ABSTRACT OF MISC.

LAND SCAPE JOB


AMOUNT OFFERED
JOB AREA

Mondal Nursery
(MN)

Green View
(GV)

Princep_podium Landscape

1,388,436.05

693,516.75

Princep_courtyard to promenade
plantation

623,000.00

512,000.00

Princep _courtyard _plantation

644,655.00

728,482.00

TOTAL AMOUNT

2,656,091.05

1,933,998.75

MISC. LAND SCAPE JOB


AMOUNT OFFERED
Supermode
Gardening
(SG)

AVG. OF ALL

MIN OF ALL

775,829.00

952,593.93

579,704.80

426,696.00

520,565.33

362,139.20

855,448.00

742,861.67

597,832.00

2,057,973.00

2,216,020.93

1,539,676.00

PRINDEP-PODIUM LEVEL
SNO

BOQ Item Name

BOQ Item Description

Unit

Quantity

1
1.1

DRAIN_CELL_LAYING

CHARGES FOR LAYING DRAIN CELL WITH INTERLOCKED


MECHANISM AT ALL LEVELS AFTER CLEANING OF FLOOR WITHOUT
DAMAGING THE WATERPROOFING LAYER INCLUDING ALL
NECESSARY TOOLS AND TACKLES FOR THE PURPOSE FOLLOWING
MANUFACTURER'S SPECIFICATIONAS AND PER DIRECTION AND
GIVEN DESIGN LAYOUT BY E-I-C (DRAIN CELL WILL BE SUPPLIED
FREE OF COST BY CLIENT).

1.1.1
1.2

--SUBITEM1
GEOTEXTILE_LAYING

30 THICK DRAIN CELL

SFT

10,265.00

1.2.1

--SUBITEM1

NON-WOVEN POLYPROPYLENE NEEDLE PUNCHED GEOTEXTILE SFT


150GSM

15,221.00

1.3

SAND_FILLING

1.3.1
1.4

--SUBITEM1
SOIL_PREPARATION

CHARGES
FOR
FILLING
SAND
INCLUDING
WATERING,
COMPACTING, DRESSING ETC AS PER DIRECTION AND
SATISFACTION OF E-I-C (SAND WILL BE SUPPLIED FREE OF COST
BY CLIENT).
SFT
MEDIUM COARSE 50 MM THICK
PREPARATION OF SOIL INCLUDING CLEANING OF DEBRIS & OTHER SFT
FOREIGN PARTICLES, LOOSENING, DRESSING, MIXING OF
MANURE, COCOPEAT ETC. AND PREPARATION OF BED
MAINTAINING PROPER SLOPE FOR PLANTATION INCLUDING ALL
TOOLS AND TACKLES NECESSARY FOR THE PURPOSE.

1.5

EARTH_FILLING

CHARGES FOR EARTH WORK IN FILLING WITH GOOD EARTH IN


LAYERS NOT EXCEEDING 150 MM EACH INCLUDING WATERING,
COMPACTING ETA. LAYER BY LAYER AT ALL LEVELS AS PER
DIRECTION AND SATISFACTION OF E-I-C (SOIL TO BE SUPPLIED BY
CLIENT FREE OF COST).

1.5.1
1.6

--SUBITEM1
PLANTATION

Averrage 400 MM THICK

1.6.1
1.6.2
1.6.3
1.6.4
1.6.5
1.6.6
1.6.7
1.6.8
1.6.9
1.6.10
1.6.11
1.6.12
1.6.13

SUB ITEM 1
SUB ITEM 2
SUB ITEM 3
SUB ITEM 4
SUB ITEM 5
SUB ITEM 6
SUB ITEM 7
SUB ITEM 8
SUB ITEM 9
SUB ITEM 10
SUB ITEM 11
SUB ITEM 12
SUB ITEM 13

Rate negotiated
Revised/Negotiated

CHARGES FOR LAYING GEOTEXTILE ON PRE-LAID DRAINAGE


MEDIA WITHOUT DAMAGING THE SAME INCLUDING ALL
NECESSARY TOOLS AND TACKLES FOR THE PURPOSE FOLLOWING
MANUFACTURER'S SPECIFICATIONAS AND PER DIRECTION AND
GIVEN DESIGN LAYOUT BY E-I-C (GEOTEXTILE WILL BE SUPPLIED
FREE OF COST BY CLIENT).

