You are on page 1of 40

Area tributaria: L= 3.

85 m
B= 3.43 m
A= 13.21 m2
Ancho de columna = 0.30 m
Largo de columna = 0.30 m
Altura de columna = 3.30 m
Ancho de viga = 0.25 m
Peralte de viga = 0.35 m
Metrado de cargas
Peso de columna 2138.40 Kg
Peso de Viga 2425.50 Kg
Peso de viguetas 144.20 Kg
Peso de aligerado 19015.92 Kg
Pd = 23724.02 Kg
Pl = 396.17
Datos:
Carga Muerta 23724.02 Kg
Carga viva 396.17 Kg
Sobrecarga 100.00 Kg/m2
Peso especifico del suelo 1700.00 Kg/m3
Capacidad portante del suelo 0.90 Kg/cm2
Coeficiente de Balasto 10000.00 Ton/m3
Modulo de elasticidad 2170000.00 Ton/m3
Resistencia del concreto 210.00 Kg/cm2
Altura de relleno 0.40 m
Asumir H= 0.60 m
B Ancho columna 0.30 m
Largo columna 0.30 m
L Tn= t - S/C - 2400*h - Ps*hs - 2200*0.15
6450.00 kg/m2
A=(P+0.15P) / Tn
4.30 cm2
0.15
0.40 A=B x L
L2 - (l-a) - A = 0
H L = 2.07 m
B= 2.07 m
L Asumimos:
L = 2.10 m
B = 2.10 m
Pu = 1.5 x Wd + 1.8 x Wl
Pu = 36299.13 Kg
Tu= 8.23 Ton/m
CHEQUEO DE RIGIDEZ
1/3
DISEO DE ZAPATA AISLADA
ZAPATA Z-1
H >= 2.1 x (Ko L / E)
H>= 0.45 m
h adoptado = 0.50 m
CHEQUEO POR CORTANTE

d= h - rec. - /2
d= 41.87 cm
d X= 0.48 cm
Vu = Tu x X x L
Vu= 8.32 Ton
1/2
X Vc=0.85 x 0.53 x (210) x L x d
0.55 vc = 57.40 Ton Vc > Vu
En la otra direccin
X= 0.48 cm
Vu = Tu x X x B
Vu= 8.32 Ton
1/2
d Vc=0.85 x 0.53 x (210) x L x d
vc = 57.40 Ton
Vc > Vu (OK)
X
0.55
CHEQUEO POR PUNZONAMIENTO
Cortante Actuante mnimo
Vu = Tu (Az - Ao)
d/2 Az= 4.41 m
2
0.30 d/2 Ao = (a + d) * (b+d)
0
.
3
0
+
d
0
.
3
Ao = 0.52 m
2
0.30+d Vup = Tu x (Az - Ao)
Vup = 32.05 Ton
Cortante tomado por el concreto
bo = 2(a + d) + 2(b + d)
bo= 2.87 cm
1/2
Vcp=(0.53+1.1/(a/b)) x (210) x bo x d
Vcp= 284.27 Ton
Vcp = 0.85 x Vcp
Vcp= 241.63 Ton
Vcp > Vup (OK)
ACERO DE REFUERZO
a = As x Fy
0.85 x F'c x B
As = Mu
0.9 x Fy (d - a/2)
Wu = Tu x B
Wu= 17.29 Ton/m
Mu = Wu x X
2
2
DIRECCION X-X
Mu = 7.00 Ton-m
As = 4.92 cm
2
a = 0.86 cm
As = 4.47 cm
2
a = 0.78 cm
As = 4.47 cm
2
As min = 0.0018 x d x B
As min= 15.82 cm
2
usamos 1/2"
S = 1/2" x B
As
1/2" @ 0.1712 m S = 17.12 cm
USAR 1/2" @ 0.1712 m
DIRECCION Y-Y
d' = d - 1/2"
d'= 40.60 cm
Wu = 17.29 Ton/m
Mu= 7.00 Ton-m
