You are on page 1of 4

Mechanicaltransmittalnumber: Electricaltransmittalnumber:

Statuslegend:

AApproved BApprovedwithcomments CNotapproved,resubmit Jainreferencecommentsemail

Drawingnumber EMTELEDWGCMBBA100 EMTELEDWGAPTBA100 EMTELEDWGCMB00100 EMTELEDWGAPT00100 EMTELEDWGCMB01100 EMTELEDWGCMB02100 EMTELEDWGAPT02100 EMTELEDWGCMB03100 EMTELEDWGAPT03100 EMTELEDWGAPT04100 EMTELEDWGCMBBA200 EMTELEDWGAPTBA200 EMTELEDWGCMB00200 EMTELEDWGAPT00200 EMTELEDWGCMB01200 EMTELEDWGCMB02200 EMTELEDWGAPT02200 EMTELEDWGCMB03200 EMTELEDWGAPT03200 EMTELEDWGAPT04200 EMTELEDWGCMBBA300 EMTELEDWGAPTBA300 EMTELEDWGCMB00300 EMTELEDWGAPT00300 EMTELEDWGCMB01300 EMTELEDWGCMB02300 EMTELEDWGAPT02300 EMTELEDWGCMB03300 EMTELEDWGAPT03300 EMTELEDWGAPT04300 EMTELEDWGCMBBA400 EMTELEDWGAPTBA400 EMTELEDWGCMB00400 EMTELEDWGAPT00400 EMTELEDWGCMB01400 EMTELEDWGCMB02400 EMTELEDWGAPT02400 EMTELEDWGCMB03400 EMTELEDWGAPT03400 EMTELEDWGAPT04400 EMTELEDWGCMBBA500 EMTELEDWGAPTBA500 EMTELEDWGCMB00500 EMTELEDWGAPT00500 EMTELEDWGCMB01500 EMTELEDWGCMB02500 EMTELEDWGAPT02500 EMTELEDWGCMB03500 EMTELEDWGAPT03500 EMTELEDWGAPT04500 EMTELEDWGCMBBA600 EMTELEDWGAPTBA600 EMTELEDWGCMB00600 EMTELEDWGAPT00600 EMTELEDWGCMB01600 EMTELEDWGCMB02600 EMTELEDWGAPT02600 EMTELEDWGCMB03600 EMTELEDWGAPT03600 EMTELEDWGAPT04600 EMTELEDWGCMBBA700 EMTELEDWGAPTBA700 EMTELEDWGCMB00700 EMTELEDWGAPT00700 EMTELEDWGCMB01700 EMTELEDWGCMB02700 EMTELEDWGAPT02700 EMTELEDWGCMB03700 EMTELEDWGAPT03700 EMTELEDWGAPT04700 EMTELEDWGCMBBA800 EMTELEDWGAPTBA800 EMTELEDWGCMB00800 EMTELEDWGAPT00800 EMTELEDWGCMB01800 EMTELEDWGAPT01800 EMTELEDWGCMB02800 EMTELEDWGAPT02800 EMTELEDWGCMB03800 EMTELEDWGAPT03800 EMTELEDWGAPT04800 EMTELEDWGCMBRF800 EMTELEDWGAPTRF800 EMTELEDWGAPTXX901 EMTELEDRWAPTXX942 EMTELEDRWAPTXX943 EMTELEDWGAPTXX951 EMTELEDWGAPTXX952 EMTELEDWGAPTXX953 EMTELEDWGAPTXX954 EMTELEDWGAPTXX955 EMTELEDWGAPTXX956

