Problems with
Problems Water Major Decisions to New
Structural Failure of Natural New Archaeological Utility
Main Risks Lowering Dismentale or Technological
Encroachments & Structural Failure of Surrounding Unfeasible Structural Risk(NR) Change to Policy of Finds(NAF) &Infrastructure
Projects(PWLP) Reconstruction(MDDR) Solutions(NTS)
Occupation(EO) Monuments(SFM) Buildings(SFSB) Solutios(USS) Intervention(CPI) Lines(PUIL)
Archeologica Archeologic Architictur
Architictur
Legal,Administrator l&Architictur Archeological&Ar al&Architict al& Prermissions of the
Structural Structural Structural Structural Structural Archeological&Archi al& Survey Total Delay
Secondary Risks &Financial al chitictural ural Survey Relevent
Solution(SS) Solution(SS) Solution(SS) Solution(SS) Solution(SS) or PRA tictural Studies(AAS) Documents Time/
Procedures(LAFP) Studies(AAS Studies(AAS) Studies(AA Document Authorities(PRA)
(ASD) Project
) S) s(ASD)
Project Delay Time/ Project Delay Time/ Project Delay Time/ Project Delay Time/ Project Delay Time/ Delay Time/ Project Delay Time/ Project Delay Time/ Delay Time/ Project Delay Time/ Project Time
Project Name Project Time Delay Time/ Project Time
No Time Time Time Time Time Time Project Time Time Time
Magra el Eyon no.1 40/24= 166% (VH) 5/24= 21% (L) 7/24= 29% (L) 9/24= 38% (M) 61/24=254%
El sour El shamaly no.2 5/24= 21% (L) 6/24= 25% (L) 22/24= 92%(VH) 14/24= 58% (H) 6/24= 25% (L) 9/24= 38% (M) 62/24=258%
Kasr Moh. Aly Shopra no.3 4/24= 17% (VL) 6/24= 25% (L) 20/24= 83% (VH 10/24= 42% (M) 40/24=167%
Gohary group no.4 6/24= 25% (L) 1/24= 4% (VL) 6/24= 25% (L) 4/24= 17% (VL) 6/24= 25% (L) 6/24= 25% (L) 29/24=121%
El Moayed Sheekh no.5 8/24= 33% (L) 2/24= 8.3% (VL) 6/24= 25% (L) 4/24=17% (VL) 8/24= 34% (L) 10/24= 42% (M) 2/24= 8.3% (VL)40/24=167%
Beshtak Group no.6 8/24= 33% (L) 6/24= 25% (L) 6/24= 25% (L) 4/24= 17% (VL) 24/24=100%
El Selehdar Group no.7 2/18= 11% (VL) 6/18= 34% (L) 4/18= 22% (L) 13/18= 72% (H) 13/18= 72% (H) 38/18=211%
El Ashraf Bersbay Gr. no.8 7/24= 29% (L) 4/24= 17% (VL) 3/24= 13% (VL) 6/24= 25% (L) 20/24=83%
Kalawoon Group no.9 6/24= 25% (L) 9/24= 38% (M) 3/24= 13% (VL) 4/24= 17% (VL) 22/24=92%
Ebn Tolon Masged no.10 6/24= 25% (L) 3/24= 13% (VL) 3/24= 13% (VL) 12/24=50%
Mamaay el Seefy Grou no.11 23/24= 96% (VH) 4/24= 17% (VL) 9/24= 38% (M) 9/24= 38% (M) 10/24= 42% (M) 55/24=229%
Sadat House no.12 2/24= 8% (VL) 22/24= 92% (VH) 6/24= 25% (L) 30/24=125%
Abo el Dahab Group no.14 12/24= 50% (M) 4/24= 17% (VL) 9/24= 38% (M) 12/24= 50% (M) 37/24=154%
El Khory Group no.15 24/24= 100% (VH) 6/24= 25% (L) 4/24= 17% (VL) 10/24= 42% (M) 4/24= 17% (VL) 48/24=200%