As = 6.42 cm
2
a = 1.12 cm
As = 5.88 cm
2
a = 1.03 cm
As = 5.87 cm
2
As min = 0.0018 x d x L
As min= 15.34 cm
2
1/2" @ 0.1765 m
usamos 1/2"
S = 1/2" x B
As
S = 17.65 cm
USAR 1/2" @ 0.1765 m
(OK)
Area tributaria: L= 3.43 m
B= 2.88 m
A= 9.88 m2
Ancho de columna = 0.30 m
Largo de columna = 0.30 m
Altura de columna = 3.30 m
Ancho de viga = 0.25 m
Peralte de viga = 0.35 m
Metrado de cargas
Peso de columna 2138.40 Kg
Peso de Viga 2160.90 Kg
Peso de viguetas 107.87 Kg
Peso de aligerado 14224.90 Kg
Pd = 18632.07 Kg
Pl = 296.35
Datos:
Carga Muerta 18632.07 Kg
Carga viva 296.35 Kg
Sobrecarga 100.00 Kg/m2
Peso especifico del suelo 1700.00 Kg/m3
Capacidad portante del suelo 0.90 Kg/cm2
Coeficiente de Balasto 10000.00 Ton/m3
Modulo de elasticidad 2170000.00 Ton/m3
Resistencia del concreto 210.00 Kg/cm2
Altura de relleno 0.40 m
Asumir H= 0.60 m
B Ancho columna 0.30 m
Largo columna 0.30 m
L Tn= t - S/C - 2400*h - Ps*hs - 2200*0.15
6450.00 kg/m2
A=(P+0.15P) / Tn
3.37 cm2
0.15
0.40 A=B x L
L2 - (l-a) - A = 0
H L = 1.84 m
B= 1.84 m
L Asumimos:
L = 1.85 m
B = 1.85 m
Pu = 1.5 x Wd + 1.8 x Wl
Pu = 28481.54 Kg
Tu= 8.32 Ton/m
CHEQUEO DE RIGIDEZ
DISEO DE ZAPATA AISLADA
ZAPATA Z-1
1/3
H >= 2.1 x (Ko L / E)
H>= 0.43 m
h adoptado = 0.50 m
CHEQUEO POR CORTANTE

d= h - rec. - /2
d= 41.87 cm
d X= 0.36 cm
Vu = Tu x X x L
Vu= 5.49 Ton
1/2
X Vc=0.85 x 0.53 x (210) x L x d
0.55 vc = 50.56 Ton Vc > Vu
En la otra direccin
X= 0.36 cm
Vu = Tu x X x B
Vu= 5.49 Ton
1/2
d Vc=0.85 x 0.53 x (210) x L x d
vc = 50.56 Ton
Vc > Vu (OK)
X
0.55
CHEQUEO POR PUNZONAMIENTO
Cortante Actuante mnimo
Vu = Tu (Az - Ao)
d/2 Az= 3.4225 m
2
0.30 d/2 Ao = (a + d) * (b+d)
0
.
3
0
+
d
0
.
3
Ao = 0.52 m
2
0.30+d Vup = Tu x (Az - Ao)
Vup = 24.18 Ton
Cortante tomado por el concreto
bo = 2(a + d) + 2(b + d)
bo= 2.87 cm
1/2
Vcp=(0.53+1.1/(a/b)) x (210) x bo x d
Vcp= 284.27 Ton
Vcp = 0.85 x Vcp
Vcp= 241.63 Ton
Vcp > Vup (OK)
ACERO DE REFUERZO
a = As x Fy
0.85 x F'c x B
As = Mu
0.9 x Fy (d - a/2)
Wu = Tu x B
Wu= 15.40 Ton/m
Mu = Wu x X
2
2
DIRECCION X-X
Mu = 4.62 Ton-m
As = 3.25 cm
2
a = 0.57 cm
As = 2.94 cm
2
a = 0.51 cm
As = 2.94 cm
2
As min = 0.0018 x d x B
As min= 13.94 cm
