ASPHALT ROAD - year 2013 Helmand Province

S.No

Description

Unit

Length

Width

Thickness

Quantity

Unit Cost

Total Cost

Mobalization

L.S

1.00

5000.00

Demobalization

L.S

1.00

2,000

2000.00

Topographic Srvey

L.S

1.00

3,000

3000.00

Road Design

L.S

1.00

4,000

4000.00

5000.00

SUB-GRADE
S.No

Description

Unit

Length

Thickness

Quantity

Unit Cost

Total Cost

Excavation

M3

1200.00

6.0

0.200

7,200

3.00

21600.000

Natural Ground
compaction

M2

1200.00

7.0

8,400

2.00

16800.000

sub grade

M3

1200.00

7.0

0.150

1,260

5.00

6300.000

SUB-BASE
S.No Description
1

Sub-Base

Unit

Length

1200.00

Width

Thickness

7.000

0.150

Quantity
1,260

Unit Cost
12.00

Total Cost
15120.00

BASE COURSE
S.No
1

Description
Base Course

Unit

Length

Width

Thickness

M3

1200.00

7.000

0.200

Quantity
1,680

Unit Cost
18.00

Total Cost
30240.00

ASPHALT
S.No

Description

Unit

Length

Width

Thickness

Quantity

Unit Cost

Total Cost

prime coat

M2

1200

7.000

8400.00

1.00

8400.00

Wearing course

1200

7.000

0.100

840.00

100

84000.00

RCC CONCRETE SIDEWALK 2KM


S.No
1

Description
Concrete

Unit

Length

M3

2000

Width

Thickness

1.500

0.150

Quantity
450

Unit Cost
190.00

Total Cost
85500

CONCRETE GUTTERS
S.No
1

Description
Concrete

Unit

Length

Width

Thickness

M/L

2400

Quantity
2400

Unit Cost
50.00

Total Cost
120000

CONCRETE OF 2 CAUSWAY
S.No
1

Description
RCC Concrete

Unit

Length

M3

24

Width

Thickness

7.000

0.150

Quantity
25

Unit Cost
190

Total Cost
4788

Sub Total

406748.00

Manegemant Cost( 5 %)

20337.4

DBA Insurince( 3 %)

12202.44

TOTAL COST

439287.840