STATE TRANSPORTATION
IMPROVEMENT PROGRAM

Division 1
Bertie
Camden
Chowan
Currituck
Dare
Gates
Hertford
Hyde
Martin
Northampton
Pasquotank

Perquimans
Tyrrell
Washington

R-5739

B-5603

46
I-5839

NORTHAMPTON
158

B-4920

R-2507C

B-4919

158

GATES

35

AV-5773

343

HERTFORD

R-5505

R-5311A

AV-5772

17
37

258

B-5106

42

R-4467

32

R-5716

308

11

BERTIE

45
R-5506

Elizabeth
City

R-2576

CAMDEN
AV-5770

BRIDGES FUNDED THROUGH STI

344

R-5740

PERQUIMANS

305

DIVISION 1

CURRITUCK

B-5139

AV-5769

13

DRAFT STIP
FY 2015-2025
STI Projects

R-5717

STATEWIDE AVIATION

158
B-4783

REGIONAL AVIATION

PASQUOTANK

DIVISION AVIATION

R-5731

17

CHOWAN

DIVISION FERRY

R-5738

REGIONAL RAIL

R-5014

R-3620

903
13

64

R-3826

B-4577

AV-5771

R-4705
B-5503

DIVISION RAIL
REGIONAL TRANSIT

B-4648

DIVISION TRANSIT

64

TYRRELL

SAFETY

TRANSITION *

WASHINGTON

TRANSITION *

INTERSTATE MAINTENANCE

B-2500

MARTIN

STATEWIDE HIGHWAY

B-2500B

171
94

REGIONAL HIGHWAY
DIVISON HIGHWAY

DIVISION BIKE/PEDESTRIAN

DARE

INTERSTATE ROUTE
US ROUTE

NC ROUTE

SECONDARY ROAD

B-5508

MUNICIPAL BOUNDARIES

B-5600

MILITARY BASE

264

NCDOT DIVISION BOUNDARY


COUNTY BOUNDARY

HYDE

WATER FEATURES

* Note: Reflects 108 of the Major Transition Projects

F-5700

B-5610

12

Note: FY 2015 projects represent major projects not


let as of November 2014

TG-5252

10
Miles

20

DIVISION 00

HIGHWAY PROGRAM

COUNTY

WAKE

ROUTE/CITY

NC 00

ROUTE/CITY
I - Interstate
US or NC Routes
SR - Secondary Road
Various - multiple routes
NEW ROUTE or City

ID
NUMBER
R-0000

SW

IDENTIFICATION NUMBER
Assigned to each project at
conception and remains with
project until completion.

LOCATION / DESCRIPTION

I-40 TO NC 96 EAST OF HOMETOWN.


WIDEN TO A FOUR-LANE FACILITY
WITH A BYPASS OF HOMETOWN
ON NEW LOCATION.

7.3

63,450

250

FUNDS

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS


PRIOR
TOTAL
LENGTH PROJECT YEARS
COST
COST
(MILES)
(THOU) (THOU)

STATE TRANSPORTATION IMPROVEMENT PROGRAM


FY 2015

NHP R
NHP M
NHP U
NHP
NHP
NHP
NHP
NHP

LOCATION / DESCRIPTION
Project termini and a general
work description.
FUNDING SOURCE (2)
See Highway Funding Key
for an explanation of funding categories
used for each project phase.

SW
SW
SW

A
B
C

FY 2016

FY 2017

FY 2018

FY 2020

FY 2021

FY 2022

FY 2023

FY 2024

FY 2025

FUTURE YEARS

4000 A
700
1500
C 9000 A
R

3000 B
U

5000 B

5000 B

5000 B

C
R
C

5000 B
10000 C
20000 C

I-40 TO NC 3
NC 3 TO SR 1003
SR 1003 TO NC 96
PROJECT BREAKS
One or two letter
designation for project
break.

FUNDING CATEGORY (1)


Identifies the "STI" Funding
Category for the project and
any project breaks.

FY 2019

UNFUNDED

DEVELOPMENTAL PROGRAM

WORK TYPE (ACTIVITY) (3)


Phases of implementation:
Preliminary engineering, Right of Way,
Mitigation, Utilities or Construction.
For other work types or activities see
Work Type (Activity) box below.

ESTIMATED COST Preliminary engineering, right of


way, utility, mitigation and construction cost estimates
by funding category in current dollars. Cost may
include one or more funding types. Multi-year funding
of a project segment indicates (Cash-Flow Funding)
with proposed work type or activity beginning in the
initial scheduled year. (Estimates are in thousand of
dollars.)

(1) FUNDING CATEGORY

(2) FUNDING KEY FOR HIGHWAY FUNDING SOURCES

(3) WORK TYPE (ACTIVITY)

DIV - Division
EX - Exempt
HF - State Dollars (Non-STI)
REG - Regional
SW - Statewide
TRN -Transition Project

APD - Appalachian Development


BOND (R) - Revenue Bond
CMAQ - Congestion Mitigation
DP - Discretionary or Demonstration
ER - Emergency Relief Funds
FED - Federal Rail Funds
FLPI - Federal Lands Program (Indian Reservation Roads)
HFB - Highway Fund Bridge Replacement Program
HP - Federal-Aid High Priority
HRRR - High Risk Rural Roads
HSIP - Highway Safety Improvement Program
L - Local
NHP - National Highway Performance Program

A - Acquisition
C - Construction
CG - Construction (GARVEE)
F - Feasibility Study
G - Grading and Structures
I - Implementation
L - Landscaping
M - Mitigation
O - Operations
P - Paving
PE - Preliminary Engineering
R - Right of Way
RG - Right of Way (GARVEE)
S - Structure
U - Utilities

NHPB - National Highway Performance Program (Bridge)


NHPIM - National Highway Performance Program (Interstate Maintenance)
O - Others
RR - Rail-Highway Safety
S (M) - State Match
SRTS - Safe Routes to School
STP - Surface Transportation Program
STPDA - Surface Transportation Program - Direct Attributable
STPEB - Surface Transportation Program, Enhancements (Bike)
STPON - Surface Transportation Program Bridge (On System Bridge)
STPOFF -Surface Transportation Program (Off System Bridge)
T - State Highway Trust Funds
TAP - Transportation Alternatives Program

UNFUNDED
FFUTURE
COMMITMENTS

HIGHWAY PROGRAM
DIVISION

COUNTY
BERTIE

ROUTE/CITY
RURAL PROJECTS
US 17

ID
NUMBER
R-5506

US 17

7.3

3228

SOUTH END OF CHOWAN RIVER BRIDGE TO


US 17 BUSINESS IN EDENTON. UPGRADE
FREEWAY TO INTERSTATE STANDARDS.

8.5

42943

FS-1501A US 64 IN WILLIAMSTON TO VIRGINIA STATE


LINE. UPGRADE TO INTERSTATE
STANDARDS.

79

R-5731
DIV

FEASIBILITY STUDIES
US 13/US 17
BERTIE
CAMDEN
CHOWAN
MARTIN
PASQUOTANK
PERQUIMANS

LENGTH

SR 1364 (LEDREW PERRY ROAD) TO


CHOWAN RIVER. PAVEMENT
STRENGTHENING AND RESURFACING.

TRN

BERTIE
CHOWAN

LOCATION / DESCRIPTION

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

TOTAL PRIOR
PROJ YEARS
COST COST
(THOU) (THOU) FUNDS

STATE TRANSPORTATION PROGRAM


FY 2016

FY 2015

FY 2017

FY 2018

UNFUNDED

DEVELOPMENTAL PROGRAM

FY 2019

FY 2020

FY 2021

FY 2022

FY 2023

FY 2024

FY 2025

FUTURE YEARS

3228

UNDER CONSTRUCTION
T
T

3000
C

9986

29957

SCHEDULED FOR FEASIBILITY STUDY


BERTIE

FEDERAL BRIDGE PROJECTS


US 13

B-5141
SW

BERTIE

US 13

B-4916

REPLACE BRIDGE NO. 53 OVER WHITE OAK


SWAMP.

2813

REPLACE BRIDGE NO. 57 OVER


QUIOCCOSION SWAMP.

1020

2813
UNDER CONSTRUCTION
30 HFB
HFB

90
C

900

HF
BERTIE

SR 1200
(CONNARITSA ROAD)

B-5106

REPLACE BRIDGE NO. 148 OVER WAHTON


CREEK.

810

DIVISION 1 PURCHASE ORDER CONTRACT


BRIDGE REPLACEMENT PROJECTS AT
SELECTED LOCATIONS.

27227

100 STPOFF
STPOFF

60
C

650

DIV
BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

VARIOUS

BD-5101

DIVISION PURCHASE ORDER CONTRACT (DPOC)


R
200
25227 STPOFF
STPOFF
C
1800

DIV
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

DIV - Division Category


EX - Exempt Category
HF - State Dollars (Non STI) REG - Regional Category
SW - Statewide Category
TRN - Transition Project

1-7

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO


SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE

HIGHWAY PROGRAM
DIVISION

COUNTY

ROUTE/CITY
MITIGATION PROJECTS
VARIOUS

BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

ID
NUMBER
EE-4901

LOCATION / DESCRIPTION

LENGTH

ECOSYSTEMS ENHANCEMENT PROGRAM


FOR DIVISION 1 PROJECT MITIGATION.

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

TOTAL PRIOR
PROJ YEARS
COST COST
(THOU) (THOU) FUNDS
19816

STATE TRANSPORTATION PROGRAM


FY 2015

FY 2016

FY 2017

FY 2018

FY 2019

UNFUNDED

DEVELOPMENTAL PROGRAM
FY 2020

FY 2021

FY 2022

FY 2023

FY 2024

FY 2025

FUTURE YEARS

19816

IN PROGRESS
HAZARD ELIMINATION PROJECTS
VARIOUS

BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

W-5201

DIVISION 1 RUMBLE STRIPS, GUARDRAIL,


SAFETY AND LIGHTING IMPROVEMENTS AT
SELECTED LOCATIONS.

595

595

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS


RURAL PROJECTS
CAMDEN
US 158/NC 34

CAMDEN
CURRITUCK

SR 1227/SR 1208

R-2414*

R-5717

(SOUTH MILLS ROAD)


SR 1224/SR 1223

EAST OF PASQUOTANK RIVER IN ELIZABETH


CITY TO EAST OF NC 34 IN BELCROSS.
WIDEN TO MULTI-LANES.

5.3

NC 343 IN CAMDEN COUNTY TO PROPOSED


NC 168 BYPASS IN CURRITUCK COUNTY.
WIDEN AND INTERSECTION IMPROVEMENTS.

10.9

US 17 BUSINESS (NORTH ROAD STREET) TO


EAST OF PASQUOTANK RIVER IN ELIZABETH
CITY. RECONSTRUCT ROADWAY AND
REPLACE BRIDGE NO.19.

0.6

48568

48568
A
B

EAST OF PASQUOTANK RIVER IN ELIZABETH CITY TO SOUTH OF SR 1139 (COUNTRY CLUB ROAD) - COMPLETE
SOUTH OF SR 1139 (COUNTRY CLUB ROAD) TO EAST OF NC 34 IN BELCROSS - UNDER CONSTRUCTION

T
T

12640

100
C

12540

(OLD SWAMP ROAD)


DIV
URBAN PROJECTS
CAMDEN
US 158
PASQUOTANK

U-4438

89305

89305

UNDER CONSTRUCTION
FEASIBILITY STUDIES
US 13/US 17

BERTIE
CAMDEN
CHOWAN
MARTIN
PASQUOTANK
PERQUIMANS

FS-1501A US 64 IN WILLIAMSTON TO VIRGINIA STATE


LINE. UPGRADE TO INTERSTATE
STANDARDS.

