Cover sheet

CLIENT :
NMDC Limited
3.0 MTPY INTERGRADED STEEL PLANT , NAGARNAR
CHHATTISGARH
RAW MATERIAL HANDLING SYSTEM
CONSULTANT:
EPC CONTRACTOR :
CIVIL CONTRACTOR
SNEHALATH , GREENLANDS, HYDERABAD
BHARATH HEAVY ELECTRICALS LIMITED
M E C O N L I M I T E D
ISG, BANGALORE
PRASAD AND CO (PROJECT WORKS) LIMITED
CIVIL CONSULTANTS
SUBJECT :
revision
NMDR/CVL/DBR/001 0 1 ST submission
design code date remarks
HBS INFRA ENGINEERS INDIA PVT LIMITED
DESIGN BASIS REPORT FOR CIVIL WORKS FOR OTHER THAN SILOS (Wagon
tipplers,tunnels, trucktipplers, stacker cum reclaimers etc.,)
Oct-11

HYDERABAD
HBS INFRA ENGINEERS INDIA PVT LIMITED
Project RAW MATERIAL HANDLING SYSTEM 3.0 MTPY INTERGRADED STEEL PLANT , NAGARNAR Date
Subject Design Criterion for Civil works Rev

Contents of This report
I Introduction
II Analysis and Design considerations for various types of structures
III List of Documents and Drawings

Introduction

A Civil designs and Drawings for WT complexes (WT1&2 & WT3&4) & Associated Structures like
Side arm charger foundation(near W.T),Weigh bridge foundation ( Near W.T) and WT shed foundations
B Under ground Tunnels for conveyors
C Truck Tippler (Underground structure , TT-1)
D Ground Hopper for Coke (Under ground structures )
E Pent houses , PH-1& PH-2
F Stacker Reclaimer
E Barrel Reclaimer
G Tranfer car foundations
H Coal / Ore Settling Pond
I Slag Settling Pond
Oct-11
Jan-00
This document contains analysis and design methodology of Civil works for the following
structures

HBS INFRA ENGINEERS INDIA PVT LIMITED
Project RAW MATERIAL HANDLING SYSTEM 3.0 MTPY INTERGRADED STEEL PLANT , NAGARNAR Date
Subject Design Criterion for Civil works Rev
Oct-11
Jan-00
Analysis and Design considerations
1 Configuration

**Side arm charger foundation : RCC block foundation
** Load cell weigh bridge foundation : Open foundation system
** Track stop foundations : Open foundation system
** WT shed foundations : Open foundation system
2 Materials Concrete Gr M25
Fe 500 Rafts bottom 75mm
top 50mm
sides 50mm
50 mm
CF's/tiebeams
inside face 30 mm In contact with earth 50mm
floor slabs 30 mm not in contact with earth 40mm
beams 30 mm Columns 40mm
Foundations 50mm
RCC hopper 30mm
3 Loading Dead load D Unit wt. Of concrete at 2.5 t/cum
Unit wt. Of brick work at 2.0 t/cum
Live load L 500 Kg/sqm on floors Unless other wise specified
LR 300 kg/sqm on accessible roof (150+100 water proofing+50 dust load)
LR 225 kg/sqm on Non accessible roof (75+100 water proofing + 50 dust load)
Equipment
Load
EQ
Coal Load CL
Iron Ore Load IL
SP case 1 Dry case with unit weight of soil = 1.8 t/cum
case 2 Water table case above WT 1.8 t/m
3
(Ka h)
below WT water pr (HP)+sub soil pr (SP)
Water table level shall be considered at graded ground level
Ka (earth pressure coefficient) Ka = Ko=0.5
It shall be considered as earth pressure at rest
Live load
surcharge
pressure
SCL 2 t/sqm (vertical surcharge) & Horizontal surcharge Pressure 2*0.5 = 1 t/sqm on pit walls
Seismic loads SL Zone - II as per IS:1893
Wind loads WL
Buoyancy check
Unit weight of Ore at 2.2 t/cum, Angle of repose = 37 deg
Reinf. Steel
Cover to reinf
Unit weight of coal at 1.05 t/cum, Angle of repose = 37 deg
Founding levels to
be based on
approved soil report
Reference
WT pit being an underground structure Wind loads are not Considered in the Analysis
and design
A)Wagon Tippler Complex
S.
No
Earth pressure
Structure Wagon Tippler Complex( For WT 1,2 3, 4)
** Wagon tippler pit is underground RCC box type structure with deep walls. The walls will be provided with
Counterforts at suitable intervals to reduce wall slenderness. Combined base raft supporting pit walls and
hopper supporting and other equipment supporting pedestals will be provided. The base raft is solid raft with
uniform thickness or inverted beam-slab system
Walls
Water table level shall be considered at graded ground level
in contact with
water/earth
WT pit being an underground structure seismic loads are not Considered in the
Analysis and design
As applicable i.e as per system drawings supplied by ELECON/BHEL For
Monorails/Hoists etc - An Impact factor of 1.25 will be considered in design
As per IS:875

