You are on page 1of 1

4 11

40 40

10
20
3.6

2.2
Moác loä 1.3
giôùi (tính töø
tim loä vaøo DORMITORY DORMITORY
26 meùt) 40m x 12m 40m x 12m Ranh baûo löu bôø
soâng (tính töø meùp
7.4
bôø soâng vaøo 15
meùt)

CANTINA
28m x 10m

2.8

3.9
2.6 9m 23
NIGICO ARRANGEMENT

L:12.192xW:2438xH:2591

L:12.192xW:2438xH:2591
19.5

3.3
Container 40 - 3

Container 40 - 3
8 7
1.2

5 4.5 10 16.5

1.8
COLD STORE Compressor
Chiller Room

12
Room
7

Dry Room L20.45x W6.8x H3

Shimp washing
Changing Changing

machine
Room Room Diesel
Head less Room

7.5
Oil
5 Tank Shell
1.2 Shimp
17 8.3
2

14.5
5 6.5

2.7
2nd FLOOR

1.3

4.3
8sizing machine Pre-Treatment

Receiving
Room

5m
8,5 m
Room
7.9m

4.3
23.4 6 5.7
2 3.1 3.9 16 4 12.5
Squid washing
2.5 machine
4.5 10

20.5
Container 20 - 1
2.9

Squid Room

16m
Incubator room Sterilizing room

ÑH
Boil Room
14.7

MOTOR GENERATOR

44
COMPRESSOR ROOM FILTRATED- ROOM
8

2.35 3.35 2.4 2.45 2.4 2.4 2.3 1.45 COAGULATI WATER
ÑH

10.5

ON TANK 7.9m
5x4x3(2.1) TANK
ÑH

=60(42)m3 5x4x3(2)
Tool Washing Room

vaccu =60(40)m3
m seal
3.5

1.5
Bacteria room

Antibiotic
room
Casher Store
WATER
10

COMPRESSOR

CONTACT CONTACT

8
CONTACT CONTACT
FREEZER FREEZER FREEZER DISINEFECTE SYSTEM 5.15
FREEZER Boiler Room
ROOM

D-WATER

5.2
Toång dieän tích A1: 880
ÑH

TANK
7

Toilet COLD STORE 8.6x4x3.4(3.3)


m2
5.5

X- RAY
=117(114)m3 FIRST PROCESSING ROOM

3.7
2nd TANK SAND SQUID PROCESSING ROOM
FILTER
Guardman Room

Washing Area 5.5x4.4x1.8(1.4) 10,4m


Office Room Washing Area
ICE E =44(33)m3
1.5
8

Store
###

1.95m 1.5

sizing machine

sizing machine

sizing machine
Chiller Room Table Table
Changing
4

Changing Ari Blower


6

water tank
Room
Room Air
2.5
BLOCK PANNING Washing Area

15.5
shower

13
12.7
TOILET
9.6

3.7
Washing Area
Changing Changing Changing Air - T: 18oC÷22oC - W: 60 - V: 240 m3
TOILET Room Room Room Sho 11.5
Loading ChangingChanging wer Meeting
Conference
Room No 1

Area Room Room Room


ICE
- T: 18oC÷22oC - W: 60 - V: 240 m3 2.5 2 2.3 1.4
10

5
5.3

2.5
SIZZING & GRADING EREA
TEST KITCHEN Air Shower
2.5

3
COLD STORE AIR BLAST
Conference

Washing Area
Room No 2

L14.85x W15.15x H5 7.5 SQUID POWDER ROOM


2.3
17

SASHIMI ROOM

2
4

143
4.2

3.2 ICE ICE


3.1
- T: 18oC÷22oC - W: 60 - V: 240 m3
6

- T: -18
T:oC÷22
18oC÷22
C C- W:- 60
W: 80
- V: -240
V: 240
m3 m
o 3
o
Conference
Room No 3

