LTE KPI DT GUIDE & MEASURE METHOD

SECRET

Product name

Confidentiality level

LTE RNP/RNO

Internal Open

Product version

Total 34 pages

LTE KPI DT GUIDE & MEASURE METHOD

Prepared by

Date

Hu Wei

Reviewed by

Date

Reviewed by

Date

Approved by

Date

2011-11-29

Huawei Technologies Co., Ltd.


All rights reserved.

Huawei Confidential No spreading without permission

Page 1 of 34

LTE KPI DT GUIDE & MEASURE METHOD

SECRET

Revision record
Date

Revision version

change
Description

Author

2011-11-29

V 1.0

First version
finished

Hu Wei 00135858

Huawei Confidential No spreading without permission

Page 2 of 34

LTE KPI DT GUIDE & MEASURE METHOD

SECRET

Contents

1 SSV Test........................................................................4
2 KPI Test.........................................................................6
3 Measure Method..........................................................33

Huawei Confidential No spreading without permission

Page 3 of 34

LTE KPI DT GUIDE & MEASURE METHOD

SECRET

1. SSV Test
1) First should check the azimuth and tilt, any problem the work should be
stopped and directly inform Huawei the problems.
2) The DT teams should select points as below (updated: 1,4,7 are canceled,
only 6 points needed) to do the network entry/ Download/ upload/ ping test.
The points location can be changed as the real signal condition.

3) If the teams find any problem (include but not only: wrong BSID or PCI; low
throughput; high ping delay) in the test they should report it to coordinator
right now. Take care on the feeder across! At last finish and submit the SSV
report (refer to the attachment).
4) If there is no cross feeder, the terminal should access to correct BSID and
correct PCI. If there is cross feeder, please report to Huawei SSV
Huawei Confidential No spreading without permission

Page 4 of 34

SECRET

LTE KPI DT GUIDE & MEASURE METHOD

supervisor. And the remaining test for this site should be stopped.
5) Throughput test should be done with FTP. Currently, there is one Huawei
FTP is available for throughput test. FTP IP: ftp://10.218.240.115/ user
name: huawei, password: huawei; ftp://10.212.195.139/ user name: wimax,
password: wimax. Please use FTP software (suggest to use filezilla,
because it can download several files together.) to download the files (at
least 10 files together) at least for 1 minute. Using first stopwatch of DU
meter to record the average DL/UL throughput during test.

6) All the throughput test mentioned in this document must be


performed in this way.
7) Ping test: click start button on your desktop and then: Start-> Run-> input
cmd->

enter->

input

ping

10.218.240.115

100

or

ping

10.212.195.139 n 100 > enter-> wait until output 10 ping delay result on
the screen-> record the average ping delay
8) Take a snapshot which includes all the above test result (ping and
download, upload), signal information, PCI, terminal Tx power, etc.
Huawei Confidential No spreading without permission

Page 5 of 34

LTE KPI DT GUIDE & MEASURE METHOD

SECRET

9) Record each points coordinates.

Huawei Confidential No spreading without permission

Page 6 of 34

SECRET

LTE KPI DT GUIDE & MEASURE METHOD

2. KPI Test
If the SSV test is clear, the teams can go ahead to the KPI test. KPI test include
Drier test and Points test.
1)

Tools prepared:

i.

LTE Dongle (E398s)

ii.

Genex Probe(V2R3)

iii.

Genex Probe HardwareDog

iv.

GPS

2)

Softwares prepared:

v.

Install software of LTE Dongle and Agent

vi.

Inster LTE Dongle in your laptop, you will see the picture

on My

Computer, then Double-click this picture, auto install the software.

vii.

Next phase install Hisi UE Agent

viii.

Please confirm the LTE DongleGPS and Probe Dog in your laptop.

ix.

Open Hisi UE Agent

x.

Open Genex Probe(V2R3)

Huawei Confidential No spreading without permission

Page 7 of 34

LTE KPI DT GUIDE & MEASURE METHOD

xi.

New LTE template:

xii.

Then clean up template like this:

xiii.

New Engineering Parameter

Huawei Confidential No spreading without permission

SECRET

Page 8 of 34

LTE KPI DT GUIDE & MEASURE METHOD

xiv.

Import File

xv.

Select File, the Engineering Paremeter will be provided by huawei.

Huawei Confidential No spreading without permission

SECRET

Page 9 of 34

LTE KPI DT GUIDE & MEASURE METHOD

xvi.

Finish Import File

xvii.

Engineering Apply

Huawei Confidential No spreading without permission

SECRET

Page 10 of 34

LTE KPI DT GUIDE & MEASURE METHOD

xviii.

SECRET

Device Configure

Huawei Confidential No spreading without permission

Page 11 of 34

LTE KPI DT GUIDE & MEASURE METHOD

xix.

Add MS

xx.

Finish MS Add

Huawei Confidential No spreading without permission

SECRET

Page 12 of 34

LTE KPI DT GUIDE & MEASURE METHOD

xxi.

SECRET

Add GPS

Huawei Confidential No spreading without permission

Page 13 of 34

LTE KPI DT GUIDE & MEASURE METHOD

xxii.

Finish GPS Add

xxiii.

New Test Plan

Huawei Confidential No spreading without permission

SECRET

Page 14 of 34

LTE KPI DT GUIDE & MEASURE METHOD

xxiv.

SECRET

Loading-in Test Plan, the test plan will be provided by huawei. But you need
to change FTP Upload file to your local file(20M).

Huawei Confidential No spreading without permission

Page 15 of 34

LTE KPI DT GUIDE & MEASURE METHOD

Huawei Confidential No spreading without permission

SECRET

Page 16 of 34

LTE KPI DT GUIDE & MEASURE METHOD

xxv.

Open Map

xxvi.

Open Geoset File

Huawei Confidential No spreading without permission

SECRET

Page 17 of 34

LTE KPI DT GUIDE & MEASURE METHOD

xxvii.

SECRET

Select Map File(TAR file), the map file will be provided by huawei

Huawei Confidential No spreading without permission

Page 18 of 34

LTE KPI DT GUIDE & MEASURE METHOD

xxviii.

SECRET

Set Cell Radius

Huawei Confidential No spreading without permission

Page 19 of 34

LTE KPI DT GUIDE & MEASURE METHOD

Huawei Confidential No spreading without permission

SECRET

Page 20 of 34

LTE KPI DT GUIDE & MEASURE METHOD

xxix.

SECRET

Set Lable

Huawei Confidential No spreading without permission

Page 21 of 34

LTE KPI DT GUIDE & MEASURE METHOD

Huawei Confidential No spreading without permission

SECRET

Page 22 of 34

LTE KPI DT GUIDE & MEASURE METHOD

xxx.

SECRET

Finish all setting, then connect to LTE Dongle and GPS.

Huawei Confidential No spreading without permission

Page 23 of 34

LTE KPI DT GUIDE & MEASURE METHOD

xxxi.

SECRET

Please begin the log recording before DT, you need to open test plan, then
begin to log recording and save.

Huawei Confidential No spreading without permission

Page 24 of 34

LTE KPI DT GUIDE & MEASURE METHOD

3)
i.

SECRET

Begin DT
The DT will follow before confirmed wimax DT boundary. Using Huawei
E398s USB terminal and Huawei Genex Probe DT software to perform the
DT. During the DT the engineers should parallel perform network entry,
minimum guarantee DownLoad/UpLoad test. By this after the DT can get
the test result of coverage probability/ successful setup rate / session
establish delay/ dropped session rate/ minimum rate guarantee of
downstream&upstream/ handoff/ wireless link burst error rate.

ii.

All the streets should be covered. The speed should less than 30km/h. In
the DT engineers should always pay attention on the PCI/RSRP/SINR. If
any problem happened they should click the pause button to pause the
test and after solving continue the test. Any problems like KPI fail to
achieve must be informed to Huawei on time. After DT the log should be
transferred to Huawei.

Huawei Confidential No spreading without permission

Page 25 of 34

LTE KPI DT GUIDE & MEASURE METHOD

iii.

SECRET

In the DT the team should always take care the PCI and performance, the
bad performance DT log or wrong test log will need repeating work. It is ok
that feedback the problems to Huawei when you meet some problems.

4)
i.