HBS INFRA ENGINEERS INDIA PVT LIMITED
Project RAW MATERIAL HANDLING SYSTEM 3.0 MTPY INTERGRADED STEEL PLANT , NAGARNAR Date
Subject Design Criterion for Civil works Rev
Oct-11
Jan-00
4 LOAD
COBINATIO
NS
Load combinations (for U.G structures)
1 D+ SP +Buoyancy
2 D+L+EL( DL of Equip. load )
3 D+L+EL+SP
4 D+L+EQ Load+ EL(Dl of EQ) + Coal load
5 D+L+EL+ SP + (Operational loads) + coal load/Iron Ore load
6 D+L+EL+ SP + EQ load (Operational loads) +Buoyancy+ coal load/Iron Ore load
Case-1 Hopper full with top horizontal at grating level
5 ANALYSIS **3-D modelling using STAAD for Design of Raft,Beams,CF's etc
**Floor slabs using IS:456 coefficients for various support conditions
**Pit walls -BM's using Coefficients given in Engineering monograph no 27
Note:
6 Design
as per IS:456-2000 using Limit state method of design
Hopper walls
Minimum factor of safety wrt sliding = 1.5
Note
Spring constants to be considered for wagon tippler area considered as per soil report
Case-II Hopper Paritially empty with highest level of coal / Ore at grating level and making an angle of 37deg
with horizontal
S.
No
slabs , floor beams,
walls, columns and
isolated footings,
counterforts, tiebeams
etc.,
Stability against uplift
Structure Wagon Tippler Complex I & II ( For WT 1,2,3, 4) Reference
For under ground pit walls abutting rock, the lateral earth pressure coefficients will be calculated appropriately
giving due consideration to failure wedge formation. In such cases, generally there will not be any lateral
pressures developed. if the back fill behind the pit walls is done with PCC up to rock then no lateral earth
pressures are considered in the design of walls etc
Engg monograph no
27 will be enclosed
along with the
design report
The entire pit including walls and base raft will be modelled in STAAD for structural analysis. The
Counterforts,Tie beams and base raft are idealized using beam elements and soil is represented with linear
elastic springs with values of subgrade reactions (ks) attached to bottom of raft as supporting system
**Hopper walls -Bm's using Coefficients given in Engineering monograph no 27
If the miscellaneous foundations are resting on filled up soil , the same has to be checked
for filled up bearing pressure
Check for Base pressure
under foundations
will be designed as cracked section with limiting crack width 0.2mm on earth/water
face and 0.3mm away from earth /water face in accordance with IS 456 by Limit State
Method
Minimum factor of safety will be 1.2 considering only chartercristic Dead load at 0.9
times actual value
Pit walls & Rafts
The hopper walls are designed for lateral ( coal / Ore) pressure frictional forces during
filling and emptying and forces due to impact and filling of arches of coal / Iron Ore.
Will be checked with the SBC given in confirmatory soil report

HBS INFRA ENGINEERS INDIA PVT LIMITED
Project RAW MATERIAL HANDLING SYSTEM 3.0 MTPY INTERGRADED STEEL PLANT , NAGARNAR Date
Subject Design Criterion for Civil works Rev
Oct-11
Jan-00
B) Under Ground Tunnels

1

2 Materials Concrete Gr M25 Rafts bottom 75mm
FE 500 top 50mm
sides 50mm
CF's/tiebeams
50 mm
In contact with earth 50mm
inside face 30 mm not in contact with earth 30mm
floor slabs 30 mm
beams 30 mm
3 Loading Dead load D Unit wt. Of concrete at 2.5 t/cum
Live load L 500 Kg/sqm on floors Unless other wise specified
Equipment
Load
EQ
SP It shall be considered as Earth pressure at rest (Ka = Ko=0.5) and it shall be considered as following cases
case 1 Dry case with unit weight of soil = 1.8 t/cum
case 2 Water table level shall be considered at graded ground level
The Horizontal pressure = water pr (HP)+submerged soil pr(SP)
* overburden pressure shall be considered on Top slab of tunnel
Live load
surcharge
pressure
SCL 2 t/sqm (vertical surcharge) & Horizontal surcharge Pressure 2*0.5 = 1 t/sqm on pit walls
Seismic loads SL Zone - II as per IS:1893
Wind loads WL
Buoyancy
Reference
base raft/walls
Configuration
in contact with
water/earth
Water table level shall be considered at graded ground level
S.
No
Structure
Being an underground structure Wind loads are not Considered in the Analysis and
design
As applicable i.e as per system drawings supplied by ELECON/BHEL
Under ground Tunnels for conveyors
Reinf. Steel
Cover to reinf
RC tunnels are box type with or with out Cf's and beams with base raft with uniform thicknes or invert beam
slab system
As per IS:875
or Dispersion loads (arising out of railway load) through soil will be considered as 2
vert : 1 horz
Earth pressure
Being an underground structure, seismic loads are not Considered in the Analysis and
design

HBS INFRA ENGINEERS INDIA PVT LIMITED
Project RAW MATERIAL HANDLING SYSTEM 3.0 MTPY INTERGRADED STEEL PLANT , NAGARNAR Date
Subject Design Criterion for Civil works Rev
Oct-11
Jan-00
4
Load combinations
1 D+ SP +Buoyancy
2
3 D+L+EQ Load+SP
4 D+L+ SP + EQ load + Buoyancy
5 ANALYSIS **3-D modelling using STAAD for Design of Raft,Beams,CF's etc
6 Design
as per IS:456-2000 using Limit state method of design

