEOMETRY TAB
Once you have defined the cross section layout and materials, you can create and/or modify
the piers and columns by clicking the Piers button on this tab to open the Pier and Column
Definitions dialog box.

PIER AND COLUMN DEFINITIONS DIALOG BOX


The Pier and Column Definitions dialog box allows you to define single or multicolumn
piers (bents).
NOTE: Refer to Fig. T2-1: Elevation View on page T2-2 for additional data input.

FIGURE T2-12. Pier and Column Definitions Dialog Box

T2-10 / Tutorial Two

LEAP CONBOXv10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 5: Define the Piers and Columns

Specify the pier property information for Bent 2 by changing the default pier name to Bent
2 and selecting Integral from the Type drop-down list.
This pier contains a 28 ft. column that is not one of the predefined column types; therefore,
you must create a user-defined column type by clicking the Column Types button to open
the Column Definition dialog box.

COLUMN DEFINITION DIALOG BOX


This dialog box allows you to create, modify, or delete user-defined, nonstandard column
shapes.
NOTE: Refer to Fig. T2-1: Elevation View on page T2-2 for additional data input.

FIGURE T2-13. Column Definition Dialog Box

Define the column by entering the information as shown in Fig. T2-13. Once you are done,
click the OK button to return to the Pier and Column Definitions dialog box.

PIER AND COLUMN DEFINITIONS DIALOG BOX


Specify the column length by entering 28 in the Len field located in the Columns for Pier
Definition grid. Add the user-defined column you created by selecting Column from the
Column Type drop-down list and Fix from the Support drop-down list. Next you need to
define the concrete material properties for the column by clicking the Material button in the
grid to open to Concrete Material dialog box.

LEAP CONBOXv10.00.01.00

Tutorial Two / T2-11

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 5: Define the Piers and Columns

CONCRETE MATERIAL DIALOG BOX


This dialog box allows you to define the concrete material for the appropriate column by
entering the information as shown in Fig. T2-14.

FIGURE T2-14. Concrete Material Dialog Box

NOTE: Only the appropriate concrete material properties will be available.

When you are done, click the OK button to return to the Pier and Column Definitions dialog
box.

PIER AND COLUMN DEFINITIONS DIALOG BOX


Once you have completed defining the pier for this bridge, click the OK button to return to
the Geometry tab.
.

At this point, it would be a good idea to save your project. Select the Save As option from the File
menu. Enter the file name you want to save your data to (e.g., MyTutor2) in the File Name field
and click the Save button. The default extension is *.cbx

T2-12 / Tutorial Two

LEAP CONBOXv10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 6: Define the Post-Tension Layout

Step 6: Define the Post-Tension Layout


MODEL TAB
The Model tab allows you to modify the plane frame analytical model by specifying
additional details about the superstructure, the tendons, the longitudinal rebar, and the
stirrups.

FIGURE T2-15. Model Tab

The span distances, bearing, and connection information was entered previously in the Bridge
Component Layout dialog box (Layout button on the Geometry tab). Since you will not be
making any changes to this information, you can skip the Superstructure button.

You can define the post-tension layout and tendon information for the full width section by
clicking the Tendons button to open the Tendon Definitions dialog box.

TENDON DEFINITIONS DIALOG BOX


This dialog box allows you to define the post-tension layout and tendon information. Enter
the post-tensioning information and the Path Data information as shown in Fig. T2-16.
CONBOX provides the user the ability to compute the Required Jacking Force and Concrete
Strengths (fci and fc). This information can be found in the Design Results screen. For this
tutorial, however, you will proceed by specifying the post-tensioning layout information.

NOTE: Refer to Fig. T2-3: Longitudinal Section and Post-Tensioning Layout on page T2-2
for additional data input.

LEAP CONBOXv10.00.01.00

Tutorial Two / T2-13

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 7: Define the Dead Loads for the Analysis

FIGURE T2-16. Tendon Definitions Dialog Box

Once you completed the tendon definitions, click the OK button to return to the Model tab.
CONBOX will automatically compute the required longitudinal rebar, if required, to satisfy
ultimate moment capacity criteria. For this tutorial, you will design the rebar and stirrups
needed for this bridge by using the auto-design features located in the Design tab; therefore, you
can skip the Long. Rebar and Stirrups buttons.
.

At this point, it would be a good idea to save your project. Select the Save As option from the File
menu. Enter the file name you want to save your data to (e.g., MyTutor2) in the File Name field
and click the Save button. The default extension is *.cbx

Step 7: Define the Dead Loads for the Analysis


LOADS/ANALYSIS TAB
The Loads/Analysis tab allows you to specify load combinations (LFD) to be used in the
analysis. For this tutorial, you will be adding the following loads:

Dead Loads: Intrinsic Self Weight

Superimposed Dead Loads: A.C. Overlay and Concrete Barrier

Live Loads: HS20 Truck + Lane and Permit Vehicles P5, P7, P9, P11, P13

NOTE: Refer to the Problem Data beginning on page T2-3 for additional data input.

T2-14 / Tutorial Two

LEAP CONBOXv10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 7: Define the Dead Loads for the Analysis

FIGURE T2-17. Loads/Analysis Tab

Select the Initial analysis case and define the Intrinsic Self-Weight load by right-clicking the
Dead Load/DC Group option on the right panel and selecting Add DC/DL. Double-click the
load to open the Dead Loads dialog box.

DEAD LOADS DIALOG BOX (INTRINSIC SELF WEIGHT)


This dialog box allows you to define the dead load for the analysis. You can define the
intrinsic self-weight by selecting the Include Self-Weight option as shown in Fig. T2-18.

FIGURE T2-18. Dead Loads Dialog Box (Intrinsic Self-Weight)

Once you are done, click the OK button to return to the Loads/Analysis tab.

LEAP CONBOXv10.00.01.00

Tutorial Two / T2-15

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 8: Define the Superimposed Dead Loads for the Analysis

Step 8: Define the Superimposed Dead Loads for the Analysis


Once you have defined the Dead Loads, notice that Intrinsic Self-Weight has been
added to the right panel and that it is now represented in the graphic window for the
bridge as shown in Fig. T2-19.
NOTE: Refer to the Problem Data beginning on page T2-3 for additional data input.

FIGURE T2-19. Loads/Analysis Tab (Intrinsic Self-Weight Added)

Select the Final analysis case and define the A.C. Overlay Load by right-clicking the
Superimposed Dead Load/DW Group option on the right panel and selecting Add DW/
ADL. Double-click the load to open the Dead Loads dialog box.

DEAD LOADS DIALOG BOX (A.C. OVERLAY)


Define the A.C. Overlay Load by completing the information as shown in Fig. T2-20.

FIGURE T2-20. Dead Loads Dialog Box (A.C. Overlay)

LEAP CONBOXv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

/ T2-16

Step 9: Define the Live Loads for the Analysis

Once you are done, click the OK button to return to the Loads/Analysis tab. Define the
Concrete Barrier Load by right-clicking the Superimposed Dead Load/DW Group option
on the right side of the screen and selecting Add DW/ADL. Double-click the load to open
the Dead Loads dialog box.

DEAD LOADS DIALOG BOX (CONCRETE BARRIER)


Define the Concrete Barrier Load by completing the information as shown in Fig. T221.

FIGURE T2-21. Dead Loads Dialog Box (Concrete Barrier)

Once you are done, click the OK button to return to the Loads/Analysis tab.

Step 9: Define the Live Loads for the Analysis


LOADS/ANALYSIS TAB
Once you have defined the superimposed dead loads, notice that both the A.C. Overlay
and the Concrete Barrier have been added to the right side of the window and that they
are now represented in the graphic window for the bridge as shown in Fig. T2-22.
NOTE: Refer to the Problem Data beginning on page T2-3 for additional data input.

T2-17 /

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 9: Define the Live Loads for the Analysis

FIGURE T2-22. Loads/Analysis Tab (Superimposed Dead Loads Added)

Select the Final w/o Sway analysis case and define the HS20 Truck and H20/HS20 Lane
Load by expanding the Live Load Groups located under Locked Library Loads. Select
the predefined HS20 Truck + Lane load, then drag and drop it anywhere within the
Tutor 2 Loads. Notice that this load is added to the Live Load Group. In the Live Load
Group for this tutorial, double-click the HS20 Truck + Lane Load to open the Live Load
dialog box.
NOTE: The Locked Library Loads can be viewed or modified by selecting Vehicle from
the Libraries menu to open the Vehicle Library.

LIVE LOAD DIALOG BOX (HS20 TRUCK + LANE LOAD)


This dialog box allows you to add or modify live loads for the analysis. Verify that the
definition for this load appears as shown in Fig. T2-23.

FIGURE T2-23. Live Load Dialog Box (HS20 Truck + Lane)

Once you are done, click the OK button to return to the Loads/Analysis tab.

LEAP CONBOXv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

/ T2-18

Step 9: Define the Live Loads for the Analysis

LOADS/ANALYSIS TAB
Define the Permit Vehicles Load by selecting the P5, P7, P9, P11, and P13 Load located
in the Live Load Groups listed under Locked Library Loads. Drag and drop this load
anywhere within the Tutor 2 Loads. Notice that this load is added to the Live Load
Group. In the Live Load Group for this tutorial, double-click the load to open the Live
Load dialog box.

LIVE LOAD DIALOG BOX (PERMIT VEHICLES LOAD)


Verify that the definition for this load appears as shown in Fig. T2-24. Once you are
done, click the OK button to return to the Loads/Analysis tab.

FIGURE T2-24. Live Load Dialog Box (Permit Vehicles Load)

LOADS/ANALYSIS TAB
Notice that both live loads have been added to the right panel and that they are
represented in the graphic window as shown in Fig. T2-25.

FIGURE T2-25. Loads/Analysis Tab (Live Loads Added)

T2-19 /

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 10: Define the Load Combination Factors for the Analysis

At this point, it would be a good idea to save your project. Select the Save As option from the File
menu. Enter the file name you want to save your data to (e.g., MyTutor2) in the File Name field
and click the Save button. The default extension is *.cbx

Step 10: Define the Load Combination Factors for the Analysis
LOADS/ANALYSIS TAB
Once you have defined the loads for the analysis, you need to add the combination
factors to be used for the each analysis case. To define the combinations for the Initial
analysis case, select Initial from the Case drop-down list, right-click in the left panel,
and select Add Combination to add a load combination.
Although there is only the self-weight in the Initial analysis case, you will add two different
combinations (SLD and LFD). The type of combination selected governs which specification
checks and design activities the combination will be used for.

LFD LOAD COMBINATION FACTORS DIALOG BOX (SLD 1 (INITIAL))


The first combination for this analysis will be for SLD Group I. To define this
combination, double-click the load combination, Comb-1. Complete the LFD Load
Combination Factors dialog box as shown in Fig. T2-26.

FIGURE T2-26. LFD Load Combination Factors Dialog Box

Once you are done, click the OK button to return to the Loads/Analysis tab.

LOADS/ANALYSIS TAB (ADD SELF-WEIGHT TO A LOAD COMBINATION)


Once you have created the SLD 1 (Initial) combination, select the Self Weight load in
the right panel, then drag and drop it anywhere within the combination. Notice that the
Intrinsic Self Weight is added to the Dead Load/DC Group in the combination as
shown in Fig. T2-27.

LEAP CONBOXv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

/ T2-20

Step 10: Define the Load Combination Factors for the Analysis

FIGURE T2-27. Loads/Analysis Tab (SLD 1 (Initial) Combination Added)

Repeat the steps defined above to define the rest of the combinations for the analysis
cases. Leave the parameters in the LFD Load Combination Factors dialog box as the
default for all combination types. Refer to the following table for additional input
information.
AASHTO
Combination
Type

Combination Name

Purpose

Defined Loads to Include


Dead Load (SW_AC_RAIL)

Live Loads

Intrinsic
A.C. Concrete HS20 Truck + Permit
Self Weight Overlay Barrier H20/HS20 Lane Trucks
Initial

SLD Group I

SLD 1 (Initial)

f'ci Design,
Stress Check

Final Without (w/o) Sway

SLD Group I

SLD 1 (Final w/o Sway)

PT Design
f'c Design
LFD Group I LFD 1 (Final w/o Sway)
Strength Design (Std)
LFD Group IB LFD 1B (Final w/o Sway) Strength Design (Permit)

X
X

X
X

X
X

X
X

At this point, it would be a good idea to save your project. Select the Save As option from the File
menu. Enter the file name you want to save your data to (e.g., MyTutor2) in the File Name field
and click the Save button. The default extension is *.cbx

T2-21 /

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 11: Check the Design Parameters

Step 11: Check the Design Parameters


Select Design Parameters from the Settings menu to open the Design Parameters dialog
box. This dialog box allows you to view and/or edit the settings of the design
parameters.

FIGURE T2-28. Design Parameters Dialog Box

Use the default allowable stress factors, PT Resistance Factors, RC Resistance Factors,
and the plane frame model by clicking the Use Defaults button. When you are done,
click the OK button to return to the program.

Step 12: Run the Analysis


LOADS/ANALYSIS TAB
You will use the program-computed live load distribution factors according to AASHTO;
therefore, skip the Live Load Distribution Factors button.

After defining the load combinations, you can perform an analysis of the structure by
clicking the Run Analysis button. After performing the analysis, the default analysis
result text/graphic report displays in the Analysis Results screen.

ANALYSIS RESULTS SCREEN


This screen displays automatically after performing the analysis and presents you with
the analysis results.

LEAP CONBOXv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

/ T2-22

Step 13: Automatically Design the Longitudinal Rebar

FIGURE T2-29. Analysis Results Screen (Text Format)

This screen allows you to view, print, or save (in text or Microsoft Excel formats)
structure responses to all loads, load cases, and load combination. Click to close this
screen and return to the Loads/Analysis tab.
At this point, it would be a good idea to save your project. Select the Save As option from the File
menu. Enter the file name you want to save your data to (e.g., MyTutor2) in the File Name field
and click the Save button. The default extension is *.cbx

Step 13: Automatically Design the Longitudinal Rebar


DESIGN TAB
This tab allows you to verify the design results and assists you in designing the layout
of the longitudinal rebar and stirrups, if necessary. CONBOX has the ability to
automatically design the longitudinal rebar for your bridge. Design the rebar by
clicking the Rebar button to open the Longitudinal Rebar dialog box.

FIGURE T2-30. Design Tab

T2-23 /

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 14: Automatically Design the Stirrups

LONGITUDINAL REBAR DIALOG BOX


This dialog box assists you in designing the longitudinal rebar for the bridge. CONBOX
does not automatically determine the controlling load combination. It is the users
responsibility to make this determination.

FIGURE T2-31. Longitudinal Rebar Dialog Box (Design)

For this tutorial, however, the controlling load combination is LFD 1B (Final w/o
Sway). Select this load combination and enter the design method, No. of Bars with a
solution increment of 5, #5 bar size, and 2.5 in. clearance as shown in Fig. T2-31. Click
the Auto-Design button. When the following message displays, select OK.

FIGURE T2-32. Auto Design Rebar Warning Message

This action deletes any rebar data you provided in the Design tab; however, you did not
enter anything for this tutorial. Verify that the automatic design (As provided) meets
the As required. If it does, copy the rebar design into your bridge by clicking the Copy
to Model button.
When you are done, click the OK button to accept these changes and return to the
Design tab.

Step 14: Automatically Design the Stirrups


DESIGN TAB
CONBOX

has the ability to automatically design the stirrups for your bridge. Design
the vertical reinforcement (i.e., stirrups) by clicking the Stirrups button to open the
Stirrups dialog box.

LEAP CONBOXv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

/ T2-24

Step 14: Automatically Design the Stirrups

STIRRUPS DIALOG BOX


This dialog box assists you in designing the stirrups for the bridge. CONBOX does not
automatically determine the controlling load combination. It is the users responsibility
to make this determination.

FIGURE T2-33. Stirrups Dialog Box (Design)

For this tutorial, however, the controlling load combination is LFD 1B (Final w/o
Sway). Select this load combination and enter the stirrup spacing, #5 bar size, and 8
legs as shown in Fig. T2-33. Click the Auto-Design button. When the following
message displays, select OK.

FIGURE T2-34. Auto Design Stirrups Warning Message

This action deletes any stirrup data you provided in the Design tab; however, you did
not enter anything for this tutorial. Verify that the automatic design (Av/s provided)
meets the Av/s required in the graph. If it does, copy the stirrup design into your bridge
by clicking the Copy to Model button.
When you are done, click the OK button to accept these changes and return to the
Design tab.
In order to generate reports that includes the rebar and stirrup information, you will need to run
the analysis again (Loads tab, Step 12, page T2-22) and then print the final reports.
.

At this point, it would be a good idea to save your project. Select the Save As option from the File
menu. Enter the file name you want to save your data to (e.g., MyTutor2) in the File Name field
and click the Save button. The default extension is *.cbx

T2-25 /

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 15: View the Design Results

Step 15: View the Design Results


DESIGN TAB
After re-running the analysis, click the Design Results button to open the Design
Results screen.

DESIGN RESULTS SCREEN


This screen displays automatically after computing the design and presents you with
the design results.

FIGURE T2-35. Design Results Screen (Text Format)

Using this screen, you can display the design results in either a text or graphic format,
view the design results for an analysis case, view the design results for a load
combination, or view the design results by response type. You can also print your
design results by right-clicking this screen and selecting the Print option. When you are
done, click to close this screen and return to the Design tab.

LEAP CONBOXv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

/ T2-26

Step 16: Print the Reports

Step 16: Print the Reports


The input of Tutorial 2 is completed. To print the final output of the project, select Print
from the File menu to open the Print Report Manager dialog box.

PRINT REPORT MANAGER


For this tutorial, print to a file all the model reports, analysis results, design/check
reports, and miscellaneous reports as shown in Fig. T2-36. Click the Create Reports
button to send the selected output to a text file.

FIGURE T2-36. Print Report Manager

Following is a printout of the output for Tutorial 2 according to the options selected
above.

T2-27 /

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

T2-28 / Tutorial Two

Spec: AASHTO Standard

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
1 of
1
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2.cbx
Combined Summary - Box Girder
Stage Final
POI
Location ............ Min C/D Ratios ............
(ft)
Moment
Shear
St-Ten
St-Cmp LL-Def
-------- -------- ---------------- ------ -----Sp1.000
0.00 999.99
1.00d 999.99
2.37 999.00
Sp1.010
16.20
1.17
1.02d 999.99
1.87
2.86
Sp1.020
32.40
1.01
1.00d
66.10
1.63
1.51
Sp1.030
48.60
0.90*
1.00d
2.33
1.50
1.11
Sp1.040
64.80
0.86*
1.50d
1.67
1.45
0.96*
Sp1.050
81.00
0.88*
1.00d
2.04
1.47
0.93*
Sp1.060
97.20
0.97*
1.00d
16.18
1.59
1.04
Sp1.070
113.40
1.28
1.00d 999.99
1.85
1.30
Sp1.080
129.60
0.00*
1.00d 999.99
2.10
1.96
Sp1.090
145.80
1.00*
1.00d 999.99
1.43
4.18
Sp1.100
162.00
0.79*
1.00d
0.00*
1.31 263.62
Sp2.000
162.00
0.84*
1.00d
0.00*
1.35 242.52
Sp2.010
177.00
0.87*
1.00d 999.99
1.35
4.76
Sp2.020
192.00
0.00*
1.00d 999.99
1.80
2.26
Sp2.030
207.00
0.00*
1.08d 999.99
2.44
1.52
Sp2.040
222.00
1.18
1.00d 999.99
2.06
1.22
Sp2.050
237.00
1.05
1.00d 999.99
1.88
1.10
Sp2.060
252.00
1.02
1.73d
10.56
1.82
1.13
Sp2.070
267.00
1.06
1.00d
57.08
1.85
1.31
Sp2.080
282.00
1.19
1.00d 999.99
1.96
1.79
Sp2.090
297.00
1.25
1.12d 999.99
2.17
3.38
Sp2.100
312.00
0.00*
1.02d 999.99
2.59 999.00
Notes
C: Crack Control did not pass.
d: Shear reinforcement was designed.
L: Asfy-Actual < Asfy-Required.
***** End of Report **
Units: US (English)

Loss: Lump Sum

Bentley Exton Office

| Sheet
1 of
1
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2.cbx
Combined Stress Check - Box Girder
Stage Final: SLD 1 (Final w/o Sway)
POI
Location Max-Ten Loc All-Ten Ratio Max-Cmp Loc All-Cmp Ratio
(ft)
(ksi)
(ksi)
(ksi)
(ksi)
-------- -------- ------- ---- ------- ------ ------- ---- ------- -----Sp1.000
0.00
0.00
N/A 999.99
-0.67 Bm-B
-2.40
3.56
Sp1.010
16.20
0.00
N/A 999.99
-1.00 Bm-T
-2.40
2.41
Sp1.020
32.40
0.01 Bm-B
0.38 66.10
-1.22 Bm-T
-2.40
1.96
Sp1.030
48.60
0.16 Bm-B
0.38
2.33
-1.36 Bm-T
-2.40
1.77
Sp1.040
64.80
0.23 Bm-B
0.38
1.67
-1.42 Bm-T
-2.40
1.69
Sp1.050
81.00
0.19 Bm-B
0.38
2.04
-1.40 Bm-T
-2.40
1.72
Sp1.060
97.20
0.02 Bm-B
0.38 16.18
-1.28 Bm-T
-2.40
1.88
Sp1.070
113.40
0.00
N/A 999.99
-1.07 Bm-T
-2.40
2.24
Sp1.080
129.60
0.00
N/A 999.99
-0.93 Bm-B
-2.40
2.59
Sp1.090
145.80
0.00
N/A 999.99
-1.42 Bm-B
-2.40
1.69
Sp1.100
162.00
0.44 Bm-T
0.38
0.86*
-1.59 Bm-B
-2.40
1.51
Sp2.000
162.00
0.40 Bm-T
0.38
0.95*
-1.55 Bm-B
-2.40
1.55
Sp2.010
177.00
0.00
N/A 999.99
-1.49 Bm-B
-2.40
1.61
Sp2.020
192.00
0.00
N/A 999.99
-1.08 Bm-B
-2.40
2.22
Sp2.030
207.00
0.00
N/A 999.99
-0.85 Bm-T
-2.40
2.82
Sp2.040
222.00
0.00
N/A 999.99
-1.03 Bm-T
-2.40
2.33
Sp2.050
237.00
0.00
N/A 999.99
-1.14 Bm-T
-2.40
2.11
Sp2.060
252.00
0.04 Bm-B
0.38 10.56
-1.17 Bm-T
-2.40
2.05
Sp2.070
267.00
0.01 Bm-B
0.38 57.08
-1.14 Bm-T
-2.40
2.11
Sp2.080
282.00
0.00
N/A 999.99
-1.04 Bm-T
-2.40
2.31
Sp2.090
297.00
0.00
N/A 999.99
-0.87 Bm-T
-2.40
2.76
Sp2.100
312.00
0.00
N/A 999.99
-0.62 Bm-B
-2.40
3.89
***** End of Report *****
Spec: AASHTO Standard

Units: US (English)

Loss: Lump Sum

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
1 of
1
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2.cbx
Combined Stress Check - Box Girder
Stage Final: PS + Perm(SLD 1 (Final w/o Sway)):3
POI
Location Max-Ten Loc All-Ten Ratio Max-Cmp Loc All-Cmp Ratio
(ft)
(ksi)
(ksi)
(ksi)
(ksi)
-------- -------- ------- ---- ------- ------ ------- ---- ------- -----Sp1.000
0.00
0.00
N/A 999.99
-0.67 Bm-B
-1.60
2.37
Sp1.010
16.20
0.00
N/A 999.99
-0.85 Bm-T
-1.60
1.87
Sp1.020
32.40
0.00
N/A 999.99
-0.98 Bm-T
-1.60
1.63
Sp1.030
48.60
0.00
N/A 999.99
-1.07 Bm-T
-1.60
1.50
Sp1.040
64.80
0.00
N/A 999.99
-1.10 Bm-T
-1.60
1.45
Sp1.050
81.00
0.00
N/A 999.99
-1.09 Bm-T
-1.60
1.47
Sp1.060
97.20
0.00
N/A 999.99
-1.01 Bm-T
-1.60
1.59
Sp1.070
113.40
0.00
N/A 999.99
-0.87 Bm-T
-1.60
1.85
Sp1.080
129.60
0.00
N/A 999.99
-0.76 Bm-B
-1.60
2.10
Sp1.090
145.80
0.00
N/A 999.99
-1.12 Bm-B
-1.60
1.43
Sp1.100
162.00
0.08 Bm-T
0.00
0.00*
-1.22 Bm-B
-1.60
1.31
Sp2.000
162.00
0.04 Bm-T
0.00
0.00*
-1.19 Bm-B
-1.60
1.35
Sp2.010
177.00
0.00
N/A 999.99
-1.18 Bm-B
-1.60
1.35
Sp2.020
192.00
0.00
N/A 999.99
-0.89 Bm-B
-1.60
1.80
Sp2.030
207.00
0.00
N/A 999.99
-0.65 Bm-T
-1.60
2.44
Sp2.040
222.00
0.00
N/A 999.99
-0.78 Bm-T
-1.60
2.06
Sp2.050
237.00
0.00
N/A 999.99
-0.85 Bm-T
-1.60
1.88
Sp2.060
252.00
0.00
N/A 999.99
-0.88 Bm-T
-1.60
1.82
Sp2.070
267.00
0.00
N/A 999.99
-0.86 Bm-T
-1.60
1.85
Sp2.080
282.00
0.00
N/A 999.99
-0.82 Bm-T
-1.60
1.96
Sp2.090
297.00
0.00
N/A 999.99
-0.74 Bm-T
-1.60
2.17
Sp2.100
312.00
0.00
N/A 999.99
-0.62 Bm-B
-1.60
2.59

Bentley Exton Office

| Sheet
1 of
1
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2.cbx
Combined Stress Check - Box Girder
Stage Final: 1/2(PS + Perm) + LL(SLD 1 (Final w/o Sway)):3
POI
Location Max-Ten Loc All-Ten Ratio Max-Cmp Loc All-Cmp Ratio
(ft)
(ksi)
(ksi)
(ksi)
(ksi)
-------- -------- ------- ---- ------- ------ ------- ---- ------- -----Sp1.000
0.00 ------- ---- ------- ------0.34 Bm-B
-1.60
4.75
Sp1.010
16.20 ------- ---- ------- ------0.57 Bm-T
-1.60
2.81
Sp1.020
32.40 ------- ---- ------- ------0.73 Bm-T
-1.60
2.19
Sp1.030
48.60 ------- ---- ------- ------0.83 Bm-T
-1.60
1.94
Sp1.040
64.80 ------- ---- ------- ------0.87 Bm-T
-1.60
1.84
Sp1.050
81.00 ------- ---- ------- ------0.85 Bm-T
-1.60
1.88
Sp1.060
97.20 ------- ---- ------- ------0.77 Bm-T
-1.60
2.07
Sp1.070
113.40 ------- ---- ------- ------0.64 Bm-T
-1.60
2.50
Sp1.080
129.60 ------- ---- ------- ------0.54 Bm-B
-1.60
2.94
Sp1.090
145.80 ------- ---- ------- ------0.86 Bm-B
-1.60
1.87
Sp1.100
162.00 ------- ---- ------- ------0.98 Bm-B
-1.60
1.63
Sp2.000
162.00 ------- ---- ------- ------0.96 Bm-B
-1.60
1.67
Sp2.010
177.00 ------- ---- ------- ------0.90 Bm-B
-1.60
1.78
Sp2.020
192.00 ------- ---- ------- ------0.64 Bm-B
-1.60
2.51
Sp2.030
207.00 ------- ---- ------- ------0.52 Bm-T
-1.60
3.05
Sp2.040
222.00 ------- ---- ------- ------0.64 Bm-T
-1.60
2.49
Sp2.050
237.00 ------- ---- ------- ------0.71 Bm-T
-1.60
2.25
Sp2.060
252.00 ------- ---- ------- ------0.73 Bm-T
-1.60
2.19
Sp2.070
267.00 ------- ---- ------- ------0.71 Bm-T
-1.60
2.27
Sp2.080
282.00 ------- ---- ------- ------0.63 Bm-T
-1.60
2.53
Sp2.090
297.00 ------- ---- ------- ------0.50 Bm-T
-1.60
3.20
Sp2.100
312.00 ------- ---- ------- ------0.31 Bm-B
-1.60
5.18

***** End of Report *****


Spec: AASHTO Standard

Units: US (English)

***** End of Report *****

Loss: Lump Sum


Spec: AASHTO Standard

Units: US (English)

Loss: Lump Sum

Output

Tutorial Two / T2-29

T2-30 / Tutorial Two

Spec: AASHTO Standard

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
1 of
2
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2.cbx
Combined Flexure Check - Box Girder
Stage Final: LFD 1 (Final w/o Sway)
POI
Location
Mu-Max Phi*Mn-Pos
1.2*M-Cr
Cap/Mu
Mu-Min Phi*Mn-Neg
(ft)
(kip-ft)
(kip-ft)
(kip-ft)
-------- -------- ---------- ---------- --------------Sp1.000
0.00
0.01 22,971.46
21,456.92
999.99
0.00
0.00
0.00
999.99
Sp1.010
16.20
20,249.59 34,214.45
29,239.01
1.27
0.00
0.00
0.00
999.99
Sp1.020
32.40
34,571.21 42,269.80
34,671.38
1.22
0.00
0.00
0.00
999.99
Sp1.030
48.60
43,129.75 47,108.25
37,642.44
1.09
0.00
0.00
0.00
999.99
Sp1.040
64.80
46,372.71 48,721.69
38,046.98
1.05
0.00
0.00
0.00
999.99
Sp1.050
81.00
44,179.40 47,467.47
36,075.31
1.07
0.00
0.00
0.00
999.99
Sp1.060
97.20
36,579.73 43,705.97
32,016.94
1.19
0.00
0.00
0.00
999.99
Sp1.070
113.40
24,140.82 37,441.51
25,636.44
1.46
0.00
0.00
0.00
999.99
Sp1.080
129.60
7,090.09 28,686.72
17,158.83
3.04
-4,080.77
0.00
0.00
0.00 *
Sp1.090
145.80
0.00
0.00
0.00
999.99
-26,022.66 -35,257.70 -43,966.24
1.02
Sp1.100
162.00
0.00
0.00
0.00
999.99
-55,031.00 -45,296.83 -54,016.74
0.82 *
Sp2.000
162.00
0.00
0.00
0.00
999.99
-53,635.61 -45,296.83 -53,824.51
0.84 *
Sp2.010
177.00
0.00
0.00
0.00
999.99
-28,102.11 -35,257.51 -42,784.75
0.94 *
Sp2.020
192.00
3,214.09 28,686.85
16,185.79
6.71
-8,824.02
0.00
0.00
0.00 *
Sp2.030
207.00
18,551.08 37,441.61
23,849.33
1.57
0.00
0.00
0.00
999.99
Sp2.040
222.00
29,790.13 43,706.04
29,575.02
1.47
0.00
0.00
0.00
999.99
Units: US (English)

Loss: Lump Sum

Bentley Exton Office

| Sheet
2 of
2
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2.cbx
Sp2.050
237.00
36,612.45 47,467.51
33,376.28
1.30
0.00
0.00
0.00
999.99
Sp2.060
252.00
38,957.96 48,721.69
35,268.91
1.25
0.00
0.00
0.00
999.99
Sp2.070
267.00
36,644.08 47,108.21
34,980.46
1.29
0.00
0.00
0.00
999.99
Sp2.080
282.00
29,536.80 42,269.72
32,341.86
1.31
0.00
0.00
0.00
999.99
Sp2.090
297.00
17,371.37 34,214.33
27,448.61
1.48
0.00
0.00
0.00
999.99
Sp2.100
312.00
0.00 22,971.46
20,402.61
999.99
-2.93
0.00
0.00
0.00 *
***** End of Report ****

Spec: AASHTO Standard

Units: US (English)

Loss: Lump Sum

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
1 of
2
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2.cbx
Combined Flexure Check - Box Girder
Stage Final: LFD 1B (Final w/o Sway)
POI
Location
Mu-Max Phi*Mn-Pos
1.2*M-Cr
Cap/Mu
Mu-Min Phi*Mn-Neg
(ft)
(kip-ft)
(kip-ft)
(kip-ft)
-------- -------- ---------- ---------- --------------Sp1.000
0.00
0.01 22,971.46
21,456.92
999.99
0.00
0.00
0.00
999.99
Sp1.010
16.20
24,388.28 34,214.45
29,239.01
1.17
0.00
0.00
0.00
999.99
Sp1.020
32.40
41,832.72 42,269.80
34,671.38
1.01
0.00
0.00
0.00
999.99
Sp1.030
48.60
52,337.20 47,108.25
37,642.44
0.90 *
0.00
0.00
0.00
999.99
Sp1.040
64.80
56,431.90 48,721.69
38,046.98
0.86 *
0.00
0.00
0.00
999.99
Sp1.050
81.00
53,987.69 47,467.47
36,075.31
0.88 *
0.00
0.00
0.00
999.99
Sp1.060
97.20
44,940.52 43,705.97
32,016.94
0.97 *
0.00
0.00
0.00
999.99
Sp1.070
113.40
29,349.19 37,441.51
25,636.44
1.28
0.00
0.00
0.00
999.99
Sp1.080
129.60
7,807.64 28,686.72
17,158.83
2.76
-7,965.74
0.00
0.00
0.00 *
Sp1.090
145.80
0.00
0.00
0.00
999.99
-26,610.77 -35,257.70 -43,966.24
1.00 *
Sp1.100
162.00
0.00
0.00
0.00
999.99
-57,139.09 -45,296.83 -54,016.74
0.79 *
Sp2.000
162.00
0.00
0.00
0.00
999.99
-53,018.84 -45,296.83 -53,824.51
0.84 *
Sp2.010
177.00
0.00
0.00
0.00
999.99
-30,503.63 -35,257.51 -42,784.75
0.87 *
Sp2.020
192.00
3,969.89 28,686.85
16,185.79
5.43
-13,664.49
0.00
0.00
0.00 *
Sp2.030
207.00
23,177.86 37,441.61
23,849.33
1.57
-187.89
0.00
0.00
0.00 *
Sp2.040
222.00
37,107.35 43,706.04
29,575.02
1.18
0.00
0.00
0.00
999.99
Spec: AASHTO Standard

Units: US (English)

Bentley Exton Office

| Sheet
2 of
2
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2.cbx
Sp2.050
237.00
45,285.51 47,467.51
33,376.28
1.05
0.00
0.00
0.00
999.99
Sp2.060
252.00
47,743.83 48,721.69
35,268.91
1.02
0.00
0.00
0.00
999.99
Sp2.070
267.00
44,446.06 47,108.21
34,980.46
1.06
0.00
0.00
0.00
999.99
Sp2.080
282.00
35,663.22 42,269.72
32,341.86
1.19
0.00
0.00
0.00
999.99
Sp2.090
297.00
20,867.41 34,214.33
27,448.61
1.25
0.00
0.00
0.00
999.99
Sp2.100
312.00
0.00 22,971.46
20,402.61
999.99
-2.93
0.00
0.00
0.00 *
***** End of Report *****
Spec: AASHTO Standard

Units: US (English)

Loss: Lump Sum

Loss: Lump Sum

Output

Tutorial Two / T2-31

T2-32 / Tutorial Two

Spec: AASHTO Standard

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
1 of
2
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2.cbx
Combined Shear Check - Box Girder
Stage Final: LFD 1 (Final w/o Sway)
POI
Location
Vu-Max
Conc Mom
Av/S-prov
Vc
Vs-req
Vs-prov Cap-prov/Vu
Vu-Min
(ft)
(kip)
(kip-ft)
(in)
(kip)
(kip)
(kip)
-------- -------- ---------- ---------- ------- --------- ---------- --------- -----Sp1.000
0.00
-935.68
0.01
0.4775m 1,772.11
148.98
N/A
1.85f
-1,457.75
0.01
0.4775m 1,772.11
148.98
N/A
1.19f
Sp1.010
16.20
-678.32 16,407.78
0.4775m 1,419.09
148.98
N/A
2.08f
-1,132.40 20,248.59
0.4775m 1,419.09
148.98
N/A
1.25f
Sp1.020
32.40
-398.43 28,857.34
0.4775m
771.98
148.98
N/A
2.08f
-831.13 34,568.45
0.4856m
771.98
151.50
N/A
1.00f
Sp1.030
48.60
-95.72 41,830.71
0.4775m
432.38
152.74
N/A
5.50f
-531.36 43,071.54
0.4940m
432.38
158.02
N/A
1.00f
Sp1.040
64.80
211.01 45,569.24
0.4775m
338.84
157.57
N/A
2.12f
-233.88 45,926.68
0.4775m
338.84
157.57
N/A
1.91f
Sp1.050
81.00
516.64 43,687.19
0.4775m
429.72
153.82
N/A
1.02f
60.46 43,360.81
0.4775m
429.72
153.82
N/A
8.69f
Sp1.060
97.20
810.01 36,419.11
0.5528m
727.56
172.46
N/A
1.00f
354.47 35,661.60
0.4775m
727.56
148.98
N/A
2.23f
Sp1.070
113.40
1,114.33 19,285.88
0.4775m 1,268.33
148.98
N/A
1.14f
640.76 23,180.05
0.4775m 1,268.33
148.98
N/A
1.99f
Sp1.080
129.60
1,427.48
1,342.23
0.4775m 1,701.57
148.98
N/A
1.17f
918.89
6,325.29
0.4775m 1,701.57
148.98
N/A
1.81f
Sp1.090
145.80
1,742.12 -22,146.57
0.7091m 1,714.45
221.24
N/A
1.00f
1,188.73 -14,486.13
0.4775m 1,714.45
148.98
N/A
1.41f
Sp1.100
162.00
2,075.97 -51,236.46
3.0754m 1,337.89
968.76
N/A
1.00f
1,460.43 -37,580.89
0.9042m 1,337.89
284.82
N/A
1.00f
Sp2.000
162.00 -1,381.21 -36,566.34
0.5852m 1,350.35
184.33
N/A
1.00f
-1,978.88 -49,887.78
2.6934m 1,350.35
848.41
N/A
1.00f
Sp2.010
177.00 -1,128.65 -16,200.20
0.4775m 1,533.78
148.98
N/A
1.34f
-1,668.47 -24,211.49
1.0259m 1,533.78
320.08
N/A
1.00f
Sp2.020
192.00
-876.00
2,354.07
0.4775m 1,445.58
148.98
N/A
1.64f
-1,375.96 -3,380.43
0.4775m 1,445.58
148.98
N/A
1.04f
Sp2.030
207.00
-615.35 17,528.73
0.4775m 1,425.57
148.98
N/A
2.30f
-1,084.86 12,684.42
0.4775m 1,425.57
148.98
N/A
1.31f
Sp2.040
222.00
-346.61 28,875.86
0.4775m
881.73
148.98
N/A
2.68f
-800.30 29,645.42
0.4775m
881.73
148.98
N/A
1.16f
Units: US (English)

Loss: Lump Sum

Bentley Exton Office

| Sheet
2 of
2
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2.cbx
Sp2.050
237.00
-70.28 36,033.85
0.4775m
574.00
153.82
N/A
9.32f
-524.35 36,343.31
0.4775m
574.00
153.82
N/A
1.25f
Sp2.060
252.00
206.07 38,691.31
0.4775m
338.84
157.57
N/A
2.17f
-236.66 38,300.08
0.4775m
338.84
157.57
N/A
1.89f
Sp2.070
267.00
485.31 36,592.72
0.4775m
438.84
152.74
N/A
1.10f
51.91 35,310.77
0.4775m
438.84
152.74
N/A 10.26f
Sp2.080
282.00
766.72 29,536.17
0.4775m
783.98
148.98
N/A
1.10f
322.95 23,809.50
0.4775m
783.98
148.98
N/A
2.60f
Sp2.090
297.00
1,049.69 17,371.09
0.4775m 1,437.96
148.98
N/A
1.36f
583.77 13,619.14
0.4775m 1,437.96
148.98
N/A
2.45f
Sp2.100
312.00
1,339.60
-2.93
0.4775m 1,716.40
148.98
N/A
1.25f
819.30
-2.93
0.4775m 1,716.40
148.98
N/A
2.05f
Notes
(*): Factored shear stress exceeds 0.18fcbvdv. Use Strut and Tie Method if beam
end not integral with support. LRFD 5.8.3.2.
(f): Design failed!
(L): Asfy-Actual < Asfy-Required.
(m): Av/S-provided was changed to equal Av/S-minimum.
(!): Must provide Minimum transverse reinforcement per LRFD 5.8.2.4
(X): Max Vs exceeded. LRFD Eq. 5.8.3.3-2.
(z): Zero tension steel T/B.
***** End of Report *****
Spec: AASHTO Standard

Units: US (English)

Loss: Lump Sum

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
1 of
2
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2.cbx
Combined Shear Check - Box Girder
Stage Final: LFD 1B (Final w/o Sway)
POI
Location
Vu-Max
Conc Mom
Av/S-prov
Vc
Vs-req
Vs-prov Cap-prov/Vu
Vu-Min
(ft)
(kip)
(kip-ft)
(in)
(kip)
(kip)
(kip)
-------- -------- ---------- ---------- ------- --------- ---------- --------- -----Sp1.000
0.00
-907.18
0.01
0.4775m 1,772.11
148.98
N/A
1.91f
-1,773.25
0.01
0.6351m 1,772.11
198.16
N/A
1.00f
Sp1.010
16.20
-664.43 12,735.25
0.4775m 1,431.47
148.98
N/A
2.14f
-1,390.14 24,388.28
0.4775m 1,431.47
148.98
N/A
1.02f
Sp1.020
32.40
-420.47 30,697.44
0.4775m
730.62
148.98
N/A
1.88f
-1,014.81 40,411.93
1.2723m
730.62
396.95
N/A
1.00f
Sp1.030
48.60
-105.92 41,024.09
0.4775m
392.40
152.74
N/A
4.63f
-649.55 48,651.74
1.0295m
392.40
329.32
N/A
1.00f
Sp1.040
64.80
232.12 46,663.65
0.4775m
338.84
157.57
N/A
1.92f
-296.92 49,848.65
0.4775m
338.84
157.57
N/A
1.50f
Sp1.050
81.00
593.66 46,717.09
0.7026m
433.29
226.34
N/A
1.00f
35.70 45,261.79
0.4775m
433.29
153.82
N/A 14.80f
Sp1.060
97.20
963.39 40,400.78
1.0839m
732.26
338.19
N/A
1.00f
352.77 35,822.84
0.4775m
732.26
148.98
N/A
2.25f
Sp1.070
113.40
1,342.76 27,030.56
0.8578m 1,224.31
267.65
N/A
1.00f
648.92 22,281.87
0.4775m 1,224.31
148.98
N/A
1.90f
Sp1.080
129.60
1,719.82
6,367.99
2.0010m 1,286.62
624.30
N/A
1.00f
927.11
5,280.11
0.4775m 1,286.62
148.98
N/A
1.39f
Sp1.090
145.80
2,083.26 -21,060.48
3.3085m 1,282.49 1,032.26
N/A
1.00f
1,194.86 -15,373.11
0.4775m 1,282.49
148.98
N/A
1.08f
Sp1.100
162.00
2,450.42 -54,495.24
4.3962m 1,337.89 1,384.81
N/A
1.00f
1,460.46 -37,584.79
0.9043m 1,337.89
284.84
N/A
1.00f
Sp2.000
162.00 -1,381.24 -36,570.36
0.5853m 1,350.35
184.36
N/A
1.00f
-2,339.26 -51,286.25
3.9646m 1,350.35 1,248.84
N/A
1.00f
Sp2.010
177.00 -1,136.15 -17,204.29
0.4775m 1,174.81
148.98
N/A
1.05f
-1,986.92 -21,478.29
3.3105m 1,174.81 1,032.88
N/A
1.00f
Sp2.020
192.00
-885.21
1,305.68
0.4775m 1,124.28
148.98
N/A
1.29f
-1,637.97
2,818.77
2.2298m 1,124.28
695.70
N/A
1.00f
Sp2.030
207.00
-626.17 16,431.95
0.4775m 1,386.27
148.98
N/A
2.21f
-1,279.25 20,974.08
0.4775m 1,386.27
148.98
N/A
1.08f
Sp2.040
222.00
-349.09 28,667.98
0.4775m
796.67
148.98
N/A
2.44f
-921.01 32,647.76
0.7265m
796.67
226.67
N/A
1.00f
Spec: AASHTO Standard

Units: US (English)

Bentley Exton Office

| Sheet
2 of
2
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2.cbx
Sp2.050
237.00
-52.41 37,318.96
0.4775m
477.00
153.82
N/A 10.83f
-580.23 38,410.60
0.5206m
477.00
167.70
N/A
1.00f
Sp2.060
252.00
257.64 41,673.38
0.4775m
338.84
157.57
N/A
1.73f
-246.60 38,738.24
0.4775m
338.84
157.57
N/A
1.81f
Sp2.070
267.00
585.66 40,983.13
0.7663m
405.61
245.13
N/A
1.00f
65.99 34,281.67
0.4775m
405.61
152.74
N/A
7.61f
Sp2.080
282.00
930.24 34,351.65
0.9466m
738.27
295.33
N/A
1.00f
332.38 16,747.53
0.4775m
738.27
148.98
N/A
2.40f
Sp2.090
297.00
1,284.82 20,867.41
0.4775m 1,450.12
148.98
N/A
1.12f
557.50 10,053.57
0.4775m 1,450.12
148.98
N/A
2.58f
Sp2.100
312.00
1,647.28
-2.93
0.4775m 1,716.40
148.98
N/A
1.02f
782.52
-2.93
0.4775m 1,716.40
148.98
N/A
2.15f
Notes
(*): Factored shear stress exceeds 0.18fcbvdv. Use Strut and Tie Method if beam
end not integral with support. LRFD 5.8.3.2.
(f): Design failed!
(L): Asfy-Actual < Asfy-Required.
(m): Av/S-provided was changed to equal Av/S-minimum.
(!): Must provide Minimum transverse reinforcement per LRFD 5.8.2.4
(X): Max Vs exceeded. LRFD Eq. 5.8.3.3-2.
(z): Zero tension steel T/B.
***** End of Report *****
Spec: AASHTO Standard

Units: US (English)

Loss: Lump Sum

Loss: Lump Sum

Output

Tutorial Two / T2-33

T2-34 / Tutorial Two

***** End of Report ****

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
1 of
1
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2.cbx
Design Parameters - LFD
Design Requirements - Box Girder
Governing LC
Required
Provided
--------------- ------------------------------ -------------- -------------P-Jack for Tendons (kips):
Tendon-1
PS + Perm(SLD 1 (Final w/o Sway)):3
7,936.73
7,570.00*
f'ci (ksi)
SLD 1 (Initial)
1.582
3.500
f'c (ksi)
PS + Perm(SLD 1 (Final w/o Sway)):3
3.004
4.000
Notes
(*): Provided is less than Required.
Loss-Type Selected: Lump Sum
Allowable/Limiting Stress Factors
Compression
Tension
----------------------------------Permanent+LL
0.60*f'c (psi)
6.00*sqrt(f'c (psi))
PS+Perm
0.40*f'c (psi)
0.00*sqrt(f'c (psi))
1/2 (PS+Perm)+LL
0.40*f'c (psi)
Cracking Tension
7.50*sqrt(f'c (psi))
Release
0.60*f'c (psi)
3.00*sqrt(f'c (psi)) Max 200.00 (psi)
Resistance Factors
PT
RC
-------- ----------Flexure
0.95
0.90
Shear
0.90
0.85

Output

Bentley Exton Office

Check of a 3- Span Cast-In-Place Post-Tensioned


Concrete Haunched Slab (AASHTO LRFD) (Metric
Units)

This CONBOX tutorial takes you through a design, step-by-step, demonstrating the design
of a continuous 3-span cast-in-place post-tensioned concrete haunched slab. In this tutorial,
you will be designing in accordance with the AASHTO LRFD Design Specifications.
The information for this tutorial is contained in an input file called Tutor3.cbx. As an
alternative to inputting all the information from scratch, as directed in this tutorial, you can
load this file and only work on the sections you wish. To load this file, select the Open
command from the File menu. Browse to the CONBOX/Examples subdirectory, if it is not
already showing, and select the file Tutor3.cbx.
This tutorial is adopted from the Kansas Department of Transportations post-tensioned
concrete haunched slab span standards.

LEAP CONBOXv10.00.01.00

Tutorial Three / T3-1

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Diagrams

Diagrams

FIGURE T3-1. Elevation View


(76 mm O.D. Ducts w/ 9-15 mm. Dia. Strand)

A
butm
ent
C
L
460

Sym
m
.about C
ridge
LB

C
LPier1 761

460

6000

460

10500

10500
500

17000

11000

FIGURE T3-2. Cast-In-Place Concrete Haunch Slab

11 600
11 000

460

300

300

76 mm O.D. DUCT (TYP) w/ 9-15 mm Dia. Strand (20 TOTAL)

40 clear

FIGURE T3-3. Cross Section (A-A)

T3-2 / Tutorial Three

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Diagrams

(#7) #22 M @ 300 mm (41 Bars Total)


A s Provided = 15,871 mm 2

460 mm

65 mm CLR.

30 mm CLR.

(#6) #19 M @ 300 mm (41 Bars Total)


A s Provided = 11,639 mm 2

FIGURE T3-4. Longitudinal Reinforcing Detail

CL Pier

CL Abutment

Symm. about C
L Bridge

17 000

11 000

1200

1400

366

363

351

334

315

286

248

208

169

125

172

217

260

293

321

342

355

360

358

348

330

303

273

7 SPA. @ 1200 = 8400

Center of Gravity of PostTension Tendon (CGS)

Top of Slab

229

1200

1400

12 SPA. @ 1200 = 14 400

FIGURE T3-5. Post-Tension Tendon Profile

LEAP CONBOXv10.00.01.00

Tutorial Three / T3-3

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Problem Data

Problem Data
Concrete Material Properties
(kg/m3)

Unit Weight
E-Modulus, E28 (MPa)
Poissons Ratio
Thermal Coeff. (1/C)
fci (MPa)
fc (MPa)
Humidity (%)
Ultimate Creep Coeff.
Ultimate Shrinkage Strain

CIP Slab

Drop-Cap Pier

2400

2400

29786
0.20

29786
0.20
--

10.8 10-6
24
35
80
Program Calculated
Program Calculated

-35
----

Design Specifications
AASHTO LRFD

Units
SI (Metric)

Loss Type/Material Model


LRFD-1998

Horizontal Offset
0.00

Rebar Information
fy =

413.7 MPa
User-Defined

P/T Tendons
20 Ducts (76 mm O.D.) each with 9-15 mm tendons
(Total Area of Strands = 20 9 140 mm2 = 25,200 mm2)
Tendon Type

180-0.6

Friction Coeff.

0.25

Wobble Coeff. (1/ft) 0.00066

T3-4 / Tutorial Three

Relaxation

0 ksi

Jack Type

Both

Force Type

Force

Left Force

1782 kN 20 = 35,640 kN

Left Set

6.0 mm

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 1: Start the Program

Right Force

1782 kN 20 = 35,640 kN

Right Set

6.0 mm

Live Load
HL-93

Live Load Distribution Factor


Arts. 4.6.2.1.2 and 4.6.2.3

Superimposed Dead Loads


On Composite (DW)

FWS = 1.20 kPa 11.6 m = 13.92 kN/m

On Composite (DC)

2 barriers = 2 4.02 kN/m = 8.04 kN/m

Load Combinations

Initial
Final

Dead
Loads

Superimposed
Dead Loads

Live
Loads

Self Weight
Self Weight

N/A
FWS
Concrete Barrier

N/A
HL-93 Multilane

Step 1: Start the Program


Start CONBOX as you would any other application using Microsoft Windows. By
default, the program installs in Programs > LEAP Software > CONBOX. To open, click
the Start button, select Programs, then LEAP Software, and then select CONBOX.
When the CONBOX splash screen appears, click the START button to clear the screen and
view the Project tab.

FIGURE T3-6. CONBOX Splash Screen

LEAP CONBOXv10.00.01.00

Tutorial Three / T3-5

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 2: Complete the Project Information

Step 2: Complete the Project Information


The Project tab allows you to enter general information about the project and select the
analysis options, design specifications, units, and loss type. You can return to this tab at any
time and make changes.

FIGURE T3-7. Project Tab

Complete the Project tab by entering the information shown in Fig. T3-7.
For this tutorial, you will be analyzing and designing a post-tensioned cast-in-place concrete
haunched slab bridge.

Step 3: Define the Bridge Connections


GEOMETRY TAB
The Geometry tab allows you to input the physical properties of the bridge, including
bridge alignment, layout, cross section information, and pier/column properties. Using this
tab, you can create, modify, or delete elements of your bridge description.

FIGURE T3-8. Geometry Tab

T3-6 / Tutorial Three

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 4: Define the Cross Section Layout and Materials

If there is no specific alignment provided, CONBOX will use its default alignment (N 90 E).
You can now create and/or modify the bridge connections by clicking the Layout button on
this tab to open the Bridge Component Layout dialog box.

BRIDGE COMPONENT LAYOUT DIALOG BOX


The Bridge Component Layout dialog box allows you to define the physical location,
bearing, and connection types for abutments, piers (bents), and span hinges as well as the
stationing for the begin bridge and the end bridge.
NOTE: Refer to Fig. T3-1: Elevation View on page T3-2 for additional data input.

FIGURE T3-9. Bridge Component Layout Dialog Box

This bridge has two abutments and two piers. Both the abutments and the piers are
perpendicular to the bridge alignment. The program automatically creates rows for the
beginning and end of the bridge. Complete this dialog box as shown in Fig. T3-9. When
you are done, click the OK button to return to the Geometry tab.

Step 4: Define the Cross Section Layout and Materials


GEOMETRY TAB
Once you have defined the bridge layout, you can create and/or modify the superstructure
cross section and layout by clicking the Cross Section button on this tab to open the Cross
Section Layout dialog box.

CROSS SECTION LAYOUT DIALOG BOX


The Cross Section Layout dialog box allows you to define the bridge cross section.
NOTE: Refer to Fig. T1-1: Elevation View and Fig. T1-3: Cross Section (A-A) for
additional data input.

LEAP CONBOXv10.00.01.00

Tutorial Three / T3-7

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 4: Define the Cross Section Layout and Materials

FIGURE T3-10. Cross Section Layout Dialog Box

By default, the program creates a beginning section. You should define the section
properties for the begin section first by clicking the Section button under the Section Def
field to open the Multi-Cell CIP Box Section dialog box.

MULTI-CELL CIP BOX SECTION DIALOG BOX


The Multi-Cell CIP Box Section dialog box allows you to define cross section dimensions.
NOTE: Refer to Fig. T1-2: Cast-In-Place Concrete Haunch Slab and Fig. T1-3: Cross
Section (A-A) for additional data input.

FIGURE T3-11. Multi-Cell CIP Box Section Dialog Box

T3-8 / Tutorial Three

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 4: Define the Cross Section Layout and Materials

Define the section properties by entering the dimensions as shown in Fig. T3-11. To define
the concrete material properties, click the Material button to open the Concrete Material
dialog box.

CONCRETE MATERIAL DIALOG BOX


This dialog box allows you to define the material for the superstructure cross section.
Define the material properties for this bridge by entering the information as shown in Fig.
T3-12. When you are done, click the OK button to return to the Multi-Cell CIP Box Section
dialog box.
NOTE: Refer to the Concrete Material Properties section of Problem Data located on page
T3-4.

FIGURE T3-12. Concrete Material Dialog Box (Cross Section)

MULTI-CELL CIP BOX SECTION DIALOG BOX


Once you have completed defining the material and section properties for this segment,
click the OK button to return to the Cross Section Layout dialog box.

CROSS SECTION LAYOUT DIALOG BOX


When you return to this dialog box, you need to define the remaining cross sections.
You will be utilizing the Recall and Variant section types to complete the layout for this tutorial.

While in the Beg Section row, click the Recall Section button. This action copies the
section properties for the Beg Section to the recalled section.
Next, you will define the negative moment section at the pier. Click the Add Variant
button and enter the data as shown in Fig. T3-13. Define the rest of the bridge by clicking
the Recall Section button and entering the information as shown in Fig. T3-13.
NOTE: Refer to Fig. T1-1: Elevation View and Fig. T1-2: Cast-In-Place Concrete Haunch
Slab for cross section information.

LEAP CONBOXv10.00.01.00

Tutorial Three / T3-9

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 5: Define the Piers and Columns

FIGURE T3-13. Cross Section Layout Dialog Box (Completed)

When you are done, click the OK button to return to the Geometry tab.

Step 5: Define the Piers and Columns


GEOMETRY TAB
Once you have defined the cross section layout and materials, you can create and/or modify
the piers and columns by clicking the Piers button on this tab to open the Pier and Column
Definitions dialog box.

PIER AND COLUMN DEFINITIONS DIALOG BOX


The Pier and Column Definitions dialog box allows you to define single or multicolumn
piers (bents).

FIGURE T3-14. Pier and Column Definitions Dialog Box

Specify the pier property information for the Bent by changing the default pier name to
Bent and selecting Drop-Cap from the Type drop-down list and entering the data as shown
in Fig. T3-14. This pier contains a 6 m, rectangular column. (Refer to Section B-B and Fig.
T3-1: Elevation View on page T3-2 for details.) Define the column as shown in Fig. T3-14.

T3-10 / Tutorial Three

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 6: Define the Post-Tension Layout

Next you need to define the concrete material properties for the column by clicking the
Material button in the grid to open to Concrete Material dialog box.

CONCRETE MATERIAL DIALOG BOX


This dialog box allows you to define the concrete material for the appropriate column by
entering the information as shown in Fig. T3-15.
NOTE: Refer to the Concrete Material Properties section of Problem Data located on page
T3-4.

FIGURE T3-15. Concrete Material Dialog Box

NOTE: Only the appropriate concrete material properties will be available.

When you are done, click the OK button to return to the Pier and Column Definitions dialog
box.

PIER AND COLUMN DEFINITIONS DIALOG BOX


When you are done, click the OK button to return to the Geometry tab.
At this point, it would be a good idea to save your project. Select the Save As option from the File
menu. Enter the file name you want to save your data to (e.g., MyTutor3) in the File Name field
and click the Save button. The default extension is *.cbx

Step 6: Define the Post-Tension Layout


MODEL TAB
The Model tab allows you to modify the plane frame analytical model by specifying
additional details about the superstructure, the tendons, the longitudinal rebar, and the
stirrups.

LEAP CONBOXv10.00.01.00

Tutorial Three / T3-11

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 6: Define the Post-Tension Layout

FIGURE T3-16. Model Tab

The span distances, bearing, and connection information was entered previously in the Bridge
Component Layout dialog box (Layout button on the Geometry tab). Since you will not be
making any changes to this information, you can skip the Superstructure button.

You can define the post-tension layout and tendon information for your slab bridge by
clicking the Tendons button to open the Tendon Definitions dialog box.

TENDON DEFINITIONS DIALOG BOX


This dialog box allows you to define the post-tension layout and tendon information. Enter
the post-tensioning information as shown in Fig. T3-17. Refer to the following table for
Path Data information.
CONBOX provides the user the ability to compute the Required Jacking Force and Concrete
strengths (fci and fc). This information can be found in the Design Results screen. For this
tutorial, however, you will proceed by specifying the post-tensioning layout information.

T3-12 / Tutorial Three

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 6: Define the Post-Tension Layout

FIGURE T3-17. Tendon Definitions Dialog Box

NOTE: Refer to Fig. T3-5: Post-Tension Tendon Profile on page T3-3 for additional data
input.

Once you completed the tendon definitions, click the OK button to return to the Model tab.
Location

Span
Number

Distance
(m)

Top or
Bottom

Offset
(mm)

Variation
Type

POC

Path Data for Tendon Tendon-1


1

Top

229

Linear

--

1.2

Top

273

Linear

--

1.2

Top

303

Linear

--

1.2

Top

330

Linear

--

1.2

Top

348

Linear

--

1.2

Top

358

Linear

--

1.2

Top

360

Linear

--

1.2

Top

355

Linear

--

1.2

Top

342

Linear

--

10

1.2

Top

321

Linear

--

11

1.2

Top

293

Linear

--

12

1.2

Top

260

Linear

--

13

1.2

Top

217

Linear

--

14

1.2

Top

172

Linear

--

15

1.4

Top

125

Linear

--

16

1.4

Top

169

Linear

--

17

1.2

Top

208

Linear

--

18

1.2

Top

248

Linear

--

19

1.2

Top

286

Linear

--

20

1.2

Top

315

Linear

--

21

1.2

Top

334

Linear

--

22

1.2

Top

351

Linear

--

23

1.2

Top

363

Linear

--

24

1.2

Top

366

Linear

--

25

1.2

Top

363

Linear

--

26

1.2

Top

351

Linear

--

LEAP CONBOXv10.00.01.00

Tutorial Three / T3-13

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 7: Define the Longitudinal Rebar

Location

Span
Number

Distance
(m)

Top or
Bottom

Offset
(mm)

Variation
Type

POC

27

1.2

Top

334

Linear

--

28

1.2

Top

315

Linear

--

29

1.2

Top

286

Linear

--

30

1.2

Top

248

Linear

--

31

1.2

Top

208

Linear

--

32

1.2

Top

169

Linear

--

33

1.4

Top

125

Linear

--

34

1.4

Top

172

Linear

--

35

1.2

Top

217

Linear

--

36

1.2

Top

260

Linear

--

37

1.2

Top

293

Linear

--

38

1.2

Top

321

Linear

--

39

1.2

Top

342

Linear

--

40

1.2

Top

355

Linear

--

41

1.2

Top

360

Linear

--

42

1.2

Top

358

Linear

--

43

1.2

Top

348

Linear

--

44

1.2

Top

330

Linear

--

45

1.2

Top

303

Linear

--

46

1.2

Top

273

Linear

--

47

1.2

Top

229

Linear

--

Step 7: Define the Longitudinal Rebar


MODEL TAB
Once you have completed the tendon definitions, you can define the longitudinal rebar by
clicking the Long. Rebar button to open the Longitudinal Rebar Definitions dialog box.

LONGITUDINAL REBAR DEFINITIONS DIALOG BOX


This dialog box allows you to define the longitudinal rebar for the bridge.
NOTE: Refer to Fig. T3-4: Longitudinal Reinforcing Detail on page T3-3.

T3-14 / Tutorial Three

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 8: Define the Dead Loads for the Analysis

FIGURE T3-18. Longitudinal Rebar Definitions Dialog Box

Enter the longitudinal rebar as shown in Fig. T3-18. When you are done, click the OK
button to return to the Model tab. Notice that the longitudinal rebar displays in red in both
the elevation and section views of the bridge. Use the View Control feature to move ahead on
the bridge and follow the rebar along the cross section of the structure.
You do not need to enter any stirrup information for this bridge; therefore, you can skip the
Stirrups button.

At this point, it would be a good idea to save your project. Select the Save As option from the File
menu. Enter the file name you want to save your data to (e.g., MyTutor3) in the File Name field
and click the Save button. The default extension is *.cbx

Step 8: Define the Dead Loads for the Analysis


LOADS/ANALYSIS TAB
The Loads/Analysis tab allows you to specify load combinations to be used in the analysis.
For this tutorial, you will be adding the following loads:

Dead Loads: Intrinsic Self Weight

Superimposed Dead Loads: Barrier and Future Wearing Surface (FWS)

Live Loads: HL-93 Multispan

NOTE: Refer to the Problem Data beginning on page T3-4 for additional data input.

LEAP CONBOXv10.00.01.00

Tutorial Three / T3-15

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 8: Define the Dead Loads for the Analysis

FIGURE T3-19. Loads/Analysis Tab

Select the Initial analysis case and define the Intrinsic Self-Weight load by right-clicking the
Dead Load/DC Group option on the right panel and selecting Add DC/DL. Double-click the
load to open the Dead Loads dialog box.

DEAD LOADS DIALOG BOX (INTRINSIC SELF WEIGHT)


This dialog box allows you to define the dead load for the analysis. You can define the
intrinsic self-weight by selecting the Include Self-Weight option as shown in Fig. T3-20.

FIGURE T3-20. Dead Loads Dialog Box (Intrinsic Self-Weight)

Once you are done, click the OK button to return to the Loads/Analysis tab.

T3-16 / Tutorial Three

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 9: Define the Superimposed Dead Loads for the Analysis

Step 9: Define the Superimposed Dead Loads for the Analysis


Once you have defined the Dead Loads, notice that Intrinsic Self-Weight has been
added to the right panel and that it is now represented in the graphic window for the
bridge as shown in Fig. T3-21.
NOTE: Refer to the Problem Data beginning on page T3-4 for additional data input.

FIGURE T3-21. Loads/Analysis Tab (Intrinsic Self-Weight Added)

Select the Final analysis case and define the Barrier Load by right-clicking the Dead
Load/DC Group option on the right panel and selecting Add DC/DL. Double-click the
load to open the Dead Loads dialog box.

DEAD LOADS DIALOG BOX (BARRIER)


Define the Barrier Load by completing the information as shown in Fig. T3-22.

FIGURE T3-22. Dead Loads Dialog Box (Barrier)

LEAP CONBOXv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

/ T3-17

Step 10: Define the Live Loads for the Analysis

Once you are done, click the OK button to return to the Loads/Analysis tab. Define the
FWS Load by right-clicking the Superimposed Dead Load/DW Group option on the
right-side of the screen and selecting Add DW/ADL. Double-click the load to open the
Dead Loads dialog box.

DEAD LOADS DIALOG BOX (FUTURE WEARING SURFACE)


Define the FWS Load by completing the information as shown in Fig. T3-23.

FIGURE T3-23. Dead Loads Dialog Box (Future Wearing Surface)

Once you are done, click the OK button to return to the Loads/Analysis tab.

Step 10: Define the Live Loads for the Analysis


LOADS/ANALYSIS TAB
Once you have defined the superimposed dead loads, notice that both the Barrier and
the FWS Loads have been added to the right side of the window and that they are now
represented in the graphic window for the bridge as shown in Fig. T3-25.
NOTE: Refer to the Problem Data beginning on page T3-4 for additional data input.

FIGURE T3-24. Loads/Analysis Tab (Superimposed Dead Loads Added)

T3-18 /

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 10: Define the Live Loads for the Analysis

Select the Final w/o Sway analysis case and define the HL 93 Multispan Load by
expanding the Live Load Groups located under Locked Library Loads. Select the
predefined HL 93 Multispan load, then drag and drop it anywhere within the Tutor 3
Loads. Notice that this load is added to the Live Load Group. In the Live Load Group
for this tutorial, double-click the HL 93 Multispan Load to open the Live Load dialog
box.
NOTE: The Locked Library Loads can be viewed or modified by selecting Vehicle from
the Libraries menu to open the Vehicle Library.

LIVE LOAD DIALOG BOX (HL 93 MULTISPAN LOAD)


This dialog box allows you to add or modify live loads for the analysis. Verify that the
definition for this load appears as shown in Fig. T3-25.

FIGURE T3-25. Live Load Dialog Box (HL 93 Multispan)

Once you are done, click the OK button to return to the Loads/Analysis tab.

LOADS/ANALYSIS TAB
Notice that the live load has been added to the right panel and that it is now represented
in the graphic window as shown in Fig. T3-26.

FIGURE T3-26. Loads/Analysis Tab (Live Loads Added)

LEAP CONBOXv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

/ T3-19

Step 11: Define the Load Combination Factors for the Analysis

At this point, it would be a good idea to save your project. Select the Save As option from the File
menu. Enter the file name you want to save your data to (e.g., MyTutor3) in the File Name field
and click the Save button. The default extension is *.cbx

Step 11: Define the Load Combination Factors for the Analysis
LOADS/ANALYSIS TAB
Once you have defined the loads for the analysis, you need to add the combination
factors to be used for the each analysis case. To define the combinations for the Initial
analysis case, select Initial from the Case drop-down list, right-click in the left panel,
and select Add Combination to add a load combination.
Although there is only the self-weight in the Initial analysis case, you will add three different
combinations (Service I, Service III, and Strength I). The type of combination selected governs
which specification checks and design activities the combination will be used for.

LFD LOAD COMBINATION FACTORS DIALOG BOX (SERVICE I (INITIAL))


The first combination for this analysis will be for Service I. To define this combination,
double-click the load combination, Comb-1. Complete the LRFD Load Combination
Factors dialog box as shown in Fig. T3-27.

FIGURE T3-27. LRFD Load Combination Factors Dialog Box

Once you are done, click the OK button to return to the Loads/Analysis tab.

T3-20 /

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 11: Define the Load Combination Factors for the Analysis

LOADS/ANALYSIS TAB (ADD SELF-WEIGHT TO A LOAD COMBINATION)


Once you have created the Service I (Initial) combination, select the Self Weight load in
the right panel, then drag and drop it anywhere within the combination. Notice that the
Intrinsic Self Weight is added to the Dead Load/DC Group in the combination as
shown in Fig. T3-28.

