Professional Documents
Culture Documents
OBRA:
EDO DE B.C.
SALARIO MINIMO:
59.82
59.82
DE CONTROL DE OBRA
DURACION DE LA OBRA:
RIESGO DE TRABAJO:
365.16
7.58875
CALENDARIO
AGUINALDO
365.16
PRIMA VAC.
15.00
7 DIA ART.69
VAC. ART 76
52
1.50
FESTIVO ART.74
6.00
ENFERMEDAD
7.16
COSTUMBRE
3.00
LLUVIA
3.00
SUMA
73.16
1.23714468
308.50
308.50
PORCENTAJES
CONCEPTO
381.655934 =
2.00
CLAVE
SALARIO
CLAVE
NIVEL BASICO
NIVEL MEDIO
NIVEL MANDO
MINIMO
418.74
678.36
688.91
791.42
930.44
1,256.22
1,591.21
1,804.77
2,478.94
3,119.61
3,718.41
4,962.07
7,441.01
59.82
96.91
98.42
113.06
132.92
179.46
227.32
257.82
354.13
445.66
531.20
708.87
1,063.00
1.00
1.62
1.65
1.89
2.22
3.00
3.80
4.31
5.92
7.45
8.88
11.85
17.77
AGUINALDO
4.110
2.46
3.98
4.04
4.65
5.46
7.38
9.34
10.60
14.55
18.31
21.83
29.13
43.68
PRIMA VACACIONAL
SALARIO BASE DE COTIZACION
0.411
0.25
62.52
0.40
101.29
0.40
102.86
0.46
118.17
0.55
138.93
0.74
187.57
0.93
237.59
1.06
269.48
1.46
370.14
1.83
465.81
2.18
555.21
2.91
740.91
4.37
1,111.05
16.500
59.82
9.87
9.87
9.87
9.87
9.87
9.87
9.87
9.87
9.87
9.87
9.87
9.87
9.87
DIFERENCIA DE S.M.G.
4.040
179.46
0.00
0.00
0.00
0.00
0.00
0.49
3.49
5.40
11.44
17.18
22.55
33.69
55.90
1.360
179.46
0.00
0.00
0.00
0.00
0.00
0.16
1.16
1.80
3.81
5.73
7.52
11.23
18.63
PRESTACIONES EN DINERO
0.700
0.44
0.71
0.72
0.83
0.97
1.31
1.66
1.89
2.59
3.26
3.89
5.19
7.78
0.250
0.16
0.25
0.26
0.30
0.35
0.47
0.59
0.67
0.93
1.16
1.39
1.85
2.78
1.050
0.66
1.06
1.08
1.24
1.46
1.97
2.49
2.83
3.89
4.89
5.83
7.78
11.67
0.375
0.23
0.38
0.39
0.44
0.52
0.70
0.89
1.01
1.39
1.75
2.08
2.78
4.17
1.750
1.09
1.77
1.80
2.07
2.43
3.28
4.16
4.72
6.48
8.15
9.72
12.97
19.44
0.625
0.39
0.63
0.64
0.74
0.87
1.17
1.48
1.68
2.31
2.91
3.47
4.63
6.94
3.150
1.97
3.19
3.24
3.72
4.38
5.91
7.48
8.49
11.66
14.67
17.49
23.34
35.00
1.125
0.70
1.14
1.16
1.33
1.56
2.11
2.67
3.03
4.16
5.24
6.25
8.34
12.50
1.00
0.63
1.01
1.03
1.18
1.39
1.88
2.38
2.69
3.70
4.66
5.55
7.41
11.11
7.58875
84.32
PRESTACIONES EN ESPECIE
INVALIDEZ Y VIDA
GUARDERIAS
RIESGO DE TRABAJO
4.74
7.69
7.81
8.97
10.54
14.23
18.03
20.45
28.09
35.35
42.13
56.23
SUMA TRABAJADOR $
1.48
2.41
2.44
2.81
3.30
4.62
6.81
8.20
12.60
16.79
20.70
28.83
45.02
SUMA PATRON $
19.40
25.31
25.55
27.88
31.04
38.94
49.56
56.34
77.72
98.03
117.02
156.46
235.08
20.88
33.40%
27.71
27.36%
27.99
27.21%
30.68
25.97%
34.34
24.72%
43.56
23.22%
56.37
23.73%
64.54
23.95%
90.32
24.40%
114.82
24.65%
137.72
24.81%
185.29
25.01%
280.10
25.21%
59.82
96.91
98.42
113.06
132.92
179.46
227.32
257.82
354.13
445.66
531.20
708.87
1,063.00
AGUINALDO
4.110
2.46
3.98
4.04
4.65
5.46
7.38
9.34
10.60
14.55
18.31
21.83
29.13
43.68
PRIMA VACACIONAL
0.411
0.25
0.40
0.40
0.46
0.55
0.74
0.93
1.06
1.46
1.83
2.18
2.91
4.37