79

SCHEDULED FOR FEASIBILITY STUDY

DIV - Division Category


EX - Exempt Category
HF - State Dollars (Non STI) REG - Regional Category
SW - Statewide Category
TRN - Transition Project

1-8

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO


SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE

HIGHWAY PROGRAM
DIVISION

COUNTY

ROUTE/CITY

FEDERAL BRIDGE PROJECTS


CAMDEN
SR 1235

ID
NUMBER
B-4453

LOCATION / DESCRIPTION
REPLACE BRIDGE NO. 19 OVER CREEK.

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

TOTAL PRIOR
PROJ YEARS
COST COST
(THOU) (THOU) FUNDS
1435

(CAROLINA ROAD)

STATE TRANSPORTATION PROGRAM


FY 2015

FY 2016

FY 2017

FY 2018

5 HFB
HFB

FY 2019
R

UNFUNDED

DEVELOPMENTAL PROGRAM
FY 2020

FY 2021

FY 2022

FY 2023

FY 2024

FY 2025

FUTURE YEARS

130
C

1300

HF
BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

VARIOUS

BD-5101

DIVISION 1 PURCHASE ORDER CONTRACT


BRIDGE REPLACEMENT PROJECTS AT
SELECTED LOCATIONS.

27227

25227 STPOFF
STPOFF

R
C

200
1800

DIV
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
MITIGATION PROJECTS
VARIOUS

BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

EE-4901

ECOSYSTEMS ENHANCEMENT PROGRAM


FOR DIVISION 1 PROJECT MITIGATION.

19816

19816

IN PROGRESS
HAZARD ELIMINATION PROJECTS
VARIOUS

BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

W-5201

DIVISION 1 RUMBLE STRIPS, GUARDRAIL,


SAFETY AND LIGHTING IMPROVEMENTS AT
SELECTED LOCATIONS.

595

595

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

DIV - Division Category


EX - Exempt Category
HF - State Dollars (Non STI) REG - Regional Category
SW - Statewide Category
TRN - Transition Project

1-9

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO


SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE

HIGHWAY PROGRAM
DIVISION

COUNTY

ROUTE/CITY

ENHANCEMENT (CALL PROJECTS)


VARIOUS
ALAMANCE
BEAUFORT
BRUNSWICK
BUNCOMBE
CAMDEN
CHOWAN
CRAVEN
DARE
DURHAM
EDGECOMBE
GUILFORD
HALIFAX
LENOIR
PASQUOTANK
WASHINGTON
WAYNE

ID
NUMBER
E-5501

LOCATION / DESCRIPTION

LENGTH

FREEDOM ROADS. INSTALL INTERACTIVE


WAYSIDE SIGNAGE FOR DESIGNATED SITES.

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

TOTAL PRIOR
PROJ YEARS
COST COST
(THOU) (THOU) FUNDS
224

STPE
O

STATE TRANSPORTATION PROGRAM


FY 2015
C
C

FY 2016

FY 2017

FY 2018

UNFUNDED

DEVELOPMENTAL PROGRAM

FY 2019

FY 2020

FY 2021

FY 2022

FY 2023

FY 2024

FY 2025

FUTURE YEARS

96
128

TRN

BERTIE
CHOWAN

RURAL PROJECTS
US 17

R-5731

SOUTH END OF CHOWAN RIVER BRIDGE TO


US 17 BUSINESS IN EDENTON. UPGRADE
FREEWAY TO INTERSTATE STANDARDS.

8.5

FS-1501A US 64 IN WILLIAMSTON TO VIRGINIA STATE


LINE. UPGRADE TO INTERSTATE
STANDARDS.

79

DIV
FEASIBILITY STUDIES
US 13/US 17
BERTIE
CAMDEN
CHOWAN
MARTIN
PASQUOTANK
PERQUIMANS

42943

T
T

3000
C

9986

29957

SCHEDULED FOR FEASIBILITY STUDY


FEDERAL BRIDGE PROJECTS
CHOWAN
NC 32

B-5507

HF
CHOWAN

SR 1200
(MACEDONIA-MEXICO ROAD)

B-5501

REPLACE BRIDGE NO. 24 OVER WARWICK


CREEK, BRIDGE NO. 20 OVER DILLARD
CREEK, AND BRIDGE NO. 21 OVER SAND
RUN.

3123

REPLACE BRIDGE NO. 3 OVER PEMBROKE


CREEK.

1210

DIVISION 1 PURCHASE ORDER CONTRACT


BRIDGE REPLACEMENT PROJECTS AT
SELECTED LOCATIONS.

27227

HFB
HFB
HFB

R
M

280
43
C

HFB
HFB

2800

110
C

1100

HF
BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

VARIOUS

BD-5101

25227 STPOFF
STPOFF

R
C

200
1800

DIV
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

DIV - Division Category


EX - Exempt Category
HF - State Dollars (Non STI) REG - Regional Category
SW - Statewide Category
TRN - Transition Project

1-10

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO


SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE

HIGHWAY PROGRAM
DIVISION

COUNTY

ROUTE/CITY
MITIGATION PROJECTS
VARIOUS

BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

ID
NUMBER
EE-4901

LOCATION / DESCRIPTION

LENGTH

ECOSYSTEMS ENHANCEMENT PROGRAM


FOR DIVISION 1 PROJECT MITIGATION.

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

TOTAL PRIOR
PROJ YEARS
COST COST
(THOU) (THOU) FUNDS
19816

STATE TRANSPORTATION PROGRAM


FY 2015

FY 2016

FY 2017

FY 2018

FY 2019

UNFUNDED

DEVELOPMENTAL PROGRAM
FY 2020

FY 2021

FY 2022

FY 2023

FY 2024

FY 2025

FUTURE YEARS

19816

IN PROGRESS
HAZARD ELIMINATION PROJECTS
VARIOUS

BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

W-5201

DIVISION 1 RUMBLE STRIPS, GUARDRAIL,


SAFETY AND LIGHTING IMPROVEMENTS AT
SELECTED LOCATIONS.

595

595

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS


ENHANCEMENT (CALL PROJECTS)
VARIOUS
ALAMANCE
BEAUFORT
BRUNSWICK
BUNCOMBE
CAMDEN
CHOWAN
CRAVEN
DARE
DURHAM
EDGECOMBE
GUILFORD
HALIFAX
LENOIR
PASQUOTANK
WASHINGTON
WAYNE

E-5501

FREEDOM ROADS. INSTALL INTERACTIVE


WAYSIDE SIGNAGE FOR DESIGNATED SITES.

224

STPE
O

C
C

96
128

TRN
RURAL PROJECTS
CAMDEN
SR 1227/SR 1208
CURRITUCK
(SOUTH MILLS ROAD)

R-5717

SR 1224/SR 1223

NC 343 IN CAMDEN COUNTY TO PROPOSED


NC 168 BYPASS IN CURRITUCK COUNTY.
WIDEN AND INTERSECTION IMPROVEMENTS.

10.9

12640

T
T

100
C

12540

(OLD SWAMP ROAD)


DIV

DIV - Division Category


EX - Exempt Category
HF - State Dollars (Non STI) REG - Regional Category
SW - Statewide Category
TRN - Transition Project

1-11

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO


SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE

HIGHWAY PROGRAM
DIVISION

COUNTY

ROUTE/CITY

RURAL PROJECTS
CURRITUCK
NEW ROUTE

ID
NUMBER
R-2576*

LOCATION / DESCRIPTION
MID-CURRITUCK BRIDGE, COINJOCK TO
COROLLA. NEW STRUCTURE OVER
CURRITUCK SOUND AND UPGRADE
APPROACHES.

LENGTH
7.3

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

TOTAL PRIOR
PROJ YEARS
COST COST
(THOU) (THOU) FUNDS
475477

STATE TRANSPORTATION PROGRAM


FY 2015

FY 2016

FY 2017

FY 2018

35100 STP
S(M)
STP
STP
S(M)
BOND R

FY 2019
RG
RG
U
CG
CG
C

1967
3199
1947
11206
9110
59379

UNFUNDED

DEVELOPMENTAL PROGRAM
FY 2020

FY 2021

FY 2022

FY 2023

FY 2024

FY 2025

FUTURE YEARS

RG
RG

1967
3199

RG

1967

RG

1967

RG

1967

RG

1967

RG

1967

RG

9835

CG
CG
C

11206
9110
59379

CG
CG
C

11206
9110
59379

CG
CG
C

11206
9110
59379

CG

11206

CG

11206

CG

11206

CG

56030

DIV
PLANNING/DESIGN IN PROGRESS - NORTH CAROLINA TURNPIKE AUTHORITY PROJECT
FEDERAL BRIDGE PROJECTS
VARIOUS

BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

BD-5101

DIVISION 1 PURCHASE ORDER CONTRACT


BRIDGE REPLACEMENT PROJECTS AT
SELECTED LOCATIONS.

27227

25227 STPOFF
STPOFF

R
C

200
1800

DIV
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
MITIGATION PROJECTS
VARIOUS

BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

EE-4901

ECOSYSTEMS ENHANCEMENT PROGRAM


FOR DIVISION 1 PROJECT MITIGATION.

19816

19816

IN PROGRESS
HAZARD ELIMINATION PROJECTS
VARIOUS

BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

W-5201

DIVISION 1 RUMBLE STRIPS, GUARDRAIL,


SAFETY AND LIGHTING IMPROVEMENTS AT
SELECTED LOCATIONS.

595

595

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

DIV - Division Category


EX - Exempt Category
HF - State Dollars (Non STI) REG - Regional Category
SW - Statewide Category
TRN - Transition Project

1-12

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO


SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE

HIGHWAY PROGRAM
DIVISION

COUNTY
DARE

ROUTE/CITY
RURAL PROJECTS
NC 12

ID
NUMBER
R-4070

LOCATION / DESCRIPTION

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

TOTAL PRIOR
PROJ YEARS
COST COST
(THOU) (THOU) FUNDS

BUXTON TO AVON. PLANNING AND


ENVIRONMENTAL STUDIES FOR
MAINTAINING ROADWAY.

8627

NC 12 IMPROVEMENTS.

7000

STATE TRANSPORTATION PROGRAM


FY 2016

FY 2015

FY 2017

FY 2018

UNFUNDED

DEVELOPMENTAL PROGRAM

FY 2019

FY 2020

FY 2021

FY 2022

FY 2023

FY 2024

FY 2025

FUTURE YEARS

8627
A
B

NORTH OF SR 1231 (OLD LIGHTHOUSE ROAD) TO SOUTH OF SR 1420 (KINNAKEET DRIVE) - COMPLETE
BUXTON TO AVON

PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY - IN PROGRESS


DARE

NC 12

R-3116

7000
A
B
H

DARE

SR 1208

R-5738

(WEST KITTY HAWK

SR 1210 (BOB PERRY ROAD) TO IVY LANE.


UPGRADE FACILITY.

2836

OCRACOKE ISLAND HOTSPOT. INTERIM IMPROVEMENTS - PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY
HATTERAS VILLAGE HOTSPOT. INTERIM IMPROVEMENTS - PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY
OCRACOKE TO SOUTH TERMINAL OF OREGON INLET BRIDGE - PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY

T
T

100
C

2736

70

ROAD)
DIV
DARE

SR 1217

R-5014

(COLLINGTON ROAD)
DIV

US 158 (CROATON HIGHWAY) TO DEAD END


IN KILL DEVIL HILLS. OPERATIONALSAFETY IMPROVEMENTS.