FIGURE T3-28. Loads/Analysis Tab (Service I (Initial) Combination Added)

Repeat the steps defined above to define the rest of the combinations for the analysis.
Leave the parameters in the LRFD Load Combination Factors dialog box as the default
for all combination types. Refer to the following table for additional input information.
AASHTO
Combination
Type

Combination
Name

Purpose

Defined Loads to Include

Intrinsic
Self Weight

Barrier

FWS

HL 93
Multispan

Initial
Service I

Service 1 (Initial)

f'ci Design
Comprehensive Stress Check

Service III

Service 3 (Initial)

Tensile Stress Check

Final w/o Sway


Service I

Service 1 (Final w/o Sway)

f'c Design

Service III

Service 3 (Final w/o Sway)

PT Design

Strength I

Strength 1 (Final w/o Sway)

Strength Design (Std)

At this point, it would be a good idea to save your project. Select the Save As option from the File
menu. Enter the file name you want to save your data to (e.g., MyTutor3) in the File Name field
and click the Save button. The default extension is *.cbx

LEAP CONBOXv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

/ T3-21

Step 12: Check the Design Parameters

Step 12: Check the Design Parameters


Select Design Parameters from the Settings menu to open the Design Parameters dialog
box. This dialog box allows you to view and/or edit the settings of the design
parameters.

FIGURE T3-29. Design Parameters Dialog Box

Use the allowable stress and resistance factors as shown in Fig. T3-29. When you are
done, click the OK button to return to the program.
You will use the program-computed live load distribution factors according to AASHTO;
therefore, skip the Live Load Distribution Factors button.

Step 13: Run the Analysis


LOADS/ANALYSIS TAB
After defining the load combinations, you can perform an analysis of the structure by
clicking the Run Analysis button. After performing the analysis, the default analysis
result text/graphic report displays in the Analysis Results screen.

ANALYSIS RESULTS SCREEN


This screen displays automatically after performing the analysis and presents you with
the analysis results.

T3-22 /

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 14: View the Design Results

FIGURE T3-30. Analysis Results Screen (Text Format)

This screen allows you to view, print, or save (in text or Microsoft Excel formats)
structure responses to all loads, load cases, and load combination. Click to close this
screen and return to the Loads/Analysis tab.

Step 14: View the Design Results


DESIGN TAB
This tab allows you to verify the design results and assists you in designing the layout
of your rebar and stirrups. After running the analysis, click the Design Results button
to open the Design Results screen.

FIGURE T3-31. Design Tab

LEAP CONBOXv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

/ T3-23

Step 15: Print the Reports

DESIGN RESULTS SCREEN


This screen displays automatically after computing the design and presents you with
the design results.

FIGURE T3-32. Design Results Screen (Text Format)

Using this screen, you can display the design results in either a text or graphic format,
view the design results for an analysis case, view the design results for a load
combination, or view the design results by response type. You can also print your
design results by right-clicking this screen and selecting the Print option. When you are
done, click to close this screen and return to the Design tab.
Reviewing the Flexure Check design results for the Strength I (Final w/o Sway) load
combination will show you that the design fails near the points of moment inflection
(i.e., changes in sign of moment). This is due to the determination of moment capacity
by using specification equations. Using the strain compatibility approach (see results
for Flexure (SC)), it can be seen that the design is adequate.

Step 15: Print the Reports


The input of Tutorial 3 is completed. To print the output of the project to a text file,
select Print from the File menu to open the Print Report Manager dialog box.

PRINT REPORT MANAGER


For this tutorial, print to a file all the model reports, analysis results, design/check
reports, and miscellaneous reports as shown in Fig. T3-33. Click the Create Reports
button to send the selected output to a text file.

T3-24 /

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 15: Print the Reports

FIGURE T3-33. Print Report Manager

Following this page is a printout of the output for Tutorial 3 according to the options
selected above.
.

At this point, it would be a good idea to save your project. Select the Save As option from the File
menu. Enter the file name you want to save your data to (e.g., MyTutor3) in the File Name field
and click the Save button. The default extension is *.cbx

LEAP CONBOXv10.00.01.00
Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

/ T3-25

Step 15: Print the Reports

T3-26 /

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

LEAP CONBOX v.10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
1 of
1
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Combined Summary - Box Girder
Stage Final
POI
Location ............ Min C/D Ratios ............
(m)
Moment
Shear
St-Ten
St-Cmp LL-def
-------- -------- ---------------- ------ -----Sp1.000
0.00 999.99
1.38
999.99
2.88 999.00
Sp1.010
1.70
1.68
1.96
999.99
2.34
3.22
Sp1.020
3.40
1.29
2.51
999.99
1.78
1.75
Sp1.030
5.10
1.30
3.31
999.99
1.61
1.33
Sp1.040
6.80
1.30
4.23
9.83
1.62
1.23
Sp1.050
8.50
1.19
3.27
999.99
1.83
1.28
Sp1.060
10.20
0.72*
2.66
999.99
2.12
1.49
Sp1.070
11.90
0.47*C
1.92
999.99
2.63
1.93
Sp1.080
13.60
1.55
2.09
999.99
2.89
2.91
Sp1.090
15.30
1.36
1.85
999.99
3.00
6.03
Sp1.100
17.00
1.19
1.61
999.99
2.51 607.89
Sp2.000
17.00
1.19
1.60
999.99
2.56 796.55
Sp2.010
19.20
1.67
1.88
999.99
2.90
5.41
Sp2.020
21.40
0.72*
1.90
999.99
2.74
2.58
Sp2.030
23.60
1.12
2.51
999.99
2.26
1.73
Sp2.040
25.80
1.36
3.16
999.99
1.82
1.38
Sp2.050
28.00
1.36
3.55
6.70
1.61
1.28
Sp2.060
30.20
1.36
3.15
999.99
1.82
1.38
Sp2.070
32.40
1.12
2.51
999.99
2.27
1.73
Sp2.080
34.60
0.72*
1.90
999.99
2.74
2.60
Sp2.090
36.80
1.67
1.88
999.99
2.90
5.45
Sp2.100
39.00
1.19
1.60
999.99
2.57 796.01
Sp3.000
39.00
1.19
1.61
999.99
2.52 607.47
Sp3.010
40.70
1.36
1.85
999.99
3.00
6.03
Sp3.020
42.40
1.55
2.09
999.99
2.89
2.91
Sp3.030
44.10
0.47*C
1.92
999.99
2.63
1.93
Sp3.040
45.80
0.73*
2.66
999.99
2.12
1.49
Sp3.050
47.50
1.20
3.28
999.99
1.83
1.28
Sp3.060
49.20
1.30
4.23
10.94
1.62
1.23
Sp3.070
50.90
1.30
3.31
999.99
1.61
1.33
Sp3.080
52.60
1.29
2.51
999.99
1.78
1.74
Sp3.090
54.30
1.68
1.96
999.99
2.34
3.22
Sp3.100
56.00 999.99
1.66
999.99
2.88 999.00
Notes
C: Crack Control did not pass.
d: Shear reinforcement was designed.
L: Asfy-Actual < Asfy-Required.
***** End of Report *****t

Bentley Exton Office

| Sheet
1 of
1
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Combined Stress Check - Box Girder
Stage Final: Service 1 (Final w/o Sway)
POI
Location Max-Ten Loc All-Ten Ratio Max-Cmp Loc All-Cmp Ratio
(m)
(MPa)
(MPa)
(MPa)
(MPa)
-------- -------- ------- ---- ------- ------ ------- ---- ------- -----Sp1.000
0.00 ------- ---- ------- ------5.46 Bm-T -21.00
3.84
Sp1.010
1.70 ------- ---- ------- ------8.45 Bm-T -21.00
2.48
Sp1.020
3.40 ------- ---- ------- ------10.25 Bm-T -21.00
2.05
Sp1.030
5.10 ------- ---- ------- ------11.12 Bm-B -21.00
1.89
Sp1.040
6.80 ------- ---- ------- ------11.08 Bm-B -21.00
1.90
Sp1.050
8.50 ------- ---- ------- ------9.93 Bm-T -21.00
2.12
Sp1.060
10.20 ------- ---- ------- ------9.01 Bm-T -21.00
2.33
Sp1.070
11.90 ------- ---- ------- ------7.71 Bm-T -21.00
2.72
Sp1.080
13.60 ------- ---- ------- ------6.74 Bm-B -21.00
3.11
Sp1.090
15.30 ------- ---- ------- ------6.43 Bm-B -21.00
3.26
FSupp1L
16.67 ------- ---- ------- ------7.35 Bm-B -21.00
2.86
FSupp1R
17.33 ------- ---- ------- ------6.83 Bm-B -21.00
3.07
Sp2.010
19.20 ------- ---- ------- ------6.33 Bm-T -21.00
3.32
Sp2.020
21.40 ------- ---- ------- ------7.67 Bm-T -21.00
2.74
Sp2.030
23.60 ------- ---- ------- ------8.95 Bm-T -21.00
2.35
Sp2.040
25.80 ------- ---- ------- ------10.36 Bm-T -21.00
2.03
Sp2.050
28.00 ------- ---- ------- ------11.32 Bm-B -21.00
1.86
Sp2.060
30.20 ------- ---- ------- ------10.37 Bm-T -21.00
2.02
Sp2.070
32.40 ------- ---- ------- ------8.94 Bm-T -21.00
2.35
Sp2.080
34.60 ------- ---- ------- ------7.67 Bm-T -21.00
2.74
Sp2.090
36.80 ------- ---- ------- ------6.33 Bm-T -21.00
3.32
FSupp2L
38.67 ------- ---- ------- ------6.83 Bm-B -21.00
3.08
FSupp2R
39.33 ------- ---- ------- ------7.34 Bm-B -21.00
2.86
Sp3.010
40.70 ------- ---- ------- ------6.43 Bm-B -21.00
3.27
Sp3.020
42.40 ------- ---- ------- ------6.74 Bm-B -21.00
3.11
Sp3.030
44.10 ------- ---- ------- ------7.71 Bm-T -21.00
2.72
Sp3.040
45.80 ------- ---- ------- ------9.01 Bm-T -21.00
2.33
Sp3.050
47.50 ------- ---- ------- ------9.93 Bm-T -21.00
2.12
Sp3.060
49.20 ------- ---- ------- ------11.06 Bm-B -21.00
1.90
Sp3.070
50.90 ------- ---- ------- ------11.10 Bm-B -21.00
1.89
Sp3.080
52.60 ------- ---- ------- ------10.24 Bm-T -21.00
2.05
Sp3.090
54.30 ------- ---- ------- ------8.45 Bm-T -21.00
2.48
Sp3.100
56.00 ------- ---- ------- ------5.46 Bm-T -21.00
3.84
***** End of Report *****

Output

T3-26 / Tutorial Three

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
1 of
1
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Combined Stress Check - Box Girder
Stage Final: Service 3 (Final w/o Sway)
POI
Location Max-Ten Loc All-Ten Ratio Max-Cmp Loc All-Cmp Ratio
(m)
(MPa)
(MPa)
(MPa)
(MPa)
-------- -------- ------- ---- ------- ------ ------- ---- ------- -----Sp1.000
0.00
0.00
N/A 999.99 ------- ---- ------- -----Sp1.010
1.70
0.00
N/A 999.99 ------- ---- ------- -----Sp1.020
3.40
0.00
N/A 999.99 ------- ---- ------- -----Sp1.030
5.10
0.00
N/A 999.99 ------- ---- ------- -----Sp1.040
6.80
0.15 Bm-T
1.48
9.83 ------- ---- ------- -----Sp1.050
8.50
0.00
N/A 999.99 ------- ---- ------- -----Sp1.060
10.20
0.00
N/A 999.99 ------- ---- ------- -----Sp1.070
11.90
0.00
N/A 999.99 ------- ---- ------- -----Sp1.080
13.60
0.00
N/A 999.99 ------- ---- ------- -----Sp1.090
15.30
0.00
N/A 999.99 ------- ---- ------- -----FSupp1L
16.67
0.00
N/A 999.99 ------- ---- ------- -----FSupp1R
17.33
0.00
N/A 999.99 ------- ---- ------- -----Sp2.010
19.20
0.00
N/A 999.99 ------- ---- ------- -----Sp2.020
21.40
0.00
N/A 999.99 ------- ---- ------- -----Sp2.030
23.60
0.00
N/A 999.99 ------- ---- ------- -----Sp2.040
25.80
0.00
N/A 999.99 ------- ---- ------- -----Sp2.050
28.00
0.22 Bm-T
1.48
6.71 ------- ---- ------- -----Sp2.060
30.20
0.00
N/A 999.99 ------- ---- ------- -----Sp2.070
32.40
0.00
N/A 999.99 ------- ---- ------- -----Sp2.080
34.60
0.00
N/A 999.99 ------- ---- ------- -----Sp2.090
36.80
0.00
N/A 999.99 ------- ---- ------- -----FSupp2L
38.67
0.00
N/A 999.99 ------- ---- ------- -----FSupp2R
39.33
0.00
N/A 999.99 ------- ---- ------- -----Sp3.010
40.70
0.00
N/A 999.99 ------- ---- ------- -----Sp3.020
42.40
0.00
N/A 999.99 ------- ---- ------- -----Sp3.030
44.10
0.00
N/A 999.99 ------- ---- ------- -----Sp3.040
45.80
0.00
N/A 999.99 ------- ---- ------- -----Sp3.050
47.50
0.00
N/A 999.99 ------- ---- ------- -----Sp3.060
49.20
0.14 Bm-T
1.48 10.94 ------- ---- ------- -----Sp3.070
50.90
0.00
N/A 999.99 ------- ---- ------- -----Sp3.080
52.60
0.00
N/A 999.99 ------- ---- ------- -----Sp3.090
54.30
0.00
N/A 999.99 ------- ---- ------- -----Sp3.100
56.00
0.00
N/A 999.99 ------- ---- ------- ------

Bentley Exton Office

| Sheet
1 of
1
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Combined Stress Check - Box Girder
Stage Final: PS+PERM Service I - Final
POI
Location Max-Ten Loc All-Ten Ratio Max-Cmp Loc All-Cmp Ratio
(m)
(MPa)
(MPa)
(MPa)
(MPa)
-------- -------- ------- ---- ------- ------ ------- ---- ------- -----Sp1.000
0.00 ------- ---- ------- ------5.46 Bm-T -15.75
2.88
Sp1.010
1.70 ------- ---- ------- ------6.63 Bm-B -15.75
2.38
Sp1.020
3.40 ------- ---- ------- ------7.60 Bm-B -15.75
2.07
Sp1.030
5.10 ------- ---- ------- ------8.43 Bm-B -15.75
1.87
Sp1.040
6.80 ------- ---- ------- ------7.81 Bm-B -15.75
2.02
Sp1.050
8.50 ------- ---- ------- ------6.14 Bm-B -15.75
2.57
Sp1.060
10.20 ------- ---- ------- ------4.68 Bm-B -15.75
3.36
Sp1.070
11.90 ------- ---- ------- ------4.60 Bm-T -15.75
3.42
Sp1.080
13.60 ------- ---- ------- ------4.80 Bm-T -15.75
3.28
Sp1.090
15.30 ------- ---- ------- ------4.75 Bm-T -15.75
3.32
FSupp1L
16.67 ------- ---- ------- ------4.12 Bm-T -15.75
3.82
FSupp1R
17.33 ------- ---- ------- ------4.35 Bm-T -15.75
3.62
Sp2.010
19.20 ------- ---- ------- ------5.43 Bm-T -15.75
2.90
Sp2.020
21.40 ------- ---- ------- ------5.52 Bm-T -15.75
2.85
Sp2.030
23.60 ------- ---- ------- ------5.03 Bm-T -15.75
3.13
Sp2.040
25.80 ------- ---- ------- ------5.59 Bm-B -15.75
2.82
Sp2.050
28.00 ------- ---- ------- ------8.58 Bm-B -15.75
1.84
Sp2.060
30.20 ------- ---- ------- ------5.59 Bm-B -15.75
2.82
Sp2.070
32.40 ------- ---- ------- ------5.03 Bm-T -15.75
3.13
Sp2.080
34.60 ------- ---- ------- ------5.52 Bm-T -15.75
2.85
Sp2.090
36.80 ------- ---- ------- ------5.43 Bm-T -15.75
2.90
FSupp2L
38.67 ------- ---- ------- ------4.35 Bm-T -15.75
3.62
FSupp2R
39.33 ------- ---- ------- ------4.12 Bm-T -15.75
3.82
Sp3.010
40.70 ------- ---- ------- ------4.75 Bm-T -15.75
3.32
Sp3.020
42.40 ------- ---- ------- ------4.80 Bm-T -15.75
3.28
Sp3.030
44.10 ------- ---- ------- ------4.60 Bm-T -15.75
3.42
Sp3.040
45.80 ------- ---- ------- ------4.68 Bm-B -15.75
3.36
Sp3.050
47.50 ------- ---- ------- ------6.14 Bm-B -15.75
2.57
Sp3.060
49.20 ------- ---- ------- ------7.81 Bm-B -15.75
2.02
Sp3.070
50.90 ------- ---- ------- ------8.43 Bm-B -15.75
1.87
Sp3.080
52.60 ------- ---- ------- ------7.60 Bm-B -15.75
2.07
Sp3.090
54.30 ------- ---- ------- ------6.63 Bm-B -15.75
2.38
Sp3.100
56.00 ------- ---- ------- ------5.46 Bm-T -15.75
2.88

***** End of Report *****


Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

***** End of Report *****


Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Output

Tutorial Three / T3-27

T3-28 / Tutorial Three

Bentley Exton Office

| Sheet
1 of
1
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Combined Stress Check - Box Girder
Stage Final: Service I - Final
POI
Location Max-Ten Loc All-Ten Ratio Max-Cmp Loc All-Cmp Ratio
(m)
(MPa)
(MPa)
(MPa)
(MPa)
-------- -------- ------- ---- ------- ------ ------- ---- ------- -----Sp1.000
0.00 ------- ---- ------- ------5.46 Bm-T -21.00
3.84
Sp1.010
1.70 ------- ---- ------- ------8.48 Bm-T -21.00
2.48
Sp1.020
3.40 ------- ---- ------- ------10.24 Bm-T -21.00
2.05
Sp1.030
5.10 ------- ---- ------- ------11.12 Bm-B -21.00
1.89
Sp1.040
6.80 ------- ---- ------- ------11.08 Bm-B -21.00
1.90
Sp1.050
8.50 ------- ---- ------- ------9.96 Bm-T -21.00
2.11
Sp1.060
10.20 ------- ---- ------- ------9.01 Bm-T -21.00
2.33
Sp1.070
11.90 ------- ---- ------- ------7.71 Bm-T -21.00
2.72
Sp1.080
13.60 ------- ---- ------- ------6.72 Bm-B -21.00
3.12
Sp1.090
15.30 ------- ---- ------- ------6.38 Bm-B -21.00
3.29
FSupp1L
16.67 ------- ---- ------- ------7.28 Bm-B -21.00
2.89
FSupp1R
17.33 ------- ---- ------- ------6.80 Bm-B -21.00
3.09
Sp2.010
19.20 ------- ---- ------- ------6.33 Bm-T -21.00
3.32
Sp2.020
21.40 ------- ---- ------- ------7.67 Bm-T -21.00
2.74
Sp2.030
23.60 ------- ---- ------- ------9.00 Bm-T -21.00
2.33
Sp2.040
25.80 ------- ---- ------- ------10.36 Bm-T -21.00
2.03
Sp2.050
28.00 ------- ---- ------- ------11.32 Bm-B -21.00
1.86
Sp2.060
30.20 ------- ---- ------- ------10.38 Bm-T -21.00
2.02
Sp2.070
32.40 ------- ---- ------- ------9.00 Bm-T -21.00
2.33
Sp2.080
34.60 ------- ---- ------- ------7.67 Bm-T -21.00
2.74
Sp2.090
36.80 ------- ---- ------- ------6.33 Bm-T -21.00
3.32
FSupp2L
38.67 ------- ---- ------- ------6.80 Bm-B -21.00
3.09
FSupp2R
39.33 ------- ---- ------- ------7.27 Bm-B -21.00
2.89
Sp3.010
40.70 ------- ---- ------- ------6.38 Bm-B -21.00
3.29
Sp3.020
42.40 ------- ---- ------- ------6.72 Bm-B -21.00
3.12
Sp3.030
44.10 ------- ---- ------- ------7.71 Bm-T -21.00
2.72
Sp3.040
45.80 ------- ---- ------- ------9.01 Bm-T -21.00
2.33
Sp3.050
47.50 ------- ---- ------- ------9.96 Bm-T -21.00
2.11
Sp3.060
49.20 ------- ---- ------- ------11.06 Bm-B -21.00
1.90
Sp3.070
50.90 ------- ---- ------- ------11.10 Bm-B -21.00
1.89
Sp3.080
52.60 ------- ---- ------- ------10.24 Bm-T -21.00
2.05
Sp3.090
54.30 ------- ---- ------- ------8.48 Bm-T -21.00
2.48
Sp3.100
56.00 ------- ---- ------- ------5.46 Bm-T -21.00
3.84

***** End of Report *****


Spec: AASHTO LRFD

LEAP CONBOX v.10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
1 of
1
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Combined Stress Check - Box Girder
Stage Final: PS+PERM Service III - Final
POI
Location Max-Ten Loc All-Ten Ratio Max-Cmp Loc All-Cmp Ratio
(m)
(MPa)
(MPa)
(MPa)
(MPa)
-------- -------- ------- ---- ------- ------ ------- ---- ------- -----Sp1.000
0.00
0.00
N/A 999.99 ------- ---- ------- -----Sp1.010
1.70
0.00
N/A 999.99 ------- ---- ------- -----Sp1.020
3.40
0.00
N/A 999.99 ------- ---- ------- -----Sp1.030
5.10
0.00
N/A 999.99 ------- ---- ------- -----Sp1.040
6.80
0.00
N/A 999.99 ------- ---- ------- -----Sp1.050
8.50
0.00
N/A 999.99 ------- ---- ------- -----Sp1.060
10.20
0.00
N/A 999.99 ------- ---- ------- -----Sp1.070
11.90
0.00
N/A 999.99 ------- ---- ------- -----Sp1.080
13.60
0.00
N/A 999.99 ------- ---- ------- -----Sp1.090
15.30
0.00
N/A 999.99 ------- ---- ------- -----FSupp1L
16.67
0.00
N/A 999.99 ------- ---- ------- -----FSupp1R
17.33
0.00
N/A 999.99 ------- ---- ------- -----Sp2.010
19.20
0.00
N/A 999.99 ------- ---- ------- -----Sp2.020
21.40
0.00
N/A 999.99 ------- ---- ------- -----Sp2.030
23.60
0.00
N/A 999.99 ------- ---- ------- -----Sp2.040
25.80
0.00
N/A 999.99 ------- ---- ------- -----Sp2.050
28.00
0.00
N/A 999.99 ------- ---- ------- -----Sp2.060
30.20
0.00
N/A 999.99 ------- ---- ------- -----Sp2.070
32.40
0.00
N/A 999.99 ------- ---- ------- -----Sp2.080
34.60
0.00
N/A 999.99 ------- ---- ------- -----Sp2.090
36.80
0.00
N/A 999.99 ------- ---- ------- -----FSupp2L
38.67
0.00
N/A 999.99 ------- ---- ------- -----FSupp2R
39.33
0.00
N/A 999.99 ------- ---- ------- -----Sp3.010
40.70
0.00
N/A 999.99 ------- ---- ------- -----Sp3.020
42.40
0.00
N/A 999.99 ------- ---- ------- -----Sp3.030
44.10
0.00
N/A 999.99 ------- ---- ------- -----Sp3.040
45.80
0.00
N/A 999.99 ------- ---- ------- -----Sp3.050
47.50
0.00
N/A 999.99 ------- ---- ------- -----Sp3.060
49.20
0.00
N/A 999.99 ------- ---- ------- -----Sp3.070
50.90
0.00
N/A 999.99 ------- ---- ------- -----Sp3.080
52.60
0.00
N/A 999.99 ------- ---- ------- -----Sp3.090
54.30
0.00
N/A 999.99 ------- ---- ------- -----Sp3.100
56.00
0.00
N/A 999.99 ------- ---- ------- ------

Units: SI (Metric)

Loss: LRFD-2005

***** End of Report *****


Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
1 of
1
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Combined Stress Check - Box Girder
Stage Final: Service III - Final
POI
Location Max-Ten Loc All-Ten Ratio Max-Cmp Loc All-Cmp Ratio
(m)
(MPa)
(MPa)
(MPa)
(MPa)
-------- -------- ------- ---- ------- ------ ------- ---- ------- -----Sp1.000
0.00
0.00
N/A 999.99 ------- ---- ------- -----Sp1.010
1.70
0.00
N/A 999.99 ------- ---- ------- -----Sp1.020
3.40
0.00
N/A 999.99 ------- ---- ------- -----Sp1.030
5.10
0.00
N/A 999.99 ------- ---- ------- -----Sp1.040
6.80
0.15 Bm-T
1.48
9.83 ------- ---- ------- -----Sp1.050
8.50
0.00
N/A 999.99 ------- ---- ------- -----Sp1.060
10.20
0.00
N/A 999.99 ------- ---- ------- -----Sp1.070
11.90
0.00
N/A 999.99 ------- ---- ------- -----Sp1.080
13.60
0.00
N/A 999.99 ------- ---- ------- -----Sp1.090
15.30
0.00
N/A 999.99 ------- ---- ------- -----FSupp1L
16.67
0.00
N/A 999.99 ------- ---- ------- -----FSupp1R
17.33
0.00
N/A 999.99 ------- ---- ------- -----Sp2.010
19.20
0.00
N/A 999.99 ------- ---- ------- -----Sp2.020
21.40
0.00
N/A 999.99 ------- ---- ------- -----Sp2.030
23.60
0.00
N/A 999.99 ------- ---- ------- -----Sp2.040
25.80
0.00
N/A 999.99 ------- ---- ------- -----Sp2.050
28.00
0.22 Bm-T
1.48
6.70 ------- ---- ------- -----Sp2.060
30.20
0.00
N/A 999.99 ------- ---- ------- -----Sp2.070
32.40
0.00
N/A 999.99 ------- ---- ------- -----Sp2.080
34.60
0.00
N/A 999.99 ------- ---- ------- -----Sp2.090
36.80
0.00
N/A 999.99 ------- ---- ------- -----FSupp2L
38.67
0.00
N/A 999.99 ------- ---- ------- -----FSupp2R
39.33
0.00
N/A 999.99 ------- ---- ------- -----Sp3.010
40.70
0.00
N/A 999.99 ------- ---- ------- -----Sp3.020
42.40
0.00
N/A 999.99 ------- ---- ------- -----Sp3.030
44.10
0.00
N/A 999.99 ------- ---- ------- -----Sp3.040
45.80
0.00
N/A 999.99 ------- ---- ------- -----Sp3.050
47.50
0.00
N/A 999.99 ------- ---- ------- -----Sp3.060
49.20
0.14 Bm-T
1.48 10.94 ------- ---- ------- -----Sp3.070
50.90
0.00
N/A 999.99 ------- ---- ------- -----Sp3.080
52.60
0.00
N/A 999.99 ------- ---- ------- -----Sp3.090
54.30
0.00
N/A 999.99 ------- ---- ------- -----Sp3.100
56.00
0.00
N/A 999.99 ------- ---- ------- ------

Bentley Exton Office

| Sheet
1 of
1
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Combined Stress Check - Box Girder
Stage Final: Fatigue (Concrete)
POI
Location Max-Ten Loc All-Ten Ratio Max-Cmp Loc All-Cmp Ratio
(m)
(MPa)
(MPa)
(MPa)
(MPa)
-------- -------- ------- ---- ------- ------ ------- ---- ------- -----Sp1.000
0.00 ------- ---- ------- ------2.92 Bm-T -14.00
4.80
Sp1.010
1.70 ------- ---- ------- ------5.99 Bm-T -14.00
2.34
Sp1.020
3.40 ------- ---- ------- ------7.89 Bm-T -14.00
1.78
Sp1.030
5.10 ------- ---- ------- ------8.71 Bm-T -14.00
1.61
Sp1.040
6.80 ------- ---- ------- ------8.64 Bm-T -14.00
1.62
Sp1.050
8.50 ------- ---- ------- ------7.64 Bm-T -14.00
1.83
Sp1.060
10.20 ------- ---- ------- ------6.59 Bm-T -14.00
2.12
Sp1.070
11.90 ------- ---- ------- ------5.33 Bm-T -14.00
2.63
Sp1.080
13.60 ------- ---- ------- ------4.84 Bm-B -14.00
2.89
Sp1.090
15.30 ------- ---- ------- ------4.66 Bm-B -14.00
3.00
FSupp1L
16.67 ------- ---- ------- ------5.30 Bm-B -14.00
2.64
FSupp1R
17.33 ------- ---- ------- ------5.15 Bm-B -14.00
2.72
Sp2.010
19.20 ------- ---- ------- ------3.82 Bm-B -14.00
3.66
Sp2.020
21.40 ------- ---- ------- ------4.89 Bm-T -14.00
2.86
Sp2.030
23.60 ------- ---- ------- ------6.18 Bm-T -14.00
2.26
Sp2.040
25.80 ------- ---- ------- ------7.70 Bm-T -14.00
1.82
Sp2.050
28.00 ------- ---- ------- ------8.68 Bm-T -14.00
1.61
Sp2.060
30.20 ------- ---- ------- ------7.71 Bm-T -14.00
1.82
Sp2.070
32.40 ------- ---- ------- ------6.18 Bm-T -14.00
2.27
Sp2.080
34.60 ------- ---- ------- ------4.89 Bm-T -14.00
2.86
Sp2.090
36.80 ------- ---- ------- ------3.82 Bm-B -14.00
3.66
FSupp2L
38.67 ------- ---- ------- ------5.15 Bm-B -14.00
2.72
FSupp2R
39.33 ------- ---- ------- ------5.30 Bm-B -14.00
2.64
Sp3.010
40.70 ------- ---- ------- ------4.66 Bm-B -14.00
3.00
Sp3.020
42.40 ------- ---- ------- ------4.84 Bm-B -14.00
2.89
Sp3.030
44.10 ------- ---- ------- ------5.33 Bm-T -14.00
2.63
Sp3.040
45.80 ------- ---- ------- ------6.59 Bm-T -14.00
2.12
Sp3.050
47.50 ------- ---- ------- ------7.64 Bm-T -14.00
1.83
Sp3.060
49.20 ------- ---- ------- ------8.64 Bm-T -14.00
1.62
Sp3.070
50.90 ------- ---- ------- ------8.71 Bm-T -14.00
1.61
Sp3.080
52.60 ------- ---- ------- ------7.88 Bm-T -14.00
1.78
Sp3.090
54.30 ------- ---- ------- ------5.99 Bm-T -14.00
2.34
Sp3.100
56.00 ------- ---- ------- ------2.92 Bm-T -14.00
4.80

***** End of Report *****


Spec: AASHTO LRFD

Units: SI (Metric)

***** End of Report *****

Loss: LRFD-2005
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Output

Tutorial Three / T3-29

T3-30 / Tutorial Three

Sp1.090

15.30

FSupp1L

16.67

FSupp1R

17.33

Sp2.010

19.20

Sp2.020

21.40

Sp2.030

23.60

Sp2.040

25.80

Spec: AASHTO LRFD

LEAP CONBOX v.10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
1 of
2
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Combined Flexure Check - Box Girder
Stage Final: Strength 1 (Final w/o Sway)
POI
Location
Mu-Max Phi*Mn-Pos
1.2*M-Cr
Cap/Mu
Mu-Min Phi*Mn-Neg
(m)
(kN-m)
(kN-m)
(kN-m)
-------- -------- ---------- ---------- --------------Sp1.000
0.00
0.00
1,791.81
5,613.63
999.99
0.00 -7,974.76
-5,687.43
999.99
Sp1.010
1.70
4,448.13
9,932.59
7,623.90
1.68
0.00 -2,212.19
-3,656.84
999.99
Sp1.020
3.40
7,377.59 11,581.31
8,948.49
1.29
0.00 -2,212.19
-2,252.93
999.99
Sp1.030
5.10
8,900.24 12,624.70
9,735.12
1.30
-5.34 -2,212.19
-1,417.63
311.49
Sp1.040
6.80
9,334.20 13,100.24
10,097.74
1.30
-661.33 -2,347.71
-1,978.27
2.67
Sp1.050
8.50
8,575.28 13,095.74
10,090.00
1.30
-1,663.70 -2,635.67
-4,074.12
1.19
Sp1.060
10.20
6,849.69 12,381.58
9,400.55
1.36
-3,043.61 -2,923.64
-6,943.18
0.72 *
Sp1.070
11.90
4,075.01
2,524.71
8,157.43
0.47 *
-5,481.29 -13,189.35 -10,431.13
1.81
Sp1.080
13.60
1,148.10
2,735.89
6,422.72
1.79
-8,529.35 -17,636.83 -14,472.80
1.55
0.00
-12,527.04
0.00
-17,254.20
0.00
-16,795.51
0.00
-9,704.91
2,717.03
-5,045.03
6,075.57
-1,986.79
8,614.44
-485.60

2,947.06
-22,714.73
3,096.12
-26,469.39
3,096.12
-26,500.18
2,884.95
-21,498.74
2,611.66
-15,339.23
11,985.21
-2,957.51
13,017.97
-2,584.84

4,296.43
-18,930.83
2,901.69
-22,025.58
2,571.33
-22,224.54
4,260.03
-18,273.39
6,730.33
-12,822.03
8,619.36
-8,019.39
9,605.44
-4,231.71

Units: SI (Metric)

999.99
1.36
999.99
1.20
999.99
1.19
999.99
1.67
0.72 *
2.29
1.48
1.12
1.36
4.00

Loss: LRFD-2005

Bentley Exton Office

| Sheet
2 of
2
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Sp2.050
28.00
9,427.93 13,275.69
9,764.02
1.36
0.00 -2,212.19
-1,402.63
999.99
Sp2.060
30.20
8,628.03 13,017.95
9,605.48
1.36
-486.50 -2,584.86
-4,231.75
3.99
Sp2.070
32.40
6,071.53 11,985.18
8,619.39
1.48
-1,988.12 -2,957.52
-8,019.43
1.12
Sp2.080
34.60
2,716.39
2,611.67
6,730.37
0.72 *
-5,042.73 -15,339.39 -12,822.08
2.29
Sp2.090
36.80
0.00
2,884.95
4,260.07
999.99
-9,708.08 -21,498.91 -18,273.43
1.67
FSupp2L
38.67
0.00
3,096.12
2,571.33
999.99
-16,786.73 -26,500.18 -22,224.54
1.19
FSupp2R
39.33
0.00
3,096.12
2,901.69
999.99
-17,241.37 -26,469.39 -22,025.58
1.20
Sp3.010
40.70
0.00
2,947.06
4,296.39
999.99
-12,525.11 -22,714.55 -18,930.78
1.36
Sp3.020
42.40
1,146.71
2,735.88
6,422.68
1.79
-8,527.92 -17,636.65 -14,472.75
1.55
Sp3.030
44.10
4,073.46
2,524.71
8,157.39
0.47 *
-5,480.39 -13,189.20 -10,431.09
1.81
Sp3.040
45.80
6,847.97 12,381.62
9,400.52
1.36
-3,022.69 -2,923.63
-6,943.14
0.73 *
Sp3.050
47.50
8,573.40 13,095.76
10,089.96
1.30
-1,646.71 -2,635.66
-4,074.08
1.20
Sp3.060
49.20
9,332.16 13,100.23
10,097.71
1.30
-648.28 -2,347.70
-1,978.24
2.72
Sp3.070
50.90
8,897.05 12,624.68
9,735.12
1.30
0.00 -2,212.19
-1,417.63
999.99
Sp3.080
52.60
7,374.51 11,581.25
8,948.49
1.29
0.00 -2,212.19
-2,252.93
999.99
Sp3.090
54.30
4,445.75
9,932.53
7,623.90
1.68
0.00 -2,212.19
-3,656.84
999.99
Sp3.100
56.00
0.00
1,791.81
5,613.63
999.99
-2.69 -7,974.76
-5,687.43
999.99
***** End of Report *****
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
1 of
2
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Combined Flexure Check - Box Girder
Stage Final: Strength I
POI
Location
Mu-Max Phi*Mn-Pos
1.2*M-Cr
Cap/Mu
Mu-Min Phi*Mn-Neg
(m)
(kN-m)
(kN-m)
(kN-m)
-------- -------- ---------- ---------- --------------Sp1.000
0.00
0.00
1,791.81
5,613.63
999.99
0.00 -7,974.76
-5,687.43
999.99
Sp1.010
1.70
4,439.68
9,932.59
7,623.90
1.68
0.00 -2,212.19
-3,656.84
999.99
Sp1.020
3.40
7,360.69 11,581.31
8,948.49
1.29
0.00 -2,212.19
-2,252.93
999.99
Sp1.030
5.10
8,874.89 12,624.70
9,735.12
1.30
0.00 -2,212.19
-1,417.63
999.99
Sp1.040
6.80
9,300.40 13,100.24
10,097.74
1.30
-647.81 -2,347.71
-1,978.27
2.72
Sp1.050
8.50
8,533.03 13,095.74
10,090.00
1.30
-1,646.80 -2,635.67
-4,074.12
1.20
Sp1.060
10.20
6,798.99 12,381.58
9,400.55
1.37
-3,023.33 -2,923.64
-6,943.18
0.73 *
Sp1.070
11.90
4,015.86
2,524.71
8,157.43
0.47 *
-5,457.63 -13,189.35 -10,431.13
1.82
Sp1.080
13.60
1,080.50
2,735.89
6,422.72
1.90
-8,502.31 -17,636.83 -14,472.80
1.56
Sp1.090
15.30
0.00
2,947.06
4,296.43
999.99
-12,496.62 -22,714.73 -18,930.83
1.37
FSupp1L
16.67
0.00
3,096.12
2,901.69
999.99
-17,221.05 -26,469.39 -22,025.58
1.20
FSupp1R
17.33
0.00
3,096.12
2,571.33
999.99
-16,790.21 -26,500.18 -22,224.54
1.19
Sp2.010
19.20
0.00
2,884.95
4,260.03
999.99
-9,699.61 -21,498.74 -18,273.39
1.67
Sp2.020
21.40
2,714.91
2,611.66
6,730.33
0.72 *
-5,039.73 -15,339.23 -12,822.03
2.29
Sp2.030
23.60
6,073.45 11,985.21
8,619.36
1.48
-1,981.49 -2,957.51
-8,019.39
1.12
Sp2.040
25.80
8,612.32 13,017.97
9,605.44
1.36
-480.30 -2,584.84
-4,231.71
4.05
Spec: AASHTO LRFD

Units: SI (Metric)

Bentley Exton Office

| Sheet
2 of
2
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Sp2.050
28.00
9,425.81 13,275.69
9,764.02
1.36
0.00 -2,212.19
-1,402.63
999.99
Sp2.060
30.20
8,625.91 13,017.95
9,605.48
1.36
-481.20 -2,584.86
-4,231.75
4.04
Sp2.070
32.40
6,069.41 11,985.18
8,619.39
1.48
-1,982.82 -2,957.52
-8,019.43
1.12
Sp2.080
34.60
2,714.27
2,611.67
6,730.37
0.72 *
-5,037.43 -15,339.39 -12,822.08
2.29
Sp2.090
36.80
0.00
2,884.95
4,260.07
999.99
-9,702.78 -21,498.91 -18,273.43
1.67
FSupp2L
38.67
0.00
3,096.12
2,571.33
999.99
-16,781.43 -26,500.18 -22,224.54
1.19
FSupp2R
39.33
0.00
3,096.12
2,901.69
999.99
-17,208.23 -26,469.39 -22,025.58
1.20
Sp3.010
40.70
0.00
2,947.06
4,296.39
999.99
-12,494.69 -22,714.55 -18,930.78
1.37
Sp3.020
42.40
1,079.11
2,735.88
6,422.68
1.91
-8,500.89 -17,636.65 -14,472.75
1.56
Sp3.030
44.10
4,014.31
2,524.71
8,157.39
0.47 *
-5,456.73 -13,189.20 -10,431.09
1.82
Sp3.040
45.80
6,797.27 12,381.62
9,400.52
1.37
-3,002.41 -2,923.63
-6,943.14
0.73 *
Sp3.050
47.50
8,531.15 13,095.76
10,089.96
1.30
-1,629.81 -2,635.66
-4,074.08
1.22
Sp3.060
49.20
9,298.36 13,100.23
10,097.71
1.30
-634.76 -2,347.70
-1,978.24
2.78
Sp3.070
50.90
8,871.70 12,624.68
9,735.12
1.30
0.00 -2,212.19
-1,417.63
999.99
Sp3.080
52.60
7,357.61 11,581.25
8,948.49
1.29
0.00 -2,212.19
-2,252.93
999.99
Sp3.090
54.30
4,437.30
9,932.53
7,623.90
1.68
0.00 -2,212.19
-3,656.84
999.99
Sp3.100
56.00
0.00
1,791.81
5,613.63
999.99
-2.69 -7,974.76
-5,687.43
999.99
***** End of Report *****
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Loss: LRFD-2005

Output

Tutorial Three / T3-31

T3-32 / Tutorial Three

Spec: AASHTO LRFD

LEAP CONBOX v.10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
1 of
3
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Combined Shear Check - Box Girder
Method used: MCFT - Beta-Theta Tables
Stage Final: Strength 1 (Final w/o Sway)
POI
Location
Vu-Max
Conc Mom
Av/S-prov
Vc
Vs-req
Vs-prov Cap-prov/Vu
Vu-Min
(m)
(kN)
(kN-m)
(mm)
(kN)
(kN)
(kN)
-------- -------- ---------- ---------- ------- --------- ---------- --------- -----Sp1.000
0.00
-287.18
0.00
0.0000 ! 3,531.87 3,264.70
N/A 14.79
-3,081.21
0.00
0.0000 ! 3,531.87 3,264.70
N/A
1.38
FSupp0Rd
0.33
-249.74
63.22
0.0000 ! 4,507.41 3,597.18
N/A 20.26
-2,697.99
866.53
0.0000 ! 4,507.41 3,567.12
N/A
1.87
Sp1.010
1.70
-89.11
386.21
0.0000 ! 4,507.41 3,586.78
N/A 53.73
-2,446.64
4,386.09
0.0000 ! 4,507.41 3,465.83
N/A
1.96
Sp1.020
3.40
181.64
4,710.55
0.0000 ! 4,507.41 3,462.95
N/A 18.70
-1,841.82
7,169.48
0.0000 ! 4,414.02 3,400.56
N/A
2.51
Sp1.030
5.10
609.86
6,066.42
0.0000 ! 4,460.04 3,429.20
N/A
6.18
-1,270.26
8,519.84
0.0000 ! 4,394.25 3,364.90
N/A
3.31
Sp1.040
6.80
1,077.84
7,202.42
0.0000 ! 4,645.49 3,577.16
N/A
4.23
-772.84
7,882.84
0.0000 ! 4,613.70 3,557.53
N/A
4.89
Sp1.050
8.50
1,644.43
6,569.85
0.0000 ! 5,145.14 3,957.36
N/A
3.27
-326.40
7,023.20
0.0000 ! 5,125.46 3,945.09
N/A 11.84
Sp1.060
10.20
2,273.67
4,962.56
0.0000 ! 5,665.09 4,350.46
N/A
2.66
75.03
5,655.08
0.0000 ! 5,646.08 4,338.48
N/A 80.35
Sp1.070
11.90
2,920.44
2,060.07
0.0000 ! 4,976.51 4,600.07
N/A
1.92
472.42
3,590.08
0.0000 ! 4,976.51 4,600.07
N/A 11.86
Sp1.080
13.60
3,577.80 -2,085.77
0.0000 ! 6,642.23 5,113.78
N/A
2.09
868.10
886.27
0.0000 ! 5,565.29 5,153.52
N/A
7.50
Sp1.090
15.30
4,245.41 -7,429.85
0.0000 ! 6,981.08 5,376.89
N/A
1.85
1,226.63 -1,835.93
0.0000 ! 7,119.75 5,483.83
N/A
6.49
FSupp1Ld
16.34
4,550.75 -12,070.46
0.0000 ! 7,386.56 5,639.84
N/A
1.73
1,420.12 -3,310.11
0.0000 ! 7,564.13 5,806.54
N/A
5.65
FSupp1L
16.67
4,635.39 -13,561.45
0.0000 ! 7,556.76 5,746.09
N/A
1.71
1,481.06 -3,768.69
0.0000 ! 7,724.63 5,931.60
N/A
5.45
Sp1.100
17.00
4,922.95 -13,874.16
0.0000 ! 7,671.46 5,827.77
N/A
1.61
1,541.78 -4,250.75
0.0000 ! 7,829.18 6,013.62
N/A
5.23
Sp2.000
17.00 -1,328.19 -3,916.98
0.0000 ! 7,839.18 6,019.93
N/A
6.02
-4,920.63 -13,677.15
0.0000 ! 7,671.46 5,830.60
N/A
1.60
FSupp1R
17.33 -1,268.01 -3,545.29
0.0000 ! 7,739.00 5,941.71
N/A
6.30
Units: SI (Metric)

Loss: LRFD-2005

Bentley Exton Office

| Sheet
2 of
3
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
-4,578.76 -13,742.77
0.0000 ! 7,564.08 5,748.24
N/A
1.71
FSupp1Rd
17.66 -1,207.61 -3,172.24
0.0000 ! 7,583.40 5,820.76
N/A
6.56
-4,494.88 -12,291.09
0.0000 ! 7,401.22 5,646.74
N/A
1.72
Sp2.010
19.20
-923.00 -1,383.96
0.0000 ! 6,979.29 5,386.85
N/A
8.35
-4,055.17 -5,601.45
0.0000 ! 6,891.64 5,300.85
N/A
1.88
Sp2.020
21.40
-542.32
390.11
0.0000 ! 5,657.04 5,195.80
N/A 11.97
-3,219.36
574.84
0.0000 ! 5,241.60 4,849.23
N/A
1.90
Sp2.030
23.60
-87.47
5,135.95
0.0000 ! 5,718.25 4,391.66
N/A 69.30
-2,419.70
4,870.50
0.0000 ! 5,720.83 4,393.30
N/A
2.51
Sp2.040
25.80
427.41
6,728.06
0.0000 ! 5,050.46 3,886.20
N/A
8.91
-1,669.06
7,347.05
0.0000 ! 5,033.54 3,875.67
N/A
3.16
Sp2.050
28.00
981.30
8,117.56
0.0000 ! 4,438.83 3,418.13
N/A
4.59
-981.40
8,117.56
0.0000 ! 4,438.83 3,408.36
N/A
3.55
Sp2.060
30.20
1,669.79
7,346.84
0.0000 ! 5,033.56 3,875.69
N/A
3.15
-426.13
6,727.85
0.0000 ! 5,050.50 3,886.22
N/A
8.94
Sp2.070
32.40
2,419.91
4,870.08
0.0000 ! 5,720.86 4,393.32
N/A
2.51
87.57
5,135.53
0.0000 ! 5,718.28 4,391.68
N/A 69.22
Sp2.080
34.60
3,219.54
574.20
0.0000 ! 5,242.04 4,849.66
N/A
1.90
542.52
389.44
0.0000 ! 5,657.84 5,196.38
N/A 11.97
Sp2.090
36.80
4,055.32 -5,602.30
0.0000 ! 6,891.64 5,300.84
N/A
1.88
923.19 -1,384.89
0.0000 ! 6,979.30 5,386.85
N/A
8.35
FSupp2Ld
38.34
4,495.02 -12,292.08
0.0000 ! 7,401.22 5,646.72
N/A
1.72
1,207.80 -3,173.36
0.0000 ! 7,583.38 5,820.75
N/A
6.55
FSupp2L
38.67
4,578.91 -13,743.79
0.0000 ! 7,564.08 5,748.22
N/A
1.71
1,268.20 -3,546.44
0.0000 ! 7,738.97 5,941.69
N/A
6.30
Sp2.100
39.00
4,919.99 -13,678.21
0.0000 ! 7,671.46 5,830.59
N/A
1.60
1,328.38 -3,918.17
0.0000 ! 7,839.15 6,019.91
N/A
6.02
Sp3.000
39.00 -1,541.72 -4,251.96
0.0000 ! 7,829.14 6,013.60
N/A
5.23
-4,922.90 -13,875.21
0.0000 ! 7,671.46 5,827.75
N/A
1.61
FSupp2R
39.33 -1,481.00 -3,769.93
0.0000 ! 7,724.60 5,931.59
N/A
5.45
-4,635.47 -13,562.54
0.0000 ! 7,556.76 5,746.07
N/A
1.71
FSupp2Rd
39.66 -1,420.06 -3,311.38
0.0000 ! 7,564.10 5,806.52
N/A
5.65
-4,550.83 -12,071.58
0.0000 ! 7,386.56 5,639.82
N/A
1.73
Sp3.010
40.70 -1,226.57 -1,837.30
0.0000 ! 7,119.74 5,483.80
N/A
6.49
-4,245.49 -7,431.07
0.0000 ! 6,981.03 5,376.86
N/A
1.85
Sp3.020
42.40
-868.00
884.88
0.0000 ! 5,566.30 5,154.53
N/A
7.50
-3,577.72 -2,087.16
0.0000 ! 6,642.21 5,113.74
N/A
2.09
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
3 of
3
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Sp3.030
44.10
-472.33
3,588.53
0.0000 ! 4,976.50 4,600.06
N/A 11.86
-2,920.39
2,058.52
0.0000 ! 4,976.50 4,600.06
N/A
1.92
Sp3.040
45.80
-74.94
5,653.36
0.0000 ! 5,646.12 4,338.50
N/A 80.45
-2,273.65
4,960.85
0.0000 ! 5,665.13 4,350.48
N/A
2.66
Sp3.050
47.50
328.14
7,019.86
0.0000 ! 5,125.54 3,945.13
N/A 11.78
-1,639.78
6,567.97
0.0000 ! 5,145.24 3,957.42
N/A
3.28
Sp3.060
49.20
773.15
7,880.79
0.0000 ! 4,613.75 3,557.56
N/A
4.89
-1,077.74
7,200.38
0.0000 ! 4,645.55 3,577.20
N/A
4.23
Sp3.070
50.90
1,270.44
8,517.63
0.0000 ! 4,394.25 3,364.96
N/A
3.31
-609.76
6,064.22
0.0000 ! 4,460.13 3,429.26
N/A
6.18
Sp3.080
52.60
1,841.99
7,167.11
0.0000 ! 4,414.11 3,400.62
N/A
2.51
-181.55
4,708.18
0.0000 ! 4,507.41 3,463.01
N/A 18.71
Sp3.090
54.30
2,447.01
4,383.56
0.0000 ! 4,507.41 3,465.90
N/A
1.96
91.43
385.84
0.0000 ! 4,507.41 3,586.81
N/A 52.37
FSupp3Ld
55.67
2,698.18
863.87
0.0000 ! 4,507.41 3,567.20
N/A
1.87
252.06
60.98
0.0000 ! 4,507.41 3,597.26
N/A 20.07
Sp3.100
56.00
3,081.67
-2.69
0.0000 ! 4,507.41 3,595.38
N/A
1.66
289.49
-2.69
0.0000 ! 4,507.41 3,604.87
N/A 17.70
Notes
(*): Factored shear stress exceeds 0.18fcbvdv. Use Strut and Tie Method if beam
end not integral with support. LRFD 5.8.3.2.
(f): Design failed!
(L): Asfy-Actual < Asfy-Required.
(m): Av/S-provided was changed to equal Av/S-minimum.
(!): Must provide Minimum transverse reinforcement per LRFD 5.8.2.4
(X): Max Vs exceeded. LRFD Eq. 5.8.3.3-2.
(z): Zero tension steel T/B.
***** End of Report *****

Bentley Exton Office

| Sheet
2 of
3
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
-4,578.76 -13,744.89
0.0000 ! 7,564.08 5,748.20
N/A
1.71
FSupp1Rd
17.66 -1,207.61 -3,174.36
0.0000 ! 7,583.35 5,820.73
N/A
6.56
-4,494.88 -12,293.21
0.0000 ! 7,401.22 5,646.70
N/A
1.72
Sp2.010
19.20
-923.00 -1,386.08
0.0000 ! 6,979.29 5,386.81
N/A
8.35
-4,055.17 -5,603.57
0.0000 ! 6,891.59 5,300.81
N/A
1.88
Sp2.020
21.40
-542.32
387.99
0.0000 ! 5,659.35 5,197.46
N/A 11.98
-3,219.36
572.72
0.0000 ! 5,243.09 4,850.70
N/A
1.90
Sp2.030
23.60
-87.47
5,133.83
0.0000 ! 5,718.31 4,391.70
N/A 69.30
-2,419.70
4,868.38
0.0000 ! 5,720.90 4,393.34
N/A
2.51
Sp2.040
25.80
427.41
6,725.94
0.0000 ! 5,050.54 3,886.24
N/A
8.91
-1,669.06
7,344.93
0.0000 ! 5,033.61 3,875.72
N/A
3.16
Sp2.050
28.00
981.30
8,115.44
0.0000 ! 4,438.83 3,418.19
N/A
4.59
-981.40
8,115.44
0.0000 ! 4,438.83 3,408.42
N/A
3.55
Sp2.060
30.20
1,669.79
7,344.72
0.0000 ! 5,033.63 3,875.73
N/A
3.15
-426.13
6,725.73
0.0000 ! 5,050.57 3,886.27
N/A
8.94
Sp2.070
32.40
2,419.91
4,867.96
0.0000 ! 5,720.93 4,393.36
N/A
2.51
87.57
5,133.41
0.0000 ! 5,718.34 4,391.73
N/A 69.22
Sp2.080
34.60
3,219.54
572.08
0.0000 ! 5,243.53 4,851.12
N/A
1.90
542.52
387.32
0.0000 ! 5,660.16 5,198.04
N/A 11.97
Sp2.090
36.80
4,055.32 -5,604.42
0.0000 ! 6,891.58 5,300.81
N/A
1.88
923.19 -1,387.01
0.0000 ! 6,979.30 5,386.81
N/A
8.35
FSupp2Ld
38.34
4,495.02 -12,294.20
0.0000 ! 7,401.22 5,646.68
N/A
1.72
1,207.80 -3,175.48
0.0000 ! 7,583.32 5,820.71
N/A
6.55
FSupp2L
38.67
4,578.91 -13,745.91
0.0000 ! 7,564.08 5,748.18
N/A
1.71
1,268.20 -3,548.56
0.0000 ! 7,738.92 5,941.66
N/A
6.30
Sp2.100
39.00
4,919.99 -13,680.33
0.0000 ! 7,671.46 5,830.55
N/A
1.60
1,328.38 -3,920.29
0.0000 ! 7,839.09 6,019.88
N/A
6.02
Sp3.000
39.00 -1,546.69 -4,336.46
0.0000 ! 7,827.01 6,012.26
N/A
5.21
-4,920.91 -13,841.41
0.0000 ! 7,671.46 5,828.36
N/A
1.61
FSupp2R
39.33 -1,485.97 -3,852.79
0.0000 ! 7,722.51 5,930.26
N/A
5.43
-4,633.48 -13,529.39
0.0000 ! 7,556.76 5,746.67
N/A
1.71
FSupp2Rd
39.66 -1,425.03 -3,392.59
0.0000 ! 7,562.04 5,805.21
N/A
5.63
-4,548.84 -12,039.09
0.0000 ! 7,386.56 5,640.41
N/A
1.73
Sp3.010
40.70 -1,231.54 -1,913.34
0.0000 ! 7,119.74 5,482.48
N/A
6.47
-4,243.50 -7,400.65
0.0000 ! 6,981.83 5,377.35
N/A
1.85
Sp3.020
42.40
-872.97
817.28
0.0000 ! 5,618.14 5,206.73
N/A
7.51
-3,575.73 -2,060.12
0.0000 ! 6,642.21 5,114.27
N/A
2.09

Output

Tutorial Three / T3-33

T3-34 / Tutorial Three

***** End of Report *****


Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Bentley Exton Office

| Sheet
1 of
2
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Combined Flexure Check - Box Girder (Strain Compatibility)
Stage Final: Strength 1 (Final w/o Sway)
POI
Location
Mu-Max Phi*Mn-Pos
1.2*M-Cr
Cap/Mu
Mu-Min Phi*Mn-Neg
(m)
(kN-m)
(kN-m)
(kN-m)
-------- -------- ---------- ---------- --------------Sp1.000
0.00
0.00
7,725.18
5,613.63
999.99
0.00 -8,623.07
-5,687.43
999.99
Sp1.010
1.70
4,448.13 10,781.26
7,623.90
2.42
0.00 -5,926.39
-3,656.84
999.99
Sp1.020
3.40
7,377.59 12,597.26
8,948.49
1.71
0.00 -4,532.48
-2,252.93
999.99
Sp1.030
5.10
8,900.24 13,731.13
9,735.12
1.54
-5.34 -3,743.34
-1,417.63
739.98
Sp1.040
6.80
9,334.20 14,230.41
10,097.74
1.52
-661.33 -4,311.58
-1,978.27
6.88
Sp1.050
8.50
8,575.28 14,203.77
10,090.00
1.66
-1,663.70 -6,489.75
-4,074.12
4.12
Sp1.060
10.20
6,849.69 13,415.20
9,400.55
1.96
-3,043.61 -9,700.09
-6,943.18
3.36
Sp1.070
11.90
4,075.01 11,377.63
8,157.43
2.95
-5,481.29 -14,386.00 -10,431.13
2.62
Sp1.080
13.60
1,148.10
9,471.13
6,422.72
8.71
-8,529.35 -19,103.42 -14,472.80
2.24
Sp1.090
15.30
0.00
7,041.81
4,296.43
999.99
-12,527.04 -24,377.12 -18,930.83
1.95
FSupp1L
16.67
0.00
5,459.71
2,901.69
999.99
-17,254.20 -28,234.91 -22,025.58
1.64
FSupp1R
17.33
0.00
5,448.44
2,571.33
999.99
-16,795.51 -28,272.51 -22,224.54
1.68
Sp2.010
19.20
0.00
7,479.15
4,260.03
999.99
-9,704.91 -23,130.58 -18,273.39
2.38
Sp2.020
21.40
2,717.03 10,281.85
6,730.33
3.99
-5,045.03 -16,699.17 -12,822.03
3.31
Sp2.030
23.60
6,075.57 13,001.73
8,619.36
2.14
-1,986.79 -10,458.15
-8,019.39
5.56
Sp2.040
25.80
8,614.44 14,139.65
9,605.44
1.64
-485.60 -6,175.32
-4,231.71
13.42
Spec: AASHTO LRFD

LEAP CONBOX v.10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
3 of
3
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Sp3.030
44.10
-477.30
3,529.38
0.0000 ! 4,976.50 4,600.06
N/A 11.74
-2,918.41
2,082.18
0.0000 ! 4,976.50 4,600.06
N/A
1.92
Sp3.040
45.80
-79.91
5,602.66
0.0000 ! 5,647.79 4,339.55
N/A 75.47
-2,271.67
4,981.13
0.0000 ! 5,664.51 4,350.09
N/A
2.66
Sp3.050
47.50
323.17
6,977.61
0.0000 ! 5,127.05 3,946.07
N/A 11.97
-1,637.79
6,584.87
0.0000 ! 5,144.69 3,957.07
N/A
3.28
Sp3.060
49.20
768.18
7,846.99
0.0000 ! 4,615.08 3,558.38
N/A
4.92
-1,075.76
7,213.90
0.0000 ! 4,645.06 3,576.90
N/A
4.23
Sp3.070
50.90
1,265.47
8,492.28
0.0000 ! 4,394.25 3,365.73
N/A
3.32
-607.78
6,074.36
0.0000 ! 4,459.76 3,429.02
N/A
6.20
Sp3.080
52.60
1,837.02
7,150.21
0.0000 ! 4,414.83 3,401.07
N/A
2.52
-179.56
4,714.94
0.0000 ! 4,507.41 3,462.84
N/A 18.92
Sp3.090
54.30
2,442.04
4,375.11
0.0000 ! 4,507.41 3,466.17
N/A
1.96
93.42
389.22
0.0000 ! 4,507.41 3,586.73
N/A 51.26
FSupp3Ld
55.67
2,693.21
862.22
0.0000 ! 4,507.41 3,567.29
N/A
1.88
254.05
61.64
0.0000 ! 4,507.41 3,597.26
N/A 19.91
Sp3.100
56.00
3,076.70
-2.69
0.0000 ! 4,507.41 3,595.42
N/A
1.67
291.48
-2.69
0.0000 ! 4,507.41 3,604.89
N/A 17.58
Notes
(*): Factored shear stress exceeds 0.18fcbvdv. Use Strut and Tie Method if beam
end not integral with support. LRFD 5.8.3.2.
(f): Design failed!
(L): Asfy-Actual < Asfy-Required.
(m): Av/S-provided was changed to equal Av/S-minimum.
(!): Must provide Minimum transverse reinforcement per LRFD 5.8.2.4
(X): Max Vs exceeded. LRFD Eq. 5.8.3.3-2.
(z): Zero tension steel T/B.

