REQUEST FOR INSPECTION REPORT ( RFI )

RFI Number
NO

24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70

Inspection

TSRT No.

KAJIMA No.

0026/TS/MI/X/12
0027/TS/MI/X/12
0028/TS/MI/X/12
0029/TS/MI/X/12
0030/TS/MI/X/12
0031/TS/MI/X/12
0032/TS/MI/X/12
0033/TS/MI/X/12
0034/TS/MI/X/12
0035/TS/MI/X/12
0036/TS/MI/X/12
0037/TS/MI/X/12
0038/TS/MI/X/12
0039/TS/MI/XI/12
0040/TS/MI/XI/12
0041/TS/MI/XI/12
0042/TS/MI/XI/12
0043/TS/MI/XI/12
0044/TS/MI/XI/12
0045/TS/MI/XI/12
0046/TS/MI/XI/12
0047/TS/MI/XI/12
0048/TS/MI/XI/12
0049/TS/MI/XI/12
0050/TS/MI/XI/12
0051/TS/MI/XI/12
0052/TS/MI/XI/12
0053/TS/MI/XI/12
0054/TS/MI/XI/12
0055/TS/MI/XI/12
0056/TS/MI/XI/12
0057/TS/MI/XII/12
0058/TS/MI/XII/12
0059/TS/MI/XII/12
0060/TS/MI/XII/12
0061/TS/MI/XII/12
0062/TS/MI/XII/12
0063/TS/MI/XII/12
0064/TS/MI/XII/12
0065/TS/MI/XII/12
0066/TS/MI/XII/12
0067/TS/MI/XII/12
0068/TS/MI/XII/12
0069/TS/MI/XII/12
0070/TS/MI/XII/12
0071/TS/MI/XII/12
0072/TS/MI/XII/12

375

439
517
492
468
494
510
515
549
519

549
537
547
546
545
578
615
593
607
611
617
643
655
664
678
690
706
715
713
722
723
741
754
755

Scoupe

Submitted

P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P

09 Oct 2012
09 Oct 2012
09 Oct 2012
09 Oct 2012
10 Oct 2012
11 Oct 2012
19 Oct 2012
22 Oct 2012
23 Oct 2012
24 Oct 2012
25 Oct 2012
30 Oct 2012
02 Nov 2012
06 NOV 2012
06 NOV 2012
06 NOV 2012
06 NOV 2012
06 NOV 2012
07 NOV 2012
08 NOV 2012
08 NOV 2012
12 NOV 2012
12 NOV 2012
12 NOV 2012
12 NOV 2012
13 NOV 2012
21 NOV 2012
21 NOV 2012
23 NOV 2012
26 NOV 2012
30 NOV 2012
03 DES 2012
05 DES 2012
06 DES 2012
07 DES 2012
10 DES 2012
12 DES 2012
14 DES 2012
18 DES 2012
18 DES 2012
18 DES 2012
20 DES 2012
20 DES 2012
21 DES 2012
24 DES 2012
26 DES 2012
26 DES 2012

Inspection Item

4th FLOOR ( SLAB )


BASEMENT/P6 ( SLAB )
BASEMENT/P5-2 ( SLAB )
BASEMENT/P8DA ( TIE BEAM )
GROUND FLOOR/P2B ( SLAB )
INNER COREWALL 4th FLOOR ( SLAB )
BASEMENT/P5-3 ( SLAB )
BASEMENT/P8DA ( TIE BEAM )
5th FLOOR ( SLAB )
BASEMENT REFLECTED/P5-1 ( TIE BEAM & SLAB )
5th FLOOR (ZONE-1) ( SLAB )
BASEMENT/P8DA ( SLAB )
INNER COREWALL 5th FLOOR ( SLAB )
BASEMENT REFLECTED ( G.F )/P5-2 ( TIE BEAM & SLAB )
BASEMENT REFLECTED ( G.F )/P5-3 ( TIE BEAM )
BASEMENT REFLECTED ( G.F )/P6 ( TIE BEAM )
6th FLOOR (ZONE-2) ( SLAB )
BASEMENT REFLECTED ( G.F )/P8Da ( TIE BEAM & SLAB )
BASEMENT REFLECTED ( G.F )/P1 ( ADD CONC. TIE BEAM )
BASEMENT REFLECTED ( G.F )/P6 ( RETAINING WALL )
BASEMENT REFLECTED ( G.F )/P8Da ( RETAINING WALL )
6th FLOOR (ZONE-1) ( SLAB )
INNER COREWALL 6th FLOOR ( SLAB )
7th FLOOR (ZONE-2) ( SLAB )
BASEMENT REFLECTED ( G.F )/P8DB ( RETAINING WALL )
7th FLOOR (ZONE-1) ( SLAB )
INNER COREWALL 7th FLOOR
BASEMENT REFLECTED ( G.F ) P8Da PO5A.B-04 (R.3)
8th FLOOR (ZONE-2) TOWER AREA PART 2 & 3
8th FLOOR (ZONE-1) TOWER AREA PART 1 & 4
INNER COREWALL 8th FLOOR
9th FLOOR (ZONE-2) TOWER AREA PART 2 & 3
9th FLOOR (ZONE-1) TOWER AREA PART 1 & 4
GRAVITY TEST DRAINAGE INSTALATION FOR TOILET (Back WC 1)
INNER COREWALL 9th FLOOR
10th FLOOR (ZONE-2) TOWER AREA PART 2 & 3
10th FLOOR (ZONE-1) TOWER AREA PART 1 & 4
INNER COREWALL 10th FLOOR
11st FLOOR (ZONE-2) TOWER AREA PART 2 & 3
CHECK POSITION & LEVEL INSTALLATION SOIL PIPE BOH-1 ( B.F )
CHECK POSITION & LEVEL INSTALLATION SOIL PIPE BOH-2 ( B.F ) /P5-1
BASEMENT/P5C.6C ( TIE BEAM )
11st FLOOR (ZONE-1) TOWER AREA PART 1 & 4
CHECK POSITION & LEVEL INSTALLATION SOIL PIPE ST-1 5th&6th FL
INNER COREWALL 11st FLOOR
12nd FLOOR (ZONE-2) TOWER AREA PART 2 & 3
BASEMENT/P5C.6C ( SLAB ) ( H/25-H/26;H/J-H/K )

Report

Planning

Actual

Submit

Return

Oct 12&15th 2012


Oct 11st 2012
Oct 12nd 2012
Oct 12nd 2012
Oct 15th 2012
Oct 16th 2012
Oct 22nd 2012
Oct 24nd 2012
Oct 25nd 2012
Oct 27th 2012
Oct 29th, 2012
Nov 1st, 2012
Nov 5th, 2012
Nov 8th, 2012
Nov 8th, 2012
Nov 8th, 2012
Nov 24th, 2012
Nov 8th, 2012
Nov 8th, 2012
Nov 9th, 2012
Nov 9th, 2012
Nov 14th, 2012
Nov 14th, 2012
Nov 14th, 2012
Nov 14th, 2012
Nov 16th, 2012
Nov 23rd, 2012
Nov 23rd, 2012
Nov 26th, 2012
Nov 29th, 2012
Des 03rd, 2012
Des 05th, 2012
Des 07th, 2012
Des 07th, 2012
Des 11St, 2012
Des 12nd, 2012
Des 14th, 2012
Des 17th, 2012
Des 20th, 2012
Des 20th, 2012
Des 20th, 2012
Des 24th, 2012
Des 21St, 2012
Des 24th, 2012
Des 27th, 2012
Des 29th, 2012
Des 29th, 2012

Oct 12nd 2012


Oct 27th 2012
Oct 23rd, 2012
Oct 12nd 2012
Oct 21st, 2012
Oct 30th, 2012
Oct 25th, 2012
Oct 24th, 2012
Nov 1st, 2012
Nov 10th, 2012
Nov 5th&6th, 2012
Nov 2nd, 2012
Nov 8th, 2012
Nov 10th, 2012
Nov 14th, 2012
Nov 23th, 2012
Nov 10th, 2012

Oct 16th 2012


Oct 30th 2012
Oct 24nd 2012
Oct 19th, 2012
Oct 25th, 2012
Nov 1st, 2012
Nov 1st, 2012
Oct 25nd 2012
Nov 2nd, 2012
Nov 11th, 2012
Nov 14th, 2012
Nov 3rd, 2012
Nov 9th, 2012
Nov 14th, 2012
Nov 15th, 2012
Nov 24th, 2012
Nov 11st, 2012

Oct 17th 2012


Nov 1st, 2012
Oct 27th 2012
Oct 22nd 2012
Oct 23rd, 2012
Nov 2nd, 2012
Nov 2nd, 2012
Nov 2nd, 2012
Nov 6th, 2012
Nov 14th, 2012
Nov 19th, 2012

Remaks

????
Nov 14th, 2012
Nov 16th, 2012
Nov 17th, 2012
Nov 26th, 2012
Nov 12nd, 2012
RFI CANCELED(RFI double)
RFI CANCELED

Nov 21st 2012

Nov 22nd 2012

Nov 26th, 2012

Nov 14th, 2012


Nov 19th, 2012
Nov 19th,21st 2012

Nov 22nd 2012


Nov 20th, 2012
Nov 22nd 2012

Nov 24th, 2013


Nov 22nd 2012
Nov 27th, 2012

Nov 21st,23rd,24th 2012


Nov 28th, 2012
Nov 27th&Des 01, 2012
Nov 27th,28th,30th 2012
Nov 30th&Des 02, 2012
Des 05th, 2012
Des 06th&07th, 2012
Des 07th,08th,10th 2012
Des 11St,12nd 2012
Des 11St, 2012
Des 13rd,15th 2012
Des 15th&16th, 2012
Des 19th, 2012
Des 21St&24th, 2012
Des 24th, 2012
Des 26th, 2012
Des 26th,28th,31st 2012
Des 24th,26th,27th 2012

Nov 26th, 2012


Nov 29th, 2012
Des 03rd, 2012
Des 03rd, 2012
Des 03rd, 2012
Des 07th, 2012
Des 08th, 2012
Des 11St, 2012
Des 13rd, 2012
Des 12nd, 2012
Des 15th, 2012
Des 17th, 2012
Des 20th, 2012
Des 26th, 2012
Des 26th, 2012
Des 29th, 2012
Jan 04th, 2013
Des 28th, 2012

Nov 28th, 2012


Nov 28th, 2012
Des 06th, 2012
Des 12nd, 2012
Des 06th, 2012
Des 12nd, 2012
Des 13rd, 2012
Des 13rd, 2012
Des 21St, 2012
Des 18th, 2012
Des 18th, 2012
Des 20th, 2012
Des 24th, 2012
Des 27th, 2012
Des 29th, 2012

Des 28th, 2012


Des 29th,Jan 02nd, 2012
Des 28th, 2012

Jan 04th, 2013


Jan 04th, 2013
Jan 04th, 2013

Jan 08th, 2013


Jan 08th, 2013
Jan 08th, 2013

RFI CANCELED

RFI CANCELED

Re - RFI 577

RFI CANCELED
Jan 08th, 2013
Jan 02nd, 2013
RFI CANCELED

REQUEST FOR INSPECTION REPORT ( RFI )


RFI Number
NO

71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122

Inspection

TSRT No.

KAJIMA No.

0073/TS/MI/I/13
0074/TS/MI/I/13
0075/TS/MI/I/13
0076/TS/MI/I/13
0077/TS/MI/I/13
0078/TS/MI/I/13
0079/TS/MI/I/13
0080/TS/MI/I/13
0073(R.1)/TS/MI/I/13
0081/TS/MI/I/13
0082/TS/MI/I/13
0083/TS/MI/I/13
0084/TS/MI/I/13
0085/TS/MI/I/13
0086/TS/MI/I/13
0087/TS/MI/I/13
0088/TS/MI/I/13
0089/TS/MI/I/13
0090/TS/MI/I/13
0091/TS/MI/I/13
0092/TS/MI/I/13
0093/TS/MI/I/13
0094/TS/MI/I/13
0095/TS/MI/I/13
0096/TS/MI/I/13
0097/TS/MI/I/13
0098/TS/MI/I/13
0099/TS/MI/I/13
0100/TS/MI/II/13
0101/TS/MI/II/13
0102/TS/MI/II/13
0103/TS/MI/II/13
0104/TS/MI/II/13
0105/TS/MI/II/13
0106/TS/MI/II/13
0107/TS/MI/II/13
0108/TS/MI/II/13
0109/TS/MI/II/13
0110/TS/MI/II/13
0111/TS/MI/II/13
0112/TS/MI/II/13
0113/TS/MI/II/13
0114/TS/MI/II/13
0115/TS/MI/II/13
0116/TS/MI/II/13
0109(R1)/TS/MI/II/13
0117/TS/MI/II/13
0118/TS/MI/II/13
0119/TS/MI/II/13
0120/TS/MI/II/13
0121/TS/MI/II/13
0122/TS/MI/II/13

781
777
785
793
804
807
815
816
836
834
848
849
891
883
889
892
903
904
905
913
914
922
925
932
933
942
944
953
954
957
969
1044
974
1045
987
988
1001
1003
1010
1023
1024
1037
1036
1048
1050
1049
1072
1065
1064
1067
1066

Scoupe

Submitted

P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P

02 JAN 2013
02 JAN 2013
03 JAN 2013
05 JAN 2013
07 JAN 2013
07 JAN 2013
08 JAN 2013
08 JAN 2013
12 JAN 2013
14 JAN 2013
14 JAN 2013
15 JAN 2013
15 JAN 2013
21 JAN 2013
22 JAN 2013
23 JAN 2013
23 JAN 2013
24 JAN 2013
24 JAN 2013
26 JAN 2013
26 JAN 2013
26 JAN 2013
28 JAN 2013
28 JAN 2013
29 JAN 2013
29 JAN 2013
30 JAN 2013
31 JAN 2013
01 FEB 2013
01 FEB 2013
04 FEB 2013
04 FEB 2013
05 FEB 2013
05 FEB 2013
06 FEB 2013
07 FEB 2013
07 FEB 2013
08 FEB 2013
10 FEB 2013
11 FEB 2013
13 FEB 2013
13 FEB 2013
16 FEB 2013
16 FEB 2013
18 FEB 2013
18 FEB 2013
18 FEB 2013
19 FEB 2013
20 FEB 2013
20 FEB 2013
21 FEB 2013
21 FEB 2013

Inspection Item

BASEMENT/P5C.6C ( SLAB ) ( H/23-H/26;H/B-H/F )


12nd FLOOR (ZONE-1) TOWER AREA PART 1 & 4
INNER COREWALL 12nd FLOOR
13rd FLOOR (ZONE-2) TOWER AREA PART 2 & 3
GRAVITY TEST DRAINAGE INSTALATION FOR TOILET (Back WC 2)
13rd FLOOR (ZONE-1) TOWER AREA PART 1 & 4
CHECK POSITION & LEVEL INSTALLATION SOIL PIPE BOH-2 ( B.F ) /P5-1
INNER COREWALL 13rd FLOOR
BASEMENT/P5C.6C ( SLAB ) ( H/23-H/26;H/B-H/F )
14th FLOOR (ZONE-2) TOWER AREA PART 2 & 3
BASEMENT/P5C.6C ( TIE BEAM )
14th FLOOR (ZONE-1) TOWER AREA PART 1 & 4
INNER COREWALL 14th FLOOR
15th FLOOR (ZONE-2) TOWER AREA PART 2 & 3
BASEMENT REFLECTED ( G.F )/P5C.6C ( RETAINING WALL )
15th FLOOR (ZONE-1) TOWER AREA PART 1 & 4
BASEMENT/P5C.6C ( SLAB ) ( H/24-H/25;H/K-H/L )
CHECK POSITION & LEVEL INSTALLATION SOIL PIPE BOH-1 ( 2nd.Fl )
CHECK POSITION & LEVEL INSTALLATION SOIL PIPE JANITOR ROOM ( 2nd.Fl )
INNER COREWALL 15th FLOOR
CHECK POSITION & LEVEL INSTALLATION SOIL PIPE DRIVER TOILET-2 ( BFl )
CHECK POSITION & LEVEL INSTALLATION SOIL PIPE BOH-2 ( 3rd.Fl )
16th FLOOR (ZONE-2) TOWER AREA PART 2 & 3
BASEMENT/P7C.8C ( TIE BEAM )
16th FLOOR (ZONE-1) TOWER AREA PART 1 & 4
BASEMENT REFLECTED ( G.F )/P5C.6C ( RETAINING WALL )
CHECK INSTALLATION & PRESSURE TEST CLEAN WATER PIPE BOH-1 ( B.F )
CHECK POSITION & LEVEL INSTALLATION SOIL PIPE ST-1 ( 7th.Fl )
INNER COREWALL 16th FLOOR
CHECK POSITION & LEVEL INSTALLATION SOIL PIPE BOH-1 ( B.F )
17th FLOOR (ZONE-2) TOWER AREA PART 2 & 3
GRAVITY TEST DRAINAGE INSTALATION FOR RAIN WATER
BASEMENT REFLECTED ( G.F )/P5C.6C ( BEAM & RETAINING WALL )
BASEMENT/P10.A ( SLAB )
BASEMENT REFLECTED ( G.F )/P5C.6C ( BEAM & RETAINING WALL )
17th FLOOR (ZONE-1) TOWER AREA PART 1 & 4
2nd FLOOR AT PODIUM AREA
BASEMENT REFLECTED ( G.F )/P8DB ( BEAM & RETAINING WALL )
INNER COREWALL 17th FLOOR
18th FLOOR (ZONE-2) TOWER AREA PART 2 & 3
BASEMENT/P7C.8C ( TIE BEAM ) {(H/M - H/N)-(H/4 - H/5)}
18th FLOOR (ZONE-1) TOWER AREA PART 1 & 4
INNER COREWALL 18th FLOOR
BASEMENT/P7C.8C ( TIE BEAM ) {(H/L - H/M)-(H/2 - H/5)}
19th FLOOR (ZONE-2) TOWER AREA PART 2 & 3
BASEMENT REFLECTED ( G.F )/P8DB ( BEAM & RETAINING WALL )
BASEMENT REFLECTED ( G.F )/P8DB ( BEAM & SLAB )
GRAVITY TEST DRAINAGE INSTALATION FOR RAIN WATER (8th-12nd Fl)
BASEMENT/P7C.8C ( TIE BEAM ) {(H/K - H/L)-(H/1 - H/2)}
CHECK POSITION & MARKING INSTALLATION ST-1 ( 6th Fl )
19th FLOOR (ZONE-1) TOWER AREA PART 1 & 4
INNER COREWALL 19th FLOOR

Report

Planning

Actual

Submit

Return

Jan 04th, 2013


Jan 04th, 2013
Jan 04th, 2013
Jan 07th, 2013
Jan 09th, 2013
Jan 10th, 2013
Jan 10th, 2013
Jan 11st, 2013
Jan 14th, 2013
Jan 15th, 2013
Jan 16th, 2013
Jan 17th, 2013
Jan 18th, 2013
Jan 23th, 2013
Jan 23th, 2013
Jan 24th, 2013
Jan 25th, 2013
Jan 26th, 2013
Jan 26th, 2013
Jan 29th, 2013
Jan 29th, 2013
Jan 29th, 2013
Jan 30th, 2013
Jan 30th, 2013
Jan 31st, 2013
Jan 31st, 2013
Feb 1st, 2013
Feb 2nd, 2013
Feb 4th, 2013
Feb 4th, 2013
Feb 6th, 2013
Feb 6th, 2013
Feb 7th, 2013
Feb 7th, 2013
Feb 8th, 2013
Feb 9th, 2013
Feb 9th, 2013
Feb 11st, 2013
Feb 11st, 2013
Feb 13rd, 2013
Feb 15th, 2013
Feb 15th, 2013
Feb 17th, 2013
Feb 19th, 2013
Feb 20th, 2013
Feb 21st, 2013
Feb 21st, 2013
Feb 21st, 2013
Feb 22nd, 2013
Feb 21st, 2013
Feb 22nd, 2013
Feb 25th, 2013

Jan 09th, 2013


Jan 03rd, 04th, 2013
Jan 04th, 2013
Jan 07th,09th 2013
Jan 14th, 2013
Jan 10th,12nd 2013
Jan 14th, 2013
Jan 14th, 2013
Jan 16th, 2013
Jan 14th,16th 2013
Jan 16th, 2013
Jan 16th,18th 2013
Jan 22th, 2013
Jan 23th, 2013
Jan 23th, 2013
Jan 25th,26th 2013
Jan 25th, 2013
Jan 30th, 2013
Jan 30th, 2013
Jan 30th, 2013
Jan 30th, 2013

Jan 14th, 2013


Jan 05th, 2013
Jan 05th, 2013
Jan 10th, 2013
Jan 15th, 2013
Jan 14th, 2013
Jan 15th, 2013
Jan 15th, 2013
Jan 24th, 2013
Jan 17th, 2013
Jan 16th, 2013
Jan 23th, 2013
Jan 24th, 2013
Jan 24th, 2013
Jan 24th, 2013
Jan 28th, 2013
Jan 26th, 2013
Jan 31st, 2013
Jan 31st, 2013
Jan 31st, 2013
Jan 31st, 2013

Jan 14th, 2013


Jan 08th, 2013
Jan 17th, 2013
Jan 16th, 2013
Jan 17th, 2013
Jan 16th, 2013
Jan 16th, 2013
Jan 30th, 2013
Jan 19th, 2013
Jan 17th, 2013
Jan 30th, 2013
Jan 26th, 2013
Jan 30th, 2013
Feb 4th, 2013
Jan 30th, 2013
Jan 30th, 2013
Feb 5th, 2013
Feb 5th, 2013
Feb 4th, 2013
Feb 4th, 2013

Jan 30th&Feb 1st, 2013


Jan 30th, 2013
Feb 1st,2nd 2013
Jan 31st, 2013
Feb 15th 2013
Feb 4th&5th 2013
Feb 5th, 2013

Jan 31st, 2013


Jan 31st, 2013
Feb 4th, 2013
Feb 1st, 2013
Feb 18th 2013
Feb 8th, 2013
Feb 7th, 2013

Feb 8th, 2013


Feb 5th, 2013
Feb 20th, 2013
Feb 5th, 2013
Feb 21st, 2013
March 2nd, 2013
Feb 13rd, 2013

Feb 6th,8th 2013


Feb 6th,12th 2013
Feb 28th, 2013

Feb 7th, 2013


Feb 20th, 2013
March 2nd, 2013

Feb 21st, 2013


Feb 25th, 2013

Feb 21st, 2013


Feb 8th&9th, 2013
Feb 14th, 2013
Feb 9th,11st 2013
Feb 13rd, 2013
Feb 13rd,15th 2013
Feb 16th, 2013
Feb 15th,16th 2013
Feb 18th, 2013
Feb 19th, 2013
Feb 21st,22nd 2013
Feb 25th, 2013
Feb 25th, 2013
Feb 22nd,23rd 2013
Feb 21st, 2013
Feb 25th & 26th, 2013
Feb 23rd,24th, 2013
Feb 25th, 2013

Feb 22nd, 2013


Feb 11st, 2013
Feb 15th, 2013
Feb 11st,12nd 2013
Feb 14th, 2013
Feb 18th, 2013
Feb 18th, 2013
Feb 18th, 2013
Feb 19th, 2013
Feb 20th, 2013
Feb 25th, 2013
March 2nd, 2013
March 2nd, 2013
Feb 25th, 2013
Feb 22nd, 2013
APRIL 5th, 2013
Feb 25th, 2013
Feb 26th, 2013

March 1st, 2013


Feb 16th, 2013
Feb 16th, 2013
Feb 16th, 2013
Feb 16th, 2013
Feb 19th, 2013
Feb 19th, 2013
Feb 19th, 2013
Feb 21st, 2013
Feb 25th, 2013
March 2nd, 2013

Remaks

RFI CANCEL

RFI CANCEL

March 27th, 2013


March 2nd, 2013
Feb 28th, 2013
APRIL 11st, 2013
March 2nd, 2013
March 2nd, 2013

re-RFI 973
RFI CANCEL (BY OTHER)
re-RFI 982

REQUEST FOR INSPECTION REPORT ( RFI )


RFI Number
NO

123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174

Inspection

TSRT No.

KAJIMA No.

0123/TS/MI/II/13
0124/TS/MI/II/13
0125/TS/MI/II/13
0126/TS/MI/II/13
0127/TS/MI/II/13
0128/TS/MI/II/13
0129/TS/MI/II/13
0130/TS/MI/II/13
0131/TS/MI/II/13
0132/TS/MI/III/13
0133/TS/MI/III/13
0134/TS/MI/III/13
0135/TS/MI/III/13
0136/TS/MI/III/13
0137/TS/MI/III/13
0138/TS/MI/III/13
0139/TS/MI/III/13
0140/TS/MI/III/13
0141/TS/MI/III/13
0142/TS/MI/III/13
0143/TS/MI/III/13
0144/TS/MI/III/13
0145/TS/MI/III/13
0146/TS/MI/III/13
0147/TS/MI/III/13
0148/TS/MI/III/13
0149/TS/MI/III/13
0150/TS/MI/III/13
0151/TS/MI/III/13
0152/TS/MI/III/13
0153/TS/MI/III/13
0154/TS/MI/III/13
0155/TS/MI/III/13
0156/TS/MI/III/13
0157/TS/MI/III/13
0158/TS/MI/III/13
0159/TS/MI/IV/13
0160/TS/MI/IV/13
0161/TS/MI/IV/13
0162/TS/MI/IV/13
0163/TS/MI/IV/13
0164/TS/MI/IV/13
0165/TS/MI/IV/13
0166/TS/MI/IV/13
0167/TS/MI/IV/13
0168/TS/MI/IV/13
0169/TS/MI/IV/13
0170/TS/MI/IV/13
0171/TS/MI/IV/13
0172/TS/MI/IV/13
0173/TS/MI/IV/13
0174/TS/MI/IV/13

1082
1095
1092
1103
1115
1116
1118
1119
1120
1210
1128
1141
1140
1161
1164
1168
1212
1175
1186
1188
1189
1207
1206
1205
1218
1217
1230
1231
1242
1252
1266
1272
1342
1343
1287
1454
1291
1292
1293
1307
1315
1316
1318
1331
1337
1338
1349
1350
1355
1357

Scoupe

Submitted

P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P

23 FEB 2013
25 FEB 2013
26 FEB 2013
26 FEB 2013
28 FEB 2013
28 FEB 2013
28 FEB 2013
28 FEB 2013
28 FEB 2013
01 MAR 2013
02 MAR 2013
04 MAR 2013
04 MAR 2013
04 MAR 2013
06 MAR 2013
07 MAR 2013
08 MAR 2013
08 MAR 2013
09 MAR 2013
13 MAR 2013
13 MAR 2013
14 MAR 2013
15 MAR 2013
15 MAR 2013
15 MAR 2013
15 MAR 2013
18 MAR 2013
18 MAR 2013
20 MAR 2013
20 MAR 2013
25 MAR 2013
25 MAR 2013
27 MAR 2013
28 MAR 2013
28 MAR 2013
28 MAR 2013
01 APRIL 2013
01 APRIL 2013
01 APRIL 2013
01 APRIL 2013
01 APRIL 2013
04 APRIL 2013
05 APRIL 2013
05 APRIL 2013
06 APRIL 2013
08 APRIL 2013
09 APRIL 2013
09 APRIL 2013
10 APRIL 2013
10 APRIL 2013
11 APRIL 2013
12 APRIL 2013

Inspection Item

3rd FLOOR AT PODIUM AREA


COREWALL 21st FLOOR REFLECTED
20th FLOOR (ZONE-2) TOWER AREA PART 2 & 3
CHECK POSITION & MARKING INSTALLATION ST-1 ( 5th Fl )
20th FLOOR (ZONE-1) TOWER AREA PART 1 & 4
INNER COREWALL 20th FLOOR
CHECK POSITION & MARKING INSTALLATION ST-1D ( L & R TYPE ) 6th fl
CHECK POSITION & MARKING INSTALLATION ST-1C ( R ) & ST-1DC ( L ) 6th fl
CHECK POSITION & MARKING INSTALLATION DST-1D ( L ) ST-1 (HC) 6th fl
BASEMENT REFLECTED P10A RETAINING WALL
2nd FLOOR AT PODIUM AREA
21st FLOOR (ZONE-2) TOWER AREA PART 2 & 3
INNER COREWALL 21st FLOOR zone.2
INNER COREWALL 21st FLOOR zone.1
21st FLOOR (ZONE-1) TOWER AREA PART 1 & 4
BASEMENT/P7C.8C ( TIE BEAM ) {(H/E - H/G)-(H/1 - H/3)}
INNER COREWALL 21st FLOOR
BASEMENT/P7C.8C ( TIE BEAM ) {(H/C - H/E)-(H/1 - H/5)}
PRESSURE TEST CLEAN WATER PIPE CORIDOR (6th FLOOR)
GRAVITY TEST DRAINAGE INSTALATION FOR RAIN WATER (12nd-16th Fl)
CHECK POSITION & MARKING INSTALLATION ST-1( L & R TYPE ) 9th fl
22nd FLOOR (ZONE-2) TOWER AREA PART 2 & 3
22nd FLOOR (ZONE-1) TOWER AREA PART 1 & 4
INNER COREWALL 22nd FLOOR
BASEMENT/P7C.8C ( SLAB ) {(H/K - H/O)-(H/1 - H/5)}
CHECK POSITION & MARKING INSTALLATION 8th fl (all guest room)
GRAVITY TEST DRAINAGE INSTALATION FOR SUB SHAFT 1 - 14 (6th Fl)
3rd FLOOR AT PODIUM AREA (H/K-H/N) - (H7-H/8)
BASEMENT REFLECTED P10A BEAM& SLAB
INNER COREWALL 22nd FLOOR
BASEMENT/P7C.8C ( TIE BEAM ) {(H/B - H/C)-(H/1 - H/5)}
GRAVITY TEST DRAINAGE INSTALATION FOR SUB SHAFT 1 - 14 (7th Fl)
23rd FLOOR (ZONE-2) TOWER AREA PART 2 & 3
BASEMENT/P7C.8C ( SLAB ) {(H/E - H/I)-(H/1 - H/5)}
INNER CORE SLAB 23rd FLOOR
INNER CORE SLAB ZONE.1 23rd FLOOR
CHECK POSITION & MARKING INSTALLATION 9th fl (except st-1)
PRESSURE TEST CLEAN WATER PIPE CORIDOR (7th FLOOR)
GRAVITY TEST DRAINAGE INSTALATION FOR BACK WC - 1 (7th Fl)
PRESSURE TEST CLEAN WATER PIPE BACK WC-1 (6th FLOOR)
PRESSURE TEST CLEAN WATER PIPE ST-1 (6th FLOOR)
BASEMENT REFLECTED WATER TANK
BASEMENT/P7C.8C ( SLAB ) {(H/B - H/E)-(H/1 - H/5)}
GRAVITY TEST DRAINAGE INSTALATION FOR DRIVER WC - 2 (BFl)
CHECK POSITION & MARKING INSTALLATION 5th fl (except st-1)
BASEMENT REFLECTED WATER TANK
PRESSURE TEST CLEAN WATER PIPE CORIDOR (5th FLOOR)
2nd FLOOR AT PODIUM AREA (H/L-H/M) - (H7-H/8)
CHECK POSITION & MARKING INSTALLATION 10th fl
3rd FLOOR AT PODIUM AREA (H/K-H/N) - (H/14-H/20)
23rd FLOOR (ZONE-1) TOWER AREA PART 1 & 4
BASEMENT REFLECTED WATER TANK

Report

Planning

Actual

Submit

Return

Feb 25th, 2013


Feb 27th, 2013
Feb 27th, 2013
Feb 28th, 2013
March 1st, 2013
March 2nd, 2013
March 1st, 2013
March 1st, 2013
March 1st, 2013
March 2nd, 2013
March 5th, 2013
March 6th, 2013
March 6th, 2013
March 6th, 2013
March 8th, 2013
March 9th, 2013
March 9th, 2013
March 11st, 2013
March 11st, 2013
March 15th, 2013
March 15th, 2013
March 15th, 2013
March 18th, 2013
March 18th, 2013
March 18th, 2013
March 16th, 2013
March 20th, 2013
March 20th, 2013
March 21st, 2013
March 21st, 2013
March 27th, 2013
March 27th, 2013
March 30th, 2013
March 30th, 2013
March 30th, 2013
March 30th, 2013
APRIL 3rd, 2013
APRIL 4th, 2013
APRIL 4th, 2013
APRIL 4th, 2013
APRIL 4th, 2013
APRIL 5th, 2013
APRIL 8th, 2013
APRIL 8th, 2013
APRIL 9th, 2013
APRIL 9th, 2013
APRIL 11st, 2013
APRIL 11st, 2013
APRIL 12nd, 2013
APRIL 12nd, 2013
APRIL 13rd, 2013
APRIL 13rd, 2013

Feb 25th, 2013


Feb 27th, 2013
Feb 27&28th,Mar 1st, 2013
Feb 28th, 2013
March 1st,2nd 2013
March 2nd, 2013
March 4th, 2013
March 5th, 2013

Feb 26th, 2013


Feb 28th, 2013
Feb 28th, 2013
March 11st, 2013
March 4th, 2013
March 4th, 2013

March 2nd, 2013


March 2nd, 2013
March 30th, 2013
March 30th, 2013
March 6th, 2013
March 6th, 2013

March 26th. 2013


March 7th, 2013
March 7th, 2013
March 11st, 2013

March 27th, 2013


March 12nd, 2013
March 11st, 2013
March 12nd, 2013

APRIL 11st, 2013


March 15th, 2013
March 18th, 2013
March 15th, 2013

March 11st, 2013


March 9th, 2013
March 9th, 2013
March 20th&26th, 2013
March 13th,14th 2013
March 14th,15th 2013
March 18th, 2013
March 16th,20th 2013
March 16th,27th 2013
March 18th, 2014
March 25th, 2013

March 12nd, 2013


March 11st, 2013
March 12nd, 2013
March 27th, 2013
March 15th, 2013
March 18th, 2013
March 25th, 2013
March 22nd, 2013
March 28th, 2013
March 25th, 2013
Apr 2nd, 2013

March 18th, 2013


March 15th, 2013
March 15th, 2013

March 21st,25th 2013


March 27th, 2013
March 22nd, 2013
March 27th, 2013
March 30th, 2013
APRIL 8th,11st,12nd 2013
APRIL 8th, 2013
APRIL 12nd, 2013
APRIL 20th, 2013
APRIL 3rd, 2013
APRIL 29th, 2013
APRIL 5th, 2013
APRIL 8th, 2013
APRIL 5th, 2013
APRIL 5th, 2013
APRIL 8th, 2013
APRIL 9th,10th, 2013
APRIL 15th, 2013
APRIL 9th, 2013
APRIL 10th, 2013
APRIL 10th, 2013
APRIL 20th, 2013
APRIL 11st, 2013
APRIL 12nd, 2013
APRIL 19th, 2013

March 27th, 2013


APRIL 6th, 2013
March 25th, 2013
March 28th, 2013
APRIL 12nd, 2013

March 30th, 2013

APRIL 13rd, 2013


APRIL 26th, 2013

APRIL 15th, 2013


MAY 6th, 2013

APRIL 30th, 2013


APRIL 8th, 2013
APRIL 10th, 2013
APRIL 10th, 2013
APRIL 6th, 2013
APRIL 10th, 2013
APRIL 10th, 2013
APRIL 25th, 2013
APRIL 13rd, 2013
APRIL 11st, 2013
APRIL 13rd, 2013
APRIL 30th, 2013
APRIL 13rd, 2013
APRIL 17th, 2013
APRIL 20th, 2013

MAY 1st, 2013

Remaks

re-RFI 1122

RFI CANCEL

March 21st, 2013


March 28th, 2013
March 28th, 2013

March 28th, 2013


APRIL 11st, 2013

MAY 6th, 2013


RFI CANCEL

re-RFI 1290

APRIL 15th, 2013


APRIL 15th, 2013
APRIL 11st, 2013
MERGER RFI 1272
APRIL 11st, 2013
APRIL 30th, 2013
APRIL 15th, 2013
APRIL 12nd, 2013
APRIL 15th, 2013
APRIL 15th, 2013
MAY 6th, 2013
MAY 6th, 2013

REQUEST FOR INSPECTION REPORT ( RFI )


RFI Number
NO

175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226

Inspection

TSRT No.

KAJIMA No.

0175/TS/MI/IV/13
0176/TS/MI/IV/13
0177/TS/MI/IV/13
0178/TS/MI/IV/13
0179/TS/MI/IV/13
0180/TS/MI/IV/13
0181/TS/MI/IV/13
0182/TS/MI/IV/13
0183/TS/MI/IV/13
0184/TS/MI/IV/13
0185/TS/MI/IV/13
0186/TS/MI/IV/13
0187/TS/MI/IV/13
0188/TS/MI/IV/13
0189/TS/MI/IV/13
0190/TS/MI/IV/13
0191/TS/MI/IV/13
0192/TS/MI/IV/13
0193/TS/MI/IV/13
0194/TS/MI/IV/13
0195/TS/MI/IV/13
0196/TS/MI/V/13
0197/TS/MI/V/13
0198/TS/MI/V/13
0199/TS/MI/V/13
0200/TS/MI/V/13
0201/TS/MI/V/13
0202/TS/MI/V/13
0203/TS/MI/V/13
0204/TS/MI/V/13
0205/TS/MI/V/13
0206/TS/MI/V/13
0207/TS/MI/V/13
0208/TS/MI/V/13
0209/TS/MI/V/13
0210/TS/MI/V/13
0211/TS/MI/V/13
0212/TS/MI/V/13
0213/TS/MI/V/13
0214/TS/MI/V/13
0215/TS/MI/V/13
0216/TS/MI/V/13
0217/TS/MI/V/13
0218/TS/MI/V/13
0219/TS/MI/V/13
0220/TS/MI/V/13
0221/TS/MI/V/13
0222/TS/MI/V/13
0223/TS/MI/V/13
0224/TS/MI/V/13
0225/TS/MI/V/13
0226/TS/MI/V/13

1356
1362
1367
1370
1384
1386
1411
1412
1418
1417
1427
1428
1429
1430
1439
1452
1463
1462
1461
1464
1477
1495
1494
1496
1498
1505
1504
1511
1513
1525
1526
1524
1527
1534
1538
1541
1550
1557
1560
1561
1562
1579
1578
1584
1585
1586
1590
1591
1594
1593
1599
1598

Scoupe

Submitted

Inspection Item

P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P

12 APRIL 2013
12 APRIL 2013
13 APRIL 2013
15 APRIL 2013
16 APRIL 2013
16 APRIL 2013
19 APRIL 2013
19 APRIL 2013
22 APRIL 2013
22 APRIL 2013
22 APRIL 2013
23 APRIL 2013
23 APRIL 2013
23 APRIL 2013
24 APRIL 2013
25 APRIL 2013
27 APRIL 2013
27 APRIL 2013
27 APRIL 2013
27 APRIL 2013
29 APRIL 2013
01 MAY 2013
01 MAY 2013
02 MAY 2013
02 MAY 2013
03 MAY 2013
03 MAY 2013
03 MAY 2013
04 MAY 2013
06 MAY 2013
06 MAY 2013
06 MAY 2013
07 MAY 2013
07 MAY 2013
08 MAY 2013
08 MAY 2013
10 MAY 2013
10 MAY 2013
11 MAY 2013
11 MAY 2013
11 MAY 2013
14 MAY 2013
14 MAY 2013
15 MAY 2013
15 MAY 2013
15 MAY 2013
16 MAY 2013
16 MAY 2013
17 MAY 2013
17 MAY 2013
18 MAY 2013
18 MAY 2013

BASEMENT REFLECTED ( G.F )/P7C.8C ( RETAINING WALL )


