DRAWINGS' REGISTER

BULOH KASAP WATER TREATMENT PLANT


NO.
(A)

DRAWING NO.

DRAWING TITLE

GENERAL
PAAB/J002-1/HLA/TW/G/001/00
PAAB/J002-1/HLA/TW/G/002/00
PAAB/J002-1/HLA/TW/G/003/00
PAAB/J002-1/HLA/TW/G/004/00

General Notes
Legends and Abbreviations
Key and Overall Site Plan For Package 1
Location Plan

7-Sep-12
7-Sep-12
7-Sep-12
###

General Layout Plan


Setting Out Plan
Drainage layout Plan
Earthwork Layout Plan
Earthwork Cross Section (Sheet 1 of 2)
Earthwork Cross Section (Sheet 2 of 2)
ESCP Layout Plan
Sediment Basin

###
###
###
###
###

General Layout Plan


Setting Out Plan
Overall Pipeworks and Walkaway Layout Plan
Drainage and Sewerage Layout
ESCP Layout Plan
Sediment Basin
Earthwork Layout Plan
Earthwork Cross Section (Sheet 1 of 6)
Earthwork Cross Section (Sheet 2 of 6)
Earthwork Cross Section (Sheet 3 of 6)
Earthwork Cross Section (Sheet 4 of 6)
Earthwork Cross Section (Sheet 5 of 6)
Earthwork Cross Section (Sheet 6 of 6)

### 28-Sep-12
###
###
###
###
###
###
###
###
###
###

RIVER INTAKE

PAAB/J002-1/HLA/IW/C/RI/001/00
PAAB/J002-1/HLA/IW/C/RI/002/00
PAAB/J002-1/HLA/IW/C/RI/003/00
PAAB/J002-1/HLA/ESCP/C/RI/001/00
PAAB/J002-1/HLA/ESCP/C/RI/002/00
WATER TREATMENT PLANT
PAAB/J002-1/HLA/TW/CS/WTP/001/00
PAAB/J002-1/HLA/TW/CS/WTP/002/00
PAAB/J002-1/HLA/TW/CS/WTP/003/00
PAAB/J002-1/HLA/TW/CS/WTP/004/00
PAAB/J002-1/HLA/ESCP/C/WTP/001/00
PAAB/J002-1/HLA/ESCP/C/WTP/002/00
PAAB/J002-1/HLA/TW/C/WTP/001/00
PAAB/J002-1/HLA/TW/C/WTP/002/00
PAAB/J002-1/HLA/TW/C/WTP/003/00
PAAB/J002-1/HLA/TW/C/WTP/004/00
PAAB/J002-1/HLA/TW/C/WTP/005/00
PAAB/J002-1/HLA/TW/C/WTP/006/00
PAAB/J002-1/HLA/TW/C/WTP/007/00
2.5ML BATU 5 RESERVOIR

General Layout Plan


Setting Out Plan
Drainage layout Plan
Earthwork Layout Plan
Earthwork Cross Section
ACCESS ROAD TO WTP
PAAB/J002-1/HLA/TW/RDS/WTP/001/00
RAW WATER PUMPING MAIN
PAAB/J002-1/HLA/PP/C/RAW/001/00
PAAB/J002-1/HLA/PP/C/RAW/002/00
PAAB/J002-1/HLA/PP/C/RAW/003/00
PAAB/J002-1/HLA/PP/C/RAW/004/00

Plan & Profile CH 0.00 - CH 620.00


Plan & Profile CH 0.00A - CH 600.00A
Index
Plan &
Plan &
Plan &
Plan &

Profile
Profile
Profile
Profile

CH
CH
CH
CH

0.00 - CH 300.00
300.00 - CH 600.00
600.00 - CH 900.00
900.00 - CH 1077.00

###

7-Sep-1228-Sep-12
7-Sep-1228-Sep-12
7-Sep-1228-Sep-12
7-Sep-1228-Sep-12

700mm ND TREATED WATER PIPELINE


PAAB/J002-1/HLA/PP/C/TWP/INDEX/001/00
PAAB/J002-1/HLA/PP/C/TWP/001/00
PAAB/J002-1/HLA/PP/C/TWP/002/00

Index
Plan and Longitudinal Profile CH 0.00 - CH 300.00
Plan and Longitudinal Profile CH 300.00 - CH 600.00

28-Sep-12
28-Sep-12

REVISIONS
C

DRAWINGS' REGISTER
BULOH KASAP WATER TREATMENT PLANT
NO.

