Effect of the risk factors on the Structural Conservation Process Delay

Problems with
Problems Water Major Decisions to New
Structural Failure of Natural New Archaeological Utility
Main Risks Lowering Dismentale or Technological
Encroachments & Structural Failure of Surrounding Unfeasible Structural Risk(NR) Change to Policy of Finds(NAF) &Infrastructure
Projects(PWLP) Reconstruction(MDDR) Solutions(NTS)
Occupation(EO) Monuments(SFM) Buildings(SFSB) Solutios(USS) Intervention(CPI) Lines(PUIL)
Archeologica Archeologic Architictur
Architictur
Legal,Administrator l&Architictur Archeological&Ar al&Architict al& Prermissions of the
Structural Structural Structural Structural Structural Archeological&Archi al& Survey Total Delay
Secondary Risks &Financial al chitictural ural Survey Relevent
Solution(SS) Solution(SS) Solution(SS) Solution(SS) Solution(SS) or PRA tictural Studies(AAS) Documents Time/
Procedures(LAFP) Studies(AAS Studies(AAS) Studies(AA Document Authorities(PRA)
(ASD) Project
) S) s(ASD)
Project Delay Time/ Project Delay Time/ Project Delay Time/ Project Delay Time/ Project Delay Time/ Delay Time/ Project Delay Time/ Project Delay Time/ Delay Time/ Project Delay Time/ Project Time
Project Name Project Time Delay Time/ Project Time
No Time Time Time Time Time Time Project Time Time Time
Magra el Eyon no.1 40/24= 166% (VH) 5/24= 21% (L) 7/24= 29% (L) 9/24= 38% (M) 61/24=254%

El sour El shamaly no.2 5/24= 21% (L) 6/24= 25% (L) 22/24= 92%(VH) 14/24= 58% (H) 6/24= 25% (L) 9/24= 38% (M) 62/24=258%

Kasr Moh. Aly Shopra no.3 4/24= 17% (VL) 6/24= 25% (L) 20/24= 83% (VH 10/24= 42% (M) 40/24=167%

Gohary group no.4 6/24= 25% (L) 1/24= 4% (VL) 6/24= 25% (L) 4/24= 17% (VL) 6/24= 25% (L) 6/24= 25% (L) 29/24=121%

El Moayed Sheekh no.5 8/24= 33% (L) 2/24= 8.3% (VL) 6/24= 25% (L) 4/24=17% (VL) 8/24= 34% (L) 10/24= 42% (M) 2/24= 8.3% (VL)40/24=167%

Beshtak Group no.6 8/24= 33% (L) 6/24= 25% (L) 6/24= 25% (L) 4/24= 17% (VL) 24/24=100%

El Selehdar Group no.7 2/18= 11% (VL) 6/18= 34% (L) 4/18= 22% (L) 13/18= 72% (H) 13/18= 72% (H) 38/18=211%

El Ashraf Bersbay Gr. no.8 7/24= 29% (L) 4/24= 17% (VL) 3/24= 13% (VL) 6/24= 25% (L) 20/24=83%

Kalawoon Group no.9 6/24= 25% (L) 9/24= 38% (M) 3/24= 13% (VL) 4/24= 17% (VL) 22/24=92%

Ebn Tolon Masged no.10 6/24= 25% (L) 3/24= 13% (VL) 3/24= 13% (VL) 12/24=50%

Mamaay el Seefy Grou no.11 23/24= 96% (VH) 4/24= 17% (VL) 9/24= 38% (M) 9/24= 38% (M) 10/24= 42% (M) 55/24=229%

Sadat House no.12 2/24= 8% (VL) 22/24= 92% (VH) 6/24= 25% (L) 30/24=125%

Wekala el Khory no.13 30/18= 167% (VH) 30/18=167%

Abo el Dahab Group no.14 12/24= 50% (M) 4/24= 17% (VL) 9/24= 38% (M) 12/24= 50% (M) 37/24=154%

El Khory Group no.15 24/24= 100% (VH) 6/24= 25% (L) 4/24= 17% (VL) 10/24= 42% (M) 4/24= 17% (VL) 48/24=200%

El Ameer Taaz House no.16 6/30= 20% (L) 6/30=20%

El Eeny Group no.17 9/24= 38% (M) 4/24= 17% (VL) 14/24= 58.3% (H) 2/24= 8.3% (VL 5/24= 21% (L) 44/24=183%

Kasr el Manyal no.18 18/24= 75% (H) 18/24=75%

Bebars Group no.19 5/36= 14% (VL) 5/36=14%

Shabshery Group no.20 9/36= 25% (L) 2/36= 5% (VL) 4/36= 11% (VL) 15/36=42%
Structural Failure of
Main Risks Encroachments & Structural Failure of Surrounding
Occupation(EO) Monuments(SFM) Buildings(SFSB)

Legal,Administrator
Structural
Secondary Risks &Financial Structural Solution(SS)
Solution(SS)
Procedures(LAFP)

Project
Project Name Probapility Impact Probapility Impact Probapility Impact
No

Magra el Eyon no.1 80% (H) 166% (VH)

El sour El shamaly no.2 15% (VL) 21% (L)

Kasr Moh. Aly Shopra no.3 10% (VL) 17% (VL) 15% (VL) 25% (L)

Gohary group no.4 20% (VL) 25% (L) 60% (H) 4% (VL)

El Moayed Sheekh no.5 20% (VL) 33% (L) 5% (VL) 8.3% (VL)

Beshtak Group no.6 20% (VL) 33% (L)

El Selehdar Group no.7 10% (VL) 11% (VL)

El Ashraf Bersbay Gr. no.8 25% (L) 29% (L)

