You are on page 1of 7

Project Title / System Identifier:

ACG New Plant Thailand

Document Title:

Vendors Documentation Requirements

Project Document No.

86009 4 GEN 8602 DOC

Rev.

Issued for

Issued for Enquiry

Page Number

1 of 7

Dated

Current Revision Approvals:


Name

Initial

M+W Author

Win Lyn Low

WLL

Reviewed by M+W Process Lead

Neeraj Dhar

NED

Approved by Client

Date

Project Title / System Identifier:

ACG New Plant Thailand

Document Title:

Vendors Documentation Requirements

Project Document No.

86009 4 GEN 8602 DOC

Page Number

WITH

ORDER REQUIREMENT

QUOTE
DOC.
CAT

B01
B02
B03
B04
B05

DOCUMENT DESCRIPTION

ARRANGEMENT
GENERAL ARRANGEMENT DRAWINGS
DRAWINGS FOR EQUIPMENT
CROSS SECTIONAL DRAWINGS (INC. PARTS LIST)
FOUNDATION DRG. GIVING STATIC & DYNAMIC
LOADS
FABRICATION DRAWINGS

C05
C06
C07
C08
C09

ELECTRICAL
ELECTRICAL SCHEMATIC DRAWINGS
INTERCONNECTION DIAGRAMS
TERMINAL BLOCK / BULKHEAD DIAGRAMS
INTERNAL WIRING DIAGRAMS (PANEL /
EQUIPMENT)
ELECTRICAL SINGLE LINE DIAGRAMS
ELECTRICAL PROTECTION DETAILS
ELECTRICAL TERMINATION & HOOK-UP DETAILS
ELECTRICAL LOAD (kW RATING)
MOTOR DATA SHEET

D01
D02
D03

P&IDs & PROCESS SCHEMATICS


PROCESS FLOW DIAGRAMS
P & IDs INDICATING BATTERY LIMITS
SYSTEM SCHEMATICS

E01
E02
E03
E04

INSTRUMENTATION
INSTRUMENT EQUIPMENT OUTLINE DIAGRAMS
INSTRUMENT LAYOUT DIAGRAMS
LOOP DRAWINGS
INTERFACE DIAGRAMS

C01
C02
C03
C04

2 of 7

FIRST ISSUE

FINAL

NO.

NO.

REQUIRED

NO. OF

IN

OFF

OFF

DATE

VENDOR
DOC.

DATA
BOOK

Project Title / System Identifier:

ACG New Plant Thailand

Document Title:

Vendors Documentation Requirements

Project Document No.

86009 4 GEN 8602 DOC

Page Number

WITH

ORDER REQUIREMENT

QUOTE
DOC.
CAT

E05
E06
E07
E08
E09
E10
E11
E12
E13

DOCUMENT DESCRIPTION

FIRST ISSUE

NO.

NO.

REQUIRED

NO. OF

IN

OFF

DATE

VENDOR
DOC.

DATA
BOOK

INSTRUMENT TERMINATION & HOOK-UP DETAILS


LOGIC DIAGRAMS
CAUSE & EFFECT CHARTS
INSTRUMENTATION WIRING SCHEMATICS
SYSTEM FUNCTIONAL DESIGN SPECIFICATION
CONTROL SYSTEMS FUNCTIONAL DESCRIPTION
RELIABILITY STUDIES & CALCULATIONS
PLC I/O LIST
PLC PROGRAM DISK

E16

F01
F02
F03
F04
F05
F06

DATASHEETS
BILL OF MATERIALS
CATALOGUE
EQUIPMENT DATASHEET
EQUIPMENT LIST
ELECTRICAL DATASHEETS
INSTRUMENT DATASHEETS

G01
G02
G03
G04
G05
G06
G07
G08
G09
G10
G11
G12

SCHEDULE
INSTRUMENT LABEL SCHEDULE
UTILITIES SCHEDULE
CABLE SCHEDULE
TRANSIT SCHEDULE
DISTRIBUTION BOARD SCHEDULE
PRODUCTION SCHEDULE
BOLT SCHEDULE
LUBRICATION SCHEDULE
CUSTOMER TERMINAL POINT SCHEDULE
SCHEDULE OF SUB-ORDERS
ELECTRICAL HAZ. EQUIPMENT SCHEDULE
INSTRUMENT SCHEDULE

E15

NO.
OFF

DOCUMENT DESCRIPTION

INSTRUMENTATION
PLC PROGRAM LISTING
CONTROL PANEL OPERATION SEQUENCE WRITEUP
CONTROL PANEL G.A. & WIRING DRAWING

E14

FINAL

OFF

WITH
QUOTE
DOC.
CAT

3 of 7

NO.
OFF

ORDER REQUIREMENT
FIRST ISSUE
NO. OF
REQUIRED
VENDOR
DATE
DOC.

FINAL
IN
DATA
BOOK

Project Title / System Identifier:

ACG New Plant Thailand

Document Title:

Vendors Documentation Requirements

Project Document No.

