S.No
Description
Unit
Length
Width
Thickness
Quantity
Unit Cost
Total Cost
Mobalization
L.S
1.00
5000.00
Demobalization
L.S
1.00
2,000
2000.00
Topographic Srvey
L.S
1.00
3,000
3000.00
Road Design
L.S
1.00
4,000
4000.00
5000.00
SUB-GRADE
S.No
Description
Unit
Length
Thickness
Quantity
Unit Cost
Total Cost
Excavation
M3
1200.00
6.0
0.200
7,200
3.00
21600.000
Natural Ground
compaction
M2
1200.00
7.0
8,400
2.00
16800.000
sub grade
M3
1200.00
7.0
0.150
1,260
5.00
6300.000
SUB-BASE
S.No Description
1
Sub-Base
Unit
Length
1200.00
Width
Thickness
7.000
0.150
Quantity
1,260
Unit Cost
12.00
Total Cost
15120.00
BASE COURSE
S.No
1
Description
Base Course
Unit
Length
Width
Thickness
M3
1200.00
7.000
0.200
Quantity
1,680
Unit Cost
18.00
Total Cost
30240.00
ASPHALT
S.No
Description
Unit
Length
Width
Thickness
Quantity
Unit Cost
Total Cost
prime coat
M2
1200
7.000
8400.00
1.00
8400.00
Wearing course
1200
7.000
0.100
840.00
100
84000.00
Description
Concrete
Unit
Length
M3
2000
Width
Thickness
1.500
0.150
Quantity
450
Unit Cost
190.00
Total Cost
85500
CONCRETE GUTTERS
S.No
1
Description
Concrete
Unit
Length
Width
Thickness
M/L
2400
Quantity
2400
Unit Cost
50.00
Total Cost
120000
CONCRETE OF 2 CAUSWAY
S.No
1
Description
RCC Concrete
Unit
Length
M3
24
Width
Thickness
7.000
0.150
Quantity
25
Unit Cost
190
Total Cost
4788
Sub Total
406748.00
Manegemant Cost( 5 %)
20337.4
DBA Insurince( 3 %)
12202.44
TOTAL COST
439287.840