Kalawoon Group no.9 10% (VL) 25% (L)

Ebn Tolon Masged no.10

Mamaay el Seefy Group no.11 40% (M) 96% (VH) 10% (VL) 17% (VL)

Sadat House no.12 60% (H) 8% (VL)

Wekala el Khory no.13 65% (H) 167% (VH)

Abo el Dahab Group no.14 40% (M) 50% (M)

El Khory Group no.15 50% (M) 100% (VH)

El Ameer Taaz House no.16

El Eeny Group no.17 25% (L) 38% (M) 85% (VH) 17% (VL)

Kasr el Manyal no.18 50% (M) 75% (H)

Bebars Group no.19

Shabshery Group no.20 40% (M) 25% (L)


Risk Probability (%) VL (0-23 %) L (18-42 %) M (39-63 %)
Risk Impact (%) VL (0-24 %) L (19-40 %) M (37-63 %)

Structural Conservation Process


VL (0-25 %) L (20-45 %) M (43-80 %)
Delay Evaluation (SCPDE) %
Problems Water
Unfeasible Structural Natural Risk(NR) Lowering Change to Policy of
Solutios(USS) Projects(PWLP) Intervention(CPI)

Structural Structural Archeological&Architic


Structural Solution(SS)
Solution(SS) Solution(SS) or PRA tural Studies(AAS)

Probapility Impact Probapility Impact Probapility Impact Probapility Impact

90% (VH) 21% (L) 70%( H) 29% (L)

30% (L) 25% (L) 90% (VH) 92%(VH) 70% (H) 58% (H)

40% (M) 83% (VH)

80% (VH) 25% (L)

70% (H) 25% (L) 10% (VL) 17% (VL)

80% (VH) 25% (L) 40% (M) 25% (L)

75% (H) 34% (L) 80% (VH) 22% (L)

40% (M) 17% (VL) 10% (VL) 13% (VL)

90% (VH) 38% (M) 25% (L) 13% (VL)

50% (M) 25% (L) 10% (VL) 13% (VL)

70% (H) 38% (M) 40% (M) 38% (M)

90% (VH) 92% (VH) 70% (H) 25% (L)

70% (H) 17% (VL) 40% (M) 38% (M)

40% (M) 25% (L) 90% (VH) 17% (VL) 60% (H) 42% (M)

80% (VH) 58.3% (H)

90% (VH) 5% (VL)


H (60-84 %) VH (79-100 %)
H (58-78 %) VH (76-100 %)

H (75-95 %) VH > 95%


Major Decisions to Problems with Utility
New Technological New Archaeological
Dismentale or &Infrastructure
Solutions(NTS) Finds(NAF)
Reconstruction(MDDR) Lines(PUIL)
Architictural Architictural
Archeological& Archeological Prermissions of the
& Survey Archeological&Architi & Survey
Architictural &Architictural Relevent
Documents( ctural Studies(AAS) Documents(
Studies(AAS) Studies(AAS) Authorities(PRA)
ASD) ASD)

Probapility Impact Probapility Impact Probapility Impact Probapility Impact

90% (VH) 38% (M)

20% (L) 25% (L) 80% (H) 38% (M)

70% (H) 42% (M)

90% (VH) 17% (VL) 10% (VL) 25% (L) 30% (L) 25% (L)

90% (VH) 34% (L) 85% (VH) 42% (M) 5%(VL) 8.3% (VL)

90% (VH) 17% (VL)

10% (VL) 72% (H) 20% (L) 72% (H)

40% (M) 25% (L)

40% (M) 17% (VL)

10% (VL) 13% (VL)

90% (VH) 42% (M)

90% (VH) 50% (M)

10% (VL) 17% (VL)

50% (M) 20% (L)

10% (VL) 8.3% (VL) 10% (VL) 21% (L)

10% (VL) 14% (VL)

4/36= 11% (VL)


Total Delay Time/
Project Time

61/24=254% VH 77 Magra el Eyon

62/24=258% VH 79 El sour El shamaly

40/24=167% VH 41 Kasr Moh. Aly Shopra

29/24=121% VH 29 Gohary group

40/24=167% VH 40 El Moayed Sheekh

24/24=100% VH 23.5 Beshtak Group

38/18=211% VH 38 El Selehdar Group

20/24=83% H 23 El Ashraf Bersbay Gr.

22/24=92% H 23 Kalawoon Group

12/24=50% M 33 Ebn Tolon Masged

55/24=229% VH 55 Mamaay el Seefy Group

30/24=125% VH 30 Sadat House

30/18=167% VH 32.5 Wekala el Khory

37/24=154% VH 37 Abo el Dahab Group

48/24=200% VH 48 El Khory Group

6/30=20% VL 6 El Ameer Taaz House

44/24=183% VH 34 El Eeny Group

18/24=75% M 18 Kasr el Manyal

5/36=14% VL 5 Bebars Group

15/36=42% L 15 Shabshery Group


Structural Failure of
Main Risks Encroachments & Natural Risk(NR) Surrounding
Occupation(EO) Buildings(SFSB)

Legal,Administrator
Secondary Risks &Financial Structural Solution(SS) Structural Solution(SS)
Procedures(LAFP)