Units: SI (Metric)

Loss: LRFD-2005

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
2 of
2
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Sp2.050
28.00
9,427.93 14,446.78
9,764.02
1.53
0.00 -3,298.03
-1,402.63
999.99
Sp2.060
30.20
8,628.03 14,139.64
9,605.48
1.64
-486.50 -6,175.42
-4,231.75
13.40
Sp2.070
32.40
6,071.53 13,001.69
8,619.39
2.14
-1,988.12 -10,458.28
-8,019.43
5.55
Sp2.080
34.60
2,716.39 10,281.77
6,730.37
4.00
-5,042.73 -16,699.34 -12,822.08
3.31
Sp2.090
36.80
0.00
7,479.07
4,260.07
999.99
-9,708.08 -23,130.76 -18,273.43
2.38
FSupp2L
38.67
0.00
5,448.44
2,571.33
999.99
-16,786.73 -28,272.51 -22,224.54
1.68
FSupp2R
39.33
0.00
5,459.71
2,901.69
999.99
-17,241.37 -28,234.91 -22,025.58
1.64
Sp3.010
40.70
0.00
7,041.89
4,296.39
999.99
-12,525.11 -24,376.93 -18,930.78
1.95
Sp3.020
42.40
1,146.71
9,471.22
6,422.68
8.72
-8,527.92 -19,103.24 -14,472.75
2.24
Sp3.030
44.10
4,073.46 11,377.68
8,157.39
2.95
-5,480.39 -14,385.86 -10,431.09
2.62
Sp3.040
45.80
6,847.97 13,415.23
9,400.52
1.96
-3,022.69 -9,699.96
-6,943.14
3.39
Sp3.050
47.50
8,573.40 14,203.78
10,089.96
1.66
-1,646.71 -6,489.66
-4,074.08
4.16
Sp3.060
49.20
9,332.16 14,230.40
10,097.71
1.52
-648.28 -4,311.52
-1,978.24
7.02
Sp3.070
50.90
8,897.05 13,731.10
9,735.12
1.54
0.00 -3,743.36
-1,417.63
999.99
Sp3.080
52.60
7,374.51 12,597.20
8,948.49
1.71
0.00 -4,532.52
-2,252.93
999.99
Sp3.090
54.30
4,445.75 10,781.19
7,623.90
2.43
0.00 -5,926.44
-3,656.84
999.99
Sp3.100
56.00
0.00
7,725.18
5,613.63
999.99
-2.69 -8,623.07
-5,687.43
999.99
***** End of Report *****
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Bentley Exton Office

| Sheet
1 of
2
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Combined Flexure Check - Box Girder (Strain Compatibility)
Stage Final: Strength I
POI
Location
Mu-Max Phi*Mn-Pos
1.2*M-Cr
Cap/Mu
Mu-Min Phi*Mn-Neg
(m)
(kN-m)
(kN-m)
(kN-m)
-------- -------- ---------- ---------- --------------Sp1.000
0.00
0.00
7,725.18
5,613.63
999.99
0.00 -8,623.07
-5,687.43
999.99
Sp1.010
1.70
4,439.68 10,781.26
7,623.90
2.43
0.00 -5,926.39
-3,656.84
999.99
Sp1.020
3.40
7,360.69 12,597.26
8,948.49
1.71
0.00 -4,532.48
-2,252.93
999.99
Sp1.030
5.10
8,874.89 13,731.13
9,735.12
1.55
0.00 -3,743.34
-1,417.63
999.99
Sp1.040
6.80
9,300.40 14,230.41
10,097.74
1.53
-647.81 -4,311.58
-1,978.27
7.03
Sp1.050
8.50
8,533.03 14,203.77
10,090.00
1.66
-1,646.80 -6,489.75
-4,074.12
4.16
Sp1.060
10.20
6,798.99 13,415.20
9,400.55
1.97
-3,023.33 -9,700.09
-6,943.18
3.39
Sp1.070
11.90
4,015.86 11,377.63
8,157.43
2.99
-5,457.63 -14,386.00 -10,431.13
2.64
Sp1.080
13.60
1,080.50
9,471.13
6,422.72
9.25
-8,502.31 -19,103.42 -14,472.80
2.25
Sp1.090
15.30
0.00
7,041.81
4,296.43
999.99
-12,496.62 -24,377.12 -18,930.83
1.95
FSupp1L
16.67
0.00
5,459.71
2,901.69
999.99
-17,221.05 -28,234.91 -22,025.58
1.64
FSupp1R
17.33
0.00
5,448.44
2,571.33
999.99
-16,790.21 -28,272.51 -22,224.54
1.68
Sp2.010
19.20
0.00
7,479.15
4,260.03
999.99
-9,699.61 -23,130.58 -18,273.39
2.38
Sp2.020
21.40
2,714.91 10,281.85
6,730.33
4.00
-5,039.73 -16,699.17 -12,822.03
3.31
Sp2.030
23.60
6,073.45 13,001.73
8,619.36
2.14
-1,981.49 -10,458.15
-8,019.39
5.57
Sp2.040
25.80
8,612.32 14,139.65
9,605.44
1.64
-480.30 -6,175.32
-4,231.71
13.57
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Output

Tutorial Three / T3-35

T3-36 / Tutorial Three

***** End of Report *****


Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Bentley Exton Office

| Sheet
1 of
2
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Combined Shear/Moment Interaction - Box Girder
Stage Final: Strength 1 (Final w/o Sway)
POI
Location
Vu-Max
Conc Mom
As*fy
As*fy
Pr'd/Req
Vu-Min
Provided Required
(m)
(kN)
(kN-m)
(kN)
(kN)
-------- -------- --------- ---------- --------- --------- --------Sp1.000
0.00
-287.18
0.00
4,814.76
0.00
999.99
-3,081.21
0.00
4,814.76
839.12
5.74
Sp1.010
1.70
-89.11
386.21
4,814.76
0.00
999.99
-2,446.64
4,386.09
4,814.76
0.00
999.99
Sp1.020
3.40
181.64
4,710.55
4,814.76
0.00
999.99
-1,841.82
7,169.48
4,814.76
0.00
999.99
Sp1.030
5.10
609.86
6,066.42
4,814.76
0.00
999.99
-1,270.26
8,519.84
4,814.76
0.00
999.99
Sp1.040
6.80
1,077.84
7,202.42
4,814.76
0.00
999.99
-772.84
7,882.84
4,814.76
0.00
999.99
Sp1.050
8.50
1,644.43
6,569.85
4,814.76
0.00
999.99
-326.40
7,023.20
4,814.76
0.00
999.99
Sp1.060
10.20
2,273.67
4,962.56
4,814.76
0.00
999.99
75.03
5,655.08
4,814.76
0.00
999.99
Sp1.070
11.90
2,920.44
2,060.07
4,814.76 3,506.87
1.37
472.42
3,590.08
4,814.76 4,661.50
1.03
Sp1.080
13.60
3,577.80 -2,085.77
6,565.58
0.00
999.99
868.10
886.27
4,814.76
0.00
999.99
Sp1.090
15.30
4,245.41 -7,429.85
6,565.58
0.00
999.99
1,226.63 -1,835.93
6,565.58
0.00
999.99
Sp1.100
17.00
4,922.95 -13,874.16
6,565.58
0.00
999.99
1,541.78 -4,250.75
6,565.58
0.00
999.99
Sp2.000
17.00 -1,328.19 -3,916.98
6,565.58
0.00
999.99
-4,920.63 -13,677.15
6,565.58
0.00
999.99
Sp2.010
19.20
-923.00 -1,383.96
6,565.58
0.00
999.99
-4,055.17 -5,601.45
6,565.58
0.00
999.99
Sp2.020
21.40
-542.32
390.11
4,814.76
0.00
999.99
-3,219.36
574.84
4,814.76
487.76
9.87
Sp2.030
23.60
-87.47
5,135.95
4,814.76
0.00
999.99
-2,419.70
4,870.50
4,814.76
0.00
999.99
Sp2.040
25.80
427.41
6,728.06
4,814.76
0.00
999.99
-1,669.06
7,347.05
4,814.76
0.00
999.99
Spec: AASHTO LRFD

LEAP CONBOX v.10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
2 of
2
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Sp2.050
28.00
9,425.81 14,446.78
9,764.02
1.53
0.00 -3,298.03
-1,402.63
999.99
Sp2.060
30.20
8,625.91 14,139.64
9,605.48
1.64
-481.20 -6,175.42
-4,231.75
13.55
Sp2.070
32.40
6,069.41 13,001.69
8,619.39
2.14
-1,982.82 -10,458.28
-8,019.43
5.57
Sp2.080
34.60
2,714.27 10,281.77
6,730.37
4.00
-5,037.43 -16,699.34 -12,822.08
3.32
Sp2.090
36.80
0.00
7,479.07
4,260.07
999.99
-9,702.78 -23,130.76 -18,273.43
2.38
FSupp2L
38.67
0.00
5,448.44
2,571.33
999.99
-16,781.43 -28,272.51 -22,224.54
1.68
FSupp2R
39.33
0.00
5,459.71
2,901.69
999.99
-17,208.23 -28,234.91 -22,025.58
1.64
Sp3.010
40.70
0.00
7,041.89
4,296.39
999.99
-12,494.69 -24,376.93 -18,930.78
1.95
Sp3.020
42.40
1,079.11
9,471.22
6,422.68
9.26
-8,500.89 -19,103.24 -14,472.75
2.25
Sp3.030
44.10
4,014.31 11,377.68
8,157.39
2.99
-5,456.73 -14,385.86 -10,431.09
2.64
Sp3.040
45.80
6,797.27 13,415.23
9,400.52
1.97
-3,002.41 -9,699.96
-6,943.14
3.41
Sp3.050
47.50
8,531.15 14,203.78
10,089.96
1.66
-1,629.81 -6,489.66
-4,074.08
4.20
Sp3.060
49.20
9,298.36 14,230.40
10,097.71
1.53
-634.76 -4,311.52
-1,978.24
7.17
Sp3.070
50.90
8,871.70 13,731.10
9,735.12
1.55
0.00 -3,743.36
-1,417.63
999.99
Sp3.080
52.60
7,357.61 12,597.20
8,948.49
1.71
0.00 -4,532.52
-2,252.93
999.99
Sp3.090
54.30
4,437.30 10,781.19
7,623.90
2.43
0.00 -5,926.44
-3,656.84
999.99
Sp3.100
56.00
0.00
7,725.18
5,613.63
999.99
-2.69 -8,623.07
-5,687.43
999.99

Units: SI (Metric)

Loss: LRFD-2005

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
2 of
2
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Sp2.050
28.00
981.30
8,117.56
4,814.76
0.00
999.99
-981.40
8,117.56
4,814.76
0.00
999.99
Sp2.060
30.20
1,669.79
7,346.84
4,814.76
0.00
999.99
-426.13
6,727.85
4,814.76
0.00
999.99
Sp2.070
32.40
2,419.91
4,870.08
4,814.76
0.00
999.99
87.57
5,135.53
4,814.76
0.00
999.99
Sp2.080
34.60
3,219.54
574.20
4,814.76
486.38
9.90
542.52
389.44
4,814.76
0.00
999.99
Sp2.090
36.80
4,055.32 -5,602.30
6,565.58
0.00
999.99
923.19 -1,384.89
6,565.58
0.00
999.99
Sp2.100
39.00
4,919.99 -13,678.21
6,565.58
0.00
999.99
1,328.38 -3,918.17
6,565.58
0.00
999.99
Sp3.000
39.00 -1,541.72 -4,251.96
6,565.58
0.00
999.99
-4,922.90 -13,875.21
6,565.58
0.00
999.99
Sp3.010
40.70 -1,226.57 -1,837.30
6,565.58
0.00
999.99
-4,245.49 -7,431.07
6,565.58
0.00
999.99
Sp3.020
42.40
-868.00
884.88
4,814.76
0.00
999.99
-3,577.72 -2,087.16
6,565.58
0.00
999.99
Sp3.030
44.10
-472.33
3,588.53
4,814.76 4,658.59
1.03
-2,920.39
2,058.52
4,814.76 3,504.00
1.37
Sp3.040
45.80
-74.94
5,653.36
4,814.76
0.00
999.99
-2,273.65
4,960.85
4,814.76
0.00
999.99
Sp3.050
47.50
328.14
7,019.86
4,814.76
0.00
999.99
-1,639.78
6,567.97
4,814.76
0.00
999.99
p3.060
49.20
773.15
7,880.79
4,814.76
0.00
999.99
-1,077.74
7,200.38
4,814.76
0.00
999.99
Sp3.070
50.90
1,270.44
8,517.63
4,814.76
0.00
999.99
-609.76
6,064.22
4,814.76
0.00
999.99
Sp3.080
52.60
1,841.99
7,167.11
4,814.76
0.00
999.99
-181.55
4,708.18
4,814.76
0.00
999.99
Sp3.090
54.30
2,447.01
4,383.56
4,814.76
0.00
999.99
91.43
385.84
4,814.76
0.00
999.99
Sp3.100
56.00
3,081.67
-2.69
6,565.58
0.00
999.99
289.49
-2.69
6,565.58
0.00
999.99
***** End of Report *****
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Bentley Exton Office

| Sheet
1 of
2
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Combined Shear/Moment Interaction - Box Girder
Stage Final: Strength I
POI
Location
Vu-Max
Conc Mom
As*fy
As*fy
Pr'd/Req
Vu-Min
Provided Required
(m)
(kN)
(kN-m)
(kN)
(kN)
-------- -------- --------- ---------- --------- --------- --------Sp1.000
0.00
-289.17
0.00
4,814.76
0.00
999.99
-3,076.23
0.00
4,814.76
831.46
5.79
Sp1.010
1.70
-91.10
389.59
4,814.76
0.00
999.99
-2,441.67
4,377.64
4,814.76
0.00
999.99
Sp1.020
3.40
179.66
4,717.31
4,814.76
0.00
999.99
-1,836.84
7,152.58
4,814.76
0.00
999.99
Sp1.030
5.10
607.87
6,076.56
4,814.76
0.00
999.99
-1,265.29
8,494.49
4,814.76
0.00
999.99
Sp1.040
6.80
1,075.85
7,215.94
4,814.76
0.00
999.99
-767.87
7,849.04
4,814.76
0.00
999.99
Sp1.050
8.50
1,642.44
6,586.75
4,814.76
0.00
999.99
-321.43
6,980.95
4,814.76
0.00
999.99
Sp1.060
10.20
2,271.68
4,982.84
4,814.76
0.00
999.99
80.01
5,604.38
4,814.76
0.00
999.99
Sp1.070
11.90
2,918.45
2,083.73
4,814.76 3,548.93
1.36
477.39
3,530.93
4,814.76 4,541.04
1.06
Sp1.080
13.60
3,575.81 -2,058.73
6,565.58
0.00
999.99
873.07
818.67
4,814.76
0.00
999.99
Sp1.090
15.30
4,243.42 -7,399.43
6,565.58
0.00
999.99
1,231.60 -1,911.98
6,565.58
0.00
999.99
Sp1.100
17.00
4,920.96 -13,840.36
6,565.58
0.00
999.99
1,546.75 -4,335.25
6,565.58
0.00
999.99
Sp2.000
17.00 -1,328.19 -3,919.10
6,565.58
0.00
999.99
-4,920.63 -13,679.27
6,565.58
0.00
999.99
Sp2.010
19.20
-923.00 -1,386.08
6,565.58
0.00
999.99
-4,055.17 -5,603.57
6,565.58
0.00
999.99
Sp2.020
21.40
-542.32
387.99
4,814.76
0.00
999.99
-3,219.36
572.72
4,814.76
482.64
9.98
Sp2.030
23.60
-87.47
5,133.83
4,814.76
0.00
999.99
-2,419.70
4,868.38
4,814.76
0.00
999.99
Sp2.040
25.80
427.41
6,725.94
4,814.76
0.00
999.99
-1,669.06
7,344.93
4,814.76
0.00
999.99
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Output

Tutorial Three / T3-37

T3-38 / Tutorial Three

***** End of Report *****


Spec: AASHTO LRFD

LEAP CONBOX v.10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
2 of
2
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Sp2.050
28.00
981.30
8,115.44
4,814.76
0.00
999.99
-981.40
8,115.44
4,814.76
0.00
999.99
Sp2.060
30.20
1,669.79
7,344.72
4,814.76
0.00
999.99
-426.13
6,725.73
4,814.76
0.00
999.99
Sp2.070
32.40
2,419.91
4,867.96
4,814.76
0.00
999.99
87.57
5,133.41
4,814.76
0.00
999.99
Sp2.080
34.60
3,219.54
572.08
4,814.76
481.27
10.00
542.52
387.32
4,814.76
0.00
999.99
Sp2.090
36.80
4,055.32 -5,604.42
6,565.58
0.00
999.99
923.19 -1,387.01
6,565.58
0.00
999.99
Sp2.100
39.00
4,919.99 -13,680.33
6,565.58
0.00
999.99
1,328.38 -3,920.29
6,565.58
0.00
999.99
Sp3.000
39.00 -1,546.69 -4,336.46
6,565.58
0.00
999.99
-4,920.91 -13,841.41
6,565.58
0.00
999.99
Sp3.010
40.70 -1,231.54 -1,913.34
6,565.58
0.00
999.99
-4,243.50 -7,400.65
6,565.58
0.00
999.99
Sp3.020
42.40
-872.97
817.28
4,814.76
0.00
999.99
-3,575.73 -2,060.12
6,565.58
0.00
999.99
Sp3.030
44.10
-477.30
3,529.38
4,814.76 4,538.13
1.06
-2,918.41
2,082.18
4,814.76 3,546.06
1.36
Sp3.040
45.80
-79.91
5,602.66
4,814.76
0.00
999.99
-2,271.67
4,981.13
4,814.76
0.00
999.99
Sp3.050
47.50
323.17
6,977.61
4,814.76
0.00
999.99
-1,637.79
6,584.87
4,814.76
0.00
999.99
Sp3.060
49.20
768.18
7,846.99
4,814.76
0.00
999.99
-1,075.76
7,213.90
4,814.76
0.00
999.99
Sp3.070
50.90
1,265.47
8,492.28
4,814.76
0.00
999.99
-607.78
6,074.36
4,814.76
0.00
999.99
Sp3.080
52.60
1,837.02
7,150.21
4,814.76
0.00
999.99
-179.56
4,714.94
4,814.76
0.00
999.99
Sp3.090
54.30
2,442.04
4,375.11
4,814.76
0.00
999.99
93.42
389.22
4,814.76
0.00
999.99
Sp3.100
56.00
3,076.70
-2.69
6,565.58
0.00
999.99
291.48
-2.69
6,565.58
0.00
999.99

Units: SI (Metric)

Loss: LRFD-2005

Bentley Exton Office

| Sheet
1 of
1
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Design Parameters - LRFD
State Specification - None
Design Requirements - Box Girder
Governing LC
Required
Provided
--------------- ------------------------------ -------------- -------------P-Jack for Tendons ( kN):
Tendon-1
Service 3 (Final w/o Sway)
29,312.15
35,640.00
f'ci (MPa)
Service 1 (Initial)
13.502
24.000
f'c (MPa)
Service 1 (Final w/o Sway)
18.918
35.000
Notes
(*): Provided is less than Required.
Loss-Type Selected: LRFD-2005
Allowable/Limiting Stress Factors
Compression
Tension
----------------------------------CCf3 / CTf2
0.60*f'c (MPa)
0.25*sqrt(f'c (MPa))
CCf1 / CTf1
0.45*f'c (MPa)
0.00*sqrt(f'c (MPa))
CCf2
0.40*f'c (MPa)
Cracking Tension, fr2
0.63*sqrt(f'c (MPa))
CCi1 / CTi1
0.60*f'ci (MPa)
0.25*sqrt(f'ci (MPa)) Max 1.38 (MPa)
Resistance Factors
PT
RC
-------- ----------Flexure
0.95
0.90
Shear
0.90
0.90
***** End of Report *****

Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
1 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Combined Detailed Moment Capacity - Box Girder
Stage Final: Strength 1 (Final w/o Sway)
POI: Sp1.000 at
0.00 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
0.001 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
230.000 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
420.475 mm
Aps
0.000 mm^2
PT Depth
460.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,841.728 MPa
k-factor(strand type)
0.280
Effective Depth
420.475 mm
Control Case
Tension
PPR
0.865
a
13.952 mm
c
17.523 mm
phi
0.900
phi-Mn
1,791.807 kN-m
c/de
0.042
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-5.687 MPa
Section Modulus
409,093,333.333 mm^3
Cracking Moment
5,613.630 kN-m
C/D Ratio
999.990
POI: Sp1.000 at
0.00 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
0.000 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
230.000 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2

Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Bentley Exton Office

| Sheet
2 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
fy
413.685 MPa
fs
------ MPa
Rebar Depth
383.887 mm
Aps
25,199.950 mm^2
PT Depth
230.999 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,497.709 MPa
k-factor(strand type)
0.280
Effective Depth
253.654 mm
Control Case
Transition
PPR
0.865
a
128.391 mm
c
161.258 mm
phi
0.950
phi-Mn
-7,974.761 kN-m
c/de
0.636
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-5.838 MPa
Section Modulus
-409,093,333.333 mm^3
Cracking Moment
-5,687.427 kN-m
C/D Ratio
999.990
POI: Sp1.010 at
1.70 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
4,448.125 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
230.000 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
420.475 mm
Aps
25,199.950 mm^2
PT Depth
285.501 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,567.175 MPa
k-factor(strand type)
0.280
Effective Depth
300.168 mm
Control Case
Transition
PPR
0.898
a
128.390 mm
c
161.257 mm
phi
0.950
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Output

Tutorial Three / T3-39

LEAP CONBOX v.10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
5 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,861.585 MPa
k-factor(strand type)
0.280
Effective Depth
383.887 mm
Control Case
Tension
PPR
0.898
a
19.025 mm
c
23.895 mm
phi
0.900
phi-Mn
-2,212.188 kN-m
c/de
0.062
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
1.158 MPa
Section Modulus
-409,093,333.333 mm^3
Cracking Moment
-2,252.934 kN-m
C/D Ratio
999.990
POI: Sp1.030 at
5.10 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
8,900.240 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
230.000 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
420.475 mm
Aps
25,199.950 mm^2
PT Depth
350.500 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,615.219 MPa
k-factor(strand type)
0.280
Effective Depth
357.902 mm
Control Case
Transition
PPR
0.898
a
131.899 mm
c
165.663 mm
phi
0.950
phi-Mn
12,624.702 kN-m
c/de
0.463

Bentley Exton Office

Cracking Moment:

Spec: AASHTO LRFD

Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

| Sheet
6 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-14.083 MPa
Section Modulus
409,093,333.333 mm^3
Cracking Moment
9,735.118 kN-m
C/D Ratio
1.297
POI: Sp1.030 at
5.10 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-5.340 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
230.000 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
383.887 mm
Aps
0.000 mm^2
PT Depth
0.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,861.585 MPa
k-factor(strand type)
0.280
Effective Depth
383.887 mm
Control Case
Tension
PPR
0.898
a
19.025 mm
c
23.895 mm
phi
0.900
phi-Mn
-2,212.188 kN-m
c/de
0.062
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
2.860 MPa
Section Modulus
-409,093,333.333 mm^3
Cracking Moment
-1,417.625 kN-m
C/D Ratio
311.494
POI: Sp1.040 at
6.80 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
9,334.204 kN-m
f'c
35.000 MP
Location
Beam-Bot
Units: SI (Metric)

Loss: LRFD-2005

Output

T3-40 / Tutorial Three

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
7 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Beta1
0.796
Flange Thickness
241.467 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
443.409 mm
Aps
25,199.950 mm^2
PT Depth
359.333 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,620.564 MPa
k-factor(strand type)
0.280
Effective Depth
368.200 mm
Control Case
Tension
PPR
0.898
a
132.289 mm
c
166.154 mm
phi
0.950
phi-Mn
13,100.243 kN-m
c/de
0.451
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-12.914 MPa
Section Modulus
450,902,533.536 mm^3
Cracking Moment
10,097.737 kN-m
C/D Ratio
1.297
POI: Sp1.040 at
6.80 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-661.330 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
241.467 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
406.822 mm
Aps
0.000 mm^2
PT Depth
0.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,861.585 MPa
k-factor(strand type)
0.280
Effective Depth
406.822 mm

Bentley Exton Office

| Sheet
8 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Control Case
Tension
PPR
0.898
a
19.025 mm
c
23.895 mm
phi
0.900
phi-Mn
-2,347.707 kN-m
c/de
0.059
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
2.092 MPa
Section Modulus
-450,902,533.536 mm^3
Cracking Moment
-1,978.274 kN-m
C/D Ratio
2.669
POI: Sp1.050 at
8.50 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
8,575.280 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
265.834 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
492.143 mm
Aps
25,199.950 mm^2
PT Depth
353.916 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,617.314 MPa
k-factor(strand type)
0.280
Effective Depth
368.520 mm
Control Case
Tension
PPR
0.898
a
132.052 mm
c
165.856 mm
phi
0.950
phi-Mn
13,095.735 kN-m
c/de
0.450
Cracking Moment:
Location
Initial DL Moment
Rupture Modulus, fr1
Initial Stress
Section Modulus
Cracking Moment

Beam-Bot
0.000 kN-m
5.748 MPa
-9.638 MPa
546,496,055.517 mm^3
10,089.997 kN-m

Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Output

Tutorial Three / T3-41

T3-42 / Tutorial Three

Cracking Moment:
Location
Initial DL Moment
Rupture Modulus, fr1
Initial Stress
Section Modulus
Cracking Moment

LEAP CONBOX v.10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
9 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
C/D Ratio
1.298
POI: Sp1.050 at
8.50 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-1,663.696 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
265.834 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
455.555 mm
Aps
0.000 mm^2
PT Depth
0.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,861.585 MPa
k-factor(strand type)
0.280
Effective Depth
455.555 mm
Control Case
Tension
PPR
0.898
a
19.025 mm
c
23.895 mm
phi
0.900
phi-Mn
-2,635.673 kN-m
c/de
0.052

Beam-Top
0.000 kN-m
5.748 MPa
-0.465 MPa
-546,496,055.517 mm^3
-4,074.121 kN-m

C/D Ratio
1.191
POI: Sp1.060 at
10.20 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
6,849.690 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
290.200 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Bentley Exton Office

| Sheet 10 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
fy
413.685 MPa
fs
------ MPa
Rebar Depth
540.876 mm
Aps
25,199.950 mm^2
PT Depth
331.499 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,602.878 MPa
k-factor(strand type)
0.280
Effective Depth
353.799 mm
Control Case
Tension
PPR
0.898
a
130.997 mm
c
164.532 mm
phi
0.950
phi-Mn
12,381.584 kN-m
c/de
0.465
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-6.281 MPa
Section Modulus
651,272,670.239 mm^3
Cracking Moment
9,400.553 kN-m
C/D Ratio
1.359
POI: Sp1.060 at
10.20 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-3,043.608 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
290.200 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
504.288 mm
Aps
0.000 mm^2
PT Depth
0.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,861.585 MPa
k-factor(strand type)
0.280
Effective Depth
504.288 mm
Control Case
Tension
PPR
0.898
a
19.025 mm
c
23.895 mm
phi
0.900
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 11 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
phi-Mn
-2,923.639 kN-m
c/de
0.047
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-3.136 MPa
Section Modulus
-651,272,670.239 mm^3
Cracking Moment
-6,943.177 kN-m
C/D Ratio
0.722
POI: Sp1.070 at
11.90 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
4,075.009 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
314.567 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
589.609 mm
Aps
0.000 mm^2
PT Depth
629.134 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,847.066 MPa
k-factor(strand type)
0.280
Effective Depth
589.609 mm
Control Case
Tension
PPR
0.898
a
13.952 mm
c
17.523 mm
phi
0.900
phi-Mn
2,524.713 kN-m
c/de
0.030
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-3.136 MPa
Section Modulus
765,232,377.701 mm^3
Cracking Moment
8,157.431 kN-m
C/D Ratio
0.466
POI: Sp1.070 at
11.90 m - Case: LRFD

Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Bentley Exton Office

| Sheet 12 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Item
Negative
------------------------ ---------Mu-Required
-5,481.293 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
314.567 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
553.022 mm
Aps
25,199.950 mm^2
PT Depth
333.802 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,595.735 MPa
k-factor(strand type)
0.280
Effective Depth
364.570 mm
Control Case
Tension
PPR
0.865
a
135.549 mm
c
170.249 mm
phi
0.950
phi-Mn
-13,189.346 kN-m
c/de
0.467
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-5.612 MPa
Section Modulus
-765,232,377.701 mm^3
Cracking Moment
-10,431.134 kN-m
C/D Ratio
1.809
POI: Sp1.080 at
13.60 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
1,148.095 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
338.934 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
638.343 mm
Aps
0.000 mm^2
PT Depth
677.868 mm
Spec: AASHTO LRFD
Units: SI (Metric)
Loss: LRFD-2005

Output

Tutorial Three / T3-43

T3-44 / Tutorial Three

LEAP CONBOX v.10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 13 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,848.110 MPa
k-factor(strand type)
0.280
Effective Depth
638.343 mm
Control Case
Tension
PPR
0.865
a
13.952 mm
c
17.523 mm
phi
0.900
phi-Mn
2,735.888 kN-m
c/de
0.027
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-0.277 MPa
Section Modulus
888,375,177.904 mm^3
Cracking Moment
6,422.719 kN-m
C/D Ratio
1.792
POI: Sp1.080 at
13.60 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-8,529.346 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
338.934 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
601.755 mm
Aps
25,199.950 mm^2
PT Depth
432.202 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,650.233 MPa
k-factor(strand type)
0.280
Effective Depth
455.321 mm
Control Case
Tension
PPR
0.865
a
139.529 mm
c
175.247 mm
phi
0.950
phi-Mn
-17,636.828 kN-m
c/de
0.385
Cracking Moment:
Location
Beam-Top
Spec: AASHTO LRFD
Units: SI (Metric)
Loss: LRFD-2005

Bentley Exton Office

| Sheet 14 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-7.828 MPa
Section Modulus
-888,375,177.904 mm^3
Cracking Moment
-14,472.799 kN-m
C/D Ratio
1.555
POI: Sp1.090 at
15.30 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
0.000 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
363.300 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
687.076 mm
Aps
0.000 mm^2
PT Depth
726.601 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,849.014 MPa
k-factor(strand type)
0.280
Effective Depth
687.076 mm
Control Case
Tension
PPR
0.865
a
13.952 mm
c
17.523 mm
phi
0.900
phi-Mn
2,947.063 kN-m
c/de
0.026
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
2.240 MPa
Section Modulus
1,020,701,070.848 mm^3
Cracking Moment
4,296.431 kN-m
C/D Ratio
999.990
POI: Sp1.090 at
15.30 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-12,527.042 kN-m
f'c
35.000 MPa
Spec: AASHTO LRFD
Units: SI (Metric)
Loss: LRFD-2005

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 15 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Beta1
0.796
Flange Thickness
363.300 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
650.488 mm
Aps
25,199.950 mm^2
PT Depth
543.352 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,689.972 MPa
k-factor(strand type)
0.280
Effective Depth
557.663 mm
Control Case
Tension
PPR
0.865
a
142.431 mm
c
178.892 mm
phi
0.950
phi-Mn
-22,714.734 kN-m
c/de
0.321
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-9.708 MPa
Section Modulus
-1,020,701,070.848 mm^3
Cracking Moment
-18,930.828 kN-m
C/D Ratio
1.363
POI: Sp1.100 at
17.00 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
0.000 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
380.500 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
721.475 mm
Aps
0.000 mm^2
PT Depth
761.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,849.582 MPa
k-factor(strand type)
0.280
Effective Depth
721.475 mm
Spec: AASHTO LRFD
Units: SI (Metric)
Loss: LRFD-2005

Bentley Exton Office

| Sheet 16 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Control Case
Tension
PPR
0.865
a
13.952 mm
c
17.523 mm
phi
0.900
phi-Mn
3,096.124 kN-m
c/de
0.024
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
3.999 MPa
Section Modulus
1,119,633,933.333 mm^3
Cracking Moment
2,349.211 kN-m
C/D Ratio
999.990
POI: Sp1.100 at
17.00 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-18,463.186 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
380.500 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
684.887 mm
Aps
25,199.950 mm^2
PT Depth
635.999 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,713.223 MPa
k-factor(strand type)
0.280
Effective Depth
642.452 mm
Control Case
Tension
PPR
0.865
a
144.128 mm
c
181.024 mm
phi
0.950
phi-Mn
-26,951.853 kN-m
c/de
0.282
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-11.039 MPa
Section Modulus
-1,119,633,933.333 mm^3
Cracking Moment
-22,554.511 kN-m
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Output

Tutorial Three / T3-45

T3-46 / Tutorial Three

LEAP CONBOX v.10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 17 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
C/D Ratio
1.195
POI: Sp2.000 at
17.00 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
0.000 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
380.500 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
721.475 mm
Aps
0.000 mm^2
PT Depth
761.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,849.582 MPa
k-factor(strand type)
0.280
Effective Depth
721.475 mm
Control Case
Tension
PPR
0.865
a
13.952 mm
c
17.523 mm
phi
0.900
phi-Mn
3,096.124 kN-m
c/de
0.024
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
4.222 MPa
Section Modulus
1,119,633,933.333 mm^3
Cracking Moment
2,050.017 kN-m
C/D Ratio
999.990
POI: Sp2.000 at
17.00 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-18,079.891 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
380.500 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Bentley Exton Office

| Sheet 18 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
fy
413.685 MPa
fs
------ MPa
Rebar Depth
684.887 mm
Aps
25,199.950 mm^2
PT Depth
635.999 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,713.223 MPa
k-factor(strand type)
0.280
Effective Depth
642.452 mm
Control Case
Tension
PPR
0.865
a
144.128 mm
c
181.024 mm
phi
0.950
phi-Mn
-26,951.856 kN-m
c/de
0.282
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-11.147 MPa
Section Modulus
-1,119,633,933.333 mm^3
Cracking Moment
-22,698.495 kN-m
C/D Ratio
1.187
POI: Sp2.010 at
19.20 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
0.000 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
356.133 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
672.741 mm
Aps
0.000 mm^2
PT Depth
712.266 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,848.761 MPa
k-factor(strand type)
0.280
Effective Depth
672.741 mm
Control Case
Tension
PPR
0.865
a
13.952 mm
c
17.523 mm
phi
0.900
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 19 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
phi-Mn
2,884.946 kN-m
c/de
0.026
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
2.128 MPa
Section Modulus
980,823,615.507 mm^3
Cracking Moment
4,260.025 kN-m
C/D Ratio
999.990
POI: Sp2.010 at
19.20 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-9,704.908 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
356.133 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
636.153 mm
Aps
25,199.950 mm^2
PT Depth
517.265 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,682.049 MPa
k-factor(strand type)
0.280
Effective Depth
533.210 mm
Control Case
Tension
PPR
0.865
a
141.852 mm
c
178.165 mm
phi
0.950
phi-Mn
-21,498.740 kN-m
c/de
0.334
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-9.778 MPa
Section Modulus
-980,823,615.507 mm^3
Cracking Moment
-18,273.386 kN-m
C/D Ratio
1.666
POI: Sp2.020 at
21.40 m - Case: LRFD
Spec: AASHTO LRFD
Units: SI (Metric)

Loss: LRFD-2005

Bentley Exton Office

| Sheet 20 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Item
Positive
------------------------ ---------Mu-Required
2,717.026 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
324.600 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
609.674 mm
Aps
0.000 mm^2
PT Depth
649.199 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,847.515 MPa
k-factor(strand type)
0.280
Effective Depth
609.674 mm
Control Case
Tension
PPR
0.865
a
13.952 mm
c
17.523 mm
phi
0.900
phi-Mn
2,611.660 kN-m
c/de
0.029
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-1.136 MPa
Section Modulus
814,821,710.654 mm^3
Cracking Moment
6,730.334 kN-m
C/D Ratio
0.723
POI: Sp2.020 at
21.40 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-5,045.032 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
324.600 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
573.087 mm
Aps
25,199.950 mm^2
PT Depth
382.198 mm
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Output

Tutorial Three / T3-47

T3-48 / Tutorial Three

LEAP CONBOX v.10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 21 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,625.656 MPa
k-factor(strand type)
0.280
Effective Depth
408.565 mm
Control Case
Tension
PPR
0.865
a
137.734 mm
c
172.993 mm
phi
0.950
phi-Mn
-15,339.229 kN-m
c/de
0.423
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-7.366 MPa
Section Modulus
-814,821,710.654 mm^3
Cracking Moment
-12,822.032 kN-m
C/D Ratio
2.286
POI: Sp2.030 at
23.60 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
6,075.573 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
293.066 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
546.607 mm
Aps
25,199.950 mm^2
PT Depth
321.334 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,595.754 MPa
k-factor(strand type)
0.280
Effective Depth
345.422 mm
Control Case
Tension
PPR
0.898
a
130.477 mm
c
163.878 mm
phi
0.950
phi-Mn
11,985.208 kN-m
c/de
0.474
Cracking Moment:
Location
Beam-Bot
Spec: AASHTO LRFD
Units: SI (Metric)
Loss: LRFD-2005

Bentley Exton Office

| Sheet 22 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-5.067 MPa
Section Modulus
664,199,102.987 mm^3
Cracking Moment
8,619.360 kN-m
C/D Ratio
1.483
POI: Sp2.030 at
23.60 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-1,986.793 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
293.066 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
510.020 mm
Aps
0.000 mm^2
PT Depth
0.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,861.585 MPa
k-factor(strand type)
0.280
Effective Depth
510.020 mm
Control Case
Tension
PPR
0.898
a
19.025 mm
c
23.895 mm
phi
0.900
phi-Mn
-2,957.507 kN-m
c/de
0.047
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-4.314 MPa
Section Modulus
-664,199,102.987 mm^3
Cracking Moment
-8,019.387 kN-m
C/D Ratio
1.119
POI: Sp2.040 at
25.80 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
8,614.444 kN-m
f'c
35.000 MPa
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 23 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Beta1
0.796
Flange Thickness
261.533 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
483.541 mm
Aps
25,199.950 mm^2
PT Depth
353.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,616.756 MPa
k-factor(strand type)
0.280
Effective Depth
366.797 mm
Control Case
Tension
PPR
0.898
a
132.011 mm
c
165.804 mm
phi
0.950
phi-Mn
13,017.970 kN-m
c/de
0.452
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-9.385 MPa
Section Modulus
528,955,792.504 mm^3
Cracking Moment
9,605.443 kN-m
C/D Ratio
1.355
POI: Sp2.040 at
25.80 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-485.600 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
261.533 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
446.953 mm
Aps
0.000 mm^2
PT Depth
0.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,861.585 MPa
k-factor(strand type)
0.280
Effective Depth
446.953 mm
Spec: AASHTO LRFD
Units: SI (Metric)
Loss: LRFD-2005

Bentley Exton Office

| Sheet 24 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Control Case
Tension
PPR
0.898
a
19.025 mm
c
23.895 mm
phi
0.900
phi-Mn
-2,584.845 kN-m
c/de
0.053
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-0.919 MPa
Section Modulus
-528,955,792.504 mm^3
Cracking Moment
-4,231.706 kN-m
C/D Ratio
4.002
POI: Sp2.050 at
28.00 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
9,427.932 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
230.000 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
420.476 mm
Aps
25,199.950 mm^2
PT Depth
366.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,624.447 MPa
k-factor(strand type)
0.280
Effective Depth
371.733 mm
Control Case
Transition
PPR
0.898
a
132.572 mm
c
166.510 mm
phi
0.950
phi-Mn
13,275.694 kN-m
c/de
0.448
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-14.142 MPa
Section Modulus
409,094,887.463 mm^3
Cracking Moment
9,764.024 kN-m
Spec: AASHTO LRFD
Units: SI (Metric)
Loss: LRFD-2005

Output

Tutorial Three / T3-49

T3-50 / Tutorial Three

LEAP CONBOX v.10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 25 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
C/D Ratio
1.360
POI: Sp2.050 at
28.00 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
0.000 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
230.000 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
383.888 mm
Aps
0.000 mm^2
PT Depth
0.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,861.585 MPa
k-factor(strand type)
0.280
Effective Depth
383.888 mm
Control Case
Tension
PPR
0.898
a
19.025 mm
c
23.895 mm
phi
0.900
phi-Mn
-2,212.193 kN-m
c/de
0.062
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
2.891 MPa
Section Modulus
-409,094,887.463 mm^3
Cracking Moment
-1,402.629 kN-m
C/D Ratio
999.990
POI: Sp2.060 at
30.20 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
8,628.027 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
261.534 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
Spec: AASHTO LRFD
Units: SI (Metric)
Loss: LRFD-2005

Bentley Exton Office


| Sheet 26 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
fy
413.685 MPa
fs
------ MPa
Rebar Depth
483.543 mm
Aps
25,199.950 mm^2
PT Depth
353.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,616.756 MPa
k-factor(strand type)
0.280
Effective Depth
366.796 mm
Control Case
Tension
PPR
0.898
a
132.011 mm
c
165.804 mm
phi
0.950
phi-Mn
13,017.953 kN-m
c/de
0.452
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-9.385 MPa
Section Modulus
528,959,326.906 mm^3
Cracking Moment
9,605.475 kN-m
C/D Ratio
1.355
POI: Sp2.060 at
30.20 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-486.496 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
261.534 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
446.955 mm
Aps
0.000 mm^2
PT Depth
0.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,861.585 MPa
k-factor(strand type)
0.280
Effective Depth
446.955 mm
Control Case
Tension
PPR
0.898
a
19.025 mm
c
23.895 mm
phi
0.900
Spec: AASHTO LRFD
Units: SI (Metric)
Loss: LRFD-2005

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Bentley Exton Office

| Sheet 27 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
phi-Mn
-2,584.855 kN-m
c/de
0.053
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-0.919 MPa
Section Modulus
-528,959,326.906 mm^3
Cracking Moment
-4,231.745 kN-m
C/D Ratio
3.995
POI: Sp2.070 at
32.40 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
6,071.533 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
293.067 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
546.609 mm
Aps
25,199.950 mm^2
PT Depth
321.333 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,595.753 MPa
k-factor(strand type)
0.280
Effective Depth
345.421 mm
Control Case
Tension
PPR
0.898
a
130.477 mm
c
163.878 mm
phi
0.950
phi-Mn
11,985.176 kN-m
c/de
0.474
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-5.066 MPa
Section Modulus
664,203,063.535 mm^3
Cracking Moment
8,619.395 kN-m
C/D Ratio
1.484
POI: Sp2.070 at
32.40 m - Case: LRFD
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

| Sheet 28 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Item
Negative
------------------------ ---------Mu-Required
-1,988.117 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
293.067 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
510.022 mm
Aps
0.000 mm^2
PT Depth
0.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,861.585 MPa
k-factor(strand type)
0.280
Effective Depth
510.022 mm
Control Case
Tension
PPR
0.898
a
19.025 mm
c
23.895 mm
phi
0.900
phi-Mn
-2,957.517 kN-m
c/de
0.047
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-4.314 MPa
Section Modulus
-664,203,063.535 mm^3
Cracking Moment
-8,019.429 kN-m
C/D Ratio
1.118
POI: Sp2.080 at
34.60 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
2,716.391 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
324.600 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
609.676 mm
Aps
0.000 mm^2
PT Depth
649.201 mm
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Output

Tutorial Three / T3-51

T3-52 / Tutorial Three

LEAP CONBOX v.10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 29 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,847.515 MPa
k-factor(strand type)
0.280
Effective Depth
609.676 mm
Control Case
Tension
PPR
0.898
a
13.952 mm
c
17.523 mm
phi
0.900
phi-Mn
2,611.668 kN-m
c/de
0.029
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-1.136 MPa
Section Modulus
814,826,097.349 mm^3
Cracking Moment
6,730.372 kN-m
C/D Ratio
0.723
POI: Sp2.080 at
34.60 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-5,042.729 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
324.600 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
573.088 mm
Aps
25,199.950 mm^2
PT Depth
382.202 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,625.658 MPa
k-factor(strand type)
0.280
Effective Depth
408.569 mm
Control Case
Tension
PPR
0.865
a
137.734 mm
c
172.993 mm
phi
0.950
phi-Mn
-15,339.394 kN-m
c/de
0.423
Cracking Moment:
Location
Beam-Top
Spec: AASHTO LRFD
Units: SI (Metric)
Loss: LRFD-2005

Bentley Exton Office

| Sheet 30 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-7.366 MPa
Section Modulus
-814,826,097.349 mm^3
Cracking Moment
-12,822.077 kN-m
C/D Ratio
2.287
POI: Sp2.090 at
36.80 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
0.000 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
356.134 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
672.743 mm
Aps
0.000 mm^2
PT Depth
712.268 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,848.761 MPa
k-factor(strand type)
0.280
Effective Depth
672.743 mm
Control Case
Tension
PPR
0.865
a
13.952 mm
c
17.523 mm
phi
0.900
phi-Mn
2,884.953 kN-m
c/de
0.026
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
2.128 MPa
Section Modulus
980,828,428.348 mm^3
Cracking Moment
4,260.065 kN-m
C/D Ratio
999.990
POI: Sp2.090 at
36.80 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-9,708.080 kN-m
f'c
35.000 MPa
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 31 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Beta1
0.796
Flange Thickness
356.134 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
636.155 mm
Aps
25,199.950 mm^2
PT Depth
517.269 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,682.050 MPa
k-factor(strand type)
0.280
Effective Depth
533.214 mm
Control Case
Tension
PPR
0.865
a
141.852 mm
c
178.165 mm
phi
0.950
phi-Mn
-21,498.911 kN-m
c/de
0.334
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-9.778 MPa
Section Modulus
-980,828,428.348 mm^3
Cracking Moment
-18,273.434 kN-m
C/D Ratio
1.665
POI: Sp2.100 at
39.00 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
0.000 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
380.500 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
721.475 mm
Aps
0.000 mm^2
PT Depth
761.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,849.582 MPa
k-factor(strand type)
0.280
Effective Depth
721.475 mm
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Bentley Exton Office

| Sheet 32 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Control Case
Tension
PPR
0.865
a
13.952 mm
c
17.523 mm
phi
0.900
phi-Mn
3,096.124 kN-m
c/de
0.024
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
4.222 MPa
Section Modulus
1,119,633,933.333 mm^3
Cracking Moment
2,050.016 kN-m
C/D Ratio
999.990
POI: Sp2.100 at
39.00 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-18,059.972 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
380.500 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
684.887 mm
Aps
25,199.950 mm^2
PT Depth
635.999 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,713.223 MPa
k-factor(strand type)
0.280
Effective Depth
642.452 mm
Control Case
Tension
PPR
0.865
a
144.128 mm
c
181.024 mm
phi
0.950
phi-Mn
-26,951.856 kN-m
c/de
0.282
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-11.147 MPa
Section Modulus
-1,119,633,933.333 mm^3
Cracking Moment
-22,698.496 kN-m
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Output

Tutorial Three / T3-53

T3-54 / Tutorial Three

LEAP CONBOX v.10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 33 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
C/D Ratio
1.187
POI: Sp3.000 at
39.00 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
0.000 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
380.500 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
721.475 mm
Aps
0.000 mm^2
PT Depth
761.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,849.582 MPa
k-factor(strand type)
0.280
Effective Depth
721.475 mm
Control Case
Tension
PPR
0.865
a
13.952 mm
c
17.523 mm
phi
0.900
phi-Mn
3,096.124 kN-m
c/de
0.024
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
3.999 MPa
Section Modulus
1,119,633,933.333 mm^3
Cracking Moment
2,349.211 kN-m
C/D Ratio
999.990
POI: Sp3.000 at
39.00 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-18,444.282 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
380.500 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Bentley Exton Office

| Sheet 34 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
fy
413.685 MPa
fs
------ MPa
Rebar Depth
684.887 mm
Aps
25,199.950 mm^2
PT Depth
635.999 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,713.223 MPa
k-factor(strand type)
0.280
Effective Depth
642.452 mm
Control Case
Tension
PPR
0.865
a
144.128 mm
c
181.024 mm
phi
0.950
phi-Mn
-26,951.853 kN-m
c/de
0.282
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-11.039 MPa
Section Modulus
-1,119,633,933.333 mm^3
Cracking Moment
-22,554.512 kN-m
C/D Ratio
1.195
POI: Sp3.010 at
40.70 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
0.000 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
363.300 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
687.074 mm
Aps
0.000 mm^2
PT Depth
726.599 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,849.014 MPa
k-factor(strand type)
0.280
Effective Depth
687.074 mm
Control Case
Tension
PPR
0.865
a
13.952 mm
c
17.523 mm
phi
0.900
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 35 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
phi-Mn
2,947.056 kN-m
c/de
0.026
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
2.240 MPa
Section Modulus
1,020,696,161.155 mm^3
Cracking Moment
4,296.389 kN-m
C/D Ratio
999.990
POI: Sp3.010 at
40.70 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-12,525.106 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
363.300 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
650.487 mm
Aps
25,199.950 mm^2
PT Depth
543.348 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,689.971 MPa
k-factor(strand type)
0.280
Effective Depth
557.659 mm
Control Case
Tension
PPR
0.865
a
142.430 mm
c
178.891 mm
phi
0.950
phi-Mn
-22,714.548 kN-m
c/de
0.321
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-9.708 MPa
Section Modulus
-1,020,696,161.155 mm^3
Cracking Moment
-18,930.780 kN-m
C/D Ratio
1.364
POI: Sp3.020 at
42.40 m - Case: LRFD
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Bentley Exton Office

| Sheet 36 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Item
Positive
------------------------ ---------Mu-Required
1,146.708 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
338.933 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
638.341 mm
Aps
0.000 mm^2
PT Depth
677.866 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,848.110 MPa
k-factor(strand type)
0.280
Effective Depth
638.341 mm
Control Case
Tension
PPR
0.865
a
13.952 mm
c
17.523 mm
phi
0.900
phi-Mn
2,735.881 kN-m
c/de
0.027
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-0.277 MPa
Section Modulus
888,370,597.506 mm^3
Cracking Moment
6,422.679 kN-m
C/D Ratio
1.794
POI: Sp3.020 at
42.40 m - Case: LRFD
Item
-----------------------Mu-Required
f'c
Beta1
Flange Thickness
Flange Width
Web Thickness
As
fy
fs
Rebar Depth
Aps
PT Depth

Negative
----------8,527.925
35.000
0.796
338.933
11,600.000
11,600.000
15,870.936
413.685
-----601.753
25,199.950
432.198

Spec: AASHTO LRFD

Units: SI (Metric)

kN-m
MPa
mm
mm
mm
mm^2
MPa
MPa
mm
mm^2
mm
Loss: LRFD-2005

Output

Tutorial Three / T3-55

T3-56 / Tutorial Three

LEAP CONBOX v.10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 37 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,650.232 MPa
k-factor(strand type)
0.280
Effective Depth
455.317 mm
Control Case
Tension
PPR
0.865
a
139.529 mm
c
175.247 mm
phi
0.950
phi-Mn
-17,636.649 kN-m
c/de
0.385
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-7.828 MPa
Section Modulus
-888,370,597.506 mm^3
Cracking Moment
-14,472.754 kN-m
C/D Ratio
1.555
POI: Sp3.030 at
44.10 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
4,073.458 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
314.566 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
589.607 mm
Aps
0.000 mm^2
PT Depth
629.132 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,847.066 MPa
k-factor(strand type)
0.280
Effective Depth
589.607 mm
Control Case
Tension
PPR
0.865
a
13.952 mm
c
17.523 mm
phi
0.900
phi-Mn
2,524.706 kN-m
c/de
0.030
Cracking Moment:
Location
Beam-Bot
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Bentley Exton Office

| Sheet 38 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-3.136 MPa
Section Modulus
765,228,126.598 mm^3
Cracking Moment
8,157.393 kN-m
C/D Ratio
0.466
POI: Sp3.030 at
44.10 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-5,480.387 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
314.566 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
553.020 mm
Aps
25,199.950 mm^2
PT Depth
333.798 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,595.733 MPa
k-factor(strand type)
0.280
Effective Depth
364.568 mm
Control Case
Tension
PPR
0.865
a
135.549 mm
c
170.248 mm
phi
0.950
phi-Mn
-13,189.203 kN-m
c/de
0.467
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-5.612 MPa
Section Modulus
-765,228,126.598 mm^3
Cracking Moment
-10,431.091 kN-m
C/D Ratio
1.809
POI: Sp3.040 at
45.80 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
6,847.975 kN-m
f'c
35.000 MPa
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 39 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Beta1
0.796
Flange Thickness
290.200 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
540.874 mm
Aps
25,199.950 mm^2
PT Depth
331.501 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,602.879 MPa
k-factor(strand type)
0.280
Effective Depth
353.800 mm
Control Case
Tension
PPR
0.898
a
130.997 mm
c
164.532 mm
phi
0.950
phi-Mn
12,381.621 kN-m
c/de
0.465
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-6.281 MPa
Section Modulus
651,268,748.431 mm^3
Cracking Moment
9,400.517 kN-m
C/D Ratio
1.359
POI: Sp3.040 at
45.80 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-3,022.686 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
290.200 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
504.287 mm
Aps
0.000 mm^2
PT Depth
0.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,861.585 MPa
k-factor(strand type)
0.280
Effective Depth
504.287 mm

Bentley Exton Office

Spec: AASHTO LRFD

Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

| Sheet 39 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Beta1
0.796
Flange Thickness
290.200 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
540.874 mm
Aps
25,199.950 mm^2
PT Depth
331.501 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,602.879 MPa
k-factor(strand type)
0.280
Effective Depth
353.800 mm
Control Case
Tension
PPR
0.898
a
130.997 mm
c
164.532 mm
phi
0.950
phi-Mn
12,381.621 kN-m
c/de
0.465
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-6.281 MPa
Section Modulus
651,268,748.431 mm^3
Cracking Moment
9,400.517 kN-m
C/D Ratio
1.359
POI: Sp3.040 at
45.80 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-3,022.686 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
290.200 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
504.287 mm
Aps
0.000 mm^2
PT Depth
0.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,861.585 MPa
k-factor(strand type)
0.280
Effective Depth
504.287 mm
Units: SI (Metric)

Loss: LRFD-2005

Output

Tutorial Three / T3-57

T3-58 / Tutorial Three

LEAP CONBOX v.10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 39 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Beta1
0.796
Flange Thickness
290.200 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
540.874 mm
Aps
25,199.950 mm^2
PT Depth
331.501 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,602.879 MPa
k-factor(strand type)
0.280
Effective Depth
353.800 mm
Control Case
Tension
PPR
0.898
a
130.997 mm
c
164.532 mm
phi
0.950
phi-Mn
12,381.621 kN-m
c/de
0.465
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-6.281 MPa
Section Modulus
651,268,748.431 mm^3
Cracking Moment
9,400.517 kN-m
C/D Ratio
1.359
POI: Sp3.040 at
45.80 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-3,022.686 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
290.200 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
504.287 mm
Aps
0.000 mm^2
PT Depth
0.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,861.585 MPa
k-factor(strand type)
0.280
Effective Depth
504.287 mm

Bentley Exton Office

Spec: AASHTO LRFD

Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

| Sheet 42 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
fy
413.685 MPa
fs
------ MPa
Rebar Depth
443.407 mm
Aps
25,199.950 mm^2
PT Depth
359.333 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,620.564 MPa
k-factor(strand type)
0.280
Effective Depth
368.200 mm
Control Case
Tension
PPR
0.898
a
132.289 mm
c
166.154 mm
phi
0.950
phi-Mn
13,100.230 kN-m
c/de
0.451
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-12.914 MPa
Section Modulus
450,899,270.318 mm^3
Cracking Moment
10,097.706 kN-m
C/D Ratio
1.297
POI: Sp3.060 at
49.20 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-648.280 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
241.466 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
406.820 mm
Aps
0.000 mm^2
PT Depth
0.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,861.585 MPa
k-factor(strand type)
0.280
Effective Depth
406.820 mm
Control Case
Tension
PPR
0.898
a
19.025 mm
c
23.895 mm
phi
0.900
Units: SI (Metric)

Loss: LRFD-2005

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 43 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
phi-Mn
-2,347.696 kN-m
c/de
0.059
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
2.092 MPa
Section Modulus
-450,899,270.318 mm^3
Cracking Moment
-1,978.238 kN-m
C/D Ratio
2.723
POI: Sp3.070 at
50.90 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
8,897.049 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
230.000 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
420.475 mm
Aps
25,199.950 mm^2
PT Depth
350.500 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,615.219 MPa
k-factor(strand type)
0.280
Effective Depth
357.901 mm
Control Case
Transition
PPR
0.898
a
131.899 mm
c
165.663 mm
phi
0.950
phi-Mn
12,624.680 kN-m
c/de
0.463
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-14.083 MPa
Section Modulus
409,093,333.333 mm^3
Cracking Moment
9,735.118 kN-m
C/D Ratio
1.297
POI: Sp3.070 at
50.90 m - Case: LRFD
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Bentley Exton Office

| Sheet 44 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Item
Negative
------------------------ ---------Mu-Required
0.000 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
230.000 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
383.887 mm
Aps
0.000 mm^2
PT Depth
0.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,861.585 MPa
k-factor(strand type)
0.280
Effective Depth
383.887 mm
Control Case
Tension
PPR
0.898
a
19.025 mm
c
23.895 mm
phi
0.900
phi-Mn
-2,212.188 kN-m
c/de
0.062
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
2.860 MPa
Section Modulus
-409,093,333.333 mm^3
Cracking Moment
-1,417.625 kN-m
C/D Ratio
999.990
POI: Sp3.080 at
52.60 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
7,374.507 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
230.000 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
420.475 mm
Aps
25,199.950 mm^2
PT Depth
325.499 mm
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Output

Tutorial Three / T3-59

T3-60 / Tutorial Three

LEAP CONBOX v.10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 44 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Item
Negative
------------------------ ---------Mu-Required
0.000 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
230.000 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
383.887 mm
Aps
0.000 mm^2
PT Depth
0.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,861.585 MPa
k-factor(strand type)
0.280
Effective Depth
383.887 mm
Control Case
Tension
PPR
0.898
a
19.025 mm
c
23.895 mm
phi
0.900
phi-Mn
-2,212.188 kN-m
c/de
0.062
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
2.860 MPa
Section Modulus
-409,093,333.333 mm^3
Cracking Moment
-1,417.625 kN-m
C/D Ratio
999.990
POI: Sp3.080 at
52.60 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
7,374.507 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
230.000 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
420.475 mm
Aps
25,199.950 mm^2
PT Depth
325.499 mm
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Bentley Exton Office

| Sheet 46 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
1.158 MPa
Section Modulus
-409,093,333.333 mm^3
Cracking Moment
-2,252.934 kN-m
C/D Ratio
999.990
POI: Sp3.090 at
54.30 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
4,445.748 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
230.000 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
420.475 mm
Aps
25,199.950 mm^2
PT Depth
285.499 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,567.173 MPa
k-factor(strand type)
0.280
Effective Depth
300.167 mm
Control Case
Transition
PPR
0.898
a
128.390 mm
c
161.257 mm
phi
0.950
phi-Mn
9,932.532 kN-m
c/de
0.537
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-9.782 MPa
Section Modulus
409,093,333.333 mm^3
Cracking Moment
7,623.900 kN-m
C/D Ratio
1.680
POI: Sp3.090 at
54.30 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
0.000 kN-m
f'c
35.000 MPa
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 46 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
1.158 MPa
Section Modulus
-409,093,333.333 mm^3
Cracking Moment
-2,252.934 kN-m
C/D Ratio
999.990
POI: Sp3.090 at
54.30 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
4,445.748 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
230.000 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
420.475 mm
Aps
25,199.950 mm^2
PT Depth
285.499 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,567.173 MPa
k-factor(strand type)
0.280
Effective Depth
300.167 mm
Control Case
Transition
PPR
0.898
a
128.390 mm
c
161.257 mm
phi
0.950
phi-Mn
9,932.532 kN-m
c/de
0.537
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-9.782 MPa
Section Modulus
409,093,333.333 mm^3
Cracking Moment
7,623.900 kN-m
C/D Ratio
1.680
POI: Sp3.090 at
54.30 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
0.000 kN-m
f'c
35.000 MPa

Bentley Exton Office

Spec: AASHTO LRFD

Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

| Sheet 46 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
1.158 MPa
Section Modulus
-409,093,333.333 mm^3
Cracking Moment
-2,252.934 kN-m
C/D Ratio
999.990
POI: Sp3.090 at
54.30 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
4,445.748 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
230.000 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
420.475 mm
Aps
25,199.950 mm^2
PT Depth
285.499 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,567.173 MPa
k-factor(strand type)
0.280
Effective Depth
300.167 mm
Control Case
Transition
PPR
0.898
a
128.390 mm
c
161.257 mm
phi
0.950
phi-Mn
9,932.532 kN-m
c/de
0.537
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-9.782 MPa
Section Modulus
409,093,333.333 mm^3
Cracking Moment
7,623.900 kN-m
C/D Ratio
1.680
POI: Sp3.090 at
54.30 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
0.000 kN-m
f'c
35.000 MPa
Units: SI (Metric)

Loss: LRFD-2005

Output

Tutorial Three / T3-61

T3-62 / Tutorial Three

LEAP CONBOX v.10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 46 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
1.158 MPa
Section Modulus
-409,093,333.333 mm^3
Cracking Moment
-2,252.934 kN-m
C/D Ratio
999.990
POI: Sp3.090 at
54.30 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
4,445.748 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
230.000 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
420.475 mm
Aps
25,199.950 mm^2
PT Depth
285.499 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,567.173 MPa
k-factor(strand type)
0.280
Effective Depth
300.167 mm
Control Case
Transition
PPR
0.898
a
128.390 mm
c
161.257 mm
phi
0.950
phi-Mn
9,932.532 kN-m
c/de
0.537
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-9.782 MPa
Section Modulus
409,093,333.333 mm^3
Cracking Moment
7,623.900 kN-m
C/D Ratio
1.680
POI: Sp3.090 at
54.30 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
0.000 kN-m
f'c
35.000 MPa
Spec: AASHTO LRFD

Units: SI (Metric)

Bentley Exton Office

| Sheet
1 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Combined Detailed Moment Capacity - Box Girder
Stage Final: Strength I
POI: Sp1.000 at
0.00 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
0.001 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
230.000 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
420.475 mm
Aps
0.000 mm^2
PT Depth
460.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,841.728 MPa
k-factor(strand type)
0.280
Effective Depth
420.475 mm
Control Case
Tension
PPR
0.865
a
13.952 mm
c
17.523 mm
phi
0.900
phi-Mn
1,791.807 kN-m
c/de
0.042
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-5.687 MPa
Section Modulus
409,093,333.333 mm^3
Cracking Moment
5,613.630 kN-m
C/D Ratio
999.990
POI: Sp1.000 at
0.00 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
0.000 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
230.000 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2

Loss: LRFD-2005
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
2 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
fy
413.685 MPa
fs
------ MPa
Rebar Depth
383.887 mm
Aps
25,199.950 mm^2
PT Depth
230.999 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,497.709 MPa
k-factor(strand type)
0.280
Effective Depth
253.654 mm
Control Case
Transition
PPR
0.865
a
128.391 mm
c
161.258 mm
phi
0.950
phi-Mn
-7,974.761 kN-m
c/de
0.636
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-5.838 MPa
Section Modulus
-409,093,333.333 mm^3
Cracking Moment
-5,687.427 kN-m
C/D Ratio
999.990
POI: Sp1.010 at
1.70 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
4,439.675 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
230.000 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
420.475 mm
Aps
25,199.950 mm^2
PT Depth
285.501 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,567.175 MPa
k-factor(strand type)
0.280
Effective Depth
300.168 mm
Control Case
Transition
PPR
0.898
a
128.390 mm
c
161.257 mm
phi
0.950
Spec: AASHTO LRFD

Units: SI (Metric)

Bentley Exton Office

| Sheet
3 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
phi-Mn
9,932.595 kN-m
c/de
0.537
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-9.782 MPa
Section Modulus
409,093,333.333 mm^3
Cracking Moment
7,623.900 kN-m
C/D Ratio
1.682
POI: Sp1.010 at
1.70 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
0.000 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
230.000 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
383.887 mm
Aps
0.000 mm^2
PT Depth
0.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,861.585 MPa
k-factor(strand type)
0.280
Effective Depth
383.887 mm
Control Case
Tension
PPR
0.898
a
19.025 mm
c
23.895 mm
phi
0.900
phi-Mn
-2,212.188 kN-m
c/de
0.062
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-1.701 MPa
Section Modulus
-409,093,333.333 mm^3
Cracking Moment
-3,656.843 kN-m
C/D Ratio
999.990
POI: Sp1.020 at
3.40 m - Case: LRFD
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Loss: LRFD-2005

Output

Tutorial Three / T3-63

T3-64 / Tutorial Three

LEAP CONBOX v.10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
4 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Item
Positive
------------------------ ---------Mu-Required
7,360.689 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
230.000 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
420.475 mm
Aps
25,199.950 mm^2
PT Depth
325.501 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,598.721 MPa
k-factor(strand type)
0.280
Effective Depth
335.639 mm
Control Case
Transition
PPR
0.898
a
130.694 mm
c
164.150 mm
phi
0.950
phi-Mn
11,581.306 kN-m
c/de
0.489
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-12.481 MPa
Section Modulus
409,093,333.333 mm^3
Cracking Moment
8,948.486 kN-m
C/D Ratio
1.294
POI: Sp1.020 at
3.40 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
0.000 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
230.000 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
383.887 mm
Aps
0.000 mm^2
PT Depth
0.000 mm

Bentley Exton Office

Spec: AASHTO LRFD

Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

| Sheet
5 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,861.585 MPa
k-factor(strand type)
0.280
Effective Depth
383.887 mm
Control Case
Tension
PPR
0.898
a
19.025 mm
c
23.895 mm
phi
0.900
phi-Mn
-2,212.188 kN-m
c/de
0.062
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
1.158 MPa
Section Modulus
-409,093,333.333 mm^3
Cracking Moment
-2,252.934 kN-m
C/D Ratio
999.990
POI: Sp1.030 at
5.10 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
8,874.890 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
230.000 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
420.475 mm
Aps
25,199.950 mm^2
PT Depth
350.500 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,615.219 MPa
k-factor(strand type)
0.280
Effective Depth
357.902 mm
Control Case
Transition
PPR
0.898
a
131.899 mm
c
165.663 mm
phi
0.950
phi-Mn
12,624.702 kN-m
c/de
0.463
Cracking Moment:
Location
Beam-Bot
Units: SI (Metric)

Loss: LRFD-2005

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
5 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,861.585 MPa
k-factor(strand type)
0.280
Effective Depth
383.887 mm
Control Case
Tension
PPR
0.898
a
19.025 mm
c
23.895 mm
phi
0.900
phi-Mn
-2,212.188 kN-m
c/de
0.062
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
1.158 MPa
Section Modulus
-409,093,333.333 mm^3
Cracking Moment
-2,252.934 kN-m
C/D Ratio
999.990
POI: Sp1.030 at
5.10 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
8,874.890 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
230.000 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
420.475 mm
Aps
25,199.950 mm^2
PT Depth
350.500 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,615.219 MPa
k-factor(strand type)
0.280
Effective Depth
357.902 mm
Control Case
Transition
PPR
0.898
a
131.899 mm
c
165.663 mm
phi
0.950
phi-Mn
12,624.702 kN-m
c/de
0.463
Cracking Moment:
Location
Beam-Bot

Bentley Exton Office

Spec: AASHTO LRFD

Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

| Sheet
7 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Beta1
0.796
Flange Thickness
241.467 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
443.409 mm
Aps
25,199.950 mm^2
PT Depth
359.333 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,620.564 MPa
k-factor(strand type)
0.280
Effective Depth
368.200 mm
Control Case
Tension
PPR
0.898
a
132.289 mm
c
166.154 mm
phi
0.950
phi-Mn
13,100.243 kN-m
c/de
0.451
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-12.914 MPa
Section Modulus
450,902,533.536 mm^3
Cracking Moment
10,097.737 kN-m
C/D Ratio
1.297
POI: Sp1.040 at
6.80 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-647.810 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
241.467 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
406.822 mm
Aps
0.000 mm^2
PT Depth
0.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,861.585 MPa
k-factor(strand type)
0.280
Effective Depth
406.822 mm
Units: SI (Metric)

Loss: LRFD-2005

Output

Tutorial Three / T3-65

T3-66 / Tutorial Three

LEAP CONBOX v.10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
7 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Beta1
0.796
Flange Thickness
241.467 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
443.409 mm
Aps
25,199.950 mm^2
PT Depth
359.333 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,620.564 MPa
k-factor(strand type)
0.280
Effective Depth
368.200 mm
Control Case
Tension
PPR
0.898
a
132.289 mm
c
166.154 mm
phi
0.950
phi-Mn
13,100.243 kN-m
c/de
0.451
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-12.914 MPa
Section Modulus
450,902,533.536 mm^3
Cracking Moment
10,097.737 kN-m
C/D Ratio
1.297
POI: Sp1.040 at
6.80 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-647.810 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
241.467 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
406.822 mm
Aps
0.000 mm^2
PT Depth
0.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,861.585 MPa
k-factor(strand type)
0.280
Effective Depth
406.822 mm

Bentley Exton Office

Spec: AASHTO LRFD

Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

| Sheet
7 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Beta1
0.796
Flange Thickness
241.467 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
443.409 mm
Aps
25,199.950 mm^2
PT Depth
359.333 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,620.564 MPa
k-factor(strand type)
0.280
Effective Depth
368.200 mm
Control Case
Tension
PPR
0.898
a
132.289 mm
c
166.154 mm
phi
0.950
phi-Mn
13,100.243 kN-m
c/de
0.451
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-12.914 MPa
Section Modulus
450,902,533.536 mm^3
Cracking Moment
10,097.737 kN-m
C/D Ratio
1.297
POI: Sp1.040 at
6.80 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-647.810 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
241.467 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
406.822 mm
Aps
0.000 mm^2
PT Depth
0.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,861.585 MPa
k-factor(strand type)
0.280
Effective Depth
406.822 mm
Units: SI (Metric)

Loss: LRFD-2005

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Bentley Exton Office

Spec: AASHTO LRFD

Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

| Sheet
7 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Beta1
0.796
Flange Thickness
241.467 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
443.409 mm
Aps
25,199.950 mm^2
PT Depth
359.333 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,620.564 MPa
k-factor(strand type)
0.280
Effective Depth
368.200 mm
Control Case
Tension
PPR
0.898
a
132.289 mm
c
166.154 mm
phi
0.950
phi-Mn
13,100.243 kN-m
c/de
0.451
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-12.914 MPa
Section Modulus
450,902,533.536 mm^3
Cracking Moment
10,097.737 kN-m
C/D Ratio
1.297
POI: Sp1.040 at
6.80 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-647.810 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
241.467 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
406.822 mm
Aps
0.000 mm^2
PT Depth
0.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,861.585 MPa
k-factor(strand type)
0.280
Effective Depth
406.822 mm
Units: SI (Metric)

Loss: LRFD-2005

Output

Tutorial Three / T3-67

| Sheet
7 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Beta1
0.796
Flange Thickness
241.467 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
443.409 mm
Aps
25,199.950 mm^2
PT Depth
359.333 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,620.564 MPa
k-factor(strand type)
0.280
Effective Depth
368.200 mm
Control Case
Tension
PPR
0.898
a
132.289 mm
c
166.154 mm
phi
0.950
phi-Mn
13,100.243 kN-m
c/de
0.451
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-12.914 MPa
Section Modulus
450,902,533.536 mm^3
Cracking Moment
10,097.737 kN-m
C/D Ratio
1.297
POI: Sp1.040 at
6.80 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-647.810 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
241.467 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
406.822 mm
Aps
0.000 mm^2
PT Depth
0.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,861.585 MPa
k-factor(strand type)
0.280
Effective Depth
406.822 mm

T3-68 / Tutorial Three

LEAP CONBOX v.10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
7 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Beta1
0.796
Flange Thickness
241.467 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
443.409 mm
Aps
25,199.950 mm^2
PT Depth
359.333 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,620.564 MPa
k-factor(strand type)
0.280
Effective Depth
368.200 mm
Control Case
Tension
PPR
0.898
a
132.289 mm
c
166.154 mm
phi
0.950
phi-Mn
13,100.243 kN-m
c/de
0.451
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-12.914 MPa
Section Modulus
450,902,533.536 mm^3
Cracking Moment
10,097.737 kN-m
C/D Ratio
1.297
POI: Sp1.040 at
6.80 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-647.810 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
241.467 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
406.822 mm
Aps
0.000 mm^2
PT Depth
0.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,861.585 MPa
k-factor(strand type)
0.280
Effective Depth
406.822 mm

Bentley Exton Office

Spec: AASHTO LRFD

Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

| Sheet
7 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Beta1
0.796
Flange Thickness
241.467 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
443.409 mm
Aps
25,199.950 mm^2
PT Depth
359.333 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,620.564 MPa
k-factor(strand type)
0.280
Effective Depth
368.200 mm
Control Case
Tension
PPR
0.898
a
132.289 mm
c
166.154 mm
phi
0.950
phi-Mn
13,100.243 kN-m
c/de
0.451
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-12.914 MPa
Section Modulus
450,902,533.536 mm^3
Cracking Moment
10,097.737 kN-m
C/D Ratio
1.297
POI: Sp1.040 at
6.80 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-647.810 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
241.467 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
406.822 mm
Aps
0.000 mm^2
PT Depth
0.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,861.585 MPa
k-factor(strand type)
0.280
Effective Depth
406.822 mm
Units: SI (Metric)

Loss: LRFD-2005

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 14 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-7.828 MPa
Section Modulus
-888,375,177.904 mm^3
Cracking Moment
-14,472.799 kN-m
C/D Ratio
1.560
POI: Sp1.090 at
15.30 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
0.000 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
363.300 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
687.076 mm
Aps
0.000 mm^2
PT Depth
726.601 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,849.014 MPa
k-factor(strand type)
0.280
Effective Depth
687.076 mm
Control Case
Tension
PPR
0.865
a
13.952 mm
c
17.523 mm
phi
0.900
phi-Mn
2,947.063 kN-m
c/de
0.026
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
2.240 MPa
Section Modulus
1,020,701,070.848 mm^3
Cracking Moment
4,296.431 kN-m
C/D Ratio
999.990
POI: Sp1.090 at
15.30 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-12,496.622 kN-m
f'c
35.000 MPa
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Bentley Exton Office

| Sheet 15 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Beta1
0.796
Flange Thickness
363.300 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
650.488 mm
Aps
25,199.950 mm^2
PT Depth
543.352 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,689.972 MPa
k-factor(strand type)
0.280
Effective Depth
557.663 mm
Control Case
Tension
PPR
0.865
a
142.431 mm
c
178.892 mm
phi
0.950
phi-Mn
-22,714.734 kN-m
c/de
0.321
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-9.708 MPa
Section Modulus
-1,020,701,070.848 mm^3
Cracking Moment
-18,930.828 kN-m
C/D Ratio
1.367
POI: Sp1.100 at
17.00 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
0.000 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
380.500 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
721.475 mm
Aps
0.000 mm^2
PT Depth
761.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,849.582 MPa
k-factor(strand type)
0.280
Effective Depth
721.475 mm
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Output

Tutorial Three / T3-69

T3-70 / Tutorial Three

LEAP CONBOX v.10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 16 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Control Case
Tension
PPR
0.865
a
13.952 mm
c
17.523 mm
phi
0.900
phi-Mn
3,096.124 kN-m
c/de
0.024
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
3.999 MPa
Section Modulus
1,119,633,933.333 mm^3
Cracking Moment
2,349.211 kN-m
C/D Ratio
999.990
POI: Sp1.100 at
17.00 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-18,429.386 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
380.500 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
684.887 mm
Aps
25,199.950 mm^2
PT Depth
635.999 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,713.223 MPa
k-factor(strand type)
0.280
Effective Depth
642.452 mm
Control Case
Tension
PPR
0.865
a
144.128 mm
c
181.024 mm
phi
0.950
phi-Mn
-26,951.853 kN-m
c/de
0.282
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-11.039 MPa
Section Modulus
-1,119,633,933.333 mm^3
Cracking Moment
-22,554.511 kN-m
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Bentley Exton Office

| Sheet 17 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
C/D Ratio
1.195
POI: Sp2.000 at
17.00 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
0.000 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
380.500 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
721.475 mm
Aps
0.000 mm^2
PT Depth
761.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,849.582 MPa
k-factor(strand type)
0.280
Effective Depth
721.475 mm
Control Case
Tension
PPR
0.865
a
13.952 mm
c
17.523 mm
phi
0.900
phi-Mn
3,096.124 kN-m
c/de
0.024
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
4.222 MPa
Section Modulus
1,119,633,933.333 mm^3
Cracking Moment
2,050.017 kN-m
C/D Ratio
999.990
POI: Sp2.000 at
17.00 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-18,074.592 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
380.500 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 18 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
fy
413.685 MPa
fs
------ MPa
Rebar Depth
684.887 mm
Aps
25,199.950 mm^2
PT Depth
635.999 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,713.223 MPa
k-factor(strand type)
0.280
Effective Depth
642.452 mm
Control Case
Tension
PPR
0.865
a
144.128 mm
c
181.024 mm
phi
0.950
phi-Mn
-26,951.856 kN-m
c/de
0.282
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-11.147 MPa
Section Modulus
-1,119,633,933.333 mm^3
Cracking Moment
-22,698.495 kN-m
C/D Ratio
1.187
POI: Sp2.010 at
19.20 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
0.000 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
356.133 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
672.741 mm
Aps
0.000 mm^2
PT Depth
712.266 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,848.761 MPa
k-factor(strand type)
0.280
Effective Depth
672.741 mm
Control Case
Tension
PPR
0.865
a
13.952 mm
c
17.523 mm
phi
0.900
Spec: AASHTO LRFD