62.52
101.29
102.86
118.17
138.93
187.57
237.59
269.48
370.14
465.81
555.21
740.91
1,111.05
20.88
25.31
25.55
27.88
31.04
38.94
49.56
56.34
77.72
98.03
117.02
156.46
235.08
83.41
126.59
128.41
146.05
169.97
226.51
287.16
325.82
447.86
563.84
672.24
897.37
1,346.13
55.55
INFONAVIT
5.00
3.13
5.06
5.14
5.91
6.95
9.38
11.88
13.47
18.51
23.29
27.76
37.05
SAR
2.00
1.25
2.03
2.06
2.36
2.78
3.75
4.75
5.39
7.40
9.32
11.10
14.82
22.22
87.78
133.68
135.61
154.32
179.70
239.64
303.79
344.68
473.77
596.45
711.10
949.24
1423.91
1.2371
1.2371
1.2371
1.2371
1.2371
1.2371
1.2371
1.2371
1.2371
1.2371
1.2371
1.2371
1.2371
103.19
156.62
158.86
180.68
210.28
280.23
355.25
403.08
554.07
697.55
831.66
1110.18
1665.36
1.7250
1.6161
1.6142
1.5981
1.5820
1.5615
1.5628
1.5634
1.5646
1.5652
1.5656
1.5661
1.5667
108.60
1.8155
165.39
1.7066
167.77
1.7047
190.92
1.6886
222.31
1.6725
296.47
1.6520
375.83
1.6533
426.42
1.6539
586.12
1.6551
737.89
1.6557
879.74
1.6561
1174.35
1.6567
1761.58
1.6572
NOTA: EL F.S.R. EN CASO DE SER SOLICITADO POR LA DEPENDENCIA DEBERA SER EL PROMEDIO PONDERADO DE LOS SUELDOS PAGADOS AL PERSONAL OBRERO
1.5886
1.6791
AMPLIACION CASA-HABITACION
Concurso:
INFONAVIT LINEA IV
Lugar:
Fecha:
DIECIEMBRE DE 2010
Analista:
ARQ. TOLEDO
FIRMA:
NOMBRE
PEON (1.62 S.M.)
OFICIAL LINIERO(# 26 C.N.S.M.) F.D.
AYUDANTE GENERAL(1.65 S.M.)
SUPERINTENDENTE(8.88 S.M.)
TOPOGRAFO(5.92 S.M.)
CADENERO(2 S.M.)
CHOFER DE CAMION (#21 C.N.S.M.) F.D.
CHOFER CAMIONETA (# 22 C.N.S.M.) F.D.
TAQUIMECANOGRAFA(#82 C.N.S.M.) F.D.
VELADOR(#86 C.N.S.M.) F.D.
CABO (3.75 S.M.)
SOBRESTANTE(5.92 S.M.)
DIRECTOR GENERAL(17.77 S.M.)
GERENTE DE CONSTRUCCION(11.85 S.M.)
RESIDENTE DE CONTROL DE OBRA(7.45 S.M.)
ANALISTA DE P.U. (5.92 S.M.)
AUXILIAR TECNICO(3.75 S.M.)
CONTADOR GENERAL(11.85 S.M.)
JEFE ADMINISTRATIVO (8.88 S.M.)
ALMACENISTA (7.45 S.M.)
BODEGUERO (# 30 C.N.S.M.) F.D.
JEFE DE PERSONAL (5.92 S.M.)
TOMADOR DE TIEMPO (2. S.M.)
AFANADORA (1.62 S.M.)
XXXXXXXXXXXXXXXXXX
UNIDAD
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
JOR
COSTO VIATICOS
UNITARIO
39.66
100.45
61.15
318.29
211.73
73.11
100.45
80.7
80.7
61.15
133.6
211.73
638.35
425.22
266.81
211.73
133.6
425.22
318.29
266.81
80.7
211.73
73.11
60.12
HOJA N 1
FECHA
COTIZACION
Trabajadores
Patrn :
Nmero de Registro Patronal:
Domicilio de la obra:
Lugar:
Duracion de la Obra:
Fecha de Inicio de los trabajos
Costo de la Obra:
Construccin M2:
Costo Directo por M2:
6 semanas
3 de Enero de 2011
168,000,00
35 m2 en planta alta
(45 m2 para cotizacion)
Planta baja existente (solo acondicionamiento)
3,733,33
CARGO
27896021033
Superintendente
555.21
25008418568
Albail
237.59
Albail
237.59
52008206097
Peon
101.29
25038501729
Peon
101.29
Page 4
Trabajadores
Page 5