2
usamos 1/2"
S = 1/2" x B
As
1/2" @ 0.1712 m S = 17.12 cm
USAR 1/2" @ 0.1712 m
DIRECCION Y-Y
d' = d - 1/2"
d'= 40.60 cm
Wu = 15.40 Ton/m
Mu= 4.62 Ton-m
As = 5.62 cm
2
a = 0.98 cm
As = 5.16 cm
2
a = 0.90 cm
As = 5.15 cm
2
As min = 0.0018 x d x L
As min= 13.52 cm
2
1/2" @ 0.1765 m
usamos 1/2"
S = 1/2" x B
As
S = 17.65 cm
USAR 1/2" @ 0.1765 m
(OK)
Area tributaria: L= 3.43 m
B= 2.08 m
A= 7.13 m2
Ancho de columna = 0.30 m
Largo de columna = 0.30 m
Altura de columna = 3.30 m
Ancho de viga = 0.25 m
Peralte de viga = 0.35 m
Metrado de cargas
Peso de columna 2138.40 Kg
Peso de Viga 2160.90 Kg
Peso de viguetas 77.91 Kg
Peso de aligerado 10273.54 Kg
Pd = 14650.74 Kg
Pl = 214.03
Datos:
Carga Muerta 14650.74 Kg
Carga viva 214.03 Kg
Sobrecarga 100.00 Kg/m2
Peso especifico del suelo 1700.00 Kg/m3
Capacidad portante del suelo 0.90 Kg/cm2
Coeficiente de Balasto 10000.00 Ton/m3
Modulo de elasticidad 2170000.00 Ton/m3
Resistencia del concreto 210.00 Kg/cm2
Altura de relleno 0.40 m
Asumir H= 0.60 m
B Ancho columna 0.30 m
Largo columna 0.30 m
L Tn= t - S/C - 2400*h - Ps*hs - 2200*0.15
6450.00 kg/m2
A=(P+0.15P) / Tn
2.65 cm2
0.15
0.40 A=B x L
L2 - (l-a) - A = 0
H L = 1.63 m
B= 1.63 m
L Asumimos:
L = 1.65 m
B = 1.65 m
Pu = 1.5 x Wd + 1.8 x Wl
Pu = 22361.37 Kg
Tu= 8.21 Ton/m
CHEQUEO DE RIGIDEZ
DISEO DE ZAPATA AISLADA
ZAPATA Z-1
1/3
H >= 2.1 x (Ko L / E)
H>= 0.41 m
h adoptado = 0.50 m
CHEQUEO POR CORTANTE

d= h - rec. - /2
d= 41.87 cm
d X= 0.26 cm
Vu = Tu x X x L
Vu= 3.47 Ton
1/2
X Vc=0.85 x 0.53 x (210) x L x d
0.55 vc = 45.10 Ton Vc > Vu
En la otra direccin
X= 0.26 cm
Vu = Tu x X x B
Vu= 3.47 Ton
1/2
d Vc=0.85 x 0.53 x (210) x L x d
vc = 45.10 Ton
Vc > Vu (OK)
X
0.55
CHEQUEO POR PUNZONAMIENTO
Cortante Actuante mnimo
Vu = Tu (Az - Ao)
d/2 Az= 2.7225 m
2
0.30 d/2 Ao = (a + d) * (b+d)
0
.
3
0
+
d
0
.
3
Ao = 0.52 m
2
0.30+d Vup = Tu x (Az - Ao)
Vup = 18.12 Ton
Cortante tomado por el concreto
bo = 2(a + d) + 2(b + d)
bo= 2.87 cm
1/2
Vcp=(0.53+1.1/(a/b)) x (210) x bo x d
Vcp= 284.27 Ton
Vcp = 0.85 x Vcp
Vcp= 241.63 Ton
Vcp > Vup (OK)
ACERO DE REFUERZO
a = As x Fy
0.85 x F'c x B
As = Mu
0.9 x Fy (d - a/2)
Wu = Tu x B
