FRAME 9FA GE Energy Services Power Services Installations Date : 6/12/02/2014 Rv.

: 0 Page : 1/25
9FA In ta!!at"#n

ERECTION PROCEDURE

$UMMAR%

1. $&#'e #( )#*+ 2. De "gn an, E*e&t"#n P-"!# #'-. /. Re(e*en&e D#&01ent 4. Env"*#n1enta! an, $a(et. 5. Re&e"v"ng an, 2an,!"ng #( E30"'1ent 6. E30"'1ent E*e&t"#n P*#&e,0*e 4. A''en,"5 67" t8

This document, sole property of our GE Energy. It is strictly It must not be communicated, copied or reproduced without our written consent.

confidential.

FRAME 9FA GE Energy Services Power Services Installations


1.0 $COPE OF )OR9 The scope of work covered by this instruction describes the basic mechanical field erection procedures required for the installation of the gas turbine unit and related system equipment. This instruction is not intended to cover the installation details for every listed summary sheet equipment and/or use of the standard and special tools for gas turbine maintenance purposes as defined by !""" !s #$%% and $&$'. This instruction provides the installation details for the specific gas turbine system equipment only with descriptions on the use of only those special tools required for erection purposes. (ll other equipment erection instructions are provided within the specific system erection instruction. The descriptions and instructions on use of gas turbine maintenance tools are provided in the )peration and aintenance manuals. 2.0 DE$I:N AND ERECTION P2I7O$OP2% 2.1 $. te1 De &*"'t"#n The * +&#( is a single shaft heavy duty ,$ -. /0$$$ 12 3 The gas turbine is shipped as assembled unit, the GT4s with their integral base structures. The load couplings, E"haust ducts, Inlet systems, on5 base piping, combustion hardware and other related components are shipped as separate !s for assembly at site. 2.2 E*e&t"#n P-"!# #'-. an, $e30en&e 2.2.1 E*e&t"#n P-"!# #'-. The gas turbine unit will be the first equipment to be set relative to the generator unit in line with the power train centerline. #ollowing the setting and positioning of the gas turbine on the foundation sub sole plates/fi"ators the e"haust diffuser / !6$%3 must be installed prior to performing any of the internal alignment checks. The generator an an entire assembly is lowered over it foundation bolts to its supports. The supports can either be soleplates or fi"ators. (gain the unit position is ad7usted into line with the power train centerline. (ll other gas turbine and generator components such as the load coupling, combustion system hardware, on5base piping, collector house and turning gear shall now be assembled prior to final alignment.

ERECTION PROCEDURE

Date : 6/12/02/2014 Rv. : 0 Page : 2/25


9FA In ta!!at"#n

This document, sole property of our GE Energy. It is strictly It must not be communicated, copied or reproduced without our written consent.

confidential.

FRAME 9FA GE Energy Services Power Services Installations


2.2.2

ERECTION PROCEDURE

Date : 6/12/02/2014 Rv. : 0 Page : //25


9FA In ta!!at"#n

E*e&t"#n $e30en&e The preferred sequence of erection for the gas turbine unit and related components is as follows8 &. 9. 0. Install sub5sole plates and fi"ators. Erect gas turbine/generator lifting fi"ture. Transport gas turbine and generator units from off loading quay to turbine building and position under lifting frame. '. !ift and set gas turbine unit on station centerlines. ,. !ift and set generator unit on station centerlines. %. Equalise and confirm loading on GT and Generator fi"ators. 6. 1emove temporary lifting frame. :. Install GT compartment (ft lower wall section. +. (ssemble E"haust ;uct structural steel &$. Install lower half e"haust duct. &&. Install e"haust diffuser. &9. <omplete Turbine ;rop <heck. &0. <omplete assembly of E"haust ;uct. &'. Install Inlet duct support steel. &,. Install GT compartment to inlet plenum lower seal. &%. Install air inlet plenum lower half and cone. &6. Install GT combustion system hardware. &:. Install load coupling &+. <omplete preliminary GT to Generator alignment. 9$. <ommence installation of all GT on base piping. 9&. <ommence installation of all Generator )n base piping. 99. *et Gen collector house on foundation. 90. *et turning on foundation 9'. 2reliminary align turning gear. 9,. Install Gen Terminal Enclosure. 9%. *et all ma7or skid on foundations. 96. <omplete erection of air inlet plenum, 9:. <ommence erection of air inlet duct and filter house. 9+. <ontinue erection of GT and E"haust enclosure. 0$. *et all off base components. 0&. <omplete all GT on5base piping. 09. Install all GT Interconnection piping. 00. <omplete all Gen on5base piping. 0'. <omplete Gen off base components. 0,. Install all Gen interconnect piping. 0%. <omplete erection of GT and Gen enclosures. 06. <omplete erection of all ma7or shaft line components. 0:. <omplete assembly of all GT and Gen instrumentation. 0+. <omplete assembly of all GT and Gen <onduit and wiring. '$. <omplete load coupling to gen final alignment /!ift )il (vailable3. '&. <omplete turning gear to gen final alignment. '9. #inal grout of sub sole plates '0. Install anchors and finali.e turbine and Gen gib key clearances. ''. Install load coupling guard 1efer to * +#( =asic #ield (lignment Instructions !5'&& for other details regarding the final alignment conditions.

This document, sole property of our GE Energy. It is strictly It must not be communicated, copied or reproduced without our written consent.

confidential.

FRAME 9FA GE Energy Services Power Services Installations


/.0 REFERENCE DOCUMENT$ The installation documentation referred to throughout this erection instruction are standard GE reference ! numbers / !3 and GE internal drawing numbers, where applicable. The following table lists all required system drawings and related documents for the installation of the equipment and material covered within the scope of this instruction. The latest revisions of these drawings and documents shall be reviewed thoroughly prior to commencing with any of the activities described in this instruction. The final drawing number reference will be available 9 months before GT shipment. (ny of the =-E! supplied systems should be referenced to their drawing list. M7 $&$0 $&$0 $&$0 $0$& $0$9 $0$% $0&0 $0&' $090 $090 $090 $090 $090 $090 $090 $090 $090 $090 $090 $09% $09% $09% $09% $09% $09% $09% $09% $00$ $00$ $00$ $00$ $00$ $00$ $00$ $00$ :A$ TUR;INE $%$TEM DE$CRIPTION !ocking 1otor for *hipping *hipping (ttachment (rr *upport, GT *hipping )/! GT 2>G <onn5Elec )utline82urch T; devices )utline, echanical Gas Turbine ? !oad )utline, GT 2>G <onn 5 2iping @otes, GT 2>G <onn )utline 2iping )utline, #oundation Interface Gas Turb 2ackage )utline, #oundation Interface Gas Turb 2ackage )utliner, #oundation Interface (ccess ? !#/(( odule )utliner, #oundation Interface Turb Enclosure )utliner, #oundation Interface E"ht ;iffuser )utliner, #oundation Interface Inlet 2lenum (rr )utline, #oundation Interface E"ht =arrier Aall )utliner, #oundation Interface 2ipe *upports Gen Inst. Instruc. #or fi"ators on Turb Gen Equip Turbine Generator #;@ Interface Turbine Generator #;@ )/! Aater In7ection *kid )/! #uel Gas (bsolute *eparator <oalescing #ilter Interface &$ Ton, ' Bones !p <)9 *torage Cnit )utline, 2ressuri.ing Dent #an )utline ;istillate #uel *pool 2iece )utline, Aater Aash *kid )utline, (ir 2rocessing *kid )/! Aater In7ection *kid )utline +# Gte with :+ **, 1ight Entry Gas (u"iliary onitoring )utline <ontrol 2anel )/! 2anel !ayout *tatic *tart -eat e"changer Installation Inst )utline for !*9&$$/** )utline5#oundation Interface Aarm =ack Cp *yst E"9&$$ ulti =ridge !ineup
This document, sole property of our GE Energy. It is strictly It must not be communicated, copied or reproduced without our written consent.