4.3

6050

1200 STP
STP

500
C

4350

PLANNING/DESIGN IN PROGRESS
DARE

FEDERAL BRIDGE PROJECTS


NC 12

B-5610

REPLACE BRIDGE NO. 8 OVER CANAL.

1474

NHPB
NHPB

1404

CG

7175

REG
DARE

NC 12

B-5014
TRN

DARE

NC 12

B-2500

REPAIR BRIDGE NO. 11 OVER OREGON


INLET.

REPLACE BRIDGE NO. 11 (HERBERT C.


BONNER BRIDGE) OVER OREGON INLET
AND NC 12 IMPROVEMENTS.

45043

TRN A
B
C
D
E

2.7

622565

TRN

DARE

SR 1208
(NORTH KITTY HAWK ROAD)

B-5607

37638 NHPB

630

1481 A

CG

1481 A

CG

1481 A

CG

1481 A

CG

1481 A

REPAIR BRIDGE NO. 11 - COMPLETE - PAYBACK FY 2008 - FY 2019 , GARVEE BOND FUNDING $13.5 MILLION
REPAIR BRIDGE NO. 11 - COMPLETE
INSTALLATION OF CRUTCH BENT AND ADDITIONAL SCOUR PROTECTION - COMPLETE
REPAIR BRIDGE NO. 11 - COMPLETE
REHABILITATION OF EXISTING STEEL CRUTCH BENTS - COMPLETE

COMPLETE - RETAIN PROJECT FILE FOR GARVEE PAYOUT


U
762
140675 NHPB
NHPB
CG
7175
CG
7175
CG
7175
S(M)
C 13429
C 13429
C 13429
NHPB
C 30214
C 30214
C 30214
ER
C 10382 A
NHP
C 20153 A
NHP
R
3570 B
ER
R
1530 B
NHP
U
250 B
ER
C 19800 B
C 19800 B
C 19800 B
NHP
C 46200 B
C 46200 B
C 46200 B
TRN A
TRN B

REPLACE BRIDGE NO. 40 OVER CANAL.

CG

CG

7175

30214

CG

7175

CG

7175

CG

7175

55

CG

7175

575

CG

7175

CG

7175

CG

7175

PHASE II, LONG-TERM IMPROVEMENTS AT PEA ISLAND. - UNDER CONSTRUCTION


PHASE II, LONG-TERM IMPROVEMENTS AT RODANTHE.

UNDER CONSTRUCTION - GARVEE BOND FUNDING $70 MILLION; CONSTRUCTION - PAYBACK FY 2013 - FY 2024.
HFB
HFB

HF

DIV - Division Category


EX - Exempt Category
HF - State Dollars (Non STI) REG - Regional Category
SW - Statewide Category
TRN - Transition Project

1-13

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO


SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE

HIGHWAY PROGRAM
DIVISION

COUNTY

ROUTE/CITY
FEDERAL BRIDGE PROJECTS
VARIOUS

BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

ID
NUMBER
BD-5101

LOCATION / DESCRIPTION
DIVISION 1 PURCHASE ORDER CONTRACT
BRIDGE REPLACEMENT PROJECTS AT
SELECTED LOCATIONS.

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

TOTAL PRIOR
PROJ YEARS
COST COST
(THOU) (THOU) FUNDS
27227

25227 STPOFF
STPOFF

STATE TRANSPORTATION PROGRAM


FY 2016

FY 2015
R
C

FY 2017

FY 2018

FY 2019

UNFUNDED

DEVELOPMENTAL PROGRAM
FY 2020

FY 2021

FY 2022

FY 2023

FY 2024

FY 2025

FUTURE YEARS

200
1800

DIV
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
DARE

MUNICIPAL BRIDGE PROJECTS


SOUTHERN SHORES

B-5417
DIV

REPLACE BRIDGE NO. 17 OVER SOUTH


DOGWOOD TRAIL OVER SNOW GOOSE
CANAL.

1244

199 STPOFF
STPOFF

105
C

940

MUNICIPAL BRIDGE
MITIGATION PROJECTS
VARIOUS

BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

EE-4901

ECOSYSTEMS ENHANCEMENT PROGRAM


FOR DIVISION 1 PROJECT MITIGATION.

19816

19816

IN PROGRESS
HAZARD ELIMINATION PROJECTS
VARIOUS

BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

W-5201

DIVISION 1 RUMBLE STRIPS, GUARDRAIL,


SAFETY AND LIGHTING IMPROVEMENTS AT
SELECTED LOCATIONS.

595

595

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

DIV - Division Category


EX - Exempt Category
HF - State Dollars (Non STI) REG - Regional Category
SW - Statewide Category
TRN - Transition Project

1-14

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO


SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE

HIGHWAY PROGRAM
DIVISION

COUNTY

ROUTE/CITY

ENHANCEMENT (CALL PROJECTS)


VARIOUS
ALAMANCE
BEAUFORT
BRUNSWICK
BUNCOMBE
CAMDEN
CHOWAN
CRAVEN
DARE
DURHAM
EDGECOMBE
GUILFORD
HALIFAX
LENOIR
PASQUOTANK
WASHINGTON
WAYNE

ID
NUMBER
E-5501

LOCATION / DESCRIPTION

LENGTH

FREEDOM ROADS. INSTALL INTERACTIVE


WAYSIDE SIGNAGE FOR DESIGNATED SITES.

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

TOTAL PRIOR
PROJ YEARS
COST COST
(THOU) (THOU) FUNDS
STPE
O

224

STATE TRANSPORTATION PROGRAM


FY 2015
C
C

96
128

IN PROGRESS
DP
C

212

FY 2016

FY 2017

FY 2018

FY 2019

UNFUNDED

DEVELOPMENTAL PROGRAM
FY 2020

FY 2021

FY 2022

FY 2023

FY 2024

FY 2025

FUTURE YEARS

TRN
ROADSIDE ENVIRONMENTAL PROJECTS (SCENIC)
S-5501
IMPLEMENTATION OF WAYSHOWING AND
CARTERET
NC 12/US 70
VISITOR ORIENTATION.
DARE
HYDE
EX

CARTERET
DARE
HYDE

NC 12/US 70

S-5502

201

OUTER BANKS SCENIC BYWAY WAYSIDES


AND INTERPRETIVE SIGNS.

212

201

TRN
RURAL PROJECTS
GATES
US 13
HERTFORD

R-2507*

US 158 TO THE VIRGINIA STATE LINE.


WIDEN TO MULTI-LANES.

15.5

124044

66507 T
T
T
T
T
T
T

DIV

R
U

1800
1200
337
23200

B
B
B
B

11900 C

6000 C
1200 C
C

A
B
C

R
U
M
C

11900 C

US 158 IN WINTON TO US 158 BYPASS IN TARHEEL - UNDER CONSTRUCTION


US 158 BYPASS IN TARHEEL TO SR 1202 (EURE ROAD-GATES SCHOOL ROAD)
SR 1202 (EURE ROAD-GATES SCHOOL ROAD) TO VIRGINIA STATE LINE

PLANNING/DESIGN IN PROGRESS
GATES

FEDERAL BRIDGE PROJECTS


US 13

B-5611

REPLACE BRIDGE NO. 9 OVER RUN SWAMP.

1375

HFB
HFB

125
C

1250

HF

DIV - Division Category


EX - Exempt Category
HF - State Dollars (Non STI) REG - Regional Category
SW - Statewide Category
TRN - Transition Project

1-15

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO


SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE

HIGHWAY PROGRAM
DIVISION

COUNTY

ROUTE/CITY
FEDERAL BRIDGE PROJECTS
VARIOUS

BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

ID
NUMBER
BD-5101

LOCATION / DESCRIPTION
DIVISION 1 PURCHASE ORDER CONTRACT
BRIDGE REPLACEMENT PROJECTS AT
SELECTED LOCATIONS.

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

TOTAL PRIOR
PROJ YEARS
COST COST
(THOU) (THOU) FUNDS
27227

25227 STPOFF
STPOFF

STATE TRANSPORTATION PROGRAM


FY 2015
R
C

FY 2016

FY 2017

FY 2018

FY 2019

UNFUNDED

DEVELOPMENTAL PROGRAM
FY 2020

FY 2021

FY 2022

FY 2023

FY 2024

FY 2025

FUTURE YEARS

200
1800

DIV
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
MITIGATION PROJECTS
VARIOUS

BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

EE-4901

ECOSYSTEMS ENHANCEMENT PROGRAM


FOR DIVISION 1 PROJECT MITIGATION.

19816

19816

IN PROGRESS
HAZARD ELIMINATION PROJECTS
VARIOUS

BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

W-5201

DIVISION 1 RUMBLE STRIPS, GUARDRAIL,


SAFETY AND LIGHTING IMPROVEMENTS AT
SELECTED LOCATIONS.

595

595

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

DIV - Division Category


EX - Exempt Category
HF - State Dollars (Non STI) REG - Regional Category
SW - Statewide Category
TRN - Transition Project

1-16

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO


SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE

HIGHWAY PROGRAM
DIVISION

COUNTY

ROUTE/CITY

RURAL PROJECTS
HERTFORD
US 13/NC 11

ID
NUMBER
R-5311*

LOCATION / DESCRIPTION
NC 11/NC 561 INTERSECTION NEAR AHOSKIE
TO US 13/US 158/NC 45 INTERSECTION NEAR
WINTON. WIDEN TO MULTI-LANES.

LENGTH
7.8

94036

2454 NHP
NHP
NHP
HSIP
NHP
NHP
NHP
NHP

SW

GATES
HERTFORD

US 13

R-2507*

SW

US 158 TO THE VIRGINIA STATE LINE.


WIDEN TO MULTI-LANES.

15.5

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

TOTAL PRIOR
PROJ YEARS
COST COST
(THOU) (THOU) FUNDS

124044

STATE TRANSPORTATION PROGRAM


FY 2016

FY 2015
U
M

FY 2018

FY 2019

FY 2020

FY 2021

FY 2022

1875 A
2575 A

C
C

DIV

FY 2024

FY 2025

FUTURE YEARS

1875 A
2575 A
U
R
M
C

665
4425
3073
73100

B
B
B
B

R
U
M
C

1800
1200
337
23200

B
B
B
B

11900 C

NC 11/SR 1212 (SHORT CUT ROAD) AT NC 11/SR 1213 (OLD NC 11 ROAD). CONSTRUCT INTERCHANGE
NC 11/NC 561 INTERSECTION NEAR AHOSKIE TO US 13/US 158/NC 45 INTERSECTION NEAR WINTON

PLANNING/DESIGN IN PROGRESS
66507 T
T
T
T
T
T
T
A
B
C

FY 2023

60 A
1359 A
C
C

A
B

FY 2017

UNFUNDED

DEVELOPMENTAL PROGRAM

R
U

6000 C
1200 C
C

11900 C

US 158 IN WINTON TO US 158 BYPASS IN TARHEEL - UNDER CONSTRUCTION


US 158 BYPASS IN TARHEEL TO SR 1202 (EURE ROAD-GATES SCHOOL ROAD)
SR 1202 (EURE ROAD-GATES SCHOOL ROAD) TO VIRGINIA STATE LINE

PLANNING/DESIGN IN PROGRESS
HERTFORD

US 158

R-2583*

MURFREESBORO BYPASS TO US 13 WEST


OF WINTON. WIDEN TO MULTI-LANES, PART
ON NEW LOCATION.

52593

52593

UNDER CONSTRUCTION
FEDERAL BRIDGE PROJECTS
HERTFORD
US 13

B-5605

REPLACE BRIDGE NO. 31 OVER SEABOARD


COAST LINE RAILROAD.

2365

REPLACE BRIDGE NO. 28 OVER


CUTAWHISKIE SWAMP.