Project
Project Name Probapility Impact Probapility Impact Probapility
No

Magra el Eyon no.1 80 100 1 1 1

El sour El shamaly no.2 15 21 1 1 1

Kasr Moh. Aly Shopra no.3 10 17 1 1 1

Gohary group no.4 20 25 1 1 60

El Moayed Sheekh no.5 20 33 10 17 5

Beshtak Group no.6 20 33 1 1 1

El Selehdar Group no.7 10 11 1 1 1

El Ashraf Bersbay Gr. no.8 25 29 1 1 1

Kalawoon Group no.9 10 25 1 1 1

Ebn Tolon Masged no.10 1 1 1 1 1

Mamaay el Seefy Group no.11 40 96 1 1 1

Sadat House no.12 1 1 1 1 1

Wekala el Khory no.13 65 100 1 1 1

Abo el Dahab Group no.14 40 50 1 1 1

El Khory Group no.15 50 100 1 1 1

El Ameer Taaz House no.16 1 1 1 1 1

El Eeny Group no.17 25 38 1 1 85

Kasr el Manyal no.18 50 75 1 1 1

Bebars Group no.19 1 1 1 1 1

Shabshery Group no.20 40 25 1 1 1


Risk Probability (%) VL (0-23 %) VH (79-100 %) M
Risk Impact (%) VL (0-24 %) VH (76-100 %) M
Construction Conservation
Process Delay Evaluation VL (0-25 %) VH > 95% M
(CCPDE) %
Construction Conservation
Process Delay Evaluation VL (0-25 %) VH > 95% M
(CCPDE) %

80 90
15 90 30
10 15 40
20 60 80 10
20 10 5 70
20 80
10 75 10
25 10 40
10 90
10 50
40 10 70 90
60 90
65
40 70
50 90 40
50
25 85 0
50

40 90
166 21
21 92 25
17 25 83
25 4 25 25
33 17 8 25
33 25
11 34 72
29 13 17
25 38
13 25
96 17 38 42
8 92
167
50 17
100 17 25
20
38 17 8
75

25 5
Structural Failure of Problems Water
New Technological
Surrounding Structural Failure of Lowering Unfeasible Structural
Solutions(NTS)
Buildings(SFSB) Monuments(SFM) Projects(PWLP) Solutios(USS)

Structural Structural Structural Archeological&Architi


Structural Solution(SS)
Solution(SS) Solution(SS) or PRA Solution(SS) ctural Studies(AAS)

Impact Probapility Impact Probapility Impact Probapility Impact Probapility Impact

1 1 1 90 21 1 1 1 1

1 1 1 90 92 30 25 1 1

1 15 25 1 1 40 83 1 1

4 1 1 1 1 80 25 10 25

8 1 1 1 1 70 25 1 1

1 1 1 1 1 80 25 1 1

1 1 1 1 1 75 34 10 72

1 1 1 10 13 40 17 1 1

1 1 1 90 38 1 1 1 1

1 1 1 10 13 50 25 1 1

1 10 17 1 1 70 38 90 42

1 60 8 90 92 1 1 1 1

1 1 1 1 1 1 1 1 1

1 1 1 1 1 70 17 1 1

1 1 1 90 17 40 25 1 1

1 1 1 1 1 1 1 50 20

17 1 1 1 1 1 1 1 8

1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1

1 1 1 90 5 1 1 1 1
(39-63 %) L (18-42 %) H (60-84 %)
(37-63 %) L (19-40 %) H (58-78 %)

(43-80 %) L (20-45 %) H (75-95 %)


(43-80 %) L (20-45 %) H (75-95 %)

70 90
70 20 80
70
90 30
90 85 5
40 90
80 20
40
25 40
10
40
70

40 90
60 10

80 10

10
11
29 38
58 25 38
42
17 25
34 42 8
25 17
22 72
25
13 17
13
38
25

38 50
42 17

58 21

14
11
Major Decisions to Problems with Utility
New Archaeological
Change to Policy of Dismentale or &Infrastructure
Finds(NAF)
Intervention(CPI) Reconstruction(MDDR) Lines(PUIL)
Architictural Architictural
Archeological& Archeological Prermissions of the
Archeological&Architic & Survey & Survey
Architictural &Architictural Relevent
tural Studies(AAS) Documents( Documents(
Studies(AAS) Studies(AAS) Authorities(PRA)
ASD) ASD)

Probapility Impact Probapility Impact Probapility Impact Probapility Impact

70 29 1 1 1 1 90 38

70 58 1 1 20 25 80 38

1 1 1 1 70 42 1 1

1 1 90 17 30 25 1 1

1 1 90 34 85 42 5 8

40 25 1 1 90 17 1 1

80 22 1 1 20 72 1 1

1 1 1 1 40 25 1 1

25 13 1 1 40 17 1 1

1 1 1 1 10 13 1 1

40 38 1 1 1 1 1 1

70 25 1 1 1 1 1 1

1 1 1 1 1 1 1 1

40 38 90 50 1 1 1 1

60 42 1 1 10 17 1 1

1 1 1 1 1 1 1 1

80 58 1 1 10 21 1 1

1 1 1 1 1 1 1 1

1 1 1 1 10 14 1 1

1 1 1 1 11 11 1 1
Total Delay Time/
Project Time

61/24=254% VH 77 Magra el Eyon

62/24=258% VH 79 El sour El shamaly

40/24=167% VH 41 Kasr Moh. Aly Shopra

29/24=121% VH 29 Gohary group

40/24=167% VH 40 El Moayed Sheekh

24/24=100% VH 23.5 Beshtak Group

38/18=211% VH 38 El Selehdar Group

20/24=83% H 23 El Ashraf Bersbay Gr.

