You are on page 1of 6
PT PLN (PERSERO) KANTOR PUSAT Jalan Trunojoyo Blok M 1/135 Kebayoran Baru - Jakarta 12160 Tol. (021) 7261875, 7261122, 7262234 Telex: 47186, 47248 ‘Alamat Kawat : PLNPST (021) 7251284, 7250550 Faximile : (021) 7221990 Kotak Pos 4322/KBB Nomor/ Ref. No, 0668 /KON.01.10/KDIVIPP/2015 21 May 2015 Lamp Ath. 4 (one) CD Perihal/Subject: Penyampaian basic design dan design criteria Fasiitas Knusus ‘Submission of the basic designs and design criteria for Special Facilities Kepadal To: ‘MODEL 1001 Up. : Direktur Utama Dengan hormat, Berkenaan dengan surat Saudare nomor O14/06/REP/2015 tanggal 26 Januari 2015 tentang Permintaan basic design dan design criteria Fasiitas _Khusus dan menindaklanjuti email PUSENLIS ke REP tanggal 3 Februari 2015, dengan ini disampaikan kembali basic design dan design criteria Fasiltas Khusus seperti dalam lampiran (format pdf) untuk referensi Saudara. ‘Terima kasi atas perhatian Anda. ce: = Head of PUSENLIS - MS Enj. Trans & Dist. PUSENLIS PT RAJAMANDALA ELECTRIC POWER (“REP”) Wisma PMI 2% Floor, Suite 202, JI, Wijaya | No. 63 Kebayoran Baru, Jakarta Selatan 12170 Attn, : President Director Dear Sir, With regard to your letter number 014/061/REP/2015 dated 26 January 2015 concerning Request for basic designs and design criteria for Special Facilities and to follow up an email from PUSENLIS to REP dated 3 February 2015, we hereby would like to convey you the basic designs and design criteria for Special Facilities as in attachment (pdf format) for your reference. Thank you for your attention. HERNADI BUHRON RAJAMANDALA ELECTRIC POWER No 014106 /REPIZ015, Jakarta, 26 January 2015 ‘Attachment: 1 Subject Request for basic designs and design To: criteria for the Special Facil IPP Division Head PT PLN (Persero) Ji. Trunojoyo Blok M 1/135 Kebayoran Baru Jakarta Dear Sir, With regard to Development of Rajamandala 47 MW HEPP Project by PT Rejemandela Electric Power, herewith we would like to inform you that we will start discussion about detail design of the Special Facilities with our Contractors. The Special Facilities will comprise of 4 bays of swithyard and 150 kV transmission line and connect with existing Cianjur Cigareleng 150 KV line. ‘According to the Power Purchase Agreement Rajamandala HEPP 47 MW, clause 5.7.3 Approval of the Special Facilities, certain basic designs and design criteria will be provided to SELLER by PLN. With this letter, please kindly inform us. basic designs and design criteria for the Special Facilities as of basis of our detail design of the Special Facilites, including as built drawings/design documents of the exsisting tower which we intend to use as connecton point (detail attached). Thank you for your support and understanding, PRESIDENT DIRECTOR \MBANG PRIYAMBODO- ce: = GMPLN P36 JB = PT PLN (Persero) ~ Pusat Enjinting Ketenagalistnikan yr. ALA IC POWER Tesi Alor Sato Way hs Bejan Ba, Jka Stn 12170 Pore: 622178 S15 Fes 16221 270320 CONNECTION POINT OF NEW RAJAMANDALA 150 kV TRANSMISSION LINE TO EXISTING 150 kV TRANSMISSION LINE “Type of Connection =] Single Pi = “Type ofiintended connection | Tension’ tower Location of connection tower Desa Kertasari , Kabupaten Cianjur, Jawa Barat Latitude : 6° 48° 43.7 (UTM: 9246405) Longitude :107° 18" §0.3 (UTM: 755749) Tdeniffcalion of eonne Existing 150 KV T/L ISOKV Cigereleng - Cianjur line) (Soon, Cae 500 aa °°8~ S3guling Ling) Budhi Setiawan SSeS From: hanung natendra sukandrio ‘Tuesday, February 03, 2015 6:49 AM shimizu.masaji2@rajamandala-power.com; bambang priyambodo@rajamandala-power.com; natendra@yahoo.com Budhi Setiawan; Hesti Sayoga Design Criteria Part 1 Attachments: Transmission Line.rar Dear Shimizu-san Here i attached the design criteria for T/L and Substation, please let me know if you had received this email. will send you 4 email because the size is quite big ‘Thank You, Regards Hanung “Email ini adalah untuk penerinua yang dituju dan dapat herisi data yang bersifat rahasia atau hanya untuk kepentingun penerima, Jika anda tidak termasuk sebugai penerina, maka tiduk dijinkan untuk menyebarkan, mensalin emuil dan utau uttaclanent didalannya atau menggunakan untuk epentingan Iain.” “Email PLN adalah fusilnas kerja untuk melakukan korespondensi untar unit di internal perusahaan maupun dengan pihak luar, Konten Email dilarang bersifar imimidasi, Tenyesarkan atu dapat menvebubkan kesalahpuhamun, Pelongguran terhadap ketentusn tersebut akan dikenakan sanksi berupa pemblokiran akses, pencaburan uksi bahkan sanksi disiplin pegawai sesuai aturan Perusuhuui Budhi Setiawan ‘Shimizu, Masaji [Shimizu.masaji2@rajamandala-power.com] Monday, May 11, 2015 10:53 AM Budhi Setiawan hanung natendra sukandrio; natendra@yahoo.com; "Pak Yudianto (REP)"; "fish Wir#&(Raja)"; REP Ac MLZ; "Ay CURED "MRR OAD "Rl OAD) "RING", “iz BGE(KANSAN” Subject: RE: Design Criteria Part 1 Attachments: Surat ke KDIV IPP - Basic Design of Special Facilties.paf Dear Budhi-san, Thank you for your cooperation. Regarding the request letter for design criteria numbered 014/081/REP/2015 dated on January 26" 2015 from REP, we have received the Design Criteria from Hanung-san unofficially. However, we have not received official letter from PLN. Could you inform us when will you provide the offical letter and as-built drawings/design documients of existing tower which we requested including the letter? 1am sorry for rushing you. Best regards, Masaji Shimizu(REP) From: hanung natendra sukandrio [mailto:hanung.sukandrio@pin.co.id) Sent: Tuesday, February 03, 2015 8:49 AM To: shimizu.masaji2@rajamandala-power.com; bambang.priyambodo@rajamandala-power.com; natendra@yahoo.com Ce: Budhi Setiawan; Hesti Sayoga Subject: Design Criteria Part 1 Dear Shimizu-san Here i attached the design criteria for T/L and Substation, please let me know if you had received this email. will send you 4 email because the size is quite big ‘Thank You. Regards Hanung

You might also like