Units: SI (Metric)

Bentley Exton Office

| Sheet 19 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
phi-Mn
2,884.946 kN-m
c/de
0.026
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
2.128 MPa
Section Modulus
980,823,615.507 mm^3
Cracking Moment
4,260.025 kN-m
C/D Ratio
999.990
POI: Sp2.010 at
19.20 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-9,699.608 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
356.133 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
636.153 mm
Aps
25,199.950 mm^2
PT Depth
517.265 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,682.049 MPa
k-factor(strand type)
0.280
Effective Depth
533.210 mm
Control Case
Tension
PPR
0.865
a
141.852 mm
c
178.165 mm
phi
0.950
phi-Mn
-21,498.740 kN-m
c/de
0.334
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-9.778 MPa
Section Modulus
-980,823,615.507 mm^3
Cracking Moment
-18,273.386 kN-m
C/D Ratio
1.667
POI: Sp2.020 at
Spec: AASHTO LRFD

21.40 m - Case: LRFD


Units: SI (Metric)

Loss: LRFD-2005

Loss: LRFD-2005

Output

Tutorial Three / T3-71

T3-72 / Tutorial Three

LEAP CONBOX v.10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 20 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Item
Positive
------------------------ ---------Mu-Required
2,714.906 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
324.600 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
609.674 mm
Aps
0.000 mm^2
PT Depth
649.199 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,847.515 MPa
k-factor(strand type)
0.280
Effective Depth
609.674 mm
Control Case
Tension
PPR
0.865
a
13.952 mm
c
17.523 mm
phi
0.900
phi-Mn
2,611.660 kN-m
c/de
0.029
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-1.136 MPa
Section Modulus
814,821,710.654 mm^3
Cracking Moment
6,730.334 kN-m
C/D Ratio
0.723
POI: Sp2.020 at
21.40 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-5,039.733 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
324.600 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
573.087 mm
Aps
25,199.950 mm^2
PT Depth
382.198 mm

Bentley Exton Office

Spec: AASHTO LRFD

Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

| Sheet 20 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Item
Positive
------------------------ ---------Mu-Required
2,714.906 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
324.600 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
609.674 mm
Aps
0.000 mm^2
PT Depth
649.199 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,847.515 MPa
k-factor(strand type)
0.280
Effective Depth
609.674 mm
Control Case
Tension
PPR
0.865
a
13.952 mm
c
17.523 mm
phi
0.900
phi-Mn
2,611.660 kN-m
c/de
0.029
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-1.136 MPa
Section Modulus
814,821,710.654 mm^3
Cracking Moment
6,730.334 kN-m
C/D Ratio
0.723
POI: Sp2.020 at
21.40 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-5,039.733 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
324.600 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
573.087 mm
Aps
25,199.950 mm^2
PT Depth
382.198 mm
Units: SI (Metric)

Loss: LRFD-2005

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 20 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Item
Positive
------------------------ ---------Mu-Required
2,714.906 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
324.600 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
609.674 mm
Aps
0.000 mm^2
PT Depth
649.199 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,847.515 MPa
k-factor(strand type)
0.280
Effective Depth
609.674 mm
Control Case
Tension
PPR
0.865
a
13.952 mm
c
17.523 mm
phi
0.900
phi-Mn
2,611.660 kN-m
c/de
0.029
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-1.136 MPa
Section Modulus
814,821,710.654 mm^3
Cracking Moment
6,730.334 kN-m
C/D Ratio
0.723
POI: Sp2.020 at
21.40 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-5,039.733 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
324.600 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
573.087 mm
Aps
25,199.950 mm^2
PT Depth
382.198 mm

Bentley Exton Office

Spec: AASHTO LRFD

Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

| Sheet 20 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Item
Positive
------------------------ ---------Mu-Required
2,714.906 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
324.600 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
609.674 mm
Aps
0.000 mm^2
PT Depth
649.199 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,847.515 MPa
k-factor(strand type)
0.280
Effective Depth
609.674 mm
Control Case
Tension
PPR
0.865
a
13.952 mm
c
17.523 mm
phi
0.900
phi-Mn
2,611.660 kN-m
c/de
0.029
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-1.136 MPa
Section Modulus
814,821,710.654 mm^3
Cracking Moment
6,730.334 kN-m
C/D Ratio
0.723
POI: Sp2.020 at
21.40 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-5,039.733 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
324.600 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
573.087 mm
Aps
25,199.950 mm^2
PT Depth
382.198 mm
Units: SI (Metric)

Loss: LRFD-2005

Output

Tutorial Three / T3-73

T3-74 / Tutorial Three

LEAP CONBOX v.10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 20 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Item
Positive
------------------------ ---------Mu-Required
2,714.906 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
324.600 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
609.674 mm
Aps
0.000 mm^2
PT Depth
649.199 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,847.515 MPa
k-factor(strand type)
0.280
Effective Depth
609.674 mm
Control Case
Tension
PPR
0.865
a
13.952 mm
c
17.523 mm
phi
0.900
phi-Mn
2,611.660 kN-m
c/de
0.029
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-1.136 MPa
Section Modulus
814,821,710.654 mm^3
Cracking Moment
6,730.334 kN-m
C/D Ratio
0.723
POI: Sp2.020 at
21.40 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-5,039.733 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
324.600 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
573.087 mm
Aps
25,199.950 mm^2
PT Depth
382.198 mm

Bentley Exton Office

Spec: AASHTO LRFD

Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

| Sheet 20 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Item
Positive
------------------------ ---------Mu-Required
2,714.906 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
324.600 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
609.674 mm
Aps
0.000 mm^2
PT Depth
649.199 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,847.515 MPa
k-factor(strand type)
0.280
Effective Depth
609.674 mm
Control Case
Tension
PPR
0.865
a
13.952 mm
c
17.523 mm
phi
0.900
phi-Mn
2,611.660 kN-m
c/de
0.029
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-1.136 MPa
Section Modulus
814,821,710.654 mm^3
Cracking Moment
6,730.334 kN-m
C/D Ratio
0.723
POI: Sp2.020 at
21.40 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-5,039.733 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
324.600 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
573.087 mm
Aps
25,199.950 mm^2
PT Depth
382.198 mm
Units: SI (Metric)

Loss: LRFD-2005

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 20 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Item
Positive
------------------------ ---------Mu-Required
2,714.906 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
324.600 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
609.674 mm
Aps
0.000 mm^2
PT Depth
649.199 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,847.515 MPa
k-factor(strand type)
0.280
Effective Depth
609.674 mm
Control Case
Tension
PPR
0.865
a
13.952 mm
c
17.523 mm
phi
0.900
phi-Mn
2,611.660 kN-m
c/de
0.029
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-1.136 MPa
Section Modulus
814,821,710.654 mm^3
Cracking Moment
6,730.334 kN-m
C/D Ratio
0.723
POI: Sp2.020 at
21.40 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-5,039.733 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
324.600 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
573.087 mm
Aps
25,199.950 mm^2
PT Depth
382.198 mm

Bentley Exton Office

Spec: AASHTO LRFD

Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

| Sheet 20 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Item
Positive
------------------------ ---------Mu-Required
2,714.906 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
324.600 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
609.674 mm
Aps
0.000 mm^2
PT Depth
649.199 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,847.515 MPa
k-factor(strand type)
0.280
Effective Depth
609.674 mm
Control Case
Tension
PPR
0.865
a
13.952 mm
c
17.523 mm
phi
0.900
phi-Mn
2,611.660 kN-m
c/de
0.029
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-1.136 MPa
Section Modulus
814,821,710.654 mm^3
Cracking Moment
6,730.334 kN-m
C/D Ratio
0.723
POI: Sp2.020 at
21.40 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-5,039.733 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
324.600 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
573.087 mm
Aps
25,199.950 mm^2
PT Depth
382.198 mm
Units: SI (Metric)

Loss: LRFD-2005

Output

Tutorial Three / T3-75

T3-76 / Tutorial Three

LEAP CONBOX v.10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 20 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Item
Positive
------------------------ ---------Mu-Required
2,714.906 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
324.600 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
609.674 mm
Aps
0.000 mm^2
PT Depth
649.199 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,847.515 MPa
k-factor(strand type)
0.280
Effective Depth
609.674 mm
Control Case
Tension
PPR
0.865
a
13.952 mm
c
17.523 mm
phi
0.900
phi-Mn
2,611.660 kN-m
c/de
0.029
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-1.136 MPa
Section Modulus
814,821,710.654 mm^3
Cracking Moment
6,730.334 kN-m
C/D Ratio
0.723
POI: Sp2.020 at
21.40 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-5,039.733 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
324.600 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
573.087 mm
Aps
25,199.950 mm^2
PT Depth
382.198 mm

Bentley Exton Office

Spec: AASHTO LRFD

Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

| Sheet 20 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Item
Positive
------------------------ ---------Mu-Required
2,714.906 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
324.600 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
609.674 mm
Aps
0.000 mm^2
PT Depth
649.199 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,847.515 MPa
k-factor(strand type)
0.280
Effective Depth
609.674 mm
Control Case
Tension
PPR
0.865
a
13.952 mm
c
17.523 mm
phi
0.900
phi-Mn
2,611.660 kN-m
c/de
0.029
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-1.136 MPa
Section Modulus
814,821,710.654 mm^3
Cracking Moment
6,730.334 kN-m
C/D Ratio
0.723
POI: Sp2.020 at
21.40 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-5,039.733 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
324.600 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
573.087 mm
Aps
25,199.950 mm^2
PT Depth
382.198 mm
Units: SI (Metric)

Loss: LRFD-2005

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 20 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Item
Positive
------------------------ ---------Mu-Required
2,714.906 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
324.600 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
609.674 mm
Aps
0.000 mm^2
PT Depth
649.199 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,847.515 MPa
k-factor(strand type)
0.280
Effective Depth
609.674 mm
Control Case
Tension
PPR
0.865
a
13.952 mm
c
17.523 mm
phi
0.900
phi-Mn
2,611.660 kN-m
c/de
0.029
Cracking Moment:
Location
Beam-Bot
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-1.136 MPa
Section Modulus
814,821,710.654 mm^3
Cracking Moment
6,730.334 kN-m
C/D Ratio
0.723
POI: Sp2.020 at
21.40 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-5,039.733 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
324.600 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
573.087 mm
Aps
25,199.950 mm^2
PT Depth
382.198 mm
Spec: AASHTO LRFD

Units: SI (Metric)

Bentley Exton Office

| Sheet 31 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Beta1
0.796
Flange Thickness
356.134 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
636.155 mm
Aps
25,199.950 mm^2
PT Depth
517.269 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,682.050 MPa
k-factor(strand type)
0.280
Effective Depth
533.214 mm
Control Case
Tension
PPR
0.865
a
141.852 mm
c
178.165 mm
phi
0.950
phi-Mn
-21,498.911 kN-m
c/de
0.334
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-9.778 MPa
Section Modulus
-980,828,428.348 mm^3
Cracking Moment
-18,273.434 kN-m
C/D Ratio
1.666
POI: Sp2.100 at
39.00 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
0.000 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
380.500 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
721.475 mm
Aps
0.000 mm^2
PT Depth
761.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,849.582 MPa
k-factor(strand type)
0.280
Effective Depth
721.475 mm

Loss: LRFD-2005
Units: SI (Metric)

Loss: LRFD-2005

Output

Tutorial Three / T3-77

Spec: AASHTO LRFD

T3-78 / Tutorial Three

LEAP CONBOX v.10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 31 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Beta1
0.796
Flange Thickness
356.134 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
636.155 mm
Aps
25,199.950 mm^2
PT Depth
517.269 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,682.050 MPa
k-factor(strand type)
0.280
Effective Depth
533.214 mm
Control Case
Tension
PPR
0.865
a
141.852 mm
c
178.165 mm
phi
0.950
phi-Mn
-21,498.911 kN-m
c/de
0.334
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-9.778 MPa
Section Modulus
-980,828,428.348 mm^3
Cracking Moment
-18,273.434 kN-m
C/D Ratio
1.666
POI: Sp2.100 at
39.00 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
0.000 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
380.500 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
721.475 mm
Aps
0.000 mm^2
PT Depth
761.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,849.582 MPa
k-factor(strand type)
0.280
Effective Depth
721.475 mm

Bentley Exton Office

Spec: AASHTO LRFD

Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

| Sheet 31 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Beta1
0.796
Flange Thickness
356.134 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
636.155 mm
Aps
25,199.950 mm^2
PT Depth
517.269 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,682.050 MPa
k-factor(strand type)
0.280
Effective Depth
533.214 mm
Control Case
Tension
PPR
0.865
a
141.852 mm
c
178.165 mm
phi
0.950
phi-Mn
-21,498.911 kN-m
c/de
0.334
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-9.778 MPa
Section Modulus
-980,828,428.348 mm^3
Cracking Moment
-18,273.434 kN-m
C/D Ratio
1.666
POI: Sp2.100 at
39.00 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
0.000 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
380.500 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
721.475 mm
Aps
0.000 mm^2
PT Depth
761.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,849.582 MPa
k-factor(strand type)
0.280
Effective Depth
721.475 mm
Units: SI (Metric)

Loss: LRFD-2005

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Bentley Exton Office

Spec: AASHTO LRFD

Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

| Sheet 31 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Beta1
0.796
Flange Thickness
356.134 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
636.155 mm
Aps
25,199.950 mm^2
PT Depth
517.269 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,682.050 MPa
k-factor(strand type)
0.280
Effective Depth
533.214 mm
Control Case
Tension
PPR
0.865
a
141.852 mm
c
178.165 mm
phi
0.950
phi-Mn
-21,498.911 kN-m
c/de
0.334
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-9.778 MPa
Section Modulus
-980,828,428.348 mm^3
Cracking Moment
-18,273.434 kN-m
C/D Ratio
1.666
POI: Sp2.100 at
39.00 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
0.000 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
380.500 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
721.475 mm
Aps
0.000 mm^2
PT Depth
761.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,849.582 MPa
k-factor(strand type)
0.280
Effective Depth
721.475 mm
Units: SI (Metric)

Loss: LRFD-2005

Output

Tutorial Three / T3-79

| Sheet 31 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Beta1
0.796
Flange Thickness
356.134 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
636.155 mm
Aps
25,199.950 mm^2
PT Depth
517.269 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,682.050 MPa
k-factor(strand type)
0.280
Effective Depth
533.214 mm
Control Case
Tension
PPR
0.865
a
141.852 mm
c
178.165 mm
phi
0.950
phi-Mn
-21,498.911 kN-m
c/de
0.334
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-9.778 MPa
Section Modulus
-980,828,428.348 mm^3
Cracking Moment
-18,273.434 kN-m
C/D Ratio
1.666
POI: Sp2.100 at
39.00 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
0.000 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
380.500 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
721.475 mm
Aps
0.000 mm^2
PT Depth
761.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,849.582 MPa
k-factor(strand type)
0.280
Effective Depth
721.475 mm

T3-80 / Tutorial Three

LEAP CONBOX v.10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 31 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Beta1
0.796
Flange Thickness
356.134 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
636.155 mm
Aps
25,199.950 mm^2
PT Depth
517.269 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,682.050 MPa
k-factor(strand type)
0.280
Effective Depth
533.214 mm
Control Case
Tension
PPR
0.865
a
141.852 mm
c
178.165 mm
phi
0.950
phi-Mn
-21,498.911 kN-m
c/de
0.334
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-9.778 MPa
Section Modulus
-980,828,428.348 mm^3
Cracking Moment
-18,273.434 kN-m
C/D Ratio
1.666
POI: Sp2.100 at
39.00 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
0.000 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
380.500 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
721.475 mm
Aps
0.000 mm^2
PT Depth
761.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,849.582 MPa
k-factor(strand type)
0.280
Effective Depth
721.475 mm

Bentley Exton Office

Spec: AASHTO LRFD

Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

| Sheet 31 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Beta1
0.796
Flange Thickness
356.134 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
636.155 mm
Aps
25,199.950 mm^2
PT Depth
517.269 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,682.050 MPa
k-factor(strand type)
0.280
Effective Depth
533.214 mm
Control Case
Tension
PPR
0.865
a
141.852 mm
c
178.165 mm
phi
0.950
phi-Mn
-21,498.911 kN-m
c/de
0.334
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-9.778 MPa
Section Modulus
-980,828,428.348 mm^3
Cracking Moment
-18,273.434 kN-m
C/D Ratio
1.666
POI: Sp2.100 at
39.00 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
0.000 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
380.500 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
11,638.686 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
721.475 mm
Aps
0.000 mm^2
PT Depth
761.000 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,849.582 MPa
k-factor(strand type)
0.280
Effective Depth
721.475 mm
Units: SI (Metric)

Loss: LRFD-2005

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 38 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-3.136 MPa
Section Modulus
765,228,126.598 mm^3
Cracking Moment
8,157.393 kN-m
C/D Ratio
0.473
POI: Sp3.030 at
44.10 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-5,456.727 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
314.566 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
553.020 mm
Aps
25,199.950 mm^2
PT Depth
333.798 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,595.733 MPa
k-factor(strand type)
0.280
Effective Depth
364.568 mm
Control Case
Tension
PPR
0.865
a
135.549 mm
c
170.248 mm
phi
0.950
phi-Mn
-13,189.203 kN-m
c/de
0.467
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-5.612 MPa
Section Modulus
-765,228,126.598 mm^3
Cracking Moment
-10,431.091 kN-m
C/D Ratio
1.817
POI: Sp3.040 at
45.80 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
6,797.275 kN-m
f'c
35.000 MPa

Bentley Exton Office

Spec: AASHTO LRFD

Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

| Sheet 38 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-3.136 MPa
Section Modulus
765,228,126.598 mm^3
Cracking Moment
8,157.393 kN-m
C/D Ratio
0.473
POI: Sp3.030 at
44.10 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-5,456.727 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
314.566 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
553.020 mm
Aps
25,199.950 mm^2
PT Depth
333.798 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,595.733 MPa
k-factor(strand type)
0.280
Effective Depth
364.568 mm
Control Case
Tension
PPR
0.865
a
135.549 mm
c
170.248 mm
phi
0.950
phi-Mn
-13,189.203 kN-m
c/de
0.467
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-5.612 MPa
Section Modulus
-765,228,126.598 mm^3
Cracking Moment
-10,431.091 kN-m
C/D Ratio
1.817
POI: Sp3.040 at
45.80 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
6,797.275 kN-m
f'c
35.000 MPa
Units: SI (Metric)

Loss: LRFD-2005

Output

Tutorial Three / T3-81

T3-82 / Tutorial Three

LEAP CONBOX v.10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 38 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-3.136 MPa
Section Modulus
765,228,126.598 mm^3
Cracking Moment
8,157.393 kN-m
C/D Ratio
0.473
POI: Sp3.030 at
44.10 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-5,456.727 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
314.566 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
553.020 mm
Aps
25,199.950 mm^2
PT Depth
333.798 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,595.733 MPa
k-factor(strand type)
0.280
Effective Depth
364.568 mm
Control Case
Tension
PPR
0.865
a
135.549 mm
c
170.248 mm
phi
0.950
phi-Mn
-13,189.203 kN-m
c/de
0.467
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-5.612 MPa
Section Modulus
-765,228,126.598 mm^3
Cracking Moment
-10,431.091 kN-m
C/D Ratio
1.817
POI: Sp3.040 at
45.80 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
6,797.275 kN-m
f'c
35.000 MPa

Bentley Exton Office

Spec: AASHTO LRFD

Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

| Sheet 38 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-3.136 MPa
Section Modulus
765,228,126.598 mm^3
Cracking Moment
8,157.393 kN-m
C/D Ratio
0.473
POI: Sp3.030 at
44.10 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-5,456.727 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
314.566 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
553.020 mm
Aps
25,199.950 mm^2
PT Depth
333.798 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,595.733 MPa
k-factor(strand type)
0.280
Effective Depth
364.568 mm
Control Case
Tension
PPR
0.865
a
135.549 mm
c
170.248 mm
phi
0.950
phi-Mn
-13,189.203 kN-m
c/de
0.467
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-5.612 MPa
Section Modulus
-765,228,126.598 mm^3
Cracking Moment
-10,431.091 kN-m
C/D Ratio
1.817
POI: Sp3.040 at
45.80 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
6,797.275 kN-m
f'c
35.000 MPa
Units: SI (Metric)

Loss: LRFD-2005

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 38 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-3.136 MPa
Section Modulus
765,228,126.598 mm^3
Cracking Moment
8,157.393 kN-m
C/D Ratio
0.473
POI: Sp3.030 at
44.10 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-5,456.727 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
314.566 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
553.020 mm
Aps
25,199.950 mm^2
PT Depth
333.798 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,595.733 MPa
k-factor(strand type)
0.280
Effective Depth
364.568 mm
Control Case
Tension
PPR
0.865
a
135.549 mm
c
170.248 mm
phi
0.950
phi-Mn
-13,189.203 kN-m
c/de
0.467
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-5.612 MPa
Section Modulus
-765,228,126.598 mm^3
Cracking Moment
-10,431.091 kN-m
C/D Ratio
1.817
POI: Sp3.040 at
45.80 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
6,797.275 kN-m
f'c
35.000 MPa

Bentley Exton Office

Spec: AASHTO LRFD

Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

| Sheet 38 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-3.136 MPa
Section Modulus
765,228,126.598 mm^3
Cracking Moment
8,157.393 kN-m
C/D Ratio
0.473
POI: Sp3.030 at
44.10 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-5,456.727 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
314.566 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
553.020 mm
Aps
25,199.950 mm^2
PT Depth
333.798 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,595.733 MPa
k-factor(strand type)
0.280
Effective Depth
364.568 mm
Control Case
Tension
PPR
0.865
a
135.549 mm
c
170.248 mm
phi
0.950
phi-Mn
-13,189.203 kN-m
c/de
0.467
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-5.612 MPa
Section Modulus
-765,228,126.598 mm^3
Cracking Moment
-10,431.091 kN-m
C/D Ratio
1.817
POI: Sp3.040 at
45.80 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
6,797.275 kN-m
f'c
35.000 MPa
Units: SI (Metric)

Loss: LRFD-2005

Output

Tutorial Three / T3-83

T3-84 / Tutorial Three

LEAP CONBOX v.10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 38 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-3.136 MPa
Section Modulus
765,228,126.598 mm^3
Cracking Moment
8,157.393 kN-m
C/D Ratio
0.473
POI: Sp3.030 at
44.10 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-5,456.727 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
314.566 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
553.020 mm
Aps
25,199.950 mm^2
PT Depth
333.798 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,595.733 MPa
k-factor(strand type)
0.280
Effective Depth
364.568 mm
Control Case
Tension
PPR
0.865
a
135.549 mm
c
170.248 mm
phi
0.950
phi-Mn
-13,189.203 kN-m
c/de
0.467
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-5.612 MPa
Section Modulus
-765,228,126.598 mm^3
Cracking Moment
-10,431.091 kN-m
C/D Ratio
1.817
POI: Sp3.040 at
45.80 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
6,797.275 kN-m
f'c
35.000 MPa

Bentley Exton Office

Spec: AASHTO LRFD

Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

| Sheet 38 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-3.136 MPa
Section Modulus
765,228,126.598 mm^3
Cracking Moment
8,157.393 kN-m
C/D Ratio
0.473
POI: Sp3.030 at
44.10 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-5,456.727 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
314.566 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
553.020 mm
Aps
25,199.950 mm^2
PT Depth
333.798 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,595.733 MPa
k-factor(strand type)
0.280
Effective Depth
364.568 mm
Control Case
Tension
PPR
0.865
a
135.549 mm
c
170.248 mm
phi
0.950
phi-Mn
-13,189.203 kN-m
c/de
0.467
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-5.612 MPa
Section Modulus
-765,228,126.598 mm^3
Cracking Moment
-10,431.091 kN-m
C/D Ratio
1.817
POI: Sp3.040 at
45.80 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
6,797.275 kN-m
f'c
35.000 MPa
Units: SI (Metric)

Loss: LRFD-2005

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 38 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-3.136 MPa
Section Modulus
765,228,126.598 mm^3
Cracking Moment
8,157.393 kN-m
C/D Ratio
0.473
POI: Sp3.030 at
44.10 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-5,456.727 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
314.566 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
553.020 mm
Aps
25,199.950 mm^2
PT Depth
333.798 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,595.733 MPa
k-factor(strand type)
0.280
Effective Depth
364.568 mm
Control Case
Tension
PPR
0.865
a
135.549 mm
c
170.248 mm
phi
0.950
phi-Mn
-13,189.203 kN-m
c/de
0.467
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-5.612 MPa
Section Modulus
-765,228,126.598 mm^3
Cracking Moment
-10,431.091 kN-m
C/D Ratio
1.817
POI: Sp3.040 at
45.80 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
6,797.275 kN-m
f'c
35.000 MPa

Bentley Exton Office

Spec: AASHTO LRFD

Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

| Sheet 38 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-3.136 MPa
Section Modulus
765,228,126.598 mm^3
Cracking Moment
8,157.393 kN-m
C/D Ratio
0.473
POI: Sp3.030 at
44.10 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-5,456.727 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
314.566 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
553.020 mm
Aps
25,199.950 mm^2
PT Depth
333.798 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,595.733 MPa
k-factor(strand type)
0.280
Effective Depth
364.568 mm
Control Case
Tension
PPR
0.865
a
135.549 mm
c
170.248 mm
phi
0.950
phi-Mn
-13,189.203 kN-m
c/de
0.467
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-5.612 MPa
Section Modulus
-765,228,126.598 mm^3
Cracking Moment
-10,431.091 kN-m
C/D Ratio
1.817
POI: Sp3.040 at
45.80 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
6,797.275 kN-m
f'c
35.000 MPa
Units: SI (Metric)

Loss: LRFD-2005

Output

Tutorial Three / T3-85

T3-86 / Tutorial Three

LEAP CONBOX v.10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 38 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-3.136 MPa
Section Modulus
765,228,126.598 mm^3
Cracking Moment
8,157.393 kN-m
C/D Ratio
0.473
POI: Sp3.030 at
44.10 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-5,456.727 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
314.566 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
553.020 mm
Aps
25,199.950 mm^2
PT Depth
333.798 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,595.733 MPa
k-factor(strand type)
0.280
Effective Depth
364.568 mm
Control Case
Tension
PPR
0.865
a
135.549 mm
c
170.248 mm
phi
0.950
phi-Mn
-13,189.203 kN-m
c/de
0.467
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-5.612 MPa
Section Modulus
-765,228,126.598 mm^3
Cracking Moment
-10,431.091 kN-m
C/D Ratio
1.817
POI: Sp3.040 at
45.80 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
6,797.275 kN-m
f'c
35.000 MPa
Spec: AASHTO LRFD

Units: SI (Metric)

Bentley Exton Office

| Sheet 38 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-3.136 MPa
Section Modulus
765,228,126.598 mm^3
Cracking Moment
8,157.393 kN-m
C/D Ratio
0.473
POI: Sp3.030 at
44.10 m - Case: LRFD
Item
Negative
------------------------ ---------Mu-Required
-5,456.727 kN-m
f'c
35.000 MPa
Beta1
0.796
Flange Thickness
314.566 mm
Flange Width
11,600.000 mm
Web Thickness
11,600.000 mm
As
15,870.936 mm^2
fy
413.685 MPa
fs
------ MPa
Rebar Depth
553.020 mm
Aps
25,199.950 mm^2
PT Depth
333.798 mm
Ultimate Strength (fpu)
1,861.585 MPa
fpy
1,675.426 MPa
f's
1,595.733 MPa
k-factor(strand type)
0.280
Effective Depth
364.568 mm
Control Case
Tension
PPR
0.865
a
135.549 mm
c
170.248 mm
phi
0.950
phi-Mn
-13,189.203 kN-m
c/de
0.467
Cracking Moment:
Location
Beam-Top
Initial DL Moment
0.000 kN-m
Rupture Modulus, fr1
5.748 MPa
Initial Stress
-5.612 MPa
Section Modulus
-765,228,126.598 mm^3
Cracking Moment
-10,431.091 kN-m
C/D Ratio
1.817
POI: Sp3.040 at
45.80 m - Case: LRFD
Item
Positive
------------------------ ---------Mu-Required
6,797.275 kN-m
f'c
35.000 MPa

Loss: LRFD-2005
Spec: AASHTO LRFD

Units: SI (Metric)

Loss: LRFD-2005

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 49 of 49
| Job No:
LEAP-3
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor3.cbx
C/D Ratio
999.990
***** End of Report ****

Output

Tutorial Three / T3-87

Output

T3-88 / Tutorial Three

LEAP CONBOX v.10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Check of an 8-Span Post-Tensioned Prestressed


Concrete Box Girder Bridge (AASHTO Standard)
(U.S. Units)

This CONBOX tutorial takes you through a design, step-by-step and illustrates some of the
basic features of the program. In this tutorial, you will be designing in accordance with the
AASHTO Standard Design Specifications.
The information for this tutorial is contained in an input file called Tutor4.cbx. As an
alternative to inputting all the information from scratch, as directed in this tutorial, you can
load this file and only work on the sections you wish. To load this file, select the Open
command from the File pull-down menu. Browse to the CONBOX/Examples subdirectory,
if it is not already showing, and select the file Tutor4.cbx.
This tutorial follows Arizona DOT Project #NH-10-3(310): RAMP S-E (Superstition T1 Baseline Road T1, Unit 1).

LEAP CONBOX v10.00.01.00

Tutorial Four / T4-1

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

FIGURE T4-1. Typical Section

T4-2 / Tutorial Four

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

FIGURE T4-2. Plan View

LEAP CONBOX v10.00.01.00

Tutorial Four / T4-3

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

FIGURE T4-3. Elevation Segment SE1

FIGURE T4-4. Elevation Segment SE2

T4-4 / Tutorial Four

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

FIGURE T4-5. Elevation Segment SE3

LEAP CONBOX v10.00.01.00

Tutorial Four / T4-5

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

FIGURE T4-6. Box Girder Details (Web Flare at Abutments)

T4-6 / Tutorial Four

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

FIGURE T4-7. Box Girder Details (Soffit Haunch at Abutments)

LEAP CONBOX v10.00.01.00

Tutorial Four / T4-7

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

FIGURE T4-8. Pier Elevation (Piers 1, 2, 3, 5, 6, 7)

T4-8 / Tutorial Four

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

FIGURE T4-9. Pier Elevation (Pier 4)

LEAP CONBOX v10.00.01.00

Tutorial Four / T4-9

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

FIGURE T4-10. Tendon Profile ABT 1 to Hinge 1 Upper


(Pjack = 13,114 KIPS)

T4-10 / Tutorial Four

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

FIGURE T4-11. Tendon Profile Hinge 1 Lower to Hinge 2 Lower


(Pjack = 13,114 KIPS)

LEAP CONBOX v10.00.01.00

Tutorial Four / T4-11

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

FIGURE T4-12. Tendon Profile Hinge 2 Upper to ABT 2


(Pjack = 13,114 KIPS)

T4-12 / Tutorial Four

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

FIGURE T4-13. Box Girder Reinforcing Details at Midspan


(According to Construction Plans)

LEAP CONBOX v10.00.01.00

Tutorial Four / T4-13

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

FIGURE T4-14. Box Girder Reinforcing Details at Piers


(According to Construction Plans)

T4-14 / Tutorial Four

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

FIGURE T4-15. Stirrup Schedule


(According to Construction Plans)

LEAP CONBOX v10.00.01.00

Tutorial Four / T4-15

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

FIGURE T4-16. Intermediate Diaphragm Locations

T4-16 / Tutorial Four

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Problem Data
Concrete Material Properties
Unit Weight (PCF)
E-Modulus, E28 (ksi)
Poissons Ratio
Thermal Coeff. (F)
fci (ksi)
fc (ksi)
Humidity (%)
Ultimate Creep Coeff.
Ultimate Shrinkage Strain

CIP Box Girder

Integral Pier

150
3825
0.20

150
3375
0.20
--

6 10-6
3.5
4.5
70
Program Calculated
Program Calculated

-4.5
----

Design Specifications
AASHTO Standard

Units
US (English)

Loss Type/Material Model


Lump Sum

18.4 ksi

Offset to Bridge Centerline


0.00 ft.

Column Spacing
Piers 1,2,3,5,6,7 =

36-0

Pier 4 =

40-2 1/8

P/T Tendons
Strand Type

0.6 - 270 ksi Low Relaxation (Es = 28,500 ksi)

Tendon Type

Unknown

Friction Coeff.

0.25

Wobble Coeff. (1/ft) 0.0002


Relaxation

0 ksi

Jack Type

Both Ends (Left and Right)

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

/ T4-1

Force Type

Force

Pjack (Left)

13,114 kips per tendon

Left Set

3/8

Pjack (Right)

13,114 kips per tendon

Right Set

3/8

Rebar Information
fy =

60 ksi
User-Defined

Stirrup Information
fy =

60 ksi
User-Defined

Live Load
HS20-44
Alternate Military Load

Live Load Distribution Factor


0.5714 lanes

AASHTO Table 3.23.1 (Bridge Designed for Two or More


Traffic Lanes)

d.f . =

T4-2 /

S
8
=
= 1.14286 wheels = 0.5714 lanes
7.0 7.0

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 1: Start the Program


Start CONBOX as you would any other application using Microsoft Windows. By
default, the program installs in Programs > LEAP Software > CONBOX. To open,
click the Start button, select Programs, then LEAP Software, and then select
CONBOX.
When the CONBOX splash screen appears, click the START button to clear the screen
and view the Project tab.

FIGURE T4-17. CONBOX Splash Screen

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

/ T4-3

Step 2: Complete the Project Information


The Project tab allows you to enter general information about the project and select the
analysis options, design specifications, units, and loss type. You can return to this tab at
any time and make changes.

FIGURE T4-18. Project Tab

Complete the Project tab by entering the information shown in Fig. T4-18.
For this tutorial, you will be analyzing and designing the concrete box girder using the Full Width
Only option.

Step 3: Define the Bridge Alignment

T4-4 /

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Geometry Tab

GEOMETRY TAB
The Geometry tab allows you to input the physical properties of the bridge, including
bridge alignment, layout, cross section information, and pier/column properties. Using
this tab, you can create, modify, or delete elements of your bridge description.

FIGURE T4-19. Geometry Tab

From this tab, you can create and/or modify the bridge alignment by clicking the
Alignment button to open the Bridge Alignment dialog box.

BRIDGE ALIGNMENT DIALOG BOX


The Bridge Alignment dialog box allows you to define a bridges alignment by
creating, modifying, or deleting alignment tangents and/or curve segments.
NOTE: Refer to Figure 2 on page 3 for additional data input.

FIGURE T4-20. Bridge Alignment Dialog Box

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

/ T4-5

Geometry Tab

Begin by entering the beginning station equal to 87+00.0000. Next, enter segment 1,
tangent start direction equal to S 15 27 52.10 W and end station equal to 87+25.8800.
Click the Add Curve button and enter the data as shown in Fig. T4-20. Next, click the
Add Tangent button and enter the data as shown in Fig. T4-20.

Step 4: Define the Bridge Connections


GEOMETRY TAB
Once you have defined the bridge alignment, you can create and/or modify the bridge
connections by clicking the Layout button on this tab to open the Bridge Component
Layout dialog box.

BRIDGE COMPONENT LAYOUT DIALOG BOX


The Bridge Component Layout dialog box allows you to define the physical location,
bearing, and connection types for abutments, piers (bents), and span hinges as well as
the stationing for the begin bridge and the end bridge.
NOTE: Refer to Figure 2 on page 3 for additional data input.

FIGURE T4-21. Bridge Component Layout Dialog Box

This bridge has two abutments, eight piers, and two hinges. The program automatically
creates rows for the beginning and end of the bridge. Lay out the bridge as shown in
Fig. T4-21. When you are done, click the OK button to return to the Geometry tab.

Step 5: Define the Cross Section Layout and Materials

T4-6 /

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Geometry Tab

GEOMETRY TAB
Once you have defined the bridge layout, you can create and/or modify the
superstructure cross section and layout by clicking the Cross Section button on this tab
to open the Cross Section Layout dialog box.

CROSS SECTION LAYOUT DIALOG BOX


The Cross Section Layout dialog box allows you to define the bridge cross section.
NOTE: Refer to Figure 1 on page 2 for additional data input.

FIGURE T4-22. Cross Section Layout Dialog Box

This bridge has a constant depth with soffit and web flares. By default, the program
creates a beginning section. You should define the section properties for the begin
section first by clicking the Section button under the Section Def field to open the MultiCell CIP Box Section dialog box.

MULTI-CELL CIP BOX SECTION DIALOG BOX


The Multi-Cell CIP Box Section dialog box allows you to define cross section
dimensions.

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

/ T4-7

Concrete Material Dialog Box

NOTE: Refer to Figure 1 on page 2 for additional data input.

FIGURE T4-23. Multi-Cell CIP Box Section Dialog Box (Abt. Diaphragm)

Define the section properties by entering the dimensions as shown in Fig. T4-23. To
define the concrete material properties, click the Material button to open the Concrete
Material dialog box.
You will need to define nine different section definitions to complete this tutorial. Refer to the
table on page GO-11 for the data input for each definition.

CONCRETE MATERIAL DIALOG BOX


This dialog box allows you to define the material for the superstructure cross section.
Define the material properties for this bridge by entering the information as shown in
Fig. T4-24. When you are done, click the OK button to return to the Multi-Cell CIP
Box Section dialog box.
NOTE: Refer to the Concrete Material Properties section of Problem Data located on
page GO-1.

FIGURE T4-24. Concrete Material Dialog Box (Cross Section)

T4-8 /

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Multi-Cell CIP Box Section Dialog Box

MULTI-CELL CIP BOX SECTION DIALOG BOX


Once you have completed defining the material and section properties for this segment,
click the OK button to return to the Cross Section Layout dialog box.

CROSS SECTION LAYOUT DIALOG BOX


When you return to this dialog box, you need to define the remaining cross sections.
Fig. T4-25 through Fig. T4-32 represent the completed grid definitions for the bridge.
To complete each of the nine section definitions, refer to the following tables. When
you are done, click the OK button to return to the Geometry tab.
You will be utilizing the Recall section type to minimize the number of cross sections for this
tutorial. The abutment, hinge, and pier diaphragms will also be modeled by increasing the web
thickness accordingly to simulate the diaphragm.

NOTE: Refer to Figure 1 on page 2 for additional data input.

FIGURE T4-25. Cross Section Layout Dialog Box (Span 1 Completed)

FIGURE T4-26. Cross Section Layout Dialog Box (Span 2 Completed)

FIGURE T4-27. Cross Section Layout Dialog Box (Span 3 Completed)

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

/ T4-9

Cross Section Layout Dialog Box

FIGURE T4-28. Cross Section Layout Dialog Box (Span 4 Completed)

FIGURE T4-29. Cross Section Layout Dialog Box (Span 5 Completed)

FIGURE T4-30. Cross Section Layout Dialog Box (Span 6 Completed)

FIGURE T4-31. Cross Section Layout Dialog Box (Span 7 Completed)

FIGURE T4-32. Cross Section Layout Dialog Box (Span 8 Completed)

T4-10 /

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Cross Section Layout Dialog Box

Span 1

Span 3

Span 6

Abt.
Diaphragm

Abt. 1 & 2
Diaphragm
Face

Typical
Section

Face of
Pier
Diaphragm

Pier
Diaphragm

Face of
Hinge

Hinge
Diaphragm

P3
Diaphragm
(Left)

P5
Diaphragm
Face (Right)

Width (w) (ft.)

75.1666

75.1666

75.1666

75.1666

75.1666

75.1666

75.1666

75.1666

75.1666

Depth (d) (ft.)

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

6.75

Slab
Top Thick (tt) (in.)

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

Bottom Thick (bt) (in.)

12.0

12.0

6.0

12.0

12.0

12.0

12.0

12.0

12.0

Interior Girders
Number

92.0

24.0

12.0

12.0

92.0

24.0

92.0

15.0

15.0

Top Fillet (tf) (in.)

0.0

4.0

4.0

4.0

0.0

4.0

0.0

4.0

4.0

Bottom Fillet (bf) (in.)

0.0

4.0

4.0

4.0

0.0

4.0

0.0

4.0

4.0

Type

Slope

Slope

Slope

Slope

Slope

Slope

Slope

Slope

Slope

t (in.)

36.0

24.0

12.0

12.0

36.0

24.0

36.0

15.0

15.0

f (ft.)

2.25

2.25

2.25

2.25

2.25

2.25

2.25

2.25

2.25

r (ft.)

--

--

--

--

--

--

--

--

--

Type

Slope

Slope

Slope

Slope

Slope

Slope

Slope

Slope

Slope

t (in.)

36.0

24.0

12.0

12.0

36.0

24.0

36.0

15.0

15.0

f (ft.)

2.25

2.25

2.25

2.25

2.25

2.25

2.25

2.25

2.25

r (ft.)

--

--

--

--

--

--

--

--

--

Web Thick (tw) (in.)


Fillet

Left Exterior Girder

Right Exterior Girder

Left Exterior Overhang


Len (ft.)

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

ti (in.)

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

te (in.)

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

Right Exterior Overhang


Len (ft.)

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

ti (in.)

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

te (in.)
Section Properties

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

Auto
Calculate

Auto
Calculate

Auto
Calculate

Auto
Calculate

Auto
Calculate

Auto
Calculate

Auto
Calculate

Auto
Calculate

Auto
Calculate

At this point, it would be a good idea to save your project. Select the Save As option from the File
menu. Enter the file name you want to save your data to (e.g., MyTutor4) in the File Name field
and click the Save button. The default extension is *.cbx

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

/ T4-11

Geometry Tab

Step 6: Define the Piers and Columns


GEOMETRY TAB
Once you have defined the cross section layout and materials, you can create and/or
modify the piers and columns by clicking the Piers button on this tab to open the Pier
and Column Definitions dialog box.

PIER AND COLUMN DEFINITIONS DIALOG BOX


The Pier and Column Definitions dialog box allows you to define single or
multicolumn piers (bents).
NOTE: Refer to Figure 8 on page 8 for additional data input.

FIGURE T4-33. Pier and Column Definitions Dialog Box

By default, CONBOX creates a pier with the name Typ2Col. Rename this pier to
Pier 1 to match the pier referenced in the Bridge Component Layout dialog box in
order to place the defined pier at a stationing along the bridge. Note that not all piers
need to be referenced in the Bridge Component Layout dialog box, thus allowing you
to define a variety of different piers and selectively use them.
For this tutorial, however, the first pier contains two columns that are not among the
predefined prismatic column types; therefore, you must create a user-defined column
type by clicking the Column Types button to open the Column Definition dialog box.

COLUMN DEFINITION DIALOG BOX


This dialog box allows you to create, modify, or delete nonprismatic column shapes.
NOTE: Refer to Figure 8 on page 8 for additional data input.

T4-12 /

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Pier and Column Definitions Dialog Box

FIGURE T4-34. Column Definition Dialog Box (Pier Column 1)

PIER AND COLUMN DEFINITIONS DIALOG BOX


Specify the column length by entering 35.5550 (Col.
1) and 38.8750 (Col. 2) in the Len field located in the
Columns for Pier Definition grid. Select Pier Column 1
from the Column Type drop-down list, Fix from the
Support drop-down list. Also, the columns in this pier
are 36 ft. apart. Next you need to define the concrete
material properties for the column by clicking the
Material button in the grid to open the Concrete
Material dialog box.

CONCRETE MATERIAL DIALOG BOX


This dialog box allows you to define the concrete material for the appropriate column
by entering the information as shown in Fig. T4-35.

FIGURE T4-35. Concrete Material Dialog Box

NOTE: Only the appropriate concrete material properties will be available.

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

/ T4-13

Pier and Column Definitions Dialog Box

When you are done, click the OK button to return to the Pier and Column Definitions
dialog box.

PIER AND COLUMN DEFINITIONS DIALOG BOX


Once you have completed defining Pier 1, complete the definitions for Piers 2, 3, 5, 6,
and 7 by copying the definition to Pier 1 to keep the same concrete material properties.
Refer to the following table for additional data input.
Col. #

Spacing (ft.)

Len (ft.)

Column Type

Support

36.7750
40.0850

Pier Column 1
Pier Column 1

Fix
Fix

37.4250
40.7450

Pier Column 1
Pier Column 1

Fix
Fix

38.3950
41.7050

Pier Column 1
Pier Column 1

Fix
Fix

38.8250
40.9400

Pier Column 1
Pier Column 1

Fix
Fix

38.9600
39.6600

Pier Column 1
Pier Column 1

Fix
Fix

Pier 2 (Integral)

1
2

36.0
--

Pier 3 (Integral)

1
2

36.0
--

Pier 5 (Integral)

1
2

36.0
--

Pier 6 (Integral)

1
2

36.0
--

Pier 7 (Integral)

1
2

36.0
--

Next, define Pier 4 by clicking the Copy Pier Def. button while in the Pier 3 row. Pier 4
is also an integral pier but you will need to define an additional column type to
complete this pier.

COLUMN DEFINITION DIALOG BOX


Define the column by entering the information as shown in Fig. T4-36. Once you are
done, click the OK button to return to the Pier and Column Definitions dialog box.

T4-14 /

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Pier and Column Definitions Dialog Box

NOTE: Refer to Figure 9 on page 9 for additional data input.

FIGURE T4-36. Column Definition Dialog Box (Pier Column 2)

PIER AND COLUMN DEFINITIONS DIALOG BOX


Specify the column length by entering 25.2400 (Col. 1) and 28.6050 (Col. 2) in the
Len field located in the Columns for Pier Definition grid. Select Pier Column 2 from the
Column Type drop-down list, Fix from the Support drop-down list. Also, the columns in
this pier are 40.1770 ft. apart.

FIGURE T4-37. Pier and Column Definitions Dialog Box (Completed)

When you are done, click the OK button to return to the Geometry tab.
At this point, it would be a good idea to save your project. Select the Save As option from the File
menu. Enter the file name you want to save your data to (e.g., MyTutor4) in the File Name field
and click the Save button. The default extension is *.cbx

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

/ T4-15

Model Tab

Step 7: Define the Post-Tension Layout


MODEL TAB
The Model tab allows you to modify the plane frame analytical model by specifying
additional details about the superstructure, the tendons, the longitudinal rebar, and the
stirrups.

FIGURE T4-38. Model Tab

The span distances, bearing, and connection information was entered previously in the Bridge
Component Layout dialog box (Layout button on the Geometry tab). Since you will not be
making any changes to this information, you can skip the Superstructure button.

You can define the post-tension layout and tendon information for the full section by
clicking the Tendons button to open the Tendon Definitions dialog box.

TENDON DEFINITIONS DIALOG BOX


This dialog box allows you to define the post-tension layout and tendon information.
Enter the post-tensioning information as shown in Fig. T4-39. Refer to the following
table for Path Data information.
CONBOX computes the Required Jacking Force (P-Jack) and Concrete Strength at Initial
(Required fci). This information can be found in the Design Results screen located in the Design
tab. For this tutorial, however, you will proceed by specifying the post-tensioning layout
information according to the contract plans.

T4-16 /

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Tendon Definitions Dialog Box

FIGURE T4-39. Tendon Definitions Dialog Box

NOTE: Refer to the Tendon Profile Diagrams (Fig. T4-10, Fig. T4-11, and Fig. T4-12)
for additional data input.
Location

Span
Number

Distance
(%)

Top or
Bottom

Offset (in)

Variation
Type

POC

--

Path Data for Tendon (SE1)


1

1.8088

Bottom

40.75

--

50.3876

Bottom

10.00

Par-E

--

100.0000

Bottom

69.00

Par-D

0.7917

50.0000

Bottom

10.00

Par-D

0.2000

100.0000

Bottom

69.00

Par-D

0.8000

50.0000

Bottom

10.00

Par-D

0.2000

84.6667

Bottom

40.25

Par-S

--

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

/ T4-17

Model Tab

Location

Span
Number

Distance
(%)

Top or
Bottom

Offset (in)

Variation
Type

POC

--

Path Data for Tendon (SE2)


1

88.6667

Bottom

40.75

--

100.0000

Bottom

69.00

Par-E

--

50.0000

Bottom

10.00

Par-D

0.5

100.0000

Bottom

69.00

Par-D

0.5

50.0000

Bottom

10.00

Par-D

0.5

100.0000

Bottom

69.00

Par-D

0.5

11.3333

Bottom

40.25

Par-S

--

--

Path Data for Tendon (SE3)


1

15.3333

Bottom

40.25

--

50.0000

Bottom

10.00

Par-E

--

100.0000

Bottom

69.00

Par-D

0.5

50.0000

Bottom

10.00

Par-D

0.5

100.0000

Bottom

69.00

Par-D

0.5

49.6124

Bottom

10.00

Par-D

0.5

98.1912

Bottom

40.25

Par-S

--

Once you completed the tendon definitions, click the OK button to return to the Model
tab.

Step 8: Define the Longitudinal Rebar


MODEL TAB
Once you have completed the tendon definitions, you can define the longitudinal rebar
by clicking the Long. Rebar button to open the Longitudinal Rebar Definitions dialog
box.

LONGITUDINAL REBAR DEFINITIONS DIALOG BOX


This dialog box allows you to define the longitudinal rebar for the bridge.

T4-18 /

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Model Tab

NOTE: Refer to Fig. T4-13 and Fig. T4-14 to enter the longitudinal rebar information
according to the contract plans.

FIGURE T4-40. Longitudinal Rebar Definitions Dialog Box

Enter the longitudinal rebar as shown in Fig. T4-40. When you are done, click the OK
button to return to the Model tab. Notice that the longitudinal rebar displays in red in
both the elevation and section views of the bridge. Use the View Control feature to move
ahead on the bridge and follow the rebar along the cross section of the structure.

Step 9: Define the Stirrups


MODEL TAB
Once you have defined the longitudinal rebar, you can define the stirrups by clicking
the Stirrups button to open the Stirrup Definitions dialog box.

STIRRUP DEFINITIONS DIALOG BOX


This dialog box allows you to define the vertical reinforcement (i.e., stirrups).
NOTE: Refer to Figure 15 on page 15 to lay out the stirrup rebar according to the
contract plans.

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

/ T4-19

Stirrup Definitions Dialog Box

FIGURE T4-41. Stirrup Definitions Dialog Box

Once you have entered the data as shown in the following table, click the OK button to
return to the Model tab. Notice that the stirrups display in yellow in the elevation view
of the bridge.

T4-20 /

Number
of Legs

Stirrup
Size

Stirrup
Spacing

Reference
Type

Ref
Num

Ref Start
Distance

Ref End
Distance

18
18
18
18
18
18
18
18

#5
#5
#5
#5
#5
#5
#5
#5

8.0
12.0
18.0
12.0
8.0
8.0
12.0
18.0

Span
Span
Span
Span
Span
Span
Span
Span

1
1
1
1
1
2
2
2

1.75
25.0
36.5
60.0
71.666
0.6666
25.0
36.5

24.0
35.0
59.0
71.0
95.0
24.0
35.0
114.0

Number
of Legs

Stirrup
Size

Stirrup
Spacing

Reference
Type

Ref
Num

Ref Start
Distance

Ref End
Distance

18
18
18
18
18
18
18
18
18
18
18
18

#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5

12.0
8.0
8.0
12.0
18.0
12.0
8.0
6.0
8.0
12.0
18.0
12.0

Span
Span
Span
Span
Span
Span
Span
Span
Span
Span
Span
Span

2
2
3
3
3
3
3
3
4
4
4
4

115.0
126.6666
0.6666
25.0
38.5
95.0
106.6666
130.5
0.6666
25.0
36.5
115.0

126.0
150.0
24.0
37.0
94.0
106.0
130.0
150.0
24.0
35.0
114.0
126.0

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Stirrup Definitions Dialog Box

18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18
18

#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5

8.0
8.0
12.0
18.0
12.0
8.0
6.0
8.0
12.0
18.0
12.0
8.0
8.0
12.0
18.0
12.0
8.0
8.0
12.0
18.0
12.0
8.0

Span
Span
Span
Span
Span
Span
Span
Span
Span
Span
Span
Span
Span
Span
Span
Span
Span
Span
Span
Span
Span
Span

4
5
5
5
5
5
6
6
6
6
6
6
7
7
7
7
7
8
8
8
8
8

126.6666
0.6666
25.0
36.5
115.0
126.6666
0.5
20.6667
45.0
57.5
114.0
126.6666
0.6666
25.0
36.5
115.0
126.6666
0.6666
25.0
37.5
61.0
71.6666

150.0
24.0
35.0
114.0
126.0
150.0
20.0
44.0
56.0
113.0
126.0
150.0
24.0
35.0
114.0
126.0
150.0
24.0
36.0
60.0
71.0
95.0

At this point, it would be a good idea to save your project. Select the Save As option from the File
menu. Enter the file name you want to save your data to (e.g., MyTutor4) in the File Name field
and click the Save button. The default extension is *.cbx

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

/ T4-21

Stirrup Definitions Dialog Box

T4-22 /

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 10: Define the Dead Loads for the Analysis

Step 10: Define the Dead Loads for the Analysis


LOADS/ANALYSIS TAB
The Loads/Analysis tab allows you to specify load combinations (LFD) to be used in the
analysis. For this tutorial, you will be adding the following loads:

Dead Loads: Intrinsic Self Weight, Deck Falsework, and Intermediate Diaphragms

Superimposed Dead Loads: Barrier, Future Wearing Surface (FWS)

Temperature Loads: Uniform Temperature

Live Loads: HS20 Truck, HS20 Lane, and Military Vehicle

NOTE: Refer to the Problem Data beginning on page T4-1 for additional data input.

FIGURE T4-42. Loads/Analysis Tab

Select the Initial analysis case and define the Intrinsic Self-Weight load by right-clicking the
Dead Load/DC Group option on the right panel and selecting Add DC/DL. Double-click the
Dead Load-1 (Initial) load to open the Dead Loads dialog box.

DEAD LOADS DIALOG BOX (INTRINSIC SELF WEIGHT)


This dialog box allows you to define the dead load for the analysis. You can define the
intrinsic self-weight by selecting the Include Self-Weight option as shown in Fig. T4-43.

FIGURE T4-43. Dead Loads Dialog Box (Intrinsic Self-Weight)

T4-34 / Tutorial Four

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 10: Define the Dead Loads for the Analysis

Once you are done, click the OK button to return to the Loads/Analysis tab. Define the Deck
Falsework Load by right-clicking the Dead Load/DC Group option on the right panel and
selecting Add DC/DL. Double-click the load to open the Dead Loads dialog box.

DEAD LOADS DIALOG BOX (DECK FALSEWORK)


Define the Deck Falsework Load by completing the information as shown in Fig. T4-44.

FIGURE T4-44. Dead Loads Dialog Box (Deck Falsework)

Once you are done, click the OK button to return to the Loads/Analysis tab. Define the
Intermediate Diaphragms Load by right-clicking the Dead Load/DC Group option on the
right panel and selecting Add DC/DL. Double-click the load to open the Dead Loads dialog
box.

DEAD LOADS DIALOG BOX (INTERMEDIATE DIAPHRAGMS)


Define the Intermediate Diaphragm Load by completing the information as shown in Fig.
T4-45.

FIGURE T4-45. Dead Loads Dialog Box (Intermediate Diaphragms)

Once you are done, click the OK button to return to the Loads/Analysis tab.

LEAP CONBOX v10.00.01.00

Tutorial Four / T4-35

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 11: Define the Superimposed Dead Loads for the Analysis

Step 11: Define the Superimposed Dead Loads for the Analysis
Once you have defined the Dead Loads, notice that all three loads have been added to the
right panel and are now represented in the graphic window for the bridge as shown in Fig.
T4-46.
NOTE: Refer to the Problem Data beginning on page T4-1 for additional data input.

FIGURE T4-46. Loads/Analysis Tab (Dead Loads Added)

Select the Final analysis case and define the Barrier Load by right-clicking the
Superimposed Dead Load/DW Group option on the right panel and selecting Add DW/ADL.
Double-click the load to open the Dead Loads dialog box.

DEAD LOADS DIALOG BOX (BARRIER)


Define the Barrier Load by completing the information as shown in Fig. T4-47.

FIGURE T4-47. Dead Loads Dialog Box (Barrier)

T4-36 / Tutorial Four

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 12: Define the Temperature Loads for the Analysis

Once you are done, click the OK button to return to the Loads/Analysis tab. Define the FWS
Load by right-clicking the Superimposed Dead Load/DW Group option on the right-side of
the screen and selecting Add DW/ADL. Double-click the load to open the Dead Loads dialog
box.

DEAD LOADS DIALOG BOX (FWS)


Define the FWS Load by completing the information as shown in Fig. T4-48.

FIGURE T4-48. Dead Loads Dialog Box (FWS)

Once you are done, click the OK button to return to the Loads/Analysis tab.

Step 12: Define the Temperature Loads for the Analysis


Once you have defined the Superimposed Dead Loads, notice that both loads have been
added to the right panel and are now represented in the graphic window for the bridge as
shown in Fig. T4-49.
NOTE: Refer to the Problem Data beginning on page T4-1 for additional data input.

FIGURE T4-49. Loads/Analysis Tab (Superimposed Dead Loads Added)

LEAP CONBOX v10.00.01.00

Tutorial Four / T4-37

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 13: Define the Live Loads for the Analysis

Define the Uniform Temperature Load by right-clicking the Temperature Load Group option
on the right panel and selecting Add Uniform Temperature. Double-click the load to open the
Uniform Temperature Load dialog box.

UNIFORM TEMPERATURE LOAD DIALOG BOX


Define the Uniform Temperature Load by completing the information as shown in Figure
T4-34.

FIGURE T4-50. Uniform Temperature Load Dialog Box

Once you are done, click the OK button to return to the Loads/Analysis tab.

Step 13: Define the Live Loads for the Analysis


LOADS/ANALYSIS TAB
Once you have defined the temperature load, notice that it has been added to the right side
of the window and is now represented in the graphic window for the bridge as shown in Fig.
T4-51.
NOTE: Refer to the Problem Data beginning on page T4-1 for additional data input.

FIGURE T4-51. Loads/Analysis Tab (Uniform Temperature Load Added)

Select the Final w/o Sway analysis case and define the HS20 Truck + Lane by expanding the
Live Load Groups located under Locked Library Loads. Select the predefined HS20 Truck
+ Lane load, then drag and drop it anywhere within the Tutor 4 Loads. Notice that this load
is added to the Live Load Group. In the Live Load Group for this tutorial, double-click the
HS20 Truck + Lane Load to open the Live Load dialog box.

T4-38 / Tutorial Four

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 13: Define the Live Loads for the Analysis

NOTE: The Locked Library Loads can be viewed or modified by selecting Vehicle from the
Libraries menu to open the Vehicle Library.

LIVE LOAD DIALOG BOX (HS20 TRUCK + LANE LOAD)


This dialog box allows you to add or modify live loads for the analysis. Verify that the
definition for this load appears as shown in Fig. T4-52.

FIGURE T4-52. Live Load Dialog Box (HS20 Truck + Lane)

Once you are done, click the OK button to return to the Loads/Analysis tab.

LOADS/ANALYSIS TAB
Define the Military Truck Load by selecting the Military Truck Load located in the Live Load
Groups listed under Locked Library Loads. Drag and drop this load anywhere within the
Tutor 4 Loads. Notice that this load is added to the Live Load Group. In the Live Load
Group for this tutorial, double-click the load to open the Live Load dialog box.

LIVE LOAD DIALOG BOX (MILITARY TRUCK LOAD)


Verify that the definition for this load appears as shown in Fig. T4-53. Once you are done,
click the OK button to return to the Loads/Analysis tab.

FIGURE T4-53. Live Load Dialog Box (Military Truck Load)

LEAP CONBOX v10.00.01.00

Tutorial Four / T4-39

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 14: Define the Load Combination Factors for the Analysis

LOADS/ANALYSIS TAB
Notice that both live loads have been added to the right panel and that they are represented
in the graphic window as shown in Fig. T4-54.

FIGURE T4-54. Loads/Analysis Tab (Live Loads Added)


.

At this point, it would be a good idea to save your project. Select the Save As option from the File
menu. Enter the file name you want to save your data to (e.g., MyTutor4) in the File Name field
and click the Save button. The default extension is *.cbx

Step 14: Define the Load Combination Factors for the Analysis
LOADS/ANALYSIS TAB
Once you have defined the loads for the analysis, you need to add the combination factors
to be used for the each analysis case. To define the combinations for the Initial analysis
case, select Initial from the Case drop-down list, right-click in the left panel, and select Add
Combination to add a load combination.
For the Initial analysis case, you will add the SLD I combination. The type of combination
selected governs which specification checks and design activities the combination will be used
for.

LFD LOAD COMBINATION FACTORS DIALOG BOX


The only combination for this analysis case will be for SLD Group I. To define this
combination, double-click the load combination, Comb-1. Complete the LFD Load
Combination Factors dialog box as shown in Fig. T4-55.

T4-40 / Tutorial Four

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 14: Define the Load Combination Factors for the Analysis

FIGURE T4-55. LFD Load Combination Factors Dialog Box

Once you are done, click the OK button to return to the Loads/Analysis tab.

LOADS/ANALYSIS TAB
Once you have created the Initial (SLD 1) combination, select the Self Weight load in the
right panel, then drag and drop it anywhere within the combination. Repeat this process
again to add the Deck Falsework and the Intermediate Diaphragm loads to the combination.
Notice that the Dead Loads have been added to the Dead Load/DC Group in the
combination as shown in Fig. T4-56.

FIGURE T4-56. Loads/Analysis Tab (SLD 1 (Initial) Combination Added)

Repeat the steps defined above to define the rest of the combinations for the analysis. Refer
to the following table for additional input information.

LEAP CONBOX v10.00.01.00

Tutorial Four / T4-41

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 15: Check the Design Parameters

For the SLD 1 (Final) load combination, change the Uniform Temperature (Tu) factor in the LFD
Load Combination Factors dialog box to 1.0 For all other load combinations, accept the default
factors in this dialog box.

AASHTO
Combination
Type

Combination
Name

Purpose

Defined Loads to Include

Intrinsic
Deck
Intermediate Barrier FWS Uniform HS20 Truck Military
Self
Falsework Diaphragms
Temp
+ Lane
Truck
Weight
Initial
SLD Group I

SLD 1 (Initial)

f'ci Design
Stress Check

SLD 1 (Final)

Stress Check
w/Temperature

PT Design
f'c Design

Final
SLD Group I

Final Without (w/o) Sway


SLD Group I SLD 1 (Final w/o Sway)

LFD Group I LFD 1 (Final w/o Sway) Strength Design


(Std)

At this point, it would be a good idea to save your project. Select the Save As option from the File
menu. Enter the file name you want to save your data to (e.g., MyTutor4) in the File Name field
and click the Save button. The default extension is *.cbx

Step 15: Check the Design Parameters


Select Design Parameters from the Settings menu to open the Design Parameters dialog box.
This dialog box allows you to view and/or edit the settings of the design parameters.

FIGURE T4-57. Design Parameters Dialog Box

T4-42 / Tutorial Four

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 16: Run the Analysis

Change the PS + Perm Tension Factor to 6.000 and the Flexure PT Resistance Factor to
0.95. Use the default numbers for all other allowable stress and resistance factors. When
you are done, click the OK button to return to the program.

Step 16: Run the Analysis


LOADS/ANALYSIS TAB
You will use the program-computed live load distribution factors according to AASHTO;
therefore, skip the Live Load Distribution Factors button.

After defining the load combinations, you can perform an analysis of the structure by
clicking the Run Analysis button. After performing the analysis, the default analysis result
text/graphic report displays in the Analysis Results screen.

ANALYSIS RESULTS SCREEN


This screen displays automatically after performing the analysis and presents you with the
analysis results.

FIGURE T4-58. Analysis Results Screen (Text Format)

This screen allows you to view, print, save, or copy (in text or Microsoft Excel formats)
structure responses to all loads, load cases, and load combinations. Click
to close this
screen and return to the Loads/Analysis tab.

Step 17: View the Design Results


DESIGN TAB
This tab allows you to verify the design results and assists you in designing the layout of
your rebar and stirrups. After running the analysis, click the Design Results button to open
the Design Results screen.

LEAP CONBOX v10.00.01.00

Tutorial Four / T4-43

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 17: View the Design Results

FIGURE T4-59. Design Tab

CONBOX automatically computes the P-Jack, fci, and fc requirements and displays them in the

bottom view of the Design tab.

DESIGN RESULTS SCREEN


This screen displays automatically after computing the design and presents you with the
design results.

FIGURE T4-60. Design Results Screen (Text Format)

Using this screen, you can display the design results in either a text or graphic format, view
the design results for an analysis case, view the design results for a load combination, or
view the design results by response type. You can also print your design results by rightclicking this screen and selecting the Print option. When you are done, click to close this
screen and return to the Design tab.

T4-44 / Tutorial Four

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 18: Print the Reports

Since you have already entered the longitudinal rebar and stirrups, you can skip the Rebar and
Stirrups buttons.

Step 18: Print the Reports


The input of Tutorial 4 is completed. To print the final output of the project, select Print
from the File menu to open the Print Report Manager dialog box.

PRINT REPORT MANAGER


For this tutorial, print to a file all the model reports, analysis results, design/check reports,
and miscellaneous reports as shown in Fig. T4-61. Click the Create Reports button to send
the selected output to a text file.