DRAWING NO.
PAAB/J002-1/HLA/PP/C/TWP/003/00
PAAB/J002-1/HLA/PP/C/TWP/004/00
PAAB/J002-1/HLA/PP/C/TWP/005/00
PAAB/J002-1/HLA/PP/C/TWP/006/00
PAAB/J002-1/HLA/PP/C/TWP/007/00
PAAB/J002-1/HLA/PP/C/TWP/008/00
PAAB/J002-1/HLA/PP/C/TWP/009/00
PAAB/J002-1/HLA/PP/C/TWP/010/00
PAAB/J002-1/HLA/PP/C/TWP/011/00
PAAB/J002-1/HLA/PP/C/TWP/012/00
PAAB/J002-1/HLA/PP/C/TWP/013/00
PAAB/J002-1/HLA/PP/C/TWP/014/00
PAAB/J002-1/HLA/PP/C/TWP/015/00
PAAB/J002-1/HLA/PP/C/TWP/016/00
PAAB/J002-1/HLA/PP/C/TWP/017/00
PAAB/J002-1/HLA/PP/C/TWP/018/00
PAAB/J002-1/HLA/PP/C/TWP/019/00
PAAB/J002-1/HLA/PP/C/TWP/020/00
PAAB/J002-1/HLA/PP/C/TWP/021/00
PAAB/J002-1/HLA/PP/C/TWP/022/00
PAAB/J002-1/HLA/PP/C/TWP/023/00
PAAB/J002-1/HLA/PP/C/TWP/024/00

Plan
Plan
Plan
Plan
Plan
Plan
Plan
Plan
Plan
Plan
Plan
Plan
Plan
Plan
Plan
Plan
Plan
Plan
Plan
Plan
Plan
Plan

and
and
and
and
and
and
and
and
and
and
and
and
and
and
and
and
and
and
and
and
and
and

Longitudinal
Longitudinal
Longitudinal
Longitudinal
Longitudinal
Longitudinal
Longitudinal
Longitudinal
Longitudinal
Longitudinal
Longitudinal
Longitudinal
Longitudinal
Longitudinal
Longitudinal
Longitudinal
Longitudinal
Longitudinal
Longitudinal
Longitudinal
Longitudinal
Longitudinal

DRAWING TITLE
Profile CH 600.00 - CH 900.00
Profile CH 900.00 - CH 1200.00
Profile CH 1200.00 - CH 1500.00
Profile CH 1500.00 - CH 1800.00
Profile CH 1800.00 - CH 2100.00
Profile CH 2100.00 - CH 2400.00
Profile CH 2400.00 - CH 2700.00
Profile CH 2700.00 - CH 3000.00
Profile CH 3000.00 - CH 3300.00
Profile CH 3300.00 - CH 3600.00
Profile CH 3600.00 - CH 3900.00
Profile CH 3900.00 - CH 4200.00
Profile CH 4200.00 - CH 4500.00
Profile CH 4500.00 - CH 4800.00
Profile CH 4800.00 - CH 5100.00
Profile CH 5100.00 - CH 5400.00
Profile CH 5400.00 - CH 5700.00
Profile CH 5700.00 - CH 6000.00
Profile CH 6000.00 - CH 6300.00
Profile CH 6300.00 - CH 6600.00
Profile CH 6600.00 - CH 6900.00
Profile CH 6900.00 - CH 7125.00

0
28-Sep-12
28-Sep-12
28-Sep-12
28-Sep-12
28-Sep-12
28-Sep-12
28-Sep-12
28-Sep-12
28-Sep-12
28-Sep-12
28-Sep-12
28-Sep-12
28-Sep-12
28-Sep-12
28-Sep-12
28-Sep-12
28-Sep-12
28-Sep-12
28-Sep-12
28-Sep-12
28-Sep-12
28-Sep-12

REVISIONS
C

RIVER INTAKE AND RAW WATER


PUMPING STATION
PAAB/J002-1/HLA/TW/A/RI/001/00
PAAB/J002-1/HLA/TW/A/RI/002/00
PAAB/J002-1/HLA/TW/A/RI/003/00

Plan and Detail


Plan, Sections and Details
Sections and Details

###
###
###

TNB/CONSUMER SUBSTATION AT RIVER INTAKE


PAAB/J002-1/HLA/TW/A/TNBRI/001/00
PAAB/J002-1/HLA/TW/A/TNBRI/002/00

Plans
Elevations and Sections

###
###

AERATOR AND MIXING TANK


PAAB/J002-1/HLA/TW/A/AE/001/00

Plan, Elevation and Sections

25-Jul-1228-Sep-12

PROCESS TANK
PAAB/J002-1/HLA/TW/A/PT/001/00
PAAB/J002-1/HLA/TW/A/PT/001A/00
PAAB/J002-1/HLA/TW/A/PT/002/00
PAAB/J002-1/HLA/TW/A/PT/003/00
PAAB/J002-1/HLA/TW/A/PT/004/00
PAAB/J002-1/HLA/TW/A/PT/005/00
PAAB/J002-1/HLA/TW/A/PT/006/00