86009 4 GEN 8602 DOC

G13
G14
G15
G16

VALVE SCHEDULE
PURCHASERS INTERCONNECTION SUMMARY
PRE-COMMISSIONING CHECKLIST
COMMISSIONING CHECKLIST

H01
H02
H03
H04
H05
H06
H07
H08
H09
H10

DETAILS
ISOMETRIC
PIPE SUPPORTS
VESSELS
TANKS
HEAT EXCHANGERS
EQUIPMENT DETAILS
INSULATION / LINING DETAILS / DRAWING
MECHANICAL SEAL DETAILS / DRAWINGS
INSTRUMENT PANEL DETAILS
PNEUMATIC HOOK UPS

DOC.
CAT

H11
H12

Page Number

WITH
QUOTE
DOCUMENT DESCRIPTION

DETAILS
INSTRUMENT PIPING HOOK UPS
SEAL MANUFACTUERS RECOMMENDATION FOR
SELECTION OF SEAL

J01
J02
J03
J04

MECHANICAL
NOZZLE MOVEMENTS
ACCEPTABLE NOZZLE LOADS
ENCLOSURE VENTILATION REQUIREMENTS
FOUNDATION LOADING DIAG.& SUPPORT DETAILS

K01
K02
K03
K04
K05
K06
K07
K08
K09
K10
K11
K12
K13
K14
K15

CALCULATIONS
FOUNDATION SUPPORT CALCULATIONS
STRUCTURAL STEEL CALCULATIONS
BEARING LIFE CALCULATIONS
UNBALANCED FORCE CALCULATIONS
ACCELERATION EFFECT CALCULATIONS
LATERAL CRITICAL SPEED CALCULATIONS
TORSIONAL CRITICAL SPEED CALCULATIONS
SYSTEM HEAD LOSS CALCULATIONS
PRESSURE VESSEL STRENGTH CALCULATIONS
THERMAL CALCULATIONS
STRESS ANALYSIS CALCULATIONS
HYDRAULIC CALCULATIONS
HEAT EMISSION CALCULATIONS
GENERAL CALCULATIONS
THRUST BEARING LOADS & CAPABILITY

NO.
OFF

NO.
OFF

4 of 7

ORDER REQUIREMENT
FIRST ISSUE
NO. OF
REQUIRED
VENDOR
DATE
DOC.

FINAL
IN
DATA
BOOK

Project Title / System Identifier:

ACG New Plant Thailand

Document Title:

Vendors Documentation Requirements

Project Document No.

86009 4 GEN 8602 DOC

K16
K17
K18
K19
K20
K21

K23
K24

RELIABILITY CALCULATIONS
LIFTING LUG CALCULATIONS
FLOW ELEMENT CALCULATIONS
RESTRICTION ORIFICE CALCULATIONS
CONTROL VALVE SIZE & NOISE CALCULATIONS
RELIEF VALVE CALCULATIONS
THERMOWELL VIBRATION & STRESS
CALCULATIONS
INSTRUMENT ELECTRICAL POWER CALCULATION
INSTRUMENT AIR REQUIREMENTS CALCULATION

L01
L02
L03

PERFORMANCE DATA
GENERAL PERFORMANCE DATA
NOISE LEVEL DATA
CURRENT TRANSFORMER MAGNETISM CURVES

K22

Page Number

WITH
QUOTE
DOC.
CAT

DOCUMENT DESCRIPTION

L13
L14

PERFORMANCE DATA
MOTOR PERFORMANCE CURVES
HYDRAULIC MOTOR PERFORMANCE CURVES
ENGINE PERFORMANCE CURVES
CENTRIFUGAL COMPRESSOR PERFORMANCE
CURVES
CENTRIFUGAL PUMP PERFORMANCE CURVES
ROTARY PUMP CURVES
COMBUSTION GAS TURBINE PERFORMANCE
CURVES
FAN PERFORMANCE CURVES / FAMILY CURVES
ELECTRICAL RELAY CHARACTERISTICS &
RATINGS
SPEED / TORQUE STARTING CHARACTERISTICS
CRANK EFFORT DIAGRAMS

M01
M02
M03
M04
M05
M06
M07
M08
M09
M10
M11

PROCEDURES
WELD REPAIR PROCEDURES
VIBRATION/ NOISE TEST PROCEDURE
NDT PROCEDURE
WELD PROCEDURE SPEC. & QUALIFICATIONS
PERFORMANCE TEST PROCEDURE
MANUFACTURING/ FAB PROCEDURE
HEAT TREATMENT PROCEDURE
WELDING PLAN
PNEUMATIC TEST PROCEDURE
SYSTEM TEST PROCEDURE
INSTRUMENT TEST PROCEDURE

L04
L05
L06
L07
L08
L09
L10
L11
L12

NO.
OFF

NO.
OFF

5 of 7

ORDER REQUIREMENT
FIRST ISSUE
NO. OF
REQUIRED
VENDOR
DATE
DOC.