ERECTION PROCEDURE

Date : 6/12/02/2014 Rv. : 0 Page : 4/25


9FA In ta!!at"#n

:E REF

RE<

GE>5&$%+,6 GE>5%00:0 =-E! =-E! =-E! =-E! =-E! =-E! =-E! =-E!

=-E! =-E! =-E!


confidential.

FRAME 9FA GE Energy Services Power Services Installations


$'$& $'$& $'$0 $'$% $'$6 $'$: $'$: $'$: $'$: $'$: $'$: $'$: $'$: $'&$ $'&& $'&9 $'&' $'&, $'&% $'&6 $'&: $'&+ $'9$ $'9& $'99 $'9' $'9, $'9% $'09 $'0' $'0, $'0% $'0: $'0: $'0: $'0: $'0: $'0: $'0: $'0: $'0: $'0: $'0: $'0: $'0: $'0: $'0: $'0: $'0: $'0: $'0:

ERECTION PROCEDURE

Date : 6/12/02/2014 Rv. : 0 Page : 5/25


9FA In ta!!at"#n

Turbine <onnection ;iagram <ables <onfigurations Generator 2rotection 2anel5Gas Cnit Gas Turbine (rrangement Aeights ? <.G 5 Gas Turbine5 +#( )utline AT?<G E"haust ;iffuser )utline, Aeight?<.G. GT 2ackage *tator -andling Inlet 2lenum Inlet *hipping ;imensions !ift?<.G. ;iagram #ilter od/(coustic -oods !ift?<.G. ;iagram #ilter Transition Instruction, (lignment5#actory =asic #ield (lignment Instructions ;ata, Temp ? -eat 1ad ;evice *ummary ;I(G, <)@T ;EDI<E 5 TC1= ;I(G,*<- 225!C=E )I! ;I(G,*<-E 5<!G ?*!G (I1 ;I(G,*<-E 225T1I2 )I! ;I(G, *<-E 22 <T1! (I1 ;I(G,*<-E 225<))!I@G A(TE1 ;I(G,*<-E 225*T1T @* ;I(G,*<- 225#CE! G(* ;I(G, *<-E 225!IECI; #CE! ;I(G,*<- 22 (T) (I1 2 ? I; #I1E 21)TE<T *F* ;I(G,*<-E 225I@!ET (I1 -TG ;I(G,*<-E 225-F; *C22! <able Installation ;ata, *peedtrc ;I(G1( ,#!)A5-E(TI@G?DE@T I@*T1C<TI)@*, <!E(@I@G?2(I@TI@G Instruction, !ube )il *election *ymbols, 2iping <able Instl ;ata, Turbine <ontrol 2rocess and Instrum ;iagram /2?I;3 (ir Denting 2rocedure !iquid #uel *yst *yst ? <omp <leanliness 1equirements Instructions, <leaning ? 2ainting Instruction, Test 2reparation5<$9 *yst *ealing Instructions, <able Gland Inde", <ustomer ;rawings -uman5 achine Interface for *peedtronic -uman5 achine Interface for *peedtronic *peedtronic, ark DI *peedtronic, ark DI E" 9&$$ E"citation <ontrol E" 9&$$ E"citation <ontrol 2ower *ystem *tabili.er !* 9&$$ *tatic *tarter <ontrol
This document, sole property of our GE Energy. It is strictly It must not be communicated, copied or reproduced without our written consent.

=-E!

=-E!

GE-5%&9% Dol I GE-5%&9% Dol II GE-5%'9& Dol I GE-5%'9& Dol II GE-5%%0& GE-5%%09 GE-5%%6% GE-5%%6:
confidential.

FRAME 9FA GE Energy Services Power Services Installations


$'0: $'0: $'0: $'0: $'0: $'0: $'0: $'0: $'0: $'0: $'0: $'0: $'0: $'0: $'0: $'0: $'0: $'0: $'0: $'0: $'0: $'0: $'0: $'0: $'0:

ERECTION PROCEDURE

Date : 6/12/02/2014 Rv. : 0 Page : 6/25


9FA In ta!!at"#n GE-5%%6+ GEI5&$$'69 GEI5&$$,&0 GEI5&$$,&% GEI5&$$,0+ GEI5'&$$' GEI5'&$'$ GEI5'&$'6 GE>5&$&+'' GE>5&$%'$% GE>5&$%'&& GE>5&$%'&% GE>5&$%+,6 GE>5&$6&99 GE>5&$699$ GE>5&$6,0: GE>5&$6,,& GE>5&&$696 GE>59:&,% GE>59:&%0 GE>509,%: GE>56,,&9 GE150%9$ GE150+'9 GET5:,+&

!* 9&$$ *tatic *tarter <ontrol *peedtronic, ark DI T 1 - I Time *ynchroni.ation GE Indus *yst *tandard essages for *peedtronic !* 9&$$ *tatic *tarter <ontrol <ooling Aater 1ecommendations *pecification #or #uel Gases GT !iquid #uel *pecifications 1equirements #or Aater/*team 2urity in GT <%$ =reaker anagement 1elay G%$ Generator anagement 1elay T%$ Transformer anagement 1elay Turbine5Generator #oundation Interface GT <ompressor Aashing 2artial ;ischarge (nalysis *ystem =asic <ombined <ycle *tart5up 2rocedure *tandard #ield 2erformance Testing 2hilosophy 2lant Instrument (ir *ystem GT ? (ccessory Equipment 2reservation 1ecommendations #or *torage of !iquid #uels !ubricating )il 1ecommendations for GT Generator 2rotection -eavy5;uty GT )perating ? aintenance <onsiderations Gas #uel <lean5Cp *yst ;esign <onsiderations ;etermination of -a.ardous (rea E"tent

$''$ $''9 $''' $'', $'', $'%& $'%9 $'%0 $'%+ $'6& $'6' $'6' $'6, $'6, $'66

;I(G,*<-E 5!)(; EECI2E E@T ;I(G,*<-E 5T= ? <21*1 A*-G )@E !I@E ;I(G1( AI1E!I*T #IE!; AI1I@G !I*T, I@TE1<)@@E<TI)@ AI1I@G ;I(G,*<- 225A(TE1 A(*- C@IT ;I(G,*<- 225AT1 I@G *F* <(=!E *C (1F ;I(G1( *<- 22 IGD ;I(G,#!)A5I@!ET ? EH-(C*T ;I(G,*<-E 225-(B G(* ;ETE<TI)@ ;I(G,*<-E 225-(B G(* ;ETE<TI)@ Instructions, <onduit *ealing *ealing Instructions, <able Gland ;I(G,*<-E 225#CE! 2C1GE
This document, sole property of our GE Energy. It is strictly It must not be communicated, copied or reproduced without our written consent. confidential.

