AVAN C E M EN SU AL AC U M U LAD O (%)

OBRA: "REHABILITACION DE VAS URBANAS DE LOS JIRONES: BOLOGNESI, INCLN Y MOQUEGUA DE LA CIUDAD DE
HUANCANE, PROVINCIA DE HUANCANE - PUNO" - CONSTRUCCIN DE PAVIMENTO RIGIDO JR. INCLN

(Grfico N 01)
AVANCES EN PORCENTAJES ACUMULADOS
PROGRAMADO vs EJECUTADO

1
0.9
0.8
0.7

0.5617555442

0.6
0.5
0.4
0.3
0.2

PROGRAM ADO

0.1457980734
0.1725274111

EJECUT ADO

0.1

0
0
0
13-Jun-11

20-Jun-11

27-Jun-11

4-Jul-11

MONTOS VALORIZADOS PROGRAMADOS


MONTOS
MES
13-Jun-11
30-Jun-11
31-Jul-11
31-Aug-11
TOTAL

PARCIAL
S/.
0
30,818.32
87,923.73
92,634.68
211,376.73

ACUMUL.
S/.
0
30,818.32
118,742.05
211,376.73

11-Jul-11

18-Jul-11

25-Jul-11

1-A ug-11

PLAZO DE EJECUCION (M ESES)

PORCENTAJES
PARCIAL
ACUMUL.
%
%
0
0
14.58%
14.58%
41.60%
56.18%
43.82%
100.00%
100.00%

8-Aug-11

15-A ug-11

13-Jun-11
30-Jun-11
31-Jul-11
31-Aug-11
TOTAL

29-A ug-11

MONTOS VALORIZADOS EJECUTADOS


MONTOS

MES

22-A ug-11

PARCIAL
S/.
0
36,468.28

36,468.28

ACUMUL.
S/.
0
36,468.28

PORCENTAJES
PARCIAL
ACUMUL.
%
%
0
0
17.25%
17.25%

17.25%