Begin PT
Cell edge coverage probability

To the cell edge coverage probability, select 20 edge points (SINR is higher
than 0dB but lower than 5dB & RSRP is lower than -100dB) to perform ftp
download, each point last 1 min. Record the detail coordinates and test results.
The RSRP and SINR must be check from Probe, you can use test plan to
download and take a Snapshots like the Average downstream throughput
sector level pictures, check the RSRP and SINR like this picture:

Acceptable range: successful rate> 80%


Target range: successful rate> 85%
ii.

Average downstream throughput terminal level


To the average downstream/upstream throughput (terminal level), select 3
points of one sector (RSRP=-105~-95 / -95~-80/ >-

Huawei Confidential No spreading without permission

Page 26 of 34

LTE KPI DT GUIDE & MEASURE METHOD

SECRET

80SINR=0~10/15~25/25~35) to perform the ftp download/ upload for 1 min.


Record the average throughput of the 3 points. This test should be implemented
for 20% of sectors per cluster.
Please pay more attention to 3 points:
RSRP=-105~-95,SINR=0~10, keep the DL throughput between 5M to 15M
RSRP=-95~-80, SINR=15~25, keep the DL throughput between 25M to 35M
RSRP>-80, SINR=25~35, keep the DL throughput between 45M to 55M
The RSRP must be check from Probe, then you can test plan to finish this
work.This test plan PT will be provided by huawei. And you need to take a
Snapshots like the Average downstream throughput sector level pictures.
DL:
Acceptable range: the result should higher than 4 Mbps ;
Target range: the result should higher than 4 Mbps;
UL:
Acceptable range: the result should higher than 1 Mbps ;
Target range: the result should higher than 1 Mbps ;
iii.

Average downstream throughput sector level


To the average downstream/upstream throughput (sector level), use 2 terminal
to perform the ftp download/ upload for 1 min at the same time. One point
must be meet the condition of Rank2 SINR1 >20 dB. The other point must be
meet the condition of MCS (in 16QAM) between 10 to 16(as below table). This
test should be implemented for 20% of sectors per cluster.

Huawei Confidential No spreading without permission

Page 27 of 34

LTE KPI DT GUIDE & MEASURE METHOD

SECRET

Please pay more attention to the DL throughput of one point must over 35M.
The DL throughput of the other point must over 15M.
In addition, you need to add MCS to your PT logs, like this snapshot to open
MCS, and check DL MCS:

Huawei Confidential No spreading without permission

Page 28 of 34

LTE KPI DT GUIDE & MEASURE METHOD

SECRET

The Rank2 SINR1 and MCS must be check from Probe, you can use FileZilla or
test plan, this test plan PT will be provided by huawei. And you need to take a
Snapshots like this:

Huawei Confidential No spreading without permission

Page 29 of 34

LTE KPI DT GUIDE & MEASURE METHOD

SECRET

DL Snapshot

UL Snapshot

Huawei Confidential No spreading without permission

Page 30 of 34

LTE KPI DT GUIDE & MEASURE METHOD

iv.

SECRET

Maximum round trip latency

To the Maximum round trip latency, select 1 edge point to perform the ping test.
This point must be meet the condition of -100<RSRP<-90.The ping packet size
is 32KB and the ping repeat time is 100. Record the average ping delay. This
test should be implemented for 20% of sectors per cluster.

Acceptable range: the average value is less than 60 ms;


Target range: the average value is less than 50 ms;
v.

Maximum Jitteryf

Calculate the maximum jitter based on above ping result. 5 biggest jitter values
can be canceled. This test should be implemented for 20% of sectors per
cluster.
Acceptable range: less than 30 ms;
Target range: less than 20 ms;

Huawei Confidential No spreading without permission

Page 31 of 34

LTE KPI DT GUIDE & MEASURE METHOD

SECRET

The LTE Stationary KPI template in here, please finish this PT test report use
this template.

Wimax&LTE
Mobily_LTE PT report templete.xls

5)

Each Work Output:

i.

SSV report;

ii.