22/24=92% H 23 Kalawoon Group

12/24=50% M 33 Ebn Tolon Masged

55/24=229% VH 55 Mamaay el Seefy Group

30/24=125% VH 30 Sadat House

30/18=167% VH 32.5 Wekala el Khory

37/24=154% VH 37 Abo el Dahab Group

48/24=200% VH 48 El Khory Group

6/30=20% VL 6 El Ameer Taaz House

44/24=183% VH 34 El Eeny Group

18/24=75% M 18 Kasr el Manyal

5/36=14% VL 5 Bebars Group

15/36=42% L 15 Shabshery Group


Structural Failure of
Main Risks Encroachments & Natural Risk(NR) Surrounding
Occupation(EO) Buildings(SFSB)

Legal,Administrator
Structural
Secondary Risks &Financial Structural Solution(SS)
Solution(SS)
Procedures(LAFP)

Project Probapilit Probapilit Probapilit


Project Name Impact% Impact%
No y% y% y%

Magra el Eyon no.1 99 99 15 20 85

El sour El shamaly no.2 95 80 15 40 95

Kasr Moh. Aly Shopra no.3 95 80 25 70 95

Gohary group no.4 85 75 25 40 60

El Moayed Sheekh no.5 90 65 25 40 20

Beshtak Group no.6 90 85 25 40 60

El Selehdar Group no.7 90 40 25 60 0

El Ashraf Bersbay Gr. no.8 90 70 25 40 20

Kalawoon Group no.9 90 70 25 40 70

Ebn Tolon Masged no.10 0 0 25 40 0

Mamaay el Seefy Grou no.11 99 99 25 50 70

Sadat House no.12 90 40 25 70 0

Wekala el Khory no.13 99 99 25 40 0

Abo el Dahab Group no.14 90 85 20 20 20

El Khory Group no.15 99 99 25 40 50

El Ameer Taaz House no.16 95 35 25 40 80

El Eeny Group no.17 90 95 25 40 80

Kasr el Manyal no.18 95 85 25 20 0

Bebars Group no.19 90 80 25 40 70

Shabshery Group no.20 99 99 25 40 70


Risk Probability (%) VL (0-23 %) L (18-42 %) M
Risk Impact (%) VL (0-24 %) L (19-40 %) M
Structural Conservation
Process Delay Evaluation VL (0-22%) L (20-43 %) M
(SCPDE) %

80 90
15 90 30
10 15 40
20 60 80 10
20 10 5 70
20 80
10 75 10
25 10 40
10 90
10 50
40 10 70 90
60 90
65
40 70
50 90 40
50
25 85 0
50

40 90
166 21
21 92 25
17 25 83
25 4 25 25
33 17 8 25
33 25
11 34 72
29 13 17
25 38
13 25
96 17 38 42
8 92
167
50 17
100 17 25
20
38 17 8
75

25 5
The senarios of Historic Building Restoration Projects

Structural Failure of Problems Water Unfeasible New Technological


Surrounding Structural Failure of Lowering Structural Solutions(NTS)
Buildings(SFSB) Monuments(SFM) Projects(PWLP) Solutios(USS)
Archeological&Arc
Structural Structural Structural Solution(SS) Structural hitictural
Solution(SS) Solution(SS) or PRA Solution(SS) Studies(AAS) or
LAFP
Probapilit Probapilit Probapilit Probapilit
Impact% Impact% Impact% Impact% Impact%
y% y% y% y%
25 20 30 90 95 70 40 60 65

25 25 30 90 92 70 50 50 40

95 90 95 80 40 85 75 60 65

25 70 80 0 0 80 90 60 70

20 40 60 0 0 70 90 60 35

25 80 60 0 0 80 90 60 40

0 80 80 0 0 75 80 60 70

30 40 45 95 70 70 70 60 70

65 70 70 95 95 70 60 60 70

0 50 70 70 50 70 80 50 60

45 80 75 0 0 70 85 90 85

0 90 65 95 99 80 90 90 40

0 20 20 0 0 80 80 60 40

20 50 40 0 0 70 85 50 30

40 80 90 90 90 80 85 60 65

45 90 60 0 0 80 70 80 40

45 90 70 0 0 80 87 80 40

0 20 25 0 0 60 60 50 40

40 70 80 0 0 75 70 50 40

50 75 80 90 80 75 80 50 40
(39-63 %) H (60-84 %) VH (79-100 %)
(37-63 %) H (58-78 %) VH (76-100 %)

(38-59 %) H (57-81 %) VH (78-100)%

70 90
70 20 80
70
90 30
90 85 5
40 90
80 20
40
25 40
10
40
70

40 90
60 10

80 10

10
11
29 38
58 25 38
42
17 25
34 42 8
25 17
22 72
25
13 17
13
38
25

38 50
42 17

58 21

14
11
Problems with
Major Decisions to
New Archaeological Utility
Change to Policy of Dismentale or
Finds(NAF) &Infrastructure
Intervention(CPI) Reconstruction(MDDR)
Lines(PUIL)
Archeologica Archeologica Architictur
Architictur
Archeological&Arch l&Architictur l&Architictur al& Prermissions of the
al& Survey
itictural al al Survey Relevent
Documents
Studies(AAS) Studies(AAS Studies(AAS Document Authorities(PRA)
(ASD)
) ) s(ASD)
Probapilit Probapilit
Impact% Probapility% Impact% Probapility% Impact% Impact%
y% y%
70 90 80 85 70 45 70 87

70 90 80 95 70 30 70 83

70 90 90 87 70 90 0 0

80 90 90 50 70 65 0 0

95 99 95 95 85 90 0 0

85 90 80 65 90 90 0 0

80 85 0 0 90 90 0 0

80 80 0 0 60 65 0 0

80 80 90 75 60 70 0 0

70 70 0 0 60 60 20 20

70 80 70 40 70 75 0 0

80 70 0 0 90 60 70 55

70 65 0 0 50 30 0 0

80 75 90 95 70 65 0 0

80 85 90 45 80 95 70 65

95 80 0 0 90 75 0 0

80 99 80 83 80 85 0 0

70 65 0 0 50 30 0 0

70 75 50 40 80 65 0 0

70 80 85 82 70 70 0 0
Total Delay Time of
SCP/ Project Time

61/24=254%VH 77 Magra el Eyon

62/24=258%VH 79 El sour El shamaly

40/24=167%VH 41 Kasr Moh. Aly Shopra

29/24=121%VH 29 Gohary group

40/24=167%VH 40 El Moayed Sheekh

24/24=100%VH 23.5 Beshtak Group

38/18=211%VH 38 El Selehdar Group

20/24=83% H 23 El Ashraf Bersbay Gr.