C)TruckTippler /Ground Hoppers (Under ground structure)
LOAD
COBINATIO
NS
will be designed as cracked section with limiting crack width 0.2mm on earth/water
face and 0.3mm away from earth /water face in accordance with IS 456 by Limit State
Method
S.
No
Structure Under ground Tunnels for conveyors
D+L+EQ LOAD
The structure including walls and base raft will be modelled in STAAD for structural analysis. The
Counterforts, top beams and base raft are idealized using beam elements and soil is represented with linear
elastic springs with values of subgrade reactions (ks) attached to bottom of raft as supporting system
Water table level shall be considered at finished ground level
Reference
Check for Base pressure
under foundations
Slabs , floor beams,
walls, columns and
Counter forts, Tie
Beams etc.,
Will be checked with the SBC given in confirmatory soil report
minimum factor of safety will be 1.2 considering only chartercristic dead load at 0.9
times actual value
Pit walls & Raft,

HBS INFRA ENGINEERS INDIA PVT LIMITED
Project RAW MATERIAL HANDLING SYSTEM 3.0 MTPY INTERGRADED STEEL PLANT , NAGARNAR Date
Subject Design Criterion for Civil works Rev
Oct-11
Jan-00
1 Configuration

2 Materials Concrete Gr M25
Fe 500 Rafts bottom 75mm
top 50mm
sides 50mm
50 mm CF's/tiebeams
inside face 30 mm In contact with earth 50mm
floor slabs 30 mm not in contact with earth 40mm
beams 30 mm Columns 40mm
Foundations 50mm
RCC hopper 30mm
3 Loading Dead load D Unit wt. Of concrete at 2.5 t/cum
Unit wt. Of brick work at 2.0 t/cum
Live load L 500 Kg/sqm on floors Unless other wise specified
LR 300 kg/sqm on accessible roof (150+100 water proofing+50 dust load)
LR 225 kg/sqm on Non accessible roof (75+100 water proofing + 50 dust load)
Equipment EQ
Coal Load CL
SP case 1 Dry case with unit weight of soil = 1.8 t/cum
case 2 Water table case above WT 1.8 t/m
3
(Ka h)
below WT water pr (HP)+sub soil pr (SP)
Water table level shall be considered at graded ground level
Ka (earth pressure coefficient) Ka = Ko=0.5
It shall be considered as earth pressure at rest
Live load
surcharge
pressure
SCL 2 t/sqm (vertical surcharge) & Horizontal surcharge Pressure 2*0.5 = 1 t/sqm on pit walls
Seismic loads
SL Zone - II as per IS:1893
Wind loads WL
Buoyancy check
** Trucktippler pit is underground RCC box type structure with deep walls. The walls will be provided with
Counterforts at suitable intervals to reduce wall slenderness. Combined base raft supporting pit walls and
hopper supporting and other equipment supporting pedestals will be provided. The base raft is solid raft with
uniform thickness or inverted beam-slab system
Unit weight of coal at 1.05 t/cum, Angle of repose = 37 deg
Earth pressure
WT pit being an underground structure seismic loads are not Considered in the
As per IS:875
Reference
Reinf. Steel
Cover to reinf
Structure TruckTippler /Ground Hoppers (Under ground structure)
Walls
in contact with
As applicable i.e as per system drawings supplied by ELECON/BHEL For
WT pit being an underground structure Wind loads are not Considered in the Analysis
Water table level shall be considered at graded ground level
S.
No

HBS INFRA ENGINEERS INDIA PVT LIMITED
Project RAW MATERIAL HANDLING SYSTEM 3.0 MTPY INTERGRADED STEEL PLANT , NAGARNAR Date
Subject Design Criterion for Civil works Rev
Oct-11
Jan-00
4 LOAD
COBINATIO
NS Load combinations (for U.G structures)
1 D+ SP +Buoyancy
2 D+L+EL( DL of Equip. load )
3 D+L+EL+SP
4 D+L+EQ Load+ EL(Dl of EQ) + Coal load
5 D+L+EL+ SP + (Operational loads) + coal load/Iron Ore load
6 D+L+EL+ SP + EQ load (Operational loads) +Buoyancy+ coal load/Iron Ore load
Case-1 Hopper full with top horizontal at grating level
5 ANALYSIS **3-D modelling using STAAD for Design of Raft,Beams,CF's etc
**Floor slabs using IS:456 coefficients for various support conditions
**Pit walls -BM's using Coefficients given in Engineering monograph no 27
Note:
6 Design
as per IS:456-2000 using Limit state method of design
Hopper walls
Minimum factor of safety wrt sliding = 1.5
Note
Check for Base pressure
under foundations Will be checked with the SBC given in confirmatory soil report
If the miscellaneous foundations are resting on filled up soil , the same has to be checked
Engg monograph no
27 will be enclosed
along with the
design report
**Hopper walls -Bm's using Coefficients given in Engineering monograph no 27
For under ground pit walls abutting rock, the lateral earth pressure coefficients will be calculated appropriately
giving due consideration to failure wedge formation. In such cases, generally there will not be any lateral
pressures developed. if the back fill behind the pit walls is done with PCC up to rock then no lateral earth
pressures are considered in the design of walls etc
Pit walls & Rafts will be designed as cracked section with limiting crack width 0.2mm on earth/water
face and 0.3mm away from earth /water face in accordance with IS 456 by Limit State
Method
Structure TruckTippler /Ground Hoppers (Under ground structure) Reference
Case-II Hopper Paritially empty with highest level of coal / Ore at grating level and making an angle of 37deg
with horizontal
The entire pit including walls and base raft will be modelled in STAAD for structural analysis. The
Counterforts,Tie beams and base raft are idealized using beam elements and soil is represented with linear
elastic springs with values of subgrade reactions (ks) attached to bottom of raft as supporting system
The hopper walls are designed for lateral ( coal / Ore) pressure frictional forces during
filling and emptying and forces due to impact and filling of arches of coal / Iron Ore.
Stability against uplift Minimum factor of safety will be 1.2 considering only chartercristic Dead load at 0.9
Spring constants to be considered for trucktippler area considered as per soil report
slabs , floor beams,
walls, columns and
isolated footings,
counterforts, tiebeams
etc.,
S.
No