El Eeny Group no.17 9/24= 38% (M) 4/24= 17% (VL) 14/24= 58.3% (H) 2/24= 8.3% (VL 5/24= 21% (L) 44/24=183%
Shabshery Group no.20 9/36= 25% (L) 2/36= 5% (VL) 4/36= 11% (VL) 15/36=42%
Structural Failure of
Main Risks Encroachments & Structural Failure of Surrounding
Occupation(EO) Monuments(SFM) Buildings(SFSB)
Legal,Administrator
Structural
Secondary Risks &Financial Structural Solution(SS)
Solution(SS)
Procedures(LAFP)
Project
Project Name Probapility Impact Probapility Impact Probapility Impact
No
Kasr Moh. Aly Shopra no.3 10% (VL) 17% (VL) 15% (VL) 25% (L)
Gohary group no.4 20% (VL) 25% (L) 60% (H) 4% (VL)
El Moayed Sheekh no.5 20% (VL) 33% (L) 5% (VL) 8.3% (VL)
Mamaay el Seefy Group no.11 40% (M) 96% (VH) 10% (VL) 17% (VL)
El Eeny Group no.17 25% (L) 38% (M) 85% (VH) 17% (VL)
30% (L) 25% (L) 90% (VH) 92%(VH) 70% (H) 58% (H)
40% (M) 25% (L) 90% (VH) 17% (VL) 60% (H) 42% (M)
90% (VH) 17% (VL) 10% (VL) 25% (L) 30% (L) 25% (L)
90% (VH) 34% (L) 85% (VH) 42% (M) 5%(VL) 8.3% (VL)
Legal,Administrator
Secondary Risks &Financial Structural Solution(SS) Structural Solution(SS)
Procedures(LAFP)
Project
Project Name Probapility Impact Probapility Impact Probapility
No
80 90
15 90 30
10 15 40
20 60 80 10
20 10 5 70
20 80
10 75 10
25 10 40
10 90
10 50
40 10 70 90
60 90
65
40 70
50 90 40
50
25 85 0
50
40 90
166 21
21 92 25
17 25 83
25 4 25 25
33 17 8 25
33 25
11 34 72
29 13 17
25 38
13 25
96 17 38 42
8 92
167
50 17
100 17 25
20
38 17 8
75
25 5
Structural Failure of Problems Water
New Technological
Surrounding Structural Failure of Lowering Unfeasible Structural
Solutions(NTS)
Buildings(SFSB) Monuments(SFM) Projects(PWLP) Solutios(USS)
1 1 1 90 21 1 1 1 1
1 1 1 90 92 30 25 1 1
1 15 25 1 1 40 83 1 1
4 1 1 1 1 80 25 10 25
8 1 1 1 1 70 25 1 1
1 1 1 1 1 80 25 1 1
1 1 1 1 1 75 34 10 72
1 1 1 10 13 40 17 1 1
1 1 1 90 38 1 1 1 1
1 1 1 10 13 50 25 1 1
1 10 17 1 1 70 38 90 42
1 60 8 90 92 1 1 1 1
1 1 1 1 1 1 1 1 1
1 1 1 1 1 70 17 1 1
1 1 1 90 17 40 25 1 1
1 1 1 1 1 1 1 50 20
17 1 1 1 1 1 1 1 8
1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1
1 1 1 90 5 1 1 1 1
(39-63 %) L (18-42 %) H (60-84 %)
(37-63 %) L (19-40 %) H (58-78 %)
70 90
70 20 80
70
90 30
90 85 5
40 90
80 20
40
25 40
10
40
70
40 90
60 10
80 10
10
11
29 38
58 25 38
42
17 25
34 42 8
25 17
22 72
25
13 17
13
38
25
38 50
42 17
58 21
14
11
Major Decisions to Problems with Utility
New Archaeological
Change to Policy of Dismentale or &Infrastructure
Finds(NAF)
Intervention(CPI) Reconstruction(MDDR) Lines(PUIL)
Architictural Architictural
Archeological& Archeological Prermissions of the
Archeological&Architic & Survey & Survey
Architictural &Architictural Relevent
tural Studies(AAS) Documents( Documents(