Plan Level at 42.00m


Plan Level at 38.00m
Roof Plan and Plan at Level 38.95
Sections (Sheet 1)
Sections (Sheet 2)
Elevations (Sheet 1)
Elevations (Sheet 2)

### 20-Sep-12
### 20-Sep-12
### 20-Sep-12
### 20-Sep-12
### 20-Sep-12
20-Sep-12
20-Sep-12

CLEAR AND CHLORINE WATER TANK


PAAB/J002-1/HLA/TW/A/CWT/001/00
PAAB/J002-1/HLA/TW/A/CWT/002/00
PAAB/J002-1/HLA/TW/A/CWT/003/00

Ground Floor Plan


Roof Plan
Sections and Details

### 20-Sep-12
28-Sep-12
### 20-Sep-12
28-Sep-12
### 20-Sep-12
28-Sep-12

Base Floor Plan


Floor Plan

###
###

TREATED PUMPING STATION


PAAB/J002-1/HLA/TW/A/TWP/001/00
PAAB/J002-1/HLA/TW/A/TWP/002/00

DRAWINGS' REGISTER
BULOH KASAP WATER TREATMENT PLANT
NO.

DRAWING NO.
PAAB/J002-1/HLA/TW/A/TWP/003/00
PAAB/J002-1/HLA/TW/A/TWP/004/00
PAAB/J002-1/HLA/TW/A/TWP/005/00

DRAWING TITLE
Roof Plan and Details
Elevations
Sections

0
###
###
###

Layout Plan at Level 39.50


Layout Plan at Level 46.50
Layout Plan at Level 49.25
Lower Roof Plan
Section A-A
Section B-B

###
###
###
###
###
###

28-Sep-12
28-Sep-12
28-Sep-12
28-Sep-12
28-Sep-12

Layout Plan
Sections
Elevations

###
###
###

###
###
###

4.50 ML R.C ELEVATED RESERVOIR AND


0.60 ML WASH WATER TANK
PAAB/J002-1/HLA/TW/A/BR/001/00
PAAB/J002-1/HLA/TW/A/BR/002/00
PAAB/J002-1/HLA/TW/A/BR/003/00
PAAB/J002-1/HLA/TW/A/BR/004/00
PAAB/J002-1/HLA/TW/A/BR/005/00
PAAB/J002-1/HLA/TW/A/BR/006/00
CHEMICAL BUILDING
PAAB/J002-1/HLA/TW/A/CB/001/00
PAAB/J002-1/HLA/TW/A/CB/002/00
PAAB/J002-1/HLA/TW/A/CB/003/00
WASH WATER COLLECTION TANK
PAAB/J002-1/HLA/TW/WWC/01/00

Plan and Sections

SLUDGE LAGOON
PAAB/J002-1/HLA/TW/PS/G/SL/001/00

Layout Plan and Sections

PAAB/J002-1/HLA/TW/PS/G/SL/002/00
PAAB/J002-1/HLA/TW/PS/G/SL/003/00
PAAB/J002-1/HLA/TW/PS/G/SL/004/00

Inlet and Outlet Structures


RC Ramp
RC Steps

7-Sep-12
7-Sep-12
7-Sep-12
7-Sep-12

Ground Floor Plan


Roof Plan
Elevations
Sections (Sheet 1 of 2)
Sections (Sheet 2 of 2)

25-Jul-12
25-Jul-12
25-Jul-12
25-Jul-12
25-Jul-12

ADMINISTRATION BUILDING
PAAB/J002-1/HLA/TW/A/AD/001/00
PAAB/J002-1/HLA/TW/A/AD/002/00
PAAB/J002-1/HLA/TW/A/AD/003/00
PAAB/J002-1/HLA/TW/A/AD/004/00
PAAB/J002-1/HLA/TW/A/AD/005/00