FRAME 9FA GE Energy Services Power Services Installations


$'+9 $,'% $,': ,,6T ,,6T $%90 $%06 $6$& $6$% $6$% $6$% $6$% $6$% $6$% $6$% $6$% $69% $69% $+$, $+$, $+$% $+$6 $+$6 $+$+ $+$+ $+$+ $+&, $+&: $+9$ $+9' $+9' $+9' $+,0 $+%& $+%& $+%& $+%& $+%& $+%& $+%& $+%& $+%& $+%& $+%9 $+%' $+%' $+%, $+%: $+%+ $+%+ $+%+

ERECTION PROCEDURE

Date : 6/12/02/2014 Rv. : 0 Page : 4/25


9FA In ta!!at"#n

*<-E 2E1#)1 (@<E )@IT)1 2ick5Cp (rr. agnetic5-2 (<TC(T)1 (11(@GE E@T 2ressure Transducer (rrangement 2ressure Transducer (rrangement (11,T-E1 )<)C2!E, EH-(C* T-E1 )<)C2!E (11 1E )D(=! <hamber (rrangement <ombustion Turbine E"haust ;iffuser ;iffuser5(ft (ssy ;iffuser (ssy E"haust #1( E (**F, EH- I+# ;iffuser5)uter ;iffuser5(ft (ssy ;iffuser (ssy, E"haust *upport5(ft ;iffuser TC@I@G systeme TC@I@G systeme 2iping !ube )il #eed and ;rain bearing @J& 2iping !ube )il #eed and ;rain bearing @J& 2iping !ube )il #eed and ;rain interconnection 2iping !ube )il #eed and ;rain bearing @J9 Generator 1equisition *ummary 2iping <ooling and *ealing (ir 2iping <ooling and *ealing (ir 2iping <ooling and *ealing (ir 2iping <ooling Aater turbine. 2iping, #CE!/@)B,21G 2iping (rrangement #alse *tart ;rain 2iping (rrangement (ir E"traction 2iping (rr, (ir E"tract 2iping (rr, (ir E"tract 2iping, <ompressor5Aash 22G, #CE!5)I! TC=I@G (**F, #CE! )I! TC=I@G (**F, #CE! )I! TC=I@G (**F, #CE! )I! TC=I@G (**F, #CE! )I! TC=I@G (**F, #CE! )I! TC=I@G (**F, #CE! )I! TC=I@G (**F, #CE! )I! TC=I@G (**F, #CE! )I! TC=I@G (**F, #CE! )I! 2C1GE 2iping (rrangement #uel Gas *ystem 22G #I1E521), T= 22G #I1E521), T= 2iping (rrangement (T G / (I1 2iping (rr, water in7ection 2iping (rr, !ube5)il Intco 2iping (rr, <ontrol )il Interconnect 22 (11, !IECI; #CE! I@T<)@
This document, sole property of our GE Energy. It is strictly It must not be communicated, copied or reproduced without our written consent. confidential.

FRAME 9FA GE Energy Services Power Services Installations


$+%+ $+%+ $+%+ $+%+ $+69 $+6% $+6+ $+:6 $+:6 $++, &&$0 &&$, &&$, &&$, &&$6 &&$6 &&&0 &&&: &&96 &&'$ &&,, &&,+ &&,+ &&%$ &&%$ &9&0 &0&& &0&+ &%$0 &%$' &%$' &%&9 &%&9 &%&9 &%&9 &%&9 &%&9 &%&6 &%&6 &%90 &%96 &%0' &%0' &%0, &%06 &%'0 &%'0 &%'0 &%'0 &%'0 &%'0

ERECTION PROCEDURE

Date : 6/12/02/2014 Rv. : 0 Page : =/25


9FA In ta!!at"#n

22 (11 <))!I@G AT1 I@T<)@ 22 (11 #(!*E *T(1T ;1 I@T 22 (11, A(TE1 I@GE<T I@T<) 22 (11, !IE #! 2C1GE 2iping (rr, <ooling (ir 2iping E"haust 2lenum 2iping (rr, Inlet 2lenum ;rain 2iping , turbine 2erformance onit 2iping , turbine 2erformance onit 2iping , #ire 2rot E"haust <)@;CIT (11 TC1= <) 2T <)@;CIT (11 #IE!; AI1I@G <)@;CIT (11 #IE!; AI1I@G #IE!; TE*T I@*T1C<TI)@* E!E<T1I<(! <E <)@;CIT (11,TC1= -TG 2lant Instrument (ir *ystem <)@;CIT (11 TC1= !TG <)@;CIT (11,A-! *2 T< <)@;CIT (115#!( E ;ET <)@;CIT (11 #I1E ;ET GC@<TI)@ =)H (11(@GE E@T <)@;CIT (11 TC1= !)A !EDE! <)@;CIT (11 TC1= !)A !EDE! <)@;CIT (11 EH-(C*T (1E(5T <)@;CIT (11 EH-(C*T (1E( IG@ITI)@ EH<ITE1 (**E =!F Guard, <oupling5!oad (ssembly <oupling *olid )utput #oundation =olting (rrangement =olting and ;oweling (rr =olting and ;oweling (rr )utline, inlet 2lenum Inlet Erection ;rawing E"tension, Inlet 2lenum E"tension, Test #i"ture <one, Inlet 2lenum (rr, Inlet Transition )utline !oad <ompt. !)(; <) 2T ;C<T (11(@GE E@T (coust =arrier )utline )ffbase Enclosure GT Enclosure Dendor instruction ;uct (rrangement <ooling and sealing air @ameplate (rr, <orp *ignature )utline , 2ress vent #an <ompart 2ressuri.ation Inlet (ir #ilter *yst #an, Dent Enclosure general (rrangementt )utline Grating (rrangement Erection and Installation anual *tructure support
This document, sole property of our GE Energy. It is strictly It must not be communicated, copied or reproduced without our written consent.

GE>5&&$696

confidential.