FIGURE T4-61. Print Report Manager

Following this page is a printout of the output for Tutorial 4 according to the options
selected above.
At this point, it would be a good idea to save your project. Select the Save As option from the File
menu. Enter the file name you want to save your data to (e.g., MyTutor4) in the File Name field
and click the Save button. The default extension is *.cbx

LEAP CONBOX v10.00.01.00

Tutorial Four / T4-45

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

T4-46 / Tutorial Four

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
1 of
3
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor4.cbx
Combined Summary - Box Girder
Stage Final
POI
Location ............ Min C/D Ratios ............
(ft)
Moment
Shear
St-Ten
St-Cmp LL-Def
-------- -------- ---------------- ------ -----BegSuper
0.00 999.99
9.82d 999.99 999.99
7.99
EndCntlv
1.75
9.78
8.35d
36.99 167.79 999.00
Sp1.000
1.75
23.84
5.26
999.99
10.26 999.00
Sp1.010
11.25
2.27
3.10
999.99
3.90
31.30
Sp1.020
20.75
1.60
2.83
999.99
2.33
16.28
Sp1.030
30.25
1.44
2.64
999.99
2.12
11.79
Sp1.040
39.75
1.42
3.01
999.99
1.94
10.07
Sp1.050
49.25
1.52
2.42
999.99
1.79
9.55
Sp1.060
58.75
1.73
2.16
999.99
1.73
10.34
Sp1.070
68.25
2.06
2.32
999.99
1.89
12.53
Sp1.080
77.75
0.78*
1.59
999.99
2.42
17.54
Sp1.090
87.25
1.75
1.66
999.99
3.18
32.37
Sp1.100
96.75
1.27
1.99d 769.00
6.68
85.30
Sp2.000
96.75
1.08
1.77d
3.92
5.25 139.87
Sp2.010
111.75
2.68
1.89
999.99
2.95
22.48
Sp2.020
126.75
1.82
1.67
999.99
2.88
10.87
Sp2.030
141.75
1.45
1.36
5.14
2.83
7.32
Sp2.040
156.75
1.31
1.61
2.48
2.72
5.91
Sp2.050
171.75
1.29
2.28
2.58
2.65
5.41
Sp2.060
186.75
1.35
1.58
5.05
2.78
5.79
Sp2.070
201.75
1.56
1.40
999.99
3.16
6.99
Sp2.080
216.75
1.89
1.73
999.99
3.60
10.11
Sp2.090
231.75
1.61
1.49
999.99
3.43
20.30
Sp2.100
246.75
0.99*
1.78
1.70
4.25 122.68
Sp3.000
246.75
1.02
1.67d
1.40
3.95 122.68
Sp3.010
261.75
1.53
1.50
999.99
2.95
19.43
Sp3.020
276.75
1.62
1.76
999.99
2.71
9.60
Sp3.030
291.75
1.36
1.50
999.99
2.76
6.58
Sp3.040
306.75
1.31
1.65
999.99
2.82
5.40
Sp3.050
321.75
1.24
2.18
999.99
2.66
5.00
Sp3.060
336.75
1.25
1.77
999.99
2.70
5.39
Sp3.070
351.75
1.27
1.79
999.99
3.07
6.58
Sp3.080
366.75
1.70
2.48
999.99
3.74
9.47
Hinge1.L
376.75
7.97
2.53
999.99 999.99
11.65
Hinge.R
376.75
7.97
2.42d 999.99 999.99
11.65
Sp3.090
381.75
3.14
2.37
999.99
4.74
15.81
Sp3.100
396.75
1.25
1.78
1.54
4.38 125.10
Sp4.000
396.75
1.19
1.77d
1.78
4.66 125.10
Sp4.010
411.75
1.93
1.39
999.99
3.19
14.06
Sp4.020
426.75
0.20*C
1.59
5.23
2.55
7.34
Sp4.030
441.75
1.28
1.37
39.76
2.70
5.30
Sp4.040
456.75
1.32
1.74
999.99
2.76
4.54
Sp4.050
471.75
1.36
2.22
999.99
2.86
4.36
Sp4.060
486.75
1.44
1.61
999.99
3.02
4.84
Sp4.070
501.75
1.50
1.42
999.99
3.26
6.12
Sp4.080
516.75
0.36*C
1.63
999.99
2.99
9.20
Sp4.090
531.75
1.53
1.54
999.99
3.26
19.53
Sp4.100
546.75
1.05
1.77
1.00*
3.48 202.08

Bentley Exton Office

| Sheet
2 of
3
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor4.cbx
Sp5.000
546.75
1.05
1.68d
0.99*
3.47 202.08
Sp5.010
561.75
1.53
1.55
999.99
3.26
19.41
Sp5.020
576.75
0.36*C
1.63
999.99
2.99
9.15
Sp5.030
591.75
1.50
1.41
999.99
3.26
6.09
Sp5.040
606.75
1.43
1.60
999.99
3.01
4.82
Sp5.050
621.75
1.35
2.27
999.99
2.84
4.34
Sp5.060
636.75
1.31
1.74
999.99
2.74
4.51
Sp5.070
651.75
1.27
1.36
16.15
2.67
5.27
Sp5.080
666.75
0.20*C
1.58
4.30
2.51
7.29
Sp5.090
681.75
1.95
1.39
999.99
3.12
13.94
Sp5.100
696.75
1.18
1.86
1.85
4.72 122.11
Sp6.000
696.75
1.23
1.54d
1.62
4.47 122.11
Sp6.010
711.75
3.16
3.33
999.99
9.00
15.66
Hinge2.L
716.75
7.80
2.84
999.99 999.99
11.54
Hinge.R
716.75
7.80
2.45d 999.99 999.99
11.54
Sp6.020
726.75
1.72
2.54
999.99
3.81
9.39
Sp6.030
741.75
1.24
1.85
999.99
3.14
6.54
Sp6.040
756.75
1.24
1.87
999.99
2.79
5.36
Sp6.050
771.75
1.24
2.11
999.99
2.78
4.96
Sp6.060
786.75
1.24
1.61
999.99
2.68
5.36
Sp6.070
801.75
1.27
1.42
999.99
3.08
6.53
Sp6.080
816.75
0.35*C
1.78
999.99
2.77
9.50
Sp6.090
831.75
1.51
1.48
999.99
3.07
19.19
Sp6.100
846.75
1.05
1.74
1.09
3.59 117.71
Sp7.000
846.75
1.07
1.69d
1.26
3.84 117.71
Sp7.010
861.75
1.56
1.50
999.99
3.40
20.01
Sp7.020
876.75
0.33*C
1.73
999.99
2.85
9.99
Sp7.030
891.75
1.53
1.40
999.99
3.15
6.92
Sp7.040
906.75
1.43
1.62
999.99
3.00
5.73
Sp7.050
921.75
1.39
2.45
999.99
2.92
5.36
Sp7.060
936.75
1.38
1.65
6.53
2.91
5.85
Sp7.070
951.75
1.41
1.35
3.46
2.80
7.23
Sp7.080
966.75
0.24*C
1.64
3.58
2.40
10.71
Sp7.090
981.75
2.49
1.68
999.99
2.84
22.06
Sp7.100
996.75
1.12
1.87
2.26
4.75 131.63
Sp8.000
996.75
1.16
1.97d
4.57
5.74
80.28
Sp8.010 1,006.25
1.70
1.62
999.99
3.24
31.69
Sp8.020 1,015.75
0.97*
1.80
999.99
3.50
17.26
Sp8.030 1,025.25
1.34
2.22
999.99
2.16
12.36
Sp8.040 1,034.75
1.82
2.10
53.78
1.66
10.22
Sp8.050 1,044.25
1.61
2.37
55.92
1.66
9.46
Sp8.060 1,053.75
1.49
3.09
999.99
1.83
9.99
Sp8.070 1,063.25
1.49
2.80
999.99
2.04
11.70
Sp8.080 1,072.75
1.66
2.94
999.99
2.29
16.17
Sp8.090 1,082.25
2.35
3.14
999.99
3.85
31.10
Sp8.100 1,091.75
21.18
2.63d 999.99
10.01 999.00
BegCntlv 1,091.75
10.08
8.36d
36.99 167.81 999.00
EndSuper 1,093.50 139.00
9.92d 999.99 999.99
7.94
Notes
C: Crack Control did not pass.
d: Shear reinforcement was designed.
L: Asfy-Actual < Asfy-Required.
Spec: AASHTO Standard

Units: US (English)

Loss: Lump Sum

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
2 of
3
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor4.cbx
Sp5.000
546.75
1.05
1.68d
0.99*
3.47 202.08
Sp5.010
561.75
1.53
1.55
999.99
3.26
19.41
Sp5.020
576.75
0.36*C
1.63
999.99
2.99
9.15
Sp5.030
591.75
1.50
1.41
999.99
3.26
6.09
Sp5.040
606.75
1.43
1.60
999.99
3.01
4.82
Sp5.050
621.75
1.35
2.27
999.99
2.84
4.34
Sp5.060
636.75
1.31
1.74
999.99
2.74
4.51
Sp5.070
651.75
1.27
1.36
16.15
2.67
5.27
Sp5.080
666.75
0.20*C
1.58
4.30
2.51
7.29
Sp5.090
681.75
1.95
1.39
999.99
3.12
13.94
Sp5.100
696.75
1.18
1.86
1.85
4.72 122.11
Sp6.000
696.75
1.23
1.54d
1.62
4.47 122.11
Sp6.010
711.75
3.16
3.33
999.99
9.00
15.66
Hinge2.L
716.75
7.80
2.84
999.99 999.99
11.54
Hinge.R
716.75
7.80
2.45d 999.99 999.99
11.54
Sp6.020
726.75
1.72
2.54
999.99
3.81
9.39
Sp6.030
741.75
1.24
1.85
999.99
3.14
6.54
Sp6.040
756.75
1.24
1.87
999.99
2.79
5.36
Sp6.050
771.75
1.24
2.11
999.99
2.78
4.96
Sp6.060
786.75
1.24
1.61
999.99
2.68
5.36
Sp6.070
801.75
1.27
1.42
999.99
3.08
6.53
Sp6.080
816.75
0.35*C
1.78
999.99
2.77
9.50
Sp6.090
831.75
1.51
1.48
999.99
3.07
19.19
Sp6.100
846.75
1.05
1.74
1.09
3.59 117.71
Sp7.000
846.75
1.07
1.69d
1.26
3.84 117.71
Sp7.010
861.75
1.56
1.50
999.99
3.40
20.01
Sp7.020
876.75
0.33*C
1.73
999.99
2.85
9.99
Sp7.030
891.75
1.53
1.40
999.99
3.15
6.92
Sp7.040
906.75
1.43
1.62
999.99
3.00
5.73
Sp7.050
921.75
1.39
2.45
999.99
2.92
5.36
Sp7.060
936.75
1.38
1.65
6.53
2.91
5.85
Sp7.070
951.75
1.41
1.35
3.46
2.80
7.23
Sp7.080
966.75
0.24*C
1.64
3.58
2.40
10.71
Sp7.090
981.75
2.49
1.68
999.99
2.84
22.06
Sp7.100
996.75
1.12
1.87
2.26
4.75 131.63
Sp8.000
996.75
1.16
1.97d
4.57
5.74
80.28
Sp8.010 1,006.25
1.70
1.62
999.99
3.24
31.69
Sp8.020 1,015.75
0.97*
1.80
999.99
3.50
17.26
Sp8.030 1,025.25
1.34
2.22
999.99
2.16
12.36
Sp8.040 1,034.75
1.82
2.10
53.78
1.66
10.22
Sp8.050 1,044.25
1.61
2.37
55.92
1.66
9.46
Sp8.060 1,053.75
1.49
3.09
999.99
1.83
9.99
Sp8.070 1,063.25
1.49
2.80
999.99
2.04
11.70
Sp8.080 1,072.75
1.66
2.94
999.99
2.29
16.17
Sp8.090 1,082.25
2.35
3.14
999.99
3.85
31.10
Sp8.100 1,091.75
21.18
2.63d 999.99
10.01 999.00
BegCntlv 1,091.75
10.08
8.36d
36.99 167.81 999.00
EndSuper 1,093.50 139.00
9.92d 999.99 999.99
7.94
Notes
C: Crack Control did not pass.
d: Shear reinforcement was designed.
L: Asfy-Actual < Asfy-Required.
Units: US (English)

| Sheet
2 of
2
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor4.cbx
Sp5.000
546.75
0.17 Bm-T
0.40
2.36
-0.48 Bm-B
-2.70
5.58
Sp5.010
561.75
0.00
N/A 999.99
-0.53 Bm-B
-2.70
5.11
Sp5.020
576.75
0.00
N/A 999.99
-0.62 Bm-T
-2.70
4.32
Sp5.030
591.75
0.00
N/A 999.99
-0.55 Bm-T
-2.70
4.91
Sp5.040
606.75
0.00
N/A 999.99
-0.55 Bm-B
-2.70
4.88
Sp5.050
621.75
0.00
N/A 999.99
-0.61 Bm-B
-2.70
4.41
Sp5.060
636.75
0.00
N/A 999.99
-0.60 Bm-B
-2.70
4.50
Sp5.070
651.75
0.00
N/A 999.99
-0.64 Bm-T
-2.70
4.20
Sp5.080
666.75
0.00
N/A 999.99
-0.78 Bm-T
-2.70
3.48
Sp5.090
681.75
0.00
N/A 999.99
-0.65 Bm-T
-2.70
4.17
Sp5.100
696.75
0.07 Bm-T
0.40
5.39
-0.42 Bm-B
-2.70
6.46
Sp6.000
696.75
0.06 Bm-T
0.40
6.63
-0.40 Bm-B
-2.70
6.73
Sp6.010
711.75
0.00
N/A 999.99
-0.20 Bm-B
-2.70 13.42
Hinge2.L
716.75
0.00 Bm-B
0.40 999.99
0.00 Bm-T
-2.70 999.99
Hinge.R
716.75
0.00 Bm-B
0.40 999.99
0.00 Bm-T
-2.70 999.99
Sp6.020
726.75
0.00
N/A 999.99
-0.48 Bm-T
-2.70
5.68
Sp6.030
741.75
0.00
N/A 999.99
-0.56 Bm-T
-2.70
4.79
Sp6.040
756.75
0.00
N/A 999.99
-0.61 Bm-B
-2.70
4.46
Sp6.050
771.75
0.00
N/A 999.99
-0.68 Bm-B
-2.70
4.00
Sp6.060
786.75
0.00
N/A 999.99
-0.71 Bm-B
-2.70
3.78
Sp6.070
801.75
0.00
N/A 999.99
-0.62 Bm-B
-2.70
4.35
Sp6.080
816.75
0.00
N/A 999.99
-0.69 Bm-T
-2.70
3.92
Sp6.090
831.75
0.00
N/A 999.99
-0.65 Bm-B
-2.70
4.13
Sp6.100
846.75
0.17 Bm-T
0.40
2.31
-0.54 Bm-B
-2.70
4.99
Sp7.000
846.75
0.13 Bm-T
0.40
3.05
-0.50 Bm-B
-2.70
5.40
Sp7.010
861.75
0.00
N/A 999.99
-0.60 Bm-B
-2.70
4.54
Sp7.020
876.75
0.00
N/A 999.99
-0.68 Bm-T
-2.70
3.95
Sp7.030
891.75
0.00
N/A 999.99
-0.59 Bm-T
-2.70
4.59
Sp7.040
906.75
0.00
N/A 999.99
-0.52 Bm-B
-2.70
5.17
Sp7.050
921.75
0.00
N/A 999.99
-0.51 Bm-T
-2.70
5.30
Sp7.060
936.75
0.00
N/A 999.99
-0.56 Bm-T
-2.70
4.81
Sp7.070
951.75
0.00
N/A 999.99
-0.66 Bm-T
-2.70
4.08
Sp7.080
966.75
0.00
N/A 999.99
-0.78 Bm-T
-2.70
3.46
Sp7.090
981.75
0.00
N/A 999.99
-0.68 Bm-T
-2.70
4.00
Sp7.100
996.75
0.00 Bm-T
0.40 120.49
-0.33 Bm-B
-2.70
8.25
Sp8.000
996.75
0.00
N/A 999.99
-0.23 Bm-B
-2.70 11.72
Sp8.010 1,006.25
0.00
N/A 999.99
-0.56 Bm-T
-2.70
4.80
Sp8.020 1,015.75
0.00
N/A 999.99
-0.54 Bm-B
-2.70
5.03
Sp8.030 1,025.25
0.00
N/A 999.99
-0.86 Bm-B
-2.70
3.14
Sp8.040 1,034.75
0.00
N/A 999.99
-1.11 Bm-B
-2.70
2.44
Sp8.050 1,044.25
0.00
N/A 999.99
-1.11 Bm-B
-2.70
2.44
Sp8.060 1,053.75
0.00
N/A 999.99
-1.00 Bm-B
-2.70
2.69
Sp8.070 1,063.25
0.00
N/A 999.99
-0.90 Bm-B
-2.70
2.99
Sp8.080 1,072.75
0.00
N/A 999.99
-0.80 Bm-B
-2.70
3.35
Sp8.090 1,082.25
0.00
N/A 999.99
-0.48 Bm-B
-2.70
5.62
Sp8.100 1,091.75
0.00
N/A 999.99
-0.19 Bm-B
-2.70 14.59
BegCntlv 1,091.75
0.00 Bm-T
0.40 288.88
0.00 Bm-B
-2.70 999.99
EndSuper 1,093.50
0.00 Bm-B
0.40 999.99
0.00 Bm-T
-2.70 999.99
***** End of Report *****
Spec: AASHTO Standard

Units: US (English)

Loss: Lump Sum

Loss: Lump Sum

Output

Tutorial Four / T4-47

Spec: AASHTO Standard

Bentley Exton Office

T4-48 / Tutorial Four

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
2 of
2
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor4.cbx
Sp5.000
546.75
0.17 Bm-T
0.40
2.36
-0.48 Bm-B
-2.70
5.58
Sp5.010
561.75
0.00
N/A 999.99
-0.53 Bm-B
-2.70
5.11
Sp5.020
576.75
0.00
N/A 999.99
-0.62 Bm-T
-2.70
4.32
Sp5.030
591.75
0.00
N/A 999.99
-0.55 Bm-T
-2.70
4.91
Sp5.040
606.75
0.00
N/A 999.99
-0.55 Bm-B
-2.70
4.88
Sp5.050
621.75
0.00
N/A 999.99
-0.61 Bm-B
-2.70
4.41
Sp5.060
636.75
0.00
N/A 999.99
-0.60 Bm-B
-2.70
4.50
Sp5.070
651.75
0.00
N/A 999.99
-0.64 Bm-T
-2.70
4.20
Sp5.080
666.75
0.00
N/A 999.99
-0.78 Bm-T
-2.70
3.48
Sp5.090
681.75
0.00
N/A 999.99
-0.65 Bm-T
-2.70
4.17
Sp5.100
696.75
0.07 Bm-T
0.40
5.39
-0.42 Bm-B
-2.70
6.46
Sp6.000
696.75
0.06 Bm-T
0.40
6.63
-0.40 Bm-B
-2.70
6.73
Sp6.010
711.75
0.00
N/A 999.99
-0.20 Bm-B
-2.70 13.42
Hinge2.L
716.75
0.00 Bm-B
0.40 999.99
0.00 Bm-T
-2.70 999.99
Hinge.R
716.75
0.00 Bm-B
0.40 999.99
0.00 Bm-T
-2.70 999.99
Sp6.020
726.75
0.00
N/A 999.99
-0.48 Bm-T
-2.70
5.68
Sp6.030
741.75
0.00
N/A 999.99
-0.56 Bm-T
-2.70
4.79
Sp6.040
756.75
0.00
N/A 999.99
-0.61 Bm-B
-2.70
4.46
Sp6.050
771.75
0.00
N/A 999.99
-0.68 Bm-B
-2.70
4.00
Sp6.060
786.75
0.00
N/A 999.99
-0.71 Bm-B
-2.70
3.78
Sp6.070
801.75
0.00
N/A 999.99
-0.62 Bm-B
-2.70
4.35
Sp6.080
816.75
0.00
N/A 999.99
-0.69 Bm-T
-2.70
3.92
Sp6.090
831.75
0.00
N/A 999.99
-0.65 Bm-B
-2.70
4.13
Sp6.100
846.75
0.17 Bm-T
0.40
2.31
-0.54 Bm-B
-2.70
4.99
Sp7.000
846.75
0.13 Bm-T
0.40
3.05
-0.50 Bm-B
-2.70
5.40
Sp7.010
861.75
0.00
N/A 999.99
-0.60 Bm-B
-2.70
4.54
Sp7.020
876.75
0.00
N/A 999.99
-0.68 Bm-T
-2.70
3.95
Sp7.030
891.75
0.00
N/A 999.99
-0.59 Bm-T
-2.70
4.59
Sp7.040
906.75
0.00
N/A 999.99
-0.52 Bm-B
-2.70
5.17
Sp7.050
921.75
0.00
N/A 999.99
-0.51 Bm-T
-2.70
5.30
Sp7.060
936.75
0.00
N/A 999.99
-0.56 Bm-T
-2.70
4.81
Sp7.070
951.75
0.00
N/A 999.99
-0.66 Bm-T
-2.70
4.08
Sp7.080
966.75
0.00
N/A 999.99
-0.78 Bm-T
-2.70
3.46
Sp7.090
981.75
0.00
N/A 999.99
-0.68 Bm-T
-2.70
4.00
Sp7.100
996.75
0.00 Bm-T
0.40 120.49
-0.33 Bm-B
-2.70
8.25
Sp8.000
996.75
0.00
N/A 999.99
-0.23 Bm-B
-2.70 11.72
Sp8.010 1,006.25
0.00
N/A 999.99
-0.56 Bm-T
-2.70
4.80
Sp8.020 1,015.75
0.00
N/A 999.99
-0.54 Bm-B
-2.70
5.03
Sp8.030 1,025.25
0.00
N/A 999.99
-0.86 Bm-B
-2.70
3.14
Sp8.040 1,034.75
0.00
N/A 999.99
-1.11 Bm-B
-2.70
2.44
Sp8.050 1,044.25
0.00
N/A 999.99
-1.11 Bm-B
-2.70
2.44
Sp8.060 1,053.75
0.00
N/A 999.99
-1.00 Bm-B
-2.70
2.69
Sp8.070 1,063.25
0.00
N/A 999.99
-0.90 Bm-B
-2.70
2.99
Sp8.080 1,072.75
0.00
N/A 999.99
-0.80 Bm-B
-2.70
3.35
Sp8.090 1,082.25
0.00
N/A 999.99
-0.48 Bm-B
-2.70
5.62
Sp8.100 1,091.75
0.00
N/A 999.99
-0.19 Bm-B
-2.70 14.59
BegCntlv 1,091.75
0.00 Bm-T
0.40 288.88
0.00 Bm-B
-2.70 999.99
EndSuper 1,093.50
0.00 Bm-B
0.40 999.99
0.00 Bm-T
-2.70 999.99
***** End of Report *****
Spec: AASHTO Standard

Units: US (English)

Loss: Lump Sum

Bentley Exton Office

| Sheet
2 of
2
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor4.cbx
Sp5.000
Sp5.010
Sp5.020
Sp5.030
Sp5.040
Sp5.050
Sp5.060
Sp5.070
Sp5.080
Sp5.090
Sp5.100
Sp6.000
Sp6.010
Hinge2.L
Hinge.R
Sp6.020
Sp6.030
Sp6.040
Sp6.050
Sp6.060
Sp6.070
Sp6.080
Sp6.090
Sp6.100
Sp7.000
Sp7.010
Sp7.020
Sp7.030
Sp7.040
Sp7.050
Sp7.060
Sp7.070
Sp7.080
Sp7.090
Sp7.100
Sp8.000
Sp8.010
Sp8.020
Sp8.030
Sp8.040
Sp8.050
Sp8.060
Sp8.070
Sp8.080
Sp8.090
Sp8.100
BegCntlv
EndSuper

546.75
561.75
576.75
591.75
606.75
621.75
636.75
651.75
666.75
681.75
696.75
696.75
711.75
716.75
716.75
726.75
741.75
756.75
771.75
786.75
801.75
816.75
831.75
846.75
846.75
861.75
876.75
891.75
906.75
921.75
936.75
951.75
966.75
981.75
996.75
996.75
1,006.25
1,015.75
1,025.25
1,034.75
1,044.25
1,053.75
1,063.25
1,072.75
1,082.25
1,091.75
1,091.75
1,093.50

0.41
0.00
0.00
0.00
0.00
0.00
0.00
0.02
0.09
0.00
0.22
0.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.37
0.32
0.00
0.00
0.00
0.00
0.00
0.06
0.12
0.11
0.00
0.18
0.09
0.00
0.00
0.00
0.01
0.01
0.00
0.00
0.00
0.00
0.00
0.01
0.00

Bm-T

Bm-B
Bm-B
Bm-T
Bm-T
Bm-B
Bm-B

Bm-T
Bm-T

Bm-B
Bm-B
Bm-B
Bm-T
Bm-T

Bm-T
Bm-T

Bm-T
Bm-B

0.40
N/A
N/A
N/A
N/A
N/A
N/A
0.40
0.40
N/A
0.40
0.40
N/A
0.40
0.40
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
0.40
0.40
N/A
N/A
N/A
N/A
N/A
0.40
0.40
0.40
N/A
0.40
0.40
N/A
N/A
N/A
0.40
0.40
N/A
N/A
N/A
N/A
N/A
0.40
0.40

0.99*
999.99
999.99
999.99
999.99
999.99
999.99
16.15
4.30
999.99
1.85
1.62
999.99
999.99
999.99
999.99
999.99
999.99
999.99
999.99
999.99
999.99
999.99
1.09
1.26
999.99
999.99
999.99
999.99
999.99
6.53
3.46
3.58
999.99
2.26
4.57
999.99
999.99
999.99
53.78
55.92
999.99
999.99
999.99
999.99
999.99
36.99
999.99

-0.74
-0.80
-0.78
-0.82
-0.83
-0.86
-0.90
-0.97
-1.00
-0.73
-0.57
-0.60
-0.25
0.00
0.00
-0.60
-0.85
-0.91
-0.90
-0.87
-0.87
-0.85
-0.85
-0.75
-0.69
-0.79
-0.83
-0.85
-0.85
-0.87
-0.89
-0.92
-0.93
-0.71
-0.53
-0.42
-0.63
-0.76
-1.05
-1.27
-1.25
-1.11
-0.98
-0.86
-0.50
-0.19
-0.01
0.00

***** End of Report *****

Bm-B
Bm-B
Bm-T
Bm-T
Bm-T
Bm-T
Bm-T
Bm-T
Bm-T
Bm-T
Bm-B
Bm-B
Bm-B
Bm-T
Bm-T
Bm-T
Bm-T
Bm-T
Bm-T
Bm-T
Bm-T
Bm-T
Bm-B
Bm-B
Bm-B
Bm-B
Bm-T
Bm-T
Bm-T
Bm-T
Bm-T
Bm-T
Bm-T
Bm-T
Bm-B
Bm-B
Bm-T
Bm-B
Bm-B
Bm-B
Bm-B
Bm-B
Bm-B
Bm-B
Bm-B
Bm-B
Bm-B
Bm-T

-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70
-2.70

3.63
3.38
3.47
3.28
3.23
3.13
2.99
2.78
2.69
3.72
4.77
4.49
10.73
999.99
999.99
4.50
3.18
2.95
3.00
3.11
3.11
3.19
3.16
3.60
3.89
3.44
3.25
3.18
3.18
3.11
3.02
2.93
2.91
3.80
5.13
6.38
4.31
3.54
2.57
2.13
2.17
2.42
2.75
3.15
5.44
14.23
235.59
999.99

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Bentley Exton Office

Spec: AASHTO Standard

Spec: AASHTO Standard

Units: US (English)

Loss: Lump Sum

| Sheet
1 of
2
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor4.cbx
Combined Stress Check - Box Girder
Stage Final: PS + Perm(SLD 1 (Final)):3
POI
Location Max-Ten Loc All-Ten Ratio Max-Cmp Loc All-Cmp Ratio
(ft)
(ksi)
(ksi)
(ksi)
(ksi)
-------- -------- ------- ---- ------- ------ ------- ---- ------- -----BegSuper
0.00
0.00 Bm-T
0.40 999.99
0.00 Bm-B
-1.80 999.99
EndCntlv
1.75
0.00 Bm-T
0.40 288.88
0.00 Bm-B
-1.80 999.99
Sp1.000
1.75
0.00
N/A 999.99
-0.18 Bm-B
-1.80 10.26
Sp1.010
11.25
0.00
N/A 999.99
-0.46 Bm-B
-1.80
3.90
Sp1.020
20.75
0.00
N/A 999.99
-0.77 Bm-B
-1.80
2.33
Sp1.030
30.25
0.00
N/A 999.99
-0.85 Bm-B
-1.80
2.12
Sp1.040
39.75
0.00
N/A 999.99
-0.93 Bm-B
-1.80
1.94
Sp1.050
49.25
0.00
N/A 999.99
-1.01 Bm-B
-1.80
1.79
Sp1.060
58.75
0.00
N/A 999.99
-1.04 Bm-B
-1.80
1.73
Sp1.070
68.25
0.00
N/A 999.99
-0.95 Bm-B
-1.80
1.89
Sp1.080
77.75
0.00
N/A 999.99
-0.74 Bm-B
-1.80
2.42
Sp1.090
87.25
0.00
N/A 999.99
-0.57 Bm-T
-1.80
3.18
Sp1.100
96.75
0.00
N/A 999.99
-0.19 Bm-T
-1.80
9.51
Sp2.000
96.75
0.00
N/A 999.99
-0.22 Bm-B
-1.80
8.12
Sp2.010
111.75
0.00
N/A 999.99
-0.61 Bm-T
-1.80
2.95
Sp2.020
126.75
0.00
N/A 999.99
-0.62 Bm-T
-1.80
2.88
Sp2.030
141.75
0.00
N/A 999.99
-0.64 Bm-T
-1.80
2.83
Sp2.040
156.75
0.00
N/A 999.99
-0.64 Bm-T
-1.80
2.81
Sp2.050
171.75
0.00
N/A 999.99
-0.63 Bm-T
-1.80
2.86
Sp2.060
186.75
0.00
N/A 999.99
-0.59 Bm-T
-1.80
3.04
Sp2.070
201.75
0.00
N/A 999.99
-0.55 Bm-T
-1.80
3.28
Sp2.080
216.75
0.00
N/A 999.99
-0.50 Bm-T
-1.80
3.60
Sp2.090
231.75
0.00
N/A 999.99
-0.51 Bm-B
-1.80
3.56
Sp2.100
246.75
0.01 Bm-T
0.40 46.85
-0.36 Bm-B
-1.80
5.00
Sp3.000
246.75
0.05 Bm-T
0.40
7.78
-0.41 Bm-B
-1.80
4.39
Sp3.010
261.75
0.00
N/A 999.99
-0.61 Bm-B
-1.80
2.95
Sp3.020
276.75
0.00
N/A 999.99
-0.66 Bm-B
-1.80
2.71
Sp3.030
291.75
0.00
N/A 999.99
-0.65 Bm-B
-1.80
2.76
Sp3.040
306.75
0.00
N/A 999.99
-0.62 Bm-B
-1.80
2.92
Sp3.050
321.75
0.00
N/A 999.99
-0.57 Bm-B
-1.80
3.18
Sp3.060
336.75
0.00
N/A 999.99
-0.58 Bm-T
-1.80
3.10
Sp3.070
351.75
0.00
N/A 999.99
-0.58 Bm-T
-1.80
3.10
Sp3.080
366.75
0.00
N/A 999.99
-0.48 Bm-T
-1.80
3.74
Hinge1.L
376.75
0.00 Bm-T
0.40 999.99
0.00 Bm-B
-1.80 999.99
Hinge.R
376.75
0.00 Bm-T
0.40 999.99
0.00 Bm-B
-1.80 999.99
Sp3.090
381.75
0.00
N/A 999.99
-0.38 Bm-B
-1.80
4.74
Sp3.100
396.75
0.07 Bm-T
0.40
5.81
-0.41 Bm-B
-1.80
4.38
Sp4.000
396.75
0.04 Bm-T
0.40
9.77
-0.38 Bm-B
-1.80
4.76
Sp4.010
411.75
0.00
N/A 999.99
-0.56 Bm-T
-1.80
3.19
Sp4.020
426.75
0.00
N/A 999.99
-0.71 Bm-T
-1.80
2.55
Sp4.030
441.75
0.00
N/A 999.99
-0.59 Bm-T
-1.80
3.06
Sp4.040
456.75
0.00
N/A 999.99
-0.57 Bm-B
-1.80
3.16
Sp4.050
471.75
0.00
N/A 999.99
-0.59 Bm-B
-1.80
3.03
Sp4.060
486.75
0.00
N/A 999.99
-0.55 Bm-B
-1.80
3.30
Sp4.070
501.75
0.00
N/A 999.99
-0.54 Bm-T
-1.80
3.36
Sp4.080
516.75
0.00
N/A 999.99
-0.60 Bm-T
-1.80
2.99
Sp4.090
531.75
0.00
N/A 999.99
-0.49 Bm-B
-1.80
3.68
Sp4.100
546.75
0.13 Bm-T
0.40
3.00
-0.45 Bm-B
-1.80
3.99
Units: US (English)

Loss: Lump Sum

Output

Tutorial Four / T4-49

| Sheet
1 of
2
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor4.cbx
Combined Stress Check - Box Girder
Stage Final: PS + Perm(SLD 1 (Final)):3
POI
Location Max-Ten Loc All-Ten Ratio Max-Cmp Loc All-Cmp Ratio
(ft)
(ksi)
(ksi)
(ksi)
(ksi)
-------- -------- ------- ---- ------- ------ ------- ---- ------- -----BegSuper
0.00
0.00 Bm-T
0.40 999.99
0.00 Bm-B
-1.80 999.99
EndCntlv
1.75
0.00 Bm-T
0.40 288.88
0.00 Bm-B
-1.80 999.99
Sp1.000
1.75
0.00
N/A 999.99
-0.18 Bm-B
-1.80 10.26
Sp1.010
11.25
0.00
N/A 999.99
-0.46 Bm-B
-1.80
3.90
Sp1.020
20.75
0.00
N/A 999.99
-0.77 Bm-B
-1.80
2.33
Sp1.030
30.25
0.00
N/A 999.99
-0.85 Bm-B
-1.80
2.12
Sp1.040
39.75
0.00
N/A 999.99
-0.93 Bm-B
-1.80
1.94
Sp1.050
49.25
0.00
N/A 999.99
-1.01 Bm-B
-1.80
1.79
Sp1.060
58.75
0.00
N/A 999.99
-1.04 Bm-B
-1.80
1.73
Sp1.070
68.25
0.00
N/A 999.99
-0.95 Bm-B
-1.80
1.89
Sp1.080
77.75
0.00
N/A 999.99
-0.74 Bm-B
-1.80
2.42
Sp1.090
87.25
0.00
N/A 999.99
-0.57 Bm-T
-1.80
3.18
Sp1.100
96.75
0.00
N/A 999.99
-0.19 Bm-T
-1.80
9.51
Sp2.000
96.75
0.00
N/A 999.99
-0.22 Bm-B
-1.80
8.12
Sp2.010
111.75
0.00
N/A 999.99
-0.61 Bm-T
-1.80
2.95
Sp2.020
126.75
0.00
N/A 999.99
-0.62 Bm-T
-1.80
2.88
Sp2.030
141.75
0.00
N/A 999.99
-0.64 Bm-T
-1.80
2.83
Sp2.040
156.75
0.00
N/A 999.99
-0.64 Bm-T
-1.80
2.81
Sp2.050
171.75
0.00
N/A 999.99
-0.63 Bm-T
-1.80
2.86
Sp2.060
186.75
0.00
N/A 999.99
-0.59 Bm-T
-1.80
3.04
Sp2.070
201.75
0.00
N/A 999.99
-0.55 Bm-T
-1.80
3.28
Sp2.080
216.75
0.00
N/A 999.99
-0.50 Bm-T
-1.80
3.60
Sp2.090
231.75
0.00
N/A 999.99
-0.51 Bm-B
-1.80
3.56
Sp2.100
246.75
0.01 Bm-T
0.40 46.85
-0.36 Bm-B
-1.80
5.00
Sp3.000
246.75
0.05 Bm-T
0.40
7.78
-0.41 Bm-B
-1.80
4.39
Sp3.010
261.75
0.00
N/A 999.99
-0.61 Bm-B
-1.80
2.95
Sp3.020
276.75
0.00
N/A 999.99
-0.66 Bm-B
-1.80
2.71
Sp3.030
291.75
0.00
N/A 999.99
-0.65 Bm-B
-1.80
2.76
Sp3.040
306.75
0.00
N/A 999.99
-0.62 Bm-B
-1.80
2.92
Sp3.050
321.75
0.00
N/A 999.99
-0.57 Bm-B
-1.80
3.18
Sp3.060
336.75
0.00
N/A 999.99
-0.58 Bm-T
-1.80
3.10
Sp3.070
351.75
0.00
N/A 999.99
-0.58 Bm-T
-1.80
3.10
Sp3.080
366.75
0.00
N/A 999.99
-0.48 Bm-T
-1.80
3.74
Hinge1.L
376.75
0.00 Bm-T
0.40 999.99
0.00 Bm-B
-1.80 999.99
Hinge.R
376.75
0.00 Bm-T
0.40 999.99
0.00 Bm-B
-1.80 999.99
Sp3.090
381.75
0.00
N/A 999.99
-0.38 Bm-B
-1.80
4.74
Sp3.100
396.75
0.07 Bm-T
0.40
5.81
-0.41 Bm-B
-1.80
4.38
Sp4.000
396.75
0.04 Bm-T
0.40
9.77
-0.38 Bm-B
-1.80
4.76
Sp4.010
411.75
0.00
N/A 999.99
-0.56 Bm-T
-1.80
3.19
Sp4.020
426.75
0.00
N/A 999.99
-0.71 Bm-T
-1.80
2.55
Sp4.030
441.75
0.00
N/A 999.99
-0.59 Bm-T
-1.80
3.06
Sp4.040
456.75
0.00
N/A 999.99
-0.57 Bm-B
-1.80
3.16
Sp4.050
471.75
0.00
N/A 999.99
-0.59 Bm-B
-1.80
3.03
Sp4.060
486.75
0.00
N/A 999.99
-0.55 Bm-B
-1.80
3.30
Sp4.070
501.75
0.00
N/A 999.99
-0.54 Bm-T
-1.80
3.36
Sp4.080
516.75
0.00
N/A 999.99
-0.60 Bm-T
-1.80
2.99
Sp4.090
531.75
0.00
N/A 999.99
-0.49 Bm-B
-1.80
3.68
Sp4.100
546.75
0.13 Bm-T
0.40
3.00
-0.45 Bm-B
-1.80
3.99

T4-50 / Tutorial Four

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
1 of
2
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor4.cbx
Combined Stress Check - Box Girder
Stage Final: PS + Perm(SLD 1 (Final)):3
POI
Location Max-Ten Loc All-Ten Ratio Max-Cmp Loc All-Cmp Ratio
(ft)
(ksi)
(ksi)
(ksi)
(ksi)
-------- -------- ------- ---- ------- ------ ------- ---- ------- -----BegSuper
0.00
0.00 Bm-T
0.40 999.99
0.00 Bm-B
-1.80 999.99
EndCntlv
1.75
0.00 Bm-T
0.40 288.88
0.00 Bm-B
-1.80 999.99
Sp1.000
1.75
0.00
N/A 999.99
-0.18 Bm-B
-1.80 10.26
Sp1.010
11.25
0.00
N/A 999.99
-0.46 Bm-B
-1.80
3.90
Sp1.020
20.75
0.00
N/A 999.99
-0.77 Bm-B
-1.80
2.33
Sp1.030
30.25
0.00
N/A 999.99
-0.85 Bm-B
-1.80
2.12
Sp1.040
39.75
0.00
N/A 999.99
-0.93 Bm-B
-1.80
1.94
Sp1.050
49.25
0.00
N/A 999.99
-1.01 Bm-B
-1.80
1.79
Sp1.060
58.75
0.00
N/A 999.99
-1.04 Bm-B
-1.80
1.73
Sp1.070
68.25
0.00
N/A 999.99
-0.95 Bm-B
-1.80
1.89
Sp1.080
77.75
0.00
N/A 999.99
-0.74 Bm-B
-1.80
2.42
Sp1.090
87.25
0.00
N/A 999.99
-0.57 Bm-T
-1.80
3.18
Sp1.100
96.75
0.00
N/A 999.99
-0.19 Bm-T
-1.80
9.51
Sp2.000
96.75
0.00
N/A 999.99
-0.22 Bm-B
-1.80
8.12
Sp2.010
111.75
0.00
N/A 999.99
-0.61 Bm-T
-1.80
2.95
Sp2.020
126.75
0.00
N/A 999.99
-0.62 Bm-T
-1.80
2.88
Sp2.030
141.75
0.00
N/A 999.99
-0.64 Bm-T
-1.80
2.83
Sp2.040
156.75
0.00
N/A 999.99
-0.64 Bm-T
-1.80
2.81
Sp2.050
171.75
0.00
N/A 999.99
-0.63 Bm-T
-1.80
2.86
Sp2.060
186.75
0.00
N/A 999.99
-0.59 Bm-T
-1.80
3.04
Sp2.070
201.75
0.00
N/A 999.99
-0.55 Bm-T
-1.80
3.28
Sp2.080
216.75
0.00
N/A 999.99
-0.50 Bm-T
-1.80
3.60
Sp2.090
231.75
0.00
N/A 999.99
-0.51 Bm-B
-1.80
3.56
Sp2.100
246.75
0.01 Bm-T
0.40 46.85
-0.36 Bm-B
-1.80
5.00
Sp3.000
246.75
0.05 Bm-T
0.40
7.78
-0.41 Bm-B
-1.80
4.39
Sp3.010
261.75
0.00
N/A 999.99
-0.61 Bm-B
-1.80
2.95
Sp3.020
276.75
0.00
N/A 999.99
-0.66 Bm-B
-1.80
2.71
Sp3.030
291.75
0.00
N/A 999.99
-0.65 Bm-B
-1.80
2.76
Sp3.040
306.75
0.00
N/A 999.99
-0.62 Bm-B
-1.80
2.92
Sp3.050
321.75
0.00
N/A 999.99
-0.57 Bm-B
-1.80
3.18
Sp3.060
336.75
0.00
N/A 999.99
-0.58 Bm-T
-1.80
3.10
Sp3.070
351.75
0.00
N/A 999.99
-0.58 Bm-T
-1.80
3.10
Sp3.080
366.75
0.00
N/A 999.99
-0.48 Bm-T
-1.80
3.74
Hinge1.L
376.75
0.00 Bm-T
0.40 999.99
0.00 Bm-B
-1.80 999.99
Hinge.R
376.75
0.00 Bm-T
0.40 999.99
0.00 Bm-B
-1.80 999.99
Sp3.090
381.75
0.00
N/A 999.99
-0.38 Bm-B
-1.80
4.74
Sp3.100
396.75
0.07 Bm-T
0.40
5.81
-0.41 Bm-B
-1.80
4.38
Sp4.000
396.75
0.04 Bm-T
0.40
9.77
-0.38 Bm-B
-1.80
4.76
Sp4.010
411.75
0.00
N/A 999.99
-0.56 Bm-T
-1.80
3.19
Sp4.020
426.75
0.00
N/A 999.99
-0.71 Bm-T
-1.80
2.55
Sp4.030
441.75
0.00
N/A 999.99
-0.59 Bm-T
-1.80
3.06
Sp4.040
456.75
0.00
N/A 999.99
-0.57 Bm-B
-1.80
3.16
Sp4.050
471.75
0.00
N/A 999.99
-0.59 Bm-B
-1.80
3.03
Sp4.060
486.75
0.00
N/A 999.99
-0.55 Bm-B
-1.80
3.30
Sp4.070
501.75
0.00
N/A 999.99
-0.54 Bm-T
-1.80
3.36
Sp4.080
516.75
0.00
N/A 999.99
-0.60 Bm-T
-1.80
2.99
Sp4.090
531.75
0.00
N/A 999.99
-0.49 Bm-B
-1.80
3.68
Sp4.100
546.75
0.13 Bm-T
0.40
3.00
-0.45 Bm-B
-1.80
3.99
Spec: AASHTO Standard

Units: US (English)

Loss: Lump Sum

Bentley Exton Office

| Sheet
2 of
2
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor4.cbx
Sp5.000
546.75 ------- ---- ------- ------0.23 Bm-B
-1.80
7.94
Sp5.010
561.75 ------- ---- ------- ------0.25 Bm-B
-1.80
7.31
Sp5.020
576.75 ------- ---- ------- ------0.30 Bm-T
-1.80
5.98
Sp5.030
591.75 ------- ---- ------- ------0.27 Bm-T
-1.80
6.69
Sp5.040
606.75 ------- ---- ------- ------0.27 Bm-B
-1.80
6.67
Sp5.050
621.75 ------- ---- ------- ------0.29 Bm-B
-1.80
6.16
Sp5.060
636.75 ------- ---- ------- ------0.28 Bm-B
-1.80
6.44
Sp5.070
651.75 ------- ---- ------- ------0.30 Bm-T
-1.80
6.02
Sp5.080
666.75 ------- ---- ------- ------0.36 Bm-T
-1.80
5.02
Sp5.090
681.75 ------- ---- ------- ------0.29 Bm-T
-1.80
6.25
Sp5.100
696.75 ------- ---- ------- ------0.18 Bm-B
-1.80
9.76
Sp6.000
696.75 ------- ---- ------- ------0.20 Bm-B
-1.80
9.08
Sp6.010
711.75 ------- ---- ------- ------0.10 Bm-B
-1.80 18.00
Hinge2.L
716.75 ------- ---- ------- -----0.00 Bm-T
-1.80 999.99
Hinge.R
716.75 ------- ---- ------- -----0.00 Bm-T
-1.80 999.99
Sp6.020
726.75 ------- ---- ------- ------0.24 Bm-T
-1.80
7.63
Sp6.030
741.75 ------- ---- ------- ------0.28 Bm-T
-1.80
6.50
Sp6.040
756.75 ------- ---- ------- ------0.29 Bm-B
-1.80
6.20
Sp6.050
771.75 ------- ---- ------- ------0.32 Bm-B
-1.80
5.61
Sp6.060
786.75 ------- ---- ------- ------0.34 Bm-B
-1.80
5.37
Sp6.070
801.75 ------- ---- ------- ------0.28 Bm-B
-1.80
6.36
Sp6.080
816.75 ------- ---- ------- ------0.33 Bm-T
-1.80
5.53
Sp6.090
831.75 ------- ---- ------- ------0.29 Bm-B
-1.80
6.14
Sp6.100
846.75 ------- ---- ------- ------0.25 Bm-B
-1.80
7.20
Sp7.000
846.75 ------- ---- ------- ------0.22 Bm-B
-1.80
8.01
Sp7.010
861.75 ------- ---- ------- ------0.26 Bm-B
-1.80
7.03
Sp7.020
876.75 ------- ---- ------- ------0.32 Bm-T
-1.80
5.70
Sp7.030
891.75 ------- ---- ------- ------0.28 Bm-T
-1.80
6.52
Sp7.040
906.75 ------- ---- ------- ------0.25 Bm-T
-1.80
7.22
Sp7.050
921.75 ------- ---- ------- ------0.25 Bm-T
-1.80
7.12
Sp7.060
936.75 ------- ---- ------- ------0.28 Bm-T
-1.80
6.51
Sp7.070
951.75 ------- ---- ------- ------0.32 Bm-T
-1.80
5.60
Sp7.080
966.75 ------- ---- ------- ------0.37 Bm-T
-1.80
4.81
Sp7.090
981.75 ------- ---- ------- ------0.32 Bm-T
-1.80
5.68
Sp7.100
996.75 ------- ---- ------- ------0.15 Bm-B
-1.80 12.21
Sp8.000
996.75 ------- ---- ------- ------0.11 Bm-B
-1.80 16.45
Sp8.010 1,006.25 ------- ---- ------- ------0.28 Bm-T
-1.80
6.47
Sp8.020 1,015.75 ------- ---- ------- ------0.26 Bm-T
-1.80
7.00
Sp8.030 1,025.25 ------- ---- ------- ------0.42 Bm-B
-1.80
4.32
Sp8.040 1,034.75 ------- ---- ------- ------0.54 Bm-B
-1.80
3.32
Sp8.050 1,044.25 ------- ---- ------- ------0.54 Bm-B
-1.80
3.32
Sp8.060 1,053.75 ------- ---- ------- ------0.49 Bm-B
-1.80
3.66
Sp8.070 1,063.25 ------- ---- ------- ------0.44 Bm-B
-1.80
4.08
Sp8.080 1,072.75 ------- ---- ------- ------0.39 Bm-B
-1.80
4.58
Sp8.090 1,082.25 ------- ---- ------- ------0.23 Bm-B
-1.80
7.71
Sp8.100 1,091.75 ------- ---- ------- ------0.09 Bm-B
-1.80 20.02
BegCntlv 1,091.75 ------- ---- ------- -----0.00 Bm-B
-1.80 999.99
EndSuper 1,093.50 ------- ---- ------- -----0.00 Bm-T
-1.80 999.99
***** End of Report *****
Spec: AASHTO Standard

Units: US (English)

Loss: Lump Sum

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
2 of
2
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor4.cbx
Sp5.000
546.75 ------- ---- ------- ------0.23 Bm-B
-1.80
7.94
Sp5.010
561.75 ------- ---- ------- ------0.25 Bm-B
-1.80
7.31
Sp5.020
576.75 ------- ---- ------- ------0.30 Bm-T
-1.80
5.98
Sp5.030
591.75 ------- ---- ------- ------0.27 Bm-T
-1.80
6.69
Sp5.040
606.75 ------- ---- ------- ------0.27 Bm-B
-1.80
6.67
Sp5.050
621.75 ------- ---- ------- ------0.29 Bm-B
-1.80
6.16
Sp5.060
636.75 ------- ---- ------- ------0.28 Bm-B
-1.80
6.44
Sp5.070
651.75 ------- ---- ------- ------0.30 Bm-T
-1.80
6.02
Sp5.080
666.75 ------- ---- ------- ------0.36 Bm-T
-1.80
5.02
Sp5.090
681.75 ------- ---- ------- ------0.29 Bm-T
-1.80
6.25
Sp5.100
696.75 ------- ---- ------- ------0.18 Bm-B
-1.80
9.76
Sp6.000
696.75 ------- ---- ------- ------0.20 Bm-B
-1.80
9.08
Sp6.010
711.75 ------- ---- ------- ------0.10 Bm-B
-1.80 18.00
Hinge2.L
716.75 ------- ---- ------- -----0.00 Bm-T
-1.80 999.99
Hinge.R
716.75 ------- ---- ------- -----0.00 Bm-T
-1.80 999.99
Sp6.020
726.75 ------- ---- ------- ------0.24 Bm-T
-1.80
7.63
Sp6.030
741.75 ------- ---- ------- ------0.28 Bm-T
-1.80
6.50
Sp6.040
756.75 ------- ---- ------- ------0.29 Bm-B
-1.80
6.20
Sp6.050
771.75 ------- ---- ------- ------0.32 Bm-B
-1.80
5.61
Sp6.060
786.75 ------- ---- ------- ------0.34 Bm-B
-1.80
5.37
Sp6.070
801.75 ------- ---- ------- ------0.28 Bm-B
-1.80
6.36
Sp6.080
816.75 ------- ---- ------- ------0.33 Bm-T
-1.80
5.53
Sp6.090
831.75 ------- ---- ------- ------0.29 Bm-B
-1.80
6.14
Sp6.100
846.75 ------- ---- ------- ------0.25 Bm-B
-1.80
7.20
Sp7.000
846.75 ------- ---- ------- ------0.22 Bm-B
-1.80
8.01
Sp7.010
861.75 ------- ---- ------- ------0.26 Bm-B
-1.80
7.03
Sp7.020
876.75 ------- ---- ------- ------0.32 Bm-T
-1.80
5.70
Sp7.030
891.75 ------- ---- ------- ------0.28 Bm-T
-1.80
6.52
Sp7.040
906.75 ------- ---- ------- ------0.25 Bm-T
-1.80
7.22
Sp7.050
921.75 ------- ---- ------- ------0.25 Bm-T
-1.80
7.12
Sp7.060
936.75 ------- ---- ------- ------0.28 Bm-T
-1.80
6.51
Sp7.070
951.75 ------- ---- ------- ------0.32 Bm-T
-1.80
5.60
Sp7.080
966.75 ------- ---- ------- ------0.37 Bm-T
-1.80
4.81
Sp7.090
981.75 ------- ---- ------- ------0.32 Bm-T
-1.80
5.68
Sp7.100
996.75 ------- ---- ------- ------0.15 Bm-B
-1.80 12.21
Sp8.000
996.75 ------- ---- ------- ------0.11 Bm-B
-1.80 16.45
Sp8.010 1,006.25 ------- ---- ------- ------0.28 Bm-T
-1.80
6.47
Sp8.020 1,015.75 ------- ---- ------- ------0.26 Bm-T
-1.80
7.00
Sp8.030 1,025.25 ------- ---- ------- ------0.42 Bm-B
-1.80
4.32
Sp8.040 1,034.75 ------- ---- ------- ------0.54 Bm-B
-1.80
3.32
Sp8.050 1,044.25 ------- ---- ------- ------0.54 Bm-B
-1.80
3.32
Sp8.060 1,053.75 ------- ---- ------- ------0.49 Bm-B
-1.80
3.66
Sp8.070 1,063.25 ------- ---- ------- ------0.44 Bm-B
-1.80
4.08
Sp8.080 1,072.75 ------- ---- ------- ------0.39 Bm-B
-1.80
4.58
Sp8.090 1,082.25 ------- ---- ------- ------0.23 Bm-B
-1.80
7.71
Sp8.100 1,091.75 ------- ---- ------- ------0.09 Bm-B
-1.80 20.02
BegCntlv 1,091.75 ------- ---- ------- -----0.00 Bm-B
-1.80 999.99
EndSuper 1,093.50 ------- ---- ------- -----0.00 Bm-T
-1.80 999.99

Bentley Exton Office

| Sheet
2 of
2
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor4.cbx
Sp5.000
546.75
0.14 Bm-T
0.40
2.96
-0.45 Bm-B
-1.80
3.97
Sp5.010
561.75
0.00
N/A 999.99
-0.49 Bm-B
-1.80
3.66
Sp5.020
576.75
0.00
N/A 999.99
-0.60 Bm-T
-1.80
2.99
Sp5.030
591.75
0.00
N/A 999.99
-0.54 Bm-T
-1.80
3.34
Sp5.040
606.75
0.00
N/A 999.99
-0.54 Bm-B
-1.80
3.33
Sp5.050
621.75
0.00
N/A 999.99
-0.58 Bm-B
-1.80
3.08
Sp5.060
636.75
0.00
N/A 999.99
-0.56 Bm-B
-1.80
3.22
Sp5.070
651.75
0.00
N/A 999.99
-0.60 Bm-T
-1.80
3.01
Sp5.080
666.75
0.00
N/A 999.99
-0.72 Bm-T
-1.80
2.51
Sp5.090
681.75
0.00
N/A 999.99
-0.58 Bm-T
-1.80
3.12
Sp5.100
696.75
0.03 Bm-T
0.40 12.36
-0.37 Bm-B
-1.80
4.88
Sp6.000
696.75
0.06 Bm-T
0.40
7.15
-0.40 Bm-B
-1.80
4.54
Sp6.010
711.75
0.00
N/A 999.99
-0.20 Bm-B
-1.80
9.00
Hinge2.L
716.75
0.00 Bm-B
0.40 999.99
0.00 Bm-T
-1.80 999.99
Hinge.R
716.75
0.00 Bm-B
0.40 999.99
0.00 Bm-T
-1.80 999.99
Sp6.020
726.75
0.00
N/A 999.99
-0.47 Bm-T
-1.80
3.81
Sp6.030
741.75
0.00
N/A 999.99
-0.55 Bm-T
-1.80
3.25
Sp6.040
756.75
0.00
N/A 999.99
-0.58 Bm-B
-1.80
3.10
Sp6.050
771.75
0.00
N/A 999.99
-0.64 Bm-B
-1.80
2.80
Sp6.060
786.75
0.00
N/A 999.99
-0.67 Bm-B
-1.80
2.68
Sp6.070
801.75
0.00
N/A 999.99
-0.57 Bm-B
-1.80
3.18
Sp6.080
816.75
0.00
N/A 999.99
-0.65 Bm-T
-1.80
2.77
Sp6.090
831.75
0.00
N/A 999.99
-0.59 Bm-B
-1.80
3.07
Sp6.100
846.75
0.14 Bm-T
0.40
2.97
-0.50 Bm-B
-1.80
3.60
Sp7.000
846.75
0.09 Bm-T
0.40
4.37
-0.45 Bm-B
-1.80
4.00
Sp7.010
861.75
0.00
N/A 999.99
-0.51 Bm-B
-1.80
3.51
Sp7.020
876.75
0.00
N/A 999.99
-0.63 Bm-T
-1.80
2.85
Sp7.030
891.75
0.00
N/A 999.99
-0.55 Bm-T
-1.80
3.26
Sp7.040
906.75
0.00
N/A 999.99
-0.50 Bm-T
-1.80
3.61
Sp7.050
921.75
0.00
N/A 999.99
-0.51 Bm-T
-1.80
3.56
Sp7.060
936.75
0.00
N/A 999.99
-0.55 Bm-T
-1.80
3.26
Sp7.070
951.75
0.00
N/A 999.99
-0.64 Bm-T
-1.80
2.80
Sp7.080
966.75
0.00
N/A 999.99
-0.75 Bm-T
-1.80
2.40
Sp7.090
981.75
0.00
N/A 999.99
-0.63 Bm-T
-1.80
2.84
Sp7.100
996.75
0.00
N/A 999.99
-0.29 Bm-B
-1.80
6.10
Sp8.000
996.75
0.00
N/A 999.99
-0.22 Bm-B
-1.80
8.22
Sp8.010 1,006.25
0.00
N/A 999.99
-0.56 Bm-T
-1.80
3.24
Sp8.020 1,015.75
0.00
N/A 999.99
-0.51 Bm-T
-1.80
3.50
Sp8.030 1,025.25
0.00
N/A 999.99
-0.83 Bm-B
-1.80
2.16
Sp8.040 1,034.75
0.00
N/A 999.99
-1.09 Bm-B
-1.80
1.66
Sp8.050 1,044.25
0.00
N/A 999.99
-1.08 Bm-B
-1.80
1.66
Sp8.060 1,053.75
0.00
N/A 999.99
-0.98 Bm-B
-1.80
1.83
Sp8.070 1,063.25
0.00
N/A 999.99
-0.88 Bm-B
-1.80
2.04
Sp8.080 1,072.75
0.00
N/A 999.99
-0.79 Bm-B
-1.80
2.29
Sp8.090 1,082.25
0.00
N/A 999.99
-0.47 Bm-B
-1.80
3.85
Sp8.100 1,091.75
0.00
N/A 999.99
-0.18 Bm-B
-1.80 10.01
BegCntlv 1,091.75
0.00 Bm-T
0.40 288.88
0.00 Bm-B
-1.80 999.99
EndSuper 1,093.50
0.00 Bm-B
0.40 999.99
0.00 Bm-T
-1.80 999.99

***** End of Report *****


Spec: AASHTO Standard

Units: US (English)

Loss: Lump Sum

***** End of Report *****


Spec: AASHTO Standard

Units: US (English)

Loss: Lump Sum

Output

Tutorial Four / T4-51

T4-52 / Tutorial Four

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
2 of
2
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor4.cbx
Sp5.000
546.75
0.14 Bm-T
0.40
2.96
-0.45 Bm-B
-1.80
3.97
Sp5.010
561.75
0.00
N/A 999.99
-0.49 Bm-B
-1.80
3.66
Sp5.020
576.75
0.00
N/A 999.99
-0.60 Bm-T
-1.80
2.99
Sp5.030
591.75
0.00
N/A 999.99
-0.54 Bm-T
-1.80
3.34
Sp5.040
606.75
0.00
N/A 999.99
-0.54 Bm-B
-1.80
3.33
Sp5.050
621.75
0.00
N/A 999.99
-0.58 Bm-B
-1.80
3.08
Sp5.060
636.75
0.00
N/A 999.99
-0.56 Bm-B
-1.80
3.22
Sp5.070
651.75
0.00
N/A 999.99
-0.60 Bm-T
-1.80
3.01
Sp5.080
666.75
0.00
N/A 999.99
-0.72 Bm-T
-1.80
2.51
Sp5.090
681.75
0.00
N/A 999.99
-0.58 Bm-T
-1.80
3.12
Sp5.100
696.75
0.03 Bm-T
0.40 12.36
-0.37 Bm-B
-1.80
4.88
Sp6.000
696.75
0.06 Bm-T
0.40
7.15
-0.40 Bm-B
-1.80
4.54
Sp6.010
711.75
0.00
N/A 999.99
-0.20 Bm-B
-1.80
9.00
Hinge2.L
716.75
0.00 Bm-B
0.40 999.99
0.00 Bm-T
-1.80 999.99
Hinge.R
716.75
0.00 Bm-B
0.40 999.99
0.00 Bm-T
-1.80 999.99
Sp6.020
726.75
0.00
N/A 999.99
-0.47 Bm-T
-1.80
3.81
Sp6.030
741.75
0.00
N/A 999.99
-0.55 Bm-T
-1.80
3.25
Sp6.040
756.75
0.00
N/A 999.99
-0.58 Bm-B
-1.80
3.10
Sp6.050
771.75
0.00
N/A 999.99
-0.64 Bm-B
-1.80
2.80
Sp6.060
786.75
0.00
N/A 999.99
-0.67 Bm-B
-1.80
2.68
Sp6.070
801.75
0.00
N/A 999.99
-0.57 Bm-B
-1.80
3.18
Sp6.080
816.75
0.00
N/A 999.99
-0.65 Bm-T
-1.80
2.77
Sp6.090
831.75
0.00
N/A 999.99
-0.59 Bm-B
-1.80
3.07
Sp6.100
846.75
0.14 Bm-T
0.40
2.97
-0.50 Bm-B
-1.80
3.60
Sp7.000
846.75
0.09 Bm-T
0.40
4.37
-0.45 Bm-B
-1.80
4.00
Sp7.010
861.75
0.00
N/A 999.99
-0.51 Bm-B
-1.80
3.51
Sp7.020
876.75
0.00
N/A 999.99
-0.63 Bm-T
-1.80
2.85
Sp7.030
891.75
0.00
N/A 999.99
-0.55 Bm-T
-1.80
3.26
Sp7.040
906.75
0.00
N/A 999.99
-0.50 Bm-T
-1.80
3.61
Sp7.050
921.75
0.00
N/A 999.99
-0.51 Bm-T
-1.80
3.56
Sp7.060
936.75
0.00
N/A 999.99
-0.55 Bm-T
-1.80
3.26
Sp7.070
951.75
0.00
N/A 999.99
-0.64 Bm-T
-1.80
2.80
Sp7.080
966.75
0.00
N/A 999.99
-0.75 Bm-T
-1.80
2.40
Sp7.090
981.75
0.00
N/A 999.99
-0.63 Bm-T
-1.80
2.84
Sp7.100
996.75
0.00
N/A 999.99
-0.29 Bm-B
-1.80
6.10
Sp8.000
996.75
0.00
N/A 999.99
-0.22 Bm-B
-1.80
8.22
Sp8.010 1,006.25
0.00
N/A 999.99
-0.56 Bm-T
-1.80
3.24
Sp8.020 1,015.75
0.00
N/A 999.99
-0.51 Bm-T
-1.80
3.50
Sp8.030 1,025.25
0.00
N/A 999.99
-0.83 Bm-B
-1.80
2.16
Sp8.040 1,034.75
0.00
N/A 999.99
-1.09 Bm-B
-1.80
1.66
Sp8.050 1,044.25
0.00
N/A 999.99
-1.08 Bm-B
-1.80
1.66
Sp8.060 1,053.75
0.00
N/A 999.99
-0.98 Bm-B
-1.80
1.83
Sp8.070 1,063.25
0.00
N/A 999.99
-0.88 Bm-B
-1.80
2.04
Sp8.080 1,072.75
0.00
N/A 999.99
-0.79 Bm-B
-1.80
2.29
Sp8.090 1,082.25
0.00
N/A 999.99
-0.47 Bm-B
-1.80
3.85
Sp8.100 1,091.75
0.00
N/A 999.99
-0.18 Bm-B
-1.80 10.01
BegCntlv 1,091.75
0.00 Bm-T
0.40 288.88
0.00 Bm-B
-1.80 999.99
EndSuper 1,093.50
0.00 Bm-B
0.40 999.99
0.00 Bm-T
-1.80 999.99

Bentley Exton Office

| Sheet
2 of
2
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor4.cbx
Sp5.000
546.75
0.14 Bm-T
0.40
2.96
-0.45 Bm-B
-1.80
3.97
Sp5.010
561.75
0.00
N/A 999.99
-0.49 Bm-B
-1.80
3.66
Sp5.020
576.75
0.00
N/A 999.99
-0.60 Bm-T
-1.80
2.99
Sp5.030
591.75
0.00
N/A 999.99
-0.54 Bm-T
-1.80
3.34
Sp5.040
606.75
0.00
N/A 999.99
-0.54 Bm-B
-1.80
3.33
Sp5.050
621.75
0.00
N/A 999.99
-0.58 Bm-B
-1.80
3.08
Sp5.060
636.75
0.00
N/A 999.99
-0.56 Bm-B
-1.80
3.22
Sp5.070
651.75
0.00
N/A 999.99
-0.60 Bm-T
-1.80
3.01
Sp5.080
666.75
0.00
N/A 999.99
-0.72 Bm-T
-1.80
2.51
Sp5.090
681.75
0.00
N/A 999.99
-0.58 Bm-T
-1.80
3.12
Sp5.100
696.75
0.03 Bm-T
0.40 12.36
-0.37 Bm-B
-1.80
4.88
Sp6.000
696.75
0.06 Bm-T
0.40
7.15
-0.40 Bm-B
-1.80
4.54
Sp6.010
711.75
0.00
N/A 999.99
-0.20 Bm-B
-1.80
9.00
Hinge2.L
716.75
0.00 Bm-B
0.40 999.99
0.00 Bm-T
-1.80 999.99
Hinge.R
716.75
0.00 Bm-B
0.40 999.99
0.00 Bm-T
-1.80 999.99
Sp6.020
726.75
0.00
N/A 999.99
-0.47 Bm-T
-1.80
3.81
Sp6.030
741.75
0.00
N/A 999.99
-0.55 Bm-T
-1.80
3.25
Sp6.040
756.75
0.00
N/A 999.99
-0.58 Bm-B
-1.80
3.10
Sp6.050
771.75
0.00
N/A 999.99
-0.64 Bm-B
-1.80
2.80
Sp6.060
786.75
0.00
N/A 999.99
-0.67 Bm-B
-1.80
2.68
Sp6.070
801.75
0.00
N/A 999.99
-0.57 Bm-B
-1.80
3.18
Sp6.080
816.75
0.00
N/A 999.99
-0.65 Bm-T
-1.80
2.77
Sp6.090
831.75
0.00
N/A 999.99
-0.59 Bm-B
-1.80
3.07
Sp6.100
846.75
0.14 Bm-T
0.40
2.97
-0.50 Bm-B
-1.80
3.60
Sp7.000
846.75
0.09 Bm-T
0.40
4.37
-0.45 Bm-B
-1.80
4.00
Sp7.010
861.75
0.00
N/A 999.99
-0.51 Bm-B
-1.80
3.51
Sp7.020
876.75
0.00
N/A 999.99
-0.63 Bm-T
-1.80
2.85
Sp7.030
891.75
0.00
N/A 999.99
-0.55 Bm-T
-1.80
3.26
Sp7.040
906.75
0.00
N/A 999.99
-0.50 Bm-T
-1.80
3.61
Sp7.050
921.75
0.00
N/A 999.99
-0.51 Bm-T
-1.80
3.56
Sp7.060
936.75
0.00
N/A 999.99
-0.55 Bm-T
-1.80
3.26
Sp7.070
951.75
0.00
N/A 999.99
-0.64 Bm-T
-1.80
2.80
Sp7.080
966.75
0.00
N/A 999.99
-0.75 Bm-T
-1.80
2.40
Sp7.090
981.75
0.00
N/A 999.99
-0.63 Bm-T
-1.80
2.84
Sp7.100
996.75
0.00
N/A 999.99
-0.29 Bm-B
-1.80
6.10
Sp8.000
996.75
0.00
N/A 999.99
-0.22 Bm-B
-1.80
8.22
Sp8.010 1,006.25
0.00
N/A 999.99
-0.56 Bm-T
-1.80
3.24
Sp8.020 1,015.75
0.00
N/A 999.99
-0.51 Bm-T
-1.80
3.50
Sp8.030 1,025.25
0.00
N/A 999.99
-0.83 Bm-B
-1.80
2.16
Sp8.040 1,034.75
0.00
N/A 999.99
-1.09 Bm-B
-1.80
1.66
Sp8.050 1,044.25
0.00
N/A 999.99
-1.08 Bm-B
-1.80
1.66
Sp8.060 1,053.75
0.00
N/A 999.99
-0.98 Bm-B
-1.80
1.83
Sp8.070 1,063.25
0.00
N/A 999.99
-0.88 Bm-B
-1.80
2.04
Sp8.080 1,072.75
0.00
N/A 999.99
-0.79 Bm-B
-1.80
2.29
Sp8.090 1,082.25
0.00
N/A 999.99
-0.47 Bm-B
-1.80
3.85
Sp8.100 1,091.75
0.00
N/A 999.99
-0.18 Bm-B
-1.80 10.01
BegCntlv 1,091.75
0.00 Bm-T
0.40 288.88
0.00 Bm-B
-1.80 999.99
EndSuper 1,093.50
0.00 Bm-B
0.40 999.99
0.00 Bm-T
-1.80 999.99

***** End of Report *****


Spec: AASHTO Standard

Units: US (English)

Loss: Lump Sum

***** End of Report *****


Spec: AASHTO Standard

Units: US (English)

Loss: Lump Sum

Output

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
1 of
6
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor4.cbx

