You are on page 1of 2

TG13 - Integral Concrete Bridges to Eurocode 2

Contents
1 Introduction
2 Scheme design
3 Schedule of design standards
4 Structural model and analysis
5 Materials
5.1
5.2
5.3
5.4

Concrete
Prestressing steel
Reinforcement
Cover

6 Actions (loading)
6.1 Permanent actions
6.1.1 Self-weight
6.1.2 Differential settlement
6.1.3 Differential shrinkage

6.2 Variable actions


6.2.1 Temperature effects

6.3 Traffic loads


6.3.1
6.3.2
6.3.3
6.3.4
6.3.5
6.3.6
6.3.7

Notional lanes
Load Model 1
Load Model 2
Load Model 3
Crowd and footpath loading
Other traffic loading
Groups of traffic loads

6.4 Combinations of actions

7 Creep and shrinkage


8 Prestressing
8.1 Stress limits and loss of prestress
8.2 Transmission length

9 Global design at SLS


9.1
9.2
9.3
9.4
9.5
9.6

Introduction
Analysis results
Decompression
Stress limits
Crack width limitation
Transfer

10 Global design at ULS


10.1 Analysis results

10.2 Flexure
10.2.1 Minimum reinforcement requirements
10.2.2 Continuity reinforcement

10.3 Shear
10.3.1 Global shear
10.3.2 Shear failure between flange and web
10.3.3 Interface shear

10.4 Fatigue

11 In-situ slab in the transverse direction


11.1 Loading and analysis
11.2 ULS and SLS verification

12 Design of the pier


12.1 Loading
12.2 Ultimate limit state persistent and accidental

12.3 Serviceability limit state

13 Piled foundation design


14 Conclusions
References
Appendix A - Design calculations

RiversideHouse,4MeadowsBusinessPark,StationApproach,
Blackwater,Camberley,Surrey,GU179AB
Tel:0127633777Fax:01276600242EMail:enquiries@cbdg.org.uk

You might also like