FRAME 9FA GE Energy Services Power Services Installations


&%'0 &%'0 &%'0 &%', &%': &%,9 '$$6 ($0, ($0, ($06 ($06 ($'$ ($'$ ($'$ ($'$ ($'$ ($'$ ($'$ ($'$ ($'$ ($'$ ($'$ ($'$ ($'$ ($'$ ($'$ ($'$ ($'$ ($'$ ($'$ ($'$ ($'$ ($'$ ($'$ ($'$ ($'$ ($'$ ($'$ ($'$ ($'$ ($'$ ($'$ ($'$ ($'& ($'& ($'& ($'9 ($'9 ($'9 ($,+ ($,+

ERECTION PROCEDURE

Date : 6/12/02/2014 Rv. : 0 Page : 9/25


9FA In ta!!at"#n

-igh foundation 2I; ;iagram elementary )utline GT <omp Grating (rrangement <rane, )verhead /& Ton3 )utline (ccess !adder Thermocouple *<- #G <)(!E*<I@G #I!TE1 )/! Aater In7ection *kid enclosure )/! Aater In7ection *kid Inlet =leed -eat anual *top Dalve Inlet =leed -eat anual <ontrol Dalve Inlet (ir #iltration, Erection ? Install anual (ir #ilter *ystem5General (rrangement #oundation (rrangement ? !oad Tables 2iping *chematic /2?I;3 (ir #ilter Elementary ;iagram K Turbine Inlet #ilter -oist Installation >it *crew <onveyor >it Cnistrut >it, 2neumatic/Electrical <ontrol =o" G;H <onnection >it, <ompressed (ir odule Airing >it !ighting >it 1eceptacle >it 2ressure *ensing >it, 2anel ount <over Enclosure >it 2ressure *witch >it -oist Electrical >it -oist <ontrol >it *crew <onveyor Electrical >it #ire -a.ard *ign >it !ifting ? <G, ;iagram Transition Transition >it Transition Gasket >it -atch >it !ift ? <G ;iagram, #ilter od/(coustic -oods Temporary =racing >it, Cni5 od !ift #rame >it, G;H Cni5 od Inlet -ood <onnection >it, (coustic 2ulse -opper >it odule -ardware Erection >it odule Gasket Erection >it ;oor (ccess (ssembly, !Inlet ;uct Installation Instructions Inlet ;uct AT <G Inlet duct arrangement E"haust ;iffuser E"haust ;iffuser installation instruction E"haust ;iffuser 0%4 2EE<5 >DI A/2E; I@TE1#. )CT!I@E 2EE<< )CT!I@E
This document, sole property of our GE Energy. It is strictly It must not be communicated, copied or reproduced without our written consent. confidential.

FRAME 9FA GE Energy Services Power Services Installations


($,+ ($,+ ($%: ($%: ($%: ($60 ($60 ($60 ($60 ($60 (&&& (&&& (&9, (&9, (&0$ (&0$ (&0$ (&0$ (&0$ (&09 (&09 (&'$ (&'$ (&'$ (&'$ (&'$ (&,& (&,6 (&%$ (&%$ (&%$ (&%$ (&%$ (&%$ (&%$ (&%$ (&%9 (&%9 (&%9 (&%9 (&%9 (&%9 (&%9 (&%9 (&%9 (&%9 (&:6

ERECTION PROCEDURE

Date : 6/12/02/2014 Rv. : 0 Page : 10/25


9FA In ta!!at"#n

Cniversal !oad Table #or <ese !s 2EE<< )rdering ;rwg <)9 #ire 2rotection Cnit5&$ T)@, ' .ones !2<)9 *torage Cnit #ire 2rotect *yst !ow 2ressure <)95 #ire 2rotection *kid *tandard 1eq #or Dndr ;wg Gear, Turning '&9 Technical anual Turning Gear )utline ;wg Turning Gear manual instruction )utline ? Interface Generator Terminal Enclosure 2iping (rr, !ube )il #eed #lush Instruc #lushing GT !ubricant )il *yst (ir 2rocessing *kid )/! (ir 2rocessing *kid )utline ;rwg (ir 2rocess Cnit ;iagram, schem 22 <ontrol (ir (2C *kid Element <onnect ;iagram <ooling #an odule instruction (ssembly <ooling #an odule !* 9&$$ !oad <ommutated Inverter GT *tatic *tarter 2late?#rame *tatic *tart -eat E"changer )utline ;< !ink 1eactor )utline for +# *tatic *tarter *hielding 2olicy *tatic *tarter >A- <urve, -armonic (nalysis?<able *ummary Install Instruct ? ;rwgs Gen (rr/(ssy ;rwgs !* 9&$$ <ompartment Elec, Elem5(ccy odule <ool Atr Dndr *upld <mpts #uel Gas, Dndr *upld <mpts -yd *ply, Dndr <mpts !ube )il, Dndr *upld <mpts #uel 2urge, Dndr *upld <mp (cc. odule General (rrangement (cc. odule !.). Gauge 2anel Dlv (ssy, Trip 1elay5-p Dalve (ssy, =ypass5#o )utline, (rrgt D@;1 *2!; < 2T Elec Elem, D@;1 *2!; < 2T (tomi.ing air, D@;1 *2!; <))! A(TE1, D@;1 *2!; < 2T* !iquid #uel, D@;1 *2!; < !ube )il, D@;1 *2!; < 2T* #uel 2urge, D@;1 *2!; < 2 Trip )il, D@;1 *2!; < 2T* Inlet (ir -eating 2iping ;esign *tandard
This document, sole property of our GE Energy. It is strictly It must not be communicated, copied or reproduced without our written consent. confidential.

FRAME 9FA GE Energy Services Power Services Installations


E$9, E$9, E$9, G$&, G$&, G$&, *pec *pec *pec *pec *pec *pec *pec *pec *pec M7 *pec *pec *pec G9 ( G&G9 G&;$ =%; GIG&E$ G&#$ =62 (&<G G&G <+$: (&=) (&; G'GG G'G) G'G) G'G) G'G$ G'G$ G'G$ G'G$ G9#) G'=) G&<9 <+$9 G&G= G&D$ ;%= G'GH G91(

ERECTION PROCEDURE

Date : 6/12/02/2014 Rv. : 0 Page : 11/25


9FA In ta!!at"#n

)utline Aater Aash *kid enclosure )utline, Aasher Aash *kid ;iag, *chem 225Aater Aash )utline #uel Gas <oalescing #ilter 2I; #uel Gas <oalescing #ilter ;iagram connection #uel Gas <oalescing #ilter =olt ? *tud Torquing Aelding KGeneral *pec Aelding K #ab of GT1= 22 !eak Test ?=low5;own 2rocedure !iquid #uel 2urge -ydrostatic Test, #uel Gas 2iping 2neumatic Test, Instruction !eak Test?=low5;own 2rocedure, !iquid #uel 2iping Insulation / -eat 1etention aterial aterial and 2rocess Traceability :ENERATOR $%$TEM DE$CRIPTION 2iping Instruction Generator 2ipe Aelding Instruction. GE Instruction #or 2ipe *upports -ydrogen Gas ;ryer )/! ;ual Tower #loat Trap )/! !iquid !evel ;etector, )utline 2iping <onnections5Generator )utline5-ydrogen <abinet )utline5-9 anifold )utline5<)9 anifold (rrangement5Generator !agging *upport *tator -andling )/!, -9?<)9 <ontrol Dalves -a. (rea ap KGen #!G/#!G )utline, Generator echanical Electrical <onnection )utline Generator 2iping )utline Generator close 2iping 2iping bearing oil drain 2iping bearing oil drain 2iping bearing oil feed 2iping seal oil drain 2iping seal oil feed %0 ET block porting valve assy 2 ? I; Gas 2iping 2 ? I; *eal )il )/! *eal )il *kid Electrical ;ata, Generator <.T. Gunction =o" )/! -umidity *ensor *hipping ;imensions =;E !oop *eal )/! Dalve =all
This document, sole property of our GE Energy. It is strictly It must not be communicated, copied or reproduced without our written consent.