HBS INFRA ENGINEERS INDIA PVT LIMITED
Project RAW MATERIAL HANDLING SYSTEM 3.0 MTPY INTERGRADED STEEL PLANT , NAGARNAR Date
Subject Design Criterion for Civil works Rev
Oct-11
Jan-00
D Pent Houses for conveyors

1 Configuration

2 Materials Concrete Gr M25
Reinf. Steel FE 500
Cover to reinf

Footings 75 mm
. Columns 40mm
floor slabs 30 mm
beams 30 mm
3 Loading Dead load D Unit wt. Of concrete at 2.5 t/cum
Unit wt. Of brick work at 1.9 t/cum
Live load L 500 Kg/sqm on floors Unless other wise specified
LR 300 kg/sqm on accessible roof (150+100 water proofing+50 dust load)
LR 225 kg/sqm on Non accessible roof (75+100 water proofing + 50 dust load)
Equipment
Load
EQ
Wind loads WL
Seismic loads SL As IS 1893-2002/2005
4 LOAD
COBINATIO
NS 1 D+ L +EQ
2
3 D+SL/WL
5 ANALYSIS **3-D modeling using STAAD PRO/STRAP for Design of RC framed structure
**RC Roof slabs using IS:456 coefficients for various support conditions
6 Design
E Stacker cum Reclaimer Foundations
S.
No
Structure Pent houses , PH-1& PH-2

RC floor/roof slabs ,
pedestals and footings

As applicable I.e as per system drawings supplied by ELECON For
Monorails/Hoists etc - An Impact factor of 1.25 will be considered in design
As per IS:875
D+L+EQ+SL/WL
as per IS:456-2000 using Limit state method of design
Reference
RCC FRAMED STRUCTURE
Check for Base pressure
under foundations Will be checked with the SBC given in as per confirmatory soil report

HBS INFRA ENGINEERS INDIA PVT LIMITED
Project RAW MATERIAL HANDLING SYSTEM 3.0 MTPY INTERGRADED STEEL PLANT , NAGARNAR Date
Subject Design Criterion for Civil works Rev
Oct-11
Jan-00
1 Configuration
2 Materials Concrete Gr M25
Reinf. Steel FE 500
Cover to reinf

Footings 75 mm
Columns/ pedestals 40mm
tie beams 30 mm
3 Loading The following load cases will be considered at top of pedestal level (i.e at bottom of steel column)
D Dead load
LL Equipment loads/Wheel load diagram
4 LOAD
COBINATIO
NS 1 D+ Wheel loads
5 Design The columns Will be designed for axial load and bi-axial moments from the concepts given in
Indian/BS codes.
The tie beams , rail beams and footings as per IS:456-2000 using Limit state method of design
S.
No
Stacker cum Reclaimer Foundations Reference
The foundation System shall consist of RC frame at 3.0m c/c carrying the rail supporting beams which in turn
is having continous strip foundation 2.0 m below FGL with Net bearing Capacity of 20 t/m2 as per soil report (
by NMDC) The c/c distance of rail is 8.0m
Colummns/Pedestals,
Tiebeams, Rail Beams ,
and footings
Structure
Check for Base pressure
under foundations

Will be checked with the SBC given in as per confirmatory soil report

HBS INFRA ENGINEERS INDIA PVT LIMITED
Project RAW MATERIAL HANDLING SYSTEM 3.0 MTPY INTERGRADED STEEL PLANT , NAGARNAR Date
Subject Design Criterion for Civil works Rev
Oct-11
Jan-00
F Barrel Reclaimer
S.
No
Structure Reference
1 Configuration
The c/c distance of rail is 30 m

2 Materials Concrete Gr M25
Reinf. Steel FE 500
Cover to reinf

Footings 75 mm
wall 30mm
tie beams 30 mm
3 Loading The following load cases will be considered at top of pedestal level (i.e at bottom of steel column)
D Dead load
LL Equipment loads/Wheel load diagram
( Wheel load data will furished by vender/BHEL)
4 LOAD
COBINATIO
NS 1 D+ Wheel loads
5 Design The columns Will be designed for axial load and bi-axial moments from the
concepts given in Indian/BS codes.
The tie beams , rail beams and footings as per IS:456-2000 using Limit state
method of design
Check for Base pressure under foundations
Will be checked with the SBC given in soil report
Barrel Reclaimer
The barrel Reclaimer foundation shall be designed as RCC continuous wall type foundation which in turn is
having continous strip foundation 2.0 m below FGL with Net bearing Capacity of 20 t/m2 as per soil report ( by
Will be checked with the SBC given in as per confirmatory soil report

Colummns/Pedestals,
Tiebeams, Rail Beams ,
and footings
Check for Base pressure
under foundations

