You are on page 1of 30

M I N I NG

UEA:

P E R U

S A C

SAN JUAN DE AREQUIPA

PRODUCCIN DE MINERAL ENERO Nv 699


TURNO

Nv 660
9174 9024 9129 9176 9222 8567 No Carros Guardia

DIA

s/n 9274

8225

9053

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N D N

17.4 20.4 12 19.2 10 16

8 9.6 12 6.8

2.8 4 7.2

10 19.2 1.6 10.8 18 4.8 12.8

17 25 14 25 27 14 6 13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

D N D 25 N D 26 N D 27 N D 28 N D 29 N D 30 N D 31 N TOTAL 24
TOTAL TM PROGRAMA CUMPLIMINETO DIF TM/DIA CARR/Gurdia

0
0 0 0% 0 0 0

16
16 150 11% 134 6 2

0
0 200 0% 200 8 2

0
0 150 0% 150 6 2

79
79 300 26% 221 12 4

36.4
36 100 36% 63.6 4 1

14
14 200 7% 186 8 2

77.2
77 450 17% 372.8 17 5

0
0 450 0% 450 17 5

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 139
223 2000 11% 1777 77 24

TAJEOS

TM/MES

TM/DIA

TMProg./ DIA

TMProg./ Grd

TMReal

DIF

N CARROS

DATOS DH 26 Dias Trabajados Factor Humedas Factor Secas 2.8 Densidad Mineral 1 s/n 9274 8225 9053 9174 9024 9129 9176 9222 8567 TOTAL

150 200 150 300 100 200 450 450 2000

0 6 8 6 12 4 8 17 17 77

0 6 8 6 12 4 8 17 17 77 145.7 25 71 44 22

0 3 4 3 6 2 4 9 9 38

0 16 0 0 79 36 14 77 0 223

0 10 -8 -6 67 33 6 60 -17 145.7

277% 0% 0% 685% 946% 182% 446% 0% 289.4%

6 -5 -4 42 20 4 37 -11 91

DIFERENCIA FALTANTE DIAS RESTANTES TM/DIA CARROS/DIA CARROS/GDIA

INCONVENIENTES DE OPERACIN
1 2 3 4 5

El Tj 8225 tuvo inconvenientes en la operacin por falta de person En el Tj 9024 se esta avanzando en bresting y con sostenimiento

En el Tj 9176 se encuentra en relleno y perforacion de desquinche En el Tj 8567 se completo el sostenimiento,se rellena para iniciar

En el Tj 9222 se termino la acumulacion en levante al norte, y se e

1.157594771 1.046117647 0.978823529 0.910509804 0.749411765 0.749411765

0.380653595

0.17945098

s/n 9274

8225

9053

9174

9024

9129

9176

9222

8567

No Carros DIA

TM/DIA

42 38 41 18 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

67.0 61.2 65.6 28.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0 0 0 0 0 0 0 0 139 F.C Nv - 699 Nv - 660 TM/C

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 222.6

1.6

TM/Real

Ley Au gr/tn

16 0 0 79 36 14 77 0 223

6.50 8.00 7.30 9.31 6.50 6.50 7.50 9.10 7.83

operacin por falta de personal, el tajeo se encuentra en relleno.

bresting y con sostenimiento con cuadros de 2 pz.

o y perforacion de desquinche.

cion en levante al norte, y se encuentra en relleno para altura de disparo.

miento,se rellena para iniciar con el bresting.

0.380653595

8567

PLANEAMIENTO OPERACIONAL MES FEBRERO TIPO LABOR NIVEL 734 Preparacin By Pass 8587 W NIVEL 699 Explotacion 8225 Explotacion 9053 Explotacion 9174 NIVEL 040 Explotacion 9024 Explotacion 9129 Explotacion 9176 Explotacion 9222 Explotacion 8567 TOTAL SECCION 1.80 0.80 0.70 0.80 0.80 0.70 0.80 0.80 0.70 2.10 19.00 37.00 34.00 51.00 26.00 32.00 47.00 58.00 100 Av 100 150.00 200.00 150.00 300.00 100.00 200.00 450.00 450.00 2000 TM/mes

RO LEY

6.85 6.03 5.83 8.50 5.76 6.60 6.31 8.00 7.00

5.769230769 6

22.50

ESPERANZ
M I N I NG
UEA:

P E RU

S AC

PRODUCCION DE TAJE

SAN JUAN DE AREQUIPA

PLAN CONSOLIDADO DEL 30 DE ABR


NIVEL 699
LABOR TJ 8225 TJ 8225
Plan Real Plan Tn Real Tn Operativas Yacimiento Equipos Energia Personal - HH Otros Acondicionar Camino Matt. Winche Inst. Tuberia Rep Tolvas Ref. Cuadros Galeria

