PT PLN (PERSERO)
KANTOR PUSAT
Jalan Trunojoyo Blok M 1/135 Kebayoran Baru - Jakarta 12160
Tol. (021) 7261875, 7261122, 7262234 Telex: 47186, 47248 ‘Alamat Kawat : PLNPST
(021) 7251284, 7250550 Faximile : (021) 7221990
Kotak Pos 4322/KBB
Nomor/ Ref. No, 0668 /KON.01.10/KDIVIPP/2015 21 May 2015
Lamp Ath. 4 (one) CD
Perihal/Subject: Penyampaian basic design dan design
criteria Fasiitas Knusus
‘Submission of the basic designs and design
criteria for Special Facilities
Kepadal To:
‘MODEL 1001
Up. : Direktur Utama
Dengan hormat,
Berkenaan dengan surat Saudare nomor
O14/06/REP/2015 tanggal 26 Januari
2015 tentang Permintaan basic design dan
design criteria Fasiitas _Khusus dan
menindaklanjuti email PUSENLIS ke REP
tanggal 3 Februari 2015, dengan ini
disampaikan kembali basic design dan
design criteria Fasiltas Khusus seperti
dalam lampiran (format pdf) untuk referensi
Saudara.
‘Terima kasi atas perhatian Anda.
ce:
= Head of PUSENLIS
- MS Enj. Trans & Dist. PUSENLIS
PT RAJAMANDALA ELECTRIC POWER
(“REP”)
Wisma PMI 2% Floor, Suite 202, JI, Wijaya |
No. 63 Kebayoran Baru,
Jakarta Selatan 12170
Attn, : President Director
Dear Sir,
With regard to your letter number
014/061/REP/2015 dated 26 January 2015
concerning Request for basic designs and
design criteria for Special Facilities and to
follow up an email from PUSENLIS to REP
dated 3 February 2015, we hereby would like
to convey you the basic designs and design
criteria for Special Facilities as in attachment
(pdf format) for your reference.
Thank you for your attention.
HERNADI BUHRONRAJAMANDALA
ELECTRIC POWER
No 014106 /REPIZ015, Jakarta, 26 January 2015
‘Attachment: 1
Subject Request for basic designs and design To:
criteria for the Special Facil
IPP Division Head
PT PLN (Persero)
Ji. Trunojoyo Blok M 1/135
Kebayoran Baru
Jakarta
Dear Sir,
With regard to Development of Rajamandala 47 MW HEPP Project by PT
Rejemandela Electric Power, herewith we would like to inform you that we will start
discussion about detail design of the Special Facilities with our Contractors. The
Special Facilities will comprise of 4 bays of swithyard and 150 kV transmission line
and connect with existing Cianjur Cigareleng 150 KV line.
‘According to the Power Purchase Agreement Rajamandala HEPP 47 MW, clause
5.7.3 Approval of the Special Facilities, certain basic designs and design criteria
will be provided to SELLER by PLN.
With this letter, please kindly inform us. basic designs and design criteria for the
Special Facilities as of basis of our detail design of the Special Facilites, including
as built drawings/design documents of the exsisting tower which we intend to use
as connecton point (detail attached).
Thank you for your support and understanding,
PRESIDENT DIRECTOR
\MBANG PRIYAMBODO-
ce:
= GMPLN P36 JB
= PT PLN (Persero) ~ Pusat Enjinting Ketenagalistnikan
yr. ALA IC POWER
Tesi Alor Sato Way hs Bejan Ba, Jka Stn 12170 Pore: 622178 S15 Fes 16221 270320CONNECTION POINT OF
NEW RAJAMANDALA 150 kV TRANSMISSION LINE
TO EXISTING 150 kV TRANSMISSION LINE
“Type of Connection =] Single Pi =
“Type ofiintended connection | Tension’
tower
Location of connection tower Desa Kertasari , Kabupaten Cianjur, Jawa Barat
Latitude : 6° 48° 43.7 (UTM: 9246405)
Longitude :107° 18" §0.3 (UTM: 755749)
Tdeniffcalion of eonneExisting 150 KV T/L
ISOKV Cigereleng - Cianjur line)
(Soon, Cae 500 aa
°°8~ S3guling Ling)Budhi Setiawan
SSeS
From: hanung natendra sukandrio
‘Tuesday, February 03, 2015 6:49 AM
shimizu.masaji2@rajamandala-power.com; bambang priyambodo@rajamandala-power.com; natendra@yahoo.com
Budhi Setiawan; Hesti Sayoga
Design Criteria Part 1
Attachments: Transmission Line.rar
Dear Shimizu-san
Here i attached the design criteria for T/L and Substation, please let me know if you had received this email.
will send you 4 email because the size is quite big
‘Thank You,
Regards
Hanung
“Email ini adalah untuk penerinua yang dituju dan dapat herisi data yang bersifat rahasia atau hanya untuk kepentingun penerima, Jika anda tidak termasuk sebugai
penerina, maka tiduk dijinkan untuk menyebarkan, mensalin emuil dan utau uttaclanent didalannya atau menggunakan untuk epentingan Iain.”
“Email PLN adalah fusilnas kerja untuk melakukan korespondensi untar unit di internal perusahaan maupun dengan pihak luar, Konten Email dilarang bersifar imimidasi,
Tenyesarkan atu dapat menvebubkan kesalahpuhamun, Pelongguran terhadap ketentusn tersebut akan dikenakan sanksi berupa pemblokiran akses, pencaburan uksi
bahkan sanksi disiplin pegawai sesuai aturan PerusuhuuiBudhi Setiawan
‘Shimizu, Masaji [Shimizu.masaji2@rajamandala-power.com]
Monday, May 11, 2015 10:53 AM
Budhi Setiawan
hanung natendra sukandrio; natendra@yahoo.com; "Pak Yudianto (REP)"; "fish Wir#&(Raja)"; REP Ac MLZ; "Ay CURED "MRR
OAD "Rl OAD) "RING", “iz BGE(KANSAN”
Subject: RE: Design Criteria Part 1
Attachments: Surat ke KDIV IPP - Basic Design of Special Facilties.paf
Dear Budhi-san,
Thank you for your cooperation.
Regarding the request letter for design criteria numbered 014/081/REP/2015 dated on January 26" 2015 from REP,
we have received the Design Criteria from Hanung-san unofficially. However, we have not received official letter from PLN.
Could you inform us when will you provide the offical letter and as-built drawings/design documients of existing tower which we requested including the letter?
1am sorry for rushing you.
Best regards,
Masaji Shimizu(REP)
From: hanung natendra sukandrio [mailto:hanung.sukandrio@pin.co.id)
Sent: Tuesday, February 03, 2015 8:49 AM
To: shimizu.masaji2@rajamandala-power.com; bambang.priyambodo@rajamandala-power.com; natendra@yahoo.com
Ce: Budhi Setiawan; Hesti Sayoga
Subject: Design Criteria Part 1
Dear Shimizu-san
Here i attached the design criteria for T/L and Substation, please let me know if you had received this email.
will send you 4 email because the size is quite big
‘Thank You.
Regards
Hanung