Drawingname BasementFloorPartialPlanCableTrayLayout BasementFloorPartialPlanCableTrayLayout GroundFloorPartialPlanCableTrayLayout GroundFloorPartialPlanCableTrayLayout FirstFloorPartialPlanCableTrayLayout SecondFloorPartialPlanCableTrayLayout SecondFloorPartialPlanCableTrayLayout ThirdFloorPartialPlanCableTrayLayout ThirdFloorPartialPlanCableTrayLayout Typical,Roof,TopofRoofFloorPlanCableTrayLayout BasementFloorPartialPlanLightingSystem BasementFloorPartialPlanLightingSystem GroundFloorPartialPlanLightingSystem GroundFloorPartialPlanLightingSystem FirstFloorPartialPlanLightingSystem SecondFloorPartialPlanLightingSystem SecondFloorPartialPlanLightingSystem ThirdFloorPartialPlanLightingSystem ThirdFloorPartialPlanLightingSystem Typical,Roof,TopofRoofFloorPlanLightingSystem BasementFloorPartialPlanPowerSystem BasementFloorPartialPlanPowerSystem GroundFloorPartialPlanPowerSystem GroundFloorPartialPlanPowerSystem FirstFloorPartialPlanPowerSystem SecondFloorPartialPlanPowerSystem SecondFloorPartialPlanPowerSystem ThirdFloorPartialPlanPowerSystem ThirdFloorPartialPlanPowerSystem Typical,Roof,TopofRoofFloorPlanPowerSystem BasementFloorPartialPlanTelephoneandTVSystemLayout BasementFloorPartialPlanTelephoneandTVSystemLayout GroundFloorPartialPlanTelephoneandTVSystemLayout GroundFloorPartialPlanTelephoneandTVSystemLayout FirstFloorPartialPlanTelephoneandTVSystemLayout SecondFloorPartialPlanTelephoneandTVSystemLayout SecondFloorPartialPlanTelephoneandTVSystemLayout ThirdFloorPartialPlanTelephoneandTVSystemLayout ThirdFloorPartialPlanTelephoneandTVSystemLayout Typical,Roof,TopofRoofFloorPlanTelephoneandTVSystemLayout BasementFloorPartialPlanFireAlarmSystemLayout BasementFloorPartialPlanFireAlarmSystemLayout GroundFloorPartialPlanFireAlarmSystemLayout GroundFloorPartialPlanFireAlarmSystemLayout FirstFloorPartialPlanFireAlarmSystemLayout SecondFloorPartialPlanFireAlarmSystemLayout SecondFloorPartialPlanFireAlarmSystemLayout ThirdFloorPartialPlanFireAlarmSystemLayout ThirdFloorPartialPlanFireAlarmSystemLayout Typical,Roof,TopofRoofFloorPlanFireAlarmSystemLayout BasementFloorPartialPlanAnnouncementSystemLayout BasementFloorPartialPlanAnnouncementSystemLayout GroundFloorPartialPlanAnnouncementSystemLayout GroundFloorPartialPlanAnnouncementSystemLayout FirstFloorPartialPlanAnnouncementSystemLayout SecondFloorPartialPlanAnnouncementSystemLayout SecondFloorPartialPlanAnnouncementSystemLayout ThirdFloorPartialPlanAnnouncementSystemLayout ThirdFloorPartialPlanAnnouncementSystemLayout Typical,Roof,TopofRoofFloorPlanAnnouncementSystemLayout BasementFloorPartialPlanAccess,SecurityandCCTVSystemLayout BasementFloorPartialPlanAccess,SecurityandCCTVSystemLayout GroundFloorPartialPlanAccess,SecurityandCCTVSystemLayout GroundFloorPartialPlanAccess,SecurityandCCTVSystemLayout FirstFloorPartialPlanAccess,SecurityandCCTVSystemLayout SecondFloorPartialPlanAccess,SecurityandCCTVSystemLayout SecondFloorPartialPlanAccess,SecurityandCCTVSystemLayout ThirdFloorPartialPlanAccess,SecurityandCCTVSystemLayout ThirdFloorPartialPlanAccess,SecurityandCCTVSystemLayout Typical,Roof,TopofRoofFloorPlanAccess,SecurityandCCTVSystemLayout BasementFloorPartialPlanEarthingandLightningProtectionSystemLayout BasementFloorPartialPlanEarthingandLightningProtectionSystemLayout GroundFloorPartialPlanEarthingandLightningProtectionSystemLayout GroundFloorPartialPlanEarthingandLightningProtectionSystemLayout FirstFloorPartialPlanEarthingandLightningProtectionSystemLayout FirstFloorPartialPlanEarthingandLightningProtectionSystemLayout SecondFloorPartialPlanEarthingandLightningProtectionSystemLayout SecondFloorPartialPlanEarthingandLightningProtectionSystemLayout ThirdFloorPartialPlanEarthingandLightningProtectionSystemLayout ThirdFloorPartialPlanEarthingandLightningProtectionSystemLayout Typical,RoofFloorPlanEarthingandLightningProtectionSystemLayout TopofRoofFloorPlanEarthingandLightningProtectionSystemLayout TopofRoofFloorPlanEarthingandLightningProtectionSystemLayout Residence0.4kVSingleLineDiagram LightningProtectionSystemSelection1 LightningProtectionSystemSelection2 Telephonedistributionscheme Firealarmsystemscheme Publicannouncementscheme MATV/CATVsystemscheme AccesscontrolandSecuritysystemsscheme CCTVsystemscheme