CHECK POSITION & MARKING INSTALLATION PUBLIC WC-1 (BFL)
2nd FLOOR AT PODIUM AREA (H/H-H/O) - (H/2O-H/23)
24th FLOOR (ZONE-2) TOWER AREA PART 2 & 3
CHECK POSITION & MARKING INSTALLATION 11st fl
GRAVITY TEST DRAINAGE INSTALATION FOR PUBLIC WC - 2 (BFl)
INNER CORE SLAB CENTER 24th FLOOR
24th FLOOR (ZONE-1) TOWER AREA PART 1 & 4
BASEMENT REFLECTED ( G.F )/P7C.8C ( H/K-H/M)
INNER CORE SLAB ZONE.1 24th FLOOR
CHECK POSITION & MARKING INSTALLATION BACK WC-2 / 2nd FLOOR
CHECK POSITION & MARKING INSTALLATION 12nd fl
BASEMENT REFLECTED ( G.F )/P7C.8C ( RETAINING WALL )
GRAVITY TEST DRAINAGE FOR SS-1, SS-2, SS-3, SS-5 (8th Fl)
25th FLOOR (ZONE-2) TOWER AREA PART 2 & 3
BASEMENT REFLECTED ( G.F )/P7C.8C ( RETAINING WALL )
GRAVITY TEST DRAINAGE FOR SS-12, SS-13 (8th Fl)
GRAVITY TEST DRAINAGE FOR SS-1, SS-8, SS-9 (6th Fl)
GRAVITY TEST FOR RAIN WATER (16th-21st) PS-4, PS-5
2nd FLOOR AT PODIUM AREA PODIUM P-05 (H/C-H/H) - (H/21-H/23)
25th FLOOR (ZONE-1) TOWER AREA PART 1 & 4
CHECK POSITION & MARKING INSTALLATION JANITOR ROOM (3rd FL)
CHECK POSITION & MARKING INSTALLATION BACK- WC-1 (3rd FL)
CHECK POSITION & MARKING INSTALLATIONBOH-TOILET-2 (3rd FL)
INNER CORE SLAB ZONE.1 25th FLOOR
GRAVITY TEST DRAINAGE FOR SS-1~SS-6 & SS-10 (6th Fl)
PRESSURE TEST CLEAN WATER PIPE CORIDOR (8th FLOOR)
26th FLOOR (ZONE-2) TOWER AREA PART 2 & 3
PRESSURE TEST CLEAN WATER PIPE SS-1 ~ SS-5 (6th FLOOR)
CHECK POSITION & MARKING INSTALLATION BACK- WC-1 (4th FL)
CHECK POSITION & MARKING INSTALLATIONBOH-TOILET-2 (4th FL)
26th FLOOR (ZONE-1) TOWER AREA PART 1 & 4
GRAVITY TEST DRAINAGE FOR SS-2 ~ SS-5 (6th Fl)
CHECK POSITION & MARKING INSTALLATION BACK- WC-1&JANITOR (5th,6th,7th FL)
CHECK POSITION & MARKING INSTALLATION 13thfl ( st-1)
INNER CORE SLAB ZONE.1 26th FLOOR
3rd FLOOR AT PODIUM AREA PODIUM P-06
CHECK POSITION & MARKING INSTALLATION 14thfl ( st-1)
27th FLOOR (ZONE-2) TOWER AREA PART 2 & 3
CHECK POSITION & MARKING INSTALLATION 6th fl ( st-2,DST-1D)
GRAVITY TEST DRAINAGE FOR SS-11 ~ SS-14 (6th Fl)
GRAVITY TEST DRAINAGE FOR SS-6 ~ SS-10 (8th Fl)
PRESSURE TEST CLEAN WATER PIPE SS-6 ~ SS-10 (6th FLOOR)
GRAVITY TEST DRAINAGE INSTALATION FOR BACK WC - 1 (6th Fl)
PRESSURE TEST CLEAN WATER PIPE BACK WC-1 (5th FLOOR)
PRESSURE TEST CLEAN WATER PIPE CORIDOR (9th FLOOR)
27th FLOOR (ZONE-1) TOWER AREA PART 1 & 4
INNER CORE SLAB ZONE.1 27th FLOOR
CHECK POSITION & MARKING INSTALLATION 7th fl ( st-2,DST-1D,ST-3DF)
PRESSURE TEST CLEAN WATER PIPE SS-1 ~ SS-5 (5th FLOOR)
PRESSURE TEST CLEAN WATER PIPE DRIVER WC-2 (BASEMENT FLOOR)
CHECK POSITION & MARKING INSTALLATION 8th fl ( st-2,DST-1D)

Report

Planning

Actual

Submit

APRIL 13rd, 2013


APRIL 15th, 2013
APRIL 15th, 2013
APRIL 17th, 2013
APRIL 19th, 2013
APRIL 19th, 2013
APRIL 22nd, 2013
APRIL 22nd, 2013
APRIL 24th, 2013
APRIL 24th, 2013
APRIL 25th, 2013
APRIL 25th, 2013
APRIL 25th, 2013
APRIL 25th, 2013
APRIL 26th, 2013
APRIL 28th, 2013
APRIL 29th, 2013
APRIL 29th, 2013
APRIL 29th, 2013
APRIL 30th, 2013
MAY 1st, 2013
MAY 3rd, 2013
MAY 3rd, 2013
MAY 4th, 2013
MAY 4th, 2013
MAY 6th, 2013
MAY 6th, 2013
MAY 6th, 2013
MAY 6th, 2013
MAY 8th, 2013
MAY 8th, 2013
MAY 9th, 2013
MAY 9th, 2013
MAY 9th, 2013
MAY 10th, 2013
MAY 10th, 2013
MAY 13th, 2013
MAY 13th, 2013
MAY 13th, 2013
MAY 14th, 2013
MAY 14th, 2013
MAY 16th, 2013
MAY 16th, 2013
MAY 17th, 2013
MAY 17th, 2013
MAY 17th, 2013
MAY 18th, 2013
MAY 18th, 2013
MAY 20th, 2013
MAY 20th, 2013
MAY 21th, 2013
MAY 20th, 2013

APRIL 15th, 2013


APRIL 15th, 2013
APRIL 20th, 2013
APRIL 19th, 2013
APRIL 23rd, 2013
APRIL 25th, 2013
APRIL 22nd, 2013
APRIL 22nd, 2013
APRIL 27th, 2013
APRIL 26th, 2013
APRIL 26th, 2013
APRIL 29th, 2013
APRIL 23rd, 2013
APRIL 26th, 2013
APRIL 26th,29th, 30th 2013
APRIL 26th, 2013
MAY 3rd, 2013
MAY 3rd, 2013
MAY 1st, 2013
MAY 6th, 2013
APRIL 30th, 2013
MAY 8th, 2013
MAY 8th, 2013
MAY 8th, 2013
MAY 3rd, 2013
MAY 6th, 2013
MAY 8th, 2013
MAY 5th,7th 2013
MAY 8th, 2013
MAY 8th, 2013
MAY 10th, 2013
MAY 8th,9th,13th 2013
MAY 8th, 2013
MAY 10th, 2013
MAY 13th,14th 2013
MAY 10th, 2013
MAY 14th, 2013
MAY 15th, 2013
MAY 16th, 2013
MAY 16th, 2013
MAY 16th, 2013
MAY 16th, 2013
MAY 17th, 2013
MAY 17th, 2013
MAY 27th, 2013
MAY 18th, 2013
MAY 20th, 2013
MAY 20th, 2013
MAY 22nd, 2013
MAY 21th,22nd 2013
MAY 21th, 2013
MAY 20th, 2013

APRIL 20th, 2013


APRIL 16th, 2013
APRIL 25th, 2013
APRIL 23rd, 2013
APRIL 27th, 2013
APRIL 27th, 2013
APRIL 23rd, 2013
APRIL 26th, 2013
APRIL 30th, 2013
APRIL 29th, 2013
MAY 3rd, 2013
MAY 3rd, 2013
APRIL 26th, 2013
MAY 3rd, 2013
MAY 1st, 2013
APRIL 27th, 2013
MAY 6th, 2013
MAY 8th, 2013
MAY 6th, 2013
MAY 8th, 2013
MAY 6th, 2013
MAY 10th, 2013

Return

APRIL 17th, 2013

APRIL 30th, 2013


APRIL 30th, 2013
MAY 8th, 2013
MAY 8th, 2013
MAY 6th, 2013
MAY 8th, 2013
MAY 8th, 2013
MAY 8th, 2013
MAY 8th, 2013
MAY 6th, 2013
MAY 6th, 2013
JUNE 4th, 2013
MAY 22nd, 2013
MAY 28th, 2013
MAY 13th, 2013
MAY 8th, 2013
MAY 13th, 2013

MAY 10th, 2013


MAY 6th, 2013
MAY 14th, 2013
MAY 14th, 2013
MAY 14th, 2013
MAY 10th, 2013
MAY 17th, 2013
MAY 17th, 2013
MAY 14th, 2013
MAY 13th, 2013
MAY 13th, 2013
MAY 17th, 2013
MAY 14th, 2013
MAY 22nd, 2013
MAY 17th, 2013
MAY 20th, 2013

MAY 13th, 2013


MAY 8th, 2013
MAY 22nd, 2013
MAY 22nd, 2013
MAY 27th, 2013
MAY 27th, 2013
MAY 27th, 2013
MAY 27th, 2013
MAY 28th, 2013
MAY 22nd, 2013
MAY 28th, 2013
JUNE 19th, 2013
MAY 27th, 2013
MAY 28th, 2013
JUNE 7th, 2013
MAY 27th, 2013

MAY 23rd, 2013


MAY 22nd, 2013
MAY 22nd, 2013
MAY 23rd, 2013

MAY 27th, 2013


MAY 28th, 2013
MAY 27th, 2013
MAY 28th, 2013

MAY 22nd, 2013


MAY 23rd, 2013
MAY 22nd, 2013

JUNE 7th, 2013


MAY 28th, 2013
MAY 27th, 2013

MAY 22nd, 2013


MAY 23rd, 2013

MAY 27th, 2013


JUNE 7th, 2013

Remaks

REQUEST FOR INSPECTION REPORT ( RFI )


RFI Number
NO

227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278

Inspection

TSRT No.

KAJIMA No.

0227/TS/MI/V/13
0228/TS/MI/V/13
0229/TS/MI/V/13
0230/TS/MI/V/13
0231/TS/MI/V/13
0232/TS/MI/V/13
0233/TS/MI/V/13
0234/TS/MI/V/13
0235/TS/MI/V/13
0236/TS/MI/V/13
0237/TS/MI/V/13
0238/TS/MI/V/13
0239/TS/MI/V/13
0240/TS/MI/V/13
0241/TS/MI/V/13
0242/TS/MI/V/13
0243/TS/MI/V/13
0244/TS/MI/V/13
0245/TS/MI/V/13
0246/TS/MI/V/13
0247/TS/MI/VI/13
0248/TS/MI/VI/13
0249/TS/MI/VI/13
0250/TS/MI/VI/13
0251/TS/MI/VI/13
0252/TS/MI/VI/13
0253/TS/MI/VI/13
0254/TS/MI/VI/13
0255/TS/MI/VI/13
0256/TS/MI/VI/13
0257/TS/MI/VI/13
0258/TS/MI/VI/13
0259/TS/MI/VI/13
0260/TS/MI/VI/13
0261/TS/MI/VI/13
0262/TS/MI/VI/13
0263/TS/MI/VI/13
0264/TS/MI/VI/13
0265/TS/MI/VI/13
0266/TS/MI/VI/13
0267/TS/MI/VI/13
0268/TS/MI/VI/13
0269/TS/MI/VI/13
0270/TS/MI/VI/13
0271/TS/MI/VI/13
0272/TS/MI/VI/13
0273/TS/MI/VI/13
0274/TS/MI/VI/13
0275/TS/MI/VI/13
0276/TS/MI/VI/13
0277/TS/MI/VI/13
0278/TS/MI/VI/13

1608
1611
1612
1624
1632
1633
1638
1774
1647
1646
1649
1664
1665
1666
2011
2051
1688
1687
1698
1700
1702
1701
1715
1717
1716
1719
1735
1734
1733
1743
1765
1760
1761
1763
1766
1768
1767
1786
1787
1788
1789
1785
1797
1799
1809
1810
1817
1816
1825
1826
1837
2104

Scoupe

Submitted

Inspection Item

P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P

20 MAY 2013
20 MAY 2013
21 MAY 2013
22 MAY 2013
23 MAY 2013
23 MAY 2013
23 MAY 2013
23 MAY 2013
24 MAY 2013
24 MAY 2013
27 MAY 2013
28 MAY 2013
28 MAY 2013
28 MAY 2013
29 MAY 2013
29 MAY 2013
29 MAY 2013
29 MAY 2013
31 MAY 2013
31 MAY 2013
01 JUNE 2013
01 JUNE 2013
03 JUNE 2013
03 JUNE 2013
03 JUNE 2013
04 JUNE 2013
05 JUNE 2013
05 JUNE 2013
05 JUNE 2013
05 JUNE 2013
07 JUNE 2013
07 JUNE 2013
07 JUNE 2013
07 JUNE 2013
10 JUNE 2013
10 JUNE 2013
10 JUNE 2013
11 JUNE 2013
11 JUNE 2013
11 JUNE 2013
11 JUNE 2013
11 JUNE 2013
11 JUNE 2013
12 JUNE 2013
13 JUNE 2013
14 JUNE 2013
14 JUNE 2013
14 JUNE 2013
14 JUNE 2013
14 JUNE 2013
17 JUNE 2013
17 JUNE 2013

28th FLOOR (ZONE-2) TOWER AREA PART 2 & 3


3rd FLOOR AT PODIUM AREA PODIUM PO5A.B
GRAVITY TEST DRAINAGE FOR SS-11 ~ SS-14 (8th Fl)
PRESSURE TEST CLEAN WATER PIPE BACK WC-2 (BASEMENT FLOOR)
CHECK POSITION & ELEVATION INSTALLATION 6th fl ( st-1 MOCK-UP)
28th FLOOR (ZONE-1) TOWER AREA PART 1 & 4
GRAVITY TEST DRAINAGE FOR PS/DS-1 ( 9th~16th Fl )
PRESSURE TEST CLEAN WATER PIPE PUBLIC WC (BASEMENT FLOOR)
CHECK POSITION & MARKING INSTALLATION 15thfl ( st-1)
CHECK POSITION & MARKING INSTALLATION 9th fl ( st-2,DST-1D)
INNER CORE SLAB ZONE.1 28th FLOOR
GRAVITY TEST DRAINAGE FOR SS-1 ~ SS-10 (9th Fl)
PRESSURE TEST CLEAN WATER PIPE SS-1 ~ SS-3 (7th FLOOR)
29th FLOOR (ZONE-2) TOWER AREA PART 2 & 3
PRESSURE TEST CLEAN WATER PIPE CORIDOR (10th FLOOR)
PRESSURE TEST CLEAN WATER PIPE CORIDOR (11st FLOOR)
29th FLOOR (ZONE-1) TOWER AREA PART 1 & 4
INNER CORE SLAB ZONE.1 29th FLOOR
GRAVITY TEST DRAINAGE FOR PVC PIPE (zone.1 P-5)
CHECK POSITION & MARKING INSTALLATION BACK- WC-1 (GFL)
GRAVITY TEST DRAINAGE INSTALATION FOR BACK WC - 1 (GFl)
CHECK POSITION & MARKING INSTALLATION 6th fl ( st-2)
PRESSURE TEST CLEAN WATER PIPE CORIDOR (12nd FLOOR)
CHECK POSITION & MARKING INSTALLATION 16th fl ( st-1)
CHECK POSITION & MARKING INSTALLATION 10th fl ( st-2,DST-1D,ST-3)
PRESSURE TEST CLEAN WATER PIPE ST-2 (6th FLOOR)
30th FLOOR (ZONE-2) TOWER AREA PART 2 & 3
GRAVITY TEST DRAINAGE FOR PVC PIPE (11st Fl)
PRESSURE TEST CLEAN WATER PIPE ST-1 (7th FLOOR)
4th FLOOR AT PODIUM AREA PODIUM PO7A.B
CHECK POSITION & ELEVATION INSTALLATION BATHUB 6th fl ( st-1 MOCK-UP)
COREWALL 32nd FLOOR REFLECTED
PRESSURE TEST CLEAN WATER PIPE ST-1 (8th FLOOR)
GRAVITY TEST DRAINAGE FOR PS-3 (16th ~ 21st Fl)
PRESSURE TEST TRANSFER PIPE PS-6 (BFL ~ 22nd FLOOR)
30th FLOOR (ZONE-1) TOWER AREA PART 1 & 4
INNER CORE SLAB ZONE.1 30th FLOOR
GRAVITY TEST DRAINAGE AT DST-1D,DST-1DF FOR PVC PIPE (11st Fl)
GRAVITY TEST DRAINAGE AT ST-1,ST-1C,ST-1DC FOR PVC PIPE (12nd Fl)
PRESSURE TEST CLEAN WATER PIPE DST-1D, DST-1DF (6th FLOOR)
PRESSURE TEST CLEAN WATER PIPE CORIDOR (13rd FLOOR)
4th FLOOR AT PODIUM AREA PODIUM PO7A.B (H/7~H/8)
4th FLOOR AT PODIUM AREA PODIUM PO6A.B
PRESSURE TEST CLEAN WATER PIPE ST-1, ST-1D,ST-1C,ST-1DC (9th FLOOR)
31st FLOOR (ZONE-2) TOWER AREA PART 2 & 3
CHECK POSITION & MARKING INSTALLATION 10th fl ( DST-2,JSU-1)
CHECK POSITION & MARKING INSTALLATION 11st,13rd,15th fl ( BOH - 1 )
CHECK POSITION & MARKING INSTALLATION 12nd,14th,16th fl ( BOH - 1 )
CHECK POSITION & MARKING INSTALLATION GROUND FLOOR ( PUBLIC TOILET -2 )
CHECK POSITION & MARKING INSTALLATION 11st fl ( DST-1D,ST-2, DST-1DF)
GRAVITY TEST DRAINAGE AT DST-1D,DST-1DF FOR PVC PIPE (12nd Fl)
GRAVITY TEST DRAINAGE AT ST-1,ST-1C,ST-1DC FOR PVC PIPE (13rd Fl)

Report
Remaks

Planning

Actual

Submit

Return

MAY 22nd, 2013


MAY 22nd, 2013
MAY 23rd, 2013
MAY 24th, 2013
MAY 24th, 2013
MAY 27th, 2013
MAY 27th, 2013
MAY 25th, 2013
MAY 27th, 2013
MAY 27th, 2013
MAY 29th, 2013
MAY 30th, 2013
MAY 30th, 2013
MAY 30th, 2013
MAY 31st, 2013
MAY 31st, 2013
JUNE 4th, 2013
JUNE 4th, 2013
JUNE 1st, 2013
JUNE 4th, 2013
JUNE 4th, 2013
JUNE 4th, 2013
JUNE 5th, 2013
JUNE 5th, 2013
JUNE 5th, 2013
JUNE 6th, 2013
JUNE 7th, 2013
JUNE 7th, 2013
JUNE 7th, 2013
JUNE 7th, 2013
JUNE 8th, 2013
JUNE 10th, 2013
JUNE 10th, 2013
JUNE 10th, 2013
JUNE 12nd, 2013
JUNE 12nd, 2013
JUNE 12nd, 2013
JUNE 13rd, 2013
JUNE 13rd, 2013
JUNE 13rd, 2013
JUNE 13rd, 2013
JUNE 13rd, 2013
JUNE 13rd, 2013
JUNE 15th, 2013
JUNE 15th, 2013
JUNE 15th, 2013
JUNE 17th, 2013
JUNE 17th, 2013
JUNE 18th, 2013
JUNE 17th, 2013
JUNE 19th, 2013
JULY 22nd, 2013

MAY 23rd, 2013


MAY 21th, 2013
MAY 22nd, 2013
MAY 24th, 2013
MAY 24th, 2013
MAY 27th, 2013
MAY 27th, 2013
JUNE 12nd, 2013
MAY 27th, 2013
MAY 27th, 2013
MAY 27th, 2013
MAY 31st, 2013
MAY 30th, 2013
MAY 31st, 2013
JULY 12nd, 2013
JUNE 1st, 2013
MAY 31st, 2013
JUNE 5th, 2013
JUNE 1st, 2013
JUNE 4th, 2013
JUNE 4th, 2013
JUNE 4th, 2013
JUNE 7th, 2013
JUNE 5th, 2013
JUNE 5th, 2013
JUNE 7th, 2013
JUNE 7th,10th,12nd 2013
JUNE 7th, 2013

MAY 27th, 2013


MAY 27th, 2013
JUNE 4th, 2013
MAY 27th, 2013

JUNE 7th, 2013


MAY 28th, 2013
JULY 17th, 2013
JUNE 4th, 2013

MAY 31st, 2013


MAY 30th, 2013
JUNE 13rd, 2013

JUNE 19th, 2013


JUNE 7th, 2013
JUNE 28th, 2013

re-RFI 1637

MAY 28th, 2014


JUNE 30th, 2013
JUNE 4th, 2013
JUNE 7th, 2013
JULY 15th, 2013
JUNE 5th, 2013
JUNE 7th, 2013
JUNE 7th, 2013
JUNE 4th, 2013
JUNE 5th, 2013
JUNE 6th, 2013

JUNE 7th, 2013


JULY 11st, 2013
JULY 11st, 2013
JULY 10th, 2013
JULY 26th, 2013
August 23rd, 2013

re-RFI 1685
re-RFI 1686

JULY 2nd, 2013


JUNE 12nd, 2013
JUNE 10th, 2013
JUNE 10th, 2013
JUNE 13rd, 2013
JUNE 10th, 2013

JULY 3rd, 2013


JULY 3rd, 2013
JULY 19th, 2013
JULY 11st, 2013
JUNE 19th, 2013
JULY 11st, 2013

JUNE 10th, 2013

JUNE 21st, 2013

JULY 17th, 2013

JUNE 12nd, 2013


JUNE 11st, 2013
JUNE 12nd, 2013

JUNE 15th, 2013


JUNE 13rd, 2013
JUNE 13rd, 2013

JULY 9th, 2013


JULY 3rd, 2013
JUNE 28th, 2013

JUNE 12nd, 2013


JUNE 12nd, 2013
JUNE 12nd, 2013
JUNE 12nd, 2013
JUNE 13rd, 2013
JUNE 13rd, 2013
JUNE 11st, 2013
JUNE 13rd, 2013
JUNE 17th, 2013
JUNE 17th, 2013
JUNE 14th, 2013
JUNE 24th, 2013
JUNE 24th, 2013
JUNE 18th, 2013
JUNE 25th, 2013
JUNE 19th, 2013
JULY 25nd, 2013

JUNE 15th, 2013


JUNE 13rd, 2013
JUNE 19th, 2013
JUNE 30th, 2013
JUNE 30th, 2013
JUNE 30th, 2013
JUNE 19th, 2013
JUNE 19th, 2013
JUNE 28th, 2013
JUNE 22nd, 2013
JUNE 17th, 2013

JULY 4th, 2013


JUNE 19th, 2013
JULY 9th, 2013
JULY 3rd, 2013
JULY 9th, 2013
JULY 9th, 2013
JUNE 28th, 2013
JUNE 28th, 2013
JULY 16th, 2013
JULY 9th, 2013

JUNE 20th, 2013


JULY 18th, 2013
JUNE 25th, 2013
August 1st, 2013

JULY 4th, 2013


August 23rd, 2013
JULY 11st, 2013
OCTOBER 2nd, 2013

INTERNAL

JUNE 19th, 2013


JUNE 13rd, 2013
JUNE 7th, 2013
JUNE 13rd, 2013

????

re-RFI 1836

REQUEST FOR INSPECTION REPORT ( RFI )


RFI Number
NO

279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330

Inspection

TSRT No.

