You are on page 1of 343

$0/5&/54

# # #

   # %
   # )
  


1. 
2. 

  


1. 
2. 
3. 

 


1. 
2. 

  


1. Fast Track 2 
2. JICA 
3. 
4. 

$0/5&/54

   # %%   }

 
1. 
2. 
3. 
4. 

   

 
1. 
2. 
3. () 

   

 
1. 
2. 
3. 
4. 

 

 
    

 
1. 
2. 

G
73%(2011 ), 15,000
.
* 100% , , NTT 30-40% .

90% 1~2 Crash


Program , 1
2 ,
2011 157,993GWh , , ,
41%, 35%, 18% , 10 9%
,
(85) (2011 50% 2020 64%)
,
, 0%

.

G
,


,
- , , , F/S ,
,

G
() , JICA
, ,
()
, ,
,

G
2010 973 Kwh,
2015 4,000MW
38% , , 32%,
18% . 2015 40%, 28%
(EVN) ,

* kWh VND 1,369( 0.066), (0.08)

2011 5 7
, 2020 55,000MW
(2011 16,000MW)

G
() 2015 14,329MW ,

() 10 2020 46%
. 2020
() 2025 5% . 3,000km
.

G
() 18km 48% . 2020 3,411km
ODA
. ODA
()
16% , 1% . 2020
650
() (2010:22030:15)
. 2015 23
( 7.3 )

() 22 (3 , 19 ) .
BOT, BOO, PPP .
2030 Long Thanh (Dong Nai), Chu Lai (Quang
Nam) (205 )

G
1 ,

(PVN), (EVN) 1,2
,




,
.

G 

, , ,
, .

* (PVN, EVN ) 10

F/S( )

* ( ) F/S

, ADB, WB, EDCF


     #

 # # #

41# # #
G
2011 , 72.95% , 1
Crash Program( ) 2005 ,
11%
-

* (100%) , NTT
29.25% 39.92%



: (PLN)

Mine Mouth
HVDC(High Voltage Direct Current)

- Sumsel8/9/10 Mine Mouth -


- PLN 520 HVDC(500) JICA (23
)
2012 64.9 2013 80.9

- 2013
15%

90% (2019) 2006


2010 1~2 10,000 Crash Program
- (1 Crash Program) 36
9,544 , 1 Crash Program 3,790
, 2012 6,087
* , , , ,
Fast Track Committee
PLN (PPA)
- (2 Crash Program) 1
, 9,522( 92 ),
PLN 21 IPP 71

$SBTI1SPHSBN
( : )

PLN
IPP

1-5"

1-56

1-5(6

1-5(

1-51

1,174
30
1,204

1,862
1,529
3,391

740
120
860

100
100

340
3,627
3,967

4,216
5,306
9,522

: PLN

G
2011 2010 8.82% 29,268.16
- (41.2%), (26.8%), (12%),
(9.7%),

(8.8%) , 5 1 Crash

Program
- 76.9% 22,513.61
2011 (PLN ) 2010 8.03%
183,420.93GWh
- PLN 142,739.06GWh 77.8%
- IPP 40,681GWh(22.2%) 6.8%
* IPP Pation Energy(9,415GWh) Jawa Power(8,162GWh)


( : )











3,501.54
(10,627.46)
8,534
(52,208.81)
2,783.62
(4,730.4)
7,020.97
(31,374.39)
415
(3,188.49)
2,956.25
(5,733.28)
12(121.27)

3,504.28
(10,739.97)
8,764
(52,352.96)
2,496.69
(5,310.75)
7,370.97
(35,730.72)
415
(3,390.66)
3,020.88
(5,704.52)
21.84(110.24)

3,508.45
(10,306.91)
8,764
(52,963.84)
2,570.59
(7,818.01)
7,370.97
(34,746.69)
415
(3,504.47)
2,980.63
(6,093.74)
26(-)

0.1
25,223.48
(142,440.79)

0.26
25,593.92
(149,436.51)

1.06(0.1)
25,636.7
(156,797.27)

3,522.57
(15,827.35)
9,451.5
(54,407.02)
3,223.68
(7,861.7)
6,951.32
(36,811.7)
438.75
(3,398.02)
3,267.79
(5,096.98)
38.84(73.56)
0.19(0.02)
0.34(0.5)
26,894.98
(169,786.23)

3,511.20
(10,315.55)
12,052.5
(62,335.23)
2,839.44
(8,246.22)
7,833.97
(40,409.68)
435
(3,487.39)
2,568.54
(4,010.94)
25.94(47.67)
1.23(-)
0.34(0.72)
29,268.16
(183,420.93)

: PLN
: GWh

5 66.9% ,
27.8% 7.3%



..4$'

2007

10,688,976

21,466,348

171,209

2008

11,320,489

20,999,521

181,661

2009

9,408,904

21,604,464

266,539

2010

9,324,934

239,586,99

283,275

2011

11,466,851

27,434,163

285,722

: (ESDM)

2011 5,269, 4,842


.
- 17,500
.



2007

196

45

54

60

4,705

5,072

2008

189

48

58

61

4,635

5,008

2009

201

49

63

59

4,626

5,014

2010

199

55

73

50

11

4,619

5,023

2011

213

59

71

61

10

4,842

5,269

: PLN

10

G
2011 36,719.74km, 679,424.30km


( : km)











25-30

11.97

11.97

11.97

11.20

11.96

70

4619.03

4619.03

4642.18

4724.28

4456.69

150

22702.7

23678.6

24191.6

24379.76

26170.79

275

781.38

782.25

1011.39

1011.39

1028.3

500

5047.78

5092

5092

4923

5052

33162.87

34183.85

34949.14

35049.63

36719.74

: PLN


( : km)











6-7

278.32

278.32

278.32

72.73

57.74

10-12

2,968.84

2,968.84

2,968.84

242.26

15-20 250,660.86

257,916.04

265,364.71

275,540.58

288,419.36

253,908.02

261163.20

268,611.87

275,613.31

288,719.36

344,589.67

353,762

370,905.36

406,149.04

390,704.94

598,497.69

614,925.2

639,517.23

681,762.35

679,424.3

: PLN

11

G
2011 157,992.66GWh 41.2%
- 5 , , 37.6%,
19.5%, 37.4%


( : kWh)


47,324.91
45,802.51
20,608.47
2,908.7
2,016.36
2,585.86
121,246.81


50,184.17
47,968.85
22,926.29
3,082.42
2,095.8
2,761.28
129,018.81


54,945.41
46,204.21
24,825.24
33,84.36
2,334.66
2,888.11
134,581.98


59,824.94
50,985.20
27,157.22
3,700.09
2,629.93
3,000.09
14,7297.47


65,111.57
54,725.82
28,307.21
3,993.82
2,786.72
3,067.52
157,992.66

: PLN

10
9%
- 2020 241TWh , ,
10.8% 31TWh




: PLN

12

G
PLN

- , , , /
, 5
PLN 4
-
- Fuel Mix
-
-
Fuel Mix
- (2011 : 50.2% 2020 : 64.2%) (2011 : 4.9% 2019 12.4%)

- 2011 21.6% 2020 0.8%
- 2014 9,530

'VFM.JY

: ESDM
13

(DMO : Domestic Market


Obligation) 20.47%(6,725 )
- , DMO
24.72%(8,207 ) 20.27%
- 2011 DMO 7,897 Crash Program
6,631 .

1-/

: ESDM

1~2 Crash Program, PPP , Mine Mouth



- (1~2 Crash Program) 9,544 3,391

- (PPP ) 2012 PPP 6 3

* IIGF(Indonesia Infrastructure Guarantee
Fund) (
No.13/2010) 1

14

111

Sumsel9 Mine Mouth

2x600

South
15
Sumatera

Sumsel10 Mine Mouth

1x600

South
7 8
Sumatera

Jambi

2x400

Karama Hydro Power Plant

450

West
13
Sulawesi

Batang Toru Hydro Power Plant

510

North
12
Sumatera

Merangin Hydro Power Plant

350

Jambi

Jambi

10

5 6 2

: PLN

- (Mine Mouth ) PLN 2011~2020


Mine Mouth 7,310 (PLN : 800, IPP : 6,510)
- HVDC Converter

4VNTFM)7%$

: PLN

15

51# # #
G

- 11 32, 85



1
2
3

400
104.71 TSCF
280


34 7
3212 BSCF
3 2 9

11
32
85

: ESDM

, , ,

- 76,000
- , 49,891
3.25% ,
- 0%



4%

,5
,54%

1
Hydro
75,670
6,654.29
8,8%
2
Geothermal
29,038
1,226
4,2%
769.69
228.983
29.75%
3 Mini/Micro Hydro
4
Biomass
49,810
1,618.4
3.25 %
5
Solar Energy
4.80 kWh/m2/day
22.45
6
Wind Energy
3 6 m/s
1.87
7
Uranium
3.000 ( ) 30 ()
1
: ESDM

16

() 2011 116.4%
- , 2015
8,371















5,891

6,071

6,251

6,551

6,901

- ()

204

213

1.3

- ()

6,654

6,858

6,858

6,858

7,071

8,371

116.4

112.9

109.7

107.9

121


- ()

/ (%)
: ESDM

() 2011 43% ,
2014 100%















22

90

258

691

- ()

15

68

218

433

- ()

18

86

304

737

43

82

96

117

106


- ()

/ (%)
: ESDM

17

() 2011 100%
,

- 2015 5,185 2015 735



- ()

- ()
- ()
/ (%)



20



20

20
100



30

10
30
100



190

60
90
47



2,005

115
205
10



5,185

530
735
14

: ESDM

() 2025 Mix
25% 25/25
- 5.7% 12,000
- 285 29GWe
5% 1,226

: ESDM

18

- 2012 54 (GWA: Geothermal Working


Area)
* 2003 No. 27 19 35 GWA
- 140
,

: ESDM

() 2015 220%















0,02

0,04

0,05

1,0

0,02

0,06

0,56

1,56

- ()

- ()

- ()