22/24=92% H 23 Kalawoon Group

12/24=50% M 33 Ebn Tolon Masged

55/24=229%VH 55 Mamaay el Seefy Group

30/24=125%VH 30 Sadat House

30/18=167% VH 32.5 Wekala el Khory

37/24=154%VH 37 Abo el Dahab Group

48/24=200%VH 48 El Khory Group

6/30=20% VL 6 El Ameer Taaz House

44/24=183%VH 34 El Eeny Group

18/24=75% M 18 Kasr el Manyal

5/36=14% VL 5 Bebars Group

15/36=42% L 15 Shabshery Group


Magra el Eyon

El sour El shamaly

Kasr Moh. Aly Shopra

Gohary group

El Moayed Sheekh

Beshtak Group

El Selehdar Group

El Ashraf Bersbay Gr.

Kalawoon Group

Ebn Tolon Masged

Mamaay el Seefy Group

Sadat House

Wekala el Khory

Abo el Dahab Group

El Khory Group

El Ameer Taaz House

El Eeny Group

Kasr el Manyal

Bebars Group

Shabshery Group
Delay Impact Evalution
73.1 73.1 62.5 62.536 82.4 61.963 VH
63.6 63.6 62.3 62.264 76.6 59.929 H
63.8 63.8 72.1 72.112 90.6 70.876 VH
61.7 61.7 61.7 61.739 62.9 50.02 H
63.8 63.8 69.2 69.159 90.6 68.744 VH
61.4 61.4 61.4 61.397 51.3 49.882 M
64.4 64.4 67.7 67.714 90.6 67.725
63.8 63.8 60.3 60.327 72.2 60.514
63.8 63.8 70.1 70.126 90.6 69.586
61.6 61.6 66.5 66.508 76.6 58.866
64.1 64.1 73.8 73.764 90.6 71.776
63.8 63.8 68.5 68.526 90.6 68.744
63.9 63.9 68.5 68.511 90.6 68.744
69.0 69.0 68.3 68.255 91.6 61.062
63.9 63.9 70.3 70.343 90.6 69.586
63.7 63.7 62.4 62.408 76.6 59.929
61.4 61.4 70.6 70.604 72.3 58.843
63.6 63.6 58.0 57.956 72.2 60.848
64.1 64.1 69.8 69.784 90.6 69.586
64.1 64.1 68.8 68.762 90.6 68.744

Impact =
Evalution =
Structural Failure of
Main Risks Encroachments & Natural Risk(NR) Surrounding
Occupation(EO) Buildings(SFSB)
Legal,Administrator
Structural
Secondary Risks &Financial Structural Solution(SS)
Solution(SS)
Procedures(LAFP)
Project Probapilit Probapilit Probapilit
Project Name Impact% Impact%
No y% y% y%

Magra el Eyon no.1 95 99 50 70 95

El sour El shamaly no.2 95 80 50 70 95

Kasr Moh. Aly Shopra no.3 95 80 50 70 95

Gohary group no.4 85 85 50 70 60

El Moayed Sheekh no.5 90 80 50 70 90

Beshtak Group no.6 90 90 50 70 90

El Selehdar Group no.7 90 75 50 70 70

El Ashraf Bersbay Gr. no.8 90 70 50 70 70

Kalawoon Group no.9 90 70 50 70 70

Ebn Tolon Masged no.10 80 70 50 70 60

Mamaay el Seefy Grou no.11 90 90 50 70 70

Sadat House no.12 90 80 50 70 70

Wekala el Khory no.13 99 99 50 70 70

Abo el Dahab Group no.14 90 85 50 70 80

El Khory Group no.15 99 99 50 70 80

El Ameer Taaz House no.16 90 70 50 60 80

El Eeny Group no.17 90 95 50 60 80

Kasr el Manyal no.18 95 85 50 70 60


Bebars Group no.19 90 80 50 60 70

Shabshery Group no.20 99 99 50 70 70


Risk Probability (%) VL (0-23 %) L (18-42 %) M
Risk Impact (%) VL (0-24 %) L (19-40 %) M
Structural Conservation
Process Delay Evaluation VL (0-22%) L (20-43 %) M
(SCPDE) %
80 90
15 90 30
10 15 40
20 60 80 10
20 10 5 70
20 80
10 75 10
25 10 40
10 90
10 50
40 10 70 90
60 90
65
40 70
50 90 40
50
25 85 0
50

40 90
166 21
21 92 25
17 25 83
25 4 25 25
33 17 8 25
33 25
11 34 72
29 13 17
25 38
13 25
96 17 38 42
8 92
167
50 17
100 17 25
20
38 17 8
75

25 5
The senarios of Historic Building Restoration Projects

Structural Failure of Problems Water Unfeasible New Technological


Surrounding Structural Failure of Lowering Structural Solutions(NTS)
Buildings(SFSB) Monuments(SFM) Projects(PWLP) Solutios(USS)
Archeological&Arc
Structural Structural Structural Solution(SS) Structural hitictural
Solution(SS) Solution(SS) or PRA Solution(SS) Studies(AAS) or
LAFP
Probapilit Probapilit Probapilit Probapilit
Impact% Impact% Impact% Impact% Impact%
y% y% y% y%
95 80 95 90 90 70 85 60 70