Bentley Exton Office

| Sheet
2 of
6
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor4.cbx

Combined Flexure Check - Box Girder


Stage Final: LFD 1 (Final w/o Sway)
POI

Location

(ft)
-------- -------BegSuper
0.00

EndCntlv

1.75

Mu-Max
Mu-Min
(kip-ft)
---------0.00
0.00

Sp2.030

141.75

56,980.31 82,796.06
0.00 -15,808.05

47,477.27
0.00

1.45
999.99

Sp2.040

156.75

72,291.74 95,021.26
0.00 -15,808.05

55,226.37
0.00

1.31
999.99

Sp2.050

171.75

76,906.58 99,097.68
0.00 -15,808.05

58,406.47
0.00

1.29
999.99

999.99
9.78

Sp2.060

186.75

70,392.54 95,021.15
0.00 -15,808.05

55,874.75
0.00

1.35
999.99

Phi*Mn-Pos
Phi*Mn-Neg
(kip-ft)
---------6,478.44
-15,808.05

1.2*M-Cr

Cap/Mu

(kip-ft)
---------0.00
0.00

-----999.99
999.99

0.00
6,478.44
-1,615.62 -15,808.05

0.00
0.00

Sp1.000

1.75

808.69 56,655.76
-663.05 -15,808.05

55,734.88
0.00

52.68
23.84

Sp2.070

201.75

53,054.11 82,795.85
0.00 -15,808.05

47,446.56
0.00

1.56
999.99

Sp1.010

11.25

23,818.70 72,062.30
0.00 -15,808.05

59,146.65
0.00

2.27
999.99

Sp2.080

216.75

25,526.37 62,442.48
-8,002.95 -15,808.05

33,002.64
0.00

1.89
1.98

Sp1.020

20.75

39,376.27 84,020.27
0.00 -15,808.05

64,216.52
0.00

1.60
999.99

Sp2.090

231.75

0.00 12,479.93
-40,751.64 -87,350.83

0.00
-82,780.29

999.99
1.61

48,344.63 92,514.57
0.00 -15,808.05

69,524.67
0.00

1.44
999.99

Sp2.100

246.75

0.00 12,479.93
-87,734.23 -103,620.10

0.00
999.99
-104,369.25
0.99 *
0.00
999.99
-101,332.28
1.02

Sp1.030

30.25

Sp1.040

39.75

51,521.14 97,539.54
0.00 -15,808.05

72,229.48
0.00

1.42
999.99

Sp3.000

246.75

0.00 12,479.93
-92,295.14 -103,620.10

Sp1.050

49.25

49,014.21 99,086.50
0.00 -15,808.05

72,285.37
0.00

1.52
999.99

Sp3.010

261.75

0.00
6,478.44
-42,876.67 -87,350.39

0.00
-81,762.26

999.99
1.53

Sp1.060

58.75

41,230.40 94,628.00
0.00 -15,808.05

67,825.73
0.00

1.73
999.99

Sp3.020

276.75

23,381.49 62,442.80
-9,773.33 -15,808.05

42,352.27
0.00

2.01
1.62

28,351.26 82,106.37
-7,675.81 -15,808.05

55,979.91
0.00

2.18
2.06

Sp3.030

291.75

52,700.21 82,796.06
0.00 -15,808.05

60,989.04
0.00

1.36
999.99

4.19
0.78 *

Sp3.040

306.75

72,122.38 95,021.26
0.00 -15,808.05

72,395.27
0.00

1.31
999.99

Sp1.070

68.25

Sp1.080

77.75

11,037.52 61,543.34
-20,186.70 -15,808.05

36,799.60
0.00

Sp1.090

87.25

0.00 12,500.85
-37,902.88 -88,322.23

0.00
-85,968.23

Sp3.050

321.75

80,089.22 99,097.68
0.00 -15,808.05

76,526.68
0.00

1.24
999.99

Sp1.100

96.75

0.00 12,500.85
-61,494.20 -103,620.10

0.00
999.99
-103,556.20
1.27

Sp3.060

336.75

76,358.67 95,619.33
0.00 -15,808.05

74,594.94
0.00

1.25
999.99

0.00 12,500.85
-72,150.31 -103,620.10

0.00
-99,393.36

999.99
1.08

Sp3.070

351.75

60,094.94 85,187.30
0.00 -15,808.05

67,274.65
0.00

1.27
999.99

Sp3.080

366.75

30,070.87 67,814.92
0.00 -15,808.05

58,273.16
0.00

1.70
999.99

Hinge1.L

376.75

812.99
6,478.44
0.00 -15,808.05

0.00
0.00

7.97
999.99

Sp2.000

96.75

999.99
1.75

111.75

89.61
6,478.44
-24,528.84 -87,350.39

0.00
-78,557.73

72.30
2.68

Sp2.020

126.75

31,893.82 62,442.80
0.00 -15,808.05

34,223.77
0.00

1.82
999.99

Spec: AASHTO Standard

Units: US (English)

Loss: Lump Sum


Spec: AASHTO Standard

Units: US (English)

Loss: Lump Sum

Output

Tutorial Four / T4-53

Sp2.010

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
3 of
6
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor4.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor4.cbx

Hinge.R

376.75

812.97
6,478.44
0.00 -15,808.05

0.00
0.00

7.97
999.99

Hinge.R

376.75

812.97
6,478.44
0.00 -15,808.05

0.00
0.00

7.97
999.99

Sp3.090

381.75

0.00 12,500.85
-17,556.37 -73,321.36

0.00
-53,252.28

999.99
3.14

Sp3.090

381.75

0.00 12,500.85
-17,556.37 -73,321.36

0.00
-53,252.28

999.99
3.14

Sp3.100

396.75

0.00 12,500.85
-80,620.56 -103,620.10

0.00
-82,816.37

999.99
1.25

Sp3.100

396.75

0.00 12,500.85
-80,620.56 -103,620.10

0.00
-82,816.37

999.99
1.25

Sp4.000

396.75

0.00 12,500.85
-77,921.11 -103,620.10

0.00
-87,255.59

999.99
1.19

Sp4.000

396.75

0.00 12,500.85
-77,921.11 -103,620.10

0.00
-87,255.59

999.99
1.19

Sp4.010

411.75

0.00
6,478.44
-37,813.14 -97,109.41

0.00
-76,790.90

999.99
1.93

Sp4.010

411.75

0.00
6,478.44
-37,813.14 -97,109.41

0.00
-76,790.90

Sp4.020

426.75

32,177.70
6,478.44
-11,282.81 -76,876.96

0.00
-62,203.30

Sp4.020

426.75

32,177.70
6,478.44
-11,282.81 -76,876.96

0.00
-62,203.30

Sp4.030

441.75

56,854.34 73,022.05
0.00 -15,808.05

54,427.17
0.00

1.28
999.99

Sp4.030

441.75

56,854.34 73,022.05
0.00 -15,808.05

54,427.17
0.00

1.28
999.99

Sp4.040

456.75

70,303.34 92,575.71
0.00 -15,808.05

67,722.79
0.00

1.32
999.99

Sp4.040

456.75

70,303.34 92,575.71
0.00 -15,808.05

67,722.79
0.00

1.32
999.99

Sp4.050

471.75

72,891.10 99,097.68
0.00 -15,808.05

70,891.07
0.00

1.36
999.99

Sp4.050

471.75

72,891.10 99,097.68
0.00 -15,808.05

70,891.07
0.00

1.36
999.99

Sp4.060

486.75

64,345.99 92,575.53
0.00 -15,808.05

64,326.53
0.00

1.44
999.99

Sp4.060

486.75

64,345.99 92,575.53
0.00 -15,808.05

64,326.53
0.00

1.44
999.99

Sp4.070

501.75

45,630.76 73,021.70
0.00 -15,808.05

48,711.50
0.00

1.50
999.99

Sp4.070

501.75

45,630.76 73,021.70
0.00 -15,808.05

48,711.50
0.00

1.50
999.99

Sp4.080

516.75

17,808.51
6,478.44
-13,569.14 -76,877.30

0.00
-64,041.90

Sp4.080

516.75

17,808.51
6,478.44
-13,569.14 -76,877.30

0.00
-64,041.90

Sp4.090

531.75

0.00 12,500.85
-47,772.45 -97,109.58

0.00
-78,982.32

999.99
1.53

Sp4.090

531.75

0.00 12,500.85
-47,772.45 -97,109.58

0.00
-78,982.32

Sp4.100

546.75

0.00 12,500.85
-98,904.84 -103,620.10

0.00
-91,427.09

999.99
1.05

Sp4.100

546.75

0.00 12,500.85
-98,904.84 -103,620.10

0.00
-91,427.09

999.99
1.05

Sp5.000

546.75

0.00 12,500.85
-98,961.21 -103,620.10

0.00
-91,163.81

999.99
1.05

Sp5.000

546.75

0.00 12,500.85
-98,961.21 -103,620.10

0.00
-91,163.81

999.99
1.05

Sp5.010

561.75

0.00
6,478.44
-47,748.79 -97,109.41

0.00
-78,767.72

999.99
1.53

Sp5.010

561.75

0.00
6,478.44
-47,748.79 -97,109.41

0.00
-78,767.72

Sp5.020

576.75

17,826.61
6,478.44
-13,440.24 -76,876.96

0.00
-63,969.73

Sp5.020

576.75

17,826.61
6,478.44
-13,440.24 -76,876.96

0.00
-63,969.73

Sp5.030

591.75

45,737.69 73,022.05
0.00 -15,808.05

48,655.50
0.00

1.50
999.99

Sp5.030

591.75

45,737.69 73,022.05
0.00 -15,808.05

48,655.50
0.00

1.50
999.99

Sp5.040

606.75

64,574.45

64,143.37

1.43

Sp5.040

606.75

64,574.45

64,143.37

1.43

Spec: AASHTO Standard

92,575.71

Units: US (English)

0.20 *
5.12

0.36 *
4.26

0.36 *
4.30

Loss: Lump Sum

| Sheet
3 of
6
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Spec: AASHTO Standard

92,575.71

Units: US (English)

999.99
1.93
0.20 *
5.12

0.36 *
4.26
999.99
1.53

999.99
1.53
0.36 *
4.30

Loss: Lump Sum

Output

T4-54 / Tutorial Four

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Bentley Exton Office

| Sheet
5 of
6
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor4.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor4.cbx

Sp6.100

846.75

0.00 12,500.85
-98,451.52 -103,620.10

0.00
-94,104.14

999.99
1.05

Sp7.000

846.75

0.00 12,500.85
-93,927.50 -103,620.10

0.00
-97,204.04

999.99
1.07

Sp7.010

861.75

0.00
6,478.44
-46,885.64 -97,109.41

0.00
-84,203.91

Sp7.020

876.75

19,716.11
6,478.44
-13,994.22 -76,876.96

0.00
-67,162.72

Sp7.030

891.75

47,404.19 73,022.05
0.00 -15,808.05

47,748.30
0.00

1.53
999.99

Sp7.040

906.75

64,902.86 92,575.71
0.00 -15,808.05

61,132.39
0.00

1.43
999.99

Sp7.050

921.75

71,545.66 99,097.68
0.00 -15,808.05

64,896.79
0.00

1.39
999.99

Sp7.060

936.75

67,095.88 92,575.53
0.00 -15,808.05

59,470.30
0.00

1.38
999.99

Sp7.070

951.75

51,950.82 73,021.70
0.00 -15,808.05

46,255.51
0.00

1.41
999.99

Sp7.080

966.75

27,037.00
6,478.44
0.00 -76,877.30

0.00
-63,921.77

0.24 *
999.99

Sp7.090

981.75

0.00 12,500.85
-29,308.01 -97,109.58

0.00
-79,687.94

999.99
2.49

Sp7.100

996.75

0.00 12,500.85
-76,757.31 -103,620.10

0.00
-92,667.41

999.99
1.12

Sp8.000

996.75

0.00 12,500.85
-67,224.18 -103,620.10

0.00
-96,064.33

999.99
1.16

Sp8.010

1,006.25

0.00 12,500.85
-43,108.36 -97,244.24

0.00
-85,405.83

Sp8.020

1,015.75

6,708.11
6,478.44
-24,873.16 -77,412.17

0.00
-67,665.97

Sp8.030

1,025.25

24,591.29 72,201.68
-11,773.26 -15,808.05

51,195.34
0.00

2.21
1.34

Sp8.040

1,034.75

38,021.59 92,021.06
-1,457.29 -15,808.05

69,670.37
0.00

1.82
10.85

Sp8.050

1,044.25

46,346.39 99,080.00
0.00 -15,808.05

75,471.64
0.00

1.61
999.99

| Sheet
6 of
6
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Sp8.060

1,053.75

49,321.28 97,564.79
0.00 -15,808.05

74,398.78
0.00

1.49
999.99

Sp8.070

1,063.25

46,681.57 92,621.42
0.00 -15,808.05

70,784.33
0.00

1.49
999.99

Sp8.080

1,072.75

38,255.23 84,265.06
0.00 -15,808.05

64,817.13
0.00

1.66
999.99

Sp8.090

1,082.25

23,229.03 72,501.14
0.00 -15,808.05

59,724.16
0.00

2.35
999.99

Sp8.100

1,091.75

725.31 57,344.25
-746.42 -15,808.05

56,085.10
0.00

59.44
21.18

BegCntlv 1,091.75

0.00
6,478.44
-1,568.97 -15,808.05

0.00
0.00

999.99
10.08

EndSuper 1,093.50

46.61
6,478.44
0.00 -15,808.05

0.00
0.00

139.00
999.99

999.99
1.56
0.33 *
4.13

***** End of Report *****

Units: US (English)

Units: US (English)

Loss: Lump Sum

999.99
1.70
0.97 *
2.34

Loss: Lump Sum

Output

Tutorial Four / T4-55

Spec: AASHTO Standard

Spec: AASHTO Standard

| Sheet
1 of
6
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

| Sheet
2 of
6
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor4.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor4.cbx

Combined Shear Check - Box Girder

POI
prov/Vu

Location

(ft)
-------- --------BegSuper
0.00

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Sp2.030

141.75

-454.07 51,096.07
-2,031.16 56,707.42

3.7200
3.7200

1,870.82 1,205.28
1,870.82 1,205.28

1,205.28
1,205.28

6.10
1.36

Sp2.040

156.75

166.51 64,681.53
-1,390.05 71,886.99

3.7200
3.7200

828.42 1,265.73
1,214.38 1,265.73

1,265.73
1,265.73

11.32
1.61

Sp2.050

171.75

871.29 76,209.04
-694.29 76,299.34

3.7200
3.7200

888.48 1,320.60
864.33 1,320.60

1,320.60
1,320.60

2.28
2.83

Stage Final: LFD 1 (Final w/o Sway)


Vu-Max

Conc Mom

Av/S-prov

Vu-Min
(kip)
(kip-ft)
---------- ----------

Vc

Vs-req

Vs-prov Cap-

(in)
(kip)
(kip)
(kip)
------- --------- ---------- --------- -----

848.57
0.00

0.00
0.00

7.1600m 7,077.29 2,730.90


7.1600m 7,077.29 2,730.90

N/A
9.82f
N/A 999.99f

Sp2.060

186.75

1,525.01 69,959.58
-21.55 69,077.35

3.7200
3.7200

1,417.93 1,265.73
828.42 1,265.73

1,265.73
1.58
1,265.73 87.48

8.35f
55.85f

Sp2.070

201.75

2,170.86 52,787.73
631.67 51,255.83

3.7200
3.7200

2,167.32 1,205.28
2,167.32 1,205.28

1,205.28
1,205.28

1.40
4.81

EndCntlv

1.75

997.85
149.28

-987.64
-130.62

7.1600m 7,077.29 2,730.90


7.1600m 7,077.29 2,730.90

N/A
N/A

Sp1.000

1.75

-1,079.56
-2,910.05

808.69
808.69

8.3700 14,287.76 2,711.88


8.3700 14,287.76 2,711.88

2,711.88
2,711.88

14.17
5.26

Sp2.080

216.75

2,824.62 15,779.35
1,245.37 22,349.74

5.5800
5.5800

3,624.30 1,807.92
3,624.30 1,807.92

1,807.92
1,807.92

1.73
3.93

Sp1.010

11.25

-593.35
8,716.25
-2,229.14 23,817.91

8.3700
8.3700

4,977.85 2,711.88
4,977.85 2,711.88

2,711.88
2,711.88

11.66
3.10

Sp2.090

231.75

3,478.33 -23,164.47
1,809.02 -10,262.97

8.3700
8.3700

3,051.10 2,711.88
3,051.10 2,711.88

2,711.88
2,711.88

1.49
2.87

Sp1.020

20.75

-148.42 30,625.71
-1,709.11 39,374.73

8.3700
8.3700

2,655.72 2,711.88
2,655.72 2,711.88

2,711.88
2,711.88

32.55
2.83

Sp2.100

246.75

4,306.14 -72,374.92
2,461.75 -47,128.11

8.3700
8.3700

5,624.17 2,887.65
5,624.17 2,887.65

2,887.65
2,887.65

1.78
3.11

Sp1.030

30.25

302.12 38,413.36
-1,226.80 48,303.43

5.5800
5.5800

1,618.58 1,847.98
1,751.77 1,847.98

1,847.98
1,847.98

10.33
2.64

Sp3.000

246.75

-2,582.57 -51,189.27
-4,355.52 -75,976.58

7.1475m 5,624.17 2,465.89


7.1475m 5,624.17 2,465.89

N/A
N/A

Sp1.040

39.75

762.18 41,135.06
-751.89 51,063.05

3.7200
3.7200

1,475.66 1,299.63
1,217.85 1,299.63

1,299.63
1,299.63

3.28
3.01

Sp3.010

261.75

-1,895.01 -12,901.98
-3,540.56 -26,270.46

8.3700
8.3700

3,188.74 2,711.88
3,188.74 2,711.88

2,711.88
2,711.88

2.80
1.50

Sp1.050

49.25

1,304.46 48,460.14
-244.20 47,893.42

3.7200
3.7200

2,183.49 1,320.45
1,468.62 1,320.45

1,320.45
2.42
1,320.45 10.28

Sp3.020

276.75

-1,342.07 21,691.31
-2,903.65 23,179.33

5.5800
5.5800

3,865.02 1,807.92
3,865.02 1,807.92

1,807.92
1,807.92

3.80
1.76

Sp1.060

58.75

1,770.38 40,982.67
218.48 39,280.29

3.7200
3.7200

2,991.58 1,260.44
2,991.58 1,260.44

1,260.44
2.16
1,260.44 17.52

Sp3.030

291.75

-739.63 50,734.55
-2,293.10 52,502.50

3.7200
3.7200

2,616.99 1,205.28
2,616.99 1,205.28

1,205.28
1,205.28

4.65
1.50

Sp1.070

68.25

2,218.14 28,280.67
657.99 26,073.55

5.5800
5.5800

3,920.70 1,807.92
3,920.70 1,807.92

1,807.92
1,807.92

2.32
7.84

Sp3.040

306.75

-103.80 70,668.53
-1,655.01 71,696.62

3.7200
3.7200

1,765.34 1,265.73
1,765.34 1,265.73

1,265.73
1,265.73

26.28
1.65

Sp1.080

77.75

2,645.64 10,998.23
1,056.30 10,219.14

8.3700
8.3700

1,971.63 2,711.88
1,971.63 2,711.88

2,711.88
2,711.88

1.59
3.99

Sp3.050

321.75

605.66 79,520.91
-949.96 78,966.45

3.7200
3.7200

864.33 1,320.60
975.68 1,320.60

1,320.60
1,320.60

3.25
2.18

Sp1.090

87.25

3,064.96 -10,187.80
1,436.85 -7,933.32

8.3700
8.3700

2,945.35 2,711.88
2,945.35 2,711.88

2,711.88
2,711.88

1.66
3.54

Sp3.060

336.75

1,271.84 76,247.22
-249.03 73,457.31

3.7200
3.7200

1,225.03 1,273.78
892.70 1,273.78

1,273.78
1,273.78

1.77
7.83

Sp1.100

96.75

3,652.67 -47,568.85
1,936.19 -25,366.45

7.1475m 5,624.17 2,465.89


7.1475m 5,624.17 2,465.89

N/A
N/A

1.99f
3.76f

Sp3.070

351.75

1,948.71 60,094.78
430.43 50,164.45

5.5800
5.5800

2,058.15 1,807.92
2,058.15 1,807.92

1,807.92
1,807.92

1.79
8.08

Sp2.000

96.75

-2,193.17 -30,436.21
-4,107.53 -55,749.60

7.1475m 5,624.17 2,465.89


7.1475m 5,624.17 2,465.89

N/A
N/A

3.32f
1.77f

Sp3.080

366.75

2,687.01 30,069.90
1,119.08 23,993.71

8.3700
8.3700

4,688.15 2,711.88
4,688.15 2,711.88

2,711.88
2,711.88

2.48
5.95

Sp2.010

111.75

-1,545.82 -2,810.04
-3,289.24 -10,083.16

8.3700
8.3700

4,187.93 2,711.88
4,187.93 2,711.88

2,711.88
2,711.88

4.02
1.89

Hinge1.L

376.75

3,479.06
1,782.15

8.3700
8.3700

7,124.73 3,245.99
7,124.73 3,245.99

3,245.99
3,245.99

2.53
4.95

Sp2.020

126.75

-1,041.21 29,203.15
-2,651.25 31,600.66

5.5800
5.5800

3,110.55 1,807.92
3,110.55 1,807.92

1,807.92
1,807.92

4.25
1.67

Spec: AASHTO Standard

Units: US (English)

Spec: AASHTO Standard

812.99
812.99

Units: US (English)

2.82f
1.67f

Loss: Lump Sum

Loss: Lump Sum


Bentley Exton Office

| Sheet

2 of

Output

T4-56 / Tutorial Four

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:


4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor4.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor4.cbx

141.75

-454.07 51,096.07
-2,031.16 56,707.42

3.7200
3.7200

1,870.82 1,205.28
1,870.82 1,205.28

1,205.28
1,205.28

6.10
1.36

Sp2.040

156.75

166.51 64,681.53
-1,390.05 71,886.99

3.7200
3.7200

828.42 1,265.73
1,214.38 1,265.73

1,265.73
1,265.73

11.32
1.61

Sp2.050

171.75

871.29 76,209.04
-694.29 76,299.34

3.7200
3.7200

888.48 1,320.60
864.33 1,320.60

1,320.60
1,320.60

2.28
2.83

Sp2.060

186.75

1,525.01 69,959.58
-21.55 69,077.35

3.7200
3.7200

1,417.93 1,265.73
828.42 1,265.73

Sp2.070

201.75

2,170.86 52,787.73
631.67 51,255.83

3.7200
3.7200

2,167.32 1,205.28
2,167.32 1,205.28

1,205.28
1,205.28

1.40
4.81

Sp2.080

216.75

2,824.62 15,779.35
1,245.37 22,349.74

5.5800
5.5800

3,624.30 1,807.92
3,624.30 1,807.92

1,807.92
1,807.92

1.73
3.93

Sp2.090

231.75

3,478.33 -23,164.47
1,809.02 -10,262.97

8.3700
8.3700

3,051.10 2,711.88
3,051.10 2,711.88

2,711.88
2,711.88

1.49
2.87

Sp2.100

246.75

4,306.14 -72,374.92
2,461.75 -47,128.11

8.3700
8.3700

5,624.17 2,887.65
5,624.17 2,887.65

2,887.65
2,887.65

1.78
3.11

Sp3.000

246.75

-2,582.57 -51,189.27
-4,355.52 -75,976.58

7.1475m 5,624.17 2,465.89


7.1475m 5,624.17 2,465.89

N/A
N/A

Sp3.010

261.75

-1,895.01 -12,901.98
-3,540.56 -26,270.46

8.3700
8.3700

3,188.74 2,711.88
3,188.74 2,711.88

2,711.88
2,711.88

2.80
1.50

Sp3.020

276.75

-1,342.07 21,691.31
-2,903.65 23,179.33

5.5800
5.5800

3,865.02 1,807.92
3,865.02 1,807.92

1,807.92
1,807.92

3.80
1.76

Sp3.030

291.75

-739.63 50,734.55
-2,293.10 52,502.50

3.7200
3.7200

2,616.99 1,205.28
2,616.99 1,205.28

1,205.28
1,205.28

4.65
1.50

Sp3.040

306.75

-103.80 70,668.53
-1,655.01 71,696.62

3.7200
3.7200

1,765.34 1,265.73
1,765.34 1,265.73

1,265.73
1,265.73

26.28
1.65

Sp3.050

321.75

605.66 79,520.91
-949.96 78,966.45

3.7200
3.7200

864.33 1,320.60
975.68 1,320.60

1,320.60
1,320.60

3.25
2.18

Sp3.060

336.75

1,271.84 76,247.22
-249.03 73,457.31

3.7200
3.7200

1,225.03 1,273.78
892.70 1,273.78

1,273.78
1,273.78

1.77
7.83

Sp3.070

351.75

1,948.71 60,094.78
430.43 50,164.45

5.5800
5.5800

2,058.15 1,807.92
2,058.15 1,807.92

1,807.92
1,807.92

1.79
8.08

Sp3.080

366.75

2,687.01 30,069.90
1,119.08 23,993.71

8.3700
8.3700

4,688.15 2,711.88
4,688.15 2,711.88

2,711.88
2,711.88

2.48
5.95

Hinge1.L

376.75

3,479.06
1,782.15

8.3700
8.3700

7,124.73 3,245.99
7,124.73 3,245.99

3,245.99
3,245.99

2.53
4.95

812.99
812.99

Sp2.030

141.75

-454.07 51,096.07
-2,031.16 56,707.42

3.7200
3.7200

1,870.82 1,205.28
1,870.82 1,205.28

1,205.28
1,205.28

6.10
1.36

Sp2.040

156.75

166.51 64,681.53
-1,390.05 71,886.99

3.7200
3.7200

828.42 1,265.73
1,214.38 1,265.73

1,265.73
1,265.73

11.32
1.61

Sp2.050

171.75

871.29 76,209.04
-694.29 76,299.34

3.7200
3.7200

888.48 1,320.60
864.33 1,320.60

1,320.60
1,320.60

2.28
2.83

Sp2.060

186.75

1,525.01 69,959.58
-21.55 69,077.35

3.7200
3.7200

1,417.93 1,265.73
828.42 1,265.73

Sp2.070

201.75

2,170.86 52,787.73
631.67 51,255.83

3.7200
3.7200

2,167.32 1,205.28
2,167.32 1,205.28

1,205.28
1,205.28

1.40
4.81

Sp2.080

216.75

2,824.62 15,779.35
1,245.37 22,349.74

5.5800
5.5800

3,624.30 1,807.92
3,624.30 1,807.92

1,807.92
1,807.92

1.73
3.93

Sp2.090

231.75

3,478.33 -23,164.47
1,809.02 -10,262.97

8.3700
8.3700

3,051.10 2,711.88
3,051.10 2,711.88

2,711.88
2,711.88

1.49
2.87

Sp2.100

246.75

4,306.14 -72,374.92
2,461.75 -47,128.11

8.3700
8.3700

5,624.17 2,887.65
5,624.17 2,887.65

2,887.65
2,887.65

1.78
3.11

Sp3.000

246.75

-2,582.57 -51,189.27
-4,355.52 -75,976.58

7.1475m 5,624.17 2,465.89


7.1475m 5,624.17 2,465.89

N/A
N/A

Sp3.010

261.75

-1,895.01 -12,901.98
-3,540.56 -26,270.46

8.3700
8.3700

3,188.74 2,711.88
3,188.74 2,711.88

2,711.88
2,711.88

2.80
1.50

Sp3.020

276.75

-1,342.07 21,691.31
-2,903.65 23,179.33

5.5800
5.5800

3,865.02 1,807.92
3,865.02 1,807.92

1,807.92
1,807.92

3.80
1.76

Sp3.030

291.75

-739.63 50,734.55
-2,293.10 52,502.50

3.7200
3.7200

2,616.99 1,205.28
2,616.99 1,205.28

1,205.28
1,205.28

4.65
1.50

Sp3.040

306.75

-103.80 70,668.53
-1,655.01 71,696.62

3.7200
3.7200

1,765.34 1,265.73
1,765.34 1,265.73

1,265.73
1,265.73

26.28
1.65

Sp3.050

321.75

605.66 79,520.91
-949.96 78,966.45

3.7200
3.7200

864.33 1,320.60
975.68 1,320.60

1,320.60
1,320.60

3.25
2.18

Sp3.060

336.75

1,271.84 76,247.22
-249.03 73,457.31

3.7200
3.7200

1,225.03 1,273.78
892.70 1,273.78

1,273.78
1,273.78

1.77
7.83

Sp3.070

351.75

1,948.71 60,094.78
430.43 50,164.45

5.5800
5.5800

2,058.15 1,807.92
2,058.15 1,807.92

1,807.92
1,807.92

1.79
8.08

Sp3.080

366.75

2,687.01 30,069.90
1,119.08 23,993.71

8.3700
8.3700

4,688.15 2,711.88
4,688.15 2,711.88

2,711.88
2,711.88

2.48
5.95

Hinge1.L

376.75

3,479.06
1,782.15

8.3700
8.3700

7,124.73 3,245.99
7,124.73 3,245.99

3,245.99
3,245.99

2.53
4.95

1,265.73
1.58
1,265.73 87.48

2.82f
1.67f

Spec: AASHTO Standard


Spec: AASHTO Standard

Bentley Exton Office

Units: US (English)

812.99
812.99

Units: US (English)

1,265.73
1.58
1,265.73 87.48

2.82f
1.67f

Loss: Lump Sum

Loss: Lump Sum

| Sheet
2 of
| Job No:

Output

Tutorial Four / T4-57

Sp2.030

| Sheet
2 of
6
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

| Sheet
2 of
6
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor4.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor4.cbx

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Sp2.030

141.75

-454.07 51,096.07
-2,031.16 56,707.42

3.7200
3.7200

1,870.82 1,205.28
1,870.82 1,205.28

1,205.28
1,205.28

6.10
1.36

Sp2.030

141.75

-454.07 51,096.07
-2,031.16 56,707.42

3.7200
3.7200

1,870.82 1,205.28
1,870.82 1,205.28

1,205.28
1,205.28

6.10
1.36

Sp2.040

156.75

166.51 64,681.53
-1,390.05 71,886.99

3.7200
3.7200

828.42 1,265.73
1,214.38 1,265.73

1,265.73
1,265.73

11.32
1.61

Sp2.040

156.75

166.51 64,681.53
-1,390.05 71,886.99

3.7200
3.7200

828.42 1,265.73
1,214.38 1,265.73

1,265.73
1,265.73

11.32
1.61

Sp2.050

171.75

871.29 76,209.04
-694.29 76,299.34

3.7200
3.7200

888.48 1,320.60
864.33 1,320.60

1,320.60
1,320.60

2.28
2.83

Sp2.050

171.75

871.29 76,209.04
-694.29 76,299.34

3.7200
3.7200

888.48 1,320.60
864.33 1,320.60

1,320.60
1,320.60

2.28
2.83

Sp2.060

186.75

1,525.01 69,959.58
-21.55 69,077.35

3.7200
3.7200

1,417.93 1,265.73
828.42 1,265.73

1,265.73
1.58
1,265.73 87.48

Sp2.060

186.75

1,525.01 69,959.58
-21.55 69,077.35

3.7200
3.7200

1,417.93 1,265.73
828.42 1,265.73

Sp2.070

201.75

2,170.86 52,787.73
631.67 51,255.83

3.7200
3.7200

2,167.32 1,205.28
2,167.32 1,205.28

1,205.28
1,205.28

1.40
4.81

Sp2.070

201.75

2,170.86 52,787.73
631.67 51,255.83

3.7200
3.7200

2,167.32 1,205.28
2,167.32 1,205.28

1,205.28
1,205.28

1.40
4.81

Sp2.080

216.75

2,824.62 15,779.35
1,245.37 22,349.74

5.5800
5.5800

3,624.30 1,807.92
3,624.30 1,807.92

1,807.92
1,807.92

1.73
3.93

Sp2.080

216.75

2,824.62 15,779.35
1,245.37 22,349.74

5.5800
5.5800

3,624.30 1,807.92
3,624.30 1,807.92

1,807.92
1,807.92

1.73
3.93

Sp2.090

231.75

3,478.33 -23,164.47
1,809.02 -10,262.97

8.3700
8.3700

3,051.10 2,711.88
3,051.10 2,711.88

2,711.88
2,711.88

1.49
2.87

Sp2.090

231.75

3,478.33 -23,164.47
1,809.02 -10,262.97

8.3700
8.3700

3,051.10 2,711.88
3,051.10 2,711.88

2,711.88
2,711.88

1.49
2.87

Sp2.100

246.75

4,306.14 -72,374.92
2,461.75 -47,128.11

8.3700
8.3700

5,624.17 2,887.65
5,624.17 2,887.65

2,887.65
2,887.65

1.78
3.11

Sp2.100

246.75

4,306.14 -72,374.92
2,461.75 -47,128.11

8.3700
8.3700

5,624.17 2,887.65
5,624.17 2,887.65

2,887.65
2,887.65

1.78
3.11

Sp3.000

246.75

-2,582.57 -51,189.27
-4,355.52 -75,976.58

7.1475m 5,624.17 2,465.89


7.1475m 5,624.17 2,465.89

N/A
N/A

2.82f
1.67f

Sp3.000

246.75

-2,582.57 -51,189.27
-4,355.52 -75,976.58

7.1475m 5,624.17 2,465.89


7.1475m 5,624.17 2,465.89

N/A
N/A

Sp3.010

261.75

-1,895.01 -12,901.98
-3,540.56 -26,270.46

8.3700
8.3700

3,188.74 2,711.88
3,188.74 2,711.88

2,711.88
2,711.88

2.80
1.50

Sp3.010

261.75

-1,895.01 -12,901.98
-3,540.56 -26,270.46

8.3700
8.3700

3,188.74 2,711.88
3,188.74 2,711.88

2,711.88
2,711.88

2.80
1.50

Sp3.020

276.75

-1,342.07 21,691.31
-2,903.65 23,179.33

5.5800
5.5800

3,865.02 1,807.92
3,865.02 1,807.92

1,807.92
1,807.92

3.80
1.76

Sp3.020

276.75

-1,342.07 21,691.31
-2,903.65 23,179.33

5.5800
5.5800

3,865.02 1,807.92
3,865.02 1,807.92

1,807.92
1,807.92

3.80
1.76

Sp3.030

291.75

-739.63 50,734.55
-2,293.10 52,502.50

3.7200
3.7200

2,616.99 1,205.28
2,616.99 1,205.28

1,205.28
1,205.28

4.65
1.50

Sp3.030

291.75

-739.63 50,734.55
-2,293.10 52,502.50

3.7200
3.7200

2,616.99 1,205.28
2,616.99 1,205.28

1,205.28
1,205.28

4.65
1.50

Sp3.040

306.75

-103.80 70,668.53
-1,655.01 71,696.62

3.7200
3.7200

1,765.34 1,265.73
1,765.34 1,265.73

1,265.73
1,265.73

26.28
1.65

Sp3.040

306.75

-103.80 70,668.53
-1,655.01 71,696.62

3.7200
3.7200

1,765.34 1,265.73
1,765.34 1,265.73

1,265.73
1,265.73

26.28
1.65

Sp3.050

321.75

605.66 79,520.91
-949.96 78,966.45

3.7200
3.7200

864.33 1,320.60
975.68 1,320.60

1,320.60
1,320.60

3.25
2.18

Sp3.050

321.75

605.66 79,520.91
-949.96 78,966.45

3.7200
3.7200

864.33 1,320.60
975.68 1,320.60

1,320.60
1,320.60

3.25
2.18

Sp3.060

336.75

1,271.84 76,247.22
-249.03 73,457.31

3.7200
3.7200

1,225.03 1,273.78
892.70 1,273.78

1,273.78
1,273.78

1.77
7.83

Sp3.060

336.75

1,271.84 76,247.22
-249.03 73,457.31

3.7200
3.7200

1,225.03 1,273.78
892.70 1,273.78

1,273.78
1,273.78

1.77
7.83

Sp3.070

351.75

1,948.71 60,094.78
430.43 50,164.45

5.5800
5.5800

2,058.15 1,807.92
2,058.15 1,807.92

1,807.92
1,807.92

1.79
8.08

Sp3.070

351.75

1,948.71 60,094.78
430.43 50,164.45

5.5800
5.5800

2,058.15 1,807.92
2,058.15 1,807.92

1,807.92
1,807.92

1.79
8.08

Sp3.080

366.75

2,687.01 30,069.90
1,119.08 23,993.71

8.3700
8.3700

4,688.15 2,711.88
4,688.15 2,711.88

2,711.88
2,711.88

2.48
5.95

Sp3.080

366.75

2,687.01 30,069.90
1,119.08 23,993.71

8.3700
8.3700

4,688.15 2,711.88
4,688.15 2,711.88

2,711.88
2,711.88

2.48
5.95

Hinge1.L

376.75

3,479.06
1,782.15

8.3700
8.3700

7,124.73 3,245.99
7,124.73 3,245.99

3,245.99
3,245.99

2.53
4.95

Hinge1.L

376.75

3,479.06
1,782.15

8.3700
8.3700

7,124.73 3,245.99
7,124.73 3,245.99

3,245.99
3,245.99

2.53
4.95

Spec: AASHTO Standard

812.99
812.99

Units: US (English)

Loss: Lump Sum

Spec: AASHTO Standard

812.99
812.99

Units: US (English)

Loss: Lump Sum

1,265.73
1.58
1,265.73 87.48

2.82f
1.67f

Output

T4-58 / Tutorial Four

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Bentley Exton Office

| Sheet
1 of
6
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

| Sheet
2 of
6
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor4.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor4.cbx

Combined Flexure Check - Box Girder (Strain Compatibility)


Sp2.030

141.75

56,980.31 84,501.16
0.00 -37,405.07

47,477.27
0.00

1.48
999.99

Stage Final: LFD 1 (Final w/o Sway)


POI

Location

(ft)
-------- -------BegSuper
0.00

Mu-Max
Mu-Min
(kip-ft)
---------0.00
0.00

1.2*M-Cr

Cap/Mu

Sp2.040

156.75

72,291.74 96,755.84
0.00 -26,167.20

55,226.37
0.00

1.34
999.99

(kip-ft)
---------0.00
0.00

-----999.99
999.99

Sp2.050

171.75

76,906.58 100,841.77
0.00 -22,596.32

58,406.47
0.00

1.31
999.99

Sp2.060

186.75

70,392.54 96,757.99
0.00 -26,206.38

55,874.75
0.00

1.37
999.99

Sp2.070

201.75

53,054.11 84,504.22
0.00 -37,465.48

47,446.56
0.00

1.59
999.99

Sp2.080

216.75

25,526.37 64,077.99
-8,002.95 -56,778.42

33,002.64
0.00

2.51
7.09

Sp2.090

231.75

0.00 39,164.99
-40,751.64 -89,688.76

0.00
-82,780.29

999.99
2.20

Sp2.100

246.75

0.00 23,585.46
-87,734.23 -106,036.22

0.00
999.99
-104,369.25
1.21

Sp3.000

246.75

0.00 23,585.45
-92,295.14 -106,036.22

0.00
999.99
-101,332.28
1.15

Sp3.010

261.75

0.00 33,620.61
-42,876.67 -89,699.43

0.00
-81,762.26

999.99
2.09

Sp3.020

276.75

23,381.49 64,093.74
-9,773.33 -56,904.36

42,352.27
0.00

2.74
5.82

Sp3.030

291.75

52,700.21 84,518.19
0.00 -37,698.05

60,989.04
0.00

1.60
999.99

Sp3.040

306.75

72,122.38 96,770.64
0.00 -26,433.65

72,395.27
0.00

1.34
999.99

Sp3.050

321.75

80,089.22 100,853.62
0.00 -22,882.81

76,526.68
0.00

1.26
999.99

Sp3.060

336.75

76,358.67 97,367.49
0.00 -25,861.23

74,594.94
0.00

1.28
999.99

Sp3.070

351.75

60,094.94 86,910.94
0.00 -35,394.97

67,274.65
0.00

1.45
999.99

Sp3.080

366.75

30,070.87 69,481.18
0.00 -52,748.61

58,273.16
0.00

2.31
999.99

Hinge1.L

376.75

812.99
7,311.09
0.00 -15,993.70

0.00
0.00

8.99
999.99

EndCntlv

1.75

0.00
7,311.09
-1,615.62 -15,993.70

0.00
0.00

999.99
9.90

Sp1.000

1.75

808.69 58,264.26
-663.05 -63,371.25

55,734.88
0.00

72.05
95.58

Sp1.010

11.25

23,818.70 73,743.23
0.00 -48,698.01

59,146.65
0.00

3.10
999.99

Sp1.020

20.75

39,376.27 85,739.48
0.00 -36,455.96

64,216.52
0.00

2.18
999.99

Sp1.030

30.25

48,344.63 94,254.72
0.00 -28,602.23

69,524.67
0.00

1.95
999.99

Sp1.040

39.75

51,521.14 99,290.71
0.00 -24,181.22

72,229.48
0.00

1.93
999.99

Sp1.050

49.25

49,014.21 100,841.44
0.00 -22,878.72

72,285.37
0.00

2.06
999.99

Sp1.060

58.75

41,230.40 96,375.85
0.00 -26,769.55

67,825.73
0.00

2.34
999.99

Sp1.070

68.25

28,351.26 83,825.81
-7,675.81 -38,329.00

55,979.91
0.00

2.96
4.99

Sp1.080

77.75

11,037.52 63,188.41
-20,186.70 -57,746.12

36,799.60
0.00

5.72
2.86

Sp1.090

87.25

0.00 38,282.62
-37,902.88 -90,673.57

0.00
-85,968.23

999.99
2.39

Sp1.100

96.75

0.00 23,557.52
-61,494.20 -106,025.49

0.00
999.99
-103,556.20
1.72

Sp2.000

96.75

0.00 23,557.52
-72,150.31 -106,025.49

0.00
-99,393.36

Sp2.010

111.75

89.61 33,584.35
-24,528.84 -89,675.26

0.00
-78,557.73

374.80
3.66

Sp2.020

126.75

31,893.82 64,073.64
0.00 -56,736.71

34,223.77
0.00

2.01
999.99

999.99
1.47

Spec: AASHTO Standard


Spec: AASHTO Standard

Units: US (English)

Units: US (English)

Loss: Lump Sum

Loss: Lump Sum

Output

Tutorial Four / T4-59

Phi*Mn-Pos
Phi*Mn-Neg
(kip-ft)
---------7,311.09
-15,993.70

| Sheet
3 of
6
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor4.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor4.cbx

Hinge.R

376.75

812.97
7,311.09
0.00 -15,993.70

0.00
0.00

8.99
999.99

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Sp3.090

381.75

0.00 52,556.86
-17,556.37 -75,532.23

Sp3.100

396.75

0.00 23,528.52
-80,620.56 -106,022.45

0.00
-82,816.37

999.99
1.32

Sp4.000

396.75

0.00 23,528.52
-77,921.11 -106,022.45

0.00
-87,255.59

999.99
1.36

Sp4.010

411.75

0.00 24,277.90
-37,813.14 -99,491.05

0.00
-76,790.90

999.99
2.63

Sp4.020

426.75

32,177.70 42,902.67
-11,282.81 -78,786.86

0.00
-62,203.30

1.33
6.98

Sp4.030

441.75

56,854.34 74,707.56
0.00 -46,795.73

54,427.17
0.00

1.31
999.99

Sp4.040

456.75

70,303.34 94,312.65
0.00 -28,476.85

67,722.79
0.00

1.34
999.99

Sp4.050

471.75

72,891.10 100,846.35
0.00 -22,724.67

70,891.07
0.00

1.38
999.99

Sp4.060

486.75

64,345.99 94,309.17
0.00 -28,409.18

64,326.53
0.00

1.47
999.99

Sp4.070

501.75

45,630.76 74,698.49
0.00 -46,680.79

48,711.50
0.00

1.64
999.99

Sp4.080

516.75

17,808.51 42,884.49
-13,569.14 -78,716.40

0.00
-64,041.90

2.41
5.80

Sp4.090

531.75

0.00 29,802.45
-47,772.45 -99,477.42

0.00
-78,982.32

999.99
2.08

Sp4.100

546.75

0.00 23,380.01
-98,904.84 -106,009.53

0.00
-91,427.09

999.99
1.07

Sp5.000

546.75

0.00 23,380.01
-98,961.21 -106,009.53

0.00
-91,163.81

999.99
1.07

Sp5.010

561.75

0.00 24,225.23
-47,748.79 -99,476.20

0.00
-78,767.72

999.99
2.08

Sp5.020

576.75

17,826.61 42,884.52
-13,440.24 -78,714.85

0.00
-63,969.73

2.41
5.86

Sp5.030

591.75

45,737.69 74,698.69
0.00 -46,678.27

48,655.50
0.00

1.63
999.99

Sp5.040

606.75

64,574.45

64,143.37

1.46

Spec: AASHTO Standard

94,309.22

0.00
-53,252.28

Units: US (English)

| Sheet
4 of
6
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

0.00 -28,406.59

0.00

999.99

Sp5.050

621.75

73,238.79 100,846.24
0.00 -22,721.52

70,592.80
0.00

1.38
999.99

Sp5.060

636.75

70,738.74 94,312.35
0.00 -28,474.47

67,323.07
0.00

1.33
999.99

Sp5.070

651.75

57,395.03 74,707.04
0.00 -46,794.02

53,940.78
0.00

1.30
999.99

Sp5.080

666.75

32,813.00 42,902.11
-10,921.17 -78,786.29

0.00
-62,776.23

1.31
7.21

Sp5.090

681.75

0.00 29,861.29
-37,387.31 -99,491.83

0.00
-77,472.27

999.99
2.66

Sp5.100

696.75

0.00 23,526.76
-77,258.73 -106,022.28

0.00
-88,014.18

999.99
1.37

Sp6.000

696.75

0.00 23,526.76
-79,657.42 -106,022.28

0.00
-83,939.51

999.99
1.33

Sp6.010

711.75

0.00 47,474.62
-17,302.55 -74,987.24

0.00
-60,790.58

999.99
4.33

Hinge2.L

716.75

830.63
7,311.09
0.00 -15,993.70

0.00
0.00

8.80
999.99

Hinge.R

716.75

830.64
7,311.09
0.00 -15,993.70

0.00
0.00

8.80
999.99

Sp6.020

726.75

29,616.98 69,481.74
0.00 -52,749.28

58,883.10
0.00

2.35
999.99

Sp6.030

741.75

58,942.22 86,911.22
0.00 -35,396.40

68,740.40
0.00

1.47
999.99

Sp6.040

756.75

74,512.77 97,367.57
0.00 -25,860.84

76,859.81
0.00

1.31
999.99

Sp6.050

771.75

77,540.03 100,853.52
0.00 -22,881.45

79,600.38
0.00

1.30
999.99

Sp6.060

786.75

68,898.43 94,320.27
0.00 -28,643.05

74,559.30
0.00

1.37
999.99

Sp6.070

801.75

48,776.33 74,714.59
0.00 -46,884.91

57,508.97
0.00

1.53
999.99

Sp6.080

816.75

18,730.93 42,914.19
-14,657.72 -78,833.02

0.00
-65,605.99

2.29
5.38

Sp6.090

831.75

0.00 29,898.52
-48,448.56 -99,502.19

0.00
-82,567.78

999.99
2.05

999.99
4.30

Loss: Lump Sum

Spec: AASHTO Standard

Units: US (English)

Loss: Lump Sum

Output

T4-60 / Tutorial Four

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Bentley Exton Office

| Sheet
5 of
6
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor4.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor4.cbx

Sp6.100

846.75

0.00 23,612.58
-98,451.52 -106,031.84

0.00
-94,104.14

999.99
1.08

Sp7.000

846.75

0.00 23,612.58
-93,927.50 -106,031.84

0.00
-97,204.04

999.99
1.13

Sp7.010

861.75

0.00 24,287.39
-46,885.64 -99,494.06

0.00
-84,203.91

999.99
2.12

Sp7.020

876.75

19,716.11 42,897.66
-13,994.22 -78,767.16

0.00
-67,162.72

2.18
5.63

Sp7.030

891.75

47,404.19 74,701.13
0.00 -46,711.81

47,748.30
0.00

1.58
999.99

Sp7.040

906.75

64,902.86 94,307.64
0.00 -28,374.70

61,132.39
0.00

1.45
999.99

Sp7.050

921.75

71,545.66 100,841.57
0.00 -22,590.70

64,896.79
0.00

1.41
999.99

Sp7.060

936.75

67,095.88 94,303.80
0.00 -28,302.45

59,470.30
0.00

1.41
999.99

Sp7.070

951.75

51,950.82 74,693.25
0.00 -46,606.25

46,255.51
0.00

1.44
999.99

Sp7.080

966.75

27,037.00 42,883.44
0.00 -78,712.18

0.00
-63,921.77

1.59
999.99

Sp7.090

981.75

0.00 29,830.57
-29,308.01 -99,484.04

0.00
-79,687.94

999.99
3.39

Sp7.100

996.75

0.00 23,528.18
-76,757.31 -106,022.42

0.00
-92,667.41

999.99
1.38

Sp8.000

996.75

0.00 23,528.18
-67,224.18 -106,022.42

0.00
-96,064.33

999.99
1.58

Sp8.010

1,006.25

0.00 29,737.25
-43,108.36 -99,628.40

0.00
-85,405.83

999.99
2.31

Sp8.020

1,015.75

6,708.11 42,392.09
-24,873.16 -79,340.22

0.00
-67,665.97

6.32
3.19

Sp8.030

1,025.25

24,591.29 73,887.81
-11,773.26 -47,614.44

51,195.34
0.00

3.00
4.04

Sp8.040

1,034.75

38,021.59 93,763.59
-1,457.29 -29,126.86

69,670.37
0.00

2.47
19.99

Sp8.050

1,044.25

46,346.39 100,834.63
0.00 -22,880.32

75,471.64
0.00

2.18
999.99

| Sheet
6 of
6
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Sp8.060

1,053.75

49,321.28 99,315.18
0.00 -24,146.83

74,398.78
0.00

2.01
999.99

Sp8.070

1,063.25

46,681.57 94,360.32
0.00 -28,474.61

70,784.33
0.00

2.02
999.99

Sp8.080

1,072.75

38,255.23 85,982.83
0.00 -36,191.48

64,817.13
0.00

2.25
999.99

Sp8.090

1,082.25

23,229.03 74,181.53
0.00 -48,270.80

59,724.16
0.00

3.19
999.99

Sp8.100

1,091.75

725.31 58,954.43
-746.42 -62,710.16

56,085.10
0.00

81.28
84.01

BegCntlv 1,091.75

0.00
7,311.09
-1,568.97 -15,993.70

0.00
0.00

999.99
10.19

EndSuper 1,093.50

46.61
7,311.09
0.00 -15,993.70

0.00
0.00

156.86
999.99

***** End of Report *****

Spec: AASHTO Standard

Units: US (English)

Loss: Lump Sum

Loss: Lump Sum

Output

Tutorial Four / T4-61

Spec: AASHTO Standard

Units: US (English)

T4-62 / Tutorial Four

| Sheet
6 of
6
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/2/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor4.cbx
1,053.75

49,321.28 99,315.18
0.00 -24,146.83

74,398.78
0.00

2.01
999.99

Sp8.070

1,063.25

46,681.57 94,360.32
0.00 -28,474.61

70,784.33
0.00

2.02
999.99

Sp8.080

1,072.75

38,255.23 85,982.83
0.00 -36,191.48

64,817.13
0.00

2.25
999.99

Sp8.090

1,082.25

23,229.03 74,181.53
0.00 -48,270.80

59,724.16
0.00

3.19
999.99

Sp8.100

1,091.75

725.31 58,954.43
-746.42 -62,710.16

56,085.10
0.00

81.28
84.01

BegCntlv 1,091.75

0.00
7,311.09
-1,568.97 -15,993.70

0.00
0.00

999.99
10.19

EndSuper 1,093.50

46.61
7,311.09
0.00 -15,993.70

0.00
0.00

156.86
999.99

***** End of Report *****


Spec: AASHTO Standard

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Sp8.060

Units: US (English)

Loss: Lump Sum

Output

Bentley Exton Office

Load Resistance and Factor (LRFD) Design of an


8-Span Post-Tensioned Prestressed Concrete Box Girder
Bridge (U.S. Units) (AASHTO LRFD)

This CONBOX tutorial takes you through a design and illustrates the ease with which you
can take an existing AASHTO Standard design and switch code specifications to LRFD. In
this tutorial, you will check to see if the structures design requirements differ when using
the AASHTO LRFD Design Specifications.
The information for this tutorial is contained in an input file called Tutor5.cbx. As an
alternative to opening Tutor4.cbx and switching code specifications, as directed in this
tutorial, you can load this file and only work on the sections you wish. To load this file,
select the Open command from the File menu. Browse to the CONBOX/Examples
subdirectory, if it is not already showing, and select the file Tutor5.cbx.
This tutorial uses the bridge you designed in Tutorial 4 (Arizona DOT Project #NH-103(310): RAMP S-E (Superstition T1 - Baseline Road T1, Unit 1)).

LEAP CONBOX v10.00.01.00

Tutorial Five / T5-1

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Problem Data

Problem Data
Concrete Material Properties
Unit Weight (PCF)
E-Modulus, E28 (ksi)
Poissons Ratio
Thermal Coeff. (F)
fci (ksi)
fc (ksi)
Humidity (%)
Ultimate Creep Coeff.
Ultimate Shrinkage Strain

CIP Box Girder

Integral Pier

150
3825
0.20

150
3375
0.20
--

6 10-6
3.5
4.5
70
Program Calculated
Program Calculated

-4.5
----

Design Specifications
AASHTO LRFD

Units
U.S. (English)

Loss Type/Material Model


Lump Sum

18.4 ksi

Offset to Bridge Centerline


0.00 ft.

Column Spacing
Piers 1,2,3,5,6,7 =

36-0

Pier 4 =

40-2 1/8

P/T Tendons
Strand Type

0.6 - 270 ksi Low Relaxation (Es = 28,500 ksi)

Tendon Type

Unknown

Friction Coeff.

0.25

Wobble Coeff. (1/ft) 0.0002

T5-2 / Tutorial Five

Relaxation

0 ksi

Jack Type

Both Ends (Left and Right)

Force Type

Force

Pjack (Left)

13,114 kips per tendon

Left Set

3/8

Pjack (Right)

13,114 kips per tendon

Right Set

3/8

LEAP CONBOXv10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Problem Data

Rebar Information
fy =

60 ksi
User-Defined

Stirrup Information
fy =

60 ksi
User-Defined

Live Load
HL 93 Multispan

Live Load Distribution Factor


Refer to AASHTO LRFD Table 4.6.2.2.2b-1 (Applicable Cross Section d)

Dead Loads
Self Weight
Deck Falsework (left inside box girders) = 5 psf
Load =

(75.1667 - (2 5.5) - 9 webs 1.0) = 55.166


5 psf
(55.166) = 0.276 klf
1000

9 Intermediate Diaphragm Load =

(61797.75 in

19521.176 in 2
0.15 kcf = 44.04 k
ft
144

9 Intermediate Diaphragm = 0.75 44.04 = 33.03 K

Additional Dead Loads


On Composite Barrier

2 0.400 klf = 0.800 klf

Future Wearing Surface


(FWS)

25 psf

Load =

(72.00 ft. = face-to-face barrier)


0.025 klf(72.00 ft.) = 1.800 klf

Temperature Loads
Temperature Rise = +30F
Temperature Fall = -40F

LEAP CONBOX v10.00.01.00

Tutorial Five / T5-3

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 1: Start the Program

Load Combinations

Initial

Final

Final Without Sway

Dead Loads

Superimposed
Dead Loads

Temperature
Loads

Live
Loads

Self Weight
Deck Falsework
Intermediate Diaphragms
Self Weight
Deck Falsework
Intermediate Diaphragms
Self Weight
Deck Falsework
Intermediate Diaphragms

N/A

N/A

N/A

Barrier
FWS

Uniform
Temperature

N/A

Barrier
FWS

N/A

HL 93
Multispan

Step 1: Start the Program


Start CONBOX as you would any other application using Microsoft Windows. By
default, the program installs in Programs > LEAP Software > CONBOX. To open, click
the Start button, select Programs, then LEAP Software, and then select CONBOX.
When the CONBOX splash screen appears, click the START button to clear the screen and
view the Project tab.

FIGURE T5-1. CONBOX Splash Screen

Step 2: Modify the Project Information


Once you have opened the program, you need to open the file you designed in Tutorial 4. To
load this file, select the Open command from the File menu. Browse to the CONBOX/
Examples subdirectory, if it is not already showing, and select the file Tutor4.cbx. (If you
created Tutorial 4 from scratch, you can open the file you created instead.)
It is very important that you immediately save this file and rename it MyTutor5 so
that you do not accidentally overwrite your Tutor 4 file. Select the Save As option from
the File menu and name the file MyTutor5.

The Project tab allows you to enter general information about the project and select the
analysis options, design specifications, units, and loss type. You can return to this tab at any
time and make changes.

T5-4 / Tutorial Five

LEAP CONBOXv10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 3: Modify the Loads for the Analysis

FIGURE T5-2. Project Tab

Modify the Project tab information by changing the Design Specifications to AASHTO
LRFD as shown in Fig. T5-2.When you attempt to change the Design Specifications, notice
that the warning shown in Fig. T5-3 displays. Click the OK button to accept the changes.

FIGURE T5-3. Design Specification Warning Message

LRFD uses different load factors, load combinations, and live loads. Therefore, you will modify
this information accordingly in this tutorial for LRFD.

Step 3: Modify the Loads for the Analysis


LOADS/ANALYSIS TAB
The Loads/Analysis tab allows you to specify load combinations (LRFD) to be used in the
analysis. For this tutorial, your dead loads, superimposed dead loads, and uniform
temperature loads will be unaffected although you will need to redefine the live loads for
the analysis. The loads in this tutorial are:

Dead Loads: Intrinsic Self Weight, Deck Falsework, and Intermediate Diaphragms

Superimposed Dead Loads: Barrier, Future Wearing Surface (FWS)

Temperature Loads: Uniform Temperature

Live Loads: HL93 Multispan

NOTE: Refer to the Problem Data beginning on page T5-2 for additional data input.

LEAP CONBOX v10.00.01.00

Tutorial Five / T5-5

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 3: Modify the Loads for the Analysis

FIGURE T5-4. Loads/Analysis Tab

Select the Initial analysis case and verify that the Dead Loads are unchanged by expanding
the Dead Load/DC Group on the right panel and double-clicking to open the Dead Loads
dialog box for the Intrinsic Self Weight, the Deck Falsework, and the Intermediate
Diaphragm loads.

DEAD LOADS DIALOG BOX (DEAD LOADS)


This dialog box allows you to define the dead load for the analysis. The Intrinsic Self
Weight, the Deck Falsework, and the Intermediate Diaphragm loads are unchanged by
switching the design specifications to LRFD. You can compare these screens with those
found in Tutor 4 to verify this information.

LOADS/ANALYSIS TAB
Once you have verified that the Dead Loads are unchanged, select the Final analysis case
and check the Superimposed Dead Loads by expanding the Superimposed Dead Load/DW
Group on the right panel and double-clicking to open the Dead Loads dialog box for both
the Barrier Load and the FWS load.

DEAD LOADS DIALOG BOX (SUPERIMPOSED DEAD LOADS)


Both the Barrier and the FWS loads are unchanged by the switch to LRFD. You can
compare these screens with those found in Tutor 4 to verify this information.

LOADS/ANALYSIS TAB
After verifying that the Superimposed Dead Loads are unchanged, check the Uniform
Temperature Load by expanding the Temperature Load Group on the right panel (in the Final
analysis case) and double-clicking to open the Uniform Temperature Load dialog box.

T5-6 / Tutorial Five

LEAP CONBOXv10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 3: Modify the Loads for the Analysis

UNIFORM TEMPERATURE LOAD DIALOG BOX (TEMPERATURE LOAD)


This load is also unaffected by changing to LRFD. You can compare this screen with the
load found in Tutor 4 to verify this information.

LOADS/ANALYSIS TAB
After verifying the Uniform Temperature Load, select the Final w/o Sway analysis case and
check the Live Loads by expanding the Live Load Group on the right panel. The loads you
added in Tutorial 4, HS20 Truck + Lane and Military Truck, are not specific to LRFD;
therefore, you will have to delete these live loads. Delete both of these loads by rightclicking each load and selecting Delete Live Load.
For LRFD, you need to add the HL 93 Multispan load. Define this load by expanding the
Live Load Group located under Locked Library Loads. Select the predefined HL 93
Multispan load, then drag and drop it anywhere within the Tutor 5 Loads. Notice that this
load is added to the Live Load Group. In the Live Load Group for this tutorial, double-click
the HL 93 Multispan Load to open the Live Load dialog box.
NOTE: The Locked Library Loads can be viewed or modified by selecting Vehicle from the
Libraries menu to open the Vehicle Library.

LIVE LOAD DIALOG BOX (HL 93 MULTISPAN LOAD)


This dialog box allows you to add or modify live loads for the analysis. Verify that the
definition for this load appears as shown in Fig. T5-5.

FIGURE T5-5. Live Load Dialog Box (HL 93 Multispan)

Once you are done, click the OK button to return to the Loads/Analysis tab.

LEAP CONBOX v10.00.01.00

Tutorial Five / T5-7

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 4: Modify the Load Combination Factors for the Analysis

Step 4: Modify the Load Combination Factors for the Analysis


LOADS/ANALYSIS TAB
LRFD uses different combination types for analysis: Strength I, Strength II, Service I,
Service III. As a result, the combinations you defined in Tutorial 4 need to be modified and
additional loads need to be added.
To modify the combinations for the Initial case, select Initial from the Case drop-down list,
select the SLD 1 (Initial) combination from the left panel, right-click and select Edit
Combination to open the LRFD Load Combination Factors dialog box.
For each Service Load Group (SLD) case you created in Tutorial 4, you will need to create two
separate combinationsone using the Service I combination type and one using the Service III
combination type. For each Strength Load Group (LFD) case you created, you will need to create
a combination using the Strength I combination type.

LRFD LOAD COMBINATION FACTORS DIALOG BOX (SERVICE 1 (INITIAL))


Rename this combination to one more appropriate for LRFD and select the Service I
combination type. Complete the load combination as shown in Fig. T5-6.

FIGURE T5-6. LRFD Load Combination Factors Dialog Box

Once you are done, click the OK button to return to the Loads/Analysis tab.

LOADS/ANALYSIS TAB
Notice that the dead loads are still included in this combination. Next, create the Service III
load combination by right-clicking the left pane and selecting Add Combination to open the
LRFD Load Combination Factors dialog box.

T5-8 / Tutorial Five

LEAP CONBOXv10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 4: Modify the Load Combination Factors for the Analysis

LRFD LOAD COMBINATION FACTORS DIALOG BOX (SERVICE 3 (INITIAL))


Name this load combination Service 3 (Initial) and select the Service III combination type.
Accept all other defaults by clicking the OK button to return to the Loads/Analysis tab.

LOADS/ANALYSIS TAB
Once you have created the Service 3 (Initial) load combination, select the Self Weight load
in the right panel, then drag and drop it anywhere within the combination. Repeat this
process again to add the Deck Falsework load and the Intermediate Diaphragm load to the
combination.
Repeat the steps defined above to define the rest of the combinations for the analysis. You
can either modify the existing loads or delete them and add new ones. For all load
combinations, leave the parameters in the LRFD Load Combination Factors dialog box as
the default. Refer to the following table for additional input information.
AASHTO
Combination
Type

Combination
Name

Purpose

Defined Loads to Include

Intrinsic
Deck
Intermediate Barrier FWS
Uniform
HL 93
Self Weight Falsework Diaphragms
Temperature Multispan
Initial
Service I
Service III
Final
Service I
Service III

f'c Design

PT Design

Strength Design (Std)

Service 1 (Initial)

f'ci Design
Compressive Stress Check
Service 3 (Initial)
Tensile Stress Check
Service 1 (Final) Compressive Stress Check
w/ Temperature
Service 3 (Final)
Tensile Stress Check
w/ Temperature

Final Without (w/o) Sway


Service I
Service 1
(Final w/o Sway)
Service III
Service 3
(Final w/o Sway)
Strength I
Strength 1
(Final w/o Sway)

LEAP CONBOX v10.00.01.00

Tutorial Five / T5-9

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 5: Check the Design Parameters

Step 5: Check the Design Parameters


Select Design Parameters from the Settings menu to open the Design Parameters dialog box.
This dialog box allows you to view and/or edit the settings of the design parameters.

FIGURE T5-7. Design Parameters Dialog Box

Change the PS + Perm Tension Factor to 6.000 and the Flexure PT Resistance Factor to
0.95. Use the default numbers for all other allowable stress and resistance factors. When
you are done, click the OK button to return to the program.

Step 6: Run the Analysis


LOADS/ANALYSIS TAB
You will use the program-computed live load distribution factors according to AASHTO;
therefore, skip the Live Load Distribution Factors button.

After defining the load combinations, you can perform an analysis of the structure by
clicking the Run Analysis button. After performing the analysis, the default analysis result
text/graphic report displays in the Analysis Results screen.

T5-10 / Tutorial Five

LEAP CONBOXv10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 7: View the Design Results

ANALYSIS RESULTS SCREEN


This screen displays automatically after performing the analysis and presents you with the
analysis results.

FIGURE T5-8. Analysis Results Screen (Text Format)

This screen allows you to view, print, or save (in text or Microsoft Excel formats)
structure responses to all loads, load cases, and load combination. Click
to close this
screen and return to the Loads/Analysis tab.
At this point, it would be a good idea to save your project. Select the Save As option from the File
menu. Enter the file name you want to save your data to (e.g., MyTutor5) in the File Name field
and click the Save button. The default extension is *.cbx

Step 7: View the Design Results


DESIGN TAB
This tab allows you to verify the design results and assists you in designing the layout of
your rebar and stirrups, if necessary. After running the analysis, click the Design Results
button to open the Design Results screen.

LEAP CONBOX v10.00.01.00

Tutorial Five / T5-11

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 7: View the Design Results

FIGURE T5-9. Design Tab

DESIGN RESULTS SCREEN


This screen displays automatically after computing the design and presents you with the
design results.

FIGURE T5-10. Design Results Screen (Text Format)

This screen allows you to view, print, save, or copy (in text or Microsoft Excel formats)
structure responses to all loads, load cases, and load combination. Click
to close this
screen and return to the Loads/Analysis tab.

T5-12 / Tutorial Five

LEAP CONBOXv10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 8: Print the Reports

Step 8: Print the Reports


The input of Tutorial 5 is completed. To print the final output of the project, select Print
from the File menu to open the Print Report Manager dialog box.

PRINT REPORT MANAGER


For this tutorial, print to a file all the model reports, analysis results, design/check reports,
and miscellaneous reports as shown in Fig. T5-11. Click the Create Reports button to send
the selected output to a text file.