0,002

0,002

0,022

0,082

0,642

2,202

110

205

1284

220

/ (%)
: ESDM

19

G

2007 No. 30
- : , , CBM(Coal Bed Methane), ,
- : , , , , ,
(2006 No. 05 ) 4.79%
17%
- , , ,

- 83%: 20% , 30% , 33%
- 17%: 5% , 5% ,
5% , 2%
2025 (Vision 25/25) 2025
25%
- 30%



: ESDM
20

(
No.21/PMK.011/2010)
(
No.130/PMK.011/2011)
(
No.04/2012)


.( N0.31/2009)
(10 ) (656/kWh) (1,004/kWh
)
- : =1.0, =1.2, /NTB/NTT=1.3,
=1.5
- PLN
,
- (2009 N0.31)

(10 ) (975/kWh)
(1,325/kWh)
- : , , , =1.0, , , NTT,
NTB=1.2, =1.3
(10 MSW) (850/kWh) (1,198/kWh
)
-
21

(10 Zero Waste) (1,050/kWh) (1,398


/kWh)
-
( )
-



Medium Voltage
1

10

Rp. 975/kWh F

10

Rp. 975/kWh F

10

Rp. 1,050/kWh

10

Rp. 850/kWh

Zero waste

Low Voltage
1

10

Rp.1,325/kWh F

10

Rp.1,325/kWh F

10

Rp. 1,398/kWh

Zero waste

10

Rp. 1,198/kWh

: Jawa/Bali/Sumatera F = 1, Kalimantan/Sulawesi/NTB/NTT
F = 1.2, Maluku/Papua F = 1.3
: ESDM

()
(PLN)
- GWA(Geothermal Working Area), ,

-

22

- (First Right Refusal)


- GWA , ,

-
MOU



L8I

10

11.5

, ,

11

12.5

, ,

12

13.5

, ,

13

14.5

15

16.5

17

18.5

: PLN


() Micro, ,
- 10
- 1~10

- 1 (Off Grid) , NRECC/

23

() 1
- 1 On Grid
- 1 Local Grid
- 100 Off Grid
() //
- : 0.5
- : 2025 95%
50~500
- : 50



PLN
IPP
NRECC

- 10

- Solar

- 1~10
- 10

- 1

- 1~10
- 1

- 1

- 1

- 1 ( Grid)
- 1 (On Grid)

-
15~1
- Solar
-

: ESDM
: NRECC

24

- 100(Off Grid)

 # #

41#



,
// ( )

-
/
, ,

- , , //
/




- (FIT ) FIT

- ( )

- ( ) ( 6 ) ,
/


2 .

25

51#
, Financing ,
, 4



. Financing


-1. ?
-2. ?
-1. ?
-2. ?
-1. ?

-2. / ?
-3. ?
-4. ?
-1. / ?

-2. ?
-3.
?

1~5 (
55)
-

26

61#
() 55 37(67.3%) ,
/



- 2011~2020 2020
-1

7,310 Mine Mouth


- 9(1,200), 10(600), (400)


- IPP EPC
( , PLN )
-2


- Mine Mouth ,


- , ,
- PPP Fast Track 2

-1

- IPP

PPP/Fast Track Financing



- ECA
-2

-1

Financing (
)
-
(: Cirebon )
( , ,
, , Batang
)

- IPP , /

,

27


-
- Crash Program
. Marubeni, JPower, Sumitomo

- PLN
-2




- (Hitachi, Toshiba ),

, Turbine
- Wijaya Karya, Adhi Karya,
Nindya Karya, Waskita Karya, Pembangunan Perumahan
-3


- Truba Manunggal IPP
-

-4

- /

- ,

- 10 , 10 95%

-1

- O&M EPC , 95%

( ,
, 67%)

-2

- 20%

,
()

-3

- PLN
.

-

28

() 55 41(74.5%) , (10 )
/ 200~300

- , ,



- 2011~2020 75,000

- 10 96 (
, . )
-1

-2

-1

- 1,464 15
(Danau Toba: 802.8, Maninjau:68, Danau Singkarak:175,
Danau Kerinci/Danau Tondano: 51.34, Danau Limboto/Danau
Poso/Danau Tempe/Danau Matano: 336.3, Danau Semayang-Melintang/
Danau Sentani Sentani/ Danau Sentarum/ Danau Rawa Danau/Danau
Bening/Danau Rawa Pening: 32.48
-
(Wampu, Semangka )
-

- /
- PPP Fast Track 2

- Fast Track

- Wampu
Fast Track 2
Financing

- IPP
PPP IPP

( , JBIC

29

PLN ,Umbrella
Note, 2006 9 )
- IPP PPP

2011. 8

-2

-
Financing , , /

-1

-


-

- ,
(2012 8, Indonesia Power
12 5 )

-2

-
(EPC)
- 10
- (China Huadian, Gezhouba Group, Sinohydro )

-3

- Jusuf Kalla Bukaka


Medco
- 10 , Developer

-4

-1

-2

- 10
, 1

-3

- PLN
-

30

() 55 33(60%) ,



-1

- 2011~2020 49,800

- , ,
-

-2

-1
-2
-1
-2

-3

- LFG(Land Fill Gas)



- (, )
.
( )
-
-
-
-

- ,


*

-

-4
-1
-2
-3

(Itochu, JFE,
Takuma, Hitachi) Sunter 1.2



( ) ,



PLN

2
2
3
5

2
5
4
2

31

 #

41# # #
G
( )
,

- Wampu (45, 1.74 ),
Semangka(56, 1.7 )
- Takalar Fast Track 2
Wampu .
- Peusangan 1/2
Peusangan 4

4805
4USFOHUI

8FBLOFTT

- -

- - , ,


-
/

0QQPSUVOJUJFT

5ISFBU

- Developer

- 10
( )
- 10 Fast Track 2
- , PLN PQ

-
-
(-2. )
-

-
- PLN

32

( JICA )
PLN
- /
( ) PPA
Developer
Developer
- III-2. -3.



Peusangan Aceh

PLN

Wampu

IPP

IPP

- Bukaka Teknik

IPP

Gezhouba Bukaka Teknik

IPP

- Bukaka Teknik

Poso
Karama I
Mamuju
Karama II
Mamuju
Kerinci

IPP

- Bukaka Teknik

Asahan I

IPP

Jatigede

PLN

4
5

10

Tonduhan
II/Silau 2
Aek Simunggo

11

Manipi/Tangka


Pembangunan

Perumahan
Mega Power Mandiri

Huadian Bajradaya Sentranusa


Sinohydro

PP
Bersaudara Simalungun
Energi
- Mega Power Mandiri

IPP
IPP
IPP

Wijaya Karya & PT.

KF Fjellsikring Bangun Guna Graha

: EDSM, PLN

( )

- KOICA, ,

33

( )
,
-



1
2
3

HPRP
HHP
ABNR

+62-21-570-1837
+62-21-515-5090
+62-21-250-5125

www.hplaw.co.id
www.hhp.co.id
www.abnrlaw.com

G
( )
(, , , , )
- PLN Fast Track 2 PPP

- Cirebon (, , , 600)

4805
4USFOHUI

8FBLOFTT

- - PPP, Fast Track 2




- Mine Mouth ,
-

- (EPC )
-

0QQPSUVOJUJFT

5ISFBU

- Fast Track 2 -

- . Untied
- Fast Track 1
PQ


-
- PLN

34

( ) 2009
2014 (185)

- 185
-

( ) (EPC
)
- Kasel-1 (, 200, 4.5 ), PPP Sumsel
9/10(1200, 600) Jambi(800)
( )



: PLN Batubara PLTU Labuan


. coal quality 1000kcal/Kg
. PLN
Blending : PLN Blending
, 1,000
Slurry() : Sinarmas Group . PLN 5
(Belawan PP, Tangjung Priok PP, Tanjung Perak PP, Tambak Lorok
PP, Tello PP) . Slurry

35

G

4805
4USFOHUI

8FBLOFTT

- , - ,


- Supplier

-
-
( )

0QQPSUVOJUJFT
-

5ISFBU
- ,
-

36

51# # #
G

 

PT.

BUKAKA

TEKNIK

UTAMA

1978

 a

64

100,000

1,000

   

 

Jl. Amil, Gedung No. 7 Warung Jati Jakarta Selatan Indonesia


12740

 

Iman Naluri

  

+62-21-7990218

+62-21-7985164

 

Iman_naluri@yahoo.com


PLTA Poso (Poso ) - 185MW /
PLTA Kerinci (Kerinci ) - 180 MW(2010 )
Cisono (3 MW)



37

G1-/


PT. HEXA INTEGRA


ELEKTRIKA

2008

64

2,000

20

  

Jl. Metro Pondok Indah, Pondok Indah Plaza II Blok BA 35-36


Jakarta Selatan 12130

Doddy Hertanto

 

+62-21-7590-8862

+62-21-7590-8949

doddy.hertanto@yahoo.com


Jawa Tengah SPP (2x1,000 MW)
Banten IPP, (2x300 MW)
Kalteng SPP, (2x100 MW)


EPC
F/S, IPP, PPA

38

G.&%$0

 

PT. JAYA DINAMIKA


GEOHIDROENERGI

2008

64

1,000

15

 

Kompleks Grand Panglima Polim No. 82-83 Jl. Panglima Polim


Raya Jakarta Selatan

Donny Makalew

 

+62-21-7279931

+62-21-7278-0945

donny.makalew@gmail.com


Sappaya (0.5 MW)
Toraja (20 MW),
10 ( 24 MW), F/S



39

G

 

PT. MEGA POWER


MANDIRI

2000

64

1,000

25

 

Jl Amil 7, Pejaten Barat, Pasar Minggu Jakarta 12510 Indonesia

Joko Santoso

 

+62-21-7985164

+62-21-7990980

bkkpower@indosat.net.id


PLTA Parlilita (7.5 MW)
PLTA Lebong (12 MW)
PLTA Wampu (45 MW):



40

G1-/

 

PT. INDONESIA POWER

1995

64

75,000

300

 

PT. Indonesia Power Jl. Gatot Subroto Kav. 18 Jakarta 12950


Indonesia

Ariyanto PA

 

