Assessment of Transversely loaded piles in Cohesive Soil


d
Cu
Hu
g
gHu
M yield

0.45
25
75
1.30
97.5
105.2

m
kN/m
kN

1.5d =
0.675 m
9Cud = 101.25 kN/m
L = 1.5d + f + g

kN
KNm

f=

Hu

(7.9)

9Cu d

2
Mmax = 2.25d g Cu

(7.10b)

Hu = 9Cu d ( L 1.5d)

(7.11)

Mmax = Hu ( 0.5L 0.75d)


(7.12)
2
My = 2.25Cu d g 9Cu d f ( 1.5d 0.5f)
Hu =

2My

(7.14)

( 1.5d 0.5f)

Hu, kN

Short piles
Intermediate Piles
L <= 1.592
m
1.592 < L <= 4.186
Hu max
Mmax
L Hu max
f
g
M top
Mmax
L EQ.
(kN) (kNm)
(m)
(kN)
(m)
(m)
(kNm)
(kNm)
(m)
7.11 P&D 7.12 P&D
7.9 P&D 7.13 P&D
(Myield)7.10b P&D
1.000
32.9
27.6
1.050
38.0
32.7
1.100
43.0
38.2
1.150
48.1
43.9
1.200
53.2
49.8
1.250
58.2
56.0
1.300
63.3
62.5
1.350
68.3
69.2
1.400
73.4
76.2
1.450
78.5
83.4
1.500
83.5
90.8
1.592
92.8
105.2
1.750
1.750
93.2
0.920
0.155
105.20
0.60
2.000
2.000
95.2
0.940
0.385
105.20
3.75
2.185
2.185
97.5
0.963
0.547
105.20
7.57
2.285
2.285
99.0
0.978
0.632
105.20
10.10
2.385
2.385
100.8
0.995
0.715
105.20
12.94
2.485
2.485
102.6
1.013
0.797
105.20
16.06
3.000
3.000
114.2
1.128
1.197
105.20
36.28
4.000
4.000
143.1
1.413
1.912
105.20
92.51
4.100
4.100
146.3
1.445
1.980
105.20
99.24
4.186
4.186
149.1
1.472
2.039
105.20
105.19
5.000
5.500
6.000
6.500
7.000
7.500
8.000
Because the Mult of each
Because the Mult of each pile is 105.2KNm, any length
pile is 105.2KNm, any length over 4.186m will be beyond the capability of intermediate
over 1.592m will be beyond piles.
the capability of short piles.

(7.13)

Date:
25-Nov-05
Long Piles
L > 4.186 m
L
f Hu max Mmax
(m)
(m)
(kN) (kNm)
7.9 P&D

5.000
5.500
6.000
6.500
7.000
7.500
8.000

1.472
1.472
1.472
1.472
1.472
1.472
1.472

149.1
149.1
149.1
149.1
149.1
149.1
149.1

160.0
140.0
120.0
100.0
80.0
60.0
40.0
20.0
0.0
0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

Embedded Length, m
Prepared by: