D Project Proposal Report Page 1 of 2 January 2003
PROPERTY SERVICES
PROJECT PROPOSAL REPORT 1. Project Details Description Location: Bldg No Project Manager: Phone No Contractor: Phone No Architect: Phone No Client Dept: 2. Cost Analysis Please specify the cost level for the following estimates (month/year) Building Works $ Construction Including Partitions Finishes Site Works Related To Building Services Mechanical Electrical Hydraulic Fire Lift Other Built-In Furniture Built-In Equipment Structure And Finishes 2(A) Landscaping Car Parking Roads Major Site Services Other (Project Specifics) Building Contingency Construction Supervision And Preliminaries Total Building Works Total Building Works (Carried Forward) Forecast PROJECT COST
1.D Project Proposal Report Page 2 of 2 January 2003
3. Areas (Refer To Appendix 1.C) (a) Gross floor area m2 (b) Fully Enclosed covered Area (FECA) m2 (c) Useable floor area m2 (d) Assignable Floor Area (AFA) m2 (e) Area efficiency UFA x 100/GFA % 4. Building Cost per m2 Total Building Works/ Gross Floor Area 5. Programme Design Documentation Commence: Complete: Construction Commence: Complete: Defects Period Commence: Complete: 6. List of Drawings