You are on page 1of 30

CE 523 BRIDGE

DESIGN

DESIGN OF A STUB
ABUTMENT UNDER SEISMIC

16/19

DET

UNDER LOADING
STEP 10: Extreme event I (seismic loading), load case 1.
Note: In this case, maximum
vertical loads are used.
Vertical earthquake loading is
ignored, and one half live
load is considered.
The earthquake load from
superstructure is (from step
6)
Vy = 299.3 k /18 pairs
= 16.63 k per pair of
piles.
PAK= 26.00 k ( from step 2)
kh = 0.285 ( from step 2)
Total vertical loads:
V = 1.3DL + 0.5LL
+1.25(W 1+W 2+W 3)+1.35W 4
V = 85.98 k
Total vertical offset from the toe:
e = [(1.30DL + 0.5LL)(3.33 ft) + (1.25W 1 (4.83 ft) + 1.25W 2(4.0 ft) + 1.25W 3 (3.0 ft)
+ 1.35W 4 (5.83 ft)]/V
= [(1.30 x 17.5 + 0.5 x 25.8)(3.33) + 1.25(6.7)(4.83) + 1.25(13.3)(4.0) +
1.25(18.0)(3.0)
+ 1.35(2.1)(5.83)]/85.98
= 3.60 ft
Total overturning moment acting on a pair of piles:
MA = 1.35P0 (3.67 ft) + PAK(5.5 ft) + kh[W 1(9.0 ft) + W 2(5.0 ft) + W 3 (1.5 ft) + Vy (7.83
ft)
+ V(3.0 ft e)]

CE 523 BRIDGE
DESIGN

DESIGN OF REINFORCED
CONCRETE DECK SLAB

DET

17/19

EQUIVALENT STRIP METHOD


STEP 10: Extreme event I (seismic loading), load case 1 (continued).
Total overturning moment acting on a pair of piles:
MA = 1.35(24.2)(3.67) + (26.00)(5.5) + 0.285[(6.7)(9.0) + (13.3)(5.0) + (18.0)(1.5)]
+ (16.63)(7.83) + 85.98(3.0 3.60)
= 385.21 k ft
Calculate the maximum pile axial force.

Calculate the minimum pile axial force

The pile is in tension and is greater than allowable 3.0 k.


Calculate the total lateral forces.
H = 1.35P0+ PAK + Vy + kh (W 1 + W 2 + W 3)
= (1.35)(24.2 k) + 26.00 k 16.63 k + 0.285(6.7 k + 13.3 k + 18.0 k)
= 86.1 k
The total lateral resistance is composed of the hotizontal component of the battered
piles plus the lateral resistance of the vertical piles. The lateral resistance of a vertical
pile at strength limit state is 15.0 k (given).

CE 523 BRIDGE
DESIGN

DESIGN OF REINFORCED
CONCRETE DECK SLAB

18/19

DET

EQUIVALENT STRIP METHOD


STEP 11:

Extreme event I (seismic loading), load case 2.


Note: In this case, minimum
vertical loads are used. Vertical
earthquake loading is ignored,
and no live load is applied.
The earthquake load from
superstructure is (from step 6)
Vy = 299.3 k /18 pairs
= 16.63 k per pair of piles.
PAK = 26.00 k ( from step 2)
kh = 0.285 ( from step 2)
Total vertical loads:
V = 0.9(DL + W 1 + W 2 + W 3 + W 4)
V = 51.84 k

Total vertical offset from the toe:


e = [0.9DL (3.33 ft) + 0.9W 1 (4.83 ft) + 0.9W 2 (4.0 ft) + 0.9W 3 (3.0 ft)
+ (0.9W 4 (5.83 ft)] / V
= [0.9(17.5)(3.33) + 0.9 (6.7) (4.83) + 0.9(13.3)(4.0) + 0.9(18.0)(3.0)
+ 0.9(2.1)(5.83)] / 51.84
= 3.65 ft
Total overturning moment acting on a pair piles:
MA = 1.35P0 (3.67 ft) + PAK (5.5 ft) + kh[(W 1 (9.0 ft) + W 2 (5.0 ft) + W 3 (1.5 ft)]
+VY (7.83 ft)+ V(3.0 ft e)

CE 523 BRIDGE
DESIGN

DESIGN OF REINFORCED
CONCRETE DECK SLAB

DET

19/19

EQUIVALENT STRIP METHOD


STEP 11:

Extreme event I, load case 2 (continued).

Total overturning moment acting on a pair of piles:


MA = 1.35(24.2)(3.67) + (26.00)(5.5) + 0.285[(6.7)(9.0) + (13.3)(5.0) + (18.0)(1.5)] +
(16.63)(7.83) + 51.84(3.0 3.65)
MA = 403.39 k ft
Calculate the maximum pile axial force.

Calculate the minimum pile axial force.

The pile is in tension and is greater than the allowable 3.0 k.


Calculate the total lateral forces.
H = 1.35P0 + PAK + VY + kh (W 1 + W 2 + W 3)
= (1.35)(24.2 k) + 26.00 k + 16.63 k + 0.285(6.7 k + 13.3 k + 18.0 k)
= 86.1 k
The total lateral resistance is composed of the horizontal component of the battered
piles plus the lateral resistance of the vertical piles. The lateral resistanceofa vertical
pileat strength limit state is 15.0 k (given).