18
3500x 760 3500x 760

METAL
DETECTOR

Cartons Packing room 4.5


Room CONVEYOR 6
CONVEYOR IQF FREEZER
VACCUM
VACCUM MACHINE
MACHINE
1.5 1.1 2.8
Glazer

- T: 160 m 3
10oC÷15oC
CONVEYOR

- W: 10 Chill Room

22
- T: 18oC÷22oC - W: 60 - V: 240 m3
8.4

15 - V: 300 m3 - T: 18oC÷22oC L13.65xW6.15x Washing


10 7 2ND FREEZER - W: 15 H2.86 machine
43 m 3
33.5 - V: 1188 m3
4.2
3.9

3 4.5 5 3.5 9.5 4 4.5


14.5

3.3 1.8
0.7
2.65

2.6
8.4
W1.65
3.34

BELT FREEZER MYCOM


2.7

REFREEZER GLAZER
2.2

Store Store IQF Mycom IQF Mycom 2 2.27 BOIL SHIMP PROCESSING ROOM
Material 500kg/h Compressor IQF Taiwan 3.54
- T: 16oC÷18oC
Compressor Room Compressor Toång dieän tích A2: 396
Store Room Room m2

TOILET Packing room Ñeøn 66 boä


2

Chill Room
W: 6m
L: 12m
3.8

Shell ICE Chill Room


3.8

Shimp
3 W:6m x L:6m
24
27
1.4

1.8

3.5 14
2

10 16.5 3.2 21

IQF SEAREFICO
500kg/h
THOÂNG SOÁ NHAØ MAÙY (01/06/05)
- TOÅNG DT NHAØ MAÙY: (1996:15 535 m ); (2005: 13 112 m ) 2 2 Packing room
- TOÅNG DT KHU SAÛN XUAÁT: 7 085 m2 :
+ DT KHU TIEÁP NHAÄN TOÂM+ MÖÏC+ A10: 70+ 51+ 208= 239 m2 NEW DORMITORY 2.6
Xöû lyù nöôùc thaûi
Compressor Room

+ DT KHU CHEÁ BIEÁN A1+A8+ A2+ : 811+ 240+ 424= 1 475 m2 4.5
+ DT KHU CHEÁ BIEÁN CAO CAÁP (B1-1+ M.BOÄT+ B3+ B3LUOÄC): 206+ 1200m3/day
171+252+ 74= 703 m2 L26m x Wm 5.5
+ DT KHU CAÁP ÑOÂNG (KAWASAKI+ MYCOM+ TUÛ ÑOÂNG): 362+79+
203= 644 m2
+ KHU FC: 522 m2
3.8
+ DT KHO (A3+ NGAÂM+ FC+ TPFC+ TPFB+ KHO ÑAÙ): 156+ 84+ 52+ 55+
255+ 96= 698 m2 Boil Room
+ DT KHU VEÄ SINH: FB+ A1: 72.5+ 48= 120.5 m2
33.5

+ DT KHU THAY BHLÑ: FC+ FB+ SASHI+ B3+ A1: 48+ 88+ 13+ 34.25+ 144= 245
m2 Sea food mix
+ DT KHU RÖÛA TAY: FB+ B3+ A1: 65+ 18+ 39= 122 m2 cold storage
L9xW4xH3
+ DT KHU PHOØNG MAÙY VAØ THIEÁT BÒ: FB, FC: 220+ 430= 650 m2 D:W1.5x H2
+ DT KHU V.PHOØNG+ P.HOÏP VAØ KHO VT = 623 m2
- TOÅNG SOÁ BAØN CHEÁ BIEÁN: A1+ A8+ A2+ FB+ B3+ FC:
- TOÅNG SOÁ MAÙNG ÑEØN TRONG PX: 652 boä ñoâi
28

- LÖÔÏNG NÖÔÙC CHÖÙA (THOÂ+ÑAØI+ LAÉNG+ LOÏC+ LAÏNH): 114+ 33+


42+ 40+84= 313m3
- TOÅNG COÂNG SUAÁT ÑIEÄN LÖÔÙI CUNG CAÁP: 560+ 560+ 560+ 400+
320= 2 400 KVA
- TOÅNG COÂNG SUAÁT MAÙY PHAÙT ÑIEÄN: MAX: 350x 4+ 150+ 450= 2
000 KVA 4
- TOÅNG COÂNG SUAÁT THIEÁT BÒ: 3 Shell ICE
Shimp
Kitchen
5.5 Fence
45.8m

33 6
96

You might also like