2007

HFB
HFB

215
C

2150

HF
HERTFORD

SR 1137
(LIVERMAN MILL

B-5609

ROAD)

HFB
HFB
HFB

R
M

180
2
C

1825

127

HF
HERTFORD

SR 1311

B-5603

(BOONE'S BRIDGE ROAD)

REPLACE BRIDGE NO. 137 OVER MEHERRIN


RIVER OVERFLOW.

2662

REPLACE BRIDGE NO. 10 OVER MEHERRIN


RIVER.

5007

STPOFF
STPOFF

2535

DIV
HERTFORD

SR 1311

B-5608

(BOONE'S BRIDGE ROAD)

HFB
HFB
HFB

R
M

455
2
C

4550

HF
BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

VARIOUS

BD-5101

DIVISION 1 PURCHASE ORDER CONTRACT


BRIDGE REPLACEMENT PROJECTS AT
SELECTED LOCATIONS.

27227

25227 STPOFF
STPOFF

R
C

200
1800

DIV
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

DIV - Division Category


EX - Exempt Category
HF - State Dollars (Non STI) REG - Regional Category
SW - Statewide Category
TRN - Transition Project

1-17

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO


SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE

HIGHWAY PROGRAM
DIVISION

COUNTY

ROUTE/CITY
MITIGATION PROJECTS
VARIOUS

BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

ID
NUMBER
EE-4901

LOCATION / DESCRIPTION
ECOSYSTEMS ENHANCEMENT PROGRAM
FOR DIVISION 1 PROJECT MITIGATION.

LENGTH

TOTAL PRIOR
PROJ YEARS
COST COST
(THOU) (THOU) FUNDS
19816

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS


STATE TRANSPORTATION PROGRAM
FY 2015

FY 2016

FY 2017

FY 2018

UNFUNDED

DEVELOPMENTAL PROGRAM

FY 2019

FY 2020

FY 2021

FY 2022

FY 2023

FY 2024

FY 2025

FUTURE YEARS

19816

IN PROGRESS
HAZARD ELIMINATION PROJECTS
VARIOUS

BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

W-5201

DIVISION 1 RUMBLE STRIPS, GUARDRAIL,


SAFETY AND LIGHTING IMPROVEMENTS AT
SELECTED LOCATIONS.

595

595

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS


HYDE

FEDERAL BRIDGE PROJECTS


US 264

B-5602

REPLACE BRIDGE NO. 8 OVER BURGESS


MILL CREEK.

2640

REPLACE BRIDGE NO. 21 OVER CANAL.

1400

HFB
HFB

240
C

2400

309

HF
HYDE

SR 1311
(NORTH LAKE ROAD)

B-5508

STPOFF
STPOFF

125
C

1275

15

DIV
HYDE

SR 1319

B-5600

REPLACE BRIDGE NO. 79 OVER CANAL.

(ROPER LANE)

324

STPOFF
STPOFF

DIV
DIVISION PURCHASE ORDER CONTRACT

DIV - Division Category


EX - Exempt Category
HF - State Dollars (Non STI) REG - Regional Category
SW - Statewide Category
TRN - Transition Project

1-18

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO


SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE

HIGHWAY PROGRAM
DIVISION

COUNTY

ROUTE/CITY
FEDERAL BRIDGE PROJECTS
VARIOUS

BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

ID
NUMBER
BD-5101

LOCATION / DESCRIPTION
DIVISION 1 PURCHASE ORDER CONTRACT
BRIDGE REPLACEMENT PROJECTS AT
SELECTED LOCATIONS.

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

TOTAL PRIOR
PROJ YEARS
COST COST
(THOU) (THOU) FUNDS
27227

25227 STPOFF
STPOFF

STATE TRANSPORTATION PROGRAM


FY 2015
R
C

FY 2016

FY 2017

FY 2018

FY 2019

UNFUNDED

DEVELOPMENTAL PROGRAM
FY 2020

FY 2021

FY 2022

FY 2023

FY 2024

FY 2025

FUTURE YEARS

200
1800

DIV
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
MITIGATION PROJECTS
VARIOUS

BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

EE-4901

ECOSYSTEMS ENHANCEMENT PROGRAM


FOR DIVISION 1 PROJECT MITIGATION.

19816

19816

IN PROGRESS
HAZARD ELIMINATION PROJECTS
VARIOUS

BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

W-5201

DIVISION 1 RUMBLE STRIPS, GUARDRAIL,


SAFETY AND LIGHTING IMPROVEMENTS AT
SELECTED LOCATIONS.

595

595

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS


ROADSIDE ENVIRONMENTAL PROJECTS (SCENIC)
CARTERET
NC 12/US 70
S-5502
OUTER BANKS SCENIC BYWAY WAYSIDES
AND INTERPRETIVE SIGNS.
DARE

212

DP

212

HYDE
TRN

DIV - Division Category


EX - Exempt Category
HF - State Dollars (Non STI) REG - Regional Category
SW - Statewide Category
TRN - Transition Project

1-19

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO


SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE

HIGHWAY PROGRAM
DIVISION

COUNTY

ROUTE/CITY

ID
NUMBER

LOCATION / DESCRIPTION

LENGTH

ROADSIDE ENVIRONMENTAL PROJECTS (SCENIC)


NC 12/US 70
S-5501
IMPLEMENTATION OF WAYSHOWING AND
CARTERET
VISITOR ORIENTATION.
DARE

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

TOTAL PRIOR
PROJ YEARS
COST COST
(THOU) (THOU) FUNDS
201

STATE TRANSPORTATION PROGRAM


FY 2015

FY 2016

FY 2017

FY 2018

UNFUNDED

DEVELOPMENTAL PROGRAM

FY 2019

FY 2020

FY 2021

FY 2022

FY 2023

FY 2024

FY 2025

FUTURE YEARS

201

HYDE
EX
IN PROGRESS
MARTIN

RURAL PROJECTS
NC 125

R-3826

SR 1182 (EAST COLLEGE ROAD) TO NC 125


NORTHWEST OF WILLIAMSTON. TWO
LANES, PART ON NEW LOCATION.

2.5

NC 903 TO SR 1182 (EAST COLLEGE ROAD).


UPGRADE FACILITY.

9.6

14649

1194 STP
STP
STP

R
U

2400
255
C

10800

DIV

MARTIN

SR 1142

R-4705

(PRISON CAMP
ROAD)

11200

PLANNING/DESIGN IN PROGRESS
STP
STP

4000
C

7200

DIV
PLANNING/DESIGN IN PROGRESS
FEASIBILITY STUDIES
US 13/US 17

BERTIE
CAMDEN
CHOWAN
MARTIN
PASQUOTANK
PERQUIMANS

FS-1501A US 64 IN WILLIAMSTON TO VIRGINIA STATE


LINE. UPGRADE TO INTERSTATE
STANDARDS.

79

SCHEDULED FOR FEASIBILITY STUDY


EDGECOMBE
FRANKLIN
MARTIN
NASH
WAKE

US 64

FS-1504A SR 1003 (ROLESVILLE ROAD) IN WAKE


COUNTY TO US 17 IN WILLIAMSTON.
UPGRADE TO INTERSTATE STANDARDS.

86.5

SCHEDULED FOR FEASIBILITY STUDY


MARTIN

FEDERAL BRIDGE PROJECTS


NC 125

B-5503

REPLACE BRIDGE NO. 53 OVER COLLIE


SWAMP.

900

REPLACE BRIDGE NO. 71 OVER FLAT


SWAMP.

984

STPOFF
STPOFF

80
C

820

80

REG
MARTIN

SR 1159

B-4577

(FLAT SWAMP ROAD)

129 STPOFF
STPOFF

775

DIV
BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

VARIOUS

BD-5101

DIVISION 1 PURCHASE ORDER CONTRACT


BRIDGE REPLACEMENT PROJECTS AT
SELECTED LOCATIONS.

27227

25227 STPOFF
STPOFF

R
C

200
1800

DIV
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

DIV - Division Category


EX - Exempt Category
HF - State Dollars (Non STI) REG - Regional Category
SW - Statewide Category
TRN - Transition Project

1-20

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO


SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE

HIGHWAY PROGRAM
DIVISION

COUNTY

ROUTE/CITY
MITIGATION PROJECTS
VARIOUS

BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

ID
NUMBER
EE-4901

LOCATION / DESCRIPTION

LENGTH

ECOSYSTEMS ENHANCEMENT PROGRAM


FOR DIVISION 1 PROJECT MITIGATION.

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

TOTAL PRIOR
PROJ YEARS
COST COST
(THOU) (THOU) FUNDS
19816

STATE TRANSPORTATION PROGRAM


FY 2016

FY 2015

FY 2017

FY 2018

UNFUNDED

DEVELOPMENTAL PROGRAM

FY 2019

FY 2020

FY 2021

FY 2022

FY 2023

FY 2024

FY 2025

FUTURE YEARS

19816

IN PROGRESS
HAZARD ELIMINATION PROJECTS
VARIOUS

BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

W-5201

DIVISION 1 RUMBLE STRIPS, GUARDRAIL,


SAFETY AND LIGHTING IMPROVEMENTS AT
SELECTED LOCATIONS.

595

595

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS


INTERSTATE PROJECTS
NORTHAMPTON
I-95

I-4913
TRN

NORTHAMPTON

I-95

I-5839
SW

RURAL PROJECTS
NORTHAMPTON
US 158/NC 46

R-2582*

NORTH OF HALIFAX COUNTY LINE (MILE


POST 175) TO THE VIRGINIA STATE LINE
(MILE POST 181.3). PAVEMENT
REHABILITATION.

6.3

6532

HALIFAX COUNTY LINE TO SR 1201 (MACON


PRICE RD). PAVEMENT REHABILITATION.

4.6

2100

I-95/NC 46 IN ROANOKE RAPIDS TO SR 1333


(MT. CARMEL CHURCH ROAD) EAST OF
JACKSON. WIDEN TO MULTI-LANES WITH
BYPASS OF JACKSON, SOME NEW
LOCATION.

15.2

137639

NC 305 TO US 158. PAVEMENT


STRENGTHENING AND RESURFACING.

13.8

3143

NC 48 IN GASTON TO THE VIRGINIA STATE


LINE. UPGRADE AND WIDEN EXISTING
FACILITY.

10.5

8687

5268 NHP

CG

316

CG

316

CG

316

CG

316

PROJECT COMPLETE - GARVEE BOND FUNDING $2.7 MILLION; PAYBACK FY 2007 - FY 2018
NHPIM

2100

16711 T
T
T
T

C
R
M
C
A
B

54000
5400
128
61400

A
B
B
B

I-95/NC 46 IN ROANOKE RAPIDS TO SR 1312 (ST. JOHN CHURCH ROAD) IN NORTHAMPTON COUNTY - RIGHT OF WAY IN PROGRESS
SR 1312 (ST. JOHN CHURCH ROAD) TO SR 1333 (MT. CARMEL CHURCH ROAD) EAST OF JACKSON

PLANNING/DESIGN IN PROGRESS
NORTHAMPTON

US 258

R-5505
TRN

NORTHAMPTON

NC 46

R-5739
DIV

DIV - Division Category


EX - Exempt Category
HF - State Dollars (Non STI) REG - Regional Category
SW - Statewide Category
TRN - Transition Project

3143
UNDER CONSTRUCTION
T
T

100
C

1-21

8587

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO


SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE

HIGHWAY PROGRAM
DIVISION

COUNTY

ROUTE/CITY

FEASIBILITY STUDIES
I-95
CUMBERLAND
HALIFAX
HARNETT
JOHNSTON
NASH
NORTHAMPTON
ROBESON
WILSON

ID
NUMBER
I-5133

LOCATION / DESCRIPTION
CORRIDOR PLANNING AND FINANCE
STUDY. SOUTH CAROLINA STATE LINE TO
THE VIRGINIA STATE LINE.