Wu= 13.55 Ton/m
Mu = Wu x X
2
2
DIRECCION X-X
Mu = 3.09 Ton-m
As = 2.17 cm
2
a = 0.38 cm
As = 1.96 cm
2
a = 0.34 cm
As = 1.96 cm
2
As min = 0.0018 x d x B
As min= 12.43 cm
2
usamos 1/2"
S = 1/2" x B
As
1/2" @ 0.1712 m S = 17.12 cm
USAR 1/2" @ 0.1712 m
DIRECCION Y-Y
d' = d - 1/2"
d'= 40.60 cm
Wu = 13.55 Ton/m
Mu= 3.09 Ton-m
As = 5.01 cm
2
a = 0.87 cm
As = 4.62 cm
2
a = 0.81 cm
As = 4.61 cm
2
As min = 0.0018 x d x L
As min= 12.06 cm
2
1/2" @ 0.1765 m
usamos 1/2"
S = 1/2" x B
As
S = 17.65 cm
USAR 1/2" @ 0.1765 m
(OK)
Area tributaria: L= 3.85 m
B= 1.83 m
A= 7.05 m2
Ancho de columna = 0.30 m
Largo de columna = 0.30 m
Altura de columna = 3.30 m
Ancho de viga = 0.25 m
Peralte de viga = 0.35 m
Metrado de cargas
Peso de columna 2138.40 Kg
Peso de Viga 2425.50 Kg
Peso de viguetas 76.94 Kg
Peso de aligerado 10145.52 Kg
Pd = 14786.36 Kg
Pl = 211.37
Datos:
Carga Muerta 14786.36 Kg
Carga viva 211.37 Kg
Sobrecarga 100.00 Kg/m2
Peso especifico del suelo 1700.00 Kg/m3
Capacidad portante del suelo 0.90 Kg/cm2
Coeficiente de Balasto 10000.00 Ton/m3
Modulo de elasticidad 2170000.00 Ton/m3
Resistencia del concreto 210.00 Kg/cm2
Altura de relleno 0.40 m
Asumir H= 0.60 m
B Ancho columna 0.30 m
Largo columna 0.30 m
L Tn= t - S/C - 2400*h - Ps*hs - 2200*0.15
6450.00 kg/m2
A=(P+0.15P) / Tn
2.67 cm2
0.15
0.40 A=B x L
L2 - (l-a) - A = 0
H L = 1.64 m
B= 1.64 m
L Asumimos:
L = 1.65 m
B = 1.65 m
Pu = 1.5 x Wd + 1.8 x Wl
Pu = 22559.99 Kg
Tu= 8.29 Ton/m
CHEQUEO DE RIGIDEZ
DISEO DE ZAPATA AISLADA
ZAPATA Z-1
1/3
H >= 2.1 x (Ko L / E)
H>= 0.41 m
h adoptado = 0.50 m
CHEQUEO POR CORTANTE

d= h - rec. - /2
d= 41.87 cm
d X= 0.26 cm
Vu = Tu x X x L
Vu= 3.51 Ton
1/2
X Vc=0.85 x 0.53 x (210) x L x d
0.55 vc = 45.10 Ton Vc > Vu
En la otra direccin
X= 0.26 cm
Vu = Tu x X x B
Vu= 3.51 Ton
1/2
d Vc=0.85 x 0.53 x (210) x L x d
vc = 45.10 Ton
Vc > Vu (OK)
X
0.55
CHEQUEO POR PUNZONAMIENTO
Cortante Actuante mnimo
Vu = Tu (Az - Ao)
d/2 Az= 2.7225 m
2
0.30 d/2 Ao = (a + d) * (b+d)
0
.
3
0
+
d
0
.
3
Ao = 0.52 m
2
0.30+d Vup = Tu x (Az - Ao)
Vup = 18.28 Ton
Cortante tomado por el concreto
bo = 2(a + d) + 2(b + d)
bo= 2.87 cm
1/2
Vcp=(0.53+1.1/(a/b)) x (210) x bo x d