FIGURE T5-11. Print Report Manager

Following this page is a printout of select output for Tutorial 5 according to the options
selected above.
At this point, it would be a good idea to save your project. Select the Save As option from the File
menu. Enter the file name you want to save your data to (e.g., MyTutor5) in the File Name field
and click the Save button. The default extension is *.cbx

LEAP CONBOX v10.00.01.00

Tutorial Five / T5-13

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Bentley Exton Office

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Project:
Project Number:
State:
Date:
Loss Type:
File Name:

Geometry

RAMP S-E (Superstition T1 - Baseline Road T1, Unit 1)


NH-10-3(310)
Arizona
State Job Number:
11/14/2002
By: DAT
Lump Sum
C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

| Sheet
1 of
1
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bridge Alignment:

Description:
New 8 Span Post-Tensioned Prestressed Concrete Box Girder Bridge
Segment SE1 = 375'-0" (95' - 150' - 130')
Segment SE2 = 340'-0" (20' - 150' - 150' - 20')
Segment SE3 = 375'-0" (130' - 150' - 95')
***** End of Report *****

ALG01

Beginning Station:
Seg. Shape
1
2
3

Units: US (English)

87+00.0000

ft

StartDirection

Tangent
Curve
Tangent

EndStation
Radius
Sprl-In
Sprl-Out Sense
(ft)
(ft)
(ft)
(ft)
87+25.8800
105+47.4400 954.9300
0.0000 350.0000
L
107+15.6255
-

S 15 27 52.10 W
S 15 27 52.10 W
S 83 19 44.73 E

Alignment Tie:
Beginning Station

Spec: AASHTO LRFD

coordinates:

Loss: Lump Sum


North:

0.0000

ft

East:

0.0000

ft

***** End of Report *****


Spec: AASHTO LRFD

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
1 of
1
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Units: US (English)

Loss: Lump Sum

Output

T5-14 / Tutorial Five

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Bentley Exton Office

| Sheet
1 of
1
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Bridge Component Layout for Bridge:


Component
Ref. Name
Begin Bridge
Abutment
Abutment 1
Pier
Pier 1
Pier
Pier 2
Hinge
Hinge 1
Pier
Pier 3
Pier
Pier 4
Pier
Pier 5
Hinge
Hinge 2
Pier
Pier 6
Pier
Pier 7
Abutment
Abutment 2
End Bridge

BR01

Geometry: Cross Section


Station (ft)
94+76.7500
94+78.5000
95+73.5000
97+23.5000
98+53.5000
98+73.5000
100+23.5000
101+73.5000
101+93.5000
103+23.5000
104+73.5000
105+68.5000
105+70.2500

S
S
S
S
S
S

Bearing
18 26.00
18 26.00
36 26.00
36 26.00
48 26.00
36 26.00
15 40.00
36 26.00
24 26.00
58 09.00
08 22.00
40 15.00
40 15.00

60
60
54
45
37
36
S 1
S 18
S 17
S 10
S 7
S 6
S 6

***** End of Report *****

Spec: AASHTO LRFD

| Sheet
1 of
7
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Units: US (English)

Loss: Lump Sum

W
W
W
W
W
W
W
W
W
W
W
W
W

Connection
Free
Pin
Fix
Fix
Roller
Fix
Fix
Fix
Roller
Fix
Fix
Pin
Free

Spec: AASHTO LRFD

Span
---1
1
1
1
1
1
1
2
2
2
2
2
2
3
3
3
3
3
3
3
3
3
3
4
4
4
4
4
4
5
5
5
5
5
5
6
6
6
6
6
6
6
6
6
6
7
7
7
7
7

Rel Loc Dist From


Type Variation Parameter
Value
(ft) %,ft
(ft)
------- ---- ---- ------- --------- --------- -------0.00
ft Head
Full
Linear
None
N/A
3.75
ft Head Recall
Linear
None
N/A
3.75
ft Head
Full
Linear
None
N/A
19.75
ft Head
Full
Linear
None
N/A
77.75
ft Head Recall
Linear
None
N/A
93.75
ft Head
Full
Linear
None
N/A
93.75
ft Head
Full
Linear
None
N/A
99.50
ft Head Recall
Linear
None
N/A
99.50
ft Head Recall
Linear
None
N/A
115.50
ft Head Recall
Linear
None
N/A
228.00
ft Head Recall
Linear
None
N/A
244.00
ft Head Recall
Linear
None
N/A
244.00
ft Head Recall
Linear
None
N/A
249.50
ft Head Recall
Linear
None
N/A
249.50
ft Head Recall
Linear
None
N/A
265.50
ft Head Recall
Linear
None
N/A
355.75
ft Head Recall
Linear
None
N/A
371.75
ft Head
Full
Linear
None
N/A
371.75
ft Head
Full
Linear
None
N/A
381.75
ft Head Recall
Linear
None
N/A
381.75
ft Head Recall
Linear
None
N/A
394.00
ft Head
Full
Linear
None
N/A
394.00
ft Head Recall
Linear
None
N/A
399.50
ft Head Recall
Linear
None
N/A
399.50
ft Head Recall
Linear
None
N/A
415.50
ft Head Recall
Linear
None
N/A
528.00
ft Head Recall
Linear
None
N/A
544.00
ft Head Recall
Linear
None
N/A
544.00
ft Head Recall
Linear
None
N/A
549.50
ft Head Recall
Linear
None
N/A
549.50
ft Head Recall
Linear
None
N/A
565.50
ft Head Recall
Linear
None
N/A
678.00
ft Head Recall
Linear
None
N/A
694.00
ft Head Recall
Linear
None
N/A
694.00
ft Head Recall
Linear
None
N/A
699.50
ft Head Recall
Linear
None
N/A
699.50
ft Head
Full
Linear
None
N/A
711.75
ft Head Recall
Linear
None
N/A
711.75
ft Head Recall
Linear
None
N/A
721.75
ft Head Recall
Linear
None
N/A
721.75
ft Head Recall
Linear
None
N/A
737.75
ft Head Recall
Linear
None
N/A
828.00
ft Head Recall
Linear
None
N/A
844.00
ft Head Recall
Linear
None
N/A
844.00
ft Head Recall
Linear
None
N/A
849.50
ft Head Recall
Linear
None
N/A
849.50
ft Head Recall
Linear
None
N/A
865.50
ft Head Recall
Linear
None
N/A
978.00
ft Head Recall
Linear
None
N/A
994.00
ft Head Recall
Linear
None
N/A
Units: US (English)

Loss: Lump Sum

Output

Tutorial Five / T5-15

Section Abs Loc


(ft)
------- ------Abt. Diaph
0.00
Abt. Diaph
3.75
Abt. 1 & 2
3.75
Typical Se
19.75
Typical Se
77.75
Face of Pi
93.75
Pier Diaph
93.75
Pier Diaph
2.75
Face of Pi
2.75
Typical Se
18.75
Typical Se 131.25
Face of Pi 147.25
Pier Diaph 147.25
Pier Diaph
2.75
Face of Pi
2.75
Typical Se
18.75
Typical Se 109.00
Face of Hi 125.00
Hinge Diap 125.00
Hinge Diap 135.00
Face of Hi 135.00
P3 diaphra 147.25
Pier Diaph 147.25
Pier Diaph
2.75
Face of Pi
2.75
Typical Se
18.75
Typical Se 131.25
Face of Pi 147.25
Pier Diaph 147.25
Pier Diaph
2.75
Face of Pi
2.75
Typical Se
18.75
Typical Se 131.25
Face of Pi 147.25
Pier Diaph 147.25
Pier Diaph
2.75
P5 diaphra
2.75
Face of Hi
15.00
Hinge Diap
15.00
Hinge Diap
25.00
Face of Hi
25.00
Typical Se
41.00
Typical Se 131.25
Face of Pi 147.25
Pier Diaph 147.25
Pier Diaph
2.75
Face of Pi
2.75
Typical Se
18.75
Typical Se 131.25
Face of Pi 147.25

| Sheet
2 of
7
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

147.25
2.75
2.75
18.75
76.75
92.75
92.75
96.50

7
8
8
8
8
8
8
8

994.00
999.50
999.50
1,015.50
1,073.50
1,089.50
1,089.50
1,093.25

ft Head Recall
ft Head Recall
ft Head Recall
ft Head Recall
ft Head Recall
ft Head Recall
ft Head Recall
ft Head Recall

Linear
Linear
Linear
Linear
Linear
Linear
Linear
Linear

None
None
None
None
None
None
None
None

N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A

Cross Section Dimensions:


Section Fl. th.
Fillet
Overhang
Lft Ext Gdr Rt. Ext Gdr
Section
Width
Top
Num Web Top
Length Ext.Th. Type
Fctr Type
Fctr
Part?
Depth Bottom Web Th. Bottom
Int Th. th. radius th. radius
(ft)
(in)
(in)
(in)
(ft)
(in) (in)
(in) (in)
(in)
--------- ------- ------- ------- ------ ------- ------ ----- ----- ----- ----Abt. Diaph 75.167
8.00
7
0.00
5.500
8.00
Sl
27.0 Sl
27.0
6.750
12.00
92.00
0.00
13.50 36.0
0.0 36.0
0.0

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Pier Diaph
Pier Diaph
Face of Pi
Typical Se
Typical Se
Abt. 1 & 2
Abt. Diaph
Abt. Diaph

Abt. Diaph

75.167
6.750

8.00
12.00

7
92.00

0.00
0.00

5.500

8.00
13.50

Sl
36.0

27.0 Sl
0.0 36.0

27.0
0.0

Abt. 1 & 2

75.167
6.750

8.00
12.00

7
24.00

4.00
4.00

5.500

8.00
13.50

Sl
24.0

27.0 Sl
0.0 24.0

27.0
0.0

Typical Se

75.167
6.750

8.00
6.00

7
12.00

4.00
4.00

5.500

8.00
13.50

Sl
12.0

27.0 Sl
0.0 12.0

27.0
0.0

Typical Se

75.167
6.750

8.00
6.00

7
12.00

4.00
4.00

5.500

8.00
13.50

Sl
12.0

27.0 Sl
0.0 12.0

27.0
0.0

Face of Pi

75.167
6.750

8.00
12.00

7
12.00

4.00
4.00

5.500

8.00
13.50

Sl
12.0

27.0 Sl
0.0 12.0

27.0
0.0

Pier Diaph

75.167
6.750

8.00
12.00

7
92.00

0.00
0.00

5.500

8.00
13.50

Sl
36.0

27.0 Sl
0.0 36.0

27.0
0.0

Pier Diaph

75.167
6.750

8.00
12.00

7
92.00

0.00
0.00

5.500

8.00
13.50

Sl
36.0

27.0 Sl
0.0 36.0

27.0
0.0

Face of Pi

75.167
6.750

8.00
12.00

7
12.00

4.00
4.00

5.500

8.00
13.50

Sl
12.0

27.0 Sl
0.0 12.0

27.0
0.0

Typical Se

75.167
6.750

8.00
6.00

7
12.00

4.00
4.00

5.500

8.00
13.50

Sl
12.0

27.0 Sl
0.0 12.0

27.0
0.0

Typical Se

75.167
6.750

8.00
6.00

7
12.00

4.00
4.00

5.500

8.00
13.50

Sl
12.0

27.0 Sl
0.0 12.0

27.0
0.0

Face of Pi

75.167
6.750

8.00
12.00

7
12.00

4.00
4.00

5.500

8.00
13.50

Sl
12.0

27.0 Sl
0.0 12.0

27.0
0.0

Pier Diaph

75.167
6.750

8.00
12.00

7
92.00

0.00
0.00

5.500

8.00
13.50

Sl
36.0

27.0 Sl
0.0 36.0

27.0
0.0

Pier Diaph

75.167

8.00

0.00

5.500

8.00

27.0 Sl

27.0

Spec: AASHTO LRFD

Units: US (English)

Sl

Loss: Lump Sum

| Sheet
3 of
7
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

6.750

12.00

92.00

0.00

13.50

36.0

36.0

0.0

Face of Pi

75.167
6.750

8.00
12.00

7
12.00

4.00
4.00

5.500

8.00
13.50

Sl
12.0

27.0 Sl
0.0 12.0

27.0
0.0

Typical Se

75.167
6.750

8.00
6.00

7
12.00

4.00
4.00

5.500

8.00
13.50

Sl
12.0

27.0 Sl
0.0 12.0

27.0
0.0

Typical Se

75.167
6.750

8.00
6.00

7
12.00

4.00
4.00

5.500

8.00
13.50

Sl
12.0

27.0 Sl
0.0 12.0

27.0
0.0

Face of Hi

75.167
6.750

8.00
12.00

7
24.00

4.00
4.00

5.500

8.00
13.50

Sl
24.0

27.0 Sl
0.0 24.0

27.0
0.0

Hinge Diap

75.167
6.750

8.00
12.00

7
92.00

0.00
0.00

5.500

8.00
13.50

Sl
36.0

27.0 Sl
0.0 36.0

27.0
0.0

Hinge Diap

75.167
6.750

8.00
12.00

7
92.00

0.00
0.00

5.500

8.00
13.50

Sl
36.0

27.0 Sl
0.0 36.0

27.0
0.0

Face of Hi

75.167
6.750

8.00
12.00

7
24.00

4.00
4.00

5.500

8.00
13.50

Sl
24.0

27.0 Sl
0.0 24.0

27.0
0.0

P3 diaphra

75.167
6.750

8.00
12.00

7
15.00

4.00
4.00

5.500

8.00
13.50

Sl
15.0

27.0 Sl
0.0 15.0

27.0
0.0

Pier Diaph

75.167
6.750

8.00
12.00

7
92.00

0.00
0.00

5.500

8.00
13.50

Sl
36.0

27.0 Sl
0.0 36.0

27.0
0.0

Pier Diaph

75.167
6.750

8.00
12.00

7
92.00

0.00
0.00

5.500

8.00
13.50

Sl
36.0

27.0 Sl
0.0 36.0

27.0
0.0

Face of Pi

75.167
6.750

8.00
12.00

7
12.00

4.00
4.00

5.500

8.00
13.50

Sl
12.0

27.0 Sl
0.0 12.0

27.0
0.0

Typical Se

75.167
6.750

8.00
6.00

7
12.00

4.00
4.00

5.500

8.00
13.50

Sl
12.0

27.0 Sl
0.0 12.0

27.0
0.0

Typical Se

75.167
6.750

8.00
6.00

7
12.00

4.00
4.00

5.500

8.00
13.50

Sl
12.0

27.0 Sl
0.0 12.0

27.0
0.0

Face of Pi

75.167
6.750

8.00
12.00

7
12.00

4.00
4.00

5.500

8.00
13.50

Sl
12.0

27.0 Sl
0.0 12.0

27.0
0.0

Pier Diaph

75.167
6.750

8.00
12.00

7
92.00

0.00
0.00

5.500

8.00
13.50

Sl
36.0

27.0 Sl
0.0 36.0

27.0
0.0

Pier Diaph

75.167
6.750

8.00
12.00

7
92.00

0.00
0.00

5.500

8.00
13.50

Sl
36.0

27.0 Sl
0.0 36.0

27.0
0.0

Face of Pi

75.167
6.750

8.00
12.00

7
12.00

4.00
4.00

5.500

8.00
13.50

Sl
12.0

27.0 Sl
0.0 12.0

27.0
0.0

Typical Se

75.167
6.750

8.00
6.00

7
12.00

4.00
4.00

5.500

8.00
13.50

Sl
12.0

27.0 Sl
0.0 12.0

27.0
0.0

Spec: AASHTO LRFD

Units: US (English)

Loss: Lump Sum

0.0

Output

T5-16 / Tutorial Five

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Bentley Exton Office

| Sheet
4 of
7
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Typical Se

75.167
6.750

8.00
6.00

7
12.00

4.00
4.00

5.500

8.00
13.50

Sl
12.0

27.0 Sl
0.0 12.0

27.0
0.0

Face of Pi

75.167
6.750

8.00
12.00

7
12.00

4.00
4.00

5.500

8.00
13.50

Sl
12.0

27.0 Sl
0.0 12.0

27.0
0.0

Pier Diaph

75.167
6.750

8.00
12.00

7
92.00

0.00
0.00

5.500

8.00
13.50

Sl
36.0

27.0 Sl
0.0 36.0

27.0
0.0

Pier Diaph

75.167
6.750

8.00
12.00

7
92.00

0.00
0.00

5.500

8.00
13.50

Sl
36.0

27.0 Sl
0.0 36.0

27.0
0.0

P5 diaphra

75.167
6.750

8.00
12.00

7
15.00

4.00
4.00

5.500

8.00
13.50

Sl
15.0

27.0 Sl
0.0 15.0

27.0
0.0

Face of Hi

75.167
6.750

8.00
12.00

7
24.00

4.00
4.00

5.500

8.00
13.50

Sl
24.0

27.0 Sl
0.0 24.0

27.0
0.0

Hinge Diap

75.167
6.750

8.00
12.00

7
92.00

0.00
0.00

5.500

8.00
13.50

Sl
36.0

27.0 Sl
0.0 36.0

27.0
0.0

Hinge Diap

75.167
6.750

8.00
12.00

7
92.00

0.00
0.00

5.500

8.00
13.50

Sl
36.0

27.0 Sl
0.0 36.0

27.0
0.0

Face of Hi

75.167
6.750

8.00
12.00

7
24.00

4.00
4.00

5.500

8.00
13.50

Sl
24.0

27.0 Sl
0.0 24.0

27.0
0.0

| Sheet
5 of
7
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Pier Diaph

75.167
6.750

8.00
12.00

7
92.00

0.00
0.00

5.500

8.00
13.50

Sl
36.0

27.0 Sl
0.0 36.0

27.0
0.0

Pier Diaph

75.167
6.750

8.00
12.00

7
92.00

0.00
0.00

5.500

8.00
13.50

Sl
36.0

27.0 Sl
0.0 36.0

27.0
0.0

Face of Pi

75.167
6.750

8.00
12.00

7
12.00

4.00
4.00

5.500

8.00
13.50

Sl
12.0

27.0 Sl
0.0 12.0

27.0
0.0

Typical Se

75.167
6.750

8.00
6.00

7
12.00

4.00
4.00

5.500

8.00
13.50

Sl
12.0

27.0 Sl
0.0 12.0

27.0
0.0

Typical Se

75.167
6.750

8.00
6.00

7
12.00

4.00
4.00

5.500

8.00
13.50

Sl
12.0

27.0 Sl
0.0 12.0

27.0
0.0

Abt. 1 & 2

75.167
6.750

8.00
12.00

7
24.00

4.00
4.00

5.500

8.00
13.50

Sl
24.0

27.0 Sl
0.0 24.0

27.0
0.0

Abt. Diaph

75.167
6.750

8.00
12.00

7
92.00

0.00
0.00

5.500

8.00
13.50

Sl
36.0

27.0 Sl
0.0 36.0

27.0
0.0

Abt. Diaph

75.167
6.750

8.00
12.00

7
92.00

0.00
0.00

5.500

8.00
13.50

Sl
36.0

27.0 Sl
0.0 36.0

27.0
0.0

Cross Section Summary Properties:


Section

CG-Z

CG-Y

Area

IZZ

IYY

I11

Vol/A

Typical Se

75.167
6.750

8.00
6.00

7
12.00

4.00
4.00

5.500

8.00
13.50

Sl
12.0

27.0 Sl
0.0 12.0

27.0
0.0

(ft^4)

(ft^4)

(ft^4)

Typical Se

75.167
6.750

8.00
6.00

7
12.00

4.00
4.00

5.500

8.00
13.50

Sl
12.0

27.0 Sl
0.0 12.0

27.0
0.0

--------Abt. Diaph

------0.00

------3.29

------418.27

-------1,645.93

---------138,487.96

---------3,069.69

----20.34

Face of Pi

75.167
6.750

8.00
12.00

7
12.00

4.00
4.00

5.500

8.00
13.50

Sl
12.0

27.0 Sl
0.0 12.0

27.0
0.0

Abt. Diaph

0.00

3.29

418.27

1,645.93

138,487.96

3,069.69

20.34

Abt. 1 & 2

0.00

3.37

207.44

1,195.97

82,190.39

3,125.10

7.69

Pier Diaph

75.167
6.750

8.00
12.00

7
92.00

0.00
0.00

5.500

8.00
13.50

Sl
36.0

27.0 Sl
0.0 36.0

27.0
0.0

Typical Se

0.00

2.93

135.35

892.89

56,951.21

2,533.26

4.65

75.167
6.750

8.00
12.00

7
92.00

0.00
0.00

5.500

8.00
13.50

Sl
36.0

27.0 Sl
0.0 36.0

27.0
0.0

Typical Se

0.00

2.93

135.35

892.89

56,951.21

2,533.26

4.65

Face of Pi

0.00

3.41

160.91

1,094.28

64,256.48

3,180.54

5.65

Pier Diaph

0.00

3.29

418.27

1,645.93

138,487.96

3,069.69

20.34

Pier Diaph

0.00

3.29

418.27

1,645.93

138,487.96

3,069.69

20.34

Face of Pi

0.00

3.41

160.91

1,094.28

64,256.48

3,180.54

5.65

Typical Se

0.00

2.93

135.35

892.89

56,951.21

2,533.26

4.65

Typical Se

0.00

2.93

135.35

892.89

56,951.21

2,533.26

4.65

Face of Pi

0.00

3.41

160.91

1,094.28

64,256.48

3,180.54

5.65

Pier Diaph

75.167
6.750

8.00
12.00

7
12.00

4.00
4.00

5.500

8.00
13.50

Sl
12.0

27.0 Sl
0.0 12.0

27.0
0.0

Typical Se

75.167
6.750

8.00
6.00

7
12.00

4.00
4.00

5.500

8.00
13.50

Sl
12.0

27.0 Sl
0.0 12.0

27.0
0.0

Typical Se

75.167
6.750

8.00
6.00

7
12.00

4.00
4.00

5.500

8.00
13.50

Sl
12.0

27.0 Sl
0.0 12.0

27.0
0.0

75.167
6.750

8.00
12.00

7
12.00

4.00
4.00

5.500

8.00
13.50

Sl
12.0

27.0 Sl
0.0 12.0

27.0
0.0

Face of Pi

Spec: AASHTO LRFD

Units: US (English)

Loss: Lump Sum

Spec: AASHTO LRFD

(ft)

(ft^2)

Units: US (English)

(in)

Loss: Lump Sum

Output

Tutorial Five / T5-17

Face of Pi

(ft)

| Sheet
6 of
7
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Pier Diaph

0.00

3.29

418.27

1,645.93

138,487.96

3,069.69

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

0.00

3.29

418.27

1,645.93

138,487.96

3,069.69

20.34

Face of Pi

0.00

3.41

160.91

1,094.28

64,256.48

3,180.54

5.65

Typical Se

0.00

2.93

135.35

892.89

56,951.21

2,533.26

4.65

Typical Se

0.00

2.93

135.35

892.89

56,951.21

2,533.26

4.65

Face of Hi

0.00

3.37

207.44

1,195.97

82,190.39

3,125.10

7.69

Hinge Diap

0.00

3.29

418.27

1,645.93

138,487.96

3,069.69

20.34

Hinge Diap

0.00

3.29

418.27

1,645.93

138,487.96

3,069.69

20.34

Face of Hi

0.00

3.37

207.44

1,195.97

82,190.39

3,125.10

7.69

P3 diaphra

0.00

3.40

172.54

1,119.78

68,854.93

3,166.68

6.14

Pier Diaph

0.00

3.29

418.27

1,645.93

138,487.96

3,069.69

20.34

Pier Diaph

0.00

3.29

418.27

1,645.93

138,487.96

3,069.69

20.34

Face of Pi

0.00

3.41

160.91

1,094.28

64,256.48

3,180.54

5.65

Typical Se

0.00

2.93

135.35

892.89

56,951.21

2,533.26

4.65

Typical Se

0.00

2.93

135.35

892.89

56,951.21

2,533.26

4.65

Face of Pi

0.00

3.41

160.91

1,094.28

64,256.48

3,180.54

5.65

Pier Diaph

0.00

3.29

418.27

1,645.93

138,487.96

3,069.69

20.34

Pier Diaph

0.00

3.29

418.27

1,645.93

138,487.96

3,069.69

20.34

Face of Pi

0.00

3.41

160.91

1,094.28

64,256.48

3,180.54

5.65

Typical Se

0.00

2.93

135.35

892.89

56,951.21

2,533.26

4.65

Typical Se

0.00

2.93

135.35

892.89

56,951.21

2,533.26

4.65

Face of Pi

0.00

3.41

160.91

1,094.28

64,256.48

3,180.54

5.65

Pier Diaph

0.00

3.29

418.27

1,645.93

138,487.96

3,069.69

20.34

Pier Diaph

0.00

3.29

418.27

1,645.93

138,487.96

3,069.69

20.34

P5 diaphra

0.00

3.40

172.54

1,119.78

68,854.93

3,166.68

6.14

Face of Hi

0.00

3.37

207.44

1,195.97

82,190.39

3,125.10

7.69

Hinge Diap

0.00

3.29

418.27

1,645.93

138,487.96

3,069.69

20.34

Units: US (English)

Loss: Lump Sum

Hinge Diap

0.00

3.29

418.27

1,645.93

138,487.96

3,069.69

20.34

Face of Hi

0.00

3.37

207.44

1,195.97

82,190.39

3,125.10

7.69

Typical Se

0.00

2.93

135.35

892.89

56,951.21

2,533.26

4.65

Typical Se

0.00

2.93

135.35

892.89

56,951.21

2,533.26

4.65

Face of Pi

0.00

3.41

160.91

1,094.28

64,256.48

3,180.54

5.65

Pier Diaph

0.00

3.29

418.27

1,645.93

138,487.96

3,069.69

20.34

Pier Diaph

0.00

3.29

418.27

1,645.93

138,487.96

3,069.69

20.34

Face of Pi

0.00

3.41

160.91

1,094.28

64,256.48

3,180.54

5.65

Typical Se

0.00

2.93

135.35

892.89

56,951.21

2,533.26

4.65

Typical Se

0.00

2.93

135.35

892.89

56,951.21

2,533.26

4.65

Face of Pi

0.00

3.41

160.91

1,094.28

64,256.48

3,180.54

5.65

Pier Diaph

0.00

3.29

418.27

1,645.93

138,487.96

3,069.69

20.34

Pier Diaph

0.00

3.29

418.27

1,645.93

138,487.96

3,069.69

20.34

Face of Pi

0.00

3.41

160.91

1,094.28

64,256.48

3,180.54

5.65

Typical Se

0.00

2.93

135.35

892.89

56,951.21

2,533.26

4.65

Typical Se

0.00

2.93

135.35

892.89

56,951.21

2,533.26

4.65

Abt. 1 & 2

0.00

3.37

207.44

1,195.97

82,190.39

3,125.10

7.69

Abt. Diaph

0.00

3.29

418.27

1,645.93

138,487.96

3,069.69

20.34

Abt. Diaph

0.00

3.29

418.27

1,645.93

138,487.96

3,069.69

20.34

20.34

Pier Diaph

Spec: AASHTO LRFD

| Sheet
7 of
7
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Cross Section Parts:


Section
Type/Sub

Ref-Z
Ref-Y
H
V
Area
I
(in)
(in) (in)
(in)
(in^2) (ft^4)
--------- ------------- ------- ------- ------- ------- ------- -------

Cross Section Nodes:


Section
----------

Girder#
-------

Abt. Diaph

Spec: AASHTO LRFD

Node#
----1
2
3
4
5

X
-------

Y
-------

-37.5833
-37.5833
-32.0833
-29.8333
-29.8333

0.0000
0.6667
1.1250
6.7500
6.7500

Units: US (English)

Loss: Lump Sum

Output

T5-18 / Tutorial Five

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Bentley Exton Office

| Sheet
8 of 36
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Section
----------

Section
----------

Girder#
-------

Spec: AASHTO LRFD

X
-------26.7604
-26.7604
-27.0022
-27.0022
-29.0355
-29.0355
-26.7604
-26.7604
-30.5833

Y
------6.7500
5.7500
5.7500
5.7500
0.6667
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

-26.7604
-26.7604
-26.7708
-26.7708
-26.7708
-26.7708
-26.7604
-26.7604
-22.9375
-19.1146
-19.1146
-19.1041
-19.1041
-19.1041
-19.1041
-19.1146
-19.1146
-22.9375

0.0000
0.6667
0.6667
0.6667
5.7500
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.7500
0.6667
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

-19.1146
-19.1146
-19.1250
-19.1250
-19.1250
-19.1250
-19.1146
-19.1146
-15.2917
-11.4687
-11.4687
-11.4583
-11.4583
-11.4583
-11.4583
-11.4687
-11.4687
-15.2917

0.0000
0.6667
0.6667
0.6667
5.7500
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.7500
0.6667
0.6667
0.6667
0.0000
0.0000

1
2
3
4

-11.4687
-11.4687
-11.4792
-11.4792

0.0000
0.6667
0.6667
0.6667

Units: US (English)

Loss: Lump Sum

Girder#
-------

Node#
----5
6
7
8
9
10
11
12
13
14
15
16
17
18

X
-------11.4792
-11.4792
-11.4687
-11.4687
-7.6458
-3.8229
-3.8229
-3.8125
-3.8125
-3.8125
-3.8125
-3.8229
-3.8229
-7.6458

Y
------5.7500
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.7500
0.6667
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

-3.8229
-3.8229
-3.8333
-3.8333
-3.8333
-3.8333
-3.8229
-3.8229
0.0000
3.8229
3.8229
3.8333
3.8333
3.8333
3.8333
3.8229
3.8229
0.0000

0.0000
0.6667
0.6667
0.6667
5.7500
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.7500
0.6667
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

3.8229
3.8229
3.8125
3.8125
3.8125
3.8125
3.8229
3.8229
7.6458
11.4687
11.4687
11.4792
11.4792
11.4792
11.4792
11.4687
11.4687
7.6458

0.0000
0.6667
0.6667
0.6667
5.7500
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.7500
0.6667
0.6667
0.6667
0.0000
0.0000

Spec: AASHTO LRFD

Units: US (English)

Loss: Lump Sum

Output

Tutorial Five / T5-19

Node#
----6
7
8
9
10
11
12
13
14

| Sheet
9 of 36
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

| Sheet 10 of 36
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Section
----------

Section
----------

Girder#
-------

Abt. 1 & 2

Girder#
-------

X
-------

Y
-------

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

11.4687
11.4687
11.4583
11.4583
11.4583
11.4583
11.4687
11.4687
15.2917
19.1146
19.1146
19.1250
19.1250
19.1250
19.1250
19.1146
19.1146
15.2917

0.0000
0.6667
0.6667
0.6667
5.7500
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.7500
0.6667
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

19.1146
19.1146
19.1041
19.1041
19.1041
19.1041
19.1146
19.1146
22.9375
26.7604
26.7604
26.7708
26.7708
26.7708
26.7708
26.7604
26.7604
22.9375

0.0000
0.6667
0.6667
0.6667
5.7500
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.7500
0.6667
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13

37.5833
37.5833
32.0833
29.8333
29.8333
26.7604
26.7604
27.0022
27.0022
29.0355
29.0355
26.7604
26.7604

0.0000
0.6667
1.1250
6.7500
6.7500
6.7500
5.7500
5.7500
5.7500
0.6667
0.6667
0.6667
0.0000

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Spec: AASHTO LRFD

Node#
-----

Units: US (English)

Loss: Lump Sum

| Sheet 11 of 36
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

X
------30.5833

Y
------0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14

-37.5833
-37.5833
-32.0833
-29.8333
-29.8333
-27.1979
-27.1979
-27.7459
-28.2030
-29.9888
-29.7792
-27.1979
-27.1979
-31.0833

0.0000
0.6667
1.1250
6.7500
6.7500
6.7500
5.7500
5.7500
5.4405
0.9762
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

-27.1979
-27.1979
-24.6458
-24.3125
-24.3125
-24.6458
-27.1979
-27.1979
-23.3125
-19.4271
-19.4271
-21.9791
-22.3125
-22.3125
-21.9791
-19.4271
-19.4271
-23.3125

0.0000
0.6667
0.6667
1.0000
5.4167
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.4167
1.0000
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14

-19.4271
-19.4271
-16.8750
-16.5417
-16.5417
-16.8750
-19.4271
-19.4271
-15.5417
-11.6562
-11.6562
-14.2083
-14.5417
-14.5417

0.0000
0.6667
0.6667
1.0000
5.4167
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.4167
1.0000

Spec: AASHTO LRFD

Node#
----14

Units: US (English)

Loss: Lump Sum

Output

T5-20 / Tutorial Five

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Bentley Exton Office

| Sheet 12 of 36
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Section
----------

Section
----------

Girder#
-------

X
-------14.2083
-11.6562
-11.6562
-15.5417

Y
------0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

-11.6562
-11.6562
-9.1042
-8.7708
-8.7708
-9.1042
-11.6562
-11.6562
-7.7708
-3.8854
-3.8854
-6.4375
-6.7708
-6.7708
-6.4375
-3.8854
-3.8854
-7.7708

0.0000
0.6667
0.6667
1.0000
5.4167
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.4167
1.0000
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

-3.8854
-3.8854
-1.3333
-1.0000
-1.0000
-1.3333
-3.8854
-3.8854
0.0000
3.8854
3.8854
1.3333
1.0000
1.0000
1.3333
3.8854
3.8854
0.0000

0.0000
0.6667
0.6667
1.0000
5.4167
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.4167
1.0000
0.6667
0.6667
0.0000
0.0000

3.8854
3.8854
6.4375
6.7708
6.7708
6.4375
3.8854
3.8854
7.7708

0.0000
0.6667
0.6667
1.0000
5.4167
5.7500
5.7500
6.7500
6.7500

1
2
3
4
5
6
7
8
9

Units: US (English)

Loss: Lump Sum

Girder#
-------

Node#
----10
11
12
13
14
15
16
17
18

X
------11.6562
11.6562
9.1042
8.7708
8.7708
9.1042
11.6562
11.6562
7.7708

Y
------6.7500
5.7500
5.7500
5.4167
1.0000
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

11.6562
11.6562
14.2083
14.5417
14.5417
14.2083
11.6562
11.6562
15.5417
19.4271
19.4271
16.8750
16.5417
16.5417
16.8750
19.4271
19.4271
15.5417

0.0000
0.6667
0.6667
1.0000
5.4167
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.4167
1.0000
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

19.4271
19.4271
21.9791
22.3125
22.3125
21.9791
19.4271
19.4271
23.3125
27.1979
27.1979
24.6458
24.3125
24.3125
24.6458
27.1979
27.1979
23.3125

0.0000
0.6667
0.6667
1.0000
5.4167
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.4167
1.0000
0.6667
0.6667
0.0000
0.0000

1
2
3
4

37.5833
37.5833
32.0833
29.8333

0.0000
0.6667
1.1250
6.7500

Spec: AASHTO LRFD

Units: US (English)

Loss: Lump Sum

Output

Tutorial Five / T5-21

Spec: AASHTO LRFD

Node#
----15
16
17
18

| Sheet 13 of 36
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Section
----------

Girder#
-------

Section
----------

Typical Se

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 14 of 36
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Spec: AASHTO LRFD

Node#
----5
6
7
8
9
10
11
12
13
14

X
------29.8333
27.1979
27.1979
27.7459
28.2030
29.9888
29.7792
27.1979
27.1979
31.0833

Y
------6.7500
6.7500
5.7500
5.7500
5.4405
0.9762
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14

-37.5833
-37.5833
-32.0833
-29.8333
-29.8333
-27.6354
-27.6354
-28.6229
-29.0801
-31.0658
-30.8563
-27.6354
-27.6354
-31.5833

0.0000
0.6667
1.1250
6.7500
6.7500
6.7500
6.2500
6.2500
5.9405
0.9762
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

-27.6354
-27.6354
-24.5208
-24.1875
-24.1875
-24.5208
-27.6354
-27.6354
-23.6875
-19.7396
-19.7396
-22.8541
-23.1875
-23.1875
-22.8541
-19.7396
-19.7396
-23.6875

0.0000
0.6667
0.6667
1.0000
5.9167
6.2500
6.2500
6.7500
6.7500
6.7500
6.2500
6.2500
5.9167
1.0000
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5

-19.7396
-19.7396
-16.6250
-16.2917
-16.2917

0.0000
0.6667
0.6667
1.0000
5.9167

Units: US (English)

Loss: Lump Sum

| Sheet 15 of 36
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Girder#
-------

Node#
----6
7
8
9
10
11
12
13
14
15
16
17
18

X
-------16.6250
-19.7396
-19.7396
-15.7917
-11.8437
-11.8437
-14.9583
-15.2917
-15.2917
-14.9583
-11.8437
-11.8437
-15.7917

Y
------6.2500
6.2500
6.7500
6.7500
6.7500
6.2500
6.2500
5.9167
1.0000
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

-11.8437
-11.8437
-8.7292
-8.3958
-8.3958
-8.7292
-11.8437
-11.8437
-7.8958
-3.9479
-3.9479
-7.0625
-7.3958
-7.3958
-7.0625
-3.9479
-3.9479
-7.8958

0.0000
0.6667
0.6667
1.0000
5.9167
6.2500
6.2500
6.7500
6.7500
6.7500
6.2500
6.2500
5.9167
1.0000
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

-3.9479
-3.9479
-0.8333
-0.5000
-0.5000
-0.8333
-3.9479
-3.9479
0.0000
3.9479
3.9479
0.8333
0.5000
0.5000
0.8333
3.9479
3.9479
0.0000

0.0000
0.6667
0.6667
1.0000
5.9167
6.2500
6.2500
6.7500
6.7500
6.7500
6.2500
6.2500
5.9167
1.0000
0.6667
0.6667
0.0000
0.0000

Spec: AASHTO LRFD

Units: US (English)

Loss: Lump Sum

Output

T5-22 / Tutorial Five

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Bentley Exton Office

| Sheet 16 of 36
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Section
----------

Section
----------

Girder#
------6

X
------3.9479
3.9479
7.0625
7.3958
7.3958
7.0625
3.9479
3.9479
7.8958
11.8437
11.8437
8.7292
8.3958
8.3958
8.7292
11.8437
11.8437
7.8958

Y
------0.0000
0.6667
0.6667
1.0000
5.9167
6.2500
6.2500
6.7500
6.7500
6.7500
6.2500
6.2500
5.9167
1.0000
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

11.8437
11.8437
14.9583
15.2917
15.2917
14.9583
11.8437
11.8437
15.7917
19.7396
19.7396
16.6250
16.2917
16.2917
16.6250
19.7396
19.7396
15.7917

0.0000
0.6667
0.6667
1.0000
5.9167
6.2500
6.2500
6.7500
6.7500
6.7500
6.2500
6.2500
5.9167
1.0000
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14

19.7396
19.7396
22.8541
23.1875
23.1875
22.8541
19.7396
19.7396
23.6875
27.6354
27.6354
24.5208
24.1875
24.1875

0.0000
0.6667
0.6667
1.0000
5.9167
6.2500
6.2500
6.7500
6.7500
6.7500
6.2500
6.2500
5.9167
1.0000

Units: US (English)

Loss: Lump Sum

Face of Pi

Girder#
-------

Node#
----15
16
17
18

X
------24.5208
27.6354
27.6354
23.6875

Y
------0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14

37.5833
37.5833
32.0833
29.8333
29.8333
27.6354
27.6354
28.6229
29.0801
31.0658
30.8563
27.6354
27.6354
31.5833

0.0000
0.6667
1.1250
6.7500
6.7500
6.7500
6.2500
6.2500
5.9405
0.9762
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14

-37.5833
-37.5833
-32.0833
-29.8333
-29.8333
-27.6354
-27.6354
-28.8229
-29.2801
-31.0658
-30.8563
-27.6354
-27.6354
-31.5833

0.0000
0.6667
1.1250
6.7500
6.7500
6.7500
5.7500
5.7500
5.4405
0.9762
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

-27.6354
-27.6354
-24.5208
-24.1875
-24.1875
-24.5208
-27.6354
-27.6354
-23.6875
-19.7396
-19.7396
-22.8541
-23.1875
-23.1875
-22.8541

0.0000
0.6667
0.6667
1.0000
5.4167
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.4167
1.0000
0.6667

Spec: AASHTO LRFD

Units: US (English)

Loss: Lump Sum

Output

Tutorial Five / T5-23

Spec: AASHTO LRFD

Node#
----1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

| Sheet 17 of 36
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

| Sheet 18 of 36
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Section
----------

Section
----------

Girder#
-------

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Spec: AASHTO LRFD

Node#
----16
17
18

X
-------19.7396
-19.7396
-23.6875

Y
------0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

-19.7396
-19.7396
-16.6250
-16.2917
-16.2917
-16.6250
-19.7396
-19.7396
-15.7917
-11.8437
-11.8437
-14.9583
-15.2917
-15.2917
-14.9583
-11.8437
-11.8437
-15.7917

0.0000
0.6667
0.6667
1.0000
5.4167
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.4167
1.0000
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

-11.8437
-11.8437
-8.7292
-8.3958
-8.3958
-8.7292
-11.8437
-11.8437
-7.8958
-3.9479
-3.9479
-7.0625
-7.3958
-7.3958
-7.0625
-3.9479
-3.9479
-7.8958

0.0000
0.6667
0.6667
1.0000
5.4167
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.4167
1.0000
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10

-3.9479
-3.9479
-0.8333
-0.5000
-0.5000
-0.8333
-3.9479
-3.9479
0.0000
3.9479

0.0000
0.6667
0.6667
1.0000
5.4167
5.7500
5.7500
6.7500
6.7500
6.7500

Units: US (English)

Loss: Lump Sum

| Sheet 19 of 36
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Girder#
-------

Node#
----11
12
13
14
15
16
17
18

X
------3.9479
0.8333
0.5000
0.5000
0.8333
3.9479
3.9479
0.0000

Y
------5.7500
5.7500
5.4167
1.0000
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

3.9479
3.9479
7.0625
7.3958
7.3958
7.0625
3.9479
3.9479
7.8958
11.8437
11.8437
8.7292
8.3958
8.3958
8.7292
11.8437
11.8437
7.8958

0.0000
0.6667
0.6667
1.0000
5.4167
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.4167
1.0000
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

11.8437
11.8437
14.9583
15.2917
15.2917
14.9583
11.8437
11.8437
15.7917
19.7396
19.7396
16.6250
16.2917
16.2917
16.6250
19.7396
19.7396
15.7917

0.0000
0.6667
0.6667
1.0000
5.4167
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.4167
1.0000
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5

19.7396
19.7396
22.8541
23.1875
23.1875

0.0000
0.6667
0.6667
1.0000
5.4167

Spec: AASHTO LRFD

Units: US (English)

Loss: Lump Sum

Output

T5-24 / Tutorial Five

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Bentley Exton Office

| Sheet 20 of 36
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Section
----------

Section
----------

Pier Diaph

Girder#
-------

Node#
----6
7
8
9
10
11
12
13
14
15
16
17
18

X
------22.8541
19.7396
19.7396
23.6875
27.6354
27.6354
24.5208
24.1875
24.1875
24.5208
27.6354
27.6354
23.6875

Y
------5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.4167
1.0000
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14

37.5833
37.5833
32.0833
29.8333
29.8333
27.6354
27.6354
28.8229
29.2801
31.0658
30.8563
27.6354
27.6354
31.5833

0.0000
0.6667
1.1250
6.7500
6.7500
6.7500
5.7500
5.7500
5.4405
0.9762
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14

-37.5833
-37.5833
-32.0833
-29.8333
-29.8333
-26.7604
-26.7604
-27.0022
-27.0022
-29.0355
-29.0355
-26.7604
-26.7604
-30.5833

0.0000
0.6667
1.1250
6.7500
6.7500
6.7500
5.7500
5.7500
5.7500
0.6667
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6

-26.7604
-26.7604
-26.7708
-26.7708
-26.7708
-26.7708

0.0000
0.6667
0.6667
0.6667
5.7500
5.7500

Units: US (English)

Loss: Lump Sum

Girder#
-------

Node#
----7
8
9
10
11
12
13
14
15
16
17
18

X
-------26.7604
-26.7604
-22.9375
-19.1146
-19.1146
-19.1041
-19.1041
-19.1041
-19.1041
-19.1146
-19.1146
-22.9375

Y
------5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.7500
0.6667
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

-19.1146
-19.1146
-19.1250
-19.1250
-19.1250
-19.1250
-19.1146
-19.1146
-15.2917
-11.4687
-11.4687
-11.4583
-11.4583
-11.4583
-11.4583
-11.4687
-11.4687
-15.2917

0.0000
0.6667
0.6667
0.6667
5.7500
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.7500
0.6667
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

-11.4687
-11.4687
-11.4792
-11.4792
-11.4792
-11.4792
-11.4687
-11.4687
-7.6458
-3.8229
-3.8229
-3.8125
-3.8125
-3.8125
-3.8125
-3.8229
-3.8229
-7.6458

0.0000
0.6667
0.6667
0.6667
5.7500
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.7500
0.6667
0.6667
0.6667
0.0000
0.0000

-3.8229

0.0000

Spec: AASHTO LRFD

Units: US (English)

Loss: Lump Sum

Output

Tutorial Five / T5-25

Spec: AASHTO LRFD

| Sheet 21 of 36
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

| Sheet 22 of 36
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Section
----------

Section
----------

Girder#
-------

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Spec: AASHTO LRFD

Node#
----2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

X
-------3.8229
-3.8333
-3.8333
-3.8333
-3.8333
-3.8229
-3.8229
0.0000
3.8229
3.8229
3.8333
3.8333
3.8333
3.8333
3.8229
3.8229
0.0000

Y
------0.6667
0.6667
0.6667
5.7500
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.7500
0.6667
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

3.8229
3.8229
3.8125
3.8125
3.8125
3.8125
3.8229
3.8229
7.6458
11.4687
11.4687
11.4792
11.4792
11.4792
11.4792
11.4687
11.4687
7.6458

0.0000
0.6667
0.6667
0.6667
5.7500
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.7500
0.6667
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

11.4687
11.4687
11.4583
11.4583
11.4583
11.4583
11.4687
11.4687
15.2917
19.1146
19.1146
19.1250
19.1250
19.1250
19.1250

0.0000
0.6667
0.6667
0.6667
5.7500
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.7500
0.6667
0.6667

Units: US (English)

Loss: Lump Sum

| Sheet 23 of 36
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Face of Hi

Girder#
-------

Node#
----16
17
18

X
------19.1146
19.1146
15.2917

Y
------0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

19.1146
19.1146
19.1041
19.1041
19.1041
19.1041
19.1146
19.1146
22.9375
26.7604
26.7604
26.7708
26.7708
26.7708
26.7708
26.7604
26.7604
22.9375

0.0000
0.6667
0.6667
0.6667
5.7500
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.7500
0.6667
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14

37.5833
37.5833
32.0833
29.8333
29.8333
26.7604
26.7604
27.0022
27.0022
29.0355
29.0355
26.7604
26.7604
30.5833

0.0000
0.6667
1.1250
6.7500
6.7500
6.7500
5.7500
5.7500
5.7500
0.6667
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12

-37.5833
-37.5833
-32.0833
-29.8333
-29.8333
-27.1979
-27.1979
-27.7459
-28.2030
-29.9888
-29.7792
-27.1979

0.0000
0.6667
1.1250
6.7500
6.7500
6.7500
5.7500
5.7500
5.4405
0.9762
0.6667
0.6667

Spec: AASHTO LRFD

Units: US (English)

Loss: Lump Sum

Output

T5-26 / Tutorial Five

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Bentley Exton Office

| Sheet 24 of 36
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Section
----------

Section
----------

Girder#
-------

X
-------27.1979
-31.0833

Y
------0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

-27.1979
-27.1979
-24.6458
-24.3125
-24.3125
-24.6458
-27.1979
-27.1979
-23.3125
-19.4271
-19.4271
-21.9791
-22.3125
-22.3125
-21.9791
-19.4271
-19.4271
-23.3125

0.0000
0.6667
0.6667
1.0000
5.4167
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.4167
1.0000
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

-19.4271
-19.4271
-16.8750
-16.5417
-16.5417
-16.8750
-19.4271
-19.4271
-15.5417
-11.6562
-11.6562
-14.2083
-14.5417
-14.5417
-14.2083
-11.6562
-11.6562
-15.5417

0.0000
0.6667
0.6667
1.0000
5.4167
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.4167
1.0000
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11

-11.6562
-11.6562
-9.1042
-8.7708
-8.7708
-9.1042
-11.6562
-11.6562
-7.7708
-3.8854
-3.8854

0.0000
0.6667
0.6667
1.0000
5.4167
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500

Units: US (English)

Loss: Lump Sum

Girder#
-------

Node#
----12
13
14
15
16
17
18

X
-------6.4375
-6.7708
-6.7708
-6.4375
-3.8854
-3.8854
-7.7708

Y
------5.7500
5.4167
1.0000
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

-3.8854
-3.8854
-1.3333
-1.0000
-1.0000
-1.3333
-3.8854
-3.8854
0.0000
3.8854
3.8854
1.3333
1.0000
1.0000
1.3333
3.8854
3.8854
0.0000

0.0000
0.6667
0.6667
1.0000
5.4167
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.4167
1.0000
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

3.8854
3.8854
6.4375
6.7708
6.7708
6.4375
3.8854
3.8854
7.7708
11.6562
11.6562
9.1042
8.7708
8.7708
9.1042
11.6562
11.6562
7.7708

0.0000
0.6667
0.6667
1.0000
5.4167
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.4167
1.0000
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6

11.6562
11.6562
14.2083
14.5417
14.5417
14.2083

0.0000
0.6667
0.6667
1.0000
5.4167
5.7500

Spec: AASHTO LRFD

Units: US (English)

Loss: Lump Sum

Output

Tutorial Five / T5-27

Spec: AASHTO LRFD

Node#
----13
14

| Sheet 25 of 36
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

| Sheet 26 of 36
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Section
----------

Section
----------

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Hinge Diap

Girder#
-------

Node#
----7
8
9
10
11
12
13
14
15
16
17
18

X
------11.6562
11.6562
15.5417
19.4271
19.4271
16.8750
16.5417
16.5417
16.8750
19.4271
19.4271
15.5417

Y
------5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.4167
1.0000
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

19.4271
19.4271
21.9791
22.3125
22.3125
21.9791
19.4271
19.4271
23.3125
27.1979
27.1979
24.6458
24.3125
24.3125
24.6458
27.1979
27.1979
23.3125

0.0000
0.6667
0.6667
1.0000
5.4167
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.4167
1.0000
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14

37.5833
37.5833
32.0833
29.8333
29.8333
27.1979
27.1979
27.7459
28.2030
29.9888
29.7792
27.1979
27.1979
31.0833

0.0000
0.6667
1.1250
6.7500
6.7500
6.7500
5.7500
5.7500
5.4405
0.9762
0.6667
0.6667
0.0000
0.0000

1
2
3

-37.5833
-37.5833
-32.0833

0.0000
0.6667
1.1250

Spec: AASHTO LRFD

Units: US (English)

Loss: Lump Sum

| Sheet 27 of 36
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Girder#
-------

Node#
----4
5
6
7
8
9
10
11
12
13
14

X
-------29.8333
-29.8333
-26.7604
-26.7604
-27.0022
-27.0022
-29.0355
-29.0355
-26.7604
-26.7604
-30.5833

Y
------6.7500
6.7500
6.7500
5.7500
5.7500
5.7500
0.6667
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

-26.7604
-26.7604
-26.7708
-26.7708
-26.7708
-26.7708
-26.7604
-26.7604
-22.9375
-19.1146
-19.1146
-19.1041
-19.1041
-19.1041
-19.1041
-19.1146
-19.1146
-22.9375

0.0000
0.6667
0.6667
0.6667
5.7500
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.7500
0.6667
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

-19.1146
-19.1146
-19.1250
-19.1250
-19.1250
-19.1250
-19.1146
-19.1146
-15.2917
-11.4687
-11.4687
-11.4583
-11.4583
-11.4583
-11.4583
-11.4687
-11.4687
-15.2917

0.0000
0.6667
0.6667
0.6667
5.7500
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.7500
0.6667
0.6667
0.6667
0.0000
0.0000

1
2

-11.4687
-11.4687

0.0000
0.6667

Spec: AASHTO LRFD

Units: US (English)

Loss: Lump Sum

Output

T5-28 / Tutorial Five

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Bentley Exton Office

| Sheet 28 of 36
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Section
----------

Section
----------

Girder#
-------

X
-------11.4792
-11.4792
-11.4792
-11.4792
-11.4687
-11.4687
-7.6458
-3.8229
-3.8229
-3.8125
-3.8125
-3.8125
-3.8125
-3.8229
-3.8229
-7.6458

Y
------0.6667
0.6667
5.7500
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.7500
0.6667
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

-3.8229
-3.8229
-3.8333
-3.8333
-3.8333
-3.8333
-3.8229
-3.8229
0.0000
3.8229
3.8229
3.8333
3.8333
3.8333
3.8333
3.8229
3.8229
0.0000

0.0000
0.6667
0.6667
0.6667
5.7500
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.7500
0.6667
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

3.8229
3.8229
3.8125
3.8125
3.8125
3.8125
3.8229
3.8229
7.6458
11.4687
11.4687
11.4792
11.4792
11.4792
11.4792
11.4687

0.0000
0.6667
0.6667
0.6667
5.7500
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.7500
0.6667
0.6667
0.6667

Units: US (English)

Loss: Lump Sum

Girder#
-------

Node#
----17
18

X
------11.4687
7.6458

Y
------0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

11.4687
11.4687
11.4583
11.4583
11.4583
11.4583
11.4687
11.4687
15.2917
19.1146
19.1146
19.1250
19.1250
19.1250
19.1250
19.1146
19.1146
15.2917

0.0000
0.6667
0.6667
0.6667
5.7500
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.7500
0.6667
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

19.1146
19.1146
19.1041
19.1041
19.1041
19.1041
19.1146
19.1146
22.9375
26.7604
26.7604
26.7708
26.7708
26.7708
26.7708
26.7604
26.7604
22.9375

0.0000
0.6667
0.6667
0.6667
5.7500
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.7500
0.6667
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11

37.5833
37.5833
32.0833
29.8333
29.8333
26.7604
26.7604
27.0022
27.0022
29.0355
29.0355

0.0000
0.6667
1.1250
6.7500
6.7500
6.7500
5.7500
5.7500
5.7500
0.6667
0.6667

Spec: AASHTO LRFD

Units: US (English)

Loss: Lump Sum

Output

Tutorial Five / T5-29

Spec: AASHTO LRFD

Node#
----3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

| Sheet 29 of 36
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Section
----------

Girder#
-------

Section
----------

P3 diaphra

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 30 of 36
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Spec: AASHTO LRFD

Node#
----12
13
14

X
------26.7604
26.7604
30.5833

Y
------0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14

-37.5833
-37.5833
-32.0833
-29.8333
-29.8333
-27.5260
-27.5260
-28.5537
-29.0108
-30.7965
-30.5870
-27.5260
-27.5260
-31.4583

0.0000
0.6667
1.1250
6.7500
6.7500
6.7500
5.7500
5.7500
5.4405
0.9762
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

-27.5260
-27.5260
-24.5521
-24.2187
-24.2187
-24.5521
-27.5260
-27.5260
-23.5937
-19.6614
-19.6614
-22.6354
-22.9687
-22.9687
-22.6354
-19.6614
-19.6614
-23.5937

0.0000
0.6667
0.6667
1.0000
5.4167
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.4167
1.0000
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12

-19.6614
-19.6614
-16.6875
-16.3542
-16.3542
-16.6875
-19.6614
-19.6614
-15.7292
-11.7969
-11.7969
-14.7708

0.0000
0.6667
0.6667
1.0000
5.4167
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500

Units: US (English)

Loss: Lump Sum

| Sheet 31 of 36
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Girder#
-------

Node#
----13
14
15
16
17
18

X
-------15.1042
-15.1042
-14.7708
-11.7969
-11.7969
-15.7292

Y
------5.4167
1.0000
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

-11.7969
-11.7969
-8.8229
-8.4896
-8.4896
-8.8229
-11.7969
-11.7969
-7.8646
-3.9323
-3.9323
-6.9062
-7.2396
-7.2396
-6.9062
-3.9323
-3.9323
-7.8646

0.0000
0.6667
0.6667
1.0000
5.4167
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.4167
1.0000
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

-3.9323
-3.9323
-0.9583
-0.6250
-0.6250
-0.9583
-3.9323
-3.9323
0.0000
3.9323
3.9323
0.9583
0.6250
0.6250
0.9583
3.9323
3.9323
0.0000

0.0000
0.6667
0.6667
1.0000
5.4167
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.4167
1.0000
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7

3.9323
3.9323
6.9062
7.2396
7.2396
6.9062
3.9323

0.0000
0.6667
0.6667
1.0000
5.4167
5.7500
5.7500

Spec: AASHTO LRFD

Units: US (English)

Loss: Lump Sum

Output

T5-30 / Tutorial Five

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Bentley Exton Office

| Sheet 32 of 36
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Section
----------

Section
----------

Girder#
-------

P5 diaphra

Girder#
-------

X
------3.9323
7.8646
11.7969
11.7969
8.8229
8.4896
8.4896
8.8229
11.7969
11.7969
7.8646

Y
------6.7500
6.7500
6.7500
5.7500
5.7500
5.4167
1.0000
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

11.7969
11.7969
14.7708
15.1042
15.1042
14.7708
11.7969
11.7969
15.7292
19.6614
19.6614
16.6875
16.3542
16.3542
16.6875
19.6614
19.6614
15.7292

0.0000
0.6667
0.6667
1.0000
5.4167
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.4167
1.0000
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

19.6614
19.6614
22.6354
22.9687
22.9687
22.6354
19.6614
19.6614
23.5937
27.5260
27.5260
24.5521
24.2187
24.2187
24.5521
27.5260
27.5260
23.5937

0.0000
0.6667
0.6667
1.0000
5.4167
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.4167
1.0000
0.6667
0.6667
0.0000
0.0000

1
2

37.5833
37.5833

0.0000
0.6667

Units: US (English)

Loss: Lump Sum

X
------32.0833
29.8333
29.8333
27.5260
27.5260
28.5537
29.0108
30.7965
30.5870
27.5260
27.5260
31.4583

Y
------1.1250
6.7500
6.7500
6.7500
5.7500
5.7500
5.4405
0.9762
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14

-37.5833
-37.5833
-32.0833
-29.8333
-29.8333
-27.5260
-27.5260
-28.5537
-29.0108
-30.7965
-30.5870
-27.5260
-27.5260
-31.4583

0.0000
0.6667
1.1250
6.7500
6.7500
6.7500
5.7500
5.7500
5.4405
0.9762
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

-27.5260
-27.5260
-24.5521
-24.2187
-24.2187
-24.5521
-27.5260
-27.5260
-23.5937
-19.6614
-19.6614
-22.6354
-22.9687
-22.9687
-22.6354
-19.6614
-19.6614
-23.5937

0.0000
0.6667
0.6667
1.0000
5.4167
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.4167
1.0000
0.6667
0.6667
0.0000
0.0000

1
2
3

-19.6614
-19.6614
-16.6875

0.0000
0.6667
0.6667

Spec: AASHTO LRFD

Node#
----3
4
5
6
7
8
9
10
11
12
13
14

Units: US (English)

Loss: Lump Sum

Output

Tutorial Five / T5-31

Spec: AASHTO LRFD

Node#
----8
9
10
11
12
13
14
15
16
17
18

| Sheet 33 of 36
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

| Sheet 34 of 36
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Section
----------

Section
----------

Girder#
-------

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Spec: AASHTO LRFD

Node#
----4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

X
-------16.3542
-16.3542
-16.6875
-19.6614
-19.6614
-15.7292
-11.7969
-11.7969
-14.7708
-15.1042
-15.1042
-14.7708
-11.7969
-11.7969
-15.7292

Y
------1.0000
5.4167
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.4167
1.0000
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

-11.7969
-11.7969
-8.8229
-8.4896
-8.4896
-8.8229
-11.7969
-11.7969
-7.8646
-3.9323
-3.9323
-6.9062
-7.2396
-7.2396
-6.9062
-3.9323
-3.9323
-7.8646

0.0000
0.6667
0.6667
1.0000
5.4167
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.4167
1.0000
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

-3.9323
-3.9323
-0.9583
-0.6250
-0.6250
-0.9583
-3.9323
-3.9323
0.0000
3.9323
3.9323
0.9583
0.6250
0.6250
0.9583
3.9323
3.9323

0.0000
0.6667
0.6667
1.0000
5.4167
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.4167
1.0000
0.6667
0.6667
0.0000

Units: US (English)

Loss: Lump Sum

| Sheet 35 of 36
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Girder#
-------

Node#
----18

X
------0.0000

Y
------0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

3.9323
3.9323
6.9062
7.2396
7.2396
6.9062
3.9323
3.9323
7.8646
11.7969
11.7969
8.8229
8.4896
8.4896
8.8229
11.7969
11.7969
7.8646

0.0000
0.6667
0.6667
1.0000
5.4167
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.4167
1.0000
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

11.7969
11.7969
14.7708
15.1042
15.1042
14.7708
11.7969
11.7969
15.7292
19.6614
19.6614
16.6875
16.3542
16.3542
16.6875
19.6614
19.6614
15.7292

0.0000
0.6667
0.6667
1.0000
5.4167
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500
5.4167
1.0000
0.6667
0.6667
0.0000
0.0000

1
2
3
4
5
6
7
8
9
10
11
12

19.6614
19.6614
22.6354
22.9687
22.9687
22.6354
19.6614
19.6614
23.5937
27.5260
27.5260
24.5521

0.0000
0.6667
0.6667
1.0000
5.4167
5.7500
5.7500
6.7500
6.7500
6.7500
5.7500
5.7500

Spec: AASHTO LRFD

Units: US (English)

Loss: Lump Sum

Output

T5-32 / Tutorial Five

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet 36 of 36
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Section
----------

Girder#
-------

Node#
----13
14
15
16
17
18
1
2
3
4
5
6
7
8
9
10
11
12
13
14

X
------24.2187
24.2187
24.5521
27.5260
27.5260
23.5937

Y
------5.4167
1.0000
0.6667
0.6667
0.0000
0.0000

37.5833
37.5833
32.0833
29.8333
29.8333
27.5260
27.5260
28.5537
29.0108
30.7965
30.5870
27.5260
27.5260
31.4583

0.0000
0.6667
1.1250
6.7500
6.7500
6.7500
5.7500
5.7500
5.4405
0.9762
0.6667
0.6667
0.0000
0.0000

***** End of Report *****


Spec: AASHTO LRFD

Units: US (English)

Loss: Lump Sum

Bentley Exton Office

***** End of Report *****

Output

Tutorial Five / T5-33

| Sheet
1 of
1
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx
Pier Definitions:
PierName
Type
Horiz.Offset
Soffit-to-Brg
Brg-to-Cap
Cap Height
(ft)
(in)
(in)
(ft)
---------- -------- ------------- -------------- ----------- ----------Pier 1
Integral
0.0000
------Pier 2
Integral
0.0000
------Pier 3
Integral
0.0000
------Pier 4
Integral
0.0000
------Pier 5
Integral
0.0000
------Pier 6
Integral
0.0000
------Pier 7
Integral
0.0000
------Column Definitions:
#
Space
Len. ColumnType
H
V
R,C,X
Y Sup
Ec-28 P-Rat IzzUsage
IzzFactor
(ft)
(ft)
(ft)
(ft)
(ft)
(ft)
(ksi)
-- ------- ------- ----------- ------ ------ ------ ------ --- --------- ----- ----Pier Name: Pier 1
1 36.000 35.555 Pier Column
0.00
0.00
0.00
0.00 Fix
3,375.0 0.20
Gross 1.0000
2
0.000 38.875 Pier Column
0.00
0.00
0.00
0.00 Fix
3,375.0 0.20
Gross 1.0000
Pier Name: Pier 2
1 36.000 36.775 Pier Column
0.00
0.00
0.00
0.00 Fix
3,375.0 0.20
Gross 1.0000
2
0.000 40.085 Pier Column
0.00
0.00
0.00
0.00 Fix
3,375.0 0.20
Gross 1.0000
Pier Name: Pier 3
1 36.000 37.425 Pier Column
0.00
0.00
0.00
0.00 Fix
3,375.0 0.20
Gross 1.0000
2
0.000 40.745 Pier Column
0.00
0.00
0.00
0.00 Fix
3,375.0 0.20
Gross 1.0000
Pier Name: Pier 4
1 40.177 25.240 Pier Column
0.00
0.00
0.00
0.00 Fix
3,375.0 0.20
Gross 1.0000
2
0.000 28.605 Pier Column
0.00
0.00
0.00
0.00 Fix
3,375.0 0.20
Gross 1.0000
Pier Name: Pier 5
1 36.000 38.395 Pier Column
0.00
0.00
0.00
0.00 Fix
3,375.0 0.20
Gross 1.0000
2
0.000 41.705 Pier Column
0.00
0.00
0.00
0.00 Fix
3,375.0 0.20
Gross 1.0000
Pier Name: Pier 6
1 36.000 38.825 Pier Column
0.00
0.00
0.00
0.00 Fix
3,375.0 0.20
Gross 1.0000
2
0.000 40.940 Pier Column
0.00
0.00
0.00
0.00 Fix
3,375.0 0.20
Gross 1.0000
Pier Name: Pier 7
1 36.000 38.960 Pier Column
0.00
0.00
0.00
0.00 Fix
3,375.0 0.20
Gross 1.0000
2
0.000 39.660 Pier Column
0.00
0.00
0.00
0.00 Fix
3,375.0 0.20
Gross 1.0000
User Column Definitions
H
V
R,C,X
Y
A
Izz
Iyy IzzGross
Column Name
Loc (ft)
(ft)
(ft)
(ft)
Var
(ft^2)
(ft^4)
(ft^4)
(ft^4)
------------ ------ ------ ------ ------ ------ ---- -------- -------- -------- ----Pier Column
Top 12.50
4.00
0.50
--Con
49.79
65.9
643.0
65.9
12.00
5.00
4.00
0.50
--Par
19.79
25.9
40.4
25.9
Bot
5.00
4.00
0.50
--Lin
19.79
25.9
40.4
25.9
Pier Column
Top 13.50
4.00
0.50
--Con
53.79
71.2
810.7
71.2
12.00
6.00
4.00
0.50
--Par
23.79
31.2
70.2
31.2
Bot
6.00
4.00
0.50
--Lin
23.79
31.2
70.2
31.2

| Sheet
1 of
1
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Hinge Dist.(ft)
I(ft^4)
------------------------------130.0000
--------------20.0000
-------------------

Bearing
E(ksi)
--------------S 60 18 26.00 W
--S 60 18 26.00 W
--S 54 36 26.00 W
--S 45 36 26.00 W
--S 37 48 26.00 W
--S 36 36 26.00 W
--S 1 15 40.00 W
--S 18 36 26.00 W
--S 17 24 26.00 W
--S 10 58 09.00 W
--S 7 08 22.00 W
--S 6 40 15.00 W
--S 6 40 15.00 W
---

***** End of Report *****


Spec: AASHTO LRFD

Units: US (English)

Loss: Lump Sum

Connection
Density(PCF)
-------------Free
--Pin
--Fix
--Fix
--Roller
--Fix
--Fix
--Fix
--Roller
--Fix
--Fix
--Pin
--Free
---

| Sheet
1 of
1
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Tendon Definitions:
Full Section:
P/T Tendon TendonType Losses
(ksi)
---------- ---------- ------Tendon (
1000-0.6(2 20.00
Tendon (
1000-0.6(2 20.00
Tendon (
1000-0.6(2 20.00

Fr.Coef Wobble PJ-Left PJ-Right Aset-L Aset-R Ul.Rlx


(1/ft)
(Kips)
(Kips)
(in)
(in) (ksi)
------- --------- -------- -------- ------ ------ ---0.250 0.0002000 13,114.0 13,114.0
0.250 0.0002000 13,114.0 13,114.0
0.250 0.0002000 13,114.0 13,114.0

0.375
0.375
0.375

0.375
0.375
0.375

Post Tensioned Tendon Path:


......... POC ..........
Length Rel.Dist Top Off
Var
%
Rel.Dist Offset
(ft)
(ft)
(in)
Type
(ft)
(in)
---------- --------- --------- -------- -------- ------ ----- -------- ------Tendon (
General
372.000
1.809
40.75
50.388
71.00 Par-E
100.000
12.00 Par-D 0.792
38.002
24.29
50.000
71.00 Par-D 0.200
15.000
23.80
100.000
12.00 Par-D 0.800
60.000
23.80
50.000
71.00 Par-D 0.200
15.000
23.80
84.667
40.75 Par-S
Tendon (
General
334.000
88.667
40.75
100.000
12.00 Par-E
50.000
71.00 Par-D 0.500
37.500
41.50
100.000
12.00 Par-D 0.500
37.500
41.50
50.000
71.00 Par-D 0.500
37.500
41.50
100.000
12.00 Par-D 0.500
37.500
41.50
11.333
40.75 Par-S
Tendon (
General
372.005
15.333
40.75
50.000
71.00 Par-E
100.000
12.00 Par-D 0.500
37.500
41.50
50.000
71.00 Par-D 0.500
37.500
41.50
100.000
12.00 Par-D 0.500
37.500
41.50
49.612
71.00 Par-D 0.500
24.001
41.50
98.191
40.75 Par-S
P/T Tendon

Path Type

***** End of Report *****


Spec: AASHTO LRFD

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Superstructure Report:
Full Section:
Ref. Name
Distance(ft)
A(in^2)
--------------------0.0000
--Abutment 1
1.7500
--Pier 1
95.0000
--Pier 2
150.0000
--Hinge 1
----Pier 3
150.0000
--Pier 4
150.0000
--Pier 5
150.0000
--Hinge 2
----Pier 6
150.0000
--Pier 7
150.0000
--Abutment 2
95.0047
--1.7500
---

Output

T5-34 / Tutorial Five

Bentley Exton Office

Units: US (English)

Loss: Lump Sum

0.0
0.0
0.0

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Bentley Exton Office

| Sheet
1 of
2
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Reinforcement Report:
Longitudinal Rebar:
Full Section:
Loc
--Top
Top
Top
Bot
Bot
Bot
Bot
Bot
Bot
Bot
Bot

Cover
(in)
---------3.12
5.75
5.63
3.12
8.25
8.25
8.25
8.25
8.25
8.25
8.25

# bars

Size

------ ----76
#5
48
#5
18
#5
60
#5
60
#5
60
#5
60
#5
60
#5
60
#5
60
#5
60
#5

--------------- Reference ----------------Area


Type
Num
Unit
Start
End
(in^2)
(%,ft)
---------- -------------- --------- --------23.56 Contin
1
ft
0.000 1,093.505
14.88 Contin
1
ft
0.000 1,093.505
5.58 Contin
1
ft
0.000 1,093.505
18.60 Contin
1
ft
0.000 1,093.505
18.60 Bridge
1
ft
81.750
111.750
18.60 Bridge
1
ft
231.750
261.750
18.60 Bridge
1
ft
381.750
411.750
18.60 Bridge
1
ft
531.750
561.750
18.60 Bridge
1
ft
681.750
711.750
18.60 Bridge
1
ft
831.750
861.750
18.60 Bridge
1
ft
981.750 1,011.750

| Sheet
2 of
2
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

12.00
8.00
8.00
12.00
18.00
12.00
8.00
8.00
12.00
18.00
12.00
8.00

18
18
18
18
18
18
18
18
18
18
18
18

#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5

5.58
5.58
5.58
5.58
5.58
5.58
5.58
5.58
5.58
5.58
5.58
5.58

Span
Span
Span
Span
Span
Span
Span
Span
Span
Span
Span
Span

6
6
7
7
7
7
7
8
8
8
8
8

ft
ft
ft
ft
ft
ft
ft
ft
ft
ft
ft
ft

114.000
126.667
0.667
25.000
36.500
115.000
126.667
0.667
25.000
37.500
61.000
71.667

126.000
150.000
24.000
35.000
114.000
126.000
150.000
24.000
36.000
60.000
71.000
95.000

***** End of Report *****

Spec: AASHTO LRFD

Units: US (English)

Loss: Lump Sum

Stirrups:
Full Section:

Spec: AASHTO LRFD

# legs

Size

------ ----18
#5
18
#5
18
#5
18
#5
18
#5
18
#5
18
#5
18
#5
18
#5
18
#5
18
#5
18
#5
18
#5
18
#5
18
#5
18
#5
18
#5
18
#5
18
#5
18
#5
18
#5
18
#5
18
#5
18
#5
18
#5
18
#5
18
#5
18
#5
18
#5
18
#5