HBS INFRA ENGINEERS INDIA PVT LIMITED
Project RAW MATERIAL HANDLING SYSTEM 3.0 MTPY INTERGRADED STEEL PLANT , NAGARNAR Date
Subject Design Criterion for Civil works Rev
Oct-11
Jan-00
G Transfer foundations
S.
No
Structure Reference
1 Configuration

2 Materials Concrete Gr M25
Reinf. Steel FE 500
Cover to reinf

Raft 75 mm
walls 30mm
3 Loading The following load cases will be considered at top of pedestal level (i.e at bottom of steel column)
D Dead load
LL Equipment loads/Wheel load diagram
SL Earth pressure
case 1 Dry case with unit weight of soil = 1.8 t/cum
case 2 Water table case above WT 1.8 t/cum
3
(Ka h)
below WT considered under saturated condition ( (sat =2.1t/cum)
Ka (earth pressure coefficient) Ka = 0.279 ( as per coloumb's theory)
Water Pressure Water Pressure from Inside
Live load surcharge pressure SCL 2 t/sqm (vertical surcharge) &
Horizontal surcharge Pressure 2*0.279 = 0.58 t/sqm on r. walls
4 LOAD
COBINATIO
NS 1 D+ Wheel loads + SP
5 Design The wall will be designed for axial load and Earth Pressure from the concepts given in
IS/BS
The rafts as per IS:456-2000 using Limit state method of design

Check for Base pressure under foundations
Will be checked with the SBC given in soil report
Walls and raft
Check for Base pressure
under foundations Will be checked with the SBC given in as per confirmatory soil report
Earth pressure
Transfer Car foundations
The Travel car pit foundation shall be designed as RCC continuous wall type foundation which in turn is having
continuous raft foundation 2.5 m below FGL. A Maintainance bay provided nearer to the tranfer car

HBS INFRA ENGINEERS INDIA PVT LIMITED
Project RAW MATERIAL HANDLING SYSTEM 3.0 MTPY INTERGRADED STEEL PLANT , NAGARNAR Date
Subject Design Criterion for Civil works Rev
Oct-11
Jan-00
G. Coal/Ore/Slag Settling Pond
1 Configuration

2 Materials Concrete Gr M25
Reinf. Steel FE 500
Cover to reinf

Base slab 75 mm
walls 30mm
3 Loading The following load cases will be considered
D Dead load
L Live load
Earth pressure
SP case 1 Dry case with unit weight of soil = 1.8 t/cum
case 2 Water table case above WT 1.8 t/cum
3
(Ka h)
below WT considered under saturated condition ( (sat =2.1t/cum)
Ka (earth pressure coefficient) Ka = 0.279 ( as per coloumb's theory)
(active earth pressure as per IRC-6-2000)
Water Pressure Water Pressure from Inside
Live load surcharge pressure SCL 2 t/sqm (vertical surcharge) &
Horizontal surcharge Pressure 2*0.279 = 0.58 t/sqm on r. walls
4 1 D+ L + SP
D+L + WP
5 Design RCC slab and
raft and
supporting
system
The RCC R walls will be analysed and designs as per fundamental principles
designed using IS 456-2000/IS 3370
Will be checked with the SBC given in as per confirmatory soil report
LOAD
COBINATIO
NS
Check for Base pressure under
foundations

The Settling pond consists of RCC pit shall consists of RCC retaining walls on either sides and Base raft

HBS INFRA ENGINEERS INDIA PVT LIMITED
Project RAW MATERIAL HANDLING SYSTEM 3.0 MTPY INTERGRADED STEEL PLANT , NAGARNAR Date
Subject Design Criterion for Civil works Rev
Oct-11
Jan-00
CODES AND STANDARDS
General
IS: 875 Code of practice for design loads for building and structures.
IS: 1893 Criteria for Earthquake resistant design of structures
IS: 1911 Schedule of unit weight of building materials
Foundation
IS: 1080 Code of practice for design and construction of shallow foundations on Soils(other than raft, ring and shell)
IS: 1904 Code of practice for design and construction of foundations in soils: General requirements
IS: 2950 Code of practice for design and construction of raft foundations.
IS:2974 Code of practice for design and construction of machine foundations.(All Parts)
Concrete
IS: 456 Code of practice for plain and Reinforced concrete.
IS: 3370 Code of practice for concrete structures for the liquid retaining structures
IS: 13920 Ductile detailing of reinforced concrete structures subjected to seismic Forces Code of practice
IS: 4995 Criteria for design of reinforced concrete bins for storage of granular and powder materials
The following Indian codes and standards will be generally used for design of civil works. In all cases, the latest revisions with amendments, if any, will
be followed. For works not covered by Indian Standards, as applicable will be followed. In case where standards, either Indian or International, are not
available, good engineering practice, as approved by the Engineer-in-charge will be followed