GE59':('&,: 2:(5(G& 2:(5(G0 0,:(::,& 069(9+'6 069(&0+& 0%$(6'': 0,,(6',0 0%9(0%6: ;2E7 REF RE<

confidential.

FRAME 9FA GE Energy Services Power Services Installations


G9<$ <+$+ <+$6 G9=$ <+$$ G&2$

ERECTION PROCEDURE

Date : 6/12/02/2014 Rv. : 0 Page : 12/25


9FA In ta!!at"#n

;iag Elect <onnection *eal )il *ystem Equip 1esidual 1isk *ummary Generator 1equisition *ummary ;iag, <ust Elect <onn Gen Gas (u" E"citation *ystem odel <onstants )/! Gen Gas onitoring *ystem

This document, sole property of our GE Energy. It is strictly It must not be communicated, copied or reproduced without our written consent.

confidential.

FRAME 9FA GE Energy Services Power Services Installations Date : 6/12/02/2014 Rv. : 0 Page : 1//25
9FA In ta!!at"#n

ERECTION PROCEDURE

4.0

EN<IRONMENTA7 AND $AFET% CONCERN$ 4.1 :ene*a! The Erection Team shall follow all site safety instructions and procedures as required for the e"ecution of the scope of work covered by this instruction. In addition, the GE site safety manual and standards shall be followed as a minimum requirement. 4.2 $a(et. 4.2.1 4.2.2 *ite safety instructions shall apply. The installation of the gas turbine unit and system components requires work being performed from ground level to heights of appro"imately &$ meters. *afety precautions such as those detailed in the GE *afety anual, available from the GE Technical (dvisor on site, should be observed as minimum requirements.

5.0

RECEI<IN:> 2AND7IN: AND $TORA:E OF E?UIPMENT 5.2 Invent#*. #( E30"'1ent ( detailed inventory of all material shall be performed by the Installer against the shipping packing lists provided. In the event of either a quantitative or qualitative discrepancy, 1eport shall be issued. (ll discrepancies shall be reported immediately to the GE Technical (dvisor on site for verification and assistance in initiating any corrective action and/or claims. NOTE: (ll material and equipment packed in the *ummary *heet container, whether applicable for this instruction or not, shall be inventoried at this time. 5./ $t#*age #( E30"'1ent an, Mate*"a! The Equipment and/or materials defined in this instruction can normally be stored in an outdoor lay down area with suitable cribbing to elevate the equipment above ground and with adequate weather protection provided /i.e., tarps3. )ther specific storage and/or preservation instructions from the )wner and/or GELs Technical (dvisor on site, if applicable, shall also apply. (ll material received shall be stored and arranged to accommodate correct order of installation. 1efer to the specific equipment erection instructions for other details regarding special storage requirements. NOTE: The material and equipment packed in the *ummary *heet container is categori.ed for identification and stored on shelves within the container. This container, with all contents, is normally positioned in the vicinity of the gas turbine unit foundation pedestal during the time of erection.

This document, sole property of our GE Energy. It is strictly It must not be communicated, copied or reproduced without our written consent.

confidential.

FRAME 9FA GE Energy Services Power Services Installations


6.0

ERECTION PROCEDURE

Date : 6/12/02/2014 Rv. : 0 Page : 14/25


9FA In ta!!at"#n

E?UIPMENT ERECTION PROCEDURE The following instruction outlines the detailed erection procedures to be followed for the scope of the work covered by this document. 1eference to the required installation inspection sheets, data record forms in the 2lan, is provided throughout the procedures and is indicated following each activity (ll damages, design discrepancies, defects and modification work shall be reported immediately to the GE Technical (dvisor on site for verification and assistance in initiating any corrective action and/or claims. 6.1 P*e!"1"na*. )#*+ 2rior to commencing with any of the erection activities described herein, the following preliminary work activities must be completed. 6.1.1 Rev"e@ E*e&t"#n D#&01entat"#n 6.1.1.1 1eview all erection documentation as referenced in *ection '.$ of this instruction. 6.1.1.2 1eview and understand all safety and environmental information and documentation as referenced in *ection ,.$ of this instruction. 6.1.1./ Ensure that all ;ata 1ecord *heets are available as required. 6.1.1.4 Derify that all documentation as referenced in %.&.&.&, %.&.&.9, and %.&.&.0, above, has been thoroughly reviewed and understood. 6.1.2 P*e'a*at"#n #( )#*+ A*ea 6.1.2.1 Ensure that turbine hall building, foundations, turbine foundations, building structural steel, etc., have been completed 6.1.2.2 Ensure that the work area is clear of all debris, equipment and material that may cause in7ury to personnel, interference with the installation effort or damage to the equipment being installed. 6.2 F#0n,at"#n Inte*(a&e C-e&+ It is critical that the foundation and support areas be thoroughly inspected prior to setting the gas turbine and generator unit in place. These inspections are required to verify that the foundation has been properly formed with all required anchor bolts, grout pockets, restraining blocks, 7acking posts, conduit stub5ups and cable pits for installation of the equipment covered by this instruction. 6.2.1 In 'e&t/<e*"(. F#0n,at"#n Inte*(a&e> E1Ae,1ent an, $0''#*t A*ea 6.2.1.1 Derify that all required foundation embedment, fi"ators and sole plates for the gas turbine/generator equipment have been installed. 6.2.1.2 Derify all foundation and support areas for correct location, si.e, elevation and potential interferences of grout pockets, anchor bolts, pits, embedded conduit, piping and height restrictions with respect to the equipment to be installed.
This document, sole property of our GE Energy. It is strictly It must not be communicated, copied or reproduced without our written consent. confidential.

FRAME 9FA GE Energy Services Power Services Installations Date : 6/12/02/2014 Rv. : 0 Page : 15/25
9FA In ta!!at"#n

ERECTION PROCEDURE

6.2.1./ <lean as required the foundation sub5sole plates and embedded restraining blocks and apply a light grade machinists oil. 6.2.1.4 Derify that all foundation interface checks per %.9.&.&, %.9.&.9 and %.9.&.0 have been carried out. <omplete installation report sheet. BF#0n,at"#n An&-#* ;#!t P# "t"#nC. 6.2.2 P*e'a*at"#n #( F#0n,at"#n> Pa&+e* an, $-"1 6.2.2.1 Transfer all equipment centerline and elevation references to foundation and support areas and record data. Derify that all critical datum4s are established with chalk line or wire as required in accordance with M7 0/2/. 6.2.2.2 2repare gas turbine foundation bolting arrangement material M7 160/ 6.2.2./ Derify that all foundation checks per %.9.9.& and %.9.9.9 have been carried out as required. <omplete installation report *heet. B$0A #!e P!ate D F"5at#* C-e&+ C. 6./ P*e'a*at"#n #( E30"'1ent (#* In ta!!at"#n 6./.1 1emove all general shipping braces, saddles, bolsters, shipping covers, packing and supports as required to permit unrestricted installation of the equipment. NOTE: ;o not remove any braces or supports that may be installed for stiffening purposes for lifting and handling of the equipment. ;o not remove the shipping covers on the gas turbine inlet casing and e"haust frame at this time. These covers shall remain in place until it is absolutely necessary to remove for erection of the associated components.