10,265.00
10,265.00

SFT

10,265.00

BOUGAINVILLEA 'MARY PALMER' COLOUR MOUVE @450 MM C/C

NO

1,300.00

TYPHA GRASS @ 450 MM C/C


ASPARAGUS SPRENGERI @ 150 MM C/C
CHLOROPHYTUM COMOSUM @ 200 MM C/C
CYPRESS ALTERNIFOLIS @ 450 MM C/C
POTHOS @ 200MM C/C- 3" pot
HELICONIA PSITTACORUM @450 MM C/C
CHRYSALIDOCARPUS LUTESCENS @ 600 MM C/C 3.5-4.0'
BAMBUSA VENTRICOSA @ 600MM C/C
HYMENOCALLIS LITTORALIS (SPIDER LILY) @ 300 MM C/C
LAGERSTROEMIA THORELLI - 6-7' height , stem dia 3.5- 4"
IXORA DWARF @ 450 MM C/C
PASPALM GRASS

NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
SQM

80.00
850.00
1,375.00
300.00
2,750.00
470.00
600.00
100.00
80.00
4.00
700.00
95.00

Supplying & planting of Trees & Palms including carriage

Rate

BOQ Amount

MN

GV

SG

0.75

3.5

MN

AVG. OF ALL

GV

10,265.00
-

SG

7,698.75
-

RATE

35,927.50

1.75

LOWEST OF ALL

MOUNT

0.75

RATE

17,963.75

0.5

0.5

1.5

7,610.50

7,610.50

22,831.50

0.83

0.50

12,684.17

2.46

1.87

25,217.68

5.67

4.00

58,168.33

17.00

15.00

174,505.00

1.87
6

2.5
7

3
4

19,195.55
61,590.00

25,662.50
71,855.00

30,795.00

41,060.00

20

550
80
35
45
40
25
40
150
250
20
1200
45
200

15

75
75
25
25
30
35
50
125
150
18
500
35
220
TOTAL

16

205,300.00
-

153,975.00
-

164,240.00

90
300
70
45
35
22
80
90
60
65
400
40
160

715,000.00

97,500.00

117,000.00

6,400.00
29,750.00
61,875.00
12,000.00
68,750.00
18,800.00
90,000.00
25,000.00
1,600.00
4,800.00
31,500.00
19,000.00

6,000.00
21,250.00
34,375.00
9,000.00
96,250.00
23,500.00
75,000.00
15,000.00
1,440.00
2,000.00
24,500.00
20,900.00

24,000.00
59,500.00
61,875.00
10,500.00
60,500.00
37,600.00
54,000.00
6,000.00
5,200.00
1,600.00
28,000.00
15,200.00

1,388,436.05

693,516.75

775,829.00

238.33
151.67
43.33
38.33
35.00
27.33
56.67
121.67
153.33
34.33
700.00
40.00
193.33

75.00
75.00
25.00
25.00
30.00
22.00
40.00
90.00
60.00
18.00
400.00
35.00
160.00

309,833.33
12,133.33
36,833.33
52,708.33
10,500.00
75,166.67
26,633.33
73,000.00
15,333.33
2,746.67
2,800.00
28,000.00
18,366.67
952,593.93

LOWEST OF ALL
AMOUNT

7,698.75

7,610.50

19,195.55

41,060.00

153,975.00
97,500.00
6,000.00
21,250.00
34,375.00
9,000.00
60,500.00
18,800.00
54,000.00
6,000.00
1,440.00
1,600.00
24,500.00
15,200.00
579,704.80

PRINCEP_COURT YARD TO PROMENADE


SNO BOQ Item Name BOQ Item Description
1
Soil Preparation
Preparation of Valley and Mound as per design including filling
1.1
Sub Item-1
and dressing of earth
1.2
Sub Item-2
Soil preparation with Manure
2 Supplying &
Supplying & Planting of Grass / Grass Carpet
Planting of -Grass
1
2.1 --Sub-Item
Supplying & laying of Paspalum notetum grass
Supplying &
3
Supplying & planting of Trees & Palms including carriage :
planting of Plants
carriage
3.1 including
--Sub-Item
- 1 Ipomea Bioloba
3.2

--Sub-Item - 2

Bogenvillea Fronposa (Height 3', Foliage 2') @ 600mm c/c

Unit

MN

RATE
GV

SG

Quantity

SQM

700

130

80

172.2

SQM

700

60

70

43

SQM

350

200

220

160

NOS

6,000

55

40

30

NOS

200.000

450

450

200

TOTAL
Rate negotiated
Revised/Negotiated
Considered rate was submitted on uom as Sft