+62-21-5267666 #2306

+62-21-5224921

ariyanto.priyagung@indone
siapower.co.id


PT. Indonesia Power 8 (PLTA Saguling (700 MW),
PLTA Plengan (7 MW), PLTA Lamajan (20 MW), PLTA Cikalong (19 MW),
PLTA Bengkok (4 MW), PLTA Ubrug (18 MW), PLTA Kracak (19 MW),
PLTA Parakankondang (10 MW))




41

 # #

41# Idvw# Wudfn# 5#


1-/

PLTP Sungai Penuh

Jambi

2x55

PLTP Hululais

Bengkulu

2x55

PLTP Kotamobagu 1 & 2

Sulawesi Utara

2x20

PLTP Kotamobagu 3 & 4

Sulawesi Utara

2x20

PLTP Sembalun

Nusa Tenggara Barat

2x10

PLTP Tulehu

Maluku

2x10

PLTA Upper Cisokan

Jawa Barat

4x250

PLTA Asahan 3

Sumatera Utara

2x87

PLTU Indramayu

Jawa Barat

1x1,000

10

PLTU Sabang

Jawa Timur

2x4

11

PLTU Pangkalan Susu 3 & 4

Sumatera Utara

2x200

12

PLTU Sampit

Kalimantan Tengah

2x25

13

PLTU Kotabaru

Kalimantan Selatan

2x7

14

PLTU Parit Baru

Kalimantan Barat

2x50

15

PLTU Ketapang

Jawa Barat

2x10

16

PLTU Takalar

Sulawesi Selatan

2x100

17

PLTU Bau Bau

Sulawesi Tenggara

2x10

18

PLTU Lombok

Jawa Barat

2x25

19

PLTG Kaltim (Peaking)

Kalimantan Timur

2x50

20

PLTGU Muara Tawar add on Block 2

Jawa Barat

1x500

21

PLTGU Senoro

Sulawesi Tengah

2x120

42

4,216

*11

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37


PLTP Tangkuban Perahu
PLTP Kamojang 5&6
PLTP Ijen
PLTP Iyang Argopuro
PLTP Wilis/Ngebel
PLTP Rawa Dano
PLTP Cibuni
PLTP Cisolok-Cisukarame
PLTP Drajat
PLTP Karaha Bodas
PLTP Patuha
PLTP Salak
PLTP Tampomas
PLTP Tangkuban Perahu II
PLTP Wayang Windu
PLTP Baturaden
PLTP Dieng
PLTP Guci
PLTP Ungaran
PLTP Seulawah Agam
PLTP Jaboi
PLTP Sarulla 1
PLTP Sarulla 2
PLTP Sorik Merapi
PLTP Muaralaboh
PLTP Lumut Balai
PLTP Rantau Dadap
PLTP Rajabasa
PLTP Ulubelu 3 & 4
PLTP Lahendong 5 & 6
PLTP Bora
PLTP Merana/Masaingi
PLTP Huu
PLTP Atadei
PLTP Sukoria
PLTP Jailolo
PLTP Songa Wayaua

Jawa Barat
Jawa Barat
Jawa Timur
Jawa Timur
Jawa Timur
Banten
Jawa Barat
Jawa Barat
Jawa Barat
Jawa Barat
Jawa Barat
Jawa Barat
Jawa Barat
Jawa Barat
Jawa Barat
Jawa Tengah
Jawa Tengah
Jawa Tengah
Jawa Tengah
Nanggroe Aceh Darussalam
Nanggroe Aceh Darussalam
Sumatera Utara
Sumatera Utara
Sumatera Utara
Nanggroe Aceh Darussalam
Sumatera Selatan
Sumatera Selatan
Lampung
Lampung
Lampung
Sulawesi Tengah
Sulawesi Tengah
Nusa Tenggara Barat
Nusa Tenggara Timur
Nusa Tenggara Timur
Maluku Utara
Maluku Utara

2x55
1x40, 1x60
2x55
1x55
3x55
1x110
1x10
1x50
2x55
1x30, 2x55
3x60
1x40
1x45
2x30
2x120
2x110
1x55, 1x60
1x55
1x55
1x55
1x7
3x110
2x55
1x55
2x110
4x55
2x110
2x110
2x55
2x20
1x5
2x10
2x10
2x2,5
2x2,5
2x5
1x5

43

38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71

44

PLTA Simpang Aur


Bengkulu
PLTU Bali Timur
Bali
PLTA Madura
Madura
PLTU Nias
Sumatera Utara
PLTU Tanjung Pinang
Kepulauan Riau
PLTU Tanjung Balai Karimun
Kepulauan Riau
PLTU Tanjung Batu
Kepulauan Riau
PLTU Bangka
Bangka Belitung
PLTU Melak
Kalimantan Timur
PLTU Nunukan
Kalimantan Timur
PLTU Kaltim
Kalimantan Timur
PLTU Putussibau
Kalimantan Barat
PLTU Kalsel
Kalimantan Selatan
PLTU Tahuna
Sulawesi Utara
PLTU Moutong
Sulawesi Tengah
PLTU Luwuk
Sulawesi Tengah
PLTU Mamuju
Sulawesi Barat
PLTU Selayar
Sulawesi Selatan
PLTU Kendari
Sulawesi Tenggara
PLTU Kolaka
Sulawesi Tenggara
PLTU Sumbawa
Nusa Tenggara Barat
PLTU Larantuka
Nusa Tenggara Timur
PLTU Waingapu
Nusa Tenggara Timur
PLTU Tobelo
Maluku Utara
PLTU Tidore
Maluku Utara
PLTU Tual
Maluku
PLTU Masohi
Maluku
PLTU Biak
Papua
PLTU Jayapura
Papua
PLTU Nabire
Papua
PLTU Merauke
Papua
PLTU Klalin
Papua Barat
PLTU Andai
Papua Barat
PLTGU Bangkanai
Kalimantan Tengah

2x6, 2x9
2x100
1x400
2x7
2x15
2x10
2x4
2x30
2x7
2x7
2x100
2x4
2x100 MW
2x4
2x4
2x10
2x7
2x4
2x25
2x10
2x10
2x4
2x4
2x4
2x7
2x4
2x4
2x7
2x15
2x7
2x7
2x15
2x7
1x120
5,306

51# # MLFD# # #
*11

1
2
3

Peusangan 4
Lawe Mamas
Jambo Papeun-3

ROR
ROR
ROR

Aceh Tengah
Singkil
Aceh Tengah

30.9
50.0
25.4

Sibubung-1,2

ROR

Aceh Selatan

32.4, 22.6

Seunangan-3

ROR

Nagan Raya, Aceh

31.2

Teunom-1,2,3

RES

Pidie, Aceh

24.3,230, 102

7
8
9
10
11

Woyla-2
Ramasan-1
Teripa-1
Bila-2
Raisan-1

RES
Aceh Barat
RES
Aceh Timur
RES
Gayo Lues, Aceh
ROR
Tap-Sel, North Sumatera
ROR
Tap-Teng, North Sumatera
ROR,
12
Toru-2,3
Tap-Ut, North Sumatera
RES
13
Siria
ROR
Humbang Hasundutan
14
Gumanti-1
ROR
Solok, Sumbar
15
Sinamar-1,2
ROR
Sumbar
16
Anai-1
ROR
Padang Pariaman Sumbar
17
Batang Hari-4
RES
Solok, Sumbar
18
Kuantan-2
RES
Sawahlunto, Sumbar
19
Padang Guci-2 ROR
Bengkulu
20
Endikat-2
ROR
Lahat, Sumsel
21
Semung-3
ROR
Lampung Timur
22
Poso-2
ROR
Sulawesi Tengah
23
Karama-1
RES
Mamuju, Sulsel
24
Batu
ROR
Enrekang, Sulsel
25
Tamboli
ROR
Kolaka, Sultra
26
Mala-2
ROR
Seram, Maluku
27
Tina
ROR
Buru, Maluku
28
Tala
RES
Maluku Tengah
29
Cibareno-1
ROR
Lebak, Banten
: ROR Run of River, RES Reservoir

242
119
184
42
26
33, 237
16.5
15.8
36, 25
19
216
272
21
22
20.8
132.8
800
271
25.8
30.4
12
54
17.5

$0%

2019
2016
2019
2021,
2026
2021
2023,
2024,
2026
2024
2024
2024
2019
2020
2020,
2026
2020
2020
2020
2020
2027
2028
2020
2019
2020
2018
2022
2027
2020
2020
2020
2021
2020

45

1-/

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

Kluet-1,2
Meulaboh-5
Tempur-1
Meulaboh-2
Kumbih-3
Sibundong-4
Lake Toba
Ordi-3,5
Masang-2
Merangin-5
Besai-2
Pinoh
Kelai-2
Lariang-6
Konaweha-3
Poko
Masuni
Mong
Watunohu-1
Isal-2
Wai Rantjang
Kalikonto - 2
Karang Kates Ext
Grindulu-PS-3
Kalikonto-PS
Matenggeng
Alas 4
Ketaun -1
Lariang 8
Konaweha -4
Konaweha

ROR
ROR
RES
ROR
ROR
ROR
PST
ROR
ROR
RES
ROR
RES
RES
RES
RES
RES
RES
RES
ROR
RES
ROR
RES
RES
PST
PST
PST
RES
RES
ROR
RES
RES

Aceh Selatan
Nagan Raya, Aceh
Aceh Timur
Nagan Raya, Aceh
Pakpak barat, Sumut
Taput, North Sumatera
Dairi, Sumut
Pakpak Barat
Agam, Sumbar
Jambi
Lampung
Solok, Sumbar
Berau, Kaltim
Mamuju Utara, Sulsel
Kolalka, Sulsel
Mamasa, Sulsel
Polewali Mandar, Sulsel
Soppeng, Sulsel
Kolaka Utara, Sultra
Maluku
Manggarai, NTT
Malang
Malang
Pacitan, Jatim
Malang, Jatim
Cilacap, Jabar
Aceh Selatan
Rejang Lebong
Poso
Kendari and Kolaka
Kendari

40.6, 24
43
330
37
42
31.6
400
18, 26
52
24
44
198
168
209
24
233
400
255
57
60
15
15
62
1,000
1,000
887
150
86.6
12.8
26
50

