You are on page 1of 5
CADANGAN MEMBINA 1 UNIT BANGUNAN PERNIAGAAN 2 TINGKAT YANG MENGANDUNGI DEWAN BADMINTON DENGAN GYMNASIUN DI TINGKAT 1 DAN RUANG PERNIAGAAN DI TINGKAT BAWAH.DI ATAS LOT 16 PEKAN BATU 14, MUKIM BANDAR ULU LANGAT,SELANGOR DARUL EHSAN UNTUK TETUAN LEE SWE ANN & BROTHERS SDN.BHD. MSMA REPORT 30/05/15 Y TSL CIVIL ENGINEERING Consulting Engineers (001227144-W) F-5, Jalan PJU 14200, Dataran Ara Damansara, 47301 Petaling jaya, Selangor. ‘Tel: 03-78313903 Fax: 03-78313906 1.0 INTRODUCTION ‘The proposed development of 1 unit 2 storey cormecial building is located at Lot 16 Pekan Batu 14,.Mukim Bandar Ulu Langt. The general topography of the proposed site is a flat land. Purpose of Report ‘The objective of this calculation report is to present the detail design of roadside drainage, 3.0 Design Criteria The design Criteria for roadside drainage design is accordance with the design procedure set out in the planning & Design Procedure No.1 ~ “Urban Drainage Design Standards And Procedures For Peninsular Malaysia ~ Procedure No.1’. 3.1 Hydrological, Storm water runoff is obtained by using the Modified Rational method, Q = CsCIA Where Q = peak discharge in en ft/sec (cusec) of return period T yeras Cs = storage coefficient C =nun off coefficient I =average intensity of rainfall in inch/hr for duration equal to time of concentration, te and a return period T years ‘A = catchments area in acres Storage Coefficient (Cs Storage coefficient shall be determined as Cs = 2te / (2te +td) where te = time of concentration ‘td = time of flow in the drain ‘Time of Concentration (to ‘The time of concentration is the time required for water to flow from the most remote point of catchments to the point being investigated. For urban stomwater drains, the time of concentration is calculated as te = to + td Where to — time for overland flow which shall be estimated from Figure 4.1 using appropriate value of length, slope and run off coefficient, C td = time of flow in drains or culverts which shall be estimated from the hydraulic properties of the sections, 32 Runoff Coefficient (C: ‘The runoff coefficient, C is based on the ultimate expected development fo the land. Table 4.2 presents recommended value of runoff coefficients, For the case of fully developed, C= 0.85, Rainfall fs 0 From Rainfall Intensity Chart For Kuala Lumpur Design for 2 year return period, For this design, te < 10 minutes, thus, I= 5.2 in/hr. Hydrological ; Manning Formula The channels size are computed using the Manning’s Formula for open channel flow Q=1486xR™ x8 x An) or Q=VA where Q = discharge in cu ft/ sec (cusec) V = velocity in ft/ see n= Manning Roughness Coefficient (0.015 for drains and culverts) R = Hydraulic Radius (area of channel / wetted perimeter) S = Slope of channel in 1 = N A = Area of channel. Fileno. — R1502-OSD design calculation (5) Design calculation for below ground tank (6.1) Total