HBS INFRA ENGINEERS INDIA PVT LIMITED
Project RAW MATERIAL HANDLING SYSTEM 3.0 MTPY INTERGRADED STEEL PLANT , NAGARNAR Date
Subject Design Criterion for Civil works Rev
Oct-11
Jan-00
G LIST OF DOCUMENTS AND DRAWINGS
Sno Drawing No
1 Design criterion for civil works -Raw Material handling plant
1 General Notes drawing
I Wagon tippler WT-1 ( Coal tippler)
1 Excavation drawing
2 General arrangement drawings
3 Reinforcement details of rafts
4 Reinforcement details of walls
5 Reinforcement details of Counter Forts,columns, Tiebeams
6 Reinforcement details of beams and slabs
7 RC details of Hopper
8 RC details of stair case
9 Misc details for mech stopper, load cell weigh bridge foundations
and pivot pinion piller details etc.,
10 Details of Side arm charger foundations
11 Details of WT shed foundations
12 Analysis and design of Wagon tippler compled and
associated structures ( Coal tippler)
II Wagon tippler WT-2 ( Coal tippler)
13 Excavation drawing
14 General arrangement drawings
15 Reinforcement details of rafts
16 Reinforcement details of walls
17 Reinforcement details of Counter Forts,columns, Tiebeams
18 Reinforcement details of beams and slabs
19 RC details of Hopper
20 RC details of stair case
21 Misc details for mech stopper, load cell weigh bridge foundations
and pivot pinion piller details etc.,
22 Details of Side arm charger foundations
23 Details of WT shed foundations
24 Analysis and design of Wagon tippler compled and
associated structures ( Coal tippler)
III Wagon tippler WT-3 ( Ore tippler)
25 Excavation drawing
26 General arrangement drawings
27 Reinforcement details of rafts
28 Reinforcement details of walls
29 Reinforcement details of Counter Forts,columns, Tiebeams
30 Reinforcement details of beams and slabs
31 RC details of Hopper
32 RC details of stair case
33 Misc details for mech stopper, load cell weigh bridge foundations
and pivot pinion piller details etc.,
34 Details of Side arm charger foundations
35 Details of WT shed foundations
36 Analysis and design of Wagon tippler compled and
associated structures ( Coal tippler)
IV Wagon tippler WT-4 ( Ore tippler)
37 Excavation drawing
38 General arrangement drawings
39 Reinforcement details of rafts
40 Reinforcement details of walls
41 Reinforcement details of Counter Forts,columns, Tiebeams
42 Reinforcement details of beams and slabs IS-1-RC-669-503-C2080 ( 6 sheets)
IS-1-DC-669-503-C2067 ( 1 sheet(s))
IS-1-CE-669-503-C2075 (1 sheet (s))
IS-1-CE-669-503-C2076 (9 sheet (s))
IS-1-RC-669-503-C2077 ( 6 sheets)
IS-1-RC-669-503-C2078 ( 2 sheets)
IS-1-RC-669-503-C2079 ( 2 sheets)
IS-1-RC-669-503-C2061 ( 6 sheets)
IS-1-RC-669-503-C2062 ( 1 sheet(s))
IS-1-RC-669-503-C2063 ( 1 sheet(s))
IS-1-RC-669-503-C2064 ( 1 sheet(s))
IS-1-RC-669-503-C2065 ( 1 sheet(s))
IS-1-RC-669-503-C2066 ( 1 sheet(s))
IS-1-DC-669-503-C2048 ( 1 sheet(s))
IS-1-CE-669-503-C2056
IS-1-CE-669-503-C2057 ( 9sheets)
IS-1-RC-669-503-C2058 ( 6 sheets)
IS-1-RC-669-503-C2059 ( 2 sheets)
IS-1-RC-669-503-C2060 ( 2 sheets)
IS-1-RC-669-503-C2043 ( 1 sheet(s))
IS-1-RC-669-503-C2044 ( 1 sheet(s))
IS-1-RC-669-503-C2045 ( 1 sheet(s))
IS-1-RC-669-503-C2046 ( 1 sheet(s))
IS-1-RC-669-503-C2047 ( 1 sheet(s))
IS-1-DC-669-503-C2024 ( 1 sheet(s))
IS-1-CE-669-503-C2037 (1 sheet (s))
IS-1-CE-669-503-C2038 ( 9sheets)
IS-1-RC-669-503-C2039 ( 6 sheets)
IS-1-RC-669-503-C2040 ( 2 sheets)
IS-1-RC-669-503-C2041 ( 2 sheets)
IS-1-RC-669-503-C2042 ( 6 sheets)
IS-1-RC-669-503-C2018 ( 6 sheets)
IS-1-RC-669-503-C2019 ( 1 sheet(s))
IS-1-RC-669-503-C2020 ( 1 sheet(s))
IS-1-RC-669-503-C2021 ( 1 sheet(s))
IS-1-RC-669-503-C2022 ( 1 sheet(s))
IS-1-RC-669-503-C2023 ( 1 sheet(s))
IS-1-RC-669-503-C2015 ( 6 sheets)
IS-1-RC-669-503-C2016 ( 2 sheets)
IS-1-RC-669-503-C2017 ( 2 sheets)
IS-1-CE-669-503-C2013
IS-1-CE-669-Gen notes-2000
Structure/ Title
IS-1-CE-669-503-C2014 ( 9sheets)