80 80 95 90 92 70 85 60 70

95 90 95 80 80 95 95 60 70

80 70 80 50 75 80 90 60 70

80 80 80 50 75 70 80 60 70

80 80 80 50 75 80 90 60 70

80 80 80 50 75 75 80 60 70

80 70 80 95 80 70 60 60 70

80 70 90 95 95 70 60 60 70

60 60 70 80 80 70 80 50 60

85 80 90 50 70 70 85 90 85

70 90 90 95 99 80 90 90 90

80 75 80 50 70 80 80 60 70

85 80 90 60 70 70 85 50 70

85 80 90 90 90 80 85 60 70

85 90 80 50 60 80 85 80 70

85 90 95 50 70 80 87 80 70

60 60 70 50 60 60 60 50 60
65 70 80 40 60 75 70 50 60

80 75 80 90 80 75 80 50 70
(39-63 %) H (60-84 %) VH (79-100 %)
(37-63 %) H (58-78 %) VH (76-100 %)

(38-59 %) H (57-81 %) VH (78-100)%


70 90
70 20 80
70
90 30
90 85 5
40 90
80 20
40
25 40
10
40
70

40 90
60 10

80 10

10
11
29 38
58 25 38
42
17 25
34 42 8
25 17
22 72
25
13 17
13
38
25

38 50
42 17

58 21

14
11
Problems with
Major Decisions to
New Archaeological Utility
Change to Policy of Dismentale or
Finds(NAF) &Infrastructure
Intervention(CPI) Reconstruction(MDDR)
Archeologica Archeologica Architictur Lines(PUIL)
Architictur
Archeological&Arch l&Architictur l&Architictur al& Prermissions of the
al& Survey
itictural al al Survey Relevent
Documents
Studies(AAS) Studies(AAS Studies(AAS Document Authorities(PRA)
(ASD)
) ) s(ASD)
Probapilit Probapilit
Impact% Probapility% Impact% Probapility% Impact% Impact%
y% y%
70 85 80 85 70 75 90 90

70 90 95 95 70 75 80 90

70 90 90 95 70 80 80 80

80 90 90 90 70 80 80 80

95 99 95 95 85 90 70 80

85 90 90 90 90 90 70 80

80 85 90 90 90 90 70 80

80 80 50 60 60 65 50 70

80 80 90 80 60 70 50 70

70 70 50 50 60 60 50 50

70 80 70 80 70 75 60 75

80 85 80 95 90 95 70 85

70 85 50 65 70 70 60 70

80 85 90 95 70 85 50 60

80 85 90 95 80 95 70 70

95 80 90 75 90 75 70 60

80 99 80 83 80 85 70 65

70 65 50 60 50 55 60 50
70 75 60 60 80 85 60 60

70 80 85 82 70 75 60 60
Total Delay Time/
Project Time

61/24=254%VH 77 Magra el Eyon

62/24=258%VH 79 El sour El shamaly

40/24=167%VH 41 Kasr Moh. Aly Shopra

29/24=121%VH 29 Gohary group

40/24=167%VH 40 El Moayed Sheekh

24/24=100%VH 23.5 Beshtak Group

38/18=211%VH 38 El Selehdar Group

20/24=83% H 23 El Ashraf Bersbay Gr.

22/24=92% H 23 Kalawoon Group

12/24=50% M 33 Ebn Tolon Masged

55/24=229%VH 55 Mamaay el Seefy Group

30/24=125%VH 30 Sadat House

30/18=167% VH 32.5 Wekala el Khory

37/24=154%VH 37 Abo el Dahab Group

48/24=200%VH 48 El Khory Group

6/30=20% VL 6 El Ameer Taaz House

44/24=183%VH 34 El Eeny Group

18/24=75% M 18 Kasr el Manyal


5/36=14% VL 5 Bebars Group

15/36=42% L 15 Shabshery Group


Magra el Eyon

El sour El shamaly

Kasr Moh. Aly Shopra

Gohary group

El Moayed Sheekh

Beshtak Group

El Selehdar Group

El Ashraf Bersbay Gr.

