Sl.

Description Unit Nos Length Width Height Qty Total


No
1 Excavation
Tower foundation
Normal soil Cum 4 4.00 4.00 0.60 9.6 38.4
Soft rock Cum 4 4.00 4.00 3.00 48 192
DG bed
Normal soil Cum 2 1.270 0.60 0.60 0.4572 0.9144
Cum 2 3.620 0.60 0.60 1.3032 2.6064
Soft rock Cum 2 1.270 0.60 0.10 0.0762 0.1524
Cum 2 3.620 0.60 0.10 0.2172 0.4344
OD BTS Cum 2 2.455 0.60 0.60 0.8838 1.7676
Cum 2 3.005 0.60 0.60 1.0818 2.1636
2 PCC
Tower foundation Cum 4 4.00 4.00 0.1 1.6 6.4
DG Cum 2 1.270 0.60 0.1 0.0762 0.1524
Cum 2 3.620 0.60 0.1 0.2172 0.4344
DG Bedtop Cum 1 2.790 1.040 0.075 0.21762 0.21762
DG Bedstep Cum 1 0.8 4.25 0.075 0.255 0.255
OD foundation Cum 2 2.455 0.60 0.10 0.1473 0.2946
Cum 2 3.005 0.60 0.10 0.1803 0.3606
OD Bedtop Cum 1 2.710 2.060 0.10 0.5582 0.5582
Cum 2 1.00 0.350 0.075 0.02655 0.0525
3 RCC as per drawing
Tower 36.08
DG 0.7313
OD 1.403
4 Centring
Roof Sq.m 4 15.2 0.3 4.56 18.24
Sq,m 4 9.6 0.4 3.84 15.36
Column Sq.m 4 12.6 0.85 10.71 42.84
Sq.m 1 9.5 0.15 1.425 1.425
Sq.m 1 12.3 0.15 1.875
5 Steel as per drawing
Tower 3918
5% waste 195.00
DG 56.67
OD 82.62
6 Random rubble
masonary and stone
masonary (as per
drawing) 6.663