You are on page 1of 1

Room Heating Load Calculations

4th Year Mechanical

Room
Plan Size
Heat Transfer

0.24

238.625

37.8

BTU/hr
2164.806

0.24

230.000

37.8

2086.560

0.24

118.561

37.8

1075.585

0.24

104.212

37.8

945.4113

0.24

273.33

37.8

2479.650

Windows

1.10

63.350

37.8

2634.093

Ventilators

1.10

32.745

37.8

1361.537

Door

0.49

30.939

37.8

573.052

Roof/Ceiling

0.09

558.402

37.8

1899.683

Floor

0.33

558.402

37.8

6965.506

Walls

TD

Heat Transfer Loss ( BTU/hr)


Infiltration

1.1

22185.880
x

( CFM )
B

TC

Window

1.1

0.37

87.915

37.8

1352.537

Door

1.1

0.50

30.917

37.8

642.764

Ventilator

1.1

0.37

53.930

37.8

829.692

Infiltration Heat Loss ( BTU/hr)

2824.993

Room Heating Load ( BTU/hr)

25010.873

Infiltration CFM
Windows
ventilator
Doors

Column A
CFM per ft
CFM per ft
CFM per ft2

Column B
Crack Length, ft
Crack Length, ft
Area, ft2

You might also like