JOB SAFETY ANALYSIS

Project : Maaden Ammonia Plant Project Required Work Permit(s)


!te : Elevated Work Lifting LOTO
Su"er#isor
:
Hot Work Excavation
Grating Removal/Open
Hole
Work Are! : Scafold Confne Space Other:
T$"e o% Work &r!%t(s) isci"'i(e B!sic Jo) Ste"s Pote(ti!' *!+!rd &o(tro',S!%et$ -e!sures
iping iping
Civil Civil
Electrical Electrical
!n"tr#mentation !n"tr#mentation
$ec%anical $ec%anical
ainting ainting
Lifting E&#ipment Operator
Rigging Rigging/Erector
Scafolding Scafolding
Welding Welding
Str#ct#ral 'endor/Tec%nical
Other: Other:
Required Perso(!' Protecti#e Equi"me(t(s)
Handling of Pipe
Spools
- Loading and
Off loading of
materials
- Serious personal
injury
- Potential pinch,
caught in-beteen
and crush points!
- "ne#pected
mo$ement of load!
- %limbing on trailer
bed ithout use of
ladder, &oll out of
spools
- Se'uence of or( shall be discussed during daily pre-start meeting before or(
commence! Super$isor in-charge ) safety officer shall identify and restrict access
to all pinch, crush and caught in beteen points
- *inders and other safety de$ices shall be sloly remo$e and only hen
e'uipment is in stable position +free from any mo$ement,
- Ladders are to be used as ingress and egress on the trailer bed!
- *inders and accessories shall inspected and free from any defects or contaminants
+e!g! oil, sol$ents, etc!, that may ea(en the nylon ebbing! Softeners shall be
use to protect the sling from sharp edges of the materials!
- Pipe spools shall be properly arranged in such a ay that it ill not bloc( the
access!
- -'uipment spotters in orange $est to be utili.ed hile maneu$ering the
e'uipment!
- "se of crane )
for(lift
- Personnel can be
struc( by the load
during lifting )
transporting!
- Personnel struc( by
mo$ing e'uipment!
- /amage to Property
- Lifting gears ) tac(les shall be inspected prior to use! Only competent person +i!e!
riggers, shall perform all rigging or(s!
- %urrent 0
rd
party certificates for lifting tac(les! S1L clearly indicated on
spreader bar and here applicable
- /aily documented inspection of e'uipment by operator!
- %urrent 0
rd
party certificates for lifting tac(les! S1L clearly indicated on
spreader bar and here applicable!
- %rane shall be properly set-up and appropriate timber pads to be used and 2o
tag lines used to control the load!
- Physical barricade to installed and maintained ith entry and e#it points!
- &iggers are not alloed to stay on the trailer bed during actual lifting of the load!
2railer truc( shall not stay on his cab hile lifting is on going and nobody is
alloed to stay under the trailer bed!
- 3or no reason nobody is alloed to stay or pass under suspended load!
Signboards to be posted!