KAJIMA No.

0279/TS/MI/VI/13
0280/TS/MI/VI/13
0281/TS/MI/VI/13
0282/TS/MI/VI/13
0283/TS/MI/VI/13
0284/TS/MI/VI/13
0285/TS/MI/VI/13
0286/TS/MI/VI/13
0287/TS/MI/VI/13
0288/TS/MI/VI/13
0289/TS/MI/VI/13
0290/TS/MI/VI/13
0291/TS/MI/VI/13
0292/TS/MI/VI/13
0293/TS/MI/VI/13
0294/TS/MI/VI/13
0295/TS/MI/VI/13
0296/TS/MI/VI/13
0297/TS/MI/VI/13
0298/TS/MI/VI/13
0299/TS/MI/VI/13
0300/TS/MI/VI/13
0301/TS/MI/VI/13
0302/TS/MI/VI/13
0303/TS/MI/VI/13
0304/TS/MI/VI/13
0305/TS/MI/VI/13
0306/TS/MI/VI/13
0307/TS/MI/VI/13
0308/TS/MI/VII/13
0309/TS/MI/VII/13
0310/TS/MI/VII/13
0311/TS/MI/VII/13
0312/TS/MI/VII/13
0313/TS/MI/VII/13
0314/TS/MI/VII/13
0315/TS/MI/VII/13
0316/TS/MI/VII/13
0317/TS/MI/VII/13
0318/TS/MI/VII/13
0319/TS/MI/VII/13
0320/TS/MI/VII/13
0321/TS/MI/VII/13
0322/TS/MI/VII/13
0323/TS/MI/VII/13
0324/TS/MI/VII/13
0325/TS/MI/VII/13
0326/TS/MI/VII/13
0327/TS/MI/VII/13
0328/TS/MI/VII/13
0329/TS/MI/VII/13
0330/TS/MI/VII/13

1843

1858
1859
1864
1865
1870
1876
1900
1908
1907
1906
1915
1914
1913
1912
1929
1936
1937
1939
1940
1942
1941
1963
1976
1977
1998
1999
2007
2019
2018
2017
2033

2052
2053
2054
2055
2085
2084
2089

Scoupe

Submitted

Inspection Item

P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P

17 JUNE 2013
17 JUNE 2013
17 JUNE 2013
17 JUNE 2013
17 JUNE 2013
17 JUNE 2013
18 JUNE 2013
18 JUNE 2013
18 JUNE 2013
19 JUNE 2013
19 JUNE 2013
19 JUNE 2013
20 JUNE 2013
21 JUNE 2013
24 JUNE 2013
24 JUNE 2013
24 JUNE 2013
25 JUNE 2013
26 JUNE 2013
26 JUNE 2013
26 JUNE 2013
26 JUNE 2013
27 JUNE 2013
27 JUNE 2013
27 JUNE 2013
28 JUNE 2013
28 JUNE 2013
28 JUNE 2013
28 JUNE 2013
01 JULY 2013
02 JULY 2013
03 JULY 2013
03 JULY 2013
06 JULY 2013
06 JULY 2013
08 JULY 2013
08 JULY 2013
08 JULY 2013
08 JULY 2013
09 JULY 2013
10 JULY 2013
11 JULY 2013
11 JULY 2013
12 JULY 2013
12 JULY 2013
12 JULY 2013
13 JULY 2013
13 JULY 2013
16 JULY 2013
16 JULY 2013
17 JULY 2013
17 JULY 2013

4th FLOOR AT PODIUM AREA PODIUM PO6A.B (H/14 ~ H/20 )


CHECK POSITION & MARKING COORING 23rd fl ( PS-7 )
CHECK POSITION & MARKING COORING BFL ( SOIL WATER )
CHECK POSITION & MARKING COORING BFL ( P-3 )
CHECK POSITION & MARKING COORING BFL ( P-2 ) ( H/22~H/23;H/K~H/L)
CHECK POSITION & MARKING COORING BFL ( P-2 ) ( H/20~H/21;H/F~H/G)
31st FLOOR (ZONE-1) TOWER AREA PART 1 & 4
INNER CORE SLAB ZONE.1 31st FLOOR
CHECK POSITION & MARKING INSTALLATION 17th fl ( st-1, st-1d)
PRESSURE TEST CLEAN WATER PIPE ST-1, ST-1D,ST-1C,ST-1DC (10th FLOOR)
COREWALL ROOF FLOOR
4th FLOOR AT PODIUM AREA PODIUM PO6A.B & PO5A.B (H/Fa ~ H/Ka )
2th FLOOR AT PODIUM AREA PODIUM PO7A.B (H/5~H/7)
GRAVITY TEST DRAINAGE AT ST-1,ST-2,DST-1D,DST-1DF FOR PVC PIPE (9th Fl)
32nd FLOOR (ZONE-2) TOWER AREA PART 2 & 3
CHECK POSITION & MARKING INSTALLATION PUBLIC TOILET-3 ( GROUND FLOOR )
PRESSURE TEST STEAM PIPE CORIDOR (BASEMENT FLOOR)
4th FLOOR AT PODIUM AREA PODIUM PO5A.B (H/C ~ H/Fa )
PRESSURE TEST CLEAN WATER PIPE ST-1, ST-1D,ST-1C,ST-1DC (11st FLOOR)
CHECK POSITION & MARKING INSTALLATION 18th fl ( st-1, st-1d)
GRAVITY TEST DRAINAGE AT ST-1,ST-2,DST-1D,DST-1DF FOR PVC PIPE (10th Fl)
CHECK POSITION & ELEVATION INSTALLATION SHOWER 5th fl ( st-1)
32nd FLOOR (ZONE-1) TOWER AREA PART 1 & 4
CHECK POSITION & ELEVATION INSTALLATION SHOWER 6th fl ( st-1)
CHECK POSITION & ELEVATION INSTALLATION SHOWER 7th fl ( st-1)
PRESSURE TEST CLEAN WATER PIPE ST-1, ST-1D,ST-1C,ST-1DC (12nd FLOOR)
CHECK POSITION & ELEVATION INSTALLATION SHOWER 8th fl ( st-1)
INNER CORE SLAB ZONE.1 32nd FLOOR
PRESSURE TEST CLEAN WATER PIPE CORIDOR (14th FLOOR)
2th FLOOR AT PODIUM AREA PODIUM PO8A.B (H/5~H/7)
CHECK POSITION & MARKING COORING 20th & 21stFL ( SS-3 )
CHECK POSITION & MARKING INSTALLATION GUEST ROOM TOILET ( GFL )
CHECK POSITION & MARKING INSTALLATION DRIVER TOILET-1 ( BFL )
PRESSURE TEST CLEAN WATER PIPE ST-1, ST-1F,ST-1C,ST-1DC (13rd FLOOR)
5th FLOOR AT PODIUM AREA PODIUM PO7A.B (H/M ~ H/N )
CHECK POSITION & MARKING INSTALLATION 19th fl ( st-1, st-1d)
GRAVITY TEST DRAINAGE AT PUBLIC TOILET - 2 ( GROUND FLOOR )
GRAVITY TEST DRAINAGE AT ST-1,ST-1D FOR PVC PIPE (15th Fl)
CHECK POSITION & ELEVATION INSTALLATION BATHUB 6th fl ( st-1 )
GRAVITY TEST DRAINAGE FOR PS-4 & PS-5 (21st ~ 27th Fl)
ROOF FLOOR (ZONE-2) ROOF AREA PART 2 & 3
CHECK POSITION & MARKING INSTALLATION 12nd fl ( DST-1D,ST-2, DST-1DF)
CHECK POSITION & MARKING INSTALLATION 13rd fl ( st-2,DST-1D,ST-3DF)
CHECK POSITION & MARKING INSTALLATION 20th fl ( st-1,JSU-1,DST-2F, JSU-2)
CHECK POSITION & ELEVATION INSTALLATION BATHUB 6th fl ( st-1 ) (unit 24~27)
PRESSURE TEST CLEAN WATER PIPE ST-1, ST-1F,ST-1C,ST-1DC (14th FLOOR)
GRAVITY TEST DRAINAGE AT ST-1,ST-1D, JSU-1 FOR PVC PIPE (16th Fl)
5th FLOOR AT PODIUM AREA PODIUM PO6A.B (H/K ~ H/O )
CHECK POSITION & ELEVATION INSTALLATION BATHUB 5th fl ( st-1 ) (unit 10~11)
CHECK POSITION & MARKING INSTALLATION BACK WC-3 ( 2nd FL )
CHECK POSITION & MARKING INSTALLATION 17th ~ 20th fl ( BOH - 1 )
GRAVITY TEST DRAINAGE AT ST-2 FOR PVC PIPE (6th Fl)

Report

Planning

Actual

Submit

Return

JUNE 19th, 2013


JUNE 19th, 2013
JUNE 19th, 2013
JUNE 20th, 2013
JUNE 20th, 2013
JUNE 20th, 2013
JUNE 20th, 2013
JUNE 20th, 2013
JUNE 20th, 2013
JUNE 21st, 2013
JUNE 21st, 2013
JUNE 20th, 2013
JUNE 22nd, 2013
JUNE 24th, 2013
JUNE 26th, 2013
JUNE 26th, 2013
JUNE 26th, 2013
JUNE 27th, 2013
JUNE 28th, 2013
JUNE 28th, 2013
JUNE 28th, 2013
JUNE 28th, 2013
JUNE 29th, 2013
JUNE 29th, 2013
JUNE 29th, 2013
JULY 1st, 2013
JULY 1st, 2013
JULY 1st, 2013
JULY 1st, 2013
JULY 2nd, 2013
JULY 3rd, 2013
JULY 5th, 2013
JULY 5th, 2013
JULY 9th, 2013
JULY 9th, 2013
JULY 10th, 2013
JULY 11st, 2013
JULY 10th, 2013
JULY 10th, 2013
JULY 11st, 2013
JULY 11st, 2013
JULY 13th, 2013
JULY 13rd, 2013
JULY 15th, 2013
JULY 15th, 2013
JULY 16th, 2013
JULY 16th, 2013
JULY 16th, 2013
JULY 18th, 2013
JULY 18th, 2013
JULY 19th, 2013
JULY 19th, 2013

JUNE 17th, 2013


JUNE 19th, 2013

JULY 1st, 2013


JUNE 20th, 2013

JULY 19th, 2013

JUNE 27th, 2013


JUNE 27th, 2013

JUNE 28th, 2013


JUNE 28th, 2013

JUNE 20th, 2013


JUNE 20th, 2013
JUNE 17th, 2013
JUNE 21st, 2013
JUNE 22nd, 2013
JUNE 21st, 2013
JUNE 25th, 2013
JUNE 25th, 2013
JUNE 27th, 2013
JUNE 27th, 2013
JUNE 26th, 2013
JUNE 26th, 2013
JUNE 28th, 2013
JUNE 27th, 2013
JUNE 29th, 2013

JUNE 26th, 2013


JUNE 21st, 2013
JUNE 30th, 2013
JUNE 30th, 2013
JUNE 26th, 2013
JUNE 26th, 2013
JUNE 27th, 2013
JUNE 30th, 2013
JULY 4th, 2013
JUNE 28th, 2013
JUNE 28th, 2013
JULY 1st, 2013
JULY 11st, 2013
JULY 1st, 2013
JULY 1st, 2013

JULY 3rd, 2013


JULY 17th, 2013
JULY 19th, 2013
August 23rd, 2013
JULY 19th, 2013

JUNE 27th, 2013

JULY 4th, 2013

JULY 30th, 2013

JULY 6th, 2013

JULY 9th, 2013

JULY 19th, 2013

JULY 1st, 2013


JULY 2nd, 2013
JULY 2nd,11st 2013

JULY 2nd, 2013


JULY 15th, 2013
JULY 16th, 2013

JULY 4th, 2013


JULY 19th, 2013
JULY 30th, 2013

JULY 5th, 2013


JULY 5th, 2013
JULY 15th, 2013
JULY 12nd, 2013
JULY 11st, 2013
JULY 10th, 2013
JULY 10th, 2013
JULY 11st, 2013

JULY 10th, 2013


JULY 10th, 2013
JULY 23rd, 2013
JULY 16th, 2013
JULY 15th, 2013
JULY 17th, 2013
JULY 20th, 2013
JULY 13rd, 2013

JULY 11st, 2013


JULY 11st, 2013
OCTOBER 3rd, 2013
August 23rd, 2013
OCTOBER 28th, 2013
SEPTEMBER 23rd, 2013
JULY 17th, 2013

JULY 12nd, 2013


JULY 15th, 2013
JULY 13rd, 2013
JULY 14th, 2013
JULY 15th, 2013
JULY 19th, 2013
JULY 18th, 2013
JULY 15th, 16th 2013

JULY 18th, 2013


JULY 26th, 2013
JULY 23rd, 2013
JULY 26th, 2013
JULY 26th, 2013
JULY 29th, 2013
August 1st, 2013
JULY 17th, 2013

OCTOBER 2nd, 2013


SEPTEMBER 23rd, 2013
August 23rd, 2013
JULY 19th, 2013
August 23rd, 2013
August 23rd, 2013
JULY 19th, 2013

JULY 23rd, 2013


JULY 31st, 2013
JULY 19th, 2013

JULY 23rd, 2013

Remaks

INTERNAL INSPECTION
CANCEL
INTERNAL INSPECTION
INTERNAL INSPECTION
JULY 4th, 2013
JULY 9th, 2013
INTERNAL
JULY 20th, 2013
JUNE 28th, 2013
JULY 4th, 2013
JULY 17th, 2013
JULY 11st, 2013
JULY 30th, 2013

INTERNAL

INTERNAL

INTERNAL
INTERNAL
INTERNAL

INTERNAL

REQUEST FOR INSPECTION REPORT ( RFI )


RFI Number
NO

331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382

Inspection

TSRT No.

KAJIMA No.

0331/TS/MI/VII/13
0332/TS/MI/VII/13
0333/TS/MI/VII/13
0334/TS/MI/VII/13
0335/TS/MI/VII/13
0336/TS/MI/VII/13
0337/TS/MI/VII/13
0338/TS/MI/VII/13
0339/TS/MI/VII/13
0340/TS/MI/VII/13
0341/TS/MI/VII/13
0342/TS/MI/VII/13
0343/TS/MI/VII/13
0344/TS/MI/VII/13
0345/TS/MI/VII/13
0346/TS/MI/VII/13
0347/TS/MI/VII/13
0348/TS/MI/VIII/13
0349/TS/MI/VIII/13
0350/TS/MI/VIII/13
0351/TS/MI/VIII/13
0352/TS/MI/VIII/13
0353/TS/MI/VIII/13
0354/TS/MI/VIII/13
0355/TS/MI/VIII/13
0356/TS/MI/VIII/13
0357/TS/MI/VIII/13
0358/TS/MI/VIII/13
0359/TS/MI/VIII/13
0360/TS/MI/VIII/13
0361/TS/MI/VIII/13
0362/TS/MI/VIII/13
0363/TS/MI/VIII/13
0364/TS/MI/IX/13
0365/TS/MI/IX/13
0366/TS/MI/IX/13
0367/TS/MI/IX/13
0368/TS/MI/IX/13
0369/TS/MI/IX/13
0370/TS/MI/IX/13
0371/TS/MI/IX/13
0372/TS/MI/IX/13
0373/TS/MI/IX/13
0374/TS/MI/IX/13
0375/TS/MI/IX/13
0376/TS/MI/IX/13
0377/TS/MI/IX/13
0378/TS/MI/IX/13
0379/TS/MI/IX/13
0380/TS/MI/IX/13
0381/TS/MI/IX/13
0382/TS/MI/IX/13

2094
2095
2102
2121
2133
2143
2144

2145
2150
2163
2177
2176

2204
2217
2225
2226
2227
2229
2241
2242
2243
2244
2259
2258
2289
2294
2297
2302
2301
2306
2311
2316
2333
2356
2357
2358
2359
2361
2360
2374
2375
2373
2376
2377

Scoupe

Submitted

P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P

18 JULY 2013
18 JULY 2013
18 JULY 2013
22 JULY 2013
22 JULY 2013
24 JULY 2013
24 JULY 2013
24 JULY 2013
24 JULY 2013
24 JULY 2013
25 JULY 2013
25 JULY 2013
27 JULY 2013
29 JULY 2013
29 JULY 2013
29 JULY 2013
29 JULY 2013
20 AUGUST 2013
20 AUGUST 2013
21 AUGUST 2013
22 AUGUST 2013
22 AUGUST 2013
22 AUGUST 2013
23 AUGUST 2013
23 AUGUST 2013
23 AUGUST 2013
24 AUGUST 2013
24 AUGUST 2013
24 AUGUST 2013
26 AUGUST 2013
26 AUGUST 2013
30 AUGUST 2013
30 AUGUST 2013
02 SEP 2013
02 SEP 2013
02 SEP 2013
03 SEP 2013
03 SEP 2013
03 SEP 2013
04 SEP 2013
04 SEP 2013
07 SEP 2013
07 SEP 2013
07 SEP 2013
07 SEP 2013
07 SEP 2013
07 SEP 2013
09 SEP 2013
09 SEP 2013
09 SEP 2013
09 SEP 2013
09 SEP 2013