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

TOTAL PRIOR
PROJ YEARS
COST COST
(THOU) (THOU) FUNDS
10034

STATE TRANSPORTATION PROGRAM


FY 2015

FY 2016

FY 2017

FY 2018

FY 2019

UNFUNDED

DEVELOPMENTAL PROGRAM
FY 2020

FY 2021

FY 2022

FY 2023

FY 2024

FY 2025

FUTURE YEARS

10034

PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY


FEDERAL BRIDGE PROJECTS
NORTHAMPTON
SR 1339

B-5502

(BRANCHES BRIDGE
ROAD)

REPLACE BRIDGE NO. 13 OVER MEHERRIN


RIVER.

1320

REPLACE BRIDGE NO. 14 OVER POTECASI


CREEK.

771

HFB
HFB

STPOFF
STPOFF
STPOFF

R
M

32 STPOFF
STPOFF

120
C

1200

700

900

HF
NORTHAMPTON

SR 1500
(FIRE TOWER ROAD)

B-4919

70
1

DIV
NORTHAMPTON

SR 1505
(NCHS EAST ROAD)

B-4920

REPLACE BRIDGE NO. 15 OVER WILDCAT


SWAMP.

1022

DIVISION 1 PURCHASE ORDER CONTRACT


BRIDGE REPLACEMENT PROJECTS AT
SELECTED LOCATIONS.

27227

90

DIV
BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

VARIOUS

BD-5101

25227 STPOFF
STPOFF

R
C

200
1800

DIV
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
MITIGATION PROJECTS
VARIOUS

BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

EE-4901

ECOSYSTEMS ENHANCEMENT PROGRAM


FOR DIVISION 1 PROJECT MITIGATION.

19816

19816

IN PROGRESS

DIV - Division Category


EX - Exempt Category
HF - State Dollars (Non STI) REG - Regional Category
SW - Statewide Category
TRN - Transition Project

1-22

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO


SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE

HIGHWAY PROGRAM
DIVISION

COUNTY

ROUTE/CITY
HAZARD ELIMINATION PROJECTS
VARIOUS

BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

ID
NUMBER
W-5201

LOCATION / DESCRIPTION

LENGTH

DIVISION 1 RUMBLE STRIPS, GUARDRAIL,


SAFETY AND LIGHTING IMPROVEMENTS AT
SELECTED LOCATIONS.

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

TOTAL PRIOR
PROJ YEARS
COST COST
(THOU) (THOU) FUNDS
595

STATE TRANSPORTATION PROGRAM


FY 2015

FY 2016

FY 2017

FY 2018

FY 2019

UNFUNDED

DEVELOPMENTAL PROGRAM
FY 2020

FY 2021

FY 2022

FY 2023

FY 2024

FY 2025

FUTURE YEARS

595

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS


URBAN PROJECTS
CAMDEN
US 158
PASQUOTANK

U-4438

US 17 BUSINESS (NORTH ROAD STREET) TO


EAST OF PASQUOTANK RIVER IN ELIZABETH
CITY. RECONSTRUCT ROADWAY AND
REPLACE BRIDGE NO.19.

0.6

89305

89305

UNDER CONSTRUCTION
FEASIBILITY STUDIES
US 13/US 17

BERTIE
CAMDEN
CHOWAN
MARTIN
PASQUOTANK
PERQUIMANS

FS-1501A US 64 IN WILLIAMSTON TO VIRGINIA STATE


LINE. UPGRADE TO INTERSTATE
STANDARDS.

79

SCHEDULED FOR FEASIBILITY STUDY


FEDERAL BRIDGE PROJECTS
PASQUOTANK
US 17/US 158

B-4599
SW

PASQUOTANK

SR 1103
(ESCLIP ROAD)

B-4783

REPLACE BRIDGE NO. 1 AND BRIDGE NO. 2


OVER KNOBBS CREEK.

19934

REPLACE BRIDGE NO. 5 OVER BRANCH OF


FLATTY CREEK.

826

REPLACE BRIDGE NO. 21 OVER KNOBB'S


CREEK.

650

19934
UNDER CONSTRUCTION
1 STPOFF
STPOFF

75
C

750

DIV
PASQUOTANK

SR 1332

B-5139

(CREEK ROAD)

100 STPON
STPON

R
C

50
500

DIV
DIVISION PURCHASE ORDER CONTRACT (DPOC)

DIV - Division Category


EX - Exempt Category
HF - State Dollars (Non STI) REG - Regional Category
SW - Statewide Category
TRN - Transition Project

1-23

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO


SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE

HIGHWAY PROGRAM
DIVISION

COUNTY

ROUTE/CITY
FEDERAL BRIDGE PROJECTS
VARIOUS

BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

ID
NUMBER
BD-5101

LOCATION / DESCRIPTION
DIVISION 1 PURCHASE ORDER CONTRACT
BRIDGE REPLACEMENT PROJECTS AT
SELECTED LOCATIONS.

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

TOTAL PRIOR
PROJ YEARS
COST COST
(THOU) (THOU) FUNDS
27227

25227 STPOFF
STPOFF

STATE TRANSPORTATION PROGRAM


FY 2015
R
C

FY 2016

FY 2017

FY 2018

FY 2019

UNFUNDED

DEVELOPMENTAL PROGRAM
FY 2020

FY 2021

FY 2022

FY 2023

FY 2024

FY 2025

FUTURE YEARS

200
1800

DIV
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
MITIGATION PROJECTS
VARIOUS

BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

EE-4901

ECOSYSTEMS ENHANCEMENT PROGRAM


FOR DIVISION 1 PROJECT MITIGATION.

19816

19816

IN PROGRESS
HAZARD ELIMINATION PROJECTS
VARIOUS

BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

W-5201

DIVISION 1 RUMBLE STRIPS, GUARDRAIL,


SAFETY AND LIGHTING IMPROVEMENTS AT
SELECTED LOCATIONS.

595

595

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

DIV - Division Category


EX - Exempt Category
HF - State Dollars (Non STI) REG - Regional Category
SW - Statewide Category
TRN - Transition Project

1-24

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO


SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE

HIGHWAY PROGRAM
DIVISION

COUNTY

ROUTE/CITY

ENHANCEMENT (CALL PROJECTS)


VARIOUS
ALAMANCE
BEAUFORT
BRUNSWICK
BUNCOMBE
CAMDEN
CHOWAN
CRAVEN
DARE
DURHAM
EDGECOMBE
GUILFORD
HALIFAX
LENOIR
PASQUOTANK
WASHINGTON
WAYNE

ID
NUMBER
E-5501

LOCATION / DESCRIPTION

LENGTH

FREEDOM ROADS. INSTALL INTERACTIVE


WAYSIDE SIGNAGE FOR DESIGNATED SITES.

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

TOTAL PRIOR
PROJ YEARS
COST COST
(THOU) (THOU) FUNDS
224

STPE
O

STATE TRANSPORTATION PROGRAM


FY 2015
C
C

FY 2016

FY 2017

FY 2018

UNFUNDED

DEVELOPMENTAL PROGRAM

FY 2019

FY 2020

FY 2021

FY 2022

FY 2023

FY 2024

FY 2025

FUTURE YEARS

96
128

TRN
RURAL PROJECTS
PERQUIMANS
SR 1300

R-5716

(NEW HOPE ROAD)


DIV
PERQUIMANS

SR 1329

R-5740

(WOODVILLE ROAD)

SR 1301 (OLD NECK ROAD) TO SR 1302


(UNION HALL ROAD). WIDEN AND
RESURFACE.

1.48

SR 1331 (RED BANK ROAD) TO SR 1300 (NEW


HOPE ROAD). UPGRADE ROADWAY.

4.39

1214

784

T
T

100
C

T
T

1114

50
C

734

DIV
FEASIBILITY STUDIES
US 13/US 17
BERTIE
CAMDEN
CHOWAN
MARTIN
PASQUOTANK
PERQUIMANS

FS-1501A US 64 IN WILLIAMSTON TO VIRGINIA STATE


LINE. UPGRADE TO INTERSTATE
STANDARDS.

79

SCHEDULED FOR FEASIBILITY STUDY


FEDERAL BRIDGE PROJECTS
PERQUIMANS
US 17 BUSINESS

B-5604

REPLACE BRIDGE NO. 19 OVER BRIGHTS


MILL CREEK.

2310

HFB
HFB

210
C

2100

1850

HF
PERQUIMANS

US 17 BUSINESS/

R-4467

NC 37

EAST OF PERQUIMANS RIVER BRIDGE TO


NC 37 IN HERTFORD. REPLACE BRIDGE NO.
8.

0.4

21136

2106 T
T
T

R
U

900
130
C

6000

775

6000

6000

185

REG

PERQUIMANS

SR 1200

B-5416

(PERRY'S BRIDGE ROAD)

REPLACE BRIDGE NO. 29 OVER BRANCH OF


PERQUIMANS RIVER.

850

REPLACE BRIDGE NO. 11 OVER CASTLETON


CREEK.

2035

PLANNING/DESIGN IN PROGRESS
HFB
HFB

75

HF
PERQUIMANS

SR 1338

B-5606

(WYNNE FORK ROAD)

HFB
HFB

HF

DIV - Division Category


EX - Exempt Category
HF - State Dollars (Non STI) REG - Regional Category
SW - Statewide Category
TRN - Transition Project

1-25

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO


SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE

HIGHWAY PROGRAM
DIVISION

COUNTY

ROUTE/CITY
FEDERAL BRIDGE PROJECTS
VARIOUS

BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

ID
NUMBER
BD-5101

LOCATION / DESCRIPTION
DIVISION 1 PURCHASE ORDER CONTRACT
BRIDGE REPLACEMENT PROJECTS AT
SELECTED LOCATIONS.

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

TOTAL PRIOR
PROJ YEARS
COST COST
(THOU) (THOU) FUNDS
27227

25227 STPOFF
STPOFF

STATE TRANSPORTATION PROGRAM


FY 2015
R
C

FY 2016

FY 2017

FY 2018

UNFUNDED

DEVELOPMENTAL PROGRAM

FY 2019

FY 2020

FY 2021

FY 2022

FY 2023

FY 2024

FY 2025

FUTURE YEARS

200
1800

DIV
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
MITIGATION PROJECTS
VARIOUS

BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

EE-4901

ECOSYSTEMS ENHANCEMENT PROGRAM


FOR DIVISION 1 PROJECT MITIGATION.

19816

19816

IN PROGRESS
HAZARD ELIMINATION PROJECTS
VARIOUS

BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

W-5201

DIVISION 1 RUMBLE STRIPS, GUARDRAIL,


SAFETY AND LIGHTING IMPROVEMENTS AT
SELECTED LOCATIONS.

595

595

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS


FEDERAL BRIDGE PROJECTS
TYRRELL
SR 1105

B-4648

(CROSSLANDING

REPLACE BRIDGE NO. 17 OVER RIDERS


CREEK.

1424

94 STPOFF
STPOFF

180
C

1150

ROAD)
DIV

DIV - Division Category


EX - Exempt Category
HF - State Dollars (Non STI) REG - Regional Category
SW - Statewide Category
TRN - Transition Project

1-26

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO


SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE

HIGHWAY PROGRAM
DIVISION

COUNTY

ROUTE/CITY
FEDERAL BRIDGE PROJECTS
VARIOUS

BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

ID
NUMBER
BD-5101

LOCATION / DESCRIPTION

LENGTH

DIVISION 1 PURCHASE ORDER CONTRACT


BRIDGE REPLACEMENT PROJECTS AT
SELECTED LOCATIONS.