DT logs.
Snapshots for Cell edge coverage probability, sector level throughput, terminal
level throughput; the result summary table (refer to attachment)
Round trip latency test detail by excel file;

Huawei Confidential No spreading without permission

Page 32 of 34

LTE KPI DT GUIDE & MEASURE METHOD

SECRET

3. Measure Method
KPI Test includes DT and PT (point test).
1) DT:
i.
The DT will follow before confirmed wimax DT boundary. Using
Huawei E398s USB terminal and Huawei Genex Probe&Assistant DT
software to perform the DT. During the DT the engineers should
parallel
perform
network
entry,
minimum
guarantee
DownLoad/UpLoad test. By this after the DT can get the test result
of coverage probability/ successful setup rate / session establish
delay/ dropped session rate/ minimum rate guarantee of
downstream&upstream/ handoff/ HSR/ wireless link burst error rate.
ii.
To the coverage probability, need to show out the statistic of
points percentage of RSRP>-110dBm&SINR>-3dB, show the RSRP
& SINR & PCI map picture.
iii.
Successful setup rate= ERAB Setup Success Counter / ( ERAB
Setup Success Counter + ERAB Setup Failure Counter);
iv.
Session establishment delay= T(Attach CMP)-T(Attach REQ);
v.
Dropped session rate= ERAB Abnormal Rel Counter / ERAB Setup
Suc Counter.
vi.
To the minimum rate guarantee of downstream&upstream, the
engineers will perform ftp download and upload by one fixed size
file (DL 80MB and UL 20MB) with non-GBR account, the
download&upload will be ceaselessly repeated until finish the DT.
Then calculate the average throughput of these tests. The test
result will be filtered as contract requirements and only the valid
service result will be calculated. This after filter result will be the
KPI result of this test item.
vii.
Handover successful rate(HSR)= HO Success Counter / ( HO
Success Counter + HO Failure Counter);
viii.
In any 1 min of the DT cannot happen more than 6 times HO, if
this not happen, the handoff test is passed.
ix.
To the wireless link burst error rate, calculate the average RBLER
in the DT, the average RBLER of the DT should be less than 1% to
achieve the contract KPI.
x.
All the above test result will be filtered as the RF test condition
defined in contract and the final result listed in the report should
base on the test result after this filter. The service drop or test fail
happened at bad RF points defined by contract will be excluded.
Besides, Huawei should provide all the original logs when submit
the KPI reports.
Huawei Confidential No spreading without permission

Page 33 of 34

LTE KPI DT GUIDE & MEASURE METHOD

SECRET

2) PT:
xi.
To the cell edge coverage probability, select 20 edge points (SINR
is higher than 0dB but lower than 5dB & RSRP is lower than
-95dBm) to perform ftp download, each point last 1 min. Do a
statistic for the successful service points percentage.
xii.
To the average downstream/upstream throughput (terminal
level), select 3 points (RSRP=-105~-95 / -95~-80/ >-80) to perform
the ftp download/ upload for 1 min. Record the average throughput
of the 3 points. This test should be implemented for 20% of sectors
per cluster
xiii.
To the average downstream/upstream throughput (sector level),
use 2 or 3 terminals (can be negotiated by Mobily & Huawei to
detail test requiremtns) to perform the ftp download/ upload for 1
min at the same time. In the 2 terminals condition the modulation
should be around 64QAM and 16QAM. This test should be
implemented for 20% of sectors per cluster.
xiv.
To the Maximum round trip latency, select 1 edge point (RSRP=100~-90) to perform the ping test. The ping packet size is 32KB
and the ping repeat times is 100. Record the average ping delay.
This test should be implemented for 20% of sectors per cluster.
xv.
Calculate the maximum jitter based on above ping result. 5
biggest jitter values should be canceled. This test should be
implemented for 20% of sectors per cluster.
xvi.
As contract requirements, if the site has other commercial users,
the throughput KPI is not must achieved, DT team just normally
record the test result & the slot occupy rate from NOC M2000. For
that the test is a long term work and the ftp problem is always met,
as to avoid any delay by the ftp server, to all the ftp related test
items Huawei can use either Mobily ftp server (ftp.bayanat.com.sa)
or Huawei server.
xvii.
Huawei should provide all the original logs when submit the KPI
reports.
xviii.
KPI test report template

LTE-KPI
Report_Dawadmi.ppt