Professional Documents
Culture Documents
Cold Outside
Breather Membrane
Steel L-Bracket
Cellulose Insulation
200mm
Recyclable
Suspended Ceiling
Warm
Inside
Suspension Wire
Trespa Timber-Fibre
Cladding Panel
Head
Triple Glazing
Window Revel (Trespa
cladding panel)
Cill
Meeting
Room
Zinc Flashing
Window Cill
Gravel
Cladding Screw
Drainage Gutter to
allow water to drain
either side of rooflight
Sealant
Timber Section
Thermal Break
Wild Flower
Zinc Flashing
Timber Batten 75x35mm
OSB screwed
to timber joists
2nd Floor
Walkway
Zinc Flashing
Planting Substrate
DuPont AirGuard, air tight
vapour check
PassivLux Triple
glazed Central Pivot
Rooflight
Filter Sheet
Drainage Layer
OSB 15mm
Fermacell
Gypsum/ Cellulose
Plasterboard
Protection Mat
Sealing tape used in areas
where air tight vapour
check wraps around rafters
Fermacell
Gypsum/Cellulose
Plasterboard
OSB
Fermacell Gypsum/Cellulose
Plasterboard, screwed in,
mastic sealant over screw for
air tightness
Recycled Denim
Insulation 300mm
Heated Hallway
Root Barrier
Foamglas Rigid
Insulation 180mm
Timber Joist x2
120x45mm between rafters
PassivLux Triple
glazed Central
Pivot Rooflight
Breather Membrane
OSB sheathing board
screwed to timber joists
Zinc Flashing
Timber Wall plate 150x75mm to
support rafter, Wall plate
supported by timber studs
spaced with insulation between
Gravel
Insulation
Plasterboard
Cellulose Insulation
200mm
DuPont AirGuard,
air tight vapour
check
Meeting Room
1st Floor
Walkway
Suspension Wire
Heated
Hallway
Concrete Beam
Recyclable Suspended
Ceiling
Concrete Column
SHEET
Sheet No.
Details
0-7
Scale (@A1)
1:5
Bubblecrete
Concrete Deck
PROJECT
Ryan O'Reilly
AT4
B1008257
Sheffield Hallam University