Studies(AAS) Studies(AAS) Authorities(PRA)
ASD) ASD)
70 29 1 1 1 1 90 38
70 58 1 1 20 25 80 38
1 1 1 1 70 42 1 1
1 1 90 17 30 25 1 1
1 1 90 34 85 42 5 8
40 25 1 1 90 17 1 1
80 22 1 1 20 72 1 1
1 1 1 1 40 25 1 1
25 13 1 1 40 17 1 1
1 1 1 1 10 13 1 1
40 38 1 1 1 1 1 1
70 25 1 1 1 1 1 1
1 1 1 1 1 1 1 1
40 38 90 50 1 1 1 1
60 42 1 1 10 17 1 1
1 1 1 1 1 1 1 1
80 58 1 1 10 21 1 1
1 1 1 1 1 1 1 1
1 1 1 1 10 14 1 1
1 1 1 1 11 11 1 1
Total Delay Time/
Project Time
Legal,Administrator
Structural
Secondary Risks &Financial Structural Solution(SS)
Solution(SS)
Procedures(LAFP)
80 90
15 90 30
10 15 40
20 60 80 10
20 10 5 70
20 80
10 75 10
25 10 40
10 90
10 50
40 10 70 90
60 90
65
40 70
50 90 40
50
25 85 0
50
40 90
166 21
21 92 25
17 25 83
25 4 25 25
33 17 8 25
33 25
11 34 72
29 13 17
25 38
13 25
96 17 38 42
8 92
167
50 17
100 17 25
20
38 17 8
75
25 5
The senarios of Historic Building Restoration Projects
25 25 30 90 92 70 50 50 40
95 90 95 80 40 85 75 60 65
25 70 80 0 0 80 90 60 70
20 40 60 0 0 70 90 60 35
25 80 60 0 0 80 90 60 40
0 80 80 0 0 75 80 60 70
30 40 45 95 70 70 70 60 70
65 70 70 95 95 70 60 60 70
0 50 70 70 50 70 80 50 60
45 80 75 0 0 70 85 90 85
0 90 65 95 99 80 90 90 40
0 20 20 0 0 80 80 60 40
20 50 40 0 0 70 85 50 30
40 80 90 90 90 80 85 60 65
45 90 60 0 0 80 70 80 40
45 90 70 0 0 80 87 80 40
0 20 25 0 0 60 60 50 40
40 70 80 0 0 75 70 50 40
50 75 80 90 80 75 80 50 40
(39-63 %) H (60-84 %) VH (79-100 %)
(37-63 %) H (58-78 %) VH (76-100 %)
70 90
70 20 80
70
90 30
90 85 5
40 90
80 20
40
25 40
10
40
70
40 90
60 10
80 10
10
11
29 38
58 25 38
42
17 25
34 42 8
25 17
22 72
25
13 17
13
38
25
38 50
42 17
58 21
14
11
Problems with
Major Decisions to
New Archaeological Utility
Change to Policy of Dismentale or
Finds(NAF) &Infrastructure
Intervention(CPI) Reconstruction(MDDR)
Lines(PUIL)
Archeologica Archeologica Architictur
Architictur
Archeological&Arch l&Architictur l&Architictur al& Prermissions of the
al& Survey
itictural al al Survey Relevent
Documents
Studies(AAS) Studies(AAS Studies(AAS Document Authorities(PRA)
(ASD)
) ) s(ASD)
Probapilit Probapilit
Impact% Probapility% Impact% Probapility% Impact% Impact%
y% y%
70 90 80 85 70 45 70 87
70 90 80 95 70 30 70 83
70 90 90 87 70 90 0 0
80 90 90 50 70 65 0 0
95 99 95 95 85 90 0 0
85 90 80 65 90 90 0 0
80 85 0 0 90 90 0 0
80 80 0 0 60 65 0 0
80 80 90 75 60 70 0 0
70 70 0 0 60 60 20 20
70 80 70 40 70 75 0 0
80 70 0 0 90 60 70 55
70 65 0 0 50 30 0 0
80 75 90 95 70 65 0 0
80 85 90 45 80 95 70 65
95 80 0 0 90 75 0 0
80 99 80 83 80 85 0 0
70 65 0 0 50 30 0 0
70 75 50 40 80 65 0 0
70 80 85 82 70 70 0 0
Total Delay Time of
SCP/ Project Time
El sour El shamaly