Revision 4 4 4 4 6 4 4 4 4 4 4 4 4 4 6 4 4 4 4 4 4 4 4 4 6 4 4 4 4 4 5 5 5 5 7 5 5 5 5 5 4 4 4 4 6 4 4 4 4 4 4 4 4 4 6 4 4 4 4 4 4 4 4 4 6 4 4 4 4 4 4 4 3 3 3 3 3 3 3 3 3 4 4 1 1 1 4 3 3 3 3 3

Status A A A A A A A A A A C C C C C C C C C C B B B A B A A B A B A A A A A A A A A A B B B B B B B B B B B B B B B B B B B B A A A A A A A A A A A A A A A A A A A A A A A B A A A B B A A A

BurjAlBaherComplex

Electricalworkingdrawingsreview

LIGHTING SYSTEM
1- Final approval on emergency lighting system is subject to the Local Civil Defence approval. 2- Final approval on lighting system is subject to the final ID approval. 3- Average maintained illuminance in the lighting calculations does not comply with the recommended illuminance level by CIBSE (e.g. Low voltage room P0B.219 has an average of 164 lux instead of the recommended 200lux, and Boiler room P0B.130 has an average of 181 lux instead of the recommended 200lux). 4- The number of lighting fixture units on the calculation sheet does not match the number on the lighting layout (e.g. a 11 number F4 lighting fixture is used for corridor P0B.119 in the calculation sheet, while only 9 number lighting fixture units is distributed on the layout, and a 7X4 F2 lighting fixture units are shown in the lighting calculation sheet for the boiler room P0B.130 while a 8X4 F2 lighting fixture units are used on the lighting layout). 5- Provide a complete lighting calculation sheet for all spaces (e.g. BMS room, mechanical rooms, LV rooms, MV rooms, pump rooms, chiller room, Human resource, etc.).

POWER SYSTEM
1 No indication about the power for mechanical equipments (location, type and ratings of isolators). This note is applicable to the following drawings: (EMT-ELE-DWG-APT-ba300, EMTELE-DWG-CMB-ba300, EMT-ELE-DWG-CMB-01300, EMT-ELE-DWG-CMB-03300, EMT-ELE-DWG-APT-04300). 2 There is no indication in drawing EMT-ELE-DWG-CMB-00300 regarding the power for shops. 3 For drawing EMT-ELE-DWG-APT-XX901: a. Please clarify the metering strategy since we cant find any indication for metering in the SMDB for apartments and services (general lighting and power). b. Provide full power calculations including voltage drop and short circuit calculations. c. Provide the distribution boards final schedules as per working drawings. d. The demand current calculation (Id) does not match the demand power (Pd), review the demand currents. (e.g. the specialist kitchen load is Pi=244 kW and Pd=146.4 with 0.85 power factor, while the demand current Id=262A which neither contribute to Pi or Pd since Ii=244*1000/(400*3*.85)= 414A and Id=146.4*1000/(400*3*.85)= 248.6A). e. Never feed two branch circuits from the same tap-off unit, either to use dedicated tap-off unit for every circuit or to combine the two circuits (e.g. LP-4-1-01 and XLP-4-1-01 are fed from the same tap-off unit, and LP-4-G-01 and LP-4-G-02 are fed from the same tap-off unit). f. The size of some cables does not comply with IEE regulations, as the cable current currying capacity Iz shall be greater than the rating of the circuit breaker protecting the cable (e.g. F4-1-7 is 4(1*120) and protected by 400AT circuit breaker, while the current currying capacity for this cable is 396A as per IEE).

Page2of3

FIRE ALARM SYSTEM:


1. Final system approval is subject to the Local Civil Defence approval. 2. There is no indication in drawing EMT-ELE-DWG-APT-XX952 REGARDING System interface and integration with other systems (e.g. security, BMS, lifts, fire fighting, etc.).

ANNOUNCMENT SYSTEM:
1. Final system approval is subject to the Local Civil Defence approval.

Page3of3