D
LM APV 12

30 N
LM LA 12 8.8

1 N
LM 12

2 N

3 D

A R R ASR ARPV ASR

SERVICIOS

DESVIACION

FALTA PERSONAL

TOTAL PLAN TN TOTAL REAL TN % CUMPLIMIENTO

12 0 0%

12 0 8.8 0 73% #####

12 0 0%

0 0 0 0 0 0 ##### ##### #####

NIVEL 699
LABOR TJ 9053 TJ 9053
Plan Real Plan Tn Real Tn Operativas Yacimiento Equipos Energia Personal - HH Otros Acondicionar Camino Matt. Winche Inst. Tuberia Rep Tolvas Ref. Cuadros Galeria

D
LMS AP 10 16

30 N
LMV AS 10

1 N
LM 10

D
LMS ASPV 10 14.4

2 N
LM R 10

3 D
P ASRV

SERVICIOS

DESVIACION

RELLENO

TOTAL PLAN TN TOTAL REAL TN % CUMPLIMIENTO

10 16 160%

10 0 0%

0 0 #####

10 0 0%

10 14.4 144%

10 0 0%

0 0 #####

NIVEL 660
LABOR TJ 9274 TJ 9274
Plan Real Plan Tn Real Tn Operativas Yacimiento Equipos Energia Personal - HH Otros Acondicionar Camino Matt. Winche Inst. Tuberia Rep Tolvas Ref. Cuadros Galeria

30 D N
A AW

1 D N
AS

2 D N
S R A

3 D
R AS

SERVICIOS

DESVIACION

FALTA PERSONAL

TOTAL PLAN TN TOTAL REAL TN % CUMPLIMIENTO

0 0 0 0 0 0 0 0 0 0 0 0 0 0 ##### ##### ##### ##### ##### ##### #####

NIVEL 660
LABOR TJ 9024 TJ 9024
Plan Real Plan Tn Real Tn Operativas Yacimiento Equipos Energia Personal - HH Otros Acondicionar Camino Matt. Winche Inst. Tuberia Rep Tolvas Ref. Cuadros Galeria

30 D N
R R LASV

1 D N
R

2 D N
A AR AV AR

3 D
LM SR 12

SERVICIOS

DESVIACION

TOTAL PLAN TN TOTAL REAL TN % CUMPLIMIENTO

0 0 0 0 0 0 0 0 0 0 0 0 ##### ##### ##### ##### ##### #####

12 0 0%

NIVEL 660
LABOR TJ 9176
Plan Real

TJ 9176

30 D N
S AS PVD ASPV

1 D N
S

2 D N

3 D

PVD S PVD ASR ASPV LAPV

TJ 9176

Plan Tn Real Tn Operativas Yacimiento Equipos Energia Personal - HH Otros Acondicionar Camino Matt. Winche Inst. Tuberia Rep Tolvas Ref. Cuadros Galeria

7.2

SERVICIOS

DESVIACION

TOTAL PLAN TN TOTAL REAL TN % CUMPLIMIENTO

0 0 0 0 0 0 0 0 0 0 0 0 0 7.2 ##### ##### ##### ##### ##### ##### #####

NIVEL 699
LABOR TJ 9222 TJ 9222
Plan Real Plan Tn Real Tn Operativas Yacimiento Equipos Energia Personal - HH Otros Acondicionar Camino Matt. Winche Inst. Tuberia Rep Tolvas Ref. Cuadros Galeria

30 D N
LM AS 15 LMS ARS 15

1 D N
LMS 15

2 D N
A ASR R R

3 D
R ASR

SERVICIOS

DESVIACION

NV 699 PERSONAL PARA LOCOMOTORA

TOTAL PLAN TN TOTAL REAL TN % CUMPLIMIENTO

15 0 0%

15 0 0%

0 0 #####

15 0 0%

0 0 0 0 0 0 ##### ##### #####

NIVEL 699
LABOR
TJ 8567-W

TJ 8567 W
Plan Real Plan Tn Real Tn Operativas Yacimiento Equipos

D
LD AS

30 N
S AS

1 N
A

D
R AS

2 N
R LA

3 D
RV ASR 3.6

DESVIACION

DESVIACION

Energia Personal - HH Otros Acondicionar Camino Matt. Winche Inst. Tuberia Rep Tolvas Ref. Cuadros Galeria