Gohary group
El Moayed Sheekh
Beshtak Group
El Selehdar Group
Kalawoon Group
Sadat House
Wekala el Khory
El Khory Group
El Eeny Group
Kasr el Manyal
Bebars Group
Shabshery Group
Delay Impact Evalution
73.1 73.1 62.5 62.536 82.4 61.963 VH
63.6 63.6 62.3 62.264 76.6 59.929 H
63.8 63.8 72.1 72.112 90.6 70.876 VH
61.7 61.7 61.7 61.739 62.9 50.02 H
63.8 63.8 69.2 69.159 90.6 68.744 VH
61.4 61.4 61.4 61.397 51.3 49.882 M
64.4 64.4 67.7 67.714 90.6 67.725
63.8 63.8 60.3 60.327 72.2 60.514
63.8 63.8 70.1 70.126 90.6 69.586
61.6 61.6 66.5 66.508 76.6 58.866
64.1 64.1 73.8 73.764 90.6 71.776
63.8 63.8 68.5 68.526 90.6 68.744
63.9 63.9 68.5 68.511 90.6 68.744
69.0 69.0 68.3 68.255 91.6 61.062
63.9 63.9 70.3 70.343 90.6 69.586
63.7 63.7 62.4 62.408 76.6 59.929
61.4 61.4 70.6 70.604 72.3 58.843
63.6 63.6 58.0 57.956 72.2 60.848
64.1 64.1 69.8 69.784 90.6 69.586
64.1 64.1 68.8 68.762 90.6 68.744
Impact =
Evalution =
Structural Failure of
Main Risks Encroachments & Natural Risk(NR) Surrounding
Occupation(EO) Buildings(SFSB)
Legal,Administrator
Structural
Secondary Risks &Financial Structural Solution(SS)
Solution(SS)
Procedures(LAFP)
Project Probapilit Probapilit Probapilit
Project Name Impact% Impact%
No y% y% y%
40 90
166 21
21 92 25
17 25 83
25 4 25 25
33 17 8 25
33 25
11 34 72
29 13 17
25 38
13 25
96 17 38 42
8 92
167
50 17
100 17 25
20
38 17 8
75
25 5
The senarios of Historic Building Restoration Projects
80 80 95 90 92 70 85 60 70
95 90 95 80 80 95 95 60 70
80 70 80 50 75 80 90 60 70
80 80 80 50 75 70 80 60 70
80 80 80 50 75 80 90 60 70
80 80 80 50 75 75 80 60 70
80 70 80 95 80 70 60 60 70
80 70 90 95 95 70 60 60 70
60 60 70 80 80 70 80 50 60
85 80 90 50 70 70 85 90 85
70 90 90 95 99 80 90 90 90
80 75 80 50 70 80 80 60 70
85 80 90 60 70 70 85 50 70
85 80 90 90 90 80 85 60 70
85 90 80 50 60 80 85 80 70
85 90 95 50 70 80 87 80 70
60 60 70 50 60 60 60 50 60
65 70 80 40 60 75 70 50 60
80 75 80 90 80 75 80 50 70
(39-63 %) H (60-84 %) VH (79-100 %)
(37-63 %) H (58-78 %) VH (76-100 %)
40 90
60 10
80 10
10
11
29 38
58 25 38
42
17 25
34 42 8
25 17
22 72
25
13 17
13
38
25
38 50
42 17
58 21
14
11
Problems with
Major Decisions to
New Archaeological Utility
Change to Policy of Dismentale or
Finds(NAF) &Infrastructure
Intervention(CPI) Reconstruction(MDDR)
Archeologica Archeologica Architictur Lines(PUIL)
Architictur
Archeological&Arch l&Architictur l&Architictur al& Prermissions of the
al& Survey
itictural al al Survey Relevent
Documents
Studies(AAS) Studies(AAS Studies(AAS Document Authorities(PRA)
(ASD)
) ) s(ASD)
Probapilit Probapilit
Impact% Probapility% Impact% Probapility% Impact% Impact%
y% y%
70 85 80 85 70 75 90 90
70 90 95 95 70 75 80 90