: PST Pump Storage

46

$0%

2019, 2021
2019
2025
2026
2019
2019
2020
2020
2018
2024
2020
2020
2020
2024
2026
2020
2023
2024
2020
2019
2020
2020
2016
2021
2027
2020
2019
2018
2018
2016
2016

61# # # #

Kalibening

2 x 1.5

Cicatih

2 x 3.2

Baseh

2 x 0.93

Babakan

2 x 0.67

Banjaran

2 x 1.1

Sambirata

2 x 0.75

Air Meo

2 x 1.35

Cibareno

2.9

Cileteuh

1.8

10

Cisereuh

2.1

11

Cisih Leutik

1.7

PT. Medco Power

12

Cisimeut

3.3

Indonesia

13
14

Curuk
Citambur
Curug
Malela

PT. Bias Petrasia Persada


Loan

PT. Rumeksa Power

PT. Rumangsa Enrgi


Banyumas Utama
PT. Ulu Enerindo Jaya

PPA
F/S

F/S

0.6
3.2

15

Ambal

2 x 1.05

PT. Nureco Tirta Banjarnegara

PPA

16

Sunyalangu

2 x 0.76

PT. Naluri Energi Utama

17

Lae Ordi

2x5

PT. Bakara Bumi Energi

18

Tornauli

2x4

19

Nambadia

2x5

20

Parduaan

2x5

21

Sisira

2 x 3.1

22

Tina

3.7

- Tornauli
PT. Northsum Hydro

- Nambadia, Parduaan,
Sisira F/S

PT. Binatek Reka

Energy

F/S

47

71# # # #
G  .8

.3*$"/):%30108&31-"/5
G


PLTM MRICAN

Brantas River,
Malang, East Java

Perusahaan Umum Jasa Tirta I & PT. Hexa Integra Electrica


2012 2014
Perusahaan Umum Jasa Tirta
Brantas East Java 12

  Jasa Tirta


. East Java
.
, .

48

Jasa Tirta
. .
5 million

24

G


PT. Hexa Integra Electrica (Perusahaan Umum Jasa Tirta


business partner)

Perusahaan Jasa Tirta


. East Java Brantas . Mrican Brantas
. .
3.35MW , 19 million Kwh .
: bendung Mrican
Debit Mainstay: 50m3/sec
Head: 9,0m
: 3.350 kW (21675kW)
: 21,43 million kWh/year

G

Perusahaan Umum Jasa Tirta & PT. Hexa Integra Electrica


Perusahaan Umum Jasa Tirta: Mr. Harianto
PT. Hexa Integra Electrica: Mr. Doddy Hertanto
Perusahaan Umum Jasa Tirta: Mr. Harianto (Director of

Planning & Business Development)


PT. Hexa Integra Electrica: Mr. Doddy Hertanto (Director of
Procurement)

+62-21-75908862
HP: +62-818-124380

+62-21-7590-8949

doddy.hertanto@yahoo.com

,#$
 

Brantas
East Java county
Jasa Tirta .

49

.-*3*1):%30108&31-"/5
G


a




PLTM Mlirip

Mojokerto, East Java



Perusahaan Umum Jasa Tirta I & PT. Hexa Integra Electrica


.
.

2012-2014

Brantas
Jasa Tirta .
  60% ,
 .

, .

Jasa Tirta ,
J/V .
1.5 million
24
e

G


PT. Hexa Integra Electrica (Perusahaan Umum Jasa Tirta


business partner)

Perusahaan Jasa Tirta 8


. East Java Brantas
.
1MW , 6.4 million Kwh
.
Kwh IDR 14 million,
USD 3.7 billion/year .
- : Mlirip
- Debit Mainstay: 18,0m3/sec
- Head: 7,45m
- : 2500kW
- : 6,40 million kWh/year

50

G
Perusahaan Umum Jasa Tirta (www.jasatirta1.go.id) & PT. Hexa
Integra Electrica (www.hire-eng.com)
Perusahaan Umum Jasa Tirta: Mr. Harianto

PT. Hexa Integra Electrica: Mr. Doddy Hertanto


Perusahaan Umum Jasa Tirta: Mr. Harianto (Director of Planning
& Business Development)

PT. Hexa Integra Electrica: Mr. Doddy Hertanto (Director of


Procurement)
+62-21-75908862

HP: +62-818-124380
+62-21-75908949

doddy.hertanto@yahoo.com

Brantas
,#$
East Java county
 

Jasa Tirta .

-0%0:0):%30108&31-"/5
G
 PLTA Lodoyo

Blitar, East Java


a

Perusahaan Umum Jasa Tirta I & PT. Hexa Integra Electrica




.
.


 2012 - 2014
East Java
Brantas
  Jasa Tirta .
 Jasa Tirta 3
. 2 PLTA
Lesti (12.6MW) PLTA Wangi (7MW).

Jasa Tirta .
. Jasa Tirta
J/V .
8 million

36

51

G


PT. Hexa Integra Electrica (Perusahaan Umum Jasa Tirta


business partner)

Perusahaan Tirta 8
. Lodoyo
.
7.8MW , 41 million Kwh
.
Kwh IDR 9 million,
IDR 5 billion/year .

G

Perusahaan Umum Jasa Tirta (www.jasatirta1.go.id) & PT.


Hexa Integra Electrica (www.hire-eng.com)
Perusahaan Umum Jasa Tirta: Mr. Harianto
PT. Hexa Integra Electrica: Mr. Doddy Hertanto
Perusahaan Umum Jasa Tirta: Mr. Harianto (Director of

Planning & Business Development)


PT. Hexa Integra Electrica: Mr. Doddy Hertanto (Director of
Procurement)

+62-21-75908862
HP: +62-818-124380

+62-21-75908949

doddy.hertanto@yahoo.com

,#$
 

52

Brantas
East Java county
Jasa Tirta .

-&45*):%30108&31-"/5
G


a


PLTA Lesti 3

 Lesti River, East Java

Perusahaan Umum Jasa Tirta I & PT. Hexa Integra Electrica


.
.

2012-2014

East Java
Brantas
  Jasa Tirta .
 Jasa Tirta 3
. 2
PLTA Lodody(7.8MW) PLTA Wangi(7MW).

Jasa Tirta ,
. ,
. Jasa Tirta
J/V .
15 million

36

G


PT. Hexa Integra Electrica (Perusahaan Umum Jasa Tirta


business partner)

Perusahaan Jasa Tirta 8


. Lesti .
12.6MW , 23 million Kwh
.
Kwh IDR 11.2 million,
IDR 18.9 billion/year .

53

G

Perusahaan Umum Jasa Tirta (www.jasatirta1.go.id) & PT.


Hexa Integra Electrica (www.hire-eng.com)
Perusahaan Umum Jasa Tirta: Mr. Harianto
PT. Hexa Integra Electrica: Mr. Doddy Hertanto
Perusahaan Umum Jasa Tirta: Mr. Harianto (Director of
Planning & Business Development)
PT. Hexa Integra Electrica: Mr. Doddy Hertanto (Director of
Procurement)

+62-21-75908862
HP: +62-818-124380

+62-21-75908949

doddy.hertanto@yahoo.com
Brantas
,#$
East Java county
 
Jasa Tirta .

8"/(*):%30108&31-"/5
G
 PLTA Wangi

Surabaya, East Java


a

Perusahaan Umum Jasa Tirta I & PT. Hexa Integra Electrica




.
.

2012-2014

East Java
Brantas Jasa
  Tirta .
 Jasa Tirta 3
. 2
PLTA Lodody(7.8MW) PLTA Lesti 3(12.60MW).

54

Jasa Tirta ,
. ,
. Jasa Tirta
J/V .
7 million
36
e

G


PT. Hexa Integra Electrica (Perusahaan Umum Jasa Tirta


business partner)

Perusahaan Jasa Tirta 8


. Lodoyo
.
7MW , 28.9 million Kwh
. Kwh IDR 11.2 million.
- : Bendung Segawe
- Debit Mainstay: 6,28m3/sec
- Head: 84,30m
- : 7,000kW
- : 28,90 million kWh/year

G

Perusahaan Umum Jasa Tirta (www.jasatirta1.go.id) & PT.


Hexa Integra Electrica (www.hire-eng.com)
Perusahaan Umum Jasa Tirta: Mr. Harianto
PT. Hexa Integra Electrica: Mr. Doddy Hertanto
Perusahaan Umum Jasa Tirta: Mr. Harianto (Director of

Planning & Business Development)


PT. Hexa Integra Electrica: Mr. Doddy Hertanto (Director of
Procurement)

+62-21-75908862
HP: +62-818-124380

+62-21-75908949

doddy.hertanto@yahoo.com

Brantas
,#$
East Java
 
county Jasa Tirta
.

55

164","):%30108&31-"/5
G


a


PLTM Pusaka

design

PT. Cipta Energi Lestari


, Engineering

Cianjur, West Java

.
.

2012-2014

  , PLN IDR 656/kwh( 14 US




Cents) .
PT. Cipta Energi Lestari J/V
.
e
19.3 million

20

G
PT. Cipta Energi Lestari

Karang Jaya, Cianjur Regency, West Java.


, effective head 155m.
24.4MW 60.670MWh . (intake weir)
4m, 26m .
20 (total capacity) 8.8MW.
IDR 181 billion (USD 19 million), 19.25%.

56

57

58

59

G

PT. Cipta Energy Lestari

Ms. Mila Viendyasari

Director

+62-21-71522956

+62-21-7991465

Mila.viendyasari@yahoo.com

West Java Cianjur Regency


. ,
 

Java .
,#$

164","):%30108&31-"/5
G


PLTM Pusaka

PT. Cipta Energi Lestari




, Engineering
design

Cianjur, West Java



.
.