Inspection Item

Planning

ROOF FLOOR (ZONE-1) TOWER AREA PART 1 & 4


JULY 20th, 2013
GRAVITY TEST DRAINAGE AT BACK WC - 2 ( 4th FLOOR )
JULY 20th, 2013
3rd FLOOR AT PODIUM AREA PODIUM PO7A.B
JULY 20th, 2013
CHECK POSITION & MARKING INSTALLATION 21st fl ( st-1,JSU-1,JSU-2)
JULY 24th, 2013
PRESSURE TEST CLEAN WATER PIPE INNERCORE (5th,7th,8th,9th FLOOR)
JULY 24th, 2013
CHECK POSITION & ELEVATION INSTALLATION BATHUB 5th fl ( st-1 ) (unit 15~19)
JULY 26th, 2013
PRESSURE TEST CLEAN WATER PIPE ST-1, ST-1D (15th FLOOR)
JULY 26th, 2013
PRESSURE TEST CLEAN WATER PIPE CORIDOR (15th FLOOR)
JULY 26th, 2013
CHECK POSITION & MARKING INSTALLATION 14th fl ( DST-1D ,ST-2)
JULY 26th, 2013
CHECK POSITION & MARKING INSTALLATION 15th fl ( JSU-1,DST-2)
JULY 26th, 2013
CHECK CALORIFIER SPECIFIKATION, DIMENSION
JULY 25th, 2013
PRESSURE TEST CLEAN WATER PIPE CORIDOR (16th FLOOR)
JULY 27th, 2013
GRAVITY TEST DRAINAGE AT ST-2& ST-3DF FOR PVC PIPE (7th Fl)
JULY 30th, 2013
GRAVITY TEST DRAINAGE AT ST-1,ST-2,DST-1D,DST-1DF FOR PVC PIPE (14th Fl)
JULY 31st, 2013
3rd FLOOR AT PODIUM AREA PODIUM PO8A.B
JULY 31st, 2013
CHECK POSITION & MARKING INSTALLATION 16th fl ( JSU-1,DST-2, ST-3D)
JULY 31st, 2013
CHECK POSITION & MARKING INSTALLATION 17th fl ( JSU-1,DST-2)
JULY 31st, 2013
CHECK POSITION & MARKING INSTALLATION 19th fl ( ST-3DF, DST-2F, JSU-1, JSU-1F)
AUGUST 22nd, 2013
GRAVITY TEST DRAINAGE AT ST-1 FOR PVC PIPE (15th Fl)
AUGUST 22nd, 2013
3rd FLOOR AT PODIUM AREA PODIUM PO8A.B (PART.2 & 3)
AUGUST 23rd, 2013
ROOF FLOOR (DOG HOUSE) TOWER AREA PART 4
AUGUST 24th, 2013
GRAVITY TEST DRAINAGE FOR PS-4 & PS-5 (21st ~ 27th Fl)
AUGUST 24th, 2013
PRESSURE TEST CLEAN WATER PIPE ST-1, ST-1D (16th FLOOR)
AUGUST 24th, 2013
PRESSURE TEST CLEAN WATER PIPE ST-1, ST-1D (17th FLOOR)
AUGUST 26th, 2013
CHECK POSITION & MARKING COORING BFL ( BOILER ROOM )
AUGUST 26th, 2013
GRAVITY TEST DRAINAGE AT ST-1,ST-1D,DST-2DF,ST-3DF, JSU-1, JSU 1F FOR PVC PIPE (19th AUGUST
Fl)
26th, 2013
CHECK POSITION & ELEVATION INSTALLATION BATHUB 7th fl ( st-1 ) (unit 10~16)
AUGUST 26th, 2013
CHECK POSITION & MARKING INSTALLATION 10,13,15,16,17,18 fl ( JSU-1)
AUGUST 26th, 2013
CHECK POSITION & MARKING INSTALLATION 23rd fl ( 1B-1 )
AUGUST 26th, 2013
CHECK POSITION & ELEVATION INSTALLATION BATHUB 7th fl ( st-1 ) (unit 1,2,3,18)
AUGUST 29th, 2013
GRAVITY TEST DRAINAGE FOR PS-3 (21st ~ 27th Fl)
AUGUST 29th, 2013
PRESSURE TEST CLEAN WATER PIPE ST-1, ST-1D (18th FLOOR)
SEPTEMBER 2nd, 2013
GRAVITY TEST DRAINAGE FOR BACK WC-1 (4th Fl)
SEPTEMBER 2nd, 2013
CHECK POSITION & ELEVATION INSTALLATION BATHUB 8th fl ( ST-1&ST1-D ) (unit 25~28) SEPTEMBER 3rd, 2013
CHECK POSITION WC & LC 6th fl (MOCK-UP) (ST-1)
SEPTEMBER 4th, 2013
GRAVITY TEST DRAINAGE AT ST-2 FOR PVC PIPE (8th Fl)
SEPTEMBER 4th, 2013
4th FLOOR AT PODIUM AREA PODIUM PO7A.B (H/L~H/P)
SEPTEMBER 5th, 2013
GRAVITY TEST DRAINAGE FOR JANITOR & DISH WASHER MACHINE (14th Fl)
SEPTEMBER 5th, 2013
GRAVITY TEST DRAINAGE AT ST-1, ST-1D, JSU-1 FOR PVC PIPE (17th Fl)
SEPTEMBER 6th, 2013
PRESSURE TEST CLEAN WATER PIPE INNER CORE (10,11,12 FLOOR)
SEPTEMBER 6th, 2013
CHECK POSITION & MARKING INSTALLATION 24th fl ( 1B-1 )
SEPTEMBER 6th, 2013
GRAVITY TEST DRAINAGE FOR BACK WC-1 (2nd Fl)
SEPTEMBER 10th, 2013
GRAVITY TEST DRAINAGE FOR BACK WC-2 (2nd Fl)
SEPTEMBER 10th, 2013
GRAVITY TEST DRAINAGE FOR JANITOR (2nd Fl)
SEPTEMBER 10th, 2013
GRAVITY TEST DRAINAGE FOR BACK WC-1 (2nd Fl)
SEPTEMBER 10th, 2013
GRAVITY TEST DRAINAGE FOR BACK WC-2 (3rd Fl)
SEPTEMBER 10th, 2013
GRAVITY TEST DRAINAGE FOR JANITOR (3rd Fl)
SEPTEMBER 10th, 2013
CHECK POSITION & ELEVATION INSTALLATION BATHUB 9th fl (unit 10~19)
SEPTEMBER 11st, 2013
CHECK POSITION & ELEVATION GREASE TRAP (GT-9)
SEPTEMBER 11st, 2013
PRESSURE TEST CLEAN WATER PIPE ST-1, ST-1D (19th FLOOR)
SEPTEMBER 11st, 2013
GRAVITY TEST DRAINAGE FOR BACK WC-1 (15th Fl)
SEPTEMBER 11st, 2013
GRAVITY TEST DRAINAGE AT ST-1, ST-1D, JSU-1 FOR PVC PIPE (18th Fl)
SEPTEMBER 12nd, 2013

Report
Actual

Submit

Return

JULY 22nd, 2013


JULY 24th, 2013
JULY 24th, 2013
JULY 24th, 2013
JULY 29th, 2013
JULY 26th, 2013
JULY 29th, 2013
JULY 29th, 2013
JULY 26th, 2013
JULY 27th, 2013
JULY 25th, 2014
JULY 29th, 2013
JULY 30th, 2013
JULY 31st, 2013
JULY 31st, 2013
JULY 31st, 2013
August 1st, 2013
AUGUST 21st, 2013
AUGUST 22nd, 2013
AUGUST 23rd, 2013
AUGUST 24th, 2013
AUGUST 24th, 2013
AUGUST 26th, 2013
SEPTEMBER 2nd, 2013

JULY 26th, 2013


JULY 25th, 2013
August 1st, 2013

AUGUST 29th, 2013

August 21st, 2013


AUGUST 22nd, 2013
AUGUST 24th, 2013
August 1st, 2013

SEPTEMBER 3rd, 2013


SEPTEMBER 5th, 2013
SEPTEMBER 5th, 2013
August 23rd, 2013

JULY 31st, 2013

OCTOBER 2nd, 2013

August 1st, 2013


AUGUST 2nd, 2013
AUGUST 22nd, 2013
AUGUST 26th, 2013

August 23rd, 2013


SEPTEMBER 5th, 2013
SEPTEMBER 27th, 2013
OCTOBER 16th, 2013

SEPTEMBER 10th, 2013


AUGUST 27th, 2013
AUGUST 27th, 2013
SEPTEMBER 10th, 2013
SEPTEMBER 11st, 2013
SEPTEMBER 11st, 2013

SEPTEMBER 13rd, 2013


SEPTEMBER 30th, 2013
SEPTEMBER 30th, 2013
SEPTEMBER 27th, 2013
SEPTEMBER 23rd, 2013
SEPTEMBER 17th, 2013

AUGUST 30th, 2013


AUGUST 26th, 2013

SEPTEMBER 4th, 2013

SEPTEMBER 11st, 2013

AUGUST 27th, 2013


AUGUST 27th, 2014
SEPTEMBER 5th, 2013
SEPTEMBER 3rd, 2013
SEPTEMBER 3rd, 2013

SEPTEMBER 5th, 2013


SEPTEMBER 5th, 2013
SEPTEMBER 14th, 2013
SEPTEMBER 9th, 2013
SEPTEMBER 10th, 2013

SEPTEMBER 11st, 2013


DESEMBER 19th, 2013
SEPTEMBER 27th, 2013
SEPTEMBER 17th, 2013
SEPTEMBER 27th, 2013

SEPTEMBER 4th, 2013


SEPTEMBER 5th, 2013
SEPTEMBER 5th, 2013
SEPTEMBER 6th, 2013
SEPTEMBER 11st, 2013
SEPTEMBER 10th, 2013
SEPTEMBER 13rd, 2013
SEPTEMBER 13rd, 2013
SEPTEMBER 13rd, 2013
SEPTEMBER 13rd, 2013
SEPTEMBER 14th, 2013
SEPTEMBER 14th, 2013
SEPTEMBER 10th, 2013

SEPTEMBER 10th, 2013


SEPTEMBER 10th, 2013
SEPTEMBER 11st, 2013
SEPTEMBER 13rd, 2013
SEPTEMBER 13rd, 2013

SEPTEMBER 17th, 2013


SEPTEMBER 30th, 2013
SEPTEMBER 17th, 2013
SEPTEMBER 23rd, 2013
SEPTEMBER 27th, 2013

SEPTEMBER 11st, 2013


SEPTEMBER 13rd, 2013
SEPTEMBER 12nd, 2013

SEPTEMBER 17th, 2013

Remaks

AUGUST 29th, 2013


INTERNAL

INTERNAL
INTERNAL
INTERNAL

"kitchen not yet"

SEPTEMBER 13rd, 2013 OCTOBER 16th, 2013


SEPTEMBER 13rd, 2013 OCTOBER 16th, 2013
SEPTEMBER 13rd, 2013 OCTOBER 16th, 2013
SEPTEMBER 13rd, 2013 OCTOBER 16th, 2013
SEPTEMBER 20th, 2013 OCTOBER 16th, 2013
SEPTEMBER 20th, 2013 OCTOBER 16th, 2013
SEPTEMBER 13rd, 2013 SEPTEMBER 27th, 2013
OCTOBER 4th, 2013

SEPTEMBER 17th, 2013 SEPTEMBER 27th, 2013

REQUEST FOR INSPECTION REPORT ( RFI )


RFI Number
NO

383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434

Inspection

TSRT No.

KAJIMA No.

0383/TS/MI/IX/13
0384/TS/MI/IX/13
0385/TS/MI/IX/13
0386/TS/MI/IX/13
0387/TS/MI/IX/13
0388/TS/MI/IX/13
0389/TS/MI/IX/13
0390/TS/MI/IX/13
0391/TS/MI/IX/13
0392/TS/MI/IX/13
0393/TS/MI/IX/13
0394/TS/MI/IX/13
0395/TS/MI/IX/13
0396/TS/MI/IX/13
0397/TS/MI/IX/13
0398/TS/MI/IX/13
0399/TS/MI/IX/13
0400/TS/MI/IX/13
0401/TS/MI/IX/13
0402/TS/MI/IX/13
0403/TS/MI/IX/13
0404/TS/MI/IX/13
0405/TS/MI/IX/13
0406/TS/MI/IX/13
0407/TS/MI/IX/13
0408/TS/MI/IX/13
0409/TS/MI/IX/13
0410/TS/MI/IX/13
0411/TS/MI/IX/13
0412/TS/MI/IX/13
0413/TS/MI/IX/13
0414/TS/MI/IX/13
0415/TS/MI/IX/13
0416/TS/MI/IX/13
0417/TS/MI/IX/13
0418/TS/MI/IX/13
0419/TS/MI/IX/13
0420/TS/MI/IX/13
0421/TS/MI/IX/13
0422/TS/MI/IX/13
0423/TS/MI/IX/13
0424/TS/MI/IX/13
0425/TS/MI/X/13
0426/TS/MI/X/13
0427/TS/MI/X/13
0428/TS/MI/X/13
0429/TS/MI/X/13
0430/TS/MI/X/13
0431/TS/MI/X/13
0432/TS/MI/X/13
0433/TS/MI/X/13
0434/TS/MI/X/13

2391
2400
2405
2404
2403
2415
2414
2416
2418
2419
2417
2427
2430
2426
2434
2469
2470
2472
2473
2471
2483
2480
2481
2482
2490
2501
2511
2513
2512
2521
2528
2527
2546
2564
2565
2566
2567
2568
2563
2562
2580
2585
2588
2599
2601
2600
2602

Scoupe

Submitted

P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P

11 SEP 2013
12 SEP 2013
12 SEP 2013
12 SEP 2013
13 SEP 2013
13 SEP 2013
13 SEP 2013
13 SEP 2013
13 SEP 2013
13 SEP 2013
14 SEP 2013
14 SEP 2013
14 SEP 2013
16 SEP 2013
16 SEP 2013
16 SEP 2013
17 SEP 2013
17 SEP 2013
18 SEP 2013
18 SEP 2013
18 SEP 2013
18 SEP 2013
18 SEP 2013
20 SEP 2013
20 SEP 2013
20 SEP 2013
20 SEP 2013
20 SEP 2013
21 SEP 2013
21 SEP 2013
23 SEP 2013
23 SEP 2013
23 SEP 2013
25 SEP 2013
25 SEP 2013
25 SEP 2013
27 SEP 2013
30 SEP 2013
30 SEP 2013
30 SEP 2013
30 SEP 2013
30 SEP 2013
01 OCT 2013
01 OCT 2013
02 OCT 2013
02 OCT 2013
04 OCT 2013
04 OCT 2013
04 OCT 2013
04 OCT 2013
05 OCT 2013
05 OCT 2013

Inspection Item

CHECK POSITION & ELEVATION INSTALLATION BATHUB 9th fl (unit 24~28&1~4)


CHECK POSITION, ELEVATION & LEAKAGE TEST EXTERNAL PIPE
PRESSURE TEST CLEAN WATER PIPE PS-6 (BFL-8FL)
PRESSURE TEST CLEAN WATER PIPE PS-7 (4FL-17FL)
GRAVITY TEST DRAINAGE AT ST-2 FOR PVC PIPE (9th Fl)
CHECK INSTALLATION REBAR AND FORMWORK FOR MANHOLE
PRESSURE TEST STEAM PIPE (BFL)
4th FLOOR AT PODIUM AREA PODIUM PO7A.B (H/E~H/Kb)
CHECK INSTALLATION CITY WATER BEFORE BACKFILL (BASEMENT FLOOR)
PRESSURE TEST CITY WATER PIPE (BFL)
PRESSURE TEST CLEAN WATER PIPE ST-2, DST-1D (8th FLOOR)
PRESSURE TEST CLEAN WATER PIPE BACK WC-1 (SHOWER ROOM)
CHECK POSITION & MARKING INSTALLATION 25th fl ( 1B-1 )
PRESSURE TEST CLEAN WATER PIPE DST-1D (12nd FLOOR)
PRESSURE TEST CLEAN WATER PIPE DST-1D (11st FLOOR)
GRAVITY TEST DRAINAGE AT LOUDRY (BFL)
CHECK POSITION & ELEVATION INSTALLATION BATHUB 10th fl (unit 10~28)
CHECK POSITION & MARKING INSTALLATION 21st~25th fl ( INNER CORE )
CHECK POSITION & ELEVATION INSTALLATION BACK WC-2 (GFL)
CHECK POSITION & ELEVATION INSTALLATION VIP BATHROOM (2NDFL)
CHECK POSITION & ELEVATION INSTALLATION BATHUB 10th fl (unit1~4)
PRESSURE TEST CLEAN WATER PIPE INNER CORE (13,14,15,16,17 & 19 FLOOR)
GRAVITY TEST DRAINAGE FOR INNER CORE (16th Fl)
GRAVITY TEST DRAINAGE FOR PS-3, PS-4, PS-5 (27th~32nd Fl)
PRESSURE TEST CLEAN WATER PIPE DST-1D UNIT 9&6 (8th FLOOR)
PRESSURE TEST CLEAN WATER PIPE DST-1D UNIT 20&23 (11st FLOOR)
PRESSURE TEST CLEAN WATER PIPE DST-1D UNIT 9 (12nd FLOOR)
4th FLOOR AT PODIUM AREA PODIUM PO8A.B (H/C~H/E)
GRAVITY TEST DRAINAGE AT ST-2 & ST-3DF FOR PVC PIPE (10th Fl)
CHECK POSITION & MARKING INSTALLATION 26th fl ( 1B-1 )
GRAVITY TEST DRAINAGE AT ST-1 & JSU-1 FOR PVC PIPE (20th Fl)
PRESSURE TEST CLEAN WATER PIPE ST-2 UNIT 7/8 (7th FLOOR)
PRESSURE TEST CLEAN WATER PIPE ST-2 UNIT 21/22 (9th FLOOR)
CHECK POSITION & ELEVATION INSTALLATION BATHUB 11st fl (ALL UNIT ST-1)
PRESSURE TEST CLEAN WATER PIPE DST-1D UNIT 6,9&23 (8th FLOOR)
GRAVITY TEST DRAINAGE FOR INNER CORE (17th Fl)
PRESSURE TEST HW & HWR PIPE (BFL)
PRESSURE TEST CLEAN WATER PIPE DST-1D UNIT 9 (10th FLOOR)
PRESSURE TEST CLEAN WATER PIPE DST-1D& ST-2 UNIT 9 (11th FLOOR)
PRESSURE TEST CLEAN WATER PIPE DST-1D, DST-1DF& ST-2 UNIT 9,20,23 (14th FLOOR)
CHECK POSITION & ELEVATION INSTALLATION BATHUB 10th fl (UNIT3)
CHECK POSITION & ELEVATION INSTALLATION BATHUB 11th fl (UNIT 1,2,27)
4th FLOOR AT PODIUM DOG HOUSE
CHECK POSITION & ELEVATION INSTALLATION PUNLIC TOILET-1 (GFL)
CHECK POSITION & ELEVATION INSTALLATION WC 6th fl (UNIT 6~10)
PRESSURE TEST CW PIPE (BFL)
GRAVITY TEST DRAINAGE AT JSU-2 & JSU-1 FOR PVC PIPE (21th Fl)
PRESSURE TEST CLEAN WATER PIPE JSU-1-1D UNIT 23/24 (13th FLOOR)
PRESSURE TEST CLEAN WATER PIPE DST-1D UNIT 20 (12th FLOOR)
PRESSURE TEST CLEAN WATER PIPE DST-1DF UNIT 6 (9th FLOOR)
GRAVITY TEST DRAINAGE FOR BALKONI (22nd REFLECTED Fl)
CHECK POSITION & MARKING COORING 2B-1 ( 23~31 FL )