SERVICIOS

TOTAL PLAN TN TOTAL REAL TN % CUMPLIMIENTO

0 0 0 0 0 0 0 0 0 0 0 0 0 3.6 ##### ##### ##### ##### ##### ##### #####

NIVEL 699
LABOR
TJ 8567-E

TJ 8567 E
Plan Real Plan Tn Real Tn Operativas Yacimiento Equipos Energia Personal - HH Otros Acondicionar Camino Matt. Winche Inst. Tuberia Rep Tolvas Ref. Cuadros Galeria

30 D N
LM ASR 10 LM LAS 10 9

1 D N
A

2 D N
R LAS 19.2 R LAPV 16.4

3 D
AW LAS 11.2

SERVICIOS

DESVIACION

TOTAL PLAN TN TOTAL REAL TN % CUMPLIMIENTO

10 0 0%

10 0 0 0 0 0 9 0 0 19.2 16.4 11.2 90% ##### ##### ##### ##### #####

TOTAL PLAN TN TOTAL REAL TN % CUMPLIMIENTO LEYENDA

55 16 29% L P V

47 0 17.8 0 38% #####

45 0 0%

10 33.6 336%

18 16.4 91% W A RD

12 22 183% Traslado de Winche Acondicionaminto Relleno Detritico

Limpieza Mineral Perforacion Voladura

INFRAESTRUCTURA + EQUIPOS
Nv 660 Nv 734 Nv 734 Bateria Nuevaal Nv 600 Winche Valdor para el Nv 734, para relleno del Tajeo 9024 y Tajeo 9053 Reservorio de agua

Contrata MBM

By Pass 8587 W Nv. 660 Nv 734 Nv 734 Nv 660 Nv 609 Nv 660 699 660

Nv 699 - Cx 9275-N Realizar desquinches para 3 cuadros. sostenimiento 2 cuadros completos Continuar Crucero MBM Sostenimiento con pernos de anclaje (15 metros)

Galeria antigua By Pass 8587-W Instalacion de Intercomunicador, Telefono y iluminacion Bateria Nv 600 ( Soldar Angulos) escalera de gato Instalacion de tuberia de 4''

M I N I NG P E R U S A C
UEA: SAN JUAN DE AREQUIPA

AVANCES LINEALES

PLAN CONSOLIDADO DEL 30 DE ABR


By Pass 8587-W NIVEL 040
By Pass 8587-W PLAN REAL

30 D N D

1 N D

2 N D

By Pass 8587-

PLAN Mts. REAL Mts. TOTAL PLAN METROS TOTAL REAL METROS

0 0 0 0 0 0 0 #REF! #REF! #REF! #REF! #REF! #REF! #REF!

