PIPE SIZE LESS THAN OR EQUAL TO 2.375 O.D.


WELDING PROCESS FITTING/PIPE MATERIAL PIPE SIZE (INCH) WALL THICKNESS RANGE (INCH) PROCEDURE NO. POSITION/ DIRECTION

SMAW (Stick)

Butt

P1 Group 1 to P1 Group 2 API 5L Gr B to API 5LX-65 P1 Group 1 to P1 Group 2 API 5L Gr B to API 5LX-65 P1 Group 1 to P1 Group 2 API 5L Gr B to API 5LX-65 P1 Group 1 to P1 Group 2 API 5L Gr B to API 5LX-65 P1 Group 1 to P1 Group 2 API 5L Gr B to API 5LX-65

0.109 to 0.436

200

Fixed/VDH

SMAW (Stick) (6010 Root 7018 fill and cap) GMAW (Wire) 100% CO2 or 75% Ar / 25% CO2

Butt

0.109 to 0.436

220

Fixed/VDH (root) Fixed/VUH (fill and cap)

Butt

0.109 to 0.240

230

Fixed/VDH

GTAW 100% Argon GTAW 100% Argon (root) and SMAW (7018 fill and cap)

Butt

0.109 to 0.436

240

Fixed/VUH

Butt

0.109 to 0.436

250

Fixed/VUH

For Position/Direction Fixed/VUH = Fixed Position, Vertical Uphill Rolled/VUH = Rolled Position, Vertical Uphill Fixed/VDH = Fixed Position, Vertical Downhill

2.20
GENERAL POLICY

WELDING PROCEDURE MANUAL PROCESS PIPING

Page 2 of 26

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

PIPE SIZE GREATER THAN 2.375 THROUGH UNLIMITED O.D.


WELDING PROCESS FITTING/PIPE MATERIAL PIPE SIZE (INCH) WALL THICKNESS RANGE (INCH) (QW-403) PROCEDURE NO. POSITION/ DIRECTION

SMAW (Stick)

Butt

P1 Group 1 to P1 Group 2 API 5L Gr B to API 5LX-65 P1 Group 1 to P1 Group 2 API 5L Gr B to API 5LX-65 P1 Group 1 to P1 Group 2 API 5L Gr B to API 5LX-65 P1 Group 1 to P1 Group 2 API 5L Gr B to API 5LX-65

>2

0.154 0.864

600

Fixed/VDH

SMAW (Stick) (6010 Root 7018 fill and cap) GTAW 100% Argon (root) and SMAW (7018 fill and cap) GMAW (Wire) 100% CO2 or 75% Ar / 25% CO2 GMAW (Wire) 100% CO2 or 75% Ar / 25% CO2 (root) and FCAW (Flux Core) 100% CO2 (fill and cap) GTAW 100% Argon (root) and FCAW (Flux Core) 100% CO2 (fill and cap)

Butt

>2

0.154 0.864

620

Fixed/VDH

Butt

>2

0.154 0.864

640

Fixed/VUH (root) Fixed/VDH (fill and cap)

Butt

>2

0.154 0.475

650

Fixed/VDH

Butt

P1 Group 1 to P1 Group 2 API 5L Gr B to API 5LX-65

>2

0.154 0.864

660

Fixed/VUH

Butt

P1 Group 1 to P1 Group 2 API 5L Gr B to API 5LX-65

2-1/2 -12

0.154 0.864

680

Fixed/VUH

For Position/Direction Fixed/VUH = Fixed Position, Vertical Uphill Rolled/VUH = Rolled Position, Vertical Uphill Fixed/VDH = Fixed Position, Vertical Downhill

2.20
GENERAL POLICY

WELDING PROCEDURE MANUAL PROCESS PIPING

Page 3 of 26

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20
GENERAL POLICY

WELDING PROCEDURE MANUAL PROCESS PIPING

Page 4 of 26

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20
GENERAL POLICY

WELDING PROCEDURE MANUAL PROCESS PIPING

Page 5 of 26

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20
GENERAL POLICY

WELDING PROCEDURE MANUAL PROCESS PIPING

Page 6 of 26

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20
GENERAL POLICY

WELDING PROCEDURE MANUAL PROCESS PIPING

Page 7 of 26

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20
GENERAL POLICY

WELDING PROCEDURE MANUAL PROCESS PIPING

Page 8 of 26

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20
GENERAL POLICY

WELDING PROCEDURE MANUAL PROCESS PIPING

Page 9 of 26

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20
GENERAL POLICY

WELDING PROCEDURE MANUAL PROCESS PIPING

Page 10 of 26

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20
GENERAL POLICY

WELDING PROCEDURE MANUAL PROCESS PIPING

Page 11 of 26

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20
GENERAL POLICY

WELDING PROCEDURE MANUAL PROCESS PIPING

Page 12 of 26

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20
GENERAL POLICY

WELDING PROCEDURE MANUAL PROCESS PIPING

Page 13 of 26

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20
GENERAL POLICY

WELDING PROCEDURE MANUAL PROCESS PIPING

Page 14 of 26

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20
GENERAL POLICY

WELDING PROCEDURE MANUAL PROCESS PIPING

Page 15 of 26

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20
GENERAL POLICY

WELDING PROCEDURE MANUAL PROCESS PIPING

Page 16 of 26

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20
GENERAL POLICY

WELDING PROCEDURE MANUAL PROCESS PIPING

Page 17 of 26

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20
GENERAL POLICY

WELDING PROCEDURE MANUAL PROCESS PIPING

Page 18 of 26

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20
GENERAL POLICY

WELDING PROCEDURE MANUAL PROCESS PIPING

Page 19 of 26

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20
GENERAL POLICY

WELDING PROCEDURE MANUAL PROCESS PIPING

Page 20 of 26

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20
GENERAL POLICY

WELDING PROCEDURE MANUAL PROCESS PIPING

Page 21 of 26

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20
GENERAL POLICY

WELDING PROCEDURE MANUAL PROCESS PIPING

Page 22 of 26

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20
GENERAL POLICY

WELDING PROCEDURE MANUAL PROCESS PIPING

Page 23 of 26

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20
GENERAL POLICY

WELDING PROCEDURE MANUAL PROCESS PIPING

Page 24 of 26

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20
GENERAL POLICY

WELDING PROCEDURE MANUAL PROCESS PIPING

Page 25 of 26

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20
GENERAL POLICY

WELDING PROCEDURE MANUAL PROCESS PIPING

Page 26 of 26

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

You might also like