2012-2014

  , PLN IDR 656/kwh( 14 US




60

Cents) .
PT. Cipta Energi Lestari J/V
.
6.5 million

20

G


PT. Cipta Energy Lestari

Pusaka .
8.8MW 3MW 2 . Pusaka
Karang Jaya, Clanjur Regency,
West Java.
, effective head 49m.
21.5MW 21.668MWh . (intake weir)
4m, 26m . 20
3MW . IDR 62 billion (USD 6.5 million)
, 19.25%.
( 6. PLTM Pusaka )

G

PT. Cipta Energy Lestari

Ms. Mila Viendyasari

Director

+62-21-71522956

+62-21-7991465

Mila.viendyasari@yahoo.com

,#$

West Java Cianjur Regency

  . ,

Java .

61

1&3("3*/("/):%30108&31-"/5
G
PARGARINGAN-Mini Hydro Power Plant (24 MW)

a


North Sumatra

PT. Jaya Dinamika Geohidroenergi

Principle Permits

2013-2015
North Sumatera
. Medan

  Central Tapanuli 420km 9 , Central




Tapanuli Sorkam 50km


2 .
PLN IDR 787/kwh .

35%, bank loan 65%


e
USD 16 million

24

G


PT. Jaya Dinamika Geohidroenergi

Aek Sibundong Pargaringan, Sub-District Sorkam, Central


Tapanuli, Nortth Sumatra. (Catchment Area, CA)
Sibundong 70.60km2, 26.85km.
(Flow Duration Curve, FDC) , 5.75m3/s.
(installed capacity) 8MW 61.69GWh
. (intake weir) 3m, 4km head 162m.
Sibolga 1km.
IDR 153 billion (USD 16 million), 25.03%.
30.

62

G

PT. Jaya Dinamika Geohidroenergi-Energi

Donny Makalew

Director-Chief Financial Offier

+62-21-72799381-72799031

+62-21-72780945

Donny.makalew@gmail.com

,#$
 

,
. North Sumatra Natal Sibolga
. Sumatra
.

4*."/((0):%30108&31-"/5
G


Simanggo-2 Hydroelectric Power Project

Humbang
Hasundutan Regency,
North Sumatra

PLN

2013

 PT. PLN Persero




 2013-2016
  90MW Simanggo


. PLN .

PLN

210 million

30

63

G
 PLN

Simanggo-2 216 220


9822 9826, Simanggo .
Humbang Hasundutan Regency, North Sumatra
Province . , Humbang Hasundutan Regency
Doloksanggul 40km. ,
Parlilitan Tarabintang Subdistricts (Kecamatan) .

700m 2,000m Barisan


. Simangan Mt. Simangan Dungi (El. 1,460m)
Mt. Ginjang (El. 1,685.2m) Barisan
. Lae Cinendang ,
.

Early Permian Late Carboniferous metamorphic


sandstone/slate and Quaternary tuff B , Quaternary
tuff A .
.

64

(weir) tuff A, abutment tuff B, tuff


B, tuff B, headrace sandstone, surge tank penstock
santstone, tuff A .
.
B C .
sandstone sandstone
. , Simanggo Riman alluvial
sand .
(Hydrology)
(preliminary design) .
%FTDSJQUJPO

6OJU

Catchment area

km2

Average river runoff

*OUBLF
8FJS "

*OUFSNU
1POE #

" #

1PXFSIPVTF

478.3

2.3 480.6

936

m3/s

25.1

0.1 25.2

48

95% dependable runoff m3/s

9.00

0.04 9.04

17

Design flood

m3/s

1,100

33

1,540

Construction flood

m3/s

490

15

690

96,000

460

Sediment inflow

m3/

year
Source: JICA Study team

3 .
Plan A . Plan A regulation pond
.
. . 24
base load generation. (maximum plant discharge)
(plant factor) 70%
.

65

Plan A

- , dependable power output 13MW

Plan B
(intermediate pond)
- 5 peaking mode ,
0.55mil.m3
-
Plan B regulation pond
peak time off-peak time
Plan A
-
-
- , (peakikng generation capacity)
Plan B
Plan C (intermediate pond) ,
0.3mil.m3
- 5 (peak generation) (95% dependable)
, 0.55mil.m3
- , semi peaking generation ( , peak time
off-peak time )
Plan C 3
- , Plan C 48MW
, Plan B

- Plan B Parlilitan

66

(Preliminary Design)
90MW 416GWh

- 38.1m3/s 260.3m
10m
- 3.9m 1,570m connection tunnel, 3.9m
3,980m headrace tunnel, 3.2m 615m penstock
tailrace
(intermediate pond)
0.6mil.m3
- FSL EL. 572.6m MOL EL. 567.0m
Simanggo
- EL. 296.0m
- 45MW, 90MW
- switchyard .
150kv Doloksanggul

USD 210.0 million , ,
, ,
- 2017 .

(EIRR) 21.8%, (FIRR)
10.7%
67

(sensitivity analysis)

$BTFT

#$

&/17

&*33

Base case
+Depletion

1.83

117.9

1.84

118.9

+ CDM

2.02

144.5

-10% annual energy

1.61

86.5

21.8% In the base case


Depletion
premium added to
21.8%
the base case
CER
benefit added the base
23.9%
case
Less
hydropower generation
18.4%
by 10%

Premium

/PUFT

: JICA Study Team



$BTFT

'*33

64.

30*

64.

Base case

10.7%

10.6

24.5%

75.3

The

+ CDM

11.29%

17.6

25.5%

82.4

CDM added to the base case

-10% Tariff

9.5%

-6.3

22.0%

58.5

Electricity tariff 10% less

-10% Energy

9.5%

-6.3

22.0%

58.5

Less annual energy by 10%

+10% Capex
COD Delayed

9.7%

-5.0

22.5%

66.5

9.9%

-1.0

21.4%

65.1

Greater cost by 10%


Commissioning delayed

by 1 year

/PUFT

base case

by 1 year

: JICA Team


-
- PLN PPP DBFO

68

(IPP)

-

-




-
- ,
,



- ,

-
(IUCN)

- : Dip terocarpaceae 3
- : Heosemys spinosa 1 ,

- Macaca fascicularis, Macaca nemestrina, Aonyx cinerea Sus barbatus
4

69


- ,
1.00m3/sec
- Simanggo water recession
6km , water recession 9km
, Simanggo
(limited production forest)
(protected forest)
,
. ,

G

PT. PLN Persero

Mr. Mochammad Sofyan

Head of Renewable Energy Division

+62-21-7251234 #1175

+62-21-7227040

m.sofyan@pln.co.id
peak power

,#$

Sumatra . ,

 

70

."4"/():%30108&31-"/5
G


Masang-2 Hydropower Project

a




 


Bukittinggi, West
Sumatra

PT. PLN Persero


PLN

2013

2013 - 2016
2 10,000MW
PLN 12 .
PLN .
PLN 15% , 85% .
193.4 million

30

G


PLN

05 010 10011
10015, Masang .
Agam Regency (Kabutaten), West
Sumatra Province. Bukit Tinggi city
30km, west Sumatra Padang city 100lkm
. , Palembayan
Subdistrict (Kecamatan) .

71

Barisan . Masang
Mt. Marapi (El. 2,8913.3m) .
, Great Sumatra
.
Masang

Alahanpanjang.

Sianok,

Guntung

Masang Sianok

Guntung , Masang Alahnpanjang


slate Permian limestone.


limestone Maninjau Quaternary tuff tuff
breccia
weir A weir C , weir B limestone overburden
weir .
(intermediate pond site) . ,
,
.
connection tunnel headrace tunnel CM CH
. , .

,
.

72

Alternative Layout Plans of Masang-2 Scheme

Masang River

73

(Hydrology)
.
%FTDSJQUJPO

Catchment area

6OJU

*OUBLF 8FJS

*OUFSNU
1POE

1PXFSIPVTF

km2

444

0.9

936

runoff

m3/s

17.71

95% dependable runoff

Average river

m3/s

10.05

Design flood (200-yr flood) m3/s

1.341

15.2

1,939

Construction flood
(200-yr flood)

m3/s

456

5.2

659

Sediment inflow

m3/

222,000

450

Source: JICA Study team

Project Formulation
Plan B
- Plan C Plan B 86%
- Plan A Plan B Plan C
Plan A

- Plan B Plan C Plan A
- , Plan B Plan C
Plan B

- Plan A .
- Plan C
- , Plan C
, Plan B

74

52MW 240GWh

- 32.0m3/s, 178.8m
7.0m
- 3.75m / 1,060m connection culvert, 3.75m /
1,630m connection tunnel, 3.75m / 5,550m headrace
tunnel, 3.1m / 677m penstock trailrace channel

(intermediate pondage)
0.322mil.m3
- FSL EL.339.9m MOL EL.329.9m
, Masang
- EL. 142.0m
- 26MW ( 52MW)
- switchyard

USD 193.4 million , ,
, ,

2017

(EIRR) 12.0%, (FIRR)

75

6.6%
(sensitivity analysis)

$BTFT

#$

&/17

1.15

19.2

12.0% the base case

Depletion premium 1.15

19.7

12.0%

+ CDM

1.27

34.5

13.4% CER benefit added the base case

-10% annual energy

1.00

0.5

10.1% Less hydropower generation by 10%

+10% Capex & Opex

1.04

6.3

10.6% Greater cost by 10%

-10% fuel prices

1.08

10.7

11.1% Fuel cost isles expensive by 10%

Base case

&*33

/PUFT

Depletion premium added to the


base case

: JICA Study Team

$BTFT
Base case
+ CDM
-10% Tariff
-10Energy
+10% Capex
COD Delayed
by 1 year
: JICA Team

76

'*33
6.6%
7.09%
5.6%
5.6%
5.8%

6.2%

64.
-40.5
-36.4
-50.6
-50.6
-54.5

30*
64.
/PUFT
15.0% 19.1 The base case
15.9% 23.2 CDM added to the base case
12.5%
9.0
Electricity tariff 10% less
12.5%
9.0
Less annual energy by 10%
12.8% 11.1 Greater cost by 10%
Commissioning delayed by
-47.0 13.4% 13.9
1 year


- PLN
- loan
- JICA funding agency ADB WBG
(develoment bank)


-

- (Tanah Ulayat)



- ,

-
(IUCN)

- : 3 (Presbytis melalophos,
Hylobates agilis, Tapirus indicus), 2 (Macaca
fascicularis, Macaca nemestrina)
-
- ,
0.39m3/sec
- water recession section 8km
-
1km , Simanggo
water recession section

77

(limited production forest)


(protected forest)
,
. ,
.

G
PT. PLN Persero
Mr. Mochammad Sofyan
Head of Renewable Energy Division
+62-21-7251234 #1175
+62-21-7227040
m.sofyan@pln.co.id


.
,#$
peak power
  Sumatra . ,

#"5"/(5036):%30108&31-"/5
G


Batang Toru Hydro Power Plant

PT. PLN Persero

 2014-2017

78

Tapanuli Selatan,
North Sumatra Province

PLN

2013

PLN ,
  .


. , Bajradaya Power Dharma

Public Private Partnership


e
1.2 billion
36

G
 BAPPENAS
RUPTL 2011-2020
, , , .

RUPTL 2011-2020
(unsolicited project) .
PLN Electricity plan (unsolicited project)
. (IPP) 510MW
, , .

PLN ,
,

79

G

PT. PLN Persero


Mr. Mochammad Sofyan

Head of Renewable Energy Division


+62-21-7251234 #1175

+62-21-7227040

m.sofyan@pln.co.id

North Sumatra
. , Sumatra
 
,

.
,#$

.&3"/(*/):%30108&31-"/5
G


Merangin Hydro Power Plant

Kerinci, Jambi Province

PT. PLN Persero

PLN

2013

2014-2017

  PLN

3 .
.

80

562 million

36

G
 PLN

RUPTL 2011-2020
, , , .
PLN Batang Merangin Jambi 350MW
Sumatra 7.8%
. PLN USD 610 million
, 85% loan ,
15% PLN , .
RUPTL 2011-2020 PLN
. , PLN
PLN (PPP)
(IPP) . (baseload
generation) peak generation system .
(IPP) 350MW , , ,
.
< Map of Project Location>

81

G
PT. PLN Persero
Mr. Mochammad Sofyan

Head of Renewable Energy Division


+62-21-7251234 #1175

+62-21-7227040

m.sofyan@pln.co.id

4 PLN 3
,#$
.
 
South Sumatra , Java

G  .8

-0%"(6/(*.*/*):%30108&31-"/5
G


a



PLTM LODAGUNG I

Brantas River, Malang, East Java


Perusahaan Umum Jasa Tirta I & PT. Hexa Integra Electrica

Detained Engineering
design(DED)


Perusahaan Umum Jasa
Tirta
.

.
,
.

  Brantas
Jasa Tirta .

Jasa Tirta

, .

82

Jasa Tirta USD 400,000 , USD


800,000 .
e
2 million
24

G


PT. Hexa Integra Electrica (Perusahaan Umum Jasa Tirta


business partner)

East Java Brantas .


0.55MW , 4.7 million Kwh .
IDR 21.2 million per Kwh,
USD 300,000 .
- : Lodagung
- Debit Mainstay: 9,0m3/sec
- Head: 7,2m
- : 550kW (2300kW)
- : 4,75 million kWh/year

G

Perusahaan Umum Jasa Tirta & PT. Hexa Integra Electrica


Perusahaan Umum Jasa Tirta: Mr. Harianto
PT. Hexa Integra Electrica: Mr. Doddy Hertanto
Perusahaan Umum Jasa Tirta: Mr. Harianto (Director of

Planning & Business Development)


PT. Hexa Integra Electrica: Mr. Doddy Hertanto (Director of
Procurement)

+62-21-75908862
HP: +62-818-124380

+62-21-7590-8949

doddy.hertanto@yahoo.com

,#$
East Java
  Brantas
Lodagung .

83

-0%"(6/(**.*/*):%30108&31-"/5
G


PLTM LODAGUNG

a



Brantas River, Malang, East Java

Perusahaan Umum Jasa Tirta & PT. Hexa Integra Electrica




.
.

.
,
Brantas

  Jasa Tirta . Jasa Tirta




,
.

85% .
600,000

24

G


PT. Hexa Integra Electrica (Perusahaan Umum Jasa Tirta


business partner)

- East Java Brantas .


0.30MW , 2.3 million Kwh .
- IDR 18.6 million per Kwh,
USD 180,000 .
- : PLTM Lodagung I +/- 400m, Debit
Mainstay: 9,0m3/sec, Head: 4,30m, : 300kW (2150kW),
: 2,37 million kWh/year

84

G

Perusahaan Umum Jasa Tirta & PT. Hexa Integra Electrica


Perusahaan Umum Jasa Tirta: Mr. Harianto
PT. Hexa Integra Electrica: Mr. Doddy Hertanto

Perusahaan Umum Jasa Tirta: Mr. Harianto (Director of Planning


& Business Development)
PT. Hexa Integra Electrica: Mr. Doddy Hertanto (Director of
Procurement)

+62-21-75908862
HP: +62-818-124380
+62-21-7590-8949
doddy.hertanto@yahoo.com

East Java Brantas


,#$

Lodagung
 

-&/(,0/(.*/*):%30108&31-"/5
G


a



PLTM Lengkong

Lengkong, Mojokerto,
East Java
Perusahaan Umum Jasa Tirta & PT. Hexa Integra Electrica


.

.


2012-2014

East Java
Brantas Jasa
  Tirta .
 .
, Jasa Tirta
.

Jasa Tirta ,
. Jasa Tirta J/V
.
1.8 million
e 24

85

G


PT. Hexa Integra Electrica (Perusahaan Umum Jasa Tirta


business partner)

Perusahaan Umum Jasa Tirta 8


. Brantas . Brantas
.
0.95MW , 4.5Kwh
, Kwh IDR 17 million,
USD 2.6 billion .

G

Perusahaan Umum Jasa Tirta (www.jasatirta1.go.id) & PT.


Hexa Integra Electrica (www.hire-eng.com)
Perusahaan Umum Jasa Tirta: Mr. Harianto
PT. Hexa Integra Electrica: Mr. Doddy Hertanto
Perusahaan Umum Jasa Tirta: Mr. Harianto (Director of

Planning & Business Development)


PT. Hexa Integra Electrica: Mr. Doddy Hertanto (Director of
Procurement)

+62-21-75908862
HP: +62-818-124380

+62-21-7590-8949

doddy.hertanto@yahoo.com

,#$

Brantas East

  Java county

86

Jasa Tirta .

$*#"5"36".*/*):%301-"/5
G


a


Cibatarua Mini-Hydro Project

PT. Cipta Energy Lestari

Garut, West Java


Detail Engineering
Design



 


,

.

2012-2013

. ,
.
.
e
450,000
2012-2014

G
 PT. Cipta Energy Lestari

87

181

#
##
#
##
#
#
#
##
##
##

#
###
###
#
##
###
##

#
##
##
#
##
##
##
##
#

181a

182
##
#
#
##
##
###

###
#
#
##
##
##

183

184
#
#
##
##
##
##

186
186
186
#
###
#

186a
186a
186a

KI
LA
CI

#
#
###

UK
AN
M
CI

185
#
#
###

##
##
#
#
#
##
###
##

107.9E

##
#
#
#
##
###
##

107.8E

180

107.7E

107.6E

107.5E

Cibatarua River

###
#
##
#
##
##

207
7.3S

186b
186b
186b
186c
186c
186c

% G. Cikuray

#
#
###

2.5

##
##
#
##
##
###
#

kilometers

189

#
##
##
#
##
###
##
#

#
#
###

#
188
# 188
###
188
190
190

#
#
##
##
##
##

209

208
###
#
##
##
##
##

212

gg
aann
nndd
kkaa
CCii
S..
#
191
# 191
###
191 S
#
#
###

190a
190a
190a

#
##
###
#
#
##
###
##

213

7.4S
##
#
##
#
#
##
##
##
##

SS.
. CC
IIKK
AANN
DDAA
NNGG

#
##
###
#
##
###
##
#

213a

IRI
ANG
CIS

SS..
CCii
aarr
iinn
eemm

RENCANA
RENCANA
LOKASI
LOKASI

BENDUNG
BENDUNG

N
INGA
CIKA

ruaa
taru
nta
ibaan
Cib
SS.. C

A
G
LA
A
IT
C

214

7.5S

CIP
AL
EB
UH

###
#
#
#
##
###

##
#
##
#
##
#
##
###

214a

215
#
###
#
#
##
###
#
##

215a

7.6S

Map of Project Location


(FOFSBM %BUB

Name of Project
Project Location

Hamlet
Village
Dist.
Reg.
Prov.

River Name
Scheme
Transmission line to PLN
Power output

km
kW

CIBATARUA
Bojong Boled
Garu Mukti
Pamulihan
Garut
Jawa Barat
Cibatarua
grid-connected
2
214,14

5FDIOJDBM %BUB

Gross Head
Net Head
Panjang Pipa Pesat
Measured volume
Designed volume
Location of Penstrock
Length of head race

88

m
m
m
m3/s
m3/s
m

34,7
34,0
73,8
2,50
0,98
sebelah kanan
1300

.FDIBOJDBM BOE &MFDUSJDBM $PNQPOFOUT %BUB


Turbine
Type
Crossflow
Efficiency of designed vol.
%
76
Nominal Rotation
rpm
443
Generator
Rating
kVA
257
Efficiency
%
88
Nominal Rotation
rpm
1500
Mechanical Transmission
Type
indirect
Efficiency
%
98
Pulley ratio
3,42
Pipe
Diameter
mm
1140
Thickness
mm
4
Material
welded roll pipe
mild steel St 37

Potential
Cibatarua 214.14kW .
500I/sec . Cibatarua
.
Cibatarua River Information
%FTDSJQUJPO

River

width

Depth
Cross
Average

sectional area
water speed

Instantenous

discharge

7BMVF

6OJU

16

0,3 0,65

3,48

0,88

m/s

m/s

89

Technical Specs
Cibatarua , , (headrace), (settling
basin), (forebay), (penstock), .
(headrace) (settling basin) (penstock)
. 1,300m .
(penstock) 73.8m .
114cm 6mm (mild steel) .

.
5VSCJO  UZQF   $SPTTGMPX

Basic Data
Gross head
Net head
Design volume
Diameter runner turbin
Assumption & Calculation
Optimal Efficiency
maximum Efficiency
Runner width
Turbine rotation
Turbine Design
Runner width
Optimal volume
turbine shaft
Turbine rotation
Run away speed
Eff.Gen.dan trans mekanik
Electrical output (power)

90

Hgross
m
Hnet
m
Qt ltr/second

34,7
34,0
980

Dt

0,50

etat opt
etat max
b0
nt

%
%
mm
rpm

76
76
420
443

bow
Qopt
Ptw_opt
ntw_opt
ntw_max
eta_g
Pel

mm
l/s
kW
rpm
rpm
kW

430,0
1.003,0
248,3
443
798
86%
214,14

.
5ZQF

Minimum Rating
Efisiensi
Putaran nominal
Fasa
Tegangan
Frekuensi
Jumlah pole

4JODSPOJ[FE

257
88
1500

kVA
%
rpm

3
220 / 380
50
4

fasa
V
Hz
pole

PLN 20kV
2km.

.
. IDR 3.9 billion (USD 430,000).
5.5, (IRR) 17.8%.
1&.#*":""/
Development cost
8%
Other costs
6%
Working capital:
6
bulan
Engineering-Procurement-Construction
Electro mechanical :
Component
Installation, commissioning, etc.
Civil construction :
Component
Work Preparation
Subtotal
Contractors profit (10%)
Engineering
5%
Operators training
EPC cost before tax
Tax 10 %
Total project cost

267
200
121
3,340
1.466
136
1.021
24
2,647
265
124
13
3,037
304
3,929

Million
Million
Million
Million
Million
Million
Million
Million
Million
Million
Million

IDR
IDR
IDR
IDR
IDR
IDR
IDR
IDR
IDR
IDR
IDR

Million IDR
Million IDR
Million IDR

91

G
PT. Cipta Energy Lestari

Ms. Mila Viendyasari

Director

+62-21-71522956

+62-21-7991465

Mila.viendyasari@yahoo.com

,#$



-".#"/"/.*/*):%30108&31-"/5
G


Lambanan Mini-Hydro Project

PT. Cipta Energy Lestari

Detail Engineering
Design

Mamasa, West
Sulawesi

2012-2013

  1MW .
 Sulawesi .

92


.
200,000

20

G


PT. Cipta Energy Lestari


(FOFSBM %BUB

Name of Project
Project Location

Hamlet
Village
Dist.
Reg.
Prov.

River Name
Scheme
Transmission line to PLN
km
Power output
kW
5FDIOJDB %BUB
Gross Head
m
Net Head
m
Panjang Pipa Pesat
m
Measured volume
m3/s
Designed volume
m3/s
Location of Penstrock
Length of head race
m
.FDIBOJDBM BOE &MFDUSJDBM $PNQPOFOUT %BUB
Turbine
Type
Efficiency of designed vol.
%
Nominal Rotation
rpm
Generator
Rating
kVA
Efficiency
%
Nominal Rotation
rpm
Mechanical Transmission
Type
Efficiency
%
Pulley ratio
Pipe
Diameter
mm
Thickness
mm
Material

Lambanan
Pembu
Lambanan
Mamasa
Mamasa
Sulawesi Barat
Cibatarua
grid-connected
0,2
61,86
15,8
15,5
34,6
1,7
0,66
Left side
537

Crossflow
74
498
74
85
1500
indirect
98
3,07
760
6
mild steel St 37
welded roll pipe

93

Lambanan Village . West Sulawesi Province


Polewali Regency 4, Polewali Regency Mamasa
Regency 4 Mamasa Regency Lambanan
Village 30 .

Lambanan Village 2,847, .
PLN . IDR
300,000-IDR 500,000.

61.8kW. Mamasa
. 151mm.

Location of Lambanan Hydro Power Site

94

%FTDSJQUJPO
width

Mamasa River Information


7BMVF

River
Depth
Cross sectional area
Average water speed
Instantenous discharge

6OJU

10
0,3 0,63
4.58
0.4
1.83

m
m
m
m/s
m/s

.
30-45 . 15m
.
Technical Specs
Cibatarua , , (headrace),
(settling basin), (forebay), (penstock),
.
(headrace) (settling basin) (penstock)
. 537m . 0.6m/s.
(penstock) 34.6m .
76cm 6mm (mild steel) .
1FOTUPDL   4QFDJGJDBUJPO
Material
Diameter
Thickness
Length

-PDBUJPO   %BUB
Designed volume
Gross-head

%FUBJM
welded roll pipe
mild steel St 37
760
6
34.6
%FUBJM
0.66
15.8

Head Losses
Net Head
Safety
Safety

factor
Factor requirements

2
15.5

>=

mm
mm
m
m
m
%
m

3.35
2

95

.
5VSCJO  UZQF $SPTTGMPX

Basic Data
Gross head

Hgross

15,8

Hnet

15,5

Design volume

Qt ltr/second

660

Diameter runner turbin

Dt

0,30

etat opt

74

etat max

75

Runner width

b0

mm

699

Turbine rotation

nt

rpm

498

Runner width

bow

mm

700,0

Optimal volume

Qopt

l/s

661,1

turbine shaft

Ptw_opt

kW

74,3

Turbine rotation

ntw_opt

rpm

498

Run away speed

ntw_max

rpm

897

eta_g

83%

Pel

kW

61,86

Net head

Assumption & Calculation


Optimal Efficiency
maximum Efficiency

Turbine Design

Eff.Gen.dan trans mekanik


Electrical output (power)

5ZQF
Minimum Rating
Efficiency
Nominal Rotation
Phase
Voltage
Frequency
No. of Pole

96

4JODSPOJ[FE

257

kVA

88

1500

rpm

Phase

220 / 380

50

Hz

pole

- PLN 220/380V 200m


- (synchronizer) Balla Load
ELC(Electronic Load Controller)


-
- IDR 1.7 billion (USD 200,000)
- 5.5, (IRR) 19%

'JOBODJOH 
Development cost
4%
Other costs
6%
Working capital:
6
Month
Engineering-Procurement-Construction
Electro mechanical Component
Installation, commissioning, etc.
Civil construction :
Component
Work Preparation
1.197
Contractors profit (10%)
Engineering
5%
Operators training
EPC cost before tax
Tax 10 %
Total project cost

700,0
661,1
74,3
1,504
452
147
567
30
1,197
120
51
24
1,368
137
1,687

Million
Million
Million
Million
Million
Million
Million

IDR
IDR
IDR
IDR
IDR
IDR
IDR

Million
Million
Million
Million
Million
Million
Million

IDR
IDR
IDR
IDR
IDR
IDR
IDR

97

G

PT. Cipta Energy Lestari

Ms. Mila Viendyasari

Director

+62-21-71522956

+62-21-7991465

Mila.viendyasari@yahoo.com

,#$



PLN
.

-"/5"/.*/*):%30130+&$5
G


Lantan Mini-Hydro Project

PT. Cipta Energy Lestari

Detail Engineering Design

Lombok
Tengah,
West Nusa Tenggara

2012-2014

1MW , Nusa
  Tenggara Barat .
 .
.

98


.
400,000

20

G


PT. Cipta Energy Lestari

<
4
4

44
<

44

<

44 44

<

KAB. LOMBOK TIMUR


KAB. LOMBOK BARAT

KAB. LOMBOK TENGAH

<

LOKASI PEKERJAAN
LOKASI PEKERJAAN

44

10

20

<
< <

44

44 Keru
44 44

< <

44

kilometers

44

< Bebuak

<
Kopang
<
<Barabali
<

<
<

Lingkuk Lima

44
44
Lt.Daya
Perian

Mantang

44

<

<

<
<

<

<

< <

<
<

44 44

<
<

<

<
44
KAB. LOMBOK TENGAH

KAB. LOMBOK TENGAH

<

< <

KETERANGAN

<

Kota kecamatan

<

Pos Hujan

44

Pos Debit
Sungai

Babak River

99

(FOFSBM %BUB

Name of Project
Project Location

Hamlet
Village
Dist.
Reg.
Prov.

River Name
Scheme
Transmission line to PLN
Power output

km
kW

Lantan
Rerantik
Batukliang Utara
Lombok Tengah
Nusa TenggaraBarat
Babak
Babak
grid-connected
0,51
166,41

5FDIOJDB %BUB

Gross Head
Net Head
Panjang Pipa Pesat
Measured volume
Designed volume
Location of Penstrock
Length of head race

m
m
m
m3/s
m3/s
m

.FDIBOJDBM BOE &MFDUSJDBM $PNQPOFOUT %BUB


Turbine
Type
Efficiency of designed vol.
%
Nominal Rotation
rpm
Generator
Rating
kVA
Efficiency
%
Nominal Rotation
rpm
Mechanical Transmission
Type
Efficiency
%
Pulley ratio
Pipe
Diameter
mm
Thickness
mm
mild steel St
Material

100

22,0
21,6
50,0
3,21
1,20
Right side
248

Crossflow
76
353
200
88
1500
indirect
98
4,34
1140
6
3 welded
roll pipe

Lantan Village . West Nusa Tenggara Province


Batu Kliang Utara District 1 , Batu
Kliang Utara District Lantan Village 15
.

Lantan Village 4,973,
. 2007 Sungai Babak
. IDR 500,000.