Report

Planning

Actual

Submit

Return

SEPTEMBER 13rd, 2013


SEPTEMBER 13rd, 2013
SEPTEMBER 14th, 2013
SEPTEMBER 14th, 2013
SEPTEMBER 16th, 2013
SEPTEMBER 16th, 2013
SEPTEMBER 16th, 2013
SEPTEMBER 16th, 2013
SEPTEMBER 16th, 2013
SEPTEMBER 17th, 2013
SEPTEMBER 17th, 2013
SEPTEMBER 17th, 2013
SEPTEMBER 17th, 2013
SEPTEMBER 18th, 2013
SEPTEMBER 18th, 2013
SEPTEMBER 19th, 2013
SEPTEMBER 19th, 2013
SEPTEMBER 19th, 2013
SEPTEMBER 20th, 2013
SEPTEMBER 20th, 2013
SEPTEMBER 20th, 2013
SEPTEMBER 20th, 2013
SEPTEMBER 20th, 2013
SEPTEMBER 23rd, 2013
SEPTEMBER 23rd, 2013
SEPTEMBER 23rd, 2013
SEPTEMBER 23rd, 2013
SEPTEMBER 23rd, 2013
SEPTEMBER 24th, 2013
SEPTEMBER 24th, 2013
SEPTEMBER 25th, 2013
SEPTEMBER 25th, 2013
SEPTEMBER 25th, 2013
SEPTEMBER 27th, 2013
SEPTEMBER 27th, 2013
SEPTEMBER 27th, 2013
SEPTEMBER 30th, 2013
OCTOBER 2nd, 2013
OCTOBER 2nd, 2013
OCTOBER 2nd, 2013
OCTOBER 2nd, 2013
OCTOBER 2nd, 2013
OCTOBER 3rd, 2013
OCTOBER 3rd, 2013
OCTOBER 4th, 2013
OCTOBER 4th, 2013
OCTOBER 7th, 2013
OCTOBER 7th, 2013
OCTOBER 7th, 2013
OCTOBER 7th, 2013
OCTOBER 8th, 2013
OCTOBER 8th, 2013

SEPTEMBER 13rd, 2013


SEPTEMBER 14th, 2013
SEPTEMBER 14th, 2013

SEPTEMBER 16th, 2013 SEPTEMBER 27th, 2013


SEPTEMBER 19th, 2013 SEPTEMBER 27th, 2013
SEPTEMBER 19th, 2013 OCTOBER 28th, 2013

SEPTEMBER 18th, 2013


SEPTEMBER 24th, 2013
SEPTEMBER 16th, 2013
SEPTEMBER 21th, 2013

SEPTEMBER 20th, 2013 SEPTEMBER 27th, 2013


OCTOBER 10th, 2013
SEPTEMBER 20th, 2013 SEPTEMBER 25th, 2013
SEPTEMBER 25th, 2013 OCTOBER 28th, 2013

SEPTEMBER 19th, 2013


SEPTEMBER 18th, 2013
SEPTEMBER 18th, 2013
SEPTEMBER 17th, 2013
SEPTEMBER 18th, 2013
SEPTEMBER 19th, 2013

SEPTEMBER 20th, 2013 SEPTEMBER 27th, 2013


SEPTEMBER 20th, 2013 SEPTEMBER 27th, 2013
SEPTEMBER 20th, 2013

SEPTEMBER 19th, 2013


OCTOBER 1st, 2014

SEPTEMBER 20th, 2013 SEPTEMBER 27th, 2013

SEPTEMBER 30th, 2013


SEPTEMBER 20th, 2013
SEPTEMBER 23rd, 2013
SEPTEMBER 21st, 2013
SEPTEMBER 25th, 2013

OCTOBER 1st, 2014


SEPTEMBER 23rd, 2013
SEPTEMBER 25th, 2013
SEPTEMBER 24th, 2013
OCTOBER 2nd, 2013

SEPTEMBER 21th, 2013


SEPTEMBER 24th, 2013
SEPTEMBER 22nd, 2013
SEPTEMBER 24th, 2013
OCTOBER 1st, 2013
OCTOBER 1st, 2014
SEPTEMBER 27th, 2013
OCTOBER 1st, 2014
SEPTEMBER 28th, 2013
SEPTEMBER 30th, 2013
OCTOBER 2nd, 2013
OCTOBER 2nd, 2014
OCTOBER 2nd, 2014

SEPTEMBER 25th, 2013

OCTOBER 2nd, 2013


OCTOBER 3rd, 2013
OCTOBER 3rd, 2013
NOVEMBER 1st, 2013
OCTOBER 9th, 2013
OCTOBER 8th, 2013
OCTOBER 8th, 2013
OCTOBER 8th, 2013
OCTOBER 8th, 2013
OCTOBER 8th, 2013
OCTOBER 8th, 2013

OCTOBER 7th, 2013


OCTOBER 7th, 2013
OCTOBER 5th, 2013
OCTOBER 7th, 2013
OCTOBER 11st, 2013
OCTOBER 21st, 2013
OCTOBER 21st, 2013
OCTOBER 21st, 2013
OCTOBER 21st, 2013
OCTOBER 21st, 2013

SEPTEMBER 20th, 2013


SEPTEMBER 20th, 2013 SEPTEMBER 27th, 2013

OCTOBER 28th, 2013


OCTOBER 4th, 2013
OCTOBER 4th, 2013
OCTOBER 4th, 2013
DESEMBER 19th, 2013

CANCEL (Double RFI)


OCTOBER 16th, 2013

OCTOBER 8th, 2013


OCTOBER 28th, 2013
OCTOBER 7th, 2013
OCTOBER 10th, 2013
OCTOBER 7th, 2014
OCTOBER 10th, 2013
OCTOBER 1st, 2014
NOVEMBER 28th, 2013
OCTOBER 7th, 2014
OCTOBER 10th, 2013
NOVEMBER 15th, 2013 NOVEMBER 28th, 2013
OCTOBER 2nd, 2013
OCTOBER 3rd, 2013
OCTOBER 7th, 2014
OCTOBER 10th, 2013
OCTOBER 7th, 2014
OCTOBER 10th, 2013
OCTOBER 9th, 2013
NOVEMBER 4th, 2013
NOVEMBER 28th, 2013

NOVEMBER 28th, 2013


OCTOBER 18th, 2013
OCTOBER 28th, 2013
OCTOBER 28th, 2013
OCTOBER 28th, 2013
NOVEMBER 18th, 2013

Remaks

REQUEST FOR INSPECTION REPORT ( RFI )


RFI Number
NO

435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486

TSRT No.
0435/TS/MI/X/13
0436/TS/MI/X/13
0437/TS/MI/X/13
0438/TS/MI/X/13
0439/TS/MI/X/13
0440/TS/MI/X/13
0441/TS/MI/X/13
0442/TS/MI/X/13
0443/TS/MI/X/13
0444/TS/MI/X/13
0445/TS/MI/X/13
0446/TS/MI/X/13
0447/TS/MI/X/13
0448/TS/MI/X/13
0449/TS/MI/X/13
0450/TS/MI/X/13
0451/TS/MI/X/13
0452/TS/MI/X/13
0453/TS/MI/X/13
0454/TS/MI/X/13
0455/TS/MI/X/13
0456/TS/MI/X/13
0457/TS/MI/X/13
0458/TS/MI/X/13
0459/TS/MI/X/13
0460/TS/MI/X/13
0461/TS/MI/X/13
0462/TS/MI/X/13
0463/TS/MI/X/13
0464/TS/MI/X/13
0465/TS/MI/X/13
0466/TS/MI/X/13
0467/TS/MI/X/13
0468/TS/MI/X/13
0469/TS/MI/X/13
0470/TS/MI/XI/13
0471/TS/MI/XI/13
0472/TS/MI/XI/13
0473/TS/MI/XI/13
0474/TS/MI/XI/13
0475/TS/MI/XI/13
0476/TS/MI/XI/13
0477/TS/MI/XI/13
0478/TS/MI/XI/13
0479/TS/MI/XI/13
0480/TS/MI/XI/13
0481/TS/MI/XI/13
0482/TS/MI/XI/13
0483/TS/MI/XI/13
0484/TS/MI/XI/13
0485/TS/MI/XI/13
0486/TS/MI/XI/13

Inspection

KAJIMA No.

2604
2603
2610
2613
2621
2631
2630
2638
2637
2636
2639
2651
2673
2682
2681
2680
2688
2687
2686
2685
2684
2704
2716
2728
2727
2735
2742
2743
2759
2760
2774
2773
2776
2796
2797
2782
2795
2794
2793
2792
2813
2806
2812
2810
2811
2819
2821
2822
2820

Scoupe

Submitted

P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P

05 OCT 2013
05 OCT 2013
05 OCT 2013
07 OCT 2013
08 OCT 2013
09 OCT 2013
10 OCT 2013
10 OCT 2013
11 OCT 2013
11 OCT 2013
11 OCT 2013
11 OCT 2013
12 OCT 2013
16 OCT 2013
21 OCT 2013
21 OCT 2013
21 OCT 2013
21 OCT 2013
21 OCT 2013
21 OCT 2013
21 OCT 2013
21 OCT 2013
21 OCT 2013
23 OCT 2013
24 OCT 2013
25 OCT 2013
25 OCT 2013
28 OCT 2013
28 OCT 2013
29 OCT 2013
29 OCT 2013
30 OCT 2013
30 OCT 2013
31 OCT 2013
31 OCT 2013
01 NOV 2013
01 NOV 2013
01 NOV 2013
04 NOV 2013
04 NOV 2013
04 NOV 2013
04 NOV 2013
04 NOV 2013
06 NOV 2013
06 NOV 2013
06 NOV 2013
06 NOV 2013
06 NOV 2013
06 NOV 2013
06 NOV 2013
06 NOV 2013
06 NOV 2013

Inspection Item

FLOW TEST ALL GUEST ROOM (5th Fl)


PRESSURE TEST CLEAN WATER PIPE INNER CORE (18,20,21 FLOOR)
GRAVITY TEST DRAINAGE AT INNER CORE PIPE (18th Fl)
CHECK POSITION & ELEVATION EXTERNAL PIPE (H/12~H/13 : H/A)
CHECK POSITION & MARKING COORING 2B-1 ( 23FL )
GRAVITY TEST DRAINAGE STAFF DINING ROOM (BFl)
CHECK POSITION & ELEVATION INSTALLATION BATHUB 11th fl (UNIT 4,10,26)
CHECK POSITION & ELEVATION INSTALLATION BATHUB 12th fl (UNIT 10~28)
GRAVITY TEST DRAINAGE AT ST-1 FOR PVC PIPE (5th Fl)
PRESSURE TEST CLEAN WATER PIPE ST-2 UNIT 7/8 (8th FLOOR)
GRAVITY TEST DRAINAGE AT 1B-1 FOR PVC PIPE (23th Fl)
GRAVITY TEST DRAINAGE FOR BALKONI (24th Fl)
CHECK POSITION & MARKING INSTALLATION 7,10,13,15,16,17,18,19th fl ( JSU )
CHECK POSITION & MARKING INSTALLATION BOH-4 (3FL)
GRAVITY TEST DRAINAGE AT 1B-1 FOR PVC PIPE (24th Fl)
PRESSURE TEST CLEAN WATER PIPE EXTERNAL AREA PDAM
CHECK POSITION & MARKING INSTALLATION 23rd fl ( 2B-1 )
CHECK POSITION & MARKING COORING 2B-2 ( 23FL )
CHECK POSITION & ELEVATION INSTALLATION BATHUB 13rd fl ( ALL UNIT ST-1 )
CHECK POSITION & MARKING INSTALLATION PUBLIC TOILET-2 (2nd FL)
CHECK POSITION & MARKING COORING 1B-2 ( 23FL )
CHECK POSITION & MARKING INSTALLATION 1B-2 (23rd FL)
CHECK POSITION & MARKING INSTALLATION GREASE TRAP-5 ( GT-5 )
PRESSURE TEST CLEAN WATER PIPE ST-1,DST-2F,JSU-1,JSU-2 (20th FLOOR)
CHECK POSITION & MARKING INSTALLATION 1B-1 KITCHEN AREA (23rd FL)
CHECK POSITION & MARKING INSTALLATION GREASE TRAP-3-12 ( GT-3-12 )
GRAVITY TEST DRAINAGE FOR GUEST RM WC, BACK WC-2 & CORRIDOR (BFl REFLECTED)
GRAVITY TEST DRAINAGE FOR BALKONI (25th Fl)
GRAVITY TEST DRAINAGE FOR BALKONI (22th Fl)
PRESSURE TEST FOR PRV (4th, 8th,16th FLOOR)
CHECK INSTALLATION REBAR AND FORMWORK FOR MANHOLE
CHECK POSITION & ELEVATION EXTERNAL PIPE (H/12~H/13 : H/A)
GRAVITY TEST DRAINAGE CORRIDOR (BFl REFLECTED)
GRAVITY TEST DRAINAGE 1B-1 (25th FLOOR)
GRAVITY TEST INNER CORE (19th FLOOR)
CHECK POSITION & MARKING INSTALLATION WC ( 5th FLOOR )
CHECK POSITION & MARKING INSTALLATION PUBLIC-WC 1 ( 22nd FLOOR )
CHECK POSITION & MARKING INSTALLATION GREASE TRAP ( 21nd )
GRAVITY TEST DRAINAGE ST-2,ST-3DF, DST-1D, JSU (11,12,13th FLOOR)
PRESSURE TEST CLEAN WATER PIPE JSU-1 (7th FLOOR)
PRESSURE TEST CLEAN WATER PIPE UNIT 9 & 20 (9th FLOOR)
PRESSURE TEST CLEAN WATER PIPE UNIT ST-2, DST-1D, JSU-1, ST-3DF (10th FLOOR)
PRESSURE TEST CLEAN WATER PIPE UNIT ST-2, DST-1D (11th FLOOR)
GRAVITY TEST DRAINAGE FOR PUBILC WC-3 (GFl REFLECTED)
CHECK POSITION & ELEVATION INSTALLATION BATHUB 14th fl ( ALL UNIT ST-1 )
CHECK POSITION & ELEVATION INSTALLATION WC 7th fl
GRAVITY TEST DRAINAGE FOR KITCHEN ZONE-3 (BFL)
CHECK POSITION & ELEVATION EXTERNAL PIPE (H/4~H/12 : H/A)
GRAVITY TEST DRAINAGE FOR RAIN DRAIN (3 FL)
GRAVITY TEST DRAINAGE FOR KITCHEN DRAIN (2FL REFLECTED)
CHECK POSITION & MARKING INSTALLATION GREASE TRAP ( 22nd )
CHECK POSITION & MARKING INSTALLATION 27th fl ( 1B-1 )

Report

Planning

Actual

Submit

Return

OCTOBER 8th, 2013


OCTOBER 8th, 2013
OCTOBER 8th, 2013
OCTOBER 9th, 2013
OCTOBER 10th, 2013
OCTOBER 11st, 2013
OCTOBER 12th, 2013
OCTOBER 12th, 2013
OCTOBER 16th, 2013
OCTOBER 16th, 2013
OCTOBER 16th, 2013
OCTOBER 16th, 2013
OCTOBER 16th, 2013
OCTOBER 18th, 2013
OCTOBER 23rd, 2013
OCTOBER 23rd, 2013
OCTOBER 23rd, 2013
OCTOBER 23rd, 2013
OCTOBER 23rd, 2013
OCTOBER 23rd, 2013
OCTOBER 23rd, 2013
OCTOBER 23rd, 2013
OCTOBER 23rd, 2013
OCTOBER 25th, 2013
OCTOBER 26th, 2013
OCTOBER 28th, 2013
OCTOBER 28th, 2013
OCTOBER 31st, 2013
OCTOBER 31st, 2013
OCTOBER 31st, 2013
OCTOBER 31st, 2013
OCTOBER 31st, 2013
NOVEMBER 1st, 2013
NOVEMBER 2nd, 2013
NOVEMBER 2nd, 2013
NOVEMBER 4th, 2013
NOVEMBER 4th, 2013
NOVEMBER 4th, 2013
NOVEMBER 7th, 2013
NOVEMBER 7th, 2013
NOVEMBER 7th, 2013
NOVEMBER 7th, 2013
NOVEMBER 7th, 2013
NOVEMBER 8th, 2013
NOVEMBER 8th, 2013
NOVEMBER 8th, 2013
NOVEMBER 8th, 2013
NOVEMBER 8th, 2013
NOVEMBER 8th, 2013
NOVEMBER 8th, 2013
NOVEMBER 8th, 2013
NOVEMBER 8th, 2013

OCTOBER 8th, 2013


OCTOBER 8th, 2013
OCTOBER 18th, 2013
OCTOBER 10th, 2013
OCTOBER 8th, 2013
OCTOBER 12th, 2013
OCTOBER 12th, 2013
OCTOBER 12th, 2013

OCTOBER 21st, 2013


OCTOBER 11st, 2013
OCTOBER 22nd, 2013
OCTOBER 16th, 2013
OCTOBER 12th, 2013
OCTOBER 22nd, 2013
OCTOBER 16th, 2013
OCTOBER 16th, 2013

OCTOBER 28th, 2013


OCTOBER 28th, 2013
NOVEMBER 18th, 2013
OCTOBER 18th, 2013
NOVEMBER 4th, 2013
NOVEMBER 28th, 2013
NOVEMBER 28th, 2013

OCTOBER 21st, 2013


OCTOBER 16th, 2013
OCTOBER 19th, 2013
OCTOBER 19th, 2013
OCTOBER 19th, 2013
OCTOBER 22nd, 2013
OCTOBER 28th, 2013
OCTOBER 23rd, 2013
OCTOBER 23rd, 2013
OCTOBER 23rd, 2013
OCTOBER 23rd, 2013
OCTOBER 23rd, 2013
OCTOBER 23rd, 2013
OCTOBER 24th, 2013
OCTOBER 28th, 2013
OCTOBER 26th, 2013
NOVEMBER 13rd, 2013
NOVEMBER 4th, 2013

NOVEMBER 5th, 2013


OCTOBER 22nd, 2013
OCTOBER 22nd, 2013

Remaks

CANCEL
NOVEMBER 18th, 2013
OCTOBER 28th, 2013

OCTOBER 21st, 2013


NOVEMBER 4th, 2013
OCTOBER 31st, 2013
OCTOBER 25th, 2013

NOVEMBER 28th, 2013


NOVEMBER 18th, 2013
NOVEMBER 28th, 2013

OCTOBER 24th, 2013


OCTOBER 25th, 2013

NOVEMBER 18th, 2013

OCTOBER 26th, 2013


OCTOBER 28th, 2013
NOVEMBER 11st, 2013

NOVEMBER 28th, 2013


NOVEMBER 28th, 2013
NOVEMBER 18th, 2013

NOVEMBER 7th, 2013

NOVEMBER 15th, 2013

NOVEMBER 1st, 2013

NOVEMBER 4th, 2013

NOVEMBER 28th, 2013

OCTOBER 31st, 2013


OCTOBER 31st, 2013
NOVEMBER 8th, 2013
NOVEMBER 4th, 2013
NOVEMBER 4th, 2013
NOVEMBER 7th, 2013
NOVEMBER 4th, 2013
NOVEMBER 8th, 2013
NOVEMBER 12th, 2013
NOVEMBER 6th, 2013
NOVEMBER 6th, 2013
NOVEMBER 6th, 2013
NOVEMBER 6th, 2013
NOVEMBER 8th, 2013

DESEMBER 17th, 2013


NOVEMBER 1st, 2013
NOVEMBER 11st, 2013

NOVEMBER 18th, 2013


NOVEMBER 15th, 2013

INTERNAL

NOVEMBER 21st, 2013


NOVEMBER 7th, 2013
NOVEMBER 13rd, 2013
NOVEMBER 13rd, 2013
NOVEMBER 8th, 2013
NOVEMBER 11st, 2013

DECEMBER 9th, 2013


NOVEMBER 11st, 2013
NOVEMBER 6th, 2013

DESEMBER 24th, 2013


NOVEMBER 18th, 2013

NOVEMBER 21st, 2013


NOVEMBER 4th, 2013
NOVEMBER 4th, 2013
NOVEMBER 21st, 2013
NOVEMBER 11st, 2013

NOVEMBER 28th, 2013


NOVEMBER 28th, 2013
NOVEMBER 28th, 2013
NOVEMBER 28th, 2013
NOVEMBER 15th, 2013

NOVEMBER 22nd, 2013 DESEMBER 5th, 2013


NOVEMBER 15th, 2013 NOVEMBER 28th, 2013
NOVEMBER 15th, 2013 DESEMBER 5th, 2013
NOVEMBER 15th, 2013 DESEMBER 5th, 2013
NOVEMBER 15th, 2013 NOVEMBER 18th, 2013

REQUEST FOR INSPECTION REPORT ( RFI )


RFI Number
NO

487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538

Inspection

TSRT No.

KAJIMA No.