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

TOTAL PRIOR
PROJ YEARS
COST COST
(THOU) (THOU) FUNDS
27227

25227 STPOFF
STPOFF

STATE TRANSPORTATION PROGRAM


FY 2015
R
C

FY 2016

FY 2017

FY 2018

UNFUNDED

DEVELOPMENTAL PROGRAM

FY 2019

FY 2020

FY 2021

FY 2022

FY 2023

FY 2024

FY 2025

FUTURE YEARS

200
1800

DIV
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
MITIGATION PROJECTS
VARIOUS

BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

EE-4901

ECOSYSTEMS ENHANCEMENT PROGRAM


FOR DIVISION 1 PROJECT MITIGATION.

19816

19816

IN PROGRESS
HAZARD ELIMINATION PROJECTS
VARIOUS

BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

W-5201

DIVISION 1 RUMBLE STRIPS, GUARDRAIL,


SAFETY AND LIGHTING IMPROVEMENTS AT
SELECTED LOCATIONS.

595

595

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS


RURAL PROJECTS
WASHINGTON
NEW ROUTE

R-3620
TRN

US 64 TO NC 32. TWO LANE SHOULDER


FACILITY ON NEW LOCATION.

3.3

16030

16030
UNDER CONSTRUCTION

FEDERAL BRIDGE PROJECTS


WASHINGTON
NC 308

B-5601

REPLACE BRIDGE NO. 11 OVER MACKEYS


CREEK.

3300

HFB
HFB

300
C

3000

HF

DIV - Division Category


EX - Exempt Category
HF - State Dollars (Non STI) REG - Regional Category
SW - Statewide Category
TRN - Transition Project

1-27

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO


SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE

HIGHWAY PROGRAM
DIVISION

COUNTY

ROUTE/CITY
FEDERAL BRIDGE PROJECTS
VARIOUS

BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

ID
NUMBER
BD-5101

LOCATION / DESCRIPTION
DIVISION 1 PURCHASE ORDER CONTRACT
BRIDGE REPLACEMENT PROJECTS AT
SELECTED LOCATIONS.

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

TOTAL PRIOR
PROJ YEARS
COST COST
(THOU) (THOU) FUNDS
27227

25227 STPOFF
STPOFF

STATE TRANSPORTATION PROGRAM


FY 2015
R
C

FY 2016

FY 2017

FY 2018

FY 2019

UNFUNDED

DEVELOPMENTAL PROGRAM
FY 2020

FY 2021

FY 2022

FY 2023

FY 2024

FY 2025

FUTURE YEARS

200
1800

DIV
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
MITIGATION PROJECTS
VARIOUS

BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

EE-4901

ECOSYSTEMS ENHANCEMENT PROGRAM


FOR DIVISION 1 PROJECT MITIGATION.

19816

19816

IN PROGRESS
HAZARD ELIMINATION PROJECTS
VARIOUS

BERTIE
CAMDEN
CHOWAN
CURRITUCK
DARE
GATES
HERTFORD
HYDE
MARTIN
NORTHAMPTON
PASQUOTANK
PERQUIMANS
TYRRELL
WASHINGTON

W-5201

DIVISION 1 RUMBLE STRIPS, GUARDRAIL,


SAFETY AND LIGHTING IMPROVEMENTS AT
SELECTED LOCATIONS.

595

595

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

DIV - Division Category


EX - Exempt Category
HF - State Dollars (Non STI) REG - Regional Category
SW - Statewide Category
TRN - Transition Project

1-28

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO


SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE

HIGHWAY PROGRAM
DIVISION

COUNTY

ROUTE/CITY

ENHANCEMENT (CALL PROJECTS)


VARIOUS
ALAMANCE
BEAUFORT
BRUNSWICK
BUNCOMBE
CAMDEN
CHOWAN
CRAVEN
DARE
DURHAM
EDGECOMBE
GUILFORD
HALIFAX
LENOIR
PASQUOTANK
WASHINGTON
WAYNE

ID
NUMBER
E-5501

LOCATION / DESCRIPTION
FREEDOM ROADS. INSTALL INTERACTIVE
WAYSIDE SIGNAGE FOR DESIGNATED SITES.

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

TOTAL PRIOR
PROJ YEARS
COST COST
(THOU) (THOU) FUNDS
224

STPE
O

STATE TRANSPORTATION PROGRAM


FY 2015
C
C

FY 2016

FY 2017

FY 2018

FY 2019

UNFUNDED

DEVELOPMENTAL PROGRAM
FY 2020

FY 2021

FY 2022

FY 2023

FY 2024

FY 2025

FUTURE YEARS

96
128

TRN

DIV - Division Category


EX - Exempt Category
HF - State Dollars (Non STI) REG - Regional Category
SW - Statewide Category
TRN - Transition Project

1-29

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO


SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE

DIVISION 00

NON HIGHWAY PROGRAM

COUNTY

DURHAM

ROUTE / CITY /
TRANSIT PARTNER

ID
NUMBER

DURHAM AREA
TA-4738
TRANSIT AUTHORITY

ROUTE / CITY /
TRANSIT PARTNER
I - Interstate
US or NC Routes
SR - Secondary Road
Various - multiple routes
NEW ROUTE or City
TRANSIT PARTNER

DIV

IDENTIFICATION NUMBER
Assigned to each project at
conception and remains with
project until completion.

LOCATION / DESCRIPTION

PASSENGER AMENITIES - BUS STOP


SHELTERS, BENCHES, SHOP EQUIPMENT
SPARE PARTS, ENGINES, SERVICE
VEHICLES, ETC.

STATE TRANSPORTATION IMPROVEMENT PROGRAM


FY 2015

FUZ CP
FUZ CP

FY 2016

FY 2017

FY 2018

FY 2019

FUNDING SOURCE (2)


See Highway Funding Key
for an explanation of funding categories
used for each project phase.

FY 2021

FY 2022

FY 2023

FY 2024

FY 2025

FUTURE YEARS

CP 9000 A
CP

3000 B
CP

DIV
DIV
DIV

A
B
C

5000 B

CP

5000 B CP

5000 B CP
CP
CP

5000 B
10000 C
20000 C

BUS STOP SHELTER AND BENCHES LOCATED AT HOLLOWAY STREET


BUS STOP SHELTER AND BENCHES LOCATED AT GREGSON AVENUE
SHOP EQUIPMENT, SPARE PARTS, ENGINES, SERVICE VEHICLES, ETC.
PROJECT BREAKS
One or two letter
designation for project
break.

FUNDING CATEGORY (1)


Identifies the "STI" Funding
Category for the project and
any project breaks.

WORK TYPE (ACTIVITY) (3)


Phases of implementation:
Preliminary engineering, Right of Way,
Mitigation, Utilities or Construction.
For other work types or activities see
Work Type (Activity) box below.

(2) FUNDING SOURCES KEY


C - City
CMAQ - Congestion Mitigation
DP - Discretionary or Demonstration
FBUS - Capital Program - Bus Earmark (5309)
FED - Federal Rail Funds
FEPD - Elderly and Persons with Disablity (5310)
FF - Federal Ferry
FLAP - Federal Lands Access Program
FMOD - Fixed Guideway Modifications
FMPL - Metropolitan Planning (5303)
FNF - New Freedom Program
FNS - New Starts - Capital (5309)
FNU - Non Urbanized Area Formula Program (5311)
FSPR - State Planning and Research
FUZ - Urbanized Area Formula Program (5307)
HP - Federal-Aid High Priority
JARC - Job Assistance and Reverse Commute (3037)

FY 2020

UNFUNDED

DEVELOPMENTAL PROGRAM

4000 A
700 A

LOCATION / DESCRIPTION
Project termini and a general
work description.

(1) FUNDING CATEGORY


DIV - Division
HF - State Dollars (Non-STI)
REG - Regional
SW - Statewide

FUNDS

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS


PRIOR
TOTAL
PROJECT YEARS
COST
COST
(THOU) (THOU)

L - Local
O - Other
RR - Rail-Highway Safety
RTAP - Rural Transit Assistance Program
S - State
S (M) - State Match
SMAP - Operating Assistance and State Maintenance
SRTS - Safe Routes to School
STAT - State
STHSR - Stimulus High Speed Rail
STPDA - Surface Transportation Program - Direct Attributable
STPE - Surface Transportation Program, Enhancements
STPEB - Surface Transportation Program, Enhancements (Bike)
T - State Highway Trust Funds
T2001 - State Rail Funds
TAP - Transportation Alternatives Program
TIGER DISC - TIGER Discretionary Grants

ESTIMATED COST Preliminary engineering, right of


way, utility, mitigation and construction cost estimates
by funding category in current dollars. Cost may
include one or more funding types. Multi-year funding
of a project segment indicates (Cash-Flow Funding)
with proposed work type or activity beginning in the
initial scheduled year. (Estimates are in thousand of
dollars.)

(3) WORK TYPE (ACTIVITY)


A - Acquisition
AD - Administrative
C - Construction
CP - Capital
I - Impementation
O - Operations
Oc - OPS Funded Capital
PE - Preliminary Engineering
PL - Planning / Design
R - Right-of-Way

UNFUNDED
FFUTURE
COMMITMENTS

NON HIGHWAY PROGRAM


DIVISION

COUNTY

ROUTE/CITY

ID
NUMBER

PUBLIC TRANSPORTATION PROJECTS


GREYHOUND LINES
BEAUFORT
TI-6104
BERTIE
CHOWAN
EDGECOMBE
FRANKLIN
MARTIN
NASH
PASQUOTANK
PERQUIMANS
PITT
WAKE
WILSON
HF
BERTIE
HALIFAX
HERTFORD
NORTHAMPTON

CHOANOKE PUBLIC

TA-6180

LOCATION / DESCRIPTION

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

TOTAL PRIOR
PROJ YEARS
COST COST
(THOU) (THOU) FUNDS

STATE TRANSPORTATION PROGRAM

28273

6108 FNU

3669

CAPITAL

1194

519 FNU

CP

675

ADMINISTRATION

6504

1576 FNU
FNU

984

INTERCITY BUS FROM RALEIGH TO


NORFOLK, VA VIA ELIZABETH CITY ALONG
US 64, US 301, US 264, AND US 17 WITH
STOPS AT RALEIGH, ROCKY MOUNT,
WILSON, GREENVILLE, WASHINGTON,
WILLIAMSTON, EDENTON, AND ELIZABETH
CITY

FY 2016

FY 2015

FY 2017

FY 2018

UNFUNDED

DEVELOPMENTAL PROGRAM

FY 2019

FY 2020

FY 2021

FY 2022

FY 2023

2312

2312

2312

2312

2312

2312

2312

2312

493

493

493

493

493

493

493

493

414

414

414

414

414

414

414

414

FY 2024

FY 2025

FUTURE YEARS

TRANSPORTATION
AUTHORITY
HF

BERTIE
HALIFAX
HERTFORD
NORTHAMPTON

CHOANOKE PUBLIC

TK-6119

TRANSPORTATION
AUTHORITY
HF

PASSENGER RAIL PROJECTS


BERTIE
NCVA RR
HERTFORD
NORTHAMPTON

P-5600

NORTH CAROLINA VIRGINIA RAILROAD.


UPGRADE EXISTING RAILROAD TRACK.