70 90 90 95 70 80 80 80
80 90 90 90 70 80 80 80
95 99 95 95 85 90 70 80
85 90 90 90 90 90 70 80
80 85 90 90 90 90 70 80
80 80 50 60 60 65 50 70
80 80 90 80 60 70 50 70
70 70 50 50 60 60 50 50
70 80 70 80 70 75 60 75
80 85 80 95 90 95 70 85
70 85 50 65 70 70 60 70
80 85 90 95 70 85 50 60
80 85 90 95 80 95 70 70
95 80 90 75 90 75 70 60
80 99 80 83 80 85 70 65
70 65 50 60 50 55 60 50
70 75 60 60 80 85 60 60
70 80 85 82 70 75 60 60
Total Delay Time/
Project Time
El sour El shamaly
Gohary group
El Moayed Sheekh
Beshtak Group
El Selehdar Group
Kalawoon Group
Sadat House
Wekala el Khory
El Khory Group
El Eeny Group
Kasr el Manyal
Bebars Group
Shabshery Group
Compare bet.the results of programes & the actua
Program Results
Project
Project Name RiskProbapility Risk Impact
No Values
% %
40
65
40
50
25
50
40
166
21
17
25
33 17
33
11
29
25
96
167
50
100
38
75
25
of programes & the actual results
Program Results Actual Results
Total Delay
Structural Conservation
Time of SCP/
Values Process Delay Values Values
Project Time
Evaluation(SCPD)%
%
VH 90.220 VH 61/24=254% VH
VH 90.220 VH 62/24=258% VH
VH 90.450 VH 40/24=167% VH
VH 89.984 VH 29/24=121% VH
VH 90.450 VH 40/24=167% VH
VH 89.984 VH 24/24=100% VH
VH 89.984 VH 38/18=211% VH
H 68.742 H 20/24=83% H
H 68.795 H 22/24=92% H
M 48.593 M 12/24=50% M
VH 89.984 VH 55/24=229% VH
VH 90.450 VH 30/24=125% VH
VH 90.450 VH 30/18=167% VH
H 90.450 VH 37/24=154% VH
VH 90.450 VH 48/24=200% VH
M 48.619 M 6/30=20% L
VH 90.450 VH 44/24=183% VH
H 68.742 H 18/24=75% H
M 48.583 M 5/36=14% VL
H 68.742 H 15/36=42% M
(18-42 %) M (39-63 %) H (60-84 %) VH
(19-40 %) M (37-63 %) H (58-78 %) VH
(78-100)%
Delay = Impact =
73.5097 83.4446
73.5097 83.2307
73.5097 83.8767
71.6684 82.3346
73.5097 84.0943
71.5238 82.3346
73.764 81.7199
73.5097 66.5076
73.5097 75.8551
44.1332 51.2126
71.6684 81.7199
73.5097 84.0943
73.764 84.0943
71.6684 83.8767
73.7676 84.0943
70.9322 55.3327
71.5238 84.0943
73.5097 71.2322
69.0079 56.5731
73.764 73.7676
Evaluation =
90.2195
90.2195
90.45
89.9841
90.45
89.9841
89.9841
68.742
68.7947
48.5926
89.9841
90.45
90.45
90.45
90.45
48.6185
90.45
68.742
48.5833
68.742
Main Risks Natural Risk(NR) Structural Failure of
Encroachments & Surrounding
Occupation(EO) Buildings(SFSB)
Legal,Administrator
Structural
Secondary Risks &Financial Structural Solution(SS)
Solution(SS)
Procedures(LAFP)
Project Probapilit Probapilit Probapilit
Project Name Impact% Impact%
No y% y% y%
40 90
166 21
21 92 25
17 25 83
25 4 25 25
33 17 8 25
33 25
11 34 72
29 13 17
25 38
13 25
96 17 38 42
8 92
167
50 17
100 17 25
20
38 17 8
75
25 5
The senarios of Historic Building Restoration Projects
Problems Water