0487/TS/MI/XI/13
0488/TS/MI/XI/13
0489/TS/MI/XI/13
0490/TS/MI/XI/13
0491/TS/MI/XI/13
0492/TS/MI/XI/13
0493/TS/MI/XI/13
0494/TS/MI/XI/13
0495/TS/MI/XI/13
0496/TS/MI/XI/13
0497/TS/MI/XI/13
0498/TS/MI/XI/13
0499/TS/MI/XI/13
0500/TS/MI/XI/13
0501/TS/MI/XI/13
0502/TS/MI/XI/13
0503/TS/MI/XI/13
0504/TS/MI/XI/13
0505/TS/MI/XI/13
0506/TS/MI/XI/13
0507/TS/MI/XI/13
0508/TS/MI/XI/13
0509/TS/MI/XI/13
0510/TS/MI/XI/13
0511/TS/MI/XI/13
0512/TS/MI/XI/13
0513/TS/MI/XI/13
0514/TS/MI/XI/13
0515/TS/MI/XI/13
0516/TS/MI/XI/13
0517/TS/MI/XI/13
0518/TS/MI/XI/13
0519/TS/MI/XI/13
0520/TS/MI/XI/13
0521/TS/MI/XI/13
0522/TS/MI/XI/13
0523/TS/MI/XI/13
0524/TS/MI/XI/13
0525/TS/MI/XI/13
0526/TS/MI/XI/13
0527/TS/MI/XI/13
0528/TS/MI/XI/13
0529/TS/MI/XI/13
0530/TS/MI/XI/13
0531/TS/MI/XI/13
0532/TS/MI/XI/13
0533/TS/MI/XI/13
0534/TS/MI/XI/13
0535/TS/MI/XI/13
0536/TS/MI/XI/13
0537/TS/MI/XI/13
0538/TS/MI/XI/13

2847
2858
2857
2864
2865
2869
2868
2872
2882
2884
2883
2891
2892
2893
2901
2903
2902
2904
2905
2906
2907
2913
2922
2921
2924
2925
2927
2926
2945
2944
2959
2958
2957
2964
2976
2975
2974
3001
3000
2998
2980
2981
2990
3005
3004
3003
3002
2999
3020

Scoupe

Submitted

Inspection Item

P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P

08 NOV 2013
11 NOV 2013
11 NOV 2013
11 NOV 2013
11 NOV 2013
12 NOV 2013
12 NOV 2013
12 NOV 2013
12 NOV 2013
13 NOV 2013
13 NOV 2013
13 NOV 2013
14 NOV 2013
14 NOV 2013
14 NOV 2013
15 NOV 2013
15 NOV 2013
15 NOV 2013
16 NOV 2013
16 NOV 2013
16 NOV 2013
16 NOV 2013
16 NOV 2013
18 NOV 2013
18 NOV 2013
18 NOV 2013
18 NOV 2013
18 NOV 2013
19 NOV 2013
19 NOV 2013
19 NOV 2013
19 NOV 2013
20 NOV 2013
20 NOV 2013
20 NOV 2013
21 NOV 2013
21 NOV 2013
22 NOV 2013
22 NOV 2013
22 NOV 2013
22 NOV 2013
22 NOV 2013
22 NOV 2013
22 NOV 2013
22 NOV 2013
25 NOV 2013
25 NOV 2013
25 NOV 2013
25 NOV 2013
25 NOV 2013
26 NOV 2013
26 NOV 2013

GRAVITY TEST DRAINAGE FOR PUBILC WC-1 (22nd Fl REFLECTED)


CHECK POSITION & MARKING INSTALLATION GREASE TRAP (GT-01 & GT-02 BFL )
GRAVITY TEST DRAINAGE FOR KITCHEN ZONE-1 & ZONE-2 (BFL)
CHECK POSITION & MARKING INSTALLATION GREASE TRAP (GT-G-1 ~ GT-G-4 GFL )
CHECK POSITION & ELEVATION EXTERNAL PIPE (H/D~H/E : H/A)
CHECK POSITION & MARKING INSTALLATION 1b-1, 2B-1 (28th FL)
PRESSURE TEST PVC PIPE FROM SUMPIT (BASEMENT FLOOR)
CHECK POSITION & MARKING INSTALLATION GREASE TRAP GT-3 ( BFL )
PRESSURE TEST CLEAN WATER PIPE KITCHEN ZONE 3 (BASEMENT FLOOR)
CHECK POSITION & ELEVATION INSTALLATION BATHUB 15th fl ( ALL UNIT ST-1 )
CHECK POSITION & ELEVATION INSTALLATION WC 8th fl
GRAVITY TEST DRAINAGE AT INNER CORE PIPE (5th ~ 8th Fl)
GRAVITY TEST DRAINAGE AT INNER CORE PIPE (9th ~ 13th Fl)
GRAVITY TEST DRAINAGE 1B-1 (27th FLOOR)
CHECK POSITION & ELEVATION EXTERNAL PIPE (H/1~W/1 : H/A)
GRAVITY TEST DRAINAGE FOR RAIN DRAIN H/7~H/8 (3 FL)
CHECK POSITION & MARKING INSTALLATION GREASE TRAP (GT-7, GT-8, GT-9 BFL )
CHECK POSITION & MARKING INSTALLATION GREASE TRAP (GT-101 BFL )
PRESSURE TEST CLEAN WATER PIPE JSU-1 (15th&16th FLOOR)
PRESSURE TEST CLEAN WATER PIPE JSU-1 (13th FLOOR)
PRESSURE TEST CLEAN WATER PIPE DST-1D (12th FLOOR)
CHECK POSITION & MARKING INSTALLATION FD 1b-1, 2B-1 (29th FL)
CHECK POSITION & MARKING INSTALLATION GREASE TRAP (GT-6 BFL )
PRESSURE TEST CLEAN WATER PIPE 1B-1 (23rd FLOOR)
CHECK INSTALLATION PIPE AT WATER TANK ( BFL )
CHECK POSITION & ELEVATION INSTALLATION BATHUB 8th&9th fl ( UNIT 5 )
GRAVITY TEST DRAINAGE FOR GREASE TRAP AND KITCHEN DRAIN (21 &22 FL)
PRESSURE TEST SUS PIPE CORRIDOR (23rd FLOOR REFLECTED)
CHECK INSTALLATION REBAR AND FORMWORK FOR MANHOLE
CHECK POSITION & INSTALLATION RD AT MAIN CANOPY ( GFL )
PRESSURE TEST CLEAN WATER PIPE PUBLIC WC-2 (GROUND FLOOR)
CHECK POSITION & ELEVATION EXTERNAL PIPE (H/A~H/E : W/1)
CHECK POSITION & ELEVATION INSTALLATION BACK WC-4 (2FL)
CHECK POSITION & ELEVATION INSTALLATION VIP BATHROOM (2FL)
CHECK POSITION & ELEVATION INSTALLATION BACK WC-2 (GFL)
CHECK POSITION & MARKING INSTALLATION FD 2B-2 (23th FL)
CHECK POSITION & MARKING INSTALLATION FD BOH-1 (26th~28th FL)
GRAVITY TEST DRAINAGE FOR SPA MACHINE ROOM (2nd FLOOR REFLECTED )
CHECK POSITION & ELEVATION INSTALLATION BATHUB 16h fl ( UNIT ST-1 )
GRAVITY TEST DRAINAGE KITCHEN ZONE 12 (EGG ROOM BFL )
PRESSURE TEST CLEAN WATER PIPE BACK WC-1 (GROUND FLOOR)
PRESSURE TEST CLEAN WATER PIPE BACK WC-2 (GROUND FLOOR)
PRESSURE TEST CLEAN WATER PIPE PUBLIC WC-3 (GROUND FLOOR)
CHECK POSITION & ELEVATION EXTERNAL PIPE (H/A~H/E : W/1~H/1)
FLUSHING TEST FOR CITY WATER PIPE
PRESSURE TEST CLEAN WATER PIPE ST-1,JSU-1,JSU-2 (21th FLOOR)
GRAVITY TEST DRAINAGE KITCHEN ZONE 16&17 (LOUNDRY ROOM BFL )
GRAVITY TEST DRAINAGE KITCHEN ZONE 10 (EMPLOY KITCHEN BFL )
PRESSURE TEST SUS PIPE CORRIDOR (21st FLOOR REFLECTED)
PRESSURE TEST SUS PIPE CORRIDOR (22nd FLOOR REFLECTED)
PRESSURE TEST CLEAN WATER PIPE PUBLIC WC-1 (GROUND FLOOR)
PRESSURE TEST SUS PIPE CORRIDOR (GROUND FLOOR REFLECTED)

Report

Planning

Actual

NOVEMBER 11st, 2013


NOVEMBER 13rd, 2013
NOVEMBER 13rd, 2013
NOVEMBER 13rd, 2013
NOVEMBER 13rd, 2013
NOVEMBER 14th, 2013
NOVEMBER 14th, 2013
NOVEMBER 13rd, 2013
NOVEMBER 14th, 2013
NOVEMBER 14th, 2013
NOVEMBER 15th, 2013
NOVEMBER 15th, 2013
NOVEMBER 16th, 2013
NOVEMBER 16th, 2013
NOVEMBER 16th, 2013
NOVEMBER 16th, 2013
NOVEMBER 16th, 2013
NOVEMBER 16th, 2013
NOVEMBER 18th, 2013
NOVEMBER 18th, 2013
NOVEMBER 18th, 2013
NOVEMBER 18th, 2013
NOVEMBER 18th, 2013
NOVEMBER 19th, 2013
NOVEMBER 19th, 2013
NOVEMBER 19th, 2013
NOVEMBER 19th, 2013
NOVEMBER 20th, 2013
NOVEMBER 20th, 2013
NOVEMBER 20th, 2013
NOVEMBER 21th, 2013
NOVEMBER 21th, 2013
NOVEMBER 22nd, 2013
NOVEMBER 22nd, 2013
NOVEMBER 22nd, 2013
NOVEMBER 23rd, 2013
NOVEMBER 23rd, 2013
NOVEMBER 23rd, 2013
NOVEMBER 23rd, 2013
NOVEMBER 25th, 2013
NOVEMBER 26th, 2013
NOVEMBER 26th, 2013
NOVEMBER 26th, 2013
NOVEMBER 26th, 2013
NOVEMBER 25th, 2013
NOVEMBER 26th, 2013
NOVEMBER 27th, 2013
NOVEMBER 27th, 2013
NOVEMBER 27th, 2013
NOVEMBER 27th, 2013
NOVEMBER 27th, 2013
NOVEMBER 28th, 2013

NOVEMBER 12th, 2013


NOVEMBER 12th, 2013
NOVEMBER 21st, 2013
NOVEMBER 15th, 2013
NOVEMBER 12th, 2013
NOVEMBER 14th, 2013
NOVEMBER 21st, 2013
NOVEMBER 15th, 2013
NOVEMBER 21st, 2013
NOVEMBER 18th, 2013
NOVEMBER 17th, 2013
NOVEMBER 17th, 2014
NOVEMBER 19th, 2013
NOVEMBER 16th, 2013
NOVEMBER 15th, 2013
NOVEMBER 19th, 2013

Submit

Return

Remaks

NOVEMBER 21st, 2013 NOVEMBER 28th, 2013


NOVEMBER 18th, 2013 DESEMBER 5th, 2013
NOVEMBER 22nd, 2013 DESEMBER 5th, 2013
NOVEMBER 18th, 2013 DESEMBER 5th, 2013
NOVEMBER 15th, 2013 NOVEMBER 28th, 2013
INTERNAL
NOVEMBER 20th, 2013
NOVEMBER 22nd, 2013
NOVEMBER 20th, 2013

DESEMBER 5th, 2013


DESEMBER 5th, 2013
DESEMBER 5th, 2013

NOVEMBER 18th, 2013 NOVEMBER 28th, 2013


NOVEMBER 19th, 2013 NOVEMBER 28th, 2013
NOVEMBER 20th, 2013 DESEMBER 5th, 2013

NOVEMBER 19th, 2013


DECEMBER 9th, 2013
NOVEMBER 19th, 2014
NOVEMBER 19th, 2015
DECEMBER 9th, 2013
NOVEMBER 19th, 2015
NOVEMBER 19th, 2013 NOVEMBER 20th, 2013
NOVEMBER 19th, 2013 NOVEMBER 23rd, 2013
NOVEMBER 20th, 2013
DESEMBER 7th, 2013
NOVEMBER 19th, 2013 NOVEMBER 23rd, 2013
NOVEMBER 20th, 2013 NOVEMBER 26th, 2013
NOVEMBER 20th, 2013
DECEMBER 9th, 2013
NOVEMBER 26th, 2013 DESEMBER 13th, 2013
NOVEMBER 20th, 2013 NOVEMBER 22nd, 2013
NOVEMBER 23rd, 2013 NOVEMBER 29th, 2013
NOVEMBER 21th, 2013 NOVEMBER 22nd, 2013
NOVEMBER 23rd, 2013
DESEMBER 2nd, 2013
NOVEMBER 22nd, 2013
DESEMBER 2nd, 2013
NOVEMBER 23rd, 2013
DESEMBER 2nd, 2013
NOVEMBER 23rd, 2013 NOVEMBER 26th, 2013
NOVEMBER 23rd, 2013
NOVEMBER 25th, 2013 NOVEMBER 28th, 2013
NOVEMBER 23rd, 2013
DESEMBER 4th, 2013
DESEMBER 4th, 2013
DESEMBER 6th, 2013
DESEMBER 2nd, 2013
DESEMBER 5th, 2013
NOVEMBER 29th, 2013
DESEMBER 4th, 2013
NOVEMBER 29th, 2013
DESEMBER 4th, 2013
NOVEMBER 26th, 2013 NOVEMBER 28th, 2013
NOVEMBER 26th, 2013
DESEMBER 2nd, 2013
NOVEMBER 26th, 2013 DECEMBER 9th, 2013
NOVEMBER 30th, 2013
DESEMBER 2nd, 2013
DESEMBER 2nd, 2013
DESEMBER 2nd, 2013
DESEMBER 2nd, 2013
DESEMBER 4th, 2013
DESEMBER 2nd, 2013
DESEMBER 4th, 2013
NOVEMBER 29th, 2013
DESEMBER 5th, 2013
NOVEMBER 28th, 2013
DESEMBER 5th, 2013

DESEMBER 24th, 2013


DESEMBER 24th, 2013
INTERNAL
DESEMBER 5th, 2013
DESEMBER 24th, 2013
DESEMBER 11th, 2013
DESEMBER 11th, 2013
DESEMBER 27th, 2013
DESEMBER 24th, 2013
DESEMBER 11th, 2013
DESEMBER 11th, 2013
NOVEMBER 28th, 2013
DESEMBER 11th, 2013

INTERNAL
DESEMBER 11th, 2013
JANUARY 3rd, 2014

DESEMBER 11th, 2013


DESEMBER 11th, 2013
DESEMBER 11th, 2013
DESEMBER 24th, 2013
DESEMBER 4th, 2013
DESEMBER 11th, 2013
JANUARY 3rd, 2014
DESEMBER 11th, 2013
DESEMBER 11th, 2013

REQUEST FOR INSPECTION REPORT ( RFI )


RFI Number
NO

539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590

Inspection

TSRT No.

KAJIMA No.

0539/TS/MI/XI/13
0540/TS/MI/XI/13
0541/TS/MI/XI/13
0542/TS/MI/XI/13
0543/TS/MI/XI/13
0544/TS/MI/XI/13
0545/TS/MI/XI/13
0546/TS/MI/XI/13
0547/TS/MI/XI/13
0548/TS/MI/XII/13
0549/TS/MI/XII/13
0550/TS/MI/XII/13
0551/TS/MI/XII/13
0552/TS/MI/XII/13
0553/TS/MI/XII/13
0554/TS/MI/XII/13
0555/TS/MI/XII/13
0556/TS/MI/XII/13
0557/TS/MI/XII/13
0558/TS/MI/XII/13
0559/TS/MI/XII/13
0560/TS/MI/XII/13
0561/TS/MI/XII/13
0562/TS/MI/XII/13
0563/TS/MI/XII/13
0564/TS/MI/XII/13
0565/TS/MI/XII/13
0566/TS/MI/XII/13
0567/TS/MI/XII/13
0568/TS/MI/XII/13
0569/TS/MI/XII/13
0570/TS/MI/XII/13
0571/TS/MI/XII/13
0572/TS/MI/XII/13
0573/TS/MI/XII/13
0574/TS/MI/XII/13
0575/TS/MI/XII/13
0576/TS/MI/XII/13
0577/TS/MI/XII/13
0578/TS/MI/XII/13
0579/TS/MI/XII/13
0580/TS/MI/XII/13
0581/TS/MI/XII/13
0582/TS/MI/XII/13
0583/TS/MI/XII/13
0584/TS/MI/XII/13
0585/TS/MI/XII/13
0586/TS/MI/XII/13
0587/TS/MI/XII/13
0588/TS/MI/XII/13
0589/TS/MI/XII/13
0590/TS/MI/XII/13

3019
3018
3037
3279
3039
3040
3041
3046
3057
3070
3069
3085
3084
3089
3090
3092
3094
3101
3102
3103
3106
3113
3114
3115
3116
3122
3123
3127
3131
3132
3141
3144
3148
3147
3155
3156
3157
3154
3165
3166
3171
3170
3176
3179
3195
3196
3198
3206

Scoupe

Submitted

P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P

26 NOV 2013
26 NOV 2013
27 NOV 2013
27 NOV 2013
28 NOV 2013
28 NOV 2013
28 NOV 2013
28 NOV 2013
29 NOV 2013
02 DES 2013
02 DES 2013
03 DES 2013
03 DES 2013
03 DES 2013
04 DES 2013
04 DES 2013
04 DES 2013
04 DES 2013
05 DES 2013
05 DES 2013
05 DES 2013
05 DES 2013
05 DES 2013
06 DES 2013
06 DES 2013
06 DES 2013
06 DES 2013
09 DES 2013
09 DES 2013
09 DES 2013
09 DES 2013
09 DES 2013
10 DES 2013
11 DES 2013
11 DES 2013
11 DES 2013
12 DES 2013
12 DES 2013
12 DES 2013
12 DES 2013
13 DES 2013
13 DES 2013
13 DES 2013
14 DES 2013
14 DES 2013
14 DES 2013
14 DES 2013
14 DES 2013
16 DES 2013
16 DES 2013
16 DES 2013
17 DES 2013

Inspection Item

Planning

GRAVITY TEST DRAINAGE KITCHEN ZONE 8 ( BFL )