ADE
AMOUNT
GV

MN

AVG. OF ALL
RATE
MOUNT

SG

91,000.00

56,000.00

120,556.80

42,000.00
70,000.00

49,000.00
77,000.00

30,139.20
56,000.00

127.41
57.69
193.33

80
43.056
0
160

89,185.60
40,379.73
67,666.67

56,000.00
30,139.20
56,000.00

41.67

0
30

250,000.00

180,000.00

366.67

200

73,333.33

40,000.00

520,565.33

362,139.20

330,000.00

240,000.00

180,000.00

90,000.00

90,000.00

40,000.00

623,000.00

512,000.00

426,696.00

LOWEST OF ALL
RATE
AMOUNT

900

100

PRINCEP COURT YARD


SNO

BOQ Item Name

Cleaning and Soil


Preparation

1.1

Sub Item-1

1.2

Sub Item-2

BOQ Item Description

Pit digging and soil preparation with manure fertilizer


cocopeat and planting trees and palms according to design
and drawing and supported by study stakes.

Sub Item-3

Supplying & laying of Paspalum notetum grass


2.1 --Sub-Item - 1
Supplying & planting of Supplying & planting of Trees & Palms including carriage :
3 Trees & Palms including
carriage :
3.1

--Sub-Item - 1

3.2

--Sub-Item - 2

3.3
3.4
3.5
3.6
3.7
3.8

--Sub-Item
--Sub-Item
--Sub-Item
--Sub-Item
--Sub-Item
--Sub-Item

-3
-4
-5
-6
-7
-8

Areca Catechu Beetlenut palm, stem dia 4" Avg. (6'-8'- height
) (@ 1.5M C/C)
Chrysalidocarpus lutescens 1.5'-2' ( @ 0.75M C/C)- with 4-5
branches
Heliconia rostrata 1.5'-2.0' ( @ 0.6M C/C)
Spathiphyllum 1.5' 2.0' (@ 0.45M C/C
Dracaena fragrans 1.5'-2.0' ( @ 0.45M C/C)
Murraya exotica 1.5'-2.0' ( @ 0.75M C/C)
Episcia cupreata 'Frosty' 1.5'-2.0' (@ 0.3M C/C)
Syngonium podophyllum 1.5-2.0' ( @ 0.45M C/C)

Quantity

RATE
MN

GV

2,450

10

30

NOS

50

180

150

sq.m

2,350

60

80

Cum

100

190

178

SQM

900.000

200

220

NOS

50.000

500

400

NOS

120.000

72.50

72.50

65
50
80
20
45
30

50
50
75
25
45
22

Cleaning & clearing of stone & brick pieces & unwanted


SQM
materials including fine dressing & levelling of softscape area.

Preparation of Earth Bed for Shrubs, ground cover and


grass bed with manure fertilizer, cleaning unwanted growth,
levelling, watering for compaction, grading and planting
shrubs as per drawing specified
1.4
Sub Item-4
Soil filling with supplied earth
Supplying & Planting of Supplying & Planting of Grass / Grass Carpet
2 Grass / Grass Carpet
1.3

Unit

NOS 655.000
NOS 910.000
NOS 360.000
NOS 320.000
NOS 1500.000
NOS 1,556.000

TOTAL
SG quoted for 6"- 8"
Spec. change on mutual discussion

RATE

AMOUNT
SG
40

250

MN

GV

24,500.00

9,000.00

AVG. OF ALL
SG

73,500.00

7,500.00

RATE

188,000.00

235,000.00

180

19,000.00

17,800.00

18,000.00

240

180,000.00
-

198,000.00
-

26.67

10.00

193.33

150.00

12,500.00

141,000.00

MOUNT

98,000.00

100

LOWEST OF ALL

80.00
182.67

60.00
178.00

220.00

200.00

216,000.00

RATE

AMOUNT

65,333.33

24,500.00

9,666.67

7,500.00

188,000.00

141,000.00

18,266.67

17,800.00

198,000.00
-

180,000.00
-

600

25,000.00

20,000.00

30,000.00

90

8,700.00

8,700.00

10,800.00

90
45
75
24
38
28

42,575.00
45,500.00
28,800.00
6,400.00
67,500.00
46,680.00

32,750.00
45,500.00
27,000.00
8,000.00
67,500.00
34,232.00

58,950.00
40,950.00
27,000.00
7,680.00
57,000.00
43,568.00

644,655.00

728,482.00

855,448.00

500.00

400.00

78.33
68.33
48.33
76.67
23.00
42.67
26.67

72.50
50.00
45.00
75.00
20.00
38.00
22.00

25,000.00

20,000.00

9,400.00

8,700.00

44,758.33
43,983.33
27,600.00
7,360.00
64,000.00
41,493.33

32,750.00
40,950.00
27,000.00
6,400.00
57,000.00
34,232.00

742,861.67

597,832.00

900

100
200
270
270
125
170
315