CE 523 BRIDGE
DESIGN

DESIGN OF REINFORCED
CONCRETE DECK SLAB
EQUIVALENT STRIP METHOD

PROBLEM :

DET

1/7

CE 523 BRIDGE
DESIGN

DESIGN OF REINFORCED
CONCRETE DECK SLAB
EQUIVALENT STRIP METHOD

PROBLEM :

DET

1/7

CE 523 BRIDGE
DESIGN

DESIGN OF REINFORCED
CONCRETE DECK SLAB
EQUIVALENT STRIP METHOD

PROBLEM :

DET

1/7

CE 523 BRIDGE
DESIGN

DESIGN OF REINFORCED
CONCRETE DECK SLAB
EQUIVALENT STRIP METHOD

PROBLEM :

DET

1/7

CE 523 BRIDGE
DESIGN

DESIGN OF REINFORCED
CONCRETE DECK SLAB
EQUIVALENT STRIP METHOD

PROBLEM :

DET

1/7

CE 523 BRIDGE
DESIGN

DESIGN OF REINFORCED
CONCRETE DECK SLAB
EQUIVALENT STRIP METHOD

PROBLEM :

DET

1/7

CE 523 BRIDGE
DESIGN

DESIGN OF REINFORCED
CONCRETE DECK SLAB
EQUIVALENT STRIP METHOD

PROBLEM :

DET

1/7

CE 523 BRIDGE
DESIGN

DESIGN OF REINFORCED
CONCRETE DECK SLAB
EQUIVALENT STRIP METHOD

PROBLEM :

DET

1/7

CE 523 BRIDGE
DESIGN

DESIGN OF REINFORCED
CONCRETE DECK SLAB
EQUIVALENT STRIP METHOD

PROBLEM :

DET

1/7

CE 523 BRIDGE
DESIGN

DESIGN OF REINFORCED
CONCRETE DECK SLAB
EQUIVALENT STRIP METHOD

PROBLEM :

DET

1/7

CE 523 BRIDGE
DESIGN

DESIGN OF REINFORCED
CONCRETE DECK SLAB
EQUIVALENT STRIP METHOD

PROBLEM :

DET

1/7

CE 523 BRIDGE
DESIGN

DESIGN OF REINFORCED
CONCRETE DECK SLAB
EQUIVALENT STRIP METHOD

PROBLEM :

DET

1/7

CE 523 BRIDGE
DESIGN

DESIGN OF REINFORCED
CONCRETE DECK SLAB
EQUIVALENT STRIP METHOD

PROBLEM :

DET

1/7

CE 523 BRIDGE
DESIGN

DESIGN OF REINFORCED
CONCRETE DECK SLAB
EQUIVALENT STRIP METHOD

PROBLEM :

DET

1/7

CE 523 BRIDGE
DESIGN

DESIGN OF REINFORCED
CONCRETE DECK SLAB
EQUIVALENT STRIP METHOD

PROBLEM :

DET

1/7

CE 523 BRIDGE
DESIGN

DESIGN OF REINFORCED
CONCRETE DECK SLAB
EQUIVALENT STRIP METHOD

PROBLEM :

DET

1/7

CE 523 BRIDGE
DESIGN

DESIGN OF REINFORCED
CONCRETE DECK SLAB
EQUIVALENT STRIP METHOD

PROBLEM :

DET

1/7

CE 523 BRIDGE
DESIGN

DESIGN OF REINFORCED
CONCRETE DECK SLAB
EQUIVALENT STRIP METHOD

PROBLEM :

DET

1/7

CE 523 BRIDGE
DESIGN

DESIGN OF REINFORCED
CONCRETE DECK SLAB
EQUIVALENT STRIP METHOD

PROBLEM :

DET

1/7

CE 523 BRIDGE
DESIGN

DESIGN OF REINFORCED
CONCRETE DECK SLAB
EQUIVALENT STRIP METHOD

PROBLEM :

DET

1/7

CE 523 BRIDGE
DESIGN

DESIGN OF REINFORCED
CONCRETE DECK SLAB
EQUIVALENT STRIP METHOD

PROBLEM :

DET

1/7

CE 523 BRIDGE
DESIGN

DESIGN OF REINFORCED
CONCRETE DECK SLAB
EQUIVALENT STRIP METHOD

PROBLEM :

DET

1/7

CE 523 BRIDGE
DESIGN

DESIGN OF REINFORCED
CONCRETE DECK SLAB
EQUIVALENT STRIP METHOD

PROBLEM :

DET

1/7

CE 523 BRIDGE
DESIGN

DESIGN OF REINFORCED
CONCRETE DECK SLAB
EQUIVALENT STRIP METHOD

PROBLEM :

DET

1/7

CE 523 BRIDGE
DESIGN

DESIGN OF REINFORCED
CONCRETE DECK SLAB
EQUIVALENT STRIP METHOD

PROBLEM :

DET

1/7

CE 523 BRIDGE
DESIGN

DESIGN OF REINFORCED
CONCRETE DECK SLAB
EQUIVALENT STRIP METHOD

PROBLEM :

DET

1/7

You might also like