This document, sole property of our GE Energy. It is strictly It must not be communicated, copied or reproduced without our written consent.

confidential.

FRAME 9FA GE Energy Services Power Services Installations


6./ Me&-an"&a! E*e&t"#n 6./.1 In ta!!at"#n #( t-e :T D :ene*at#* E M7 160/ 2repare all contact surfaces before lowering turbine <lean sub sole plates #it guard sleeves on anchor bolts to protect them <heck thickness of all shims with micrometer 2repare standards packets (dded or remove shims to compensate for height differences as marked on sub soles plates 5 (fter turbine installation on the foundation align on a"is REMO<IN: ROTOR ;7OC9IN: $UPPORT M7 10/ Transport, lift and set gas turbine unit and base assembly onto foundation pedestal and foundation plates. Derify that the gas turbine unit and base is initially set with respect to the established site datum4s i.eM centerline line of GT anchor pin and a"ial shaft5line to within N $.&9, in. /N 0.&: mm3 Transport, lift and set Generator unit assembly onto foundation supports. Derify that the generator unit is initially set with respect to the established site datum4s i.eM centerline line of GT anchor pin and a"ial shaft5line to within N $.&9, in. /N 0.&: mm3 and data recorded. Erect gas turbine e"haust diffuser in accordance with manufacturers instructions M7 A042 <omplete GT turbine ;rop <heck. <omplete installation inspection sheet. BT0*A"ne D*#' C-e&+C <onfirm position of e"haust duct relative to e"haust diffuser and commence field assembly in accordance with manufacturers specification. <omplete installation inspection sheet. BE5-a0 t ,"((0 e* t# e5-a0 t ,0&t a!"gn1ent $-eetC Erect inlet plenum M7 1612 structural support steel, and preposition lower inlet plenum to GT compartment enclosure seals. Install and assembly inlet plenum lower half and confirm correct elevation, a"ial and transverse location. Install the lower half inlet cone piece and e"tensions in accordance with the manufacturers instructions. Install combustion hardware in accordance GE combustion assembly drawing M7 0401. 6./.= Install gas turbine load coupling M7 1/19 in accordance with 1iverhawk bolting assembly instructions. 2rior to assembly ensure load coupling male and associated female rabbit dimension. 1ecord coupling bolt elongation data on installation report sheet . BC#0'!"ng ;#!t $t*et&- DataC.

ERECTION PROCEDURE

Date : 6/12/02/2014 Rv. : 0 Page : 16/25


9FA In ta!!at"#n

6./.2

6././

6./.4 6./.5 6./.6

6./.4

This document, sole property of our GE Energy. It is strictly It must not be communicated, copied or reproduced without our written consent.

confidential.

FRAME 9FA GE Energy Services Power Services Installations Date : 6/12/02/2014 Rv. : 0 Page : 14/25
9FA In ta!!at"#n

ERECTION PROCEDURE

6./.9

Aith the load coupling /spool piece3 installed and measuring from the coupling flange, set the preliminary gas turbine to generator cold alignment, 1ef to field alignment instruction M7 0411. (d7ustments are made utili.ing the ad7ustable fi"ators under the gas turbine sub5sole plates. ;uring the elevation and slope ad7ustments, ensure that the loading of each fi"ator remains consistent.

6./.10 Ahen preliminary alignment has been accomplished it is now possible to remove the GT =ase a"ial beams and continue with installation of the combustion hardware. (ny further alignment changes can be accomplished by sliding the generator. 6./.11 *et the generator collector house on foundation and complete preliminary alignment checks 6./.12 *et turning gear on foundation M7 A04/ and complete preliminary static alignment as outline on M7 0411 field alignment instruction 6./.1/ Install generator terminal enclosure as outline 6./.14 <omplete assembly of air inlet plenum in accordance with the vendor erection instructions. M7 1612 6./.15 <ommence erection of air inlet duct support steel and assembly of inlet duct in accordance with vendor assembly instructions M7 A041

6./.16 <ommence pre5assembly of inlet filter house modules at ground level. #ollowing lift and position all module in accordance with vendor field erection instructions. M7 A040 6./.14 *et all ma7or skid on foundation M7 A160 / A162 / A0/5 / E025 / A06=

6./.1= <ontinue erection of GT M7 16/4 and e"haust enclosures M7 1624 in accordance with vendor erection instructions

This document, sole property of our GE Energy. It is strictly It must not be communicated, copied or reproduced without our written consent.

confidential.

FRAME 9FA GE Energy Services Power Services Installations


6.4 PIPIN: IN$TA77ATION (ssembly all on base GT and module interconnection piping in accordance with the respective 2E; requirements. <omplete weld mapping, @;T and pressure testing as necessary. <onfirm all material, personnel and plant traceability records as necessary. 1efer to each system specific assembly drawing to identify the system 2E; category and testing requirements.

ERECTION PROCEDURE

Date : 6/12/02/2014 Rv. : 0 Page : 1=/25


9FA In ta!!at"#n

6.4.1

A$$EM;7IN: OI7 $UPP7% AND RETURN PIPE )OR9 M7 0905 / 0904 / 0969 #or end bearing nJ & #or end bearing nJ 9 *ealing plates return bearing nJ9 18 28 /8 48 58 ;rawing ;rawing ;rawing M7 16/5

#it on he bearing & and 9 internal pipe work before final assembly (d7ust and connect pipe work to bottom of lower oil supply and return Aelding specification.:E D*a@"ng P=AEA:1 / :E D*a@"ng P=AEA:/ <leaning ? 2ainting *pecification GE ;rawing /62A/562 =olting specification :E D*a@"ng 24= A 415=

6.4.2

COO7IN: AND $EA7IN: AIR PIPE)OR9 M7 0909 18 28 /8 '3 #asten pipe work supports (d7ust and install pipe work Aelding specification .GE ;rawing :E P=AEA:1 / :E P=AEA:/ =olting specification .:E D*a@"ng 24= A 415=

6.4./

$UPP7% AND RETURN I:< OI7 PIPE)OR9 M7 0969M 18 28 03 '3 ,3 #asten pipe work supports (d7ust and install pipe work Aelding specification GE ;rawing P=AEA:1 / :E P=AEA:/ <leaning ? 2ainting *pecification :E D*a@"ng /62A/562 =olting specification GE ;rawing :EE24= A 415=

6.4.4

INTERCONNECTION OI7 $UPP7% AND RETURN PIPE)OR9 M7 0906 / 0969 18 28 /8 48 58 #asten pipe work supports (d7ust and install pipe work Aelding specification @J :E P=AEA:1 / :E P=AEA:/ <leaning ? 2ainting *pecification NF /62A/562 =olting specification @J :EE24= A 415=

6.4.5

COO7IN: )ATER PIPE)OR9 M7 0915 / 0969


confidential.