HBS INFRA ENGINEERS INDIA PVT LIMITED
Project RAW MATERIAL HANDLING SYSTEM 3.0 MTPY INTERGRADED STEEL PLANT , NAGARNAR Date
Subject Design Criterion for Civil works Rev
Oct-11
Jan-00
43 RC details of Hopper
44 RC details of stair case
45 Misc details for mech stopper, load cell weigh bridge foundations
and pivot pinion piller details etc.,
46 Details of Side arm charger foundations
47 Details of WT shed foundations
48 Analysis and design of Wagon tippler compled and
associated structures ( Coal tippler)
V Ground Hopper for Coke ( Under ground structure)
49 Excavation drawing
50 General arrangement drawings
51 Reinforcement details of rafts
52 Reinforcement details of walls
53 Reinforcement details of Counter Forts,columns, Tiebeams
54 Reinforcement details of beams and slabs
55 RC details of Hopper
56 RC details of stair case
57 Analysis and design of Ground Hopper
VI Truck tippler ( Under ground structure)
58 Excavation drawing
2 General arrangement drawings
3 Reinforcement details of rafts
4 Reinforcement details of walls
5 Reinforcement details of Counter Forts,columns, Tiebeams
6 Reinforcement details of beams and slabs
7 RC details of Hopper
8 RC details of stair case
9 Analysis and design of Ground Hopper
VI Tunnels for conv -1 ( double conv gallery)
24 Excavation drawing IS-1-CE-669-503-C2164 ( 1 sheet(s))
25 General arrangement drawings IS-1-CE-669-503-C2165 ( 1 sheet(s))
14 Reinforcement details of slabs,walls and rafts
15 Analysis and design of Tunnel for double conv
VII Tunnels for conv -2 ( double conv gallery)
16 Excavation drawing IS-1-CE-669-503-C2168 ( 1 sheet(s))
17 General arrangement drawings IS-1-CE-669-503-C2169 ( 1 sheet(s))
18 Reinforcement details of slabs,walls and rafts
19 Analysis and design of Tunnel for double conv
VIII Tunnels for conv -1 ( single conv gallery)
19 Excavation drawing
20 General arrangement drawings
21 Reinforcement details
22 Analysis and design of Tunnel for double conv
IX Pent House PH-1
19 GA of pent House for conv 1&2
20 Reinforcement details of foundations, columns
plinth beams, floor beams of Pent house-
21 Design of Pent house Ph-1
X Pent House PH-1
20 GA of pent House for conv 1&2
21 Reinforcement details of foundations, columns
plinth beams, floor beams of Pent house-
22 Design of Pent house Ph-1
XI Stacker Reclaimer on J17C1 (coal)
22 GA & RCC Detail of Foundation IS-1 GA-669-508-C1823
23 GA & RCC Detail of Typical Module. IS-1-GA-669-508-C1824
24 GA & RCC Detail of First & Lasl Module IS-1-GA-669-508-C1825
25 GA & RCC Detail of Flooring & drainage of Stacker Reclaimer area. IS-1-GA-669-508-C1826
24 GA & RCC Detail of Buffer Stopper & Other Miscellaneous Units. IS-1 GA-669-508-C1827
25 design calculation IS-4-DC-669-508-0 828
XII Stacker Reclaimer on J19C1 (coal)
26 GA & RCC Deiail of Foundation IS-1-GA-669-508-C1839
27 GA & RCC Detail of Typical Module. IS-1-GA-669-5C8-C1840
28 GA & RCC Detail of First & Last Module IS-1-GA-669-508-C1641
29 GA & RCC Detail of Flooring & drainage of Stacker Reclaimer area IS-1-GA-669-508-C1642
30 GA & RCC Detail of Buffer Stopper & Other Miscellaneous Units. IS-1-GA-669-508-C1843
31 Design calculation IS-4-DC-669-508-C1844
IS-1-CE-669-503-C2186 ( 1 sheet(s))
IS-1-RC-669-503-C2187 ( 1 sheet(s))
IS-1-DC-669-503-C2188 ( 1 sheet(s))
IS-1-DC-669-503-C2171
IS-1-CE-669-503-C2152 ( 1 sheet(s))
IS-1-RC-669-503-C2153 ( 1 sheet(s))
IS-1-RC-669-503-C-- ( 1 sheet(s))
IS-1-DC-669-503-C2154 ( 1 sheet(s))
IS-1-DC-669-503-C2167
IS-1-CE-669-503-C2151 ( 1 sheet(s))
IS-1-DC-669-503-C--- ( 1 sheet(s))
IS-1-RC-669-503-C2170
IS-1-RC-669-503-C2166
IS-1-RC-669-503-C2139 ( 1 sheet(s))
IS-1-CE-669-503-C ---- (1 sheet (s))
IS-1-CE-669-503-C--- (5 sheet (s))
IS-1-CE-669-503-C2186 ( 1 sheet(s))
IS-1-RC-669-503-C2187 ( 1 sheet(s))
IS-1-DC-669-503-C2188 ( 1 sheet(s))
IS-1-RC-669-503-C--- ( 1 sheets)
IS-1-RC-669-503-C--- ( 1 sheets)
IS-1-RC-669-503-C-- ( 2 sheets)
IS-1-RC-669-503-C-- ( 1 sheet(s))
IS-1-RC-669-503-C--- ( 1 sheets)
IS-1-DC-669-503-C2086 ( 1 sheet(s))
IS-1-CE-669-503-C2132 (1 sheet (s))
IS-1-CE-669-503-C2133 (5 sheet (s))
IS-1-RC-669-503-C2134 ( 1 sheets)
IS-1-RC-669-503-C2135 ( 1 sheets)
IS-1-RC-669-503-C2136 ( 1 sheets)
IS-1-DC-669-503-C2040 ( 1 sheet(s))
IS-1-RC-669-503-C2137 ( 2 sheets)
IS-1-RC-669-503-C2138 ( 1 sheet(s))
IS-1-RC-669-503-C2081 ( 1 sheet(s))
IS-1-RC-669-503-C2082 ( 1 sheet(s))
IS-1-RC-669-503-C2083 ( 1 sheet(s))
IS-1-RC-669-503-C2084 ( 1 sheet(s))
IS-1-RC-669-503-C2085 ( 1 sheet(s))