--------------- Reference ----------------Area


Type
Num
Unit
Start
End
(in^2)
(%,ft)
---------- -------------- --------- --------5.58 Span
1
ft
1.750
24.000
5.58 Span
1
ft
25.000
35.000
5.58 Span
1
ft
36.500
59.000
5.58 Span
1
ft
60.000
71.000
5.58 Span
1
ft
71.667
95.000
5.58 Span
2
ft
0.667
24.000
5.58 Span
2
ft
25.000
35.000
5.58 Span
2
ft
36.500
114.000
5.58 Span
2
ft
115.000
126.000
5.58 Span
2
ft
126.667
150.000
5.58 Span
3
ft
0.667
24.000
5.58 Span
3
ft
25.000
37.000
5.58 Span
3
ft
38.500
94.000
5.58 Span
3
ft
95.000
106.000
5.58 Span
3
ft
106.667
130.000
5.58 Span
3
ft
130.500
150.000
5.58 Span
4
ft
0.667
24.000
5.58 Span
4
ft
25.000
35.000
5.58 Span
4
ft
36.500
114.000
5.58 Span
4
ft
115.000
126.000
5.58 Span
4
ft
126.667
150.000
5.58 Span
5
ft
0.667
24.000
5.58 Span
5
ft
25.000
35.000
5.58 Span
5
ft
36.500
114.000
5.58 Span
5
ft
115.000
126.000
5.58 Span
5
ft
126.667
150.000
5.58 Span
6
ft
0.500
20.000
5.58 Span
6
ft
20.666
44.000
5.58 Span
6
ft
45.000
56.000
5.58 Span
6
ft
57.500
113.000

Units: US (English)

Loss: Lump Sum

Output

Tutorial Five / T5-35

Spacing
(in)
--- ---------8.00
12.00
18.00
12.00
8.00
8.00
12.00
18.00
12.00
8.00
8.00
12.00
18.00
12.00
8.00
6.00
8.00
12.00
18.00
12.00
8.00
8.00
12.00
18.00
12.00
8.00
6.00
8.00
12.00
18.00

| Sheet
1 of
4
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

| Sheet
2 of
4
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Dead Loads (ft, kips, kips/ft, and kip-ft) - Box Girder

Deck Falsew D

0.3

0.0

Self Weight

Intrinsic Self Weight

Dead Load-I

Intrinsic Self Weight

0.3

----- ------- ------- --- ------- ------1


25.0
4.0
2
25.0
Design Truck

Var

Double Tandem

1,093.5

1.8

0.0

1.8

No

Var

Yes

Yes

Yes

Var

Yes

Yes

Yes

Axle
Load Spacing Var
Min
Max
----- ------- ------- --- ------- ------1
8.0
14.0 No
2
32.0
14.0 No
3
32.0
Yes
50.0
300.0
4
8.0
14.0 No
5
32.0
14.0 No
6
32.0

C
Analysis Case Load Name
D
Val-1
Dist-1
Val-2
Dist-2 Description
-------------- ----------- - -------- -------- -------- -------- --------------Final
Barrier
D
0.8
0.0
0.8 1,093.5
D

Yes

Axle
Load Spacing Var
Min
Max
----- ------- ------- --- ------- ------1
25.0
4.0 No
2
25.0
Yes
26.0
40.0
3
25.0
4.0 No
4
25.0
Double Truck

FWS

Yes

Axle
Load Spacing Var
Min
Max
----- ------- ------- --- ------- ------1
8.0
14.0 No
2
32.0
Yes
14.0
30.0
3
32.0

Superimposed Dead Loads (ft, kips, kips/ft, and kip-ft) - Box Girder

1,093.5

b) HL 93 - Multi Span-Disp Lane=0.64 SBS=None


Temperature Loads (Degrees Fahrenheit) - Box Girder
.....Uniform..... ..Gradient Rise.. ..Gradient Fall..
Analysis Case Load Name
Rise
Fall
Top
Bottom
Top
Bottom
-------------- ----------- -------- -------- -------- -------- -------- -------Final
Uniform Tem
30.0
-40.0

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

M
C
Analysis Case Load Name
D
Val-1
Dist-1
Val-2
Dist-2 Description
-------------- ----------- - -------- -------- -------- -------- --------------Initial
Intermediat C
33.0
45.0
C
33.0
171.8
C
33.0
311.8
C
33.0
471.8
C
33.0
621.7
C
33.0
781.8
C
33.0
921.8
C
33.0 1,046.7

Cooper Params
Truck Name
Type Lane Notional Sp. Env. Load
Dist
--------------------------- ---- ---- -------- -------- ------- -----Design Tandem
Fix
No
Yes
No
Axle
Load Spacing Var
Min
Max
----- ------- ------- --- ------- ------1
25.0
4.0
2
25.0

Live Loads (ft, kips, and kips/ft) - Box Girder


Design Truck

Var

No

Yes

No

1. Analysis case: Final


Axle
Load Spacing Var
Min
Max
----- ------- ------- --- ------- ------1
8.0
14.0 No
2
32.0
Yes
14.0
30.0
3
32.0

a) HL 93 - Multi Span Lane=0.64 SBS=None


Cooper Params
Truck Name
Type Lane Notional Sp. Env. Load
Dist
--------------------------- ---- ---- -------- -------- ------- -----Design Tandem
Fix Yes
Yes
No
Axle
Spec: AASHTO LRFD

Load Spacing Var

Units: US (English)

Min

Loss: Lump Sum

Double Tandem

Max

Var
Axle

Spec: AASHTO LRFD

No

Yes

Load Spacing Var

Units: US (English)

Yes
Min

Loss: Lump Sum

Max

Output

T5-36 / Tutorial Five

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Bentley Exton Office

| Sheet
3 of
4
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

| Sheet
4 of
4
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

----- ------- ------- --- ------- ------1


25.0
4.0 No
2
25.0
Yes
26.0
40.0
3
25.0
4.0 No
4
25.0
Double Truck

Var

No

Yes

Yes

Axle
Load Spacing Var
Min
Max
----- ------- ------- --- ------- ------1
8.0
14.0 No
2
32.0
14.0 No
3
32.0
Yes
50.0
300.0
4
8.0
14.0 No
5
32.0
14.0 No
6
32.0
Design Tandem-Disp

Fix

Yes

Yes

Program Calculated Impact Factors will be Used


Left Curb Width = 0.00 Right Curb Width = 0.00

Number
------

.....1-Lane.... ...Multi-Lane..
Location
Shear Moment
Shear Moment
-------- ------- ------- ------- ------***** End of Report *****

Spec: AASHTO LRFD

Units: US (English)

Loss: Lump Sum

No

Axle
Load Spacing Var
Min
Max
----- ------- ------- --- ------- ------1
25.0
4.0
2
25.0
Design Truck-Disp

Var

Yes

Yes

No

Axle
Load Spacing Var
Min
Max
----- ------- ------- --- ------- ------1
8.0
14.0 No
2
32.0
Yes
14.0
30.0
3
32.0
Double Tandem-Disp

Var

Yes

Yes

Yes

Axle
Load Spacing Var
Min
Max
----- ------- ------- --- ------- ------1
25.0
4.0 No
2
25.0
Yes
26.0
40.0
3
25.0
4.0 No
4
25.0
Double Truck-Disp

Var

Yes

Yes

Yes

Axle
Load Spacing Var
Min
Max
----- ------- ------- --- ------- ------1
8.0
14.0 No
2
32.0
14.0 No
3
32.0
Yes
50.0
300.0
4
8.0
14.0 No
5
32.0
14.0 No
6
32.0

Spec: AASHTO LRFD

Units: US (English)

Loss: Lump Sum

Output

Tutorial Five / T5-37

Live Load Distribution and Impact Factors (ft) - Box Girder

| Sheet
1 of
3
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

| Sheet
2 of
3
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Load Combinations - Box Girder


Analysis Case
-------------Initial

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Final

Comb Name
---------Service 1

Comb Type
Eta
Loading Name
------------ ------ --------------Service I
1.00 Self Weight
Deck Falsework
Intermediate Di
Tendon (SE1)
Tendon (SE2)
Tendon (SE3)
Shrinkage

LF (min/max)
--------------1.00/
1.00
1.00/
1.00
1.00/
1.00
1.00/
1.00
1.00/
1.00
1.00/
1.00
1.00/
1.20

Service 3

Service III

1.00 Self Weight


Deck Falsework
Intermediate Di
Tendon (SE1)
Tendon (SE2)
Tendon (SE3)
Shrinkage

1.00/
1.00/
1.00/
1.00/
1.00/
1.00/
1.00/

1.00
1.00
1.00
1.00
1.00
1.00
1.20

Service I

Service I

1.00 Dead Load-Initi


Tendon (SE1)
Tendon (SE2)
Tendon (SE3)
Shrinkage

1.00/
1.00/
1.00/
1.00/
1.00/

1.00
1.00
1.00
1.00
1.00

Service II

Service III

1.00 Dead Load-Initi


Tendon (SE1)
Tendon (SE2)
Tendon (SE3)
Shrinkage

1.00/
1.00/
1.00/
1.00/
1.00/

1.00
1.00
1.00
1.00
1.00

Service 1

Service I

1.00 Intermediate Di
Deck Falsework
Self Weight
Barrier
FWS
Uniform Tempera
Tendon (SE1)
Tendon (SE2)
Tendon (SE3)
Shrinkage

1.00/
1.00/
1.00/
1.00/
1.00/
1.00/
1.00/
1.00/
1.00/
1.00/

1.00
1.00
1.00
1.00
1.00
1.20
1.00
1.00
1.00
1.20

1.00 Intermediate Di
Deck Falsework
Self Weight
Barrier
FWS
VehicularLL-2
Tendon (SE1)
Tendon (SE2)
Tendon (SE3)
Shrinkage

1.00/
1.00/
1.00/
1.00/
1.00/
1.00/
1.00/
1.00/
1.00/
1.00/

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.20

1.00 Intermediate Di

0.90/

1.25

Service 1

Strength 1

Service I

Spec: AASHTO LRFD

Strength I

Units: US (English)

Loss: Lump Sum

Deck Falsework
Self Weight
Barrier
FWS
VehicularLL-2
Tendon (SE1)
Tendon (SE2)
Tendon (SE3)
Shrinkage

0.90/
0.90/
0.65/
0.65/
1.75/
1.00/
1.00/
1.00/
0.50/

1.25
1.25
1.50
1.50
1.75
1.00
1.00
1.00
1.20

Service 3

Service III

1.00 Intermediate Di
Deck Falsework
Self Weight
Barrier
FWS
Uniform Tempera
Tendon (SE1)
Tendon (SE2)
Tendon (SE3)
Shrinkage

1.00/
1.00/
1.00/
1.00/
1.00/
1.00/
1.00/
1.00/
1.00/
1.00/

1.00
1.00
1.00
1.00
1.00
1.20
1.00
1.00
1.00
1.20

Service 3

Service III

1.00 Intermediate Di
Deck Falsework
Self Weight
Barrier
FWS
VehicularLL-2
Tendon (SE1)
Tendon (SE2)
Tendon (SE3)
Shrinkage

1.00/
1.00/
1.00/
1.00/
1.00/
0.80/
1.00/
1.00/
1.00/
1.00/

1.00
1.00
1.00
1.00
1.00
0.80
1.00
1.00
1.00
1.20

PS+PERM Se

Service I

1.00 Dead Load-Initi


Tendon (SE1)
Tendon (SE2)
Tendon (SE3)
Shrinkage

1.00/
1.00/
1.00/
1.00/
1.00/

1.00
1.00
1.00
1.00
1.00

PS+PERM Se

Service III

1.00 Dead Load-Initi


Tendon (SE1)
Tendon (SE2)
Tendon (SE3)
Shrinkage

1.00/
1.00/
1.00/
1.00/
1.00/

1.00
1.00
1.00
1.00
1.00

Service I

Service I

1.00 VehicularLL-2
Dead Load-Initi
Tendon (SE1)
Tendon (SE2)
Tendon (SE3)
Shrinkage

1.00/
1.00/
1.00/
1.00/
1.00/
1.00/

1.00
1.00
1.00
1.00
1.00
1.00

Service II

Service III

1.00 VehicularLL-2
Dead Load-Initi
Tendon (SE1)
Tendon (SE2)

0.80/
1.00/
1.00/
1.00/

0.80
1.00
1.00
1.00

Spec: AASHTO LRFD

Units: US (English)

Loss: Lump Sum

Output

T5-38 / Tutorial Five

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Bentley Exton Office

| Sheet
3 of
3
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Tendon (SE3)
Shrinkage

1.00/
1.00/

1.00
1.00

1.00 VehicularLL-2
Dead Load-Initi
Tendon (SE1)
Tendon (SE2)
Tendon (SE3)
Shrinkage

1.75/
0.90/
1.00/
1.00/
1.00/
1.00/

1.75
1.25
1.00
1.00
1.00
1.00

1.00 VehicularLL-2
Dead Load-Initi
Tendon (SE1)
Tendon (SE2)
Tendon (SE3)
Shrinkage

1.00/
0.50/
0.50/
0.50/
0.50/
0.00/

1.00
0.50
0.50
0.50
0.50
0.00

| Sheet
1 of
3
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Combined Summary - Box Girder


Stage Final

Strength I

Fatigue (C

Strength I

Fatigue

***** End of Report *****

Spec: AASHTO LRFD

Units: US (English)

Loss: Lump Sum

Spec: AASHTO LRFD

............ Min C/D Ratios ............


Moment
Shear
St-Ten
St-Cmp LL-Def
---------------- ------ -----999.99
6.15
0.00* 999.99
4.11
6.64
5.62
0.00* 148.86 999.00
52.28
4.00
999.99
20.42 999.00
6.86
4.78
999.99
8.09
22.83
4.55
5.40
999.99
5.53
11.93
4.23
6.24
999.99
4.92
8.75
4.29
6.85
999.99
4.29
7.56
4.71
4.23
999.99
3.73
7.35
5.54
3.09
999.99
3.40
7.94
1.25
2.87
30.72
3.34
9.62
0.53*C
2.52 L 14.79
3.21
13.65
3.12
2.41
999.99
4.06
25.41
3.61
1.75
2.79
6.24
79.64
3.18
1.58
0.00*
5.19 131.62
4.41
2.72
999.99
5.19
19.41
4.44
2.49
999.99
4.61
9.41
3.25
2.64
4.45
3.73
6.34
3.49
4.07
2.28
3.30
5.17
3.53
6.51
2.37
3.23
4.83
3.45
3.58
4.51
3.48
5.07
3.48
2.26
999.99
4.18
6.12
1.28
2.02
999.99
4.50
8.83
2.61
2.05
999.99
3.38
17.87
2.60
2.52
0.00*
4.03 115.20
2.50
1.48
0.00*
3.78 115.20
2.60
2.58
76.64
3.13
16.97
1.23
2.24
999.99
4.11
8.35
3.37
2.31
999.99
4.18
5.73
3.08
3.33
5.19
3.39
4.77
3.12
6.06
2.33
3.10
4.53
3.05
4.68
2.08
3.12
4.87
2.84
3.45
3.38
3.53
6.09
4.75
3.91
999.99
5.68
9.17
10.65
2.72 L
0.00* 999.99
10.79
10.65
1.51 L
0.00* 999.99
10.79
7.52
3.35
17.80
7.92
14.25
3.06
4.45
0.00*
4.17 118.69
3.08
1.59
0.00*
4.41 118.69
3.66
2.58
999.99
4.31
12.39
0.25*C
1.70 L
6.15
4.28
6.50
2.74
2.87
2.48
3.56
4.72
3.15
4.30
3.18
3.44
4.10
3.23
5.69
5.93
3.53
4.03
3.11
3.31
41.41
3.77
4.44
3.37
2.13
999.99
4.22
5.58
0.47*C
1.49 L 999.99
4.99
8.46
2.72
1.97
18.67
3.31
18.29
2.72
2.49
0.00*
3.50 189.29
Units: US (English)

Loss: Lump Sum

Output

Tutorial Five / T5-39

POI
Location
(ft)
-------- -------BegSuper
0.00
EndCntlv
1.75
Sp1.000
1.75
Sp1.010
11.25
Sp1.020
20.75
Sp1.030
30.25
Sp1.040
39.75
Sp1.050
49.25
Sp1.060
58.75
Sp1.070
68.25
Sp1.080
77.75
Sp1.090
87.25
Sp1.100
96.75
Sp2.000
96.75
Sp2.010
111.75
Sp2.020
126.75
Sp2.030
141.75
Sp2.040
156.75
Sp2.050
171.75
Sp2.060
186.75
Sp2.070
201.75
Sp2.080
216.75
Sp2.090
231.75
Sp2.100
246.75
Sp3.000
246.75
Sp3.010
261.75
Sp3.020
276.75
Sp3.030
291.75
Sp3.040
306.75
Sp3.050
321.75
Sp3.060
336.75
Sp3.070
351.75
Sp3.080
366.75
Hinge1.L
376.75
Hinge.R
376.75
Sp3.090
381.75
Sp3.100
396.75
Sp4.000
396.75
Sp4.010
411.75
Sp4.020
426.75
Sp4.030
441.75
Sp4.040
456.75
Sp4.050
471.75
Sp4.060
486.75
Sp4.070
501.75
Sp4.080
516.75
Sp4.090
531.75
Sp4.100
546.75

| Sheet
2 of
3
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Sp5.000
Sp5.010
Sp5.020
Sp5.030
Sp5.040
Sp5.050
Sp5.060
Sp5.070
Sp5.080
Sp5.090
Sp5.100
Sp6.000
Sp6.010
Hinge2.L
Hinge.R
Sp6.020
Sp6.030
Sp6.040
Sp6.050
Sp6.060
Sp6.070
Sp6.080
Sp6.090
Sp6.100
Sp7.000
Sp7.010
Sp7.020
Sp7.030
Sp7.040
Sp7.050
Sp7.060
Sp7.070
Sp7.080
Sp7.090
Sp7.100
Sp8.000
Sp8.010
Sp8.020
Sp8.030
Sp8.040
Sp8.050
Sp8.060
Sp8.070
Sp8.080
Sp8.090
Sp8.100
BegCntlv
EndSuper

546.75
561.75
576.75
591.75
606.75
621.75
636.75
651.75
666.75
681.75
696.75
696.75
711.75
716.75
716.75
726.75
741.75
756.75
771.75
786.75
801.75
816.75
831.75
846.75
846.75
861.75
876.75
891.75
906.75
921.75
936.75
951.75
966.75
981.75
996.75
996.75
1,006.25
1,015.75
1,025.25
1,034.75
1,044.25
1,053.75
1,063.25
1,072.75
1,082.25
1,091.75
1,091.75
1,093.50

2.72
2.79
0.47*C
3.36
3.11
3.24
3.16
2.76
0.24*C
3.61
3.09
3.03
8.61
11.81
11.81
4.82
2.88
3.00
3.05
2.92
3.08
0.48*C
2.70
2.63
2.57
2.84
0.45*C
3.31
3.12
3.25
3.19
2.88
0.31*C
4.38
3.02
3.36
3.24
1.28
0.93*
4.87
5.00
4.50
4.40
4.71
7.10
26.15
11.87
79.65

1.49
2.25
1.51
2.41
3.30
5.89
4.32
2.71
1.69
2.26
2.67
1.37
5.95
3.86
1.52
3.97
3.55
4.81
5.84
3.25
2.08
1.48
1.93
2.45
1.50
2.37
1.58
2.54
3.55
6.74
4.09
2.58
1.67
2.19
2.65
1.74
2.80
3.27
3.13
3.05
4.09
6.48
6.49
5.54
4.86
2.47
6.33
6.15

0.00*
18.65
L 999.99
999.99
29.00
5.43
2.99
2.33
L
5.20
999.99
0.00*
0.00*
10.03
L
0.00*
L
0.00*
999.99
3.67
2.36
3.01
7.53
999.99
L 999.99
999.99
0.00*
0.00*
999.99
L 999.99
999.99
999.99
8.72
4.06
4.01
L 16.37
999.99
0.00*
0.00*
999.99
999.99
999.99
999.99
999.99
999.99
999.99
999.99
999.99
999.99
0.00*
0.00*

3.50
3.31
4.98
4.20
3.75
3.50
3.41
3.52
4.22
4.37
4.45
4.24
13.44
999.99
999.99
5.82
3.62
3.23
3.25
3.51
3.98
4.90
3.18
3.46
3.67
3.36
4.74
4.15
3.80
3.61
3.56
3.69
3.73
4.80
4.73
5.49
4.05
3.70
3.50
3.25
3.48
4.07
4.75
5.47
8.35
21.00
318.76
999.99

189.29
18.09
8.42
5.56
4.43
4.00
4.07
4.70
6.45
12.28
115.90
115.90
14.41
10.67
10.67
9.11
6.06
4.85
4.47
4.71
5.68
8.26
16.68
110.50
110.50
17.58
8.72
6.04
5.02
4.77
5.11
6.25
9.24
19.00
123.80
74.91
24.72
13.44
9.51
7.87
7.30
7.50
8.68
11.79
22.56
999.00
999.00
4.09

Notes
C: Crack Control did not pass.
d: Shear reinforcement was designed.
L: Asfy-Actual < Asfy-Required.
Spec: AASHTO LRFD

Units: US (English)

Loss: Lump Sum

| Sheet
3 of
3
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

***** End of Report *****

Spec: AASHTO LRFD

Units: US (English)

Loss: Lump Sum

Output

T5-40 / Tutorial Five

Bentley Exton Office

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
1 of
1
| Job No:
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor5.cbx
Design Parameters - LRFD
State Specification - None
Design Requirements - Box Girder
Governing LC
--------------- -----------------------------P-Jack for Tendons (kips):
Tendon (SE1)
PS+PERM Service III - Final
Tendon (SE2)
PS+PERM Service III - Final
Tendon (SE3)
PS+PERM Service III - Final
f'ci (ksi)
f'c (ksi)

Required
--------------

Service I - Initial
PS+PERM Service I - Final

16,620.41
23,610.99
18,765.72

Provided
-------------13,114.00*
13,114.00*
13,114.00*

3.003
2.166

3.500
4.500

Notes
(*): Provided is less than Required.
Loss-Type Selected: Lump Sum

Allowable/Limiting Stress Factors

CCf3 / CTf2
CCf1 / CTf1
CCf2

Compression
--------------0.60*f'c (ksi)
0.45*f'c (ksi)
0.40*f'c (ksi)

Cracking Tension, fr2


CCi1 / CTi1

0.60*f'ci (ksi)

Tension
--------------------0.19*sqrt(f'c (ksi))
0.00*sqrt(f'c (ksi))

0.24*sqrt(f'c (ksi))
0.09*sqrt(f'ci (ksi))

Max

0.20 (ksi)

Resistance Factors

Flexure
Shear

PT
-------1.00
0.90

RC
----------0.90
0.90

***** End of Report *****

Spec: AASHTO LRFD

Units: US (English)

Loss: Lump Sum

Output

Tutorial Five / T5-41

Output

T5-42 / Tutorial Five

LEAP CONBOX v10.00.01.00


Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 1: Start the Program and Open the File Tutor2

Rating of a 2-Span Post-Tensioned Cast-in-Place


Concrete Box Girder (AASHTO Standard-LFDR)
(U.S. Units)

This CONBOX tutorial is an extension of Tutor2. It illustrates the load rating of a posttensioned concrete box girder bridge and it takes you through a step by step process of
setting the parameters of rating and viewing the results.

Step 1: Start the Program and Open the File Tutor2


Start CONBOX as you would any other application using Microsoft Windows. By
default, the program installs in Programs > LEAP Software > CONBOX. To open, click
the Start button, select Programs, then LEAP Software, and then select CONBOX.
Select Open from the File menu to activate the File/Open dialog. Browse to the examples
subfolder and select Tutor2 file and click Open. See Figure T6-1.

FIGURE T6-1. Project tab screen

LEAP CONBOX v10.00.01.00

Tutorial Six / T6-1

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 2: Create a Rating for the Existing Bridge

Step 2: Create a Rating for the Existing Bridge


Select the Rating Tab (Figure T6-2), which allows you to specify loads and combinations
for rating the current bridge and determine the bridge vehicle load rating.
Click on the Add Rating button and the Create new rating dialog window will
appear (Figure T6-3). Enter an ID and press OK to create a new rating by using the existing
bridge design.

FIGURE T6-2. Rating Tab

FIGURE T6-3. Create a New Rating Dialog Window

Two combinations will be automatically created/copied (Inventory and Operating) and


added in the combination tree on the left side view in the Rating Tab. On the right side view
you can see the load tree for user-defined project loads, whic are in fact those from the
Tutor2. You can add, edit or delete a load by right clicking on a load from the corresponding
group. In this case, keep the existing loads from Tutor2.

T6-2 / Tutorial Six

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 2: Create a Rating for the Existing Bridge

You can also edit the rating combination factors by double clicking on a rating combination
(Figure T6-4). In this example we use the default rating factors.

FIGURE T6-4. Rating Combination factors dialog window

LEAP CONBOX v10.00.01.00

Tutorial Six / T6-3

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 3: Perform the Rating Analysis and See the Results

Step 3: Perform the Rating Analysis and See the Results


The Rating analysis button allows you to perform the rating analysis for current rating ID.
This operation is similar to the one from the Loads/Analysis Tab (except that it is applicable
to the rating bridge, instead of the design bridge).
After the rating analysis, you can see the summary rating results in the lower window of the
Rating tab (Figure T6-5).
To see all the rating results arranged by load types, load names and response types you must
click on the View Rating button (Figure T6-6)..

FIGURE T6-5. Summary Rating Results

FIGURE T6-6. Detailed Rating Results

T6-4 / Tutorial Six

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 3: Perform the Rating Analysis and See the Results

You can also use the Print option from the File menu to view and print all the text rating
reports using the Report Manager and selecting the Rating Bridge option (Figure T6-7).

FIGURE T6-7. Print Report Manager

LEAP CONBOX v10.00.01.00

Tutorial Six / T6-5

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

| Sheet
1 of
3
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2A.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2A.cbx

Rating Summary - Inventory - Box Girder


Load Type

HS20 LL(LL) Live Load - Box Girder

Weight

Rating Summary - Operating - Box Girder


Controlling Operating RF
Location
(tons)
--------------------- ------- ----------- -----------HS20 LL(LL)
36.00
162.00
2.56
P5-P13 LL(LL)
61.00
177.00
0.63*

Weight

Based on Operating
(tons)
-------- --------Conc Mom

92.17

Conc Shr

38.54

(*) Rating Factors < 1 (the structure might be posted for the respective truck load)

Inventory Rating Level (Art. 6.6.3.3)


HS20 LL(LL) Live Load - Box Girder
POI

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Controlling Inventory RF Based on Inventory


Location
(tons)
(tons)
--------------------- ------- ----------- ------------ -------- --------HS20 LL(LL)
36.00
162.00
0.83* Conc Ten
30.01

Load Type

Location
(ft)
-------- -------Sp1.000
0.00
Sp1.010
16.20
Sp1.020
32.40
Sp1.030
48.60
Sp1.040
64.80
Sp1.050
81.00
Sp1.060
97.20
Sp1.070
113.40
Sp1.080
129.60
Sp1.090
145.80
Sp1.100
162.00
Sp2.000
162.00
Sp2.010
177.00
Sp2.020
192.00
Sp2.030
207.00
Sp2.040
222.00
Sp2.050
237.00
Sp2.060
252.00
Sp2.070
267.00
Sp2.080
282.00
Sp2.090
297.00
Sp2.100
312.00

Moment

Shear

CC1

CC2

CTens

Operating Rating Level (Art. 6.6.3.3)


Units: US (English)

POI

Location
Moment
Shear
PSStT
(ft)
-------- --------- --------- --------- -------Sp1.000
0.00
999.99
4.31
999.99
Sp1.010
16.20
5.61
4.83
113.51
Sp1.020
32.40
4.22
3.99
38.57
Sp1.030
48.60
3.26
4.54
24.47
Sp1.040
64.80
2.95
7.10
20.61
Sp1.050
81.00
3.10
4.65
21.68
Sp1.060
97.20
3.86
4.02
28.68
Sp1.070
113.40
4.43
4.60
53.56
Sp1.080
129.60
8.58
4.24
223.23
Sp1.090
145.80
5.10
3.03
135.02
Sp1.100
162.00
2.56
2.68
29.43
Sp2.000
162.00
2.72
2.99
30.09
Sp2.010
177.00
4.58
2.77
151.99
Sp2.020
192.00
8.70
4.10
284.88
Sp2.030
207.00
5.62
5.59
72.49
Sp2.040
222.00
3.88
4.82
40.34
Sp2.050
237.00
3.23
5.39
30.94
Sp2.060
252.00
3.04
7.20
29.18
Sp2.070
267.00
3.24
4.81
34.03
Sp2.080
282.00
3.99
4.34
53.21
Sp2.090
297.00
6.73
5.24
155.24
Sp2.100
312.00
999.99
4.65
999.99

PSStT

------ ------ ------ ------ ------- -----999.99


2.58 999.99 999.99 999.99 999.99
3.36
2.93 10.83
8.22
4.51 60.31
2.53
2.43
5.92
4.63
2.23 19.88
1.96
2.77
4.54
3.63
1.59 12.22
1.77
4.25
4.09
3.30
1.38
9.96
1.86
2.78
4.25
3.42
1.50 10.19
2.32
2.37
5.19
4.09
2.05 13.11
2.65
2.62
7.45
5.67
3.32 24.77
5.14
2.54 10.10
7.52
6.89 106.71
3.06
1.77
4.32
3.51
3.40 66.15
1.53
1.61
3.17
2.67
0.83 15.53
1.63
1.79
3.34
2.77
0.95 15.88
2.74
1.62
3.93
3.26
2.81 86.13
5.21
2.18
7.83
5.99
5.85 164.27
3.37
3.08
8.87
6.47
4.09 42.36
2.33
2.84
6.41
4.79
2.69 23.85
1.93
3.24
5.43
4.12
2.11 18.50
1.82
4.31
5.19
3.96
1.93 17.65
1.94
2.94
5.62
4.27
2.08 20.87
2.39
2.65
7.11
5.35
2.70 33.10
4.03
3.18 12.56
9.30
4.99 97.91
999.99
2.79 999.99 999.99 999.99 999.99

Spec: AASHTO Standard

| Sheet
2 of
3
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Loss: Lump Sum

P5-P13 LL(LL) Live Load - Box Girder


POI

Location
Moment
Shear
PSStT
(ft)
-------- --------- --------- --------- -------Sp1.000
0.00
999.99
1.56
999.99
Sp1.010
16.20
2.03
1.79
41.14
Sp1.020
32.40
1.50
1.50
13.75
Sp1.030
48.60
1.15
1.85
8.63
Sp1.040
64.80
1.04
3.31
7.24
Sp1.050
81.00
1.09
2.20
7.60
Sp1.060
97.20
1.36
1.64
10.11
Sp1.070
113.40
1.69
1.65
20.45
Sp1.080
129.60
4.06
1.07
118.67
Sp1.090
145.80
2.89
0.65
76.36
Sp1.100
162.00
1.37
1.00
15.72
Sp2.000
162.00
1.69
1.12
18.69
Sp2.010
177.00
2.23
0.63
73.99
Sp2.020
192.00
3.00
0.99
149.88
Sp2.030
207.00
2.20
2.00
28.40
Sp2.040
222.00
1.41
1.91
14.67
Sp2.050
237.00
1.15
2.44
11.05
Sp2.060
252.00
1.09
3.54
10.49
Sp2.070
267.00
1.19
2.09
12.46
Sp2.080
282.00
1.48
1.70
19.70
Sp2.090
297.00
2.53
2.01
58.32
Spec: AASHTO Standard

Units: US (English)

Loss: Lump Sum

Output

T6-6 / Tutorial Six

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Bentley Exton Office

| Sheet
3 of
3
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2A.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2A.cbx

Sp2.100

Inventory Rating Level (Art. 6.6.3.3)


HS20 LL(LL) Live Load - Box Girder

312.00

999.99

1.67

999.99

| Sheet
1 of
1
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

POI
***** End of Report *****

Spec: AASHTO Standard


Bentley Exton Office

Units: US (English)

Loss: Lump Sum


| Sheet
1 of
1
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
-------------------------------------------------------------------------------Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2A.cbx
Inventory Rating Level (Art. 6.6.3.3)
HS20 LL(LL) Live Load - Box Girder
POI Location RC Moment
(ft) PS
RF
------- -------- -- -----Sp1.000
0.00 PS 999.99
Sp1.010
16.20 PS
3.36
Sp1.020
32.40 PS
2.53
Sp1.030
48.60 PS
1.96
Sp1.040
64.80 PS
1.77
Sp1.050
81.00 PS
1.86
Sp1.060
97.20 PS
2.32
Sp1.070
113.40 PS
2.65
Sp1.080
129.60 PS
5.14
Sp1.090
145.80 PS
3.06
Sp1.100
162.00 PS
1.53
Sp2.000
162.00 PS
1.63
Sp2.010
177.00 PS
2.74
Sp2.020
192.00 PS
5.21
Sp2.030
207.00 PS
3.37
Sp2.040
222.00 PS
2.33
Sp2.050
237.00 PS
1.93
Sp2.060
252.00 PS
1.82
Sp2.070
267.00 PS
1.94
Sp2.080
282.00 PS
2.39
Sp2.090
297.00 PS
4.03
Sp2.100
312.00 PS 999.99

k
Mn
DL
SDL
PS2
LL+I
1000k-ft 1000k-ft 1000k-ft 1000k-ft 1000k-ft
--- --------- --------- --------- --------- --------.75
0.0000
0.0000
0.0000
0.0000
0.0000
1.0
37.0770
8.2302
1.7060
0.9875
2.9219
1.0
53.5291
13.9616
2.8939
1.9751
4.9199
1.0
58.6421
17.1939
3.5637
2.9626
6.0698
1.0
60.3470
17.9274
3.7155
3.9502
6.5770
1.0
59.0234
16.1620
3.3492
4.9377
6.3874
1.0
55.0511
11.8976
2.4649
5.9253
5.5140
1.0
41.3341
5.1343
1.0625
6.9128
4.2184
1.0
32.0634
-4.1279
-0.8579
7.9003
2.6039
1.0 -49.0140 -15.8890
-3.2964
8.8879
-4.5997
1.0 -67.7109 -30.2441
-6.2530
9.8754
-8.0386
1.0 -67.7109 -29.4955
-6.0982
9.7157
-7.8627
1.0 -48.7264 -16.8320
-3.4897
8.7441
-4.8090
1.0 -38.4413
-6.3921
-1.3254
7.7725
-3.0280
1.0
41.3294
1.9054
0.3948
6.8009
4.0308
1.0
47.1096
8.0605
1.6709
5.8293
5.2067
1.0
51.0826
12.0731
2.5028
4.8577
5.8967
1.0
52.4064
13.9433
2.8905
3.8861
6.0732
1.0
50.7017
13.6711
2.8341
2.9145
5.6524
1.0
45.5885
11.2565
2.3336
1.9429
4.5724
1.0
37.0656
6.6995
1.3889
0.9713
2.7114
.75
0.0000
0.0000
0.0000
-0.0002
0.0000

------Sp1.000
Sp1.010
Sp1.020
Sp1.030
Sp1.040
Sp1.050
Sp1.060
Sp1.070
Sp1.080
Sp1.090
Sp1.100
Sp2.000
Sp2.010
Sp2.020
Sp2.030
Sp2.040
Sp2.050
Sp2.060
Sp2.070
Sp2.080
Sp2.090
Sp2.100

Location
(ft)
-------0.00
16.20
32.40
48.60
64.80
81.00
97.20
113.40
129.60
145.80
162.00
162.00
177.00
192.00
207.00
222.00
237.00
252.00
267.00
282.00
297.00
312.00

RC Shear
Vn
DL
SDL
PS2
LL+I
PS
RF
kip
kip
kip
kip
kip
-- ------ --------- --------- --------- --------- --------PS
2.58 -2,460.80
-585.17
-121.30
-60.96
-220.30
PS
2.93 -2,105.44
-430.91
-89.32
-60.96
-181.97
PS
2.43 -1,458.33
-276.66
-57.34
-60.96
-154.71
PS
2.77 -1,136.04
-122.40
-25.36
-60.96
-128.15
PS
4.25 -1,064.84
31.85
6.62
-60.96
-102.64
PS
2.78 1,138.59
186.11
38.60
-60.96
131.55
PS
2.37 1,414.29
340.36
70.58
-60.96
155.17
PS
2.62 1,955.52
494.61
102.56
-60.96
183.82
PS
2.54 2,390.12
648.87
134.53
-60.96
216.56
PS
1.77 2,400.37
803.12
166.51
-60.96
249.98
PS
1.61 2,721.72
971.90
198.49
-60.96
283.53
PS
1.79 -2,723.39
-923.68
-188.70
64.77
-275.30
PS
1.62 -2,220.03
-767.41
-159.09
64.77
-243.64
PS
2.18 -2,131.70
-624.58
-129.48
64.77
-212.15
PS
3.08 -2,112.72
-481.75
-99.87
64.77
-181.32
PS
2.84 -1,568.41
-338.92
-70.26
64.77
-153.49
PS
3.24 -1,282.84
-196.10
-40.65
64.77
-129.63
PS
4.31 -1,064.84
-53.27
-11.04
64.77
-100.38
PS
2.94 1,142.51
89.56
18.57
64.77
128.92
PS
2.65 1,470.34
232.39
48.18
64.77
155.29
PS
3.18 2,124.32
375.22
77.79
64.77
182.37
PS
2.79 2,405.07
518.04
107.40
64.77
212.64

Phi * Vn - 1.3 * (DL + SDL) - PS2


RF = --------------------------------2.17 * (LL+I)

***** End of Report *****

Spec: AASHTO Standard

Units: US (English)

Loss: Lump Sum

Phi * Mn - 1.3 * (DL + SDL) - PS2


RF = --------------------------------2.17 * (LL+I)

Spec: AASHTO Standard

Units: US (English)

Loss: Lump Sum

Output

Tutorial Six/ T6-7

***** End of Report *****

| Sheet
1 of
1
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2A.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2A.cbx

Inventory Rating Level (Art. 6.6.3.3)


HS20 LL(LL) Live Load - Box Girder

Inventory Rating Level (Art. 6.6.3.3)


HS20 LL(LL) Live Load - Box Girder

POI

RC CC1
fsa
DL
SDL
PS
LL+I
PS
RF
ksi
ksi
ksi
ksi
ksi
-- ------ --------- --------- --------- --------- --------PS 999.99
0.000
0.000
0.000
-0.673
0.000
PS 10.83
-2.400
-0.400
-0.083
-0.371
-0.143
PS
5.92
-2.400
-0.678
-0.141
-0.165
-0.239
PS
4.54
-2.400
-0.835
-0.173
-0.057
-0.294
PS
4.09
-2.400
-0.870
-0.180
-0.052
-0.317
PS
4.25
-2.400
-0.785
-0.163
-0.140
-0.309
PS
5.19
-2.400
-0.578
-0.120
-0.312
-0.268
PS
7.45
-2.400
-0.249
-0.052
-0.566
-0.206
PS 10.10
-2.400
-0.265
-0.055
-0.444
-0.162
PS
4.32
-2.400
-1.021
-0.212
0.112
-0.296
PS
3.17
-2.400
-1.395
-0.288
0.461
-0.371
PS
3.34
-2.400
-1.361
-0.281
0.453
-0.363
PS
3.93
-2.400
-1.081
-0.224
0.124
-0.310
PS
7.83
-2.400
-0.411
-0.085
-0.392
-0.193
PS
8.87
-2.400
-0.093
-0.019
-0.543
-0.197
PS
6.41
-2.400
-0.391
-0.081
-0.305
-0.253
PS
5.43
-2.400
-0.586
-0.122
-0.145
-0.285
PS
5.19
-2.400
-0.677
-0.140
-0.061
-0.293
PS
5.62
-2.400
-0.664
-0.138
-0.062
-0.273
PS
7.11
-2.400
-0.547
-0.113
-0.158
-0.222
PS 12.56
-2.400
-0.325
-0.067
-0.343
-0.132
PS 999.99
0.000
0.000
0.000
-0.617
0.000

fsa - (DL + SDL) - PS


RF = --------------------(LL+I)

POI
------Sp1.000
Sp1.010
Sp1.020
Sp1.030
Sp1.040
Sp1.050
Sp1.060
Sp1.070
Sp1.080
Sp1.090
Sp1.100
Sp2.000
Sp2.010
Sp2.020
Sp2.030
Sp2.040
Sp2.050
Sp2.060
Sp2.070
Sp2.080
Sp2.090
Sp2.100

Location
(ft)
-------0.00
16.20
32.40
48.60
64.80
81.00
97.20
113.40
129.60
145.80
162.00
162.00
177.00
192.00
207.00
222.00
237.00
252.00
267.00
282.00
297.00
312.00

RC CC2
fsa
DL
SDL
PS
LL+I
PS
RF
ksi
ksi
ksi
ksi
ksi
-- ------ --------- --------- --------- --------- --------PS 999.99
0.000
0.000
0.000
-0.673
0.000
PS
8.22
-1.600
-0.200
-0.041
-0.186
-0.143
PS
4.63
-1.600
-0.339
-0.070
-0.083
-0.239
PS
3.63
-1.600
-0.417
-0.087
-0.029
-0.294
PS
3.30
-1.600
-0.435
-0.090
-0.026
-0.317
PS
3.42
-1.600
-0.392
-0.081
-0.070
-0.309
PS
4.09
-1.600
-0.289
-0.060
-0.156
-0.268
PS
5.67
-1.600
-0.125
-0.026
-0.283
-0.206
PS
7.52
-1.600
-0.133
-0.028
-0.222
-0.162
PS
3.51
-1.600
-0.510
-0.106
0.056
-0.296
PS
2.67
-1.600
-0.698
-0.144
0.230
-0.371
PS
2.77
-1.600
-0.680
-0.141
0.227
-0.363
PS
3.26
-1.600
-0.541
-0.112
0.062
-0.310
PS
5.99
-1.600
-0.205
-0.043
-0.196
-0.193
PS
6.47
-1.600
-0.046
-0.010
-0.271
-0.197
PS
4.79
-1.600
-0.196
-0.041
-0.153
-0.253
PS
4.12
-1.600
-0.293
-0.061
-0.072
-0.285
PS
3.96
-1.600
-0.338
-0.070
-0.030
-0.293
PS
4.27
-1.600
-0.332
-0.069
-0.031
-0.273
PS
5.35
-1.600
-0.273
-0.057
-0.079
-0.222
PS
9.30
-1.600
-0.163
-0.034
-0.172
-0.132
PS 999.99
0.000
0.000
0.000
-0.617
0.000

fsa - (DL + SDL) - PS


RF = --------------------(LL+I)

***** End of Report *****

Spec: AASHTO Standard

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

------Sp1.000
Sp1.010
Sp1.020
Sp1.030
Sp1.040
Sp1.050
Sp1.060
Sp1.070
Sp1.080
Sp1.090
Sp1.100
Sp2.000
Sp2.010
Sp2.020
Sp2.030
Sp2.040
Sp2.050
Sp2.060
Sp2.070
Sp2.080
Sp2.090
Sp2.100

Location
(ft)
-------0.00
16.20
32.40
48.60
64.80
81.00
97.20
113.40
129.60
145.80
162.00
162.00
177.00
192.00
207.00
222.00
237.00
252.00
267.00
282.00
297.00
312.00

| Sheet
1 of
1
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Units: US (English)

Loss: Lump Sum

***** End of Report *****

Spec: AASHTO Standard

Units: US (English)

Loss: Lump Sum

Output

T6-8 / Tutorial Six

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Bentley Exton Office

| Sheet
1 of
1
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2A.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2A.cbx

Inventory Rating Level (Art. 6.6.3.3)


HS20 LL(LL) Live Load - Box Girder

Inventory Rating Level (Art. 6.6.3.3)


HS20 LL(LL) Live Load - Box Girder

POI
------Sp1.000
Sp1.010
Sp1.020
Sp1.030
Sp1.040
Sp1.050
Sp1.060
Sp1.070
Sp1.080
Sp1.090
Sp1.100
Sp2.000
Sp2.010
Sp2.020
Sp2.030
Sp2.040
Sp2.050
Sp2.060
Sp2.070
Sp2.080
Sp2.090
Sp2.100

Location
(ft)
-------0.00
16.20
32.40
48.60
64.80
81.00
97.20
113.40
129.60
145.80
162.00
162.00
177.00
192.00
207.00
222.00
237.00
252.00
267.00
282.00
297.00
312.00

RC CTens
fsa
DL
SDL
PS
LL+I
PS
RF
ksi
ksi
ksi
ksi
ksi
-- ------ --------- --------- --------- --------- --------PS 999.99
0.000
0.000
0.000
-0.673
0.000
PS
4.51
0.379
0.529
0.110
-1.091
0.185
PS
2.23
0.379
0.897
0.186
-1.381
0.304
PS
1.59
0.379
1.104
0.229
-1.540
0.370
PS
1.38
0.379
1.151
0.239
-1.562
0.398
PS
1.50
0.379
1.038
0.215
-1.456
0.389
PS
2.05
0.379
0.764
0.158
-1.239
0.340
PS
3.32
0.379
0.330
0.068
-0.898
0.264
PS
6.89
0.379
-0.265
-0.055
-0.444
0.166
PS
3.40
0.379
0.771
0.160
-1.304
0.222
PS 0.83*
0.379
1.407
0.291
-1.620
0.362
PS 0.95*
0.379
1.372
0.284
-1.612
0.354
PS
2.81
0.379
0.817
0.169
-1.257
0.232
PS
5.85
0.379
0.310
0.064
-0.859
0.148
PS
4.09
0.379
0.122
0.025
-0.802
0.253
PS
2.69
0.379
0.518
0.107
-1.109
0.321
PS
2.11
0.379
0.775
0.161
-1.312
0.359
PS
1.93
0.379
0.896
0.186
-1.413
0.368
PS
2.08
0.379
0.878
0.182
-1.398
0.344
PS
2.70
0.379
0.723
0.150
-1.257
0.283
PS
4.99
0.379
0.430
0.089
-0.995
0.171
PS 999.99
0.000
0.000
0.000
-0.617
0.000

fsa - (DL + SDL) - PS


RF = --------------------(LL+I)

| Sheet
1 of
1
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

POI
------Sp1.000
Sp1.010
Sp1.020
Sp1.030
Sp1.040
Sp1.050
Sp1.060
Sp1.070
Sp1.080
Sp1.090
Sp1.100
Sp2.000
Sp2.010
Sp2.020
Sp2.030
Sp2.040
Sp2.050
Sp2.060
Sp2.070
Sp2.080
Sp2.090
Sp2.100

Location
(ft)
-------0.00
16.20
32.40
48.60
64.80
81.00
97.20
113.40
129.60
145.80
162.00
162.00
177.00
192.00
207.00
222.00
237.00
252.00
267.00
282.00
297.00
312.00

RC
PS
-PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS

PSStT
fsa
DL
SDL
PS
LL+I
RF
ksi
ksi
ksi
ksi
ksi
------ --------- --------- --------- --------- --------999.99
0.000
0.000
0.000
-0.673
0.000
60.31
194.400
166.853
0.000
0.000
0.457
19.88
194.400
168.549
0.000
0.000
1.300
12.22
194.400
170.182
0.000
0.000
1.982
9.96
194.400
171.668
0.000
0.000
2.281
10.19
194.400
172.854
0.000
0.000
2.115
13.11
194.400
173.940
0.000
0.000
1.560
24.77
194.400
173.493
0.000
0.000
0.844
106.71
194.400
172.148
0.000
0.000
0.209
66.15
194.400
171.056
0.000
0.000
0.353
15.53
194.400
167.230
0.000
0.000
1.749
15.88
194.400
167.230
0.000
0.000
1.711
86.13
194.400
162.626
0.000
0.000
0.369
164.27
194.400
161.301
0.000
0.000
0.201
42.36
194.400
160.230
0.000
0.000
0.807
23.85
194.400
159.260
0.000
0.000
1.473
18.50
194.400
158.280
0.000
0.000
1.953
17.65
194.400
157.224
0.000
0.000
2.107
20.87
194.400
155.876
0.000
0.000
1.846
33.10
194.400
154.409
0.000
0.000
1.208
97.91
194.400
152.900
0.000
0.000
0.424
999.99
0.000
0.000
0.000
-0.617
0.000

0.8 * fpy - (DL + SDL) - PS


RF = --------------------------(LL+I)

***** End of Report *****


***** End of Report *****
Spec: AASHTO Standard
Spec: AASHTO Standard

Units: US (English)

Units: US (English)

Loss: Lump Sum

Loss: Lump Sum

Output

Tutorial Six/ T6-9

| Sheet
1 of
1
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2A.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2A.cbx

Operating Rating Level (Art. 6.6.3.3)


HS20 LL(LL) Live Load - Box Girder

Operating Rating Level (Art. 6.6.3.3)


HS20 LL(LL) Live Load - Box Girder

POI

RC
PS
-PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS

Moment
RF
-----999.99
5.61
4.22
3.26
2.95
3.10
3.86
4.43
8.58
5.10
2.56
2.72
4.58
8.70
5.62
3.88
3.23
3.04
3.24
3.99
6.73
999.99

k
--.75
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
.75

Mn
DL
SDL
PS2
LL+I
1000k-ft 1000k-ft 1000k-ft 1000k-ft 1000k-ft
--------- --------- --------- --------- --------0.0000
0.0000
0.0000
0.0000
0.0000
37.0770
8.2302
1.7060
0.9875
2.9219
53.5291
13.9616
2.8939
1.9751
4.9199
58.6421
17.1939
3.5637
2.9626
6.0698
60.3470
17.9274
3.7155
3.9502
6.5770
59.0234
16.1620
3.3492
4.9377
6.3874
55.0511
11.8976
2.4649
5.9253
5.5140
41.3341
5.1343
1.0625
6.9128
4.2184
32.0634
-4.1279
-0.8579
7.9003
2.6039
-49.0140 -15.8890
-3.2964
8.8879
-4.5997
-67.7109 -30.2441
-6.2530
9.8754
-8.0386
-67.7109 -29.4955
-6.0982
9.7157
-7.8627
-48.7264 -16.8320
-3.4897
8.7441
-4.8090
-38.4413
-6.3921
-1.3254
7.7725
-3.0280
41.3294
1.9054
0.3948
6.8009
4.0308
47.1096
8.0605
1.6709
5.8293
5.2067
51.0826
12.0731
2.5028
4.8577
5.8967
52.4064
13.9433
2.8905
3.8861
6.0732
50.7017
13.6711
2.8341
2.9145
5.6524
45.5885
11.2565
2.3336
1.9429
4.5724
37.0656
6.6995
1.3889
0.9713
2.7114
0.0000
0.0000
0.0000
-0.0002
0.0000

Phi * Mn - 1.3 * (DL + SDL) - PS2


RF = --------------------------------1.3 * (LL+I)

POI
------Sp1.000
Sp1.010
Sp1.020
Sp1.030
Sp1.040
Sp1.050
Sp1.060
Sp1.070
Sp1.080
Sp1.090
Sp1.100
Sp2.000
Sp2.010
Sp2.020
Sp2.030
Sp2.040
Sp2.050
Sp2.060
Sp2.070
Sp2.080
Sp2.090
Sp2.100

Location
(ft)
-------0.00
16.20
32.40
48.60
64.80
81.00
97.20
113.40
129.60
145.80
162.00
162.00
177.00
192.00
207.00
222.00
237.00
252.00
267.00
282.00
297.00
312.00

RC Shear
Vn
DL
SDL
PS2
LL+I
PS
RF
kip
kip
kip
kip
kip
-- ------ --------- --------- --------- --------- --------PS
4.31 -2,460.80
-585.17
-121.30
-60.96
-220.30
PS
4.83 -2,089.54
-430.91
-89.32
-60.96
-181.97
PS
3.99 -1,441.16
-276.66
-57.34
-60.96
-154.71
PS
4.54 -1,120.67
-122.40
-25.36
-60.96
-128.15
PS
7.10 -1,064.84
31.85
6.62
-60.96
-102.64
PS
4.65 1,140.81
186.11
38.60
-60.96
131.55
PS
4.02 1,427.47
340.36
70.58
-60.96
155.17
PS
4.60 2,017.00
494.61
102.56
-60.96
183.82
PS
4.24 2,390.12
648.87
134.53
-60.96
216.56
PS
3.03 2,425.74
803.12
166.51
-60.96
249.98
PS
2.68 2,721.72
971.90
198.49
-60.96
283.53
PS
2.99 -2,723.39
-923.68
-188.70
64.77
-275.30
PS
2.77 -2,239.59
-767.41
-159.09
64.77
-243.64
PS
4.10 -2,273.35
-624.58
-129.48
64.77
-212.15
PS
5.59 -2,232.17
-481.75
-99.87
64.77
-181.32
PS
4.82 -1,588.40
-338.92
-70.26
64.77
-153.49
PS
5.39 -1,279.30
-196.10
-40.65
64.77
-129.63
PS
7.20 -1,064.84
-53.27
-11.04
64.77
-100.38
PS
4.81 1,123.56
89.56
18.57
64.77
128.92
PS
4.34 1,450.70
232.39
48.18
64.77
155.29
PS
5.24 2,107.14
375.22
77.79
64.77
182.37
PS
4.65 2,405.07
518.04
107.40
64.77
212.64

Phi * Vn - 1.3 * (DL + SDL) - PS2


RF = --------------------------------1.3 * (LL+I)

***** End of Report *****


***** End of Report *****
Spec: AASHTO Standard
Spec: AASHTO Standard

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

------Sp1.000
Sp1.010
Sp1.020
Sp1.030
Sp1.040
Sp1.050
Sp1.060
Sp1.070
Sp1.080
Sp1.090
Sp1.100
Sp2.000
Sp2.010
Sp2.020
Sp2.030
Sp2.040
Sp2.050
Sp2.060
Sp2.070
Sp2.080
Sp2.090
Sp2.100

Location
(ft)
-------0.00
16.20
32.40
48.60
64.80
81.00
97.20
113.40
129.60
145.80
162.00
162.00
177.00
192.00
207.00
222.00
237.00
252.00
267.00
282.00
297.00
312.00

| Sheet
1 of
1
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Units: US (English)

Loss: Lump Sum

Units: US (English)

Loss: Lump Sum

Output

T6-10 / Tutorial Six

Bentley Exton Office

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Bentley Exton Office

| Sheet
1 of
1
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2A.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2A.cbx

Operating Rating Level (Art. 6.6.3.3)


HS20 LL(LL) Live Load - Box Girder

Operating Rating Level (Art. 6.6.3.3)


P5-P13 LL(LL) Live Load - Box Girder

POI
------Sp1.000
Sp1.010
Sp1.020
Sp1.030
Sp1.040
Sp1.050
Sp1.060
Sp1.070
Sp1.080
Sp1.090
Sp1.100
Sp2.000
Sp2.010
Sp2.020
Sp2.030
Sp2.040
Sp2.050
Sp2.060
Sp2.070
Sp2.080
Sp2.090
Sp2.100

Location
(ft)
-------0.00
16.20
32.40
48.60
64.80
81.00
97.20
113.40
129.60
145.80
162.00
162.00
177.00
192.00
207.00
222.00
237.00
252.00
267.00
282.00
297.00
312.00

RC
PS
-PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS

PSStT
fsa
DL
SDL
PS
LL+I
RF
ksi
ksi
ksi
ksi
ksi
------ --------- --------- --------- --------- --------999.99
0.000
152.900
0.000
0.000
0.000
113.51
218.700
166.853
0.000
0.000
0.457
38.57
218.700
168.549
0.000
0.000
1.300
24.47
218.700
170.182
0.000
0.000
1.982
20.61
218.700
171.668
0.000
0.000
2.281
21.68
218.700
172.854
0.000
0.000
2.115
28.68
218.700
173.940
0.000
0.000
1.560
53.56
218.700
173.493
0.000
0.000
0.844
223.23
218.700
172.148
0.000
0.000
0.209
135.02
218.700
171.056
0.000
0.000
0.353
29.43
218.700
167.230
0.000
0.000
1.749
30.09
218.700
167.230
0.000
0.000
1.711
151.99
218.700
162.626
0.000
0.000
0.369
284.88
218.700
161.301
0.000
0.000
0.201
72.49
218.700
160.230
0.000
0.000
0.807
40.34
218.700
159.260
0.000
0.000
1.473
30.94
218.700
158.280
0.000
0.000
1.953
29.18
218.700
157.224
0.000
0.000
2.107
34.03
218.700
155.876
0.000
0.000
1.846
53.21
218.700
154.409
0.000
0.000
1.208
155.24
218.700
152.900
0.000
0.000
0.424
999.99
0.000
152.900
0.000
0.000
0.000

0.9 * fpy - (DL + SDL) - PS


RF = --------------------------(LL+I)

| Sheet
1 of
1
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

POI
------Sp1.000
Sp1.010
Sp1.020
Sp1.030
Sp1.040
Sp1.050
Sp1.060
Sp1.070
Sp1.080
Sp1.090
Sp1.100
Sp2.000
Sp2.010
Sp2.020
Sp2.030
Sp2.040
Sp2.050
Sp2.060
Sp2.070
Sp2.080
Sp2.090
Sp2.100

Location
(ft)
-------0.00
16.20
32.40
48.60
64.80
81.00
97.20
113.40
129.60
145.80
162.00
162.00
177.00
192.00
207.00
222.00
237.00
252.00
267.00
282.00
297.00
312.00

RC
PS
-PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS

Moment
RF
-----999.99
2.03
1.50
1.15
1.04
1.09
1.36
1.69
4.06
2.89
1.37
1.69
2.23
3.00
2.20
1.41
1.15
1.09
1.19
1.48
2.53
999.99

k
--.75
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
.75

Mn
DL
SDL
PS2
LL+I
1000k-ft 1000k-ft 1000k-ft 1000k-ft 1000k-ft
--------- --------- --------- --------- --------0.0000
0.0000
0.0000
0.0000
0.0000
37.0770
8.2302
1.7060
0.9875
8.0628
53.5291
13.9616
2.8939
1.9751
13.8013
58.6421
17.1939
3.5637
2.9626
17.2183
60.3470
17.9274
3.7155
3.9502
18.7207
59.0234
16.1620
3.3492
4.9377
18.2111
55.0511
11.8976
2.4649
5.9253
15.6385
41.3341
5.1343
1.0625
6.9128
11.0477
-38.6282
-4.1279
-0.8579
7.9003
-7.2288
-49.0140 -15.8890
-3.2964
8.8879
-8.1324
-67.7109 -30.2441
-6.2530
9.8754 -15.0483
-67.7109 -29.4955
-6.0982
9.7157 -12.6565
-48.7264 -16.8320
-3.4897
8.7441
-9.8785
-38.4413
-6.3921
-1.3254
7.7725
-8.7809
41.3294
1.9054
0.3948
6.8009
10.2893
47.1096
8.0605
1.6709
5.8293
14.3223
51.0826
12.0731
2.5028
4.8577
16.5177
52.4064
13.9433
2.8905
3.8861
16.8994
50.7017
13.6711
2.8341
2.9145
15.4403
45.5885
11.2565
2.3336
1.9429
12.3482
37.0656
6.6995
1.3889
0.9713
7.2171
0.0000
0.0000
0.0000
-0.0002
0.0000

Phi * Mn - 1.3 * (DL + SDL) - PS2


RF = --------------------------------1.3 * (LL+I)

***** End of Report *****


***** End of Report *****
Spec: AASHTO Standard

Units: US (English)

Loss: Lump Sum

Spec: AASHTO Standard

Units: US (English)

Loss: Lump Sum

Output

Tutorial Six/ T6-11

| Sheet
1 of
1
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Bentley Exton Office

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2A.cbx

Filename: C:\Program Files\Bentley\LEAP CONBOX\Examples\Tutor2A.cbx

Operating Rating Level (Art. 6.6.3.3)


P5-P13 LL(LL) Live Load - Box Girder

Operating Rating Level (Art. 6.6.3.3)


P5-P13 LL(LL) Live Load - Box Girder

POI

RC Shear
Vn
DL
SDL
PS2
LL+I
PS
RF
kip
kip
kip
kip
kip
-- ------ --------- --------- --------- --------- --------PS
1.56 -2,460.80
-585.17
-121.30
-60.96
-610.60
PS
1.79 -2,117.84
-430.91
-89.32
-60.96
-502.12
PS
1.50 -1,416.97
-276.66
-57.34
-60.96
-399.62
PS
1.85 -1,096.07
-122.40
-25.36
-60.96
-304.87
PS
3.31 -1,064.84
31.85
6.62
-60.96
-219.86
PS
2.20 1,142.15
186.11
38.60
-60.96
278.93
PS
1.64 1,418.96
340.36
70.58
-60.96
377.11
PS
1.65 1,943.21
494.61
102.56
-60.96
482.71
PS
1.07 1,972.85
648.87
134.53
-60.96
586.53
PS 0.65* 1,968.64
803.12
166.51
-60.96
679.89
PS 1.00* 2,721.72
971.90
198.49
-60.96
761.56
PS
1.12 -2,723.39
-923.68
-188.70
64.77
-736.97
PS 0.63* -1,861.14
-767.41
-159.09
64.77
-651.82
PS 0.99* -1,810.57
-624.58
-129.48
64.77
-555.83
PS
2.00 -2,073.30
-481.75
-99.87
64.77
-452.31
PS
1.91 -1,483.32
-338.92
-70.26
64.77
-349.18
PS
2.44 -1,185.83
-196.10
-40.65
64.77
-259.47
PS
3.54 1,064.84
-53.27
-11.04
64.77
212.57
PS
2.09 1,109.28
89.56
18.57
64.77
292.45
PS
1.70 1,424.64
232.39
48.18
64.77
385.08
PS
2.01 2,136.49
375.22
77.79
64.77
485.41
PS
1.67 2,405.07
518.04
107.40
64.77
591.80

Phi * Vn - 1.3 * (DL + SDL) - PS2


RF = --------------------------------1.3 * (LL+I)

POI
------Sp1.000
Sp1.010
Sp1.020
Sp1.030
Sp1.040
Sp1.050
Sp1.060
Sp1.070
Sp1.080
Sp1.090
Sp1.100
Sp2.000
Sp2.010
Sp2.020
Sp2.030
Sp2.040
Sp2.050
Sp2.060
Sp2.070
Sp2.080
Sp2.090
Sp2.100

Location
(ft)
-------0.00
16.20
32.40
48.60
64.80
81.00
97.20
113.40
129.60
145.80
162.00
162.00
177.00
192.00
207.00
222.00
237.00
252.00
267.00
282.00
297.00
312.00

RC
PS
-PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS

PSStT
fsa
DL
SDL
PS
LL+I
RF
ksi
ksi
ksi
ksi
ksi
------ --------- --------- --------- --------- --------999.99
0.000
152.900
0.000
0.000
0.000
41.14
218.700
166.853
0.000
0.000
1.260
13.75
218.700
168.549
0.000
0.000
3.647
8.63
218.700
170.182
0.000
0.000
5.624
7.24
218.700
171.668
0.000
0.000
6.494
7.60
218.700
172.854
0.000
0.000
6.031
10.11
218.700
173.940
0.000
0.000
4.426
20.45
218.700
173.493
0.000
0.000
2.211
118.67
218.700
172.148
0.000
0.000
0.392
76.36
218.700
171.056
0.000
0.000
0.624
15.72
218.700
167.230
0.000
0.000
3.274
18.69
218.700
167.230
0.000
0.000
2.754
73.99
218.700
162.626
0.000
0.000
0.758
149.88
218.700
161.301
0.000
0.000
0.383
28.40
218.700
160.230
0.000
0.000
2.059
14.67
218.700
159.260
0.000
0.000
4.053
11.05
218.700
158.280
0.000
0.000
5.470
10.49
218.700
157.224
0.000
0.000
5.862
12.46
218.700
155.876
0.000
0.000
5.043
19.70
218.700
154.409
0.000
0.000
3.263
58.32
218.700
152.900
0.000
0.000
1.128
999.99
0.000
152.900
0.000
0.000
0.000

0.9 * fpy - (DL + SDL) - PS


RF = --------------------------(LL+I)

***** End of Report *****


Spec: AASHTO Standard

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

------Sp1.000
Sp1.010
Sp1.020
Sp1.030
Sp1.040
Sp1.050
Sp1.060
Sp1.070
Sp1.080
Sp1.090
Sp1.100
Sp2.000
Sp2.010
Sp2.020
Sp2.030
Sp2.040
Sp2.050
Sp2.060
Sp2.070
Sp2.080
Sp2.090
Sp2.100

Location
(ft)
-------0.00
16.20
32.40
48.60
64.80
81.00
97.20
113.40
129.60
145.80
162.00
162.00
177.00
192.00
207.00
222.00
237.00
252.00
267.00
282.00
297.00
312.00

| Sheet
1 of
1
| Job No:
LEAP-2
Program: LEAP CONBOX Ver: 08.01.00.18 Bentley Systems, Inc | Date:
4/3/2009
Phone: 800-778-4277
Web-Site: www.bentley.com | By:
DAT
--------------------------------------------------------------------------------

Units: US (English)

Loss: Lump Sum

***** End of Report *****


Spec: AASHTO Standard

Units: US (English)

Loss: Lump Sum g

Output

T6-12 / Tutorial Six

Bentley Exton Office

Rating of a 3-Span Cast-in-Place Post-Tensioned


Haunched Slab (AASHTO Load and Resistance
Factor Rating-LRFR) (Metric Units)

This CONBOX tutorial is an extension of Tutor3. It illustrates the load rating of a posttensioned haunched slab bridge using ASSHTO Load and Resistance Factor Rating
(LRFR). It takes you through a step by step process setting the parameters of rating and
viewing the results..

Step 1: Start the Program and Open the File Tutor3


Start CONBOX as you would any other application using Microsoft Windows. By
default, the program installs in Programs > LEAP Software > CONBOX. To open, click
the Start button, select Programs, then LEAP Software, and then select CONBOX.
Select Open from the File menu to activate the File/Open dialog. Browse to the examples
subfolder and select Tutor3 file and click Open. See Figure T7-1.

FIGURE T7-1. Project Tab

LEAP CONBOX v10.00.01.00

Tutorial Seven/ T7-1

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 2: Create a Rating for the Existing Bridge

Step 2: Create a Rating for the Existing Bridge


Select the Rating Tab (Figure T7-2), which allows you to specify loads and combinations
for rating the current bridge and determine the bridge vehicle load rating.
Click on the Add Rating button and the Create new rating dialog window will
appear (Figure T7-3). Enter an ID and press OK to create a new rating by using the existing
bridge design.

FIGURE T7-2. Rating Tab

FIGURE T7-3. Create New Rating

Two combinations will be automatically created/copied (Design-Inventory and DesignOperating) and added in the combination tree on the left side view in the Rating Tab. On the
right side view you can see the load tree for user-defined project loads, which are in fact
those from the Tutor3. You can add, edit or delete a load by right clicking on a load from the
corresponding group. In this case, keep the existing loads from Tutor3.

T7-2 / Tutorial Seven

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

You can also edit the rating combination factors by double clicking on a rating combination
(Figure T7-4). In this example we will choose to compute the Nominal Moment using code
equations. Choose to compute Vc using the LRFD Simplified method. In addition, choose
to compute Vci using the composite method. When the bridge is treated as a composite
section all DC and DW loads are included in the Vci VD term..

FIGURE T7-4. Rating Combination Factors

By default CONBOX will automatically rate all vehicles included in a live load group. For
this example we will rate the HL-93 envelope. Open the Live Load dialog (Figure T7-5) by
double-clicking on the HL 93 - Multi Span under the Live Load Group loads. Uncheck the
Rate Individual Vehicles checkbox.

FIGURE T7-5. Live Load

LEAP CONBOX v10.00.01.00

Tutorial Seven/ T7-3

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

Step 3: Perform the Rating Analysis and View the Results

Step 3: Perform the Rating Analysis and View the Results


The Rating analysis button allows you to perform the rating analysis for current rating ID.
This operation is similar to the one from the Loads/Analysis Tab (except that it is applicable
to the rating bridge, instead of the design bridge).
After the rating analysis, you can see the summary rating results in the lower window of the
Rating tab (Figure T7-6).
To see all the rating results arranged by load types, load names and response types you must
click on the View Rating button (Figure T7-7)..

FIGURE T7-6. Summary Rating Results

FIGURE T7-7. View Rating Results

T7-4 / Tutorial Seven

LEAP CONBOX v10.00.01.00

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

You can also use the Print option from the File menu to view and print all the text rating
reports using the Report Manager and selecting the Rating Bridge option (Figure T7-8).

FIGURE T7-8. Print Report Manager (Rating Bridge Option)

LEAP CONBOX v10.00.01.00

Tutorial Seven/ T7-5

Bentley Systems, Inc. No part of this user manual may be reproduced in any form or by any means without the written permission of the publisher.

You might also like