LEYENDA

L P V

Limpieza Perforacion Voladura

C A R

Ciclo L/P/V Acondicionaminto Instalacion de Riel

ESPERANZA
PRODUCCION DE TAJEOS

OLIDADO DEL 30 DE ABRIL AL 6 DE MAYO 2011


NIVEL 699
3 N
AV AP

4 D N
R LP

5 D N

6 D
LMS LA 12

N
PV LAS 18

TN ACUM

LEYES gr AU

FINO

RV LMS PV APV ASRPV A 12

60 26.8

5.80

348.00

FALTA PERSONAL

0 0 0 0 0 0 ##### ##### #####

12 0 0%

0 0 #####

12 0 0%

0 18 #####

60 26.8 45%

5.8 0

NIVEL 699
3 N
P AR

4 D N
P LAS LM AP 10

5 D N
LMS PV 10 A AR

6 D
R R

N
R AP

TN ACUM

LEYES gr AU

FINO

70 30.4

6.00

420.00

RELLENO

0 0 0 0 ##### #####

10 0 0%

10 0 0%

0 0 0 0 0 0 ##### #DIV/0! #####

70 30.4 43%

6 0

NIVEL 660
3 N
RV AS

4 D N
LM 12 LMV A 12

5 D N
LM 12 LM AS 12

6 D
P ASR

N
P AR

TN ACUM

LEYES gr AU

FINO

48 0

7.00

336.00

FALTA PERSONAL

0 0 #####

12 0 0%

12 0 0%

12 0 0%

12 0 0%

0 0 0 0 #DIV/0! #####

48 0 0%

7 0

NIVEL 660
3 N
LMS AR 12

4 D N
LM LA 12 LMS R 12

5 D N
A AR R A

6 D
R LA

N
S ARPV

TN ACUM

LEYES gr AU

FINO

48 0

8.50

408.00

12 0 0%

12 0 0%

12 0 0%

0 0 0 0 0 0 0 0 ##### ##### #DIV/0! #####

48 0 0%

8.5 0

NIVEL 660
3 N
AR LPV

4 D N
PV LA LMS LA

5 D N
PV LAS LMS LAPV

6 D
PV LA

N
LMS LA

TN ACUM

LEYES gr AU

FINO

10.6

10 8.2

10 1.6

10 10

30 37.6

6.00

180.00

0 0 10.6 0 ##### #####

10 0 10 0 10 8.2 0 1.6 0 10 82% ##### 16% #DIV/0! 100%

30 37.6 125%

6 0

NIVEL 699
3 N
A AR

4 D N
R ASR R AR

5 D N
PV LMS ASPV LA 20 15

6 D
PV LA 10

N
LMS LA 20

TN ACUM

LEYES gr AU

FINO

85 25

5.50

467.50

699 PERSONAL PARA LOCOMOTORA

0 0 0 0 20 0 0 0 0 0 15 10 ##### ##### ##### ##### 75% #DIV/0!

20 0 0%

85 25 29%

5.5 0

NIVEL 699
3 N
S LPV 13

4 D N
LM LA 12 10.8 PV LSPV 10

5 D N
LMS LAS 12 16 PV AS

6 D
LMS SPV 12 6.4

N
PV LAS 12

TN ACUM

LEYES gr AU

FINO

36 71.8

8.00

288.00

0 13 #####

12 10.8 90%

0 12 0 10 16 0 ##### 133% #####

12 6.4 53%

0 12 #####

36 71.8 199%

8 0

NIVEL 699
3 N
R LPV 11.2

4 D N
RV LAS 16 LMS LPV 10 16

5 D N
PV LAS 10.8 LMS LA 10 16

6 D
PV LAS 10.8

N
LMS LAPV 10 12.4

TN ACUM

LEYES gr AU

FINO

50 149

8.00

400.00

0 0 10 0 10 0 10 11.2 16 16 10.8 16 10.8 12.4 ##### ##### 160% ##### 160% #DIV/0! 124%

50 149 298%

8 0

TONELAJE

LEY REAL GR/TN

PLAN PRDUCCION TN/DIA

20 34.8 174%

36 26.8 74%

62 34.2 55%

46 26.8 58% D S Pr

52 32.6 63%

24 27.2 113%

40 52.4 131%

467 340.6 73% R B C

6.70

77.83

Traslado de Winche Acondicionaminto Relleno Detritico

Desquinche Sostenimiento Paralizada

Realce Bresting Ciclo L/P/V

URA + EQUIPOS

Fecha Cumplimiento Requerimiento Jueves 21 elleno del Tajeo 9024 y Tajeo 9053 Miercoles 20 100 mts de Cable de 3x10 15 Bolas Cemento de agua 1400 mts de tuberia de 2'' y accesorios

ches para 3 cuadros. uadros completos ucero MBM s de anclaje (15 metros)

Lunes 18

300 Barras Helicoidales y 6 rollos de malla electrosoldada Pernos y clavos de 25 Lbs. Rieles de 30 Lbs

antigua 8587-W ador, Telefono y iluminacion Soldar Angulos) de gato tuberia de 4''

Man Power Winche para relleno del tajo (Contactor) Tablero del ventilador (Contactor)

AVANCES LINEALES

OLIDADO DEL 30 DE ABRIL AL 6 DE MAYO 2011


NIVEL 040
3 N D 4 N D 5 N D 6 METROS N ACUM
0
LEYES

grAU

0 0 0 0 0 0 0 #REF! #REF! #REF! #REF! #REF! #REF! 0 #REF! 0 #REF!

Acondicionaminto Instalacion de Riel

D S P

Desquinche Sostenimiento Paralizada

Sv

Servicios

PEDIDOS O NECESIDADES

FECHA DE CUMPLIMIENTO

PEDIDOS O NECESIDADES

FECHA DE CUMPLIMIENTO

PEDIDOS O NECESIDADES

FECHA DE CUMPLIMIENTO

PEDIDOS O NECESIDADES

FECHA DE CUMPLIMIENTO

PEDIDOS O NECESIDADES

FECHA DE CUMPLIMIENTO

PEDIDOS O NECESIDADES

FECHA DE CUMPLIMIENTO

PEDIDOS O NECESIDADES

FECHA DE CUMPLIMIENTO

PEDIDOS O NECESIDADES

FECHA DE CUMPLIMIENTO

Cumplimiento Fecha Cumplimiento 100% 60% Rq.


30 de Abril.

100%
27 de Abril. 28 de abril 3-May

Rq. Rq.
Lunes 25 Lunes 25 Lunes 25 Miercoles 27 Martes 26

NECESIDADES

REQUERIMIENTO

REQUERIMIENTO

REQUERIMIENTO

REQUERIMIENTO

REQUERIMIENTO

REQUERIMIENTO

REQUERIMIENTO

REQUERIMIENTO