FINAL
IN
DATA
BOOK

Project Title / System Identifier:

ACG New Plant Thailand

Document Title:

Vendors Documentation Requirements

Project Document No.

86009 4 GEN 8602 DOC

M12

N01
N02
N03
N04
N05

P01
P02

DOC.
CAT

Page Number

6 of 7

LOAD TEST PROCEDURES (CRANES & DAVITS)

PACKING / STORAGE
PACKING REQUIREMENTS
STORAGE PROCEDURES
PRESERVATION & DE-PRESERVATION
PROCEDURES
SURFACE CLEANING PREP. & PAINTING SPEC
RE-PRESERVATION PROCEDURE

SPARES
RECOMMENDED COMMISSIONING SPARE PARTS
LIST
RECOMMENDED SPARES FOR 2 YEARS
CONTINUOUS OPERATION

WITH
QUOTE

DOCUMENT DESCRIPTION

P03
P04

SPARES
SPECIAL TOOLS LIST
RECOMMENDED INSURANCE SPARES

Q01
Q02
Q03
Q04
Q05
Q06
Q07
Q08
Q09
Q10
Q11
Q12
Q13
Q14
Q15
Q16
Q17
Q18
Q19
Q20
Q21
Q22
Q23
Q24

CERTIFICATION
INTERIM RELEASE/ DESPATCH DOSSIER
INST./ ELECT. APPROVAL REPORT
COMPONENT/ ASSEMBLY BALANCE CERTIFICATE
STRIPDOWN TEST & RECORD
NACE CONFORMANCE CERTIFICATE
HYDROSTATIC/ PNEUMATIC CERTIFICATE
N.D.T. OPERATOR QUALIFICATIONS
WELDERS QUALIFICATION
HEAT TREATMENT CERTIFICATES
HEAT TREATMENT CHARTS
CALIBRATION CERTIFICATES
HAZARDOUS AREA TEST CERTIFICATES
FIRE TEST CERTIFICATES
C.A. ACCEPTANCE/ REJECT NOTES
INSPECTION RELEASE CERTIFICATE
CODE COMPLIANCE CERTIFICATE
TYPE TEST CERTIFICATE
C.A. SURVEY CERTIFICATE
LIFTING EQUIPMENT TEST CERTIFICATES
MATERIAL TEST CERTIFICATE
N.D.T. TEST REPORTS
LETTERS OF CONFORMITY
CONCESSION REQUESTS
NOISE TEST CERTIFICATES

NO.
OFF

NO.
OFF

ORDER REQUIREMENT
FIRST ISSUE
NO. OF
REQUIRED
VENDOR
DATE
DOC.

FINAL
IN
DATA
BOOK

Project Title / System Identifier:

ACG New Plant Thailand

Document Title:

Vendors Documentation Requirements

Project Document No.

86009 4 GEN 8602 DOC

Q25
Q26
Q27
Q28
Q29
Q30
Q31
Q32
Q33
Q34
Q35
Q36
Q37

DOC.
CAT

Q38
Q39
Q40
Q41

7 of 7

VIBRATION TEST CERTIFICATES


VENDORS QUALITY PLAN
NAMEPLATE DRAWINGS / RUBBINGS / DETAILS
PERFORMANCE TESTING CERTIFICATE
DIMENSIONAL CONTROL REPORTS
MECHANICAL TEST REPORT
LIFTING SWL CERT.
CABLE & WIRING INSTALLATION TEST RECORDS
EARTHING CONTINUITY CHECK RECORDS
PROOF TEST REPORTS
DEFLECTION TEST REPORTS
Q.C. DATA DRAWING (WELD & N.D.T.)
MATERIAL LOCATION PLAN

WITH
QUOTE
DOCUMENT DESCRIPTION

CERTIFICATION
SPARE
BEARING NOISE LEVEL REPORT
BEARING TEMPERATURE REPORT
V-BELT ELECTRICAL CONDUCTIVITY
CERTIFICATE

R02
R03

WEIGHT
WEIGHING EQUIPMENT CALIBRATION
CERTIFICATE
WEIGHT INFORMATION SHEET
WEIGHT TEST CERTIFICATES

S01
S02
S03
S04
S05
S06
S07
S08
S09
S10
S11
S12
S13
S14

MANUALS
INSTALLATION MANUAL
COMMISSIONING MANUAL
OPERATION MANUAL
MAINTENANCE MANUAL
INST. OP. & MNTNCE. (I.O.M.) MANUAL
CERTIFICATION MANUAL
INSTALLATION MANUAL
COMMISSIONING MANUAL
OPERATING MANUAL
MAINTENANCE MANUAL
INST. OP. & MNTNCE. (I.O.M.) MANUAL
QUALITY ASSURANCE MANUAL
CERTIFICATION MANUAL
TECHNICAL MANUAL

R01

Page Number

NO.
OFF

NO.
OFF

ORDER REQUIREMENT
FIRST ISSUE
NO. OF
REQUIRED
VENDOR
DATE
DOC.

FINAL
IN
DATA
BOOK

You might also like