QUARTERS TYPE G
PAAB/J002-1/HLA/TW/A/QG/001/00
PAAB/J002-1/HLA/TW/A/QG/002/00
PAAB/J002-1/HLA/TW/A/QG/003/00
PAAB/J002-1/HLA/TW/A/QG/004/00
PAAB/J002-1/HLA/TW/A/QG/005/00

Plan Layout
Elevation
Section
Setion
Refuse Chamber

TNB SUBSTATION AT WATER TREATMENT PLANT


PAAB/J002-1/HLA/TW/A/TNB/001/00

Plans, Sections, and Elevations

###

Plans, Elevations and Sections

25-Jul-12

GUARD HOUSE
PAAB/J002-1/HLA/TW/A/GH/001/00

REVISIONS
C

DRAWINGS' REGISTER
BULOH KASAP WATER TREATMENT PLANT
NO.

DRAWING NO.
2.50ML R.C RESERVOIR
AT NEW BATU LIMA
PAAB/J002-1/HLA/TW/A/RBT5/001/00
PAAB/J002-1/HLA/TW/A/RBT5/002/00
PAAB/J002-1/HLA/TW/A/RBT5/003/00
PAAB/J002-1/HLA/TW/A/RBT5/004/00

DRAWING TITLE

Plan of Pipeworks and Schedule


Sections
Sectional Elevation and Front Elevation
Plan of Construction Joints

7-Sep-12
7-Sep-12
7-Sep-12
7-Sep-12

MISCELLANEOUS DETAILS
PAAB/J002-1/HLA/TW/A/MD/001/00
PAAB/J002-1/HLA/TW/A/MD/002/00
PAAB/J002-1/HLA/TW/A/MD/003/00
PAAB/J002-1/HLA/TW/A/MD/004/00
PAAB/J002-1/HLA/TW/A/MD/005/00
PAAB/J002-1/HLA/TW/A/MD/006/00
PAAB/J002-1/HLA/TW/A/MD/007/00
PAAB/J002-1/HLA/TW/A/MD/008/00
PAAB/J002-1/HLA/TW/A/MD/009/00
PAAB/J002-1/HLA/TW/A/MD/010/00
PAAB/J002-1/HLA/TW/A/MD/011/00
PAAB/J002-1/HLA/TW/A/MD/012/00
PAAB/J002-1/HLA/TW/A/MD/013/00
PAAB/J002-1/HLA/TW/A/MD/014/00
PAAB/J002-1/HLA/TW/A/MD/015/00
PAAB/J002-1/HLA/TW/A/MD/016/00
PAAB/J002-1/HLA/TW/A/MD/017/00
PAAB/J002-1/HLA/TW/A/MD/018/00
PAAB/J002-1/HLA/TW/A/MD/019/00
PAAB/J002-1/HLA/TW/A/MD/020/00
PAAB/J002-1/HLA/TW/A/MD/021/00
PAAB/J002-1/HLA/TW/A/MD/022/00
PAAB/J002-1/HLA/TW/A/MD/023/00
PAAB/J002-1/HLA/TW/A/MD/024/00
PAAB/J002-1/HLA/TW/A/MD/025/00
MISCELLANEOUS DETAILS (CONT'D)
PAAB/J002-1/HLA/TW/A/MD/025A/00
PAAB/J002-1/HLA/TW/A/MD/026/00
PAAB/J002-1/HLA/TW/A/MD/027/00
PAAB/J002-1/HLA/TW/A/MD/028/00
PAAB/J002-1/HLA/TW/A/MD/029/00
PAAB/J002-1/HLA/TW/A/MD/029A/00
PAAB/J002-1/HLA/TW/A/MD/030/00
PAAB/J002-1/HLA/TW/A/MD/031/00
PAAB/J002-1/HLA/TW/A/MD/032/00
PAAB/J002-1/HLA/TW/A/MD/033/00
PAAB/J002-1/HLA/TW/A/MD/034/00
PAAB/J002-1/HLA/TW/A/MD/035/00
PAAB/J002-1/HLA/TW/A/MD/036/00
PAAB/J002-1/HLA/TW/A/MD/037/00
PAAB/J002-1/HLA/TW/A/MD/038/00
PAAB/J002-1/HLA/TW/A/MD/039/00
PAAB/J002-1/HLA/TW/A/MD/040/00
PAAB/J002-1/HLA/TW/A/MD/041/00
PAAB/J002-1/HLA/TW/A/MD/042/00
PAAB/J002-1/HLA/TW/A/MD/043/00
PAAB/J002-1/HLA/TW/A/MD/044/00
PAAB/J002-1/HLA/TW/A/MD/045/00
PAAB/J002-1/HLA/TW/A/MD/046/00