800

800

TRN
IN PROGRESS
PUBLIC TRANSPORTATION PROJECTS
ALBEMARLE REGIONAL
CAMDEN
TQ-6116
CHOWAN
HEALTH SERVICE
CURRITUCK
PASQUOTANK
PERQUIMANS
HF
CAMDEN
CHOWAN
CURRITUCK
PASQUOTANK
PERQUIMANS

ALBEMARLE REGIONAL

TQ-6796

OPERATING ASSISTANCE - ELDERLY AND


DISABLED PERSONS

OPERATING

1876

1056 FEPD

820

180

FEPD

180

HEALTH SERVICE

HF
CAMDEN
CHOWAN
CURRITUCK
PASQUOTANK
PERQUIMANS

ALBEMARLE REGIONAL

TA-6142

CAPITAL

1522

755 FNU

CP

767

ADMINISTRATION

5842

1654 FNU
FNU

876

HEALTH SERVICE

HF
CAMDEN
CHOWAN
CURRITUCK
PASQUOTANK
PERQUIMANS

ALBEMARLE REGIONAL

TK-6104

HEALTH SERVICE

HF

DIV - Division Category


EX - Exempt Category
HF - State Dollars (Non STI) REG - Regional Category
SW - Statewide Category
TRN - Transition Project

1-33

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO


SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE

NON HIGHWAY PROGRAM


DIVISION

COUNTY

ROUTE/CITY

ID
NUMBER

PUBLIC TRANSPORTATION PROJECTS


ALBEMARLE REGIONAL
CAMDEN
TM-6127
CHOWAN
HEALTH SERVICE
CURRITUCK
PASQUOTANK
PERQUIMANS
HF
PUBLIC TRANSPORTATION PROJECTS
ALBEMARLE REGIONAL
CAMDEN
TQ-6796
CHOWAN
HEALTH SERVICE
CURRITUCK
PASQUOTANK
PERQUIMANS
HF
CAMDEN
CHOWAN
CURRITUCK
PASQUOTANK
PERQUIMANS

ALBEMARLE REGIONAL

TQ-6116

HEALTH SERVICE

LOCATION / DESCRIPTION

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

TOTAL PRIOR
PROJ YEARS
COST COST
(THOU) (THOU) FUNDS

STATE TRANSPORTATION PROGRAM


FY 2016

FY 2015

OPERATING ASSISTANCE

196

JARC
L

O
O

98
98

OPERATING

180

FEPD

180

OPERATING ASSISTANCE - ELDERLY AND


DISABLED PERSONS

1876

1056 FEPD

820

INTERCITY BUS FROM RALEIGH TO


NORFOLK, VA VIA ELIZABETH CITY ALONG
US 64, US 301, US 264, AND US 17 WITH
STOPS AT RALEIGH, ROCKY MOUNT,
WILSON, GREENVILLE, WASHINGTON,
WILLIAMSTON, EDENTON, AND ELIZABETH
CITY

28273

6108 FNU

3669

CAPITAL

1522

755 FNU

CP

767

ADMINISTRATION

5842

1654 FNU
FNU

876

O
O

98
98

FY 2017

FY 2018

UNFUNDED

DEVELOPMENTAL PROGRAM

FY 2019

FY 2020

FY 2021

FY 2022

FY 2023

FY 2024

FY 2025

FUTURE YEARS

HF
BEAUFORT
BERTIE
CHOWAN
EDGECOMBE
FRANKLIN
MARTIN
NASH
PASQUOTANK
PERQUIMANS
PITT
WAKE
WILSON

GREYHOUND LINES

TI-6104

2312

2312

2312

2312

2312

2312

2312

2312

414

414

414

414

414

414

414

414

HF
CAMDEN
CHOWAN
CURRITUCK
PASQUOTANK
PERQUIMANS

ALBEMARLE REGIONAL

TA-6142

HEALTH SERVICE

HF
CAMDEN
CHOWAN
CURRITUCK
PASQUOTANK
PERQUIMANS

ALBEMARLE REGIONAL
HEALTH SERVICE

TK-6104

HF
CAMDEN
CHOWAN
CURRITUCK
PASQUOTANK
PERQUIMANS

ALBEMARLE REGIONAL

TM-6127

OPERATING ASSISTANCE

196

HEALTH SERVICE

JARC
L

HF
AVIATION PROJECTS
CURRITUCK
CURRITUCK COUNTY

AV-5773

REGIONAL AIRPORT (ONX)


DIV

LAND ACQUISITION AND VARIOUS


IMPROVEMENTS FOR RUNWAY PROTECTION
ZONE.

DIV - Division Category


EX - Exempt Category
HF - State Dollars (Non STI) REG - Regional Category
SW - Statewide Category
TRN - Transition Project

21500

T
O

C
C

1-34

6450
2150

12900

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO


SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE

NON HIGHWAY PROGRAM


DIVISION

COUNTY

ROUTE/CITY

FERRY PROJECTS
CURRITUCK
SR 1242

ID
NUMBER
F-5501

(COURTHOUSE ROAD)

LOCATION / DESCRIPTION

LENGTH

CURRITUCK WELCOME CENTER.


REPLACEMENT.

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

TOTAL PRIOR
PROJ YEARS
COST COST
(THOU) (THOU) FUNDS
3512

1762 DP
T

STATE TRANSPORTATION PROGRAM


FY 2016

FY 2015
C
C

FY 2017

FY 2018

UNFUNDED

DEVELOPMENTAL PROGRAM

FY 2019

FY 2020

FY 2021

FY 2022

FY 2023

FY 2024

FY 2025

FUTURE YEARS

1400
350

TRN
RIGHT OF WAY IN PROGRESS
PUBLIC TRANSPORTATION PROJECTS
ALBEMARLE REGIONAL
CAMDEN
TQ-6116
CHOWAN
HEALTH SERVICE
CURRITUCK
PASQUOTANK
PERQUIMANS
HF
CAMDEN
CHOWAN
CURRITUCK
PASQUOTANK
PERQUIMANS

ALBEMARLE REGIONAL

TQ-6796

OPERATING ASSISTANCE - ELDERLY AND


DISABLED PERSONS

OPERATING

1876

1056 FEPD

820

180

FEPD

180

HEALTH SERVICE

HF
CAMDEN
CHOWAN
CURRITUCK
PASQUOTANK
PERQUIMANS

ALBEMARLE REGIONAL

TA-6142

CAPITAL

1522

755 FNU

CP

767

ADMINISTRATION

5842

1654 FNU
FNU

876

O
O

98
98

HEALTH SERVICE

HF
CAMDEN
CHOWAN
CURRITUCK
PASQUOTANK
PERQUIMANS

ALBEMARLE REGIONAL
HEALTH SERVICE

TK-6104

414

414

414

414

414

414

4000

4000

4000

128

128

128

414

414

128

128

HF
CAMDEN
CHOWAN
CURRITUCK
PASQUOTANK
PERQUIMANS

ALBEMARLE REGIONAL

TM-6127

OPERATING ASSISTANCE

JARC
L

196

HEALTH SERVICE

HF

DARE
HYDE

FERRY PROJECTS
NC 12

F-5700

CONSTRUCT RIVER CLASS FERRY.

FF

12000

DIV
DARE

NC 12

F-5506
TRN

HATTERAS FERRY DOCKS. REHABILITATE


FERRY RAMPS.

4000

4000
UNDER CONSTRUCTION

DARE

PUBLIC TRANSPORTATION PROJECTS


DARE COUNTY
TA-6539

EXPANSION VEHICLE

46

JARC
L

CP
CP

37
9

HF
DARE

DARE COUNTY

DARE

DARE COUNTY

DARE

DARE COUNTY

TA-6107

CAPITAL

715

124 FNF
FNU

CP
CP

500
91

1789

511 FNU
FNU

254

O
O

27
27

HF
TK-6124

ADMINISTRATION

128

128

128

HF
TM-6150

OPERATING

54

JARC
L

HF

DIV - Division Category


EX - Exempt Category
HF - State Dollars (Non STI) REG - Regional Category
SW - Statewide Category
TRN - Transition Project

1-35

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO


SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE

NON HIGHWAY PROGRAM


DIVISION

COUNTY
DARE

ROUTE/CITY

ID
NUMBER

PUBLIC TRANSPORTATION PROJECTS


DARE COUNTY
TM-6143

LOCATION / DESCRIPTION

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

TOTAL PRIOR
PROJ YEARS
COST COST
(THOU) (THOU) FUNDS

OPERATING ASSISTANCE

54

OPERATING ASSISTANCE - NEW FREEDOM

56

JARC
L

STATE TRANSPORTATION PROGRAM


FY 2016

FY 2015
O
O

27
27

O
O

50
50

FY 2017

FY 2018

UNFUNDED

DEVELOPMENTAL PROGRAM

FY 2019

FY 2020

FY 2021

FY 2022

FY 2023

FY 2024

FY 2025

FUTURE YEARS

HF
DARE

DARE COUNTY

DARE

DARE COUNTY

TN-6101

56 FNF

HF
TQ-6794

FEPD
L

OPERATING

100

CAPITAL

232

28 FNU

CP

204

1904

544 FNU
FNU

272

HF
GATES

PUBLIC TRANSPORTATION PROJECTS


GATES COUNTY
TA-6164
HF

GATES

GATES COUNTY

TK-6129

ADMINISTRATION

136

136

136

136

136

136

136

136

HF
GATES

GATES COUNTY

TM-6142

OPERATING ASSISTANCE

58

JARC
L

CP
O

29
29

OPERATING

42

JARC
L

O
O

21
21

OPERATING

92

FEPD
L

O
O

46
46

OPERATING ASSISTANCE

74

FEPD
L

O
O

37
37

HF
GATES

GATES COUNTY

TM-6148
HF

GATES

GATES COUNTY

TQ-6790
HF

GATES

GATES COUNTY

TQ-6154
HF

AVIATION PROJECTS
HERTFORD
TRI COUNTY

AV-5772

CONSTRUCT TAXIWAY.

1780

T
O

500

T
O

AIRPORT (ASJ)

C
C

1602
178

DIV
HERTFORD

TRI-COUNTY AIRPORT

AV-5769

LAND ACQUISITION.

(ASJ)

R
R

450
50

493

DIV
PUBLIC TRANSPORTATION PROJECTS
CHOANOKE PUBLIC
BERTIE
TA-6180
HALIFAX
TRANSPORTATION
HERTFORD
AUTHORITY
NORTHAMPTON
HF
BERTIE
HALIFAX
HERTFORD
NORTHAMPTON

CHOANOKE PUBLIC
TRANSPORTATION

TK-6119

CAPITAL

1194

519 FNU

CP

675

ADMINISTRATION

6504

1576 FNU
FNU

984

493

493

493

493

493

493

493

AUTHORITY
HF

PASSENGER RAIL PROJECTS


NCVA RR
BERTIE
HERTFORD
NORTHAMPTON

P-5600

NORTH CAROLINA VIRGINIA RAILROAD.


UPGRADE EXISTING RAILROAD TRACK.

800

800

TRN
IN PROGRESS
HYDE

FERRY PROJECTS
NC 12

F-5004

OCRACOKE GANTRY. REPAIR AND


REPLACE.

614

614
UNDER CONSTRUCTION

DIV - Division Category


EX - Exempt Category
HF - State Dollars (Non STI) REG - Regional Category
SW - Statewide Category
TRN - Transition Project

1-36

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO


SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE

NON HIGHWAY PROGRAM


DIVISION

COUNTY
DARE
HYDE

ROUTE/CITY
FERRY PROJECTS
NC 12

ID
NUMBER
F-5700

LOCATION / DESCRIPTION
CONSTRUCT RIVER CLASS FERRY.