Vcp= 284.27 Ton
Vcp = 0.85 x Vcp
Vcp= 241.63 Ton
Vcp > Vup (OK)
ACERO DE REFUERZO
a = As x Fy
0.85 x F'c x B
As = Mu
0.9 x Fy (d - a/2)
Wu = Tu x B
Wu= 13.67 Ton/m
Mu = Wu x X
2
2
DIRECCION X-X
Mu = 3.11 Ton-m
As = 2.19 cm
2
a = 0.38 cm
As = 1.98 cm
2
a = 0.34 cm
As = 1.98 cm
2
As min = 0.0018 x d x B
As min= 12.43 cm
2
usamos 1/2"
S = 1/2" x B
As
1/2" @ 0.1712 m S = 17.12 cm
USAR 1/2" @ 0.1712 m
DIRECCION Y-Y
d' = d - 1/2"
d'= 40.60 cm
Wu = 13.67 Ton/m
Mu= 3.11 Ton-m
As = 5.01 cm
2
a = 0.87 cm
As = 4.62 cm
2
a = 0.80 cm
As = 4.61 cm
2
As min = 0.0018 x d x L
As min= 12.06 cm
2
1/2" @ 0.1765 m
usamos 1/2"
S = 1/2" x B
As
S = 17.65 cm
USAR 1/2" @ 0.1765 m
(OK)
Area tributaria: L= 2.88 m
B= 1.83 m
A= 5.27 m2
Ancho de columna = 0.30 m
Largo de columna = 0.30 m
Altura de columna = 3.30 m
Ancho de viga = 0.25 m
Peralte de viga = 0.35 m
Metrado de cargas
Peso de columna 2138.40 Kg
Peso de Viga 1814.40 Kg
Peso de viguetas 57.55 Kg
Peso de aligerado 7589.38 Kg
Pd = 11599.73 Kg
Pl = 158.11
Datos:
Carga Muerta 11599.73 Kg
Carga viva 158.11 Kg
Sobrecarga 100.00 Kg/m2
Peso especifico del suelo 1700.00 Kg/m3
Capacidad portante del suelo 0.90 Kg/cm2
Coeficiente de Balasto 10000.00 Ton/m3
Modulo de elasticidad 2170000.00 Ton/m3
Resistencia del concreto 210.00 Kg/cm2
Altura de relleno 0.40 m
Asumir H= 0.60 m
B Ancho columna 0.30 m
Largo columna 0.30 m
L Tn= t - S/C - 2400*h - Ps*hs - 2200*0.15
6450.00 kg/m2
A=(P+0.15P) / Tn
2.10 cm2
0.15
0.40 A=B x L
L2 - (l-a) - A = 0
H L = 1.45 m
B= 1.45 m
L Asumimos:
L = 1.45 m
B = 1.45 m
Pu = 1.5 x Wd + 1.8 x Wl
Pu = 17684.19 Kg
Tu= 8.41 Ton/m
CHEQUEO DE RIGIDEZ
DISEO DE ZAPATA AISLADA
ZAPATA Z-1
1/3
H >= 2.1 x (Ko L / E)
H>= 0.40 m
h adoptado = 0.50 m
CHEQUEO POR CORTANTE

d= h - rec. - /2
d= 41.87 cm
d X= 0.16 cm
Vu = Tu x X x L
Vu= 1.91 Ton
1/2
X Vc=0.85 x 0.53 x (210) x L x d
0.55 vc = 39.63 Ton Vc > Vu
En la otra direccin
X= 0.16 cm
Vu = Tu x X x B
Vu= 1.91 Ton
1/2
d Vc=0.85 x 0.53 x (210) x L x d
vc = 39.63 Ton
Vc > Vu (OK)
X
0.55
CHEQUEO POR PUNZONAMIENTO
Cortante Actuante mnimo
Vu = Tu (Az - Ao)
d/2 Az= 2.1025 m
2
0.30 d/2 Ao = (a + d) * (b+d)
0
.
3
0
+
d
0
.
3
Ao = 0.52 m
2
0.30+d Vup = Tu x (Az - Ao)
Vup = 13.34 Ton
Cortante tomado por el concreto
bo = 2(a + d) + 2(b + d)
bo= 2.87 cm
1/2
Vcp=(0.53+1.1/(a/b)) x (210) x bo x d
Vcp= 284.27 Ton
Vcp = 0.85 x Vcp
Vcp= 241.63 Ton
Vcp > Vup (OK)
ACERO DE REFUERZO
a = As x Fy
0.85 x F'c x B
As = Mu
0.9 x Fy (d - a/2)
Wu = Tu x B
Wu= 12.20 Ton/m
Mu = Wu x X
2
2
DIRECCION X-X
Mu = 2.02 Ton-m
As = 1.42 cm
2
a = 0.25 cm
As = 1.28 cm
2
a = 0.22 cm
As = 1.28 cm
2
As min = 0.0018 x d x B
As min= 10.93 cm
2
usamos 1/2"
S = 1/2" x B
As
1/2" @ 0.1712 m S = 17.12 cm
USAR 1/2" @ 0.1712 m
DIRECCION Y-Y
d' = d - 1/2"
d'= 40.60 cm
Wu = 12.20 Ton/m
Mu= 2.02 Ton-m
As = 4.44 cm
2
a = 0.77 cm
As = 4.12 cm
2
a = 0.72 cm
As = 4.11 cm
2
As min = 0.0018 x d x L
As min= 10.60 cm
2
1/2" @ 0.1765 m
usamos 1/2"
S = 1/2" x B
As
S = 17.65 cm
USAR 1/2" @ 0.1765 m
(OK)
Area tributaria: L= 3.25 m
B= 2.25 m
A= 7.31 m2
Ancho de columna = 0.25 m
Largo de columna = 0.40 m
Altura de columna = 3.50 m
Ancho de viga = 0.25 m
Peralte de viga = 0.25 m
Metrado de cargas
Peso de columna 840.00 Kg
Peso de Viga 487.50 Kg
Peso de tijeral 77.37 Kg
Peso de viguetas 26.62 Kg
Peso de cobertura 13.97 Kg
Pd = 1445.45 Kg
Pl = 219.38
Datos:
Carga Muerta 1445.45 Kg
Carga viva 219.38 Kg
Sobrecarga 100.00 Kg/m2
Peso especifico del suelo 1700.00 Kg/m3
Capacidad portante del suelo 0.79 Kg/cm2
Coeficiente de Balasto 10000.00 Ton/m3
Modulo de elasticidad 2170000.00 Ton/m3
Resistencia del concreto 210.00 Kg/cm2
Altura de relleno 0.40 m
Asumir H= 0.60 m
B Ancho columna 0.40 m
Largo columna 0.25 m
L Tn= t - S/C - 2400*h - Ps*hs - 2200*0.15
5350.00 kg/m2
A=(P+0.15P) / Tn
0.36 cm2
0.15
0.40 A=B x L
L2 - (l-a) - A = 0
H L = 0.68 m
B= 0.53 m
L Asumimos:
L = 1.30 m
B = 1.10 m
Pu = 1.5 x Wd + 1.8 x Wl
Pu = 2563.05 Kg
Tu= 1.79 Ton/m
DISEO DE ZAPATA AISLADA
ZAPATA Z-2
CHEQUEO DE RIGIDEZ
1/3
H >= 2.1 x (Ko L / E)
H>= 0.38 m
h adoptado = 0.60 m
CHEQUEO POR CORTANTE

d= h - rec. - /2
d= 51.87 cm
d X= 0.01 cm
Vu = Tu x X x L
Vu= 0.01 Ton
1/2
X Vc=0.85 x 0.53 x (210) x L x d
0.55 vc = 44.02 Ton Vc > Vu
En la otra direccin
X= 0.01 cm
Vu = Tu x X x B
Vu= 0.01 Ton
1/2
d Vc=0.85 x 0.53 x (210) x L x d
vc = 37.25 Ton
Vc > Vu (OK)
X
0.55
CHEQUEO POR PUNZONAMIENTO
Cortante Actuante mnimo
Vu = Tu (Az - Ao)
d/2 Az= 1.43 m
2
0.40 d/2 Ao = (a + d) * (b+d)
0
.
2
5
+
d
0
.