Temporary Project Signboard Details


Sediment Protection and Temporary Diversion Drain/Dyke Details
Wash Trough
Details of RC Pile
Typical Retaining Wall Details
Standard Drainage Details (Sheet 1 of 2)
Standard Drainage Details (Sheet 2 of 2)
Hydrant, Drain Sump and Grating Details
Standard Culvert Details
Road Element and Curves
Treatment of Superelevation
Standard Road Details
Standard Road Kerb
Temporary Road Signs
Temporary Road Signs Locations
Typical Guardrail Details
Sign Board and Road Marking
Indicator Post, Boundary Marker and Typical Cross Section of Pipe
Typical Detail of Pipe Crossing (Sheet 1 of 2)
Typical Detail of Pipe Crossing (Sheet 2 of 2)
Thrust Blocks and Anchor Blocks
Details of Joints
Schedule of Pipe Specials (Sheet 1 of 2)
Schedule of Pipe Specials (Sheet 2 of 2)
Double Orifice Air Valve Chamber, Sluice Valve, Chamber Tailbay
Slab Cover

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

Details of Precast Slab Cover


Washout Chamber
Flowmeter Chamber
Details of Butterfly, Sluice Valve Chamber, Sluice Valve Precast
Pipe Jacking, Gabion Wall and RC Steps
Altitude Valve Chamber and By Pass Chamber
Metal Work (Sheet 1 of 2)
Metal Work (Sheet 2 of 2)
Movement and Construction Joints (Sheet 1 of 2)
Movement and Construction Joints (Sheet 2 of 2)
Detail of Fence and Gate
Details of Chemical Wastewater Manhole
Typical Sanitary House, Manhole Connection and Bedding Details
Typical Details of Pipe Crossing , Bulk Meter and Trenches
Grease Trap, Gully Trap, Floor Trap and Vent
Typical Detail of Inspection Manhole (Sanitary Plumbing)
Typical Detail of Sewerage Precast Manhole
Drop Manhole, Bedding and Cover Details
Typical Flow Details of Manhole
Window Details (Sheet 1 of 2)
Window Details (Sheet 2 of 2)
Door Details
Door Fixing Details

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

REVISIONS
C

DRAWINGS' REGISTER
BULOH KASAP WATER TREATMENT PLANT
NO.

DRAWING NO.
PAAB/J002-1/HLA/TW/A/MD/047/00
PAAB/J002-1/HLA/TW/A/MD/048/00
PAAB/J002-1/HLA/TW/A/MD/049/00
PAAB/J002-1/HLA/TW/A/MD/050/00
PAAB/J002-1/HLA/TW/A/MD/051/00
PAAB/J002-1/HLA/TW/A/MD/052/00
PAAB/J002-1/HLA/TW/A/MD/053/00
PAAB/J002-1/HLA/TW/A/MD/054/00
PAAB/J002-1/HLA/TW/A/MD/055/00
PAAB/J002-1/HLA/TW/A/MD/056/00
PAAB/J002-1/HLA/TW/A/MD/057/00
PAAB/J002-1/HLA/TW/A/MD/058/00
PAAB/J002-1/HLA/TW/A/MD/059/00
PAAB/J002-1/HLA/TW/A/MD/060/00
PAAB/J002-1/HLA/TW/A/MD/061/00
PAAB/J002-1/HLA/TW/A/MD/062/00

DRAWING TITLE
Roof Tile Awning
Details of Spillway
Detail of Chemical R.C Trenches/Cable Trench (Sheet 1 of 2)
Detail of Chemical R.C Trenches/Cable Trench (Sheet 2 of 2)
Scour/Overflow/Desludging Manholes Details
Standard Signage (Sheet 1 of 3)
Standard Signage (Sheet 2 of 3)
Standard Signage (Sheet 3 of 3)
Pedestrian Walkway Details
Walkway Crossing Road Details
Details of Coverred Car Park
Meter Stand Installation
Details of HDPE Communication Pipe
PE Pipe Specials (Sheet 1 of 2)
PE Pipe Specials (Sheet 2 of 2)
Details of HDPE Communication Pipe and Tapping For
Ductile Iron/ uPVC/AC Recticulation Pipe

0
###
###
###
###
###
###
###
###
28-Sep-12
28-Sep-12
28-Sep-12
28-Sep-12
28-Sep-12
28-Sep-12
28-Sep-12
28-Sep-12

REVISIONS