HBS INFRA ENGINEERS INDIA PVT LIMITED
Project RAW MATERIAL HANDLING SYSTEM 3.0 MTPY INTERGRADED STEEL PLANT , NAGARNAR Date
Subject Design Criterion for Civil works Rev
Oct-11
Jan-00
XIII Stacker Reclaimer on J9C1 (ore)
32 GA & RCC Detail of Foundation IS-1-GA-669-508-C1855
33 GA & RCC Detail of Typical Module. IS-1-GA-669-508-C1856
34 GA & RCC Detail of First & Last Module. IS-I-GA-669-508-C1857
35 GA & RCC Detail of Flooring & drainage of Stacker Reclaimer area IS-1-GA-669-508-C1858
36 GA & RCC Detail of Buffer Stopper & Olher Miscellaneous Units. IS-1-GA-669-508-C1859
37 Design calculation IS-4-DC-669-508-C1860
XIV Stacker Reclaimer on J10C1 (ore)
36 GA & RCC Detail of Foundation IS 1-GA-669-508-C1866
37 GA & RCC Detail of Typical Module IS- 1-GA-669-508-C1867
38 GA & RCC Delail of First & Last Module IS-1-GA-669-508-C1B68
39 GA & RCC Detail of Floonng & drainage of Slacker Reclaimer area. IS-1-GA-669-508-C1869
40 GA & RCC Delail of Buffer Stopper & Other Miscellaneous Unils. IS-1-GA-669-508-C1870
41 Design calculation IS-4-DC-669-508-C1871
XV Stacker Reclaimer on J11C1 (ore)
41 GA & RCC Detail of Foundation IS-1-GA-669-508-C1877
42 GA & RCC Detail of Typical Module. IS-1-GA-669-508-C1878
43 GA & RCC Detail of First & Last Module. IS-1-GA-669-508-C1879
44 GA & RCC Detail of Flooring & drainage of Stacker Reclaimer area. IS-1-GA-669-508-C1880
45 GA & RCC Detail of Buffer Stopper & Other Miscellaneous Units. IS-1-GA-669-508-C1831
46 Design calculation IS-4-DC-669-508-C1882
XVI Stacker Reclaimer on J127C1 (ore)
47 GA & RCC Detail of Foundation IS-1-GA-669-508-C1893
48 GA & RCC Detail of Typical Module. IS-1-GA-669-508-C1894
49 GA & RCC Detail of First & Last Module IS-1-GA-669-508-C1895
50 GA & RCC Delail of Floonng & drainage of Stacker Reclaimer area IS-1-GA-669-508-O896
51 GA & RCC Detail of Buffer Stopper & Other Miscellaneous Unils. IS-1-GA-669-508-C1897
49 Design calculation IS-4-DC-669-508-C1898
XVII Slew Stacker
50 General Arrangement of Foundation for Slew stacker including drainage IS-1 -GA-669-508-C1904
51 RCC details of Foundation for Slew stacker including drainage IS-1-CE-669-508-C1905
52 Design calculation for foundation of slew stacker IS-4-DC-669-508-C1906
XVIII Barrel Reclaimer
53 General Arrangement of Foundation for Barrel Reclaimer including IS-1-GA-669-508-C1912
drainage
54 RCC delails of Foundation for Barrel Reclaimer including drainage IS-1-CE-669-508-C1913
55 Design calculation for foundation of Barrel reclaimer IS-1-GA-669-508-C1914
XIX Transfer Car Foundation
56 General Arrangemen! of Foundation for Transfer car foundation including drainaqe IS-1 -GA-669-504 Ci 920
57 RCC details of Foundation for Transfer car foundation including drainage IS-1-CE-669-504-C1921
Design calculation for foundation of Transfer car foundation IS 4-DC-669-504-C1922
xx Culvert
58 Typical drawing of RCC box/pipe culvert IS-1-GA-669-511-C1959
59 Typical drawing of Hume pipe culvert IS-1-GA-669-511-C1960
60 Design calculation for Culvert IS-4-DC-669-511-C1961
xxi Coal Settling Pond
61 General Arrangement drawings IS-1 -GA-669-511-C2200
62 RCC details of coal settling pond (raft , walls and slabs and beams) , IS-1-CE-669-504-C2201 (2 sheets)
63 Design calculations IS 4-DC-669-504-C2203
xxii Ore Settling Pond
64 General Arrangement drawings IS-1 -GA-669-504 C 2210 (2sheets)
65 RCC details of coal settling pond (raft , walls and slabs and beams) , IS-1-CE-669-504-C2211
66 Design calculations IS 4-DC-669-504-C2212
xxiii Slag Settling Pond
67 General Arrangement drawings IS-1 -GA-669-504 C 2215
68 RCC details of coal settling pond (raft , walls and slabs and beams) , IS-1-CE-669-504-C 2216
69 Design calculations IS 4-DC-669-504-C2217
xxiv Road system
70 General layout of Road net work for RMHS IS-1 -GA-669-504 C 2220
71 Typical cross section of road (with drainage system) IS-1-CE-669-504-C 2221
xxv Foundations for flood light towers
72 General Arrangement drawings IS-1 -GA-669-504 C2222
73 RCC details of coal settling pond (raft , walls and slabs and beams) , IS-1-CE-669-504-C223
73 Design calculations IS 4-DC-669-504-C2224