New Technological
Structural Failure of Lowering Unfeasible Solutions(NTS)
Surrounding Structural Failure of Projects(PWLP) Structural
Buildings(SFSB) Monuments(SFM) Solutios(USS)
Archeological&Arc
Structural Structural Structural Solution(SS) Structural hitictural
Solution(SS) Solution(SS) or PRA Solution(SS) Studies(AAS) or
LAFP
Probapilit Probapilit Probapilit Probapilit
Impact% Impact% Impact% Impact% Impact%
y% y% y% y%
95 80 95 90 90 70 85 60 70
80 80 95 90 92 70 85 60 70
95 90 95 80 80 95 95 60 70
80 70 80 0 0 80 90 60 70
80 80 80 0 0 70 80 60 70
80 80 80 0 0 80 90 60 70
0 80 80 0 0 75 80 60 70
0 70 40 95 70 70 60 60 60
80 70 90 95 95 70 60 60 70
0 30 40 20 50 50 60 50 50
85 80 90 0 0 70 85 90 85
0 90 90 95 99 80 90 90 90
0 75 80 0 0 80 80 60 70
85 80 90 0 0 70 85 50 70
85 80 90 90 90 80 85 60 70
30 90 80 0 0 80 85 80 50
85 90 95 0 0 85 90 80 70
0 60 70 0 0 60 60 50 60
40 20 20 0 0 50 50 0 0
80 75 80 90 80 75 80 50 70
(39-63 %) H (60-84 %) VH (79-100 %)
(37-63 %) H (58-78 %) VH (76-100 %)
40 90
60 10
80 10
10
11
29 38
58 25 38
42
17 25
34 42 8
25 17
22 72
25
13 17
13
38
25
38 50
42 17
58 21
14
11
Problems with
Major Decisions to
New Archaeological Utility
Dismentale or
Finds(NAF) &Infrastructure
Change to Policy of Reconstruction(MDDR)
Lines(PUIL)
Intervention(CPI)
Archeologica Archeologica Architictur
Architictur
Archeological&Arch l&Architictur l&Architictur al& Prermissions of the
al& Survey
itictural al al Survey Relevent
Documents
Studies(AAS) Studies(AAS Studies(AAS Document Authorities(PRA)
(ASD)
) ) s(ASD)
Probapilit Probapilit
Impact% Probapility% Impact% Probapility% Impact% Impact%
y% y%
70 85 80 85 70 75 90 90
70 90 95 95 70 75 80 90
70 90 90 95 70 80 0 0
80 90 90 90 70 80 0 0
95 99 95 95 85 90 0 0
85 90 90 90 90 90 0 0
80 85 0 0 90 90 0 0
80 80 0 0 60 65 0 0
80 80 90 80 60 70 0 0
70 70 0 0 60 60 0 0
70 80 70 80 70 75 0 0
80 85 0 0 90 95 70 85
70 85 0 0 70 70 0 0
80 85 90 95 70 85 0 0
80 85 90 95 80 95 70 70
95 80 0 0 90 75 0 0
85 99 85 90 90 85 0 0
70 65 0 0 50 55 0 0
50 50 0 0 70 60 0 0
70 80 70 70 50 50 0 0
Total Delay Time/
Project Time
El sour El shamaly
Gohary group
El Moayed Sheekh
Beshtak Group
El Selehdar Group
Kalawoon Group
Sadat House
Wekala el Khory
El Khory Group
El Ameer Taaz House
El Eeny Group
Kasr el Manyal
Bebars Group
Shabshery Group
Delay = Impact = Evaluation =
73.5097 83.4446
73.5097 83.2307
73.5097 83.8767
71.6684 82.3346
73.5097 84.0943
71.5238 82.3346
73.764 81.7199
73.5097 66.5076
73.5097 75.8551
44.1332 51.2126
71.6684 81.7199
73.5097 84.0943
73.764 84.0943
71.6684 83.8767
73.7676 84.0943
70.9322 55.3327
71.5238 84.0943
73.5097 71.2322
69.0079 56.5731
73.764 73.7676