This document, sole property of our GE Energy. It is strictly It must not be communicated, copied or reproduced without our written consent.

FRAME 9FA GE Energy Services Power Services Installations Date : 6/12/02/2014 Rv. : 0 Page : 19/25
9FA In ta!!at"#n

ERECTION PROCEDURE

18 28 03 '3 ,3 6.4.6

#asten pipe work supports (d7ust and install pipe work Aelding specification .@J :E P=AEA:1 / :E P=AEA:/ <leaning ? 2ainting *pecification NF /62A/562 =olting specification @J :EE24= A 415=

FA7$E $TART DRAIN PIPE)OR9 M7 0920 / 0969 18 28 /8 48 58 68 #asten pipe work supports (d7ust and install pipe work Tubing fittings instruction NF 215A44/5 Aelding specification .@J :E P=AEA:1 / :E P=AEA:/ <leaning ? 2ainting *pecification NF /62A/562 =olting specification @J :EE24= A 415=

6.4.4

AIR EGTRACTION ATOMIHIN: PIPE)OR9 M7 0924 18 28 /8 48 58 #asten pipe work supports (d7ust and install pipe work Aelding specification .@J :E P=AEA:1 / :E P=AEA:/ <leaning ? 2ainting *pecification NF /62A/562 =olting specification @J :EE24= A 415=

6.4.=

ATOMIHIN: AIR PIPE)OR9 M7 0965 18 28 /8 48 58 #asten pipe work supports (d7ust and install pipe work Aelding specification .@J :E P=AEA:1 / :E P=AEA:/ <leaning ? 2ainting *pecification NF /62A/562 =olting specification @J :EE24= A 415=

6.4.9

)ATER INIECTION PIPE)OR9 M7 096= / 0969 18 28 /8 48 58 68 #asten pipe work supports (d7ust and install pipe work Tubing fittings instruction NF 215A44/5 Aelding specification .@J :E P=AEA:1 / :E P=AEA:/ <leaning ? 2ainting *pecification NF /62A/562 =olting specification @J :EE24= A 415=

This document, sole property of our GE Energy. It is strictly It must not be communicated, copied or reproduced without our written consent.

confidential.

FRAME 9FA GE Energy Services Power Services Installations Date : 6/12/02/2014 Rv. : 0 Page : 20/25
9FA In ta!!at"#n

ERECTION PROCEDURE

6.4.10 7I?UID FUE7 PUR:E PIPE)OR9 M7 091= / 0969 18 28 /8 48 58 68 48 =8 #asten pipe work supports (d7ust and install pipe work Tubing fittings instruction NF 215A44/5 Aelding specification .@J :E P=AEA:1 / :E P=AEA:/ !eak test instruction @J /5=A==51 <leaning ? 2ainting *pecification NF /62A/562 2ipe insulation NF /55A445/ =olting specification @J :EE24= A 415=

6.4.11 FUE7 OI7 PIPE)OR9 M7 0961 / 0969 18 28 /8 48 58 %3 63 #asten pipe work supports (d7ust and install pipe work Tubing fittings instruction NF 215A44/5 !iquid fuel leak test / blow down procedure NF /60A444= Aelding specification @J :E P=AEA:1 / :E P=AEA:/ <leaning ? 2ainting *pecification NF /62A/562 =olting specification @J :EE24= A 415=

6.4.12 FUE7 :A$ PIPE)OR9 M7 0962 18 28 /8 48 58 68 48 #asten pipe work supports (d7ust and install pipe work -ydrostatic test @J /42A2944 2neumatic test @J /42A1/91 Aelding specification .@J :E P=AEA:1 / :E P=AEA:/ =olting specification .@J :EE24= A 415= <leaning ? 2ainting *pecification NF /62A/562

6.4.1/ COO7IN: AIR PIPE)OR9 M7 0942 18 28 03 '3 ,3 #asten pipe work supports (d7ust and install pipe work Aelding specification .@J :E P=AEA:1 / :E P=AEA:/ =olting specification .@J :EE24= A 415= <leaning ? 2ainting *pecification NF /62A/562

6.4.14 EG2AU$T DRAIN PIPE)OR9 M7 0946 18 28 /8 ,3 %3 #asten pipe work supports (d7ust and install pipe work Aelding specification .@J :E P=AEA:1 / :E P=AEA:/ =olting specification .@J :EE24= A 415= <leaning ? 2ainting *pecification NF /62A/562

This document, sole property of our GE Energy. It is strictly It must not be communicated, copied or reproduced without our written consent.

confidential.

FRAME 9FA GE Energy Services Power Services Installations Date : 6/12/02/2014 Rv. : 0 Page : 21/25
9FA In ta!!at"#n

ERECTION PROCEDURE

6.4.15 IN7ET P7ENUM DRAIN PIPE)OR9 M7 0949 18 28 03 '3 ,3 #asten pipe work supports (d7ust and install pipe work Aelding specification .@J :E P=AEA:1 / :E P=AEA:/ =olting specification .@J :EE24= A 415= <leaning ? 2ainting *pecification NF /62A/562

6.4.16 TU;IN: PERFORMANCE MONITORIN: PIPE)OR9 M7 09=4 / 554T 18 28 /8 48 #asten pipe work supports (d7ust and install pipe work Tubing fittings instruction NF 215A44/5 <leaning ? 2ainting *pecification NF /62A/562

6.4.14 FIRE PROTECTION PIPE)OR9 M7 0964 / 0995 18 28 /8 48 58 =earing @J 9 @J 119E=414 #asten pipe work supports (d7ust and install pipe work Aelding specification .@J :E P=AEA:1 / :E P=AEA:/ <leaning ? 2ainting *pecification NF /62A/562 =olting specification @J :EE24= A 415=

6.4.1= Install all generator on base piping, off base modules and interconnection piping in accordance with the respective 2E; requirements. <omplete weld mapping, @;T and pressure testing as necessary. <onfirm all material, personnel and plant traceability kept as necessary. 1efer to each system specific assembly drawing to identify the system 2E; category and testing requirements. (ll documentation supplied by =-E!. :ENERATOR PIPE)OR9 18 28 /8 48 58 INTERCONNECTION OI7 $UPP7% AND RETURN

#asten pipe work supports (d7ust and install pipe work Aelding specification <leaning ? 2ainting *pecification =olting specification

This document, sole property of our GE Energy. It is strictly It must not be communicated, copied or reproduced without our written consent.

confidential.

