Simply enter your own data in the yellow fields for the necessary calculations to be made
Project:
Revision:
Date:
Nominal
Normal flowrate:
Nominal Bore of Pressure Lines:
Nominal Bore of Suction Lines:
Nominal Bore of Return Lines:
Length of Tank:
Width of Tank:
Steel Thickness of Tank:
61.5
1" sch80
1 1/2" sch40
1 1/2" sch40
4000
900
8
LPM
Engineer:
Flow Velocity
2.21
m/s
0.78
m/s
0.78
m/s
mm
mm
mm
(L)
(W)
(T)
0.9
0.1
67
216
355
446
500
642
525
1014
1335
1525
2025
Litres
Litres
Litres
Litres
Litres
Y or N
mm
mm
mm
mm
mm
mm
mm
mm
Max Flow
(h1)
(h2)
(h3)
(h4)
(h5)
(h6)
(L-2T)(W-2T)(h2-h1)
(L-2T)(W-2T)(h3-h1)
(L-2T)(W-2T)(h4-h1)
(L-2T)(W-2T)(h5-h1)
(L-2T)(W-2T)(h6-h1)
Pressure Line
Suction Line
Return Line
(v1)
(v2)
(v3)
(v4)
(v5)
184.5
490
Litres
Litres
(v2-v1)
Passed