Kalawoon Group

Ebn Tolon Masged

Mamaay el Seefy Group

Sadat House

Wekala el Khory

Abo el Dahab Group

El Khory Group

El Ameer Taaz House

El Eeny Group

Kasr el Manyal
Bebars Group

Shabshery Group
Compare bet.the results of programes & the actua
Program Results

Project
Project Name RiskProbapility Risk Impact
No Values
% %

Magra el Eyon (finished) no.1 73.510 H 83.450

El sour El shamaly (finished) no.2 73.510 H 83.230

Kasr Moh. Aly Shopra (finished) no.3 73.510 H 83.877

Gohary group (finished) no.4 71.668 H 83.446

El Moayed Sheekh (finished) no.5 73.510 H 84.094

Beshtak Group (finished) no.6 71.524 H 82.335

El Selehdar Group (finished) no.7 73.764 H 81.720

El Ashraf Bersbay Gr. (finished) no.8 73.510 H 66.508

Kalawoon Group (finished) no.9 73.510 H 75.855

Ebn Tolon Masged (finished) no.10 44.133 M 51.213

Mamaay el Seefy Group (finished) no.11 71.668 H 81.720

Sadat House (finished) no.12 73.510 H 84.094

Wekala el Khory (finished) no.13 73.764 H 84.094

Abo el Dahab Group (finished) no.14 71.668 H 83.877

El Khory Group (finished) no.15 73.767 H 84.094

El Ameer Taaz House (finished) no.16 70.932 H 55.333

El Eeny Group (finished) no.17 71.524 H 84.094

Kasr el Manyal (Continuous) no.18 73.510 H 71.232

Bebars Group (Continuous) no.19 69.008 H 56.573

Shabshery Group (Continuous) no.20 73.764 H 73.768


Risk Probability (%) VL (0-23 %) L
Risk Impact (%) VL (0-24 %) L

Structural Conservation Process Delay


VL (0-22%) L
Evaluation (SCPDE) %
80
15
10
20
20 10
20
10
25
10

40

65
40
50

25
50

40
166
21
17
25
33 17
33
11
29
25

96

167
50
100

38
75

25
of programes & the actual results
Program Results Actual Results
Total Delay
Structural Conservation
Time of SCP/
Values Process Delay Values Values
Project Time
Evaluation(SCPD)%
%

VH 90.220 VH 61/24=254% VH
VH 90.220 VH 62/24=258% VH
VH 90.450 VH 40/24=167% VH
VH 89.984 VH 29/24=121% VH
VH 90.450 VH 40/24=167% VH
VH 89.984 VH 24/24=100% VH
VH 89.984 VH 38/18=211% VH
H 68.742 H 20/24=83% H
H 68.795 H 22/24=92% H
M 48.593 M 12/24=50% M
VH 89.984 VH 55/24=229% VH
VH 90.450 VH 30/24=125% VH
VH 90.450 VH 30/18=167% VH
H 90.450 VH 37/24=154% VH
VH 90.450 VH 48/24=200% VH
M 48.619 M 6/30=20% L
VH 90.450 VH 44/24=183% VH
H 68.742 H 18/24=75% H
M 48.583 M 5/36=14% VL
H 68.742 H 15/36=42% M
(18-42 %) M (39-63 %) H (60-84 %) VH
(19-40 %) M (37-63 %) H (58-78 %) VH

(20-43 %) M (38-59 %) H (57-81 %) VH


(79-100 %)
(76-100 %)

(78-100)%
Delay = Impact =

73.5097 83.4446

73.5097 83.2307

73.5097 83.8767

71.6684 82.3346

73.5097 84.0943

71.5238 82.3346

73.764 81.7199

73.5097 66.5076

73.5097 75.8551

44.1332 51.2126

71.6684 81.7199

73.5097 84.0943

73.764 84.0943

71.6684 83.8767

73.7676 84.0943

70.9322 55.3327

71.5238 84.0943

73.5097 71.2322
69.0079 56.5731
73.764 73.7676
Evaluation =

90.2195

90.2195

90.45

89.9841

90.45

89.9841

89.9841

68.742

68.7947

48.5926

89.9841

90.45

90.45

90.45

90.45

48.6185

90.45

68.742
48.5833
68.742
Main Risks Natural Risk(NR) Structural Failure of
Encroachments & Surrounding
Occupation(EO) Buildings(SFSB)
Legal,Administrator
Structural
Secondary Risks &Financial Structural Solution(SS)
Solution(SS)
Procedures(LAFP)
Project Probapilit Probapilit Probapilit
Project Name Impact% Impact%
No y% y% y%

Magra el Eyon no.1 95 99 50 70 95

El sour El shamaly no.2 95 80 50 70 95

Kasr Moh. Aly Shopra no.3 95 80 50 70 95

Gohary group no.4 85 85 50 70 60

El Moayed Sheekh no.5 90 80 50 70 90

Beshtak Group no.6 90 90 50 70 90

El Selehdar Group no.7 90 75 50 70 0

El Ashraf Bersbay Gr. no.8 90 50 50 40 0

Kalawoon Group no.9 90 70 50 70 70

Ebn Tolon Masged no.10 0 0 20 30 0

Mamaay el Seefy Grou no.11 90 90 50 70 70

Sadat House no.12 90 80 50 70 0

Wekala el Khory no.13 99 99 50 70 0

Abo el Dahab Group no.14 90 85 50 70 80

El Khory Group no.15 99 99 50 70 80

El Ameer Taaz House no.16 90 30 20 20 50

El Eeny Group no.17 90 95 50 80 90


Kasr el Manyal no.18 95 85 0 0 0

Bebars Group no.19 90 60 20 20 70

Shabshery Group no.20 99 99 50 70 70


Risk Probability (%) VL (0-23 %) L (18-42 %) M
Risk Impact (%) VL (0-24 %) L (19-40 %) M
Structural Conservation
Process Delay Evaluation VL (0-22%) L (20-43 %) M
(SCPDE) %
80 90
15 90 30
10 15 40
20 60 80 10
20 10 5 70
20 80
10 75 10
25 10 40
10 90
10 50
40 10 70 90
60 90
65
40 70
50 90 40
50
25 85 0
50

40 90
166 21
21 92 25
17 25 83
25 4 25 25
33 17 8 25
33 25
11 34 72
29 13 17
25 38
13 25
96 17 38 42
8 92
167
50 17
100 17 25
20
38 17 8
75

25 5
The senarios of Historic Building Restoration Projects

Problems Water
New Technological
Structural Failure of Lowering Unfeasible Solutions(NTS)
Surrounding Structural Failure of Projects(PWLP) Structural
Buildings(SFSB) Monuments(SFM) Solutios(USS)
Archeological&Arc
Structural Structural Structural Solution(SS) Structural hitictural
Solution(SS) Solution(SS) or PRA Solution(SS) Studies(AAS) or
LAFP
Probapilit Probapilit Probapilit Probapilit
Impact% Impact% Impact% Impact% Impact%
y% y% y% y%
95 80 95 90 90 70 85 60 70