area 4000 m2 Impervious ares 3500 m2 Pervious area 500 m2 ‘The ste site condition before development was park lawns ime of concentration 100 m 4000 m2 Ss 5 t=58.5*L/[AN1°S4 7.36471 tess 7.364714 (5.3) sainfall for minor Drainage system ARIES yr. (a) Rainfall >30 min, ——_Inl=a+b*in(I}+c*In(1)2+d*In(}43 PdeI*t/60 t a b € ad In(t) [mm/h [Pd mm 30{ 5.1086] 0.5037] -0.2155[ 0.0112] 4.7s9sia| 117.262| 58.93 cof 5.1086] 0.5037] -0.2185[ 0.0112] 4.327079] 75.7227] 75.72 (a) Rainfall <20 Pd=P30-F0(P60-P30) t FD Pd [_imm/h io[ _1.28[ 37.381) 224.6285 (5.4) Determination of pre-development @ post development flows 1/360 (V/s) [status [Lmmfh | Impervious area perviousarea | _Q cl REA EEC Amd Ws pre-d | 224628] 0.9 of oa] 4000] 199.67] posta | 224628[ 0s] 3500] a.6| 00) 215.268] 5.5) Permissible Site Discharge (PSD) PSD=(a-(a%2-ab)A.5)/2 548*Qa/t)*(.333*t*Qp/Qa+.35*tc+.65*tcs) 2408.476 S48*Qa*Qp= 367416 163.674 (5.6) Estimation of site storage (SSR) - ARI=10 yrs fa) Rainfall >30 min, __in(l)=a+b*Ini}+c*In(2+c*in(1)43. Pd=I*1/60_ t a b c ad Ta) _[imm/h | Pd mm 30| 4.696] 0.6796 -0.258al 0.0147] 4.870225] 130.35| 65.18 35| 4.9696] 0.6796] -0.2584l 0.0147] 4.7a014a| 119.122| 69.49 404.3696] 0.6796] -0.258al 0.0147] 4.698204] 109.75 73.17 h_45[ 4.9696] 0.6796] 0.2584] 0.0147] 4.623085] 101.808| 76.36] Sol 4.9696] 0.6796 -0.2584] 0.0147] 4.553756] 94.9885] 79.16 55| 4.9696] 0.6796] -0.2584] 0.0147] 4.420304) 99,0675| 81.65] so] 4.9696] 0.6796| -0.2584] 0.0147] 4.429339] 83.876] 83.88] (b) Rainfall <30 min, _Pd=30-FD(P60-P: © FD Pd] tmm/h s|2.08[ 26.2773] 315.3273 io] 3.28[ 41.238] 247.4279 is] 0.8] 50.2144] 200.8576 20{ 0.47] 36.3857] 169.1571] 25] _0.235| 60.7804] 145.873] Estimation of maximum SSR SSR=,06%td*(Q-c-d) © =.675*PSD(1-.392°PSD/Q) d =117*PS0"2/Q tL mm/h [temper pervious area | _Q PSD c a SSR c] Ama] Amd Ws s| 315.327| _0.3[ 3500] 0.45] soo] 295.619| 163.67] #65018] 10.60| 59.55] 10] 247.428[ 0. _3500| __0.45| S00] 231.964] 163.67] 79.9217] 33.51] _83.12| 1s] 200.858| 0s] 3500 0.45| S00] 148.304] 163.67] 72.8365] i665] 88.94 2o{ 169.157] 0.9| 3500] 0.45] Soo] 15ases| 163.67] 65.7a2| 19.76] _87.65| 25{ 145.873| 0.9| 3500] 0.45 S00] 136.756] 163.67| Se.ca7a| 22.92] _82.78| 30{130.35| 0.9| 3500[ 0.45 Soo] 122.203 163.67] 52.4748 25.65] 79.34] 35[ 119.122| 09 3500] 0.45 00] 111.677] 163.67] 47.0073| 28.07] _76.87| 4o{_109.75|o.5|_3500{ 0.45] 500] 102.891] 163.67] 41.5871] 20.46] __74.02| 4s] 101.808| 0.9 3500|__0.45[ S00] 95.4446] 163.67] 36.2126] 2.84] 71.26] sof sagas] 0.5] 3500{ 0.45 500] 89.0517] 163.67] s0.aai| 25.20] _68.92| 's5| 89.0675| 0.s| 3500[__0.45 Soo] 3.5008] _163.67| 25.5a0a| 37.54] 67.24] of _e3.e76[ 0.3] 3500[ 0.45 S00] 78.6337] 163.67] 20.3351] 39.86] 66.38] Maximum SSR= 8.94014 m*3 (5.7) Size of outlet pipe The maximum volume to discharg=PSD= 163.6742 Ao=PSD*.01/(Cd*(2g*Ho)*.5), Cd=.6, Ho= 05 m = 0.0871 ma2 Do=(4*Ao/3.142).5 = 0.33298 m

You might also like