LENGTH
0

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

TOTAL PRIOR
PROJ YEARS
COST COST
(THOU) (THOU) FUNDS

STATE TRANSPORTATION PROGRAM


FY 2016

FY 2015

FY 2017

FY 2018

FF

12000

UNFUNDED

DEVELOPMENTAL PROGRAM

FY 2019

FY 2020

FY 2021

4000

4000

4000

100

100

100

FY 2022

FY 2023

FY 2024

FY 2025

FUTURE YEARS

DIV
HYDE

NC 45

F-5003
TRN

SWAN QUARTER VISITORS CENTER.


REPLACEMENT.

2410

2410
UNDER CONSTRUCTION

HYDE

PUBLIC TRANSPORTATION PROJECTS


HYDE COUNTY HEALTH
TQ-9006

CAPITAL - PURCHASE OF SERVICE

40

DEPARTNEBT

FEPD
L
S

CP
CP
CP

32
4
4

HF
HYDE

HYDE COUNTY NON-PROFIT

TA-6127

CAPITAL

203

40 FNU

CP

163

1424

400 FNU
FNU

224

46

CP

32

HF
HYDE

HYDE COUNTY NON-PROFIT

HYDE

HYDE COUNTY NON-PROFIT

TK-6135

ADMINISTRATION

100

100

100

100

100

HF
TM-6141

OPERATING ASSISTANCE

46

JARC

ACCESSIBLE INFORMATION KIOSKS AST


TERMINAL CENTER FOR INFORMATION BY
VARIOUS FORMS INCLUDING BRAILLE AND
MULTIPLE LANGUAGES

32

FNF

HF
CARTERET
HYDE

NCDOT FERRY DIVISION

TA-6540
HF

HYDE

OCRACOKE PARK

TG-5252

CONSTRUCT BUS SHELTERS AND BENCHES.

AND RIDE
DIV
PUBLIC TRANSPORTATION PROJECTS
GREYHOUND LINES
BEAUFORT
TI-6104
BERTIE
CHOWAN
EDGECOMBE
FRANKLIN
MARTIN
NASH
PASQUOTANK
PERQUIMANS
PITT
WAKE
WILSON
HF
MARTIN

MARTIN COUNTY

TA-6140

MARTIN

MARTIN COUNTY

TK-6144

28273

6108 FNU

3669

387

181 FNU

CP

206

ADMINISTRATION

2530

722 FNU
FNU

360

CAPITAL

1194

519 FNU

CP

675

ADMINISTRATION

6504

1576 FNU
FNU

984

INTERCITY BUS FROM RALEIGH TO


NORFOLK, VA VIA ELIZABETH CITY ALONG
US 64, US 301, US 264, AND US 17 WITH
STOPS AT RALEIGH, ROCKY MOUNT,
WILSON, GREENVILLE, WASHINGTON,
WILLIAMSTON, EDENTON, AND ELIZABETH
CITY

CAPITAL

2312

2312

2312

2312

2312

2312

2312

2312

181

181

181

181

181

181

181

181

493

493

493

493

493

493

493

493

HF

HF
PUBLIC TRANSPORTATION PROJECTS
CHOANOKE PUBLIC
BERTIE
TA-6180
HALIFAX
TRANSPORTATION
HERTFORD
AUTHORITY
NORTHAMPTON
HF
BERTIE
HALIFAX
HERTFORD
NORTHAMPTON

CHOANOKE PUBLIC

TK-6119

TRANSPORTATION
AUTHORITY
HF

DIV - Division Category


EX - Exempt Category
HF - State Dollars (Non STI) REG - Regional Category
SW - Statewide Category
TRN - Transition Project

1-37

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO


SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE

NON HIGHWAY PROGRAM


DIVISION

COUNTY

ROUTE/CITY

PASSENGER RAIL PROJECTS


NCVA RR
BERTIE
HERTFORD
NORTHAMPTON

ID
NUMBER
P-5600

LOCATION / DESCRIPTION
NORTH CAROLINA VIRGINIA RAILROAD.
UPGRADE EXISTING RAILROAD TRACK.

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

TOTAL PRIOR
PROJ YEARS
COST COST
(THOU) (THOU) FUNDS
800

STATE TRANSPORTATION PROGRAM


FY 2016

FY 2015

FY 2017

FY 2018

UNFUNDED

DEVELOPMENTAL PROGRAM

FY 2019

FY 2020

FY 2021

FY 2022

FY 2023

FY 2024

FY 2025

FUTURE YEARS

800

TRN
IN PROGRESS
AVIATION PROJECTS
PASQUOTANK
ELIZABETH CITY

AV-5770

COAST GUARD

TAXIWAY REQUIREMENTS - SOUTHSIDE


PARTIAL PARALLEL TAXIWAY.

4067

US 17 BYPASS TO PRITCHARD STREET.


CONSTRUCT GREENWAY.

676

OPERATING

180

OPERATING ASSISTANCE - ELDERLY AND


DISABLED PERSONS

INTERCITY BUS FROM RALEIGH TO


NORFOLK, VA VIA ELIZABETH CITY ALONG
US 64, US 301, US 264, AND US 17 WITH
STOPS AT RALEIGH, ROCKY MOUNT,
WILSON, GREENVILLE, WASHINGTON,
WILLIAMSTON, EDENTON, AND ELIZABETH
CITY

T
O

C
C

3660
407

STATION (ECG)
DIV
BICYCLE AND PEDESTRIAN PROJECTS
PASQUOTANK
ELIZABETH CITY
EB-4991
TRN
PUBLIC TRANSPORTATION PROJECTS
ALBEMARLE REGIONAL
CAMDEN
TQ-6796
CHOWAN
HEALTH SERVICE
CURRITUCK
PASQUOTANK
PERQUIMANS
HF
CAMDEN
CHOWAN
CURRITUCK
PASQUOTANK
PERQUIMANS

ALBEMARLE REGIONAL

TQ-6116

HEALTH SERVICE

126 HP

550

FEPD

180

1876

1056 FEPD

820

28273

6108 FNU

3669

CAPITAL

1522

755 FNU

CP

767

ADMINISTRATION

5842

1654 FNU
FNU

876

HF
BEAUFORT
BERTIE
CHOWAN
EDGECOMBE
FRANKLIN
MARTIN
NASH
PASQUOTANK
PERQUIMANS
PITT
WAKE
WILSON

GREYHOUND LINES

TI-6104

2312

2312

2312

2312

2312

2312

2312

2312

414

414

414

414

414

414

414

414

HF
CAMDEN
CHOWAN
CURRITUCK
PASQUOTANK
PERQUIMANS

ALBEMARLE REGIONAL

TA-6142

HEALTH SERVICE

HF
CAMDEN
CHOWAN
CURRITUCK
PASQUOTANK
PERQUIMANS

ALBEMARLE REGIONAL

TK-6104

HEALTH SERVICE

HF

DIV - Division Category


EX - Exempt Category
HF - State Dollars (Non STI) REG - Regional Category
SW - Statewide Category
TRN - Transition Project

1-38

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO


SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE

NON HIGHWAY PROGRAM


DIVISION

COUNTY

ROUTE/CITY

ID
NUMBER

PUBLIC TRANSPORTATION PROJECTS


ALBEMARLE REGIONAL
CAMDEN
TM-6127
CHOWAN
HEALTH SERVICE
CURRITUCK
PASQUOTANK
PERQUIMANS
HF
PUBLIC TRANSPORTATION PROJECTS
ALBEMARLE REGIONAL
CAMDEN
TQ-6116
CHOWAN
HEALTH SERVICE
CURRITUCK
PASQUOTANK
PERQUIMANS
HF
CAMDEN
CHOWAN
CURRITUCK
PASQUOTANK
PERQUIMANS

ALBEMARLE REGIONAL

TQ-6796

LOCATION / DESCRIPTION
OPERATING ASSISTANCE

OPERATING ASSISTANCE - ELDERLY AND


DISABLED PERSONS

OPERATING

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

TOTAL PRIOR
PROJ YEARS
COST COST
(THOU) (THOU) FUNDS

STATE TRANSPORTATION PROGRAM


FY 2016

FY 2015

196

JARC
L

O
O

98
98

1876

1056 FEPD

820

180

FEPD

180

FY 2017

FY 2018

UNFUNDED

DEVELOPMENTAL PROGRAM

FY 2019

FY 2020

FY 2021

FY 2022

FY 2023

FY 2024

FY 2025

FUTURE YEARS

HEALTH SERVICE

HF
BEAUFORT
BERTIE
CHOWAN
EDGECOMBE
FRANKLIN
MARTIN
NASH
PASQUOTANK
PERQUIMANS
PITT
WAKE
WILSON

GREYHOUND LINES

TI-6104

28273

6108 FNU

3669

CAPITAL

1522

755 FNU

CP

767

ADMINISTRATION

5842

1654 FNU
FNU

876

O
O

98
98

INTERCITY BUS FROM RALEIGH TO


NORFOLK, VA VIA ELIZABETH CITY ALONG
US 64, US 301, US 264, AND US 17 WITH
STOPS AT RALEIGH, ROCKY MOUNT,
WILSON, GREENVILLE, WASHINGTON,
WILLIAMSTON, EDENTON, AND ELIZABETH
CITY

2312

2312

2312

2312

2312

2312

2312

2312

414

414

414

414

414

414

414

414

22

22

22

22

22

22

22

22

HF
CAMDEN
CHOWAN
CURRITUCK
PASQUOTANK
PERQUIMANS

ALBEMARLE REGIONAL

TA-6142

HEALTH SERVICE

HF
CAMDEN
CHOWAN
CURRITUCK
PASQUOTANK
PERQUIMANS

ALBEMARLE REGIONAL
HEALTH SERVICE

TK-6104

HF
CAMDEN
CHOWAN
CURRITUCK
PASQUOTANK
PERQUIMANS

ALBEMARLE REGIONAL

TM-6127

OPERATING ASSISTANCE

196

HEALTH SERVICE

JARC
L

HF

TYRRELL

PUBLIC TRANSPORTATION PROJECTS


TYRELL COUNTY
TA-6220

CAPITAL

51

41 FNU

CP

10

308

88 FNU
FNU

44

HF
TYRRELL

TYRELL COUNTY

TK-6168

ADMINISTRATION

HF

DIV - Division Category


EX - Exempt Category
HF - State Dollars (Non STI) REG - Regional Category
SW - Statewide Category
TRN - Transition Project

1-39

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO


SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE

NON HIGHWAY PROGRAM


DIVISION

COUNTY

ROUTE/CITY

AVIATION PROJECTS
WASHINGTON
PLYMOUTH MUNICPAL

ID
NUMBER
AV-5771

LOCATION / DESCRIPTION

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

TOTAL PRIOR
PROJ YEARS
COST COST
(THOU) (THOU) FUNDS

STATE TRANSPORTATION PROGRAM


FY 2017

FY 2018

FY 2019

FY 2020

FY 2021

FY 2022

FY 2023

T
O

FY 2024
C
C

TAXIWAY TURNAROND RUNWAY 3.

530

CAPITAL

225

84 FNU

CP

141

1242

354 FNU
FNU

176

AIRPORT (PMZ)

FY 2016

FY 2015

UNFUNDED

DEVELOPMENTAL PROGRAM
FY 2025

FUTURE YEARS

477
53

DIV
PUBLIC TRANSPORTATION PROJECTS
WASHINGTON
WASHINGTON COUNTY
TA-6137
HF
WASHINGTON

WASHINGTON COUNTY

TK-6171

ADMINISTRATION

89

89

89

89

89

89

89

89

HF

DIV - Division Category


EX - Exempt Category
HF - State Dollars (Non STI) REG - Regional Category
SW - Statewide Category
TRN - Transition Project

1-40

COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO


SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE