You are on page 1of 43

0

Contents
2
Alarm Crone Box and Cable Information
3
Eltek SMPS 1000W Rectifier
4
Eltek Flatpack 1800W Rectifier
5
Exsel Rectifier
1
External Alarm Termination Methodologies
6
T5 Cabinet with Emerson Rectifier
7
T5 Cabinet with Eltek Smartpack Rectifier
8
Troubleshooting Knowledge Sharing
External alarms termination methodologies, 1
1
Scenario 1: Cabin/T5 installed
2G and/or 3G
3G 2G
Alarm Crone Block
Alarms termination in 3G
Scenario 2: 2 Cabins/T5s. 1 cabin installed 2G and/or 3G and
another cabin is just installed TX
3G 2G
Alarm Crone Block
Alarms termination in 3G
Just TX equipment only
Alarm Crone Block
Alarms termination in 2G
Scenario 3: 2 Cabins/T5s. 1 cabin installed 3G and another
cabin installed 2G
3G 2G
Alarm Crone Block
Alarms termination in 3G
Alarm Crone Block
Alarms termination in 2G
External alarms termination methodologies, 2
2
Scenario 4: T5 with APM30
installed 3G
3G
2G
Alarm Crone Block
Alarms termination in 3G
APM30
Scenario 5: existing T5 installed 2G x 2 units with APM30
installed 3G
3G
2G
Alarm Crone Block
Alarms termination in 3G
APM30
TX
TX Alarm Crone Block
Alarms termination in 2G
Scenario 6: Install inside 2G BBU unit
1. Huawei 3G equipment with DBS3806.
2. Huawei 3G equipment not exist
Please inform Huawei and Maxis for further rectification
External alarms termination methodologies, 3
3
Existing T5 x 2 units with APM30 installed 3G
3G
2G
Alarm Crone Block
Alarms termination in 3G
APM30
TX
TX
Alarm cable loop from other T5
Alarm Crone Block
The External Alarm CANNOT be loop
from one T5 cabinet to another
4
Contents
2
Alarm Crone Box and Cable Information
3
Eltek SMPS 1000W Rectifier
4
Eltek Flatpack 1800W Rectifier
5
Exsel Rectifier
1
External Alarm Termination Methodologies
6
T5 Cabinet with Emerson Rectifier
7
T5 Cabinet with Eltek Smartpack Rectifier
8
Troubleshooting Knowledge Sharing
Alarm Crone Block Termination Information, 1
5
Before external alarm cables terminated
Just remove the existing alarm cables in this column.
After external alarm cables terminated
Alarm Cable from BBU EXT-ALM 0
Alarm Cable from BBU EXT-ALM 1
Alarm Crone Block Termination Information, 2
6
NO MORE! Loop cable happen at crone box external alarm cable
termination
Alarm Cable Information
7
Top with
clipper
Bottom with
metal pin
PIN Start 1 PIN end 8
Alarm Cable Definition
(Follow LAN Cable Standard)
PIN Cable Color Alarm #
1
White
Orange
1
2 Orange
3 White Green
2
6 Green
5 White Blue
3
4 Blue
7 White Brown
4
8 Browm
8
Contents
2
Alarm Crone Box and Cable Information
3
Eltek SMPS 1000W Rectifier
4
Eltek Flatpack 1800W Rectifier
5
Exsel Rectifier
1
External Alarm Termination Methodologies
6
T5 Cabinet with Emerson Rectifier
7
T5 Cabinet with Eltek Smartpack Rectifier
8
Troubleshooting Knowledge Sharing
Eltek SMPS 1000W Rectifier Overview
9
Eltek SMPS 1000W Rectifier Alarm Termination Information, 1
10
Eltek SMPS 1000W Rectifier
OPTO
Type OPTO Description
Rectifier
Relay
Test
Rectifier
Alarm Board
Ports
Alarm
Level Remark
1 Intruder Alarm High (NC)
2 Over Temperature High (NC)
3 AC Main Failure High (NC)
4 DC High Voltage 2 17, 18 High (NC)
5 DC Low Voltage 3 1, 2 High (NC)
6 Rectifier PSU Failure 5 9, 10 High (NC)
7 Battery Disconnect 4 5, 6 High (NC)
8 Tower Light Low (NO)
Ignore when not
tower
Eltek SMPS 1000W Rectifier Alarm Termination Information, 2
11
How to test alarm OPTO 1 Intruder Alarm?
12
Step 1: Ensure the door close and intruder alarm is seizing status
Step 2: Open the door to test intruder alarm. Intruder alarm will
activated. Check with BSC integrator the intruder alarm activated
in M2000 and can use LED lit to test.
Step 3: Close the door again. Intruder alarm will seizing. Check
with BSC integrator the intruder alarm will deactivated in M2000.
How to test alarm OPTO 2 Over Temperature Alarm?
13
Step 1: Usually Maxiss Temperature Sensor Honeywell will set as 28 C
or more than 28 C.
Step 2: To activate Over Temperature alarm, turn the Honeywell sensor
to 10 C and listen click sound. Check with BSC integrator the Over
Temperature is activated in M2000. Can use LED lit to test.
Step 3: To deactivate Over Temperature alarm, turn the Honeywell
sensor to 28 C and listen click sound. Check with BSC integrator the
Over Temperature is deactivated in M2000.
How to test alarm OPTO 3 AC Main Failure?
14
Step 1: Check the delay units are installed
inside the ACPDB (usually installed on left top
of ACPDB).
Step 2: To activate AC Main Failure alarm, take out one unit of the delay
units. Check with BSC integrator the AC Main Failure is activated in
M2000. Can use LED lit to test.
Step 3: To deactivate AC Main Failure alarm, install the delay unit which
is already take out previously. Check with BSC integrator the AC Main
Failure is deactivated in M2000.
How to perform the Eltek SMPS 1000W Rectifier Alarm Test?
For OPTO 4, 5, 6 and 7
15
1. Press and then see User Option
2. Press and then see Service Option
3. Press and then see Password 0000
4. Press and then see Volt. Adjustment
5. Press and then see Calibration
6. Press and then see Change Password
7. Press and then see Set Boost Time
8. Press and then see Start/Stop Boost
9. Press and then see Output Control
10. Press and then see Relay Test
11. Press and then see Relay 1
12. Press and then see Relay 2
13. Press
Relay 2 alarm Trigger,
check with BSC integrator
14. Press and then see Relay 3
15. Press
Relay 3 alarm Trigger,
check with BSC integrator
16. Press and then see Relay 4
17. Press
Relay 4 alarm Trigger,
check with BSC integrator
18. Press and then see Relay 5
19. Press
Relay 5 alarm Trigger,
check with BSC integrator
16
Contents
2
Alarm Crone Box and Cable Information
3
Eltek SMPS 1000W Rectifier
4
Eltek Flatpack 1800W Rectifier
5
Exsel Rectifier
1
External Alarm Termination Methodologies
6
T5 Cabinet with Emerson Rectifier
7
T5 Cabinet with Eltek Smartpack Rectifier
8
Troubleshooting Knowledge Sharing
Eltek Flatpack 1800W Rectifier Overview
17
Eltek Flatpack 1800W Rectifier Alarm Termination Information, 1
18
Eltek Flatpack 1800W Rectifier
OPTO
Type OPTO Description
Rectifier
Relay
Test
Rectifier
Alarm Board
Ports
Alarm
Level Remark
1 Intruder Alarm High (NC)
2 Over Temperature High (NC)
3 AC Main Failure High (NC)
4 DC High Voltage 2 14, 15 High (NC)
5 DC Low Voltage 3 11, 12 High (NC)
6 Rectifier PSU Failure 5 5, 6 High (NC)
7 Battery Disconnect 4 8, 9 High (NC)
8 Tower Light Low (NO)
Ignore when not
tower
Eltek Flatpack 1800W Rectifier Alarm Termination Information, 2
19
How to test alarm for Flatpack 1800W Rectifier
OPTO 1, 2, 3, 4, 5, 6 and 7?
20
Entire external alarms test are as
same as alarm testing for Eltek SMPS
1000W rectifier
21
Contents
2
Alarm Crone Box and Cable Information
3
Eltek SMPS 1000W Rectifier
4
Eltek Flatpack 1800W Rectifier
5
Exsel Rectifier
1
External Alarm Termination Methodologies
6
T5 Cabinet with Emerson Rectifier
7
T5 Cabinet with Eltek Smartpack Rectifier
8
Troubleshooting Knowledge Sharing
EXSEL Rectifier Overview
22
How to test alarm for Exsel Rectfier - OPTO 1, 2, 3, 4 and 5?
23
OPTO 3 AC Main Failure
Step 1: Ensure the AC 2A fuses are installed properly manner and
no OPTO 3 alarm occur at BSC
Step 2: To activate AC Main Failure alarm, take
out one unit of AC 2A fuse. Check with BSC
integrator the AC Main Failure is activated in
M2000. Can use LED lit to test.
Step 3: To deactivate AC Main Failure alarm, install the AC 2A fuse
which is already take out previously. Check with BSC integrator the AC
Main Failure is deactivated in M2000.
OPTO 1 and 2 just follow the slides as Eltek SMPS 1000W Rectifier
OPTO 4 and 5, no any test require for DC High Voltage and DC Low Voltage
How to test alarm for Exsel Rectfier - OPTO 6?
24
Step 1: Ensure entire Rectifier Circuit breaker units are switch ON , if
any reporting to BSC integrator is required. Make sure no OPTO 6
alarm occur at BSC
Step 2: To activate OPTO 6
Rectifier PSU Failure alarm,
Switch OFF one of the PSU
unit circuit breaker. Check with
BSC integrator the Rectifier
PSU Failure is activated in
M2000. Can use LED lit to test.
Step 3: To deactivate Rectifier PSU Failure alarm,
Switch ON circuit breaker which is switch OFF
previously. Check with BSC integrator the Rectifier
PSU Failure is deactivated in M2000.
How to test alarm for Exsel Rectfier - OPTO 7?
25
Step 1: Ensure the Battery DC 2A Fuse is installed
in properly manner , Make sure no OPTO 7 alarm
occur at BSC
Step 2: To activate Battery Disconnect Alarm, take
out DC 2A fuse. Check with BSC integrator the
Battery Disconnect is activated in M2000. Can use
LED lit to test.
Step 3: To deactivate Battery Disconnect Alarm,
install the DC 2A fuse which is already take out
previously. Check with BSC integrator the Battery
Disconnect is deactivated in M2000.
26
Contents
2
Alarm Crone Box and Cable Information
3
Eltek SMPS 1000W Rectifier
4
Eltek Flatpack 1800W Rectifier
5
Exsel Rectifier
1
External Alarm Termination Methodologies
6
T5 Cabinet with Emerson Rectifier
7
T5 Cabinet with Eltek Smartpack Rectifier
8
Troubleshooting Knowledge Sharing
T5 Cabinet with Emerson Rectifier Overview
27
How to test alarm OPTO 1 - T5 Cabinet with Emerson Rectifier?
28
Step 1: Ensure the door sensor is in good condition and intruder
alarm is seizing status
Step 2: Open the door to test intruder alarm. Intruder alarm will
activated. Check with BSC integrator the intruder alarm activated
in M2000 and can use LED lit to test.
Step 3: Close the door sensor or press the door spring button.
Intruder alarm will seizing. Check with BSC integrator the intruder
alarm will deactivated in M2000.
How to test alarm OPTO 2 - T5 Cabinet with Emerson Rectifier?
29
Step 1: Usually Maxiss T5 cabinet for FAN circuit breaker units are at
the right hand of DC panel. But same cases the FAN CB units are in
between the DC panel, please check on site accordingly
Step 2: To activate Over Temperature alarm, switch OFF the FAN unit
circuit breaker and the FAN unit will not operation. Check with BSC
integrator the Over Temperature is activated in M2000. Can use LED lit
to test.
Step 3: To deactivate Over Temperature alarm, switch ON the FAN
unit circuit breaker and FAN unit will operation in normal condition.
Check with BSC integrator the Over Temperature is deactivated in
M2000.
How to test alarm OPTO 3 AC Main Failure?
30
Step 1: Check the AC fuse units are installed
properly inside T5 Emerson Rectifier cabinet.
Step 2: To activate AC Main Failure
alarm, take out one AC fuse unit.
Check with BSC integrator the AC
Main Failure is activated in M2000.
Can use LED lit to test.
Step 3: To deactivate AC Main Failure alarm,
press or install back the fuse unit which is
already take out previously. Check with BSC
integrator the AC Main Failure is deactivated in
M2000.
How to test alarm OPTO 4 and 5 DC High Voltage and DC Low
Voltage?
31
1. Press and then see User Option
2. Press and then see Service Option
3. Press and then see Password 0000
4. Press and then see Volt. Adjustment
5. Press and then see Calibration
6. Press and then see Change Password
7. Press and then see Set Boost Time
10. Press and then see Relay Test
11. Press and then see Relay 1
12. Press and then see Relay 2
13. Press
Relay 2 alarm Trigger,
check with BSC integrator
14. Press and then see Relay 3
15. Press
Relay 3 alarm Trigger,
check with BSC integrator
16. Press and then see Relay 4
17. Press
Relay 4 alarm Trigger,
check with BSC integrator
How to test alarm OPTO 4? DC High Voltage
32
1. Press x 2 times and see Setting
2. Press
3. Press
x 4 times and see DC Setting
4. Press
5. See
6. Move the cursor to DC Hi# 1: 55.7V by press
x 1 time
7. Press
until value of 53.4V and below
8. Press
wait 3 second, DC High Voltage
will activate
9. Press
until the voltage value become
55.7V (back to original)
11. DC High Voltage will deactivate
10. Press
How to test alarm OPTO 5? DC Low Voltage
33
1. Continue from OPTO 4 alarms test
2. See
5. Press
wait 3 second, DC Low Voltage
will activate
6. Press
until the voltage value become
48.0V (back to original)
8. DC Low Voltage will deactivate
7. Press
3. Move the cursor to DC Lo# 1: 48.0V by press
x 1 time
4. Press until value of 53.6V and above
9. Press until exit from alarm testing
How to test alarm OPTO 6? Rectifier PSU Failure
34
Step 1: Ensure entire Rectifier PSU units are
working in normal condition and Rectifier Circuit
breaker units are switch ON , if any reporting to
BSC integrator is required. Make sure no OPTO 6
alarm occur at BSC
Step 2: To activate OPTO 6 Rectifier PSU Failure
alarm, Switch OFF one of the PSU unit circuit
breaker. Check with BSC integrator the Rectifier
PSU Failure is activated in M2000. Can use LED lit
to test.
Step 3: To deactivate Rectifier PSU Failure alarm,
Switch ON circuit breaker which is switch OFF
previously. Check with BSC integrator the Rectifier
PSU Failure is deactivated in M2000.
How to test alarm OPTO 7? Battery Disconnect
35
Step 1: Ensure entire Baterries Circuit
Breaker units are in switch ON condition, if
any reporting to BSC integrator is required.
Make sure no OPTO 7 alarm occur at BSC
Step 2: To activate OPTO 7 Battery Disconnect alarm, Switch
OFF one of the battery unit circuit breaker. Check with BSC
integrator the Rectifier PSU Failure is activated in M2000. Can
use LED lit to test.
Step 3: To deactivate Battery Disconnect alarm, Switch ON
circuit breaker which is switch OFF previously. Check with
BSC integrator the Battery Disconnect alarm is deactivated in
M2000.
T5 Cabinet with Emerson Rectifier Guide Book
for alarm testing and overview.
36
T5 Cabinet System Overview
T5 Cabinet with Emerson Rectifier
Alarm Testing Guide Book
37
Contents
2
Alarm Crone Box and Cable Information
3
Eltek SMPS 1000W Rectifier
4
Eltek Flatpack 1800W Rectifier
5
Exsel Rectifier
1
External Alarm Termination Methodologies
6
T5 Cabinet with Emerson Rectifier
7
T5 Cabinet with Eltek Smartpack Rectifier
8
Troubleshooting Knowledge Sharing
How to test alarm OPTO 1 for T5 Cabinet with
Eltek Smartpack Rectifier? Coming Soon!!
38
Coming Soon!!!
39
Contents
2
Alarm Crone Box and Cable Information
3
Eltek SMPS 1000W Rectifier
4
Eltek Flatpack 1800W Rectifier
5
Exsel Rectifier
1
External Alarm Termination Methodologies
6
T5 Cabinet with Emerson Rectifier
7
T5 Cabinet with Eltek Smartpack Rectifier
8
Troubleshooting Knowledge Sharing
Case 1 Temperature Sensor Faulty
40
During OPTO 2 alarm test The temperature sensor cant trigger
the OPTO 2 alarm to BSC. The problem is may caused by both
screw units as shown were loose or the alarm cables were wrong
connected ports or loose connection.
Loose the screw on
top of Temperature
Sensor
Remove the cover of
Temperature Sensor
Make sure the alarm cable
connect into right position.
Must in screw 1 and 3. 2 is
not connect anything.
Make sure the both screw as
shown above are not loose. If
loose, please install and
screw until tighten.
If everything in place,
just close the cover and
tighten up the screw.
Test again the OPTO 2
alarm with turn the
temperature sensor
If alarm OPTO 2 trigger
as normal.
Troubleshooting closed
If alarm OPTO 2 cant
trigger or no any
occurrence happen after
repair action. Please inform
Huawei or Maxis.
Case 2 Rectifier PSU Module Faulty
41
If have any alarm occur on
PSU unit, please remove the
faulty PSU unit and continue
the alarm test. If not, the
OPTO 6 alarm will always
occur during the alarm
testing. At the same time
inform Huawei or Maxis
Personnel.
Ensure entire PSU modules
are working in normal
condition with green LED
lit ON
Case 3 Batteries Unit Not Exist at Site or Faulty or
Circuit Breaker units were switched OFF
42
Make sure the batteries unit are exist at site for cabin,
T5 cabinet or others related equipment location.
Check the circuit breaker for batteries unit are switch
ON condition. After that, just perform OPTO 7
Battery Disconnect Alarm Test. If above occurrence
happen at site, please inform Huawei or Maxis.
No Batteries unit exist on
site or batteries were
vandalized.
Batteries unit circuit breaker
were switched OFF