2
5
Ao = 0.71 m
2
0.40+d Vup = Tu x (Az - Ao)
Vup = 1.30 Ton
Cortante tomado por el concreto
bo = 2(a + d) + 2(b + d)
bo= 3.37 cm
1/2
Vcp=(0.53+1.1/(a/b)) x (210) x bo x d
Vcp= 308.80 Ton
Vcp = 0.85 x Vcp
Vcp= 262.48 Ton
Vcp > Vup (OK)
ACERO DE REFUERZO
a = As x Fy
0.85 x F'c x B
As = Mu
0.9 x Fy (d - a/2)
Wu = Tu x B
Wu= 1.97 Ton/m
Mu = Wu x X
2
2
DIRECCION X-X
Mu = 0.18 Ton-m
As = 0.10 cm
2
a = 0.02 cm
As = 0.09 cm
2
a = 0.02 cm
As = 0.09 cm
2
As min = 0.0018 x d x B
As min= 10.27 cm
2
usamos 1/2"
S = 1/2" x B
As
1/2" @ 0.125 m S = 16.33 cm
USAR 1/2" @ 0.125 m
DIRECCION Y-Y
d' = d - 1/2"
d'= 50.60 cm
Wu = 2.33 Ton/m
Mu= 0.24 Ton-m
As = 5.34 cm
2
a = 0.93 cm
As = 7.50 cm
2
a = 1.31 cm
As = 9.70 cm
2
As min = 0.0018 x d x L
As min= 11.84 cm
2
1/2" @ 0.125 m
usamos 1/2"
S = 1/2" x B
As
S = 11.99 cm
USAR 1/2" @ 0.125 m
(OK)
EJE 1-1 = EJE 2-2
Datos
Espesor de muro 0.15 m
Altura de muro 2.85 m
Espesor de tarrajeo 0.015 m
Ancho de sobrecimiento 0.15 m
Altura de sobrecimiento 0.45 m
Metrado de cargas
Peso de muro 769.5 Kg / m
Peso de tarrajeo 188.1 Kg / m
Peso de sobrecimiento 162 Kg / m
Pd= 1119.6 Kg / m
Carga Muerta 1119.60 Kg
Carga viva 300.00 Kg
Sobrecarga 300.00 Kg/m2
Peso especifico del suelo 1800.00 Kg/m3
Capacidad portante del suelo 0.79 Kg/cm2
Coeficiente de Balasto 10000.00 Ton/m3
Modulo de elasticidad 2170000.00 Ton/m3
Resistencia del concreto 100.00 Kg/cm2
Espesor de muro 0.15 m
Altura de relleno 0.20 m
Asumir H= 0.50 m
Tn= t - S/C - 2400*h - Ps*hs - 2200*0.15
5940.00 kg/m2
A=(P+0.15P) / Tn
0.24 cm2
Para L = 1.00 m
b = 0.24 m
Asuminos b = 0.60 m
DETERMINACIN DEL PERALTE
Fr = 1.3 x Fc
T <= f r
T = 6M
h x h
Fr = 84.50 Ton/m
e/2 Carga ltima
X Tu = 1.5xPd + 1.8xPv
L x b
Tu = 3.70 Ton/m2
Determinacin del momento ltimo
X = (b - e)/2 + e/4
X = 0.26 m
DISEO DE CIMIENTO CORRIDO
2
Mu = (Tu x X) / 2
b Mu = 0.13 Ton-m
DETERMINACIN DEL PERALTE "H"
H = 6M H = 0.45 m USAMOS H = 0.80 m
b x fr
EJE A = EJE C
Datos
Espesor de muro 0.15 m
Altura de muro 3 m
Espesor de tarrajeo 0.015 m
Ancho de sobrecimiento 0.15 m
Altura de sobrecimiento 0.4 m
Metrado de cargas
Peso de muro 810 Kg / m
Peso de tarrajeo 198 Kg / m
Peso de sobrecimiento 144 Kg / m
Pd= 1152 Kg / m
Carga Muerta 1152.00 Kg
Carga viva 300.00 Kg
Sobrecarga 300.00 Kg/m2
Peso especifico del suelo 1800.00 Kg/m3
Capacidad portante del suelo 0.55 Kg/cm2
Coeficiente de Balasto 10000.00 Ton/m3
Modulo de elasticidad 2170000.00 Ton/m3
Resistencia del concreto 140.00 Kg/cm2
Espesor de muro 0.15 m
Altura de relleno 0.20 m
Asumir H= 0.60 m
Tn= t - S/C - 2400*h - Ps*hs - 2200*0.15
3340.00 kg/m2
A=(P+0.15P) / Tn
0.43 cm2
Para L = 1.00 m
b = 0.43 m
Asuminos b = 0.50 m
DETERMINACIN DEL PERALTE
Fr = 1.3 x Fc
T <= f r
T = 6M
h x h
Fr = 99.98 Ton/m
e/2 Carga ltima
X Tu = 1.5xPd + 1.8xPv
L x b
Tu = 4.54 Ton/m2
Determinacin del momento ltimo
X = (b - e)/2 + e/4
X = 0.21 m
DISEO DE CIMIENTO CORRIDO
2
Mu = (Tu x X) / 2
b Mu = 0.10 Ton-m
DETERMINACIN DEL PERALTE "H"
H = 6M H = 0.31 m USAMOS H = 0.60 m
b x fr