FRAME 9FA GE Energy Services Power Services Installations Date : 6/12/02/2014 Rv. : 0 Page : 22/25
9FA In ta!!at"#n

ERECTION PROCEDURE

6.5

:T IN$TRUMENTATION <ommence installation of GT on base control instrumentation, cabling and conduit at roughly :$O mechanical completion. #ollow GT compartment conduit assembly outlines as close as possible, (ll compartment wall glands needs to be closely monitored in relation to positioning of control 7unction bo"es etc. 6.5.1 CONDUIT D IN$TRUMENTATION COMPT TUR;INE M7 1105 / 1155 Installation of electrical conduits. Installation of the 7unction bo". Installation #ire detectors. Instrumentation to be wire to the 7unction bo". <heck the continuity of the wires. 6.5.2 CONDUITD IN$TRUMENTATION TUR;INE 2EATIN: M7 1104 Installation of electrical conduits. Instrumentation to be wire to the 7unction bo". <heck the continuity of the wires. 6.5./ CONDUIT D 7I:2TIN: COMPT TUR;INE M7 111/ Installation of electrical conduits. Instrumentation to be wire to the 7unction bo". <heck the continuity of the wires. 6.5.4 CONDUIT D TUR;INE )27 $P TC M7 111= Installation of electrical conduits. Installation T< wheel space. Instrumentation to be wire to the 7unction bo". <heck the continuity of the wires. 6.5.5 CONDUIT F7AMME DETECTOR M7 1124 Installation of electrical conduits. Installation flame detector. Instrumentation to be wire to the 7unction bo". <heck the continuity of the wires.

This document, sole property of our GE Energy. It is strictly It must not be communicated, copied or reproduced without our written consent.

confidential.

FRAME 9FA GE Energy Services Power Services Installations Date : 6/12/02/2014 Rv. : 0 Page : 2//25
9FA In ta!!at"#n

ERECTION PROCEDURE

6.5.6

CONDUIT D FIRE DETECTION M7 1140 Installation of electrical conduits. Installation #ire detectors. Instrumentation to be wire to the 7unction bo". <heck the continuity of the wires.

6.5.4

CONDUIT D IN$TRUMENTATION TUR;INE 7O) 7E<E7 M7 1159 Installation of electrical conduits. Installation of 7unction bo". Instrumentation to be wire to the 7unction bo". <heck the continuity of the wires.

6.5.=

CONDUIT D IN$TRUMENTATION EG2AU$T $IDE M7 1160 Installation of electrical conduits. Installation of 7unction bo", thermocouples. Instrumentation to be wire to the 7unction bo". <heck the continuity of the wires.

6.6.1

<omplete erection of GT, e"haust, load and generator enclosures pay particular attention to compartment interface seals and acoustical panels. $ee M7 1614 / 16/4 / 164/ <omplete assembly of all remaining shaft5line component, fan modules, gas conditioning equipment, customer interconnection piping and cabling. <omplete GT and Generator lube oil, seal oil, lift oil and control oil flush, utili.ing flushing hardware supplied under M7 A125 and in accordance with the appropriate cleanliness specification. In t*0&t"#n /62A/595

6.6.2

6.6./

This document, sole property of our GE Energy. It is strictly It must not be communicated, copied or reproduced without our written consent.

confidential.

FRAME 9FA GE Energy Services Power Services Installations Date : 6/12/02/2014 Rv. : 0 Page : 24/25
9FA In ta!!at"#n

ERECTION PROCEDURE

6.6.4

#ollowing lube oil flush reinstatement and upon availability of lift oil system, commence load shaft run out checks. Cpon confirmation that load shaft run out data meets specification, record data on installation inspection sheet. B7#a, C#0'!"ng $'##! P"e&e R0n #0tC <ommence finally alignment of the GT to the Generator, moving the generator as the preferred option to the GT. Cpon successful completion of the alignment to GE spec record alignment data. <omplete installation inspection sheet. BF"na! A!"gn1ent 7#a, $-a(t t# :ene*at#*C Aith the gas turbine to generator alignment complete now commence final alignment of the turning gear to generator shaft by rotation and repositioning the turning gear as necessary. Cpon successful completion of the alignment to GE spec record alignment data. <omplete installation inspection sheet. BF"na! A!"gn1ent T0*n"ng :ea* t# :ene*at#*C Aith all final alignment complete, finali.e the a"ial retaining shim, gib key clearances and anchors locations in accordance with instruction outlined on ! &%$0 ? &%$' drawing instructions. <omplete installation inspection sheet. BA5"a! Cent*e !"ne $0''#*t C!ea*an&e C #inalise position of collector housing assembly and record fan blade clearance. <omplete installation inspection sheet. BC#!!e&t#* R"ng an, Fan ;!a,e C!ea*an&e C #inali.e speed pickup gap setting and install load coupling shaft guard. <omplete installation inspection sheet. B$'ee, P"&+0' :a' C

6.6.5

6.6.6

6.6.4

6.6.=

6.6.9

6.6.10 <onfirm all motor to pump final alignments in accordance with appropriate vendor coupling requirements. <omplete installation inspection sheet. F"na! A!"gn1ent A05 70Ae O"! P01' 1. F"na! A!"gn1ent A05 70Ae O"! P01' 2. F"na! A!"gn1ent E1e*gen&. DC 70Ae O"! P01'. F"na! A!"gn1ent A05 $ea! O"! P01'. F"na! A!"gn1ent E1e*gen&. DC $ea! O"! P01'. 6.6.11 <omplete grouting of gas turbine sub sole plates and remove all alignment 7acking beams.

This document, sole property of our GE Energy. It is strictly It must not be communicated, copied or reproduced without our written consent.

confidential.

FRAME 9FA GE Energy Services Power Services Installations Date : 6/12/02/2014 Rv. : 0 Page : 25/25
9FA In ta!!at"#n

ERECTION PROCEDURE

6.4

E30"'1ent Pa"nt"ng The gas turbine base and other related components are factory painted with one coat inorganic J"n&> Ca*A#!"ne CH11> followed by an epo"y top coat. *cuff marks, scratches and other damage to the primer or finish coat incurred during transportation to site and on5site handling or welding will require touch5up primer painting only. ( final coat of paint is not required for the gas turbine, base and related components. (ll enclosures, inlet plenum, duct and filter house have been factory coated with e"terior primer coat. 1efer to :E ,*a@"ng /54;9914 when selecting a suitable top coat paint. 6.5.1 <omplete touch up painting per Instruction P6CEA:25 as found in Tab ; of this instruction. Derify that all scratches and damage to e"posed painted surfaces have been repaired.

6.=

C#n t*0&t"#n C#n(#*1"t. F"!e 6.6.1 (s a prerequisite to the system <ommissioning activities and following erection of all gas turbine system components, through erection activity %.0.& to %.%.&& a complete system installation inspection must be performed to verify any outstanding work. <omplete final installation inspection and record any punch list !s. Derify that all Installation inspections sheets and other construction quality documentation has been completed in accordance with the pro7ect plan and filed in the <onstruction <onformity #ile.

6.6.2

4.0

APPENDIG 6IN$TRUCTION $PECIFIC8 In ta!!at"#n In 'e&t"#n $-eet . Re!ate, :E9K > :EIK an, TI7K