80 80 95 90 92 70 85 60 70

95 90 95 80 80 95 95 60 70

80 70 80 0 0 80 90 60 70

80 80 80 0 0 70 80 60 70

80 80 80 0 0 80 90 60 70

0 80 80 0 0 75 80 60 70

0 70 40 95 70 70 60 60 60

80 70 90 95 95 70 60 60 70

0 30 40 20 50 50 60 50 50

85 80 90 0 0 70 85 90 85

0 90 90 95 99 80 90 90 90

0 75 80 0 0 80 80 60 70

85 80 90 0 0 70 85 50 70

85 80 90 90 90 80 85 60 70

30 90 80 0 0 80 85 80 50

85 90 95 0 0 85 90 80 70
0 60 70 0 0 60 60 50 60

40 20 20 0 0 50 50 0 0

80 75 80 90 80 75 80 50 70
(39-63 %) H (60-84 %) VH (79-100 %)
(37-63 %) H (58-78 %) VH (76-100 %)

(38-59 %) H (57-81 %) VH (78-100)%


70 90
70 20 80
70
90 30
90 85 5
40 90
80 20
40
25 40
10
40
70

40 90
60 10

80 10

10
11
29 38
58 25 38
42
17 25
34 42 8
25 17
22 72
25
13 17
13
38
25

38 50
42 17

58 21

14
11
Problems with
Major Decisions to
New Archaeological Utility
Dismentale or
Finds(NAF) &Infrastructure
Change to Policy of Reconstruction(MDDR)
Lines(PUIL)
Intervention(CPI)
Archeologica Archeologica Architictur
Architictur
Archeological&Arch l&Architictur l&Architictur al& Prermissions of the
al& Survey
itictural al al Survey Relevent
Documents
Studies(AAS) Studies(AAS Studies(AAS Document Authorities(PRA)
(ASD)
) ) s(ASD)
Probapilit Probapilit
Impact% Probapility% Impact% Probapility% Impact% Impact%
y% y%
70 85 80 85 70 75 90 90

70 90 95 95 70 75 80 90

70 90 90 95 70 80 0 0

80 90 90 90 70 80 0 0

95 99 95 95 85 90 0 0

85 90 90 90 90 90 0 0

80 85 0 0 90 90 0 0

80 80 0 0 60 65 0 0

80 80 90 80 60 70 0 0

70 70 0 0 60 60 0 0

70 80 70 80 70 75 0 0

80 85 0 0 90 95 70 85

70 85 0 0 70 70 0 0

80 85 90 95 70 85 0 0

80 85 90 95 80 95 70 70

95 80 0 0 90 75 0 0

85 99 85 90 90 85 0 0
70 65 0 0 50 55 0 0

50 50 0 0 70 60 0 0

70 80 70 70 50 50 0 0
Total Delay Time/
Project Time

61/24=254%VH 90.220 VH 77 Magra el Eyon

62/24=258%VH 90.220 VH 79 El sour El shamaly

40/24=167%VH 90.450 VH 41 Kasr Moh. Aly Shopra

29/24=121%VH 89.984 VH 29 Gohary group

40/24=167%VH 90.450 VH 40 El Moayed Sheekh

24/24=100%VH 89.984 VH 23.5 Beshtak Group

38/18=211%VH 89.984 VH 38 El Selehdar Group

20/24=83% H 68.742 H 23 El Ashraf Bersbay Gr.

22/24=92% H 68.795 H 23 Kalawoon Group

12/24=50% M 48.593 M 33 Ebn Tolon Masged

55/24=229%VH 89.984 VH 55 Mamaay el Seefy Group

30/24=125%VH 90.450 VH 30 Sadat House

30/18=167% VH 90.450 VH 32.5 Wekala el Khory

37/24=154%VH 90.450 VH 37 Abo el Dahab Group

48/24=200%VH 90.450 VH 48 El Khory Group


6/30=20% VL 48.619 M 6 El Ameer Taaz House

44/24=183%VH 90.450 VH 34 El Eeny Group


18/24=75% H 68.742 H 18 Kasr el Manyal

5/36=14% VL 48.583 M 5 Bebars Group

15/36=42% L 68.742 H 15 Shabshery Group


Magra el Eyon

El sour El shamaly

Kasr Moh. Aly Shopra

Gohary group

El Moayed Sheekh

Beshtak Group

El Selehdar Group

El Ashraf Bersbay Gr.

Kalawoon Group

Ebn Tolon Masged

Mamaay el Seefy Group

Sadat House

Wekala el Khory

Abo el Dahab Group

El Khory Group
El Ameer Taaz House

El Eeny Group
Kasr el Manyal

Bebars Group

Shabshery Group
Delay = Impact = Evaluation =

73.5097 83.4446
73.5097 83.2307
73.5097 83.8767
71.6684 82.3346
73.5097 84.0943
71.5238 82.3346
73.764 81.7199
73.5097 66.5076
73.5097 75.8551
44.1332 51.2126
71.6684 81.7199
73.5097 84.0943
73.764 84.0943
71.6684 83.8767
73.7676 84.0943
70.9322 55.3327
71.5238 84.0943
73.5097 71.2322
69.0079 56.5731
73.764 73.7676

Modefy third table


90.2195 VL
90.2195 VL
90.45 VL
89.9841 VL
90.45 VL
89.9841 VL
89.9841 VL
68.742 VL
68.7947 VL
48.5926 VL
89.9841 VL
90.45 VL
90.45 VL
90.45 VL
90.45 VL
48.6185 VL
90.45 VL
68.742 VL
48.5833 VL
68.742 VL