NOVEMBER 29th, 2013
GRAVITY TEST DRAINAGE KITCHEN ZONE 9 ( BFL )
NOVEMBER 29th, 2013
GRAVITY TEST DRAINAGE KITCHEN ZONE 14 ( BFL )
NOVEMBER 29th, 2013
PRESSURE TEST TRANSFER PIPE (BFL ~ ROOF FLOOR)
DESEMBER 3rd, 2013
CHECK MARKING LEVEL WATER GROUND TANK ( BFL)
NOVEMBER 29th, 2013
PRESSURE TEST CLEAN WATER PIPE EXTERNAL PART 3&4 (GROUND FLOOR)
NOVEMBER 29th, 2013
PRESSURE TEST DRAIN PIPE SUMPIT PD-SP-7 (BASEMENT FLOOR)
NOVEMBER 29th, 2013
CHECK POSITION & ELEVATION INSTALLATION BATHUB 6h fl ( UNIT ST-2 & DST-1D )
DESEMBER 2nd, 2013
CHECK POSITION & MARKING INSTALLATION FD EXECUTIVE TOILET (5th FL)
DESEMBER 3rd, 2013
PRESSURE TEST DRAIN PIPE SUMPIT PD-PR-1 (BASEMENT FLOOR)
DESEMBER 4th, 2013
PRESSURE TEST DRAIN PIPE SUMPIT PD-SW-3 (BASEMENT FLOOR)
DESEMBER 4th, 2013
CHECK POSITION & MARKING INSTALLATION FD 1b-1, 2B-1 (30th FL)
DESEMBER 5th, 2013
CHECK POSITION & ELEVATION INSTALLATION BATHUB 5h fl ( UNIT ST-2 & DST-1D )
DESEMBER 5th, 2013
CHECK POSITION & ELEVATION INSTALLATION BATHUB 17h fl ( UNIT ST-1 )
DESEMBER 5th, 2013
PRESSURE TEST CLEAN WATER PIPE 1B-1 (24th FLOOR)
DESEMBER 5th, 2013
PRESSURE TEST CLEAN WATER PIPE GUEST ROOM-WC (GROUND FLOOR)
DESEMBER 5th, 2013
BASEMENT FLOOR AT CARPARK AREA
DESEMBER 5th, 2013
PRESSURE TEST RISER CLEAN WATER PIPE SS-2, SS-3, SS-4 (5th~10 FLOOR)
DESEMBER 6th, 2013
PRESSURE TEST CLEAN WATER PIPE BACK-WC 1 (2ND FLOOR)
DESEMBER 6th, 2013
PRESSURE TEST CLEAN WATER PIPE BACK-WC 2 (2ND FLOOR)
DESEMBER 6th, 2013
PRESSURE TEST CLEAN WATER PIPE JANITOR ROOM (2ND FLOOR)
DESEMBER 6th, 2013
CHECK COMPLETED EQUIPMENT AT GUEST ROOM (6th FL)
DESEMBER 6th, 2013
CHECK POSITION & ELEVATION EXTERNAL PIPE (H/1 : H/L~H/N)
DESEMBER 7th, 2013
CHECK POSITION & MARKING INSTALLATION GUEST RM&PUBLIC WC-2 (3rd FL)
DESEMBER 7th, 2013
GRAVITY TEST DRAINAGE FOR BACK WC-3 (2nd FLOOR )
DESEMBER 9th, 2013
PRESSURE TEST DRAIN PIPE SUMPIT PD-CH-4 (BASEMENT FLOOR)
DESEMBER 9th, 2013
PRESSURE TEST DRAIN PIPE SUMPIT PD-SL-5 (BASEMENT FLOOR)
DESEMBER 9th, 2013
PRESSURE TEST CLEAN WATER PIPE JSU-1 (20th FLOOR)
DESEMBER 10th, 2013
PRESSURE TEST CLEAN WATER PIPE ST-3DF (7th FLOOR)
DESEMBER 10th, 2013
CHECK POSITION & INSTALLATION RD AT SUB CANOPY (SOUTH AREA) ( GFL )
DESEMBER 10th, 2013
GRAVITY TEST DRAINAGE FOR RD (3rd FLOOR REFLECTED )
DESEMBER 11th, 2013
CHECK POSITION & ELEVATION INSTALLATION BATHUB 7th fl ( UNIT ST-2, DST-1D. JSU ) DESEMBER 11th, 2013
GRAVITY TEST DRAINAGE FOR RD (3rd FLOOR REFLECTED )
DESEMBER 12th, 2013
CHECK INSTALLATION REBAR AND FORMWORK FOR MANHOLE
DESEMBER 12th, 2013
CHECK POSITION & ELEVATION INSTALLATION BATHUB 8th fl ( UNIT ST-2, DST-1D )
DESEMBER 13th, 2013
GRAVITY TEST DRAINAGE FOR RD (3rd FLOOR REFLECTED )
DESEMBER 13th, 2013
GRAVITY TEST DRAINAGE FOR PUBLIC WC-1 (GROUND FLOOR )
DESEMBER 13th, 2013
GRAVITY TEST DRAINAGE FOR VIP GUEST BATHROOM (2ND FLOOR )
DESEMBER 13th, 2013
CHECK POSITION & MARKING INSTALLATION FD GUEST ROOM TOILET (2nd FL)
DESEMBER 13th, 2013
GRAVITY TEST DRAINAGE FOR RD (3rd FLOOR REFLECTED )
DESEMBER 14th, 2013
CHECK POSITION & INSTALLATION RD AT SUB CANOPY (NORTH AREA) ( GFL )
DESEMBER 14th, 2013
PRESSURE TEST DRAIN PIPE SUMPIT PD-A-3, PD,SP-9, PD-SL-8, PD-KC-2, PD-CH-2, PD-KC-3 DESEMBER
(BASEMENT14th,
FLOOR)
2013
GRAVITY TEST DRAINAGE FOR BACK WC-3 (BASEMENT FLOOR )
DESEMBER 16th, 2013
CHECK POSITION & ELEVATION INSTALLATION BATHUB 9th fl ( UNIT ST-2, DST-1D )
DESEMBER 16th, 2013
CHECK POSITION & MARKING INSTALLATION FD 1b-1, 2B-1 (31th FL)
DESEMBER 16th, 2013
CHECK POSITION & MARKING INSTALLATION FD PUBLIC TOILET-1 (21st FL)
DESEMBER 17th, 2013
CHECK POSITION & MARKING INSTALLATION FD PUBLIC TOILET-2 (21st FL)
DESEMBER 17th, 2013
CHECK POSITION & MARKING INSTALLATION FD PUBLIC TOILET-1 (2nd FL)
DESEMBER 17th, 2013
GRAVITY TEST DRAINAGE FOR BACK WC-4 (BASEMENT FLOOR )
DESEMBER 17th, 2013
CHECK POSITION & ELEVATION INSTALLATION BATHUB 10th fl ( UNIT ST-2, DST-1D, JSU, ST-3
)
DESEMBER
17th, 2013
CHECK POSITION & MARKING INSTALLATION FD BACK WC-2 (22nd FL)
DESEMBER 18th, 2013
CHECK POSITION & ELEVATION EXTERNAL PIPE (H/1 : H/M~H/Pa)
DESEMBER 18th, 2013

Report
Actual

Submit

Return

DESEMBER 5th, 2013


NOVEMBER 29th, 2013
NOVEMBER 29th, 2013
DESEMBER 27th, 2013
DESEMBER 2nd, 2013
NOVEMBER 29th, 2013
DESEMBER 2nd, 2013
DESEMBER 2nd, 2013
DESEMBER 3rd, 2013
DESEMBER 4th, 2013
DESEMBER 4th, 2013
DESEMBER 5th, 2013

DESEMBER 6th, 2013


DESEMBER 2nd, 2013
DESEMBER 2nd, 2013

DESEMBER 11th, 2013


DESEMBER 27th, 2013

DESEMBER 5th, 2013


DESEMBER 6th, 2013
DESEMBER 5th, 2013
DESEMBER 18th, 2013
DESEMBER 6th, 2013
DESEMBER 6th, 2013
DESEMBER 6th, 2013

DESEMBER 24th, 2013


DESEMBER 9th, 2013
DESEMBER 7th, 2013
DESEMBER 24th, 2013
DESEMBER 9th, 2013
DESEMBER 9th, 2013
DESEMBER 9th, 2013

DESEMBER 10th, 2013


DESEMBER 13th, 2013
DESEMBER 10th, 2013
DESEMBER 9th, 2013
DESEMBER 9th, 2013
DESEMBER 10th, 2013
DESEMBER 10th, 2013
DESEMBER 6th, 2013
DESEMBER 11th, 2013
DESEMBER 11th, 2013

DESEMBER 17th, 2013


DESEMBER 14th, 2013
DESEMBER 12th, 2013
DESEMBER 10th, 2013
DESEMBER 10th, 2013
DESEMBER 13th, 2013

DESEMBER 12th, 2013

DESEMBER 13th, 2013

DESEMBER 14th, 2013


DESEMBER 14th, 2013
DESEMBER 18th, 2013
DESEMBER 14th, 2013
DESEMBER 16th, 2013
DESEMBER 18th, 2013
DESEMBER 18th, 2013

DESEMBER 16th, 2013


DESEMBER 17th, 2013
DESEMBER 19th, 2013
DESEMBER 17th, 2013
DESEMBER 17th, 2013
DESEMBER 19th, 2013
DESEMBER 19th, 2013

DESEMBER 17th, 2013


DESEMBER 17th, 2013
DESEMBER 17th, 2013
DESEMBER 18th, 2013
DESEMBER 18th, 2013

DESEMBER 19th, 2013


DESEMBER 19th, 2013
DESEMBER 19th, 2013
DESEMBER 19th, 2013
DESEMBER 19th, 2013

DESEMBER 18th, 2013


DESEMBER 17th, 2013

DESEMBER 20th, 2013


DESEMBER 23rd, 2013

Remaks

re-RFI-3038
DESEMBER 4th, 2013
DESEMBER 3rd, 2013
DESEMBER 4th, 2013
DESEMBER 5th, 2013
DESEMBER 5th, 2013
DESEMBER 5th, 2013
DESEMBER 5th, 2013

DESEMBER 18th, 2013


DESEMBER 24th, 2013
DESEMBER 11th, 2013
JANUARY 3rd, 2014
DESEMBER 24th, 2013
DESEMBER 11th, 2013
INTERNAL

JANUARY 3rd, 2014


DESEMBER 10th, 2013
JANUARY 3rd, 2014

INTERNAL

DESEMBER 11th, 2013


DESEMBER 13th, 2013
DESEMBER 14th, 2013

DESEMBER 24th, 2013


DESEMBER 18th, 2013
DESEMBER 18th, 2013

JANUARY 3rd, 2014

DESEMBER 26th, 2013


JANUARY 3rd, 2014

DESEMBER 18th, 2013


DESEMBER 18th, 2013
DESEMBER 24th, 2013

INTERNAL
DESEMBER 27th, 2013

DESEMBER 26th, 2013


DESEMBER 24th, 2013

REQUEST FOR INSPECTION REPORT ( RFI )


RFI Number
NO

591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640

Inspection

TSRT No.

KAJIMA No.

0591/TS/MI/XII/13
0592/TS/MI/XII/13
0593/TS/MI/XII/13
0594/TS/MI/XII/13
0595/TS/MI/XII/13
0596/TS/MI/XII/13
0597/TS/MI/XII/13
0598/TS/MI/XII/13
0599/TS/MI/XII/13
0600/TS/MI/XII/13
0601/TS/MI/XII/13
0602/TS/MI/XII/13
0603/TS/MI/XII/13
0604/TS/MI/XII/13
0605/TS/MI/XII/13
0606/TS/MI/XII/13
0607/TS/MI/XII/13
0608/TS/MI/XII/13
0609/TS/MI/XII/13
0610/TS/MI/XII/13
0611/TS/MI/XII/13
0612/TS/MI/XII/13
0613/TS/MI/XII/13
0614/TS/MI/XII/13
0615/TS/MI/XII/13
0616/TS/MI/XII/13
0617/TS/MI/XII/13
0618/TS/MI/XII/13
0619/TS/MI/XII/13
0620/TS/MI/XII/13
0621/TS/MI/XII/13
0622/TS/MI/XII/13
0623/TS/MI/XII/13
0624/TS/MI/I/14
0625/TS/MI/I/14
0626/TS/MI/I/14
0627/TS/MI/I/14
0628/TS/MI/I/14
0629/TS/MI/I/14
0630/TS/MI/I/14
0631/TS/MI/I/14
0632/TS/MI/I/14
0633/TS/MI/I/14
0634/TS/MI/I/14
0635/TS/MI/I/14
0636/TS/MI/I/14
0637/TS/MI/I/14
0638/TS/MI/I/14

3205
3213
3212
3211
3210
3209
3220
3219
3221
3223
3222
3228
3235
3236
3250

3268
3269
3271
3270
3274
3275
3289
3290
3298
3299
3341
3344
3345
3343
3342
3358
3361
3360
3359
3369
3367

Scoupe

Submitted

P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P

17 DES 2013
17 DES 2013
17 DES 2013
17 DES 2013
17 DES 2013
17 DES 2013
18 DES 2013
18 DES 2013
18 DES 2013
18 DES 2013
18 DES 2013
18 DES 2013
19 DES 2013
19 DES 2013
19 DES 2013
20 DES 2013
23 DES 2013
23 DES 2013
24 DES 2013
26 DES 2013
26 DES 2013
26 DES 2013
26 DES 2013
26 DES 2013
26 DES 2013
26 DES 2013
26 DES 2013
26 DES 2013
27 DES 2013
27 DES 2013
30 DES 2013
31 DES 2013
30 DES 2013
02 JAN 2014
02 JAN 2014
03 JAN 2014
03 JAN 2014
03 JAN 2014
03 JAN 2014
03 JAN 2014
03 JAN 2014
03 JAN 2014
03 JAN 2014
03 JAN 2014
06 JAN 2014
06 JAN 2014
07 JAN 2014
07 JAN 2014

Inspection Item

Planning

BASEMENT FLOOR & RETAINING WALL AT TUNNEL


DESEMBER 19th, 2013
CHECK POSITION & ELEVATION INSTALLATION BATHUB 18th fl ( UNIT ST-1, ST-1D )
DESEMBER 19th, 2013
CHECK POSITION & ELEVATION INSTALLATION WC 8th fl ( UNIT ST-1, ST-1D, ST-1C, ST-1DC,DESEMBER
ST-1F ) 19th, 2013
CHECK POSITION & ELEVATION INSTALLATION WC 9th fl ( UNIT ST-1, ST-1D, ST-1C, ST-1DC,DESEMBER
ST-1F ) 19th, 2013
GRAVITY TEST DRAINAGE AT 1B-1 FOR PVC PIPE (26th Fl)
DESEMBER 19th, 2013
GRAVITY TEST DRAINAGE AT ST-2 FOR PVC PIPE (14th Fl)
DESEMBER 19th, 2013
CHECK POSITION & MARKING INSTALLATION FD BOH-1 (29th~32nd FL)
DESEMBER 19th, 2013
PRESSURE TEST CLEAN WATER PIPE 1B-1 (25th FLOOR)
DESEMBER 20th, 2013
GRAVITY TEST DRAINAGE AT INNER CORE PIPE (13th Fl)
DESEMBER 19th, 2013
RADIOGRAPHY TEST GAS PIPE (BASEMENT FLOOR)
DESEMBER 19th, 2013
CHECK INSTALLATION REBAR AND FORMWORK FOR MANHOLE
DESEMBER 19th, 2013
GRAVITY TEST DRAINAGE FOR BACK WC-2 (22nd FLOOR )
DESEMBER 19th, 2013
BASEMENT FLOOR & RETAINING WALL AT CARPARK
DESEMBER 20th, 2013
PRESSURE TEST HOT WATER PIPE AT CORRIDOR (25th FLOOR)
DESEMBER 20th, 2013
PRESSURE TEST DRAIN PIPE SUMPIT PD-SL-9, PD-SL-11 (BASEMENT FLOOR)
DESEMBER 20th, 2013
CHECK POSITION & MARKING INSTALLATION FD BOH-2 (5th FL)
DESEMBER 21st, 2013
PRESSURE TEST HOT WATER PIPE AT CORRIDOR (26th FLOOR)
DESEMBER 24th, 2013
CHECK POSITION & MARKING INSTALLATION GREASE TRAP (GT-2-1 ~ GT-2-5 2FL )
DESEMBER 24th, 2013
PRESSURE TEST CLEAN WATER PIPE PUBLIC WC-2 (2ND FLOOR)
DESEMBER 26th, 2013
GRAVITY TEST DRAINAGE FOR PVC PIPE (BASEMENT FLOOR REFLECTED )
DESEMBER 27th, 2013
CHECK POSITION & ELEVATION INSTALLATION BATHUB 11th fl ( UNIT ST-2, DST-1D)
DESEMBER 27th, 2013
CHECK POSITION & ELEVATION INSTALLATION BATHUB 12th fl ( UNIT ST-2, DST-1D)
DESEMBER 27th, 2013
PRESSURE TEST CLEAN WATER PIPE DST-1DF, JSU-1, JSU-1F (18th FLOOR)
DESEMBER 27th, 2013
CHECK POSITION & MARKING INSTALLATION GREASE TRAP (GT-2-1 ~ GT-2-5 2FL )
DESEMBER 27th, 2013
PRESSURE TEST DRAIN PIPE SUMPIT PD-WW-1, PD-CH-3 (BASEMENT FLOOR)
DESEMBER 27th, 2013
CHECK POSITION & MARKING INSTALLATION FD PUBLIC WC-1 (4th FL)
DESEMBER 27th, 2013
PRESSURE TEST CLEAN WATER PIPE BACK WC-4 (2ND FLOOR)
DESEMBER 27th, 2013
CHECK POSITION & MARKING INSTALLATION GREASE TRAP (GT-3-1 ~ GT-3-2 3FL )
DESEMBER 27th, 2013
PRESSURE TEST CLEAN WATER PIPE PUBLIC WC-2 (2ND FLOOR)
DESEMBER 30th, 2013
GRAVITY TEST DRAINAGE FOR PVC PIPE (BASEMENT FLOOR REFLECTED )
DESEMBER 30th, 2013
PRESSURE TEST CLEAN WATER PIPE DST-1DF, JSU-1, JSU-1F, ST-3F (19th FLOOR)
DESEMBER 31st, 2013
CHECK POSITION & ELEVATION INSTALLATION WC 10th fl ( UNIT ST-1, ST-1C, ST-1DC, ST-1F J)ANUARY 2nd, 2014
CHECK INSTALLATION FD, FCO & LEAKAGE TEST FOR KITCHEN DRAIN (BAKERY & PASTRY AREA
BFL ) 31st, 2013
DESEMBER
4th FLOOR OUTDOOR JACUZZI
JANUARY 3rd, 2014
PRESSURE TEST IRIGATION PIPE EXTERNAL AREA (GROUND FLOOR)
JANUARY 3rd, 2014
CHECK POSITION & MARKING INSTALLATION FD PUBLIC WC-1 (4th FL)
JANUARY 6th, 2014
CHECK POSITION & MARKING INSTALLATION FD BACK WC-6 (3rd FL)
JANUARY 6th, 2014
CHECK POSITION & MARKING INSTALLATION FD BACK WC-5 (3rd FL)
JANUARY 6th, 2014
PRESSURE TEST CLEAN WATER PIPE 1B-1 (26th FLOOR)
JANUARY 6th, 2014
PRESSURE TEST DRAIN PIPE SUMPIT PD-A-1, PD-LD-1 (BASEMENT FLOOR)
JANUARY 5th, 2014
PRESSURE TEST IRIGATION PIPE EXTERNAL AREA (GROUND FLOOR)
JANUARY 6th, 2014
CHECK POSITION & ELEVATION INSTALLATION BATHUB 13rd fl ( UNIT ST-2, ST-3DF, JSU-1, JSU-1F,
DST-1D,
DST-1DF)
JANUARY
7th, 2014
CHECK POSITION & ELEVATION INSTALLATION BATHUB 14th fl ( UNIT ST-2, DST-1D, DST-1DF)
JANUARY 7th, 2014
CHECK POSITION & ELEVATION INSTALLATION BATHUB 15th fl ( UNIT DST-2, JSU-1)
JANUARY 7th, 2014
PRESSURE TEST DRAIN PIPE SUMPIT PD-A-1, PD-LD-1 (BASEMENT FLOOR)
JANUARY 7th, 2014
PRESSURE TEST FOR GAS PIPE EXTERNAL AREA (GROUND FLOOR)
JANUARY 7th, 2014
GRAVITY TEST DRAINAGE 1B-1 (27th FLOOR)
JANUARY 8th, 2014
GRAVITY TEST DRAINAGE AT INNER CORE PIPE (20th Fl)
JANUARY 8th, 2014

Report
Actual

Submit

DESEMBER 19th, 2013

DESEMBER 23rd, 2013

DESEMBER 19th, 2013


DESEMBER 19th, 2013
DESEMBER 23rd, 2013
DESEMBER 20th, 2013
DESEMBER 19th, 2013
DESEMBER 19th, 2013
DESEMBER 19th, 2013
DESEMBER 19th, 2013
DESEMBER 20th, 2013
DESEMBER 20th, 2013

DESEMBER 24th, 2013


DESEMBER 24th, 2013

Return

Remaks

JANUARY 3rd, 2014


INTERNAL

DESEMBER 24th, 2013


DESEMBER 24th, 2013
DESEMBER 23rd, 2013

JANUARY 3rd, 2014

DESEMBER 24th, 2013


DESEMBER 23rd, 2013
INTERNAL

DESEMBER 24th, 2013


DESEMBER 24th, 2013

DESEMBER 27th, 2013

JANUARY 3rd, 2014


INTERNAL
INTERNAL
INTERNAL

DESEMBER 27th, 2013


DESEMBER 27th, 2013

JANUARY 2nd, 2014


INTERNAL

JANUARY 2nd, 2014


INTERNAL
DESEMBER 30th, 2013
JANUARY 2nd, 2014

JANUARY 2nd, 2014

INTERNAL
JANUARY 6th, 2014
JANUARY 3rd, 2014

INTERNAL

JANUARY 6th, 2014


INTERNAL

REQUEST FOR INSPECTION REPORT ( RFI )


RFI Number
NO

TSRT No.

KAJIMA No.

Inspection
Scoupe

Submitted

Inspection Item

Planning

Report
Actual

Submit

Return

Remaks

D(RFI double)