166.4kW. Lantan
. 9.3km. 151mm.
design volume
measurement NRECA (No Record Catchment Area) .
0

Su
ng
ai

Ba
ba
k

5E
116.3

8.45S

E
116.4

E
116.3

8.5S

LOKASI RENCANA
BENDUNG

Lt.Daya

4
4
4

8.55S

Lingkuk Lima

Location of Lantan Hydro Power Site

101

%FTDSJQUJPO
width

River
Depth
Cross sectional area
Average water speed
Instantenous discharge

Lantan River Information


7BMVF
5
0,4 0,6
2.66
1.2
3.21

6OJU

m
m
m
m/s
m/s

. 45-60
. 21m .(Geodetic Head)
Technical Specs
Lantan , , (headrace), (settling
basin), (forebay), (penstock), .
5VSCJO  UZQF $SPTTGMPX
Basic Data
Gross head
Hgross
m
Net head
Hnet
m
Design volume
Qt ltr/second
Diameter runner turbin
Dt
m
Assumption & Calculation
Optimal Efficiency
etat opt
%
maximum Efficiency
etat max
%
Runner width
b0
mm
Turbine rotation
nt
rpm
Turbine Design
Runner width
bow
mm
Optimal volume
Qopt
l/s
turbine shaft
Ptw_opt
kW
Turbine rotation
ntw_opt
rpm
Run away speed
ntw_max
rpm
Eff.Gen.dan trans mekanik
eta_g
Electrical output (power)
Pel
kW

102

22,0
21,6
1200
0,50
76
76
646
353
650,0
1.207,8
193,0
353
636
86%
166,41

(headrace) (settling

basin)

(penstock) . 248m .
1.2m/s.
(penstock) 50m .
114cm 6mm (mild steel) .
1FOTUPDL   4QFDJGJDBUJPO
Material

Diameter
Thickness
Length
-PDBUJPO   %BUB
Designed volume
Gross-head

%FUBJM
welded roll pipe
mild steel St 37
1140
mm
6
mm
50
m
 %FUBJM
1,20
m
22,021
m

Head Losses
Net Head
Safety
Safety

factor
Factor requirements

2
21.6

>=

%
m

2.86
2


5ZQF

Minimum Rating
Efficiency
Nominal Rotation
Phase
Voltage
Frequency
No. of Pole

4JODSPOJ[FE

200

kVA

88

1500

rpm

Phase

220 / 380

50

Hz

pole

103


- PLN 220/380V 510m
- 9m 40m
- (synchronizer) Balla Load
ELC(Electronic Load Controller)


-
- IDR 1.7 billion (USD 200,000)
- 5.5, (IRR) 19%

'JOBODJOH
Development cost
4%
Other costs
6%
Working capital
6
Month
Engineering-Procurement-Construction
Electro mechanical
Component
Installation, commissioning, etc.
Civil construction
Component
Work Preparation
Subtotal
Contractors profit (10%)
Engineering
5%
Operators training
EPC cost before tax
Tax 10 %
Total project cost

104

189
252
135
3,154
1.478
147
846
30
2,501
250
116
22
2,867
287
3,730

Million
Million
Million
Million
Million

IDR
IDR
IDR
IDR
IDR
151
Million IDR

Million
Million
Million
Million
Million
Million
Million

IDR
IDR
IDR
IDR
IDR
IDR
IDR

G

PT. Cipta Energy Lestari


Ms. Mila Viendyasari

Director
+62-21-71522956

+62-21-7991465

Mila.viendyasari@yahoo.com

,#$

 
.

4&368":.*/*):%30130+&$5
G


Seruway Mini-Hydro Project

a


Deli Serdang, North


Sumatra

PT. Cipta Energy Lestari


Detail Engineering
Design

2012-2014

1MW , North Sumatra


 
.

.


.
e 20
280,000

105

G
 PT. Cipta Energy Lestari

Map of Project Location (Seruway River Basin)

Seruway River

106

(FOFSBM %BUB

Name of Project
Project Location

Seruway
Cinta Rakyat
Sibolangit
Deli Serdang
Sumatera Utara
Seruway
grid-connected
0.5
77.09

Hamlet
Village
Dist.
Reg.
Prov.

River Name
Scheme
Transmission line to PLN
km
Power output
kW
5FDIOJDB %BUB
Gross Head
m
Net Head
m
Panjang Pipa Pesat
m
Measured volume
m3/s
Designed volume
m3/s
Location of Penstrock
Length of head race
m

73,5
72,1
107,5
0,34
0,177
Right side
339.0

.FDIBOJDBM BOE &MFDUSJDBM $PNQPOFOUT %BUB

Turbine
Type
Efficiency of designed vol.
Nominal Rotation
Generator
Rating
Efficiency
Nominal Rotation
Mechanical Transmission
Type
Efficiency
Pulley ratio
Pipe
Diameter
Thickness
Material

%
rpm

Crossflow
74
1075

kVA
%
rpm

93
85
1500

indirect
98
1.41

mm
mm

380
6
mild steel St 37
welded roll pipe

107

133b

133a

124

125

126

S
.D
E
L
I

POS DEBIT
S. PRUCUT- TEMBUNG

128
#

127

134

129
# 131
#

127b
#
#

129a

131a

130

#
#

Pos Hujan
Sukaraja

136a
#

127a

POS DEBIT
S. DELI-HELVITIA

130a

Pos Hujan
Dolog Pintu

135

138b

138a

138c

LOKASI
#

132

ST UDI

Pos Hujan
Brastagi

139a
#

143d

139

Location of Seruway Hydro Power

Cinta Rakyat Village North Sumatra


Medan 55km . Medan Deli Serdang District
2 , Deli Serdang District
1 .

Cinta Rakyat Village 265, ,
. .
IDR 700,000.

Seruway 77kW, Seruway
. 3.29km2. 158.5mm.
design volume
measurement NRECA (No Record Catchment Area) .
108

Seruway River Information


%FTDSJQUJPO
River width
Depth
Cross sectional area
Average water speed
Instantenous discharge

7BMVF

6OJU

7
0,3 0,4
2.68
0.13
0.34

m
m
m
m/s
m/s

. 45-60 .
73m .(Geodetic Head)
Technical Specs
Seruway , , (headrace), (settling
basin), (forebay), (penstock), .
(headrace) (settling basin) (penstock)
. 339m . 0.13m/s.
(penstock) 107.5m .
38cm 6mm (mild steel) .
1FOTUPDL   4QFDJGJDBUJPO
Material
Diameter
Thickness
Length
Location Data
Designed volume
Gross-head

%FUBJM
welded roll pipe
mild steel St 37
380
mm
6
mm
107.5
m

Head Losses
Net Head
Safety
Safety

factor
Factor requirements

>=

0.18
73.5

m
m

2
72.1

%
m

4.19
2

109

5VSCJO  UZQF $SPTTGMPX


#BTJD %BUB
Gross head
Net head
Design volume
Diameter runner turbin
"TTVNQUJPO  $BMDVMBUJPO
Optimal Efficiency
maximum Efficiency
Runner width
Turbine rotation
5VSCJOF %FTJHO
Runner width
Optimal volume
turbine shaft
Turbine rotation
Run away speed

Eff.Gen.dan trans mekanik


Electrical output (power)

%BUF

Hgross
Hnet
Qt
Dt

bow
Qopt
Ptw_opt
ntw_opt
ntw_max

m
m
ltr/second
m
  %BUF
%
%
mm
rpm
  %BUF
mm
l/s
kW
rpm
rpm

100,0
203,7
92,5
1.075
1936

eta_g

83%

Pel

kW

77,09

etat opt
etat max
b0
nt

73,5
72,1
177
0,30
74
75
87
1075


5ZQF

4JODSPOJ[FE

Minimum Rating

93

kVA

Efficiency

85

1500

rpm

Phase

220 / 380

50

Hz

pole

Nominal Rotation
Phase
Voltage
Frequency
No. of Pole

110

- PLN 500m
- 9m 40m
- (synchronizer) Balla Load
ELC(Electronic Load Controller)



- IDR 1.7 billion (USD 280,000)
- 5.5, (IRR) 19%

Development cost

'JOBODJOH
4%

130 Million IDR

Other costs

6%

174 Million IDR

Working capital:

Month

53 Million IDR

Engineering-Procurement-Construction

2,174 Million IDR

Electro mechanical : Component


Installation, commissioning, etc.
Civil construction :
Component
Work Preparation

1,000
146
547
343
1.727

Subtotal
Contractors profit (10%)
Engineering
Operators training
EPC cost before tax
Tax 10 %
Total project cost

Million IDR
151
Million IDR
Million IDR

173 Million IDR


5%

77 Million IDR
22 Million IDR
1.977 Million IDR
198 Million IDR
2,532 Million IDR

111

G

PT. Cipta Energy Lestari


Ms. Mila Viendyasari

Director
+62-21-71522956

+62-21-7991465

Mila.viendyasari@yahoo.com

Seruway
,#$
 
.

,-00',".1.*/*):%30130+&$5
G


Kloofkamp Mini-Hydro Project

PT. Cipta Energy Lestari

Detail Engineering Design

2012-2014

Jayapura, Papua

1MW , Jayapura, Papua.


 
Papua Province Jayapura

micro power plant .

112


.
360,000

20

G


PT. Cipta Energy Lestari

Location of the Plant

Gurabesi Village, Papua Province Jayapura city


.

Gurabesi Village 70 ,
.

Kloofkamp 72kW, Seruway
. 11.6km2. 148mm.
design volume measurement , 40%
minimum volume 1 2-3

113

(FOFSBM %BUB

Name of Project
Project Location

Kloofkamp
Gurabesi
Jayapura Utara
Jayapura
Papua
Kloofkamp
grid-connected
03
72

Hamlet
Village
Dist.
Reg.
Prov.

River Name
Scheme
Transmission line to PLN
km
Power output
kW
5FDIOJDBM %BUB
Gross Head
m
Net Head
m
Panjang Pipa Pesat
m
Measured volume
m3/s
Designed volume
m3/s
Location of Penstrock
Length of head race
m

75,1
73,6
300,0
0,15
0,162
sisi kanan sungai

.FDIBOJDBM BOE &MFDUSJDBM $PNQPOFOUT %BUB

Turbine
Type
Efficiency of designed vol.
Nominal Rotation
Generator
Rating
Efficiency
Nominal Rotation
Mechanical Transmission
Type
Efficiency
Pulley ratio
Pipe
Diameter
Thickness
Material

114

%
rpm

Crossflow
74
1090

kVA
%
rpm

87
85
1500

indirect
98
1.41

mm
mm

380
6
mild steel St 37 welded
roll pipe

Location of the Dam


Kloofkamp River Information
%FTDSJQUJPO
River width
Depth
Cross sectional area
Average water speed
Instantenous discharge

7BMVF

9
0,15 0,26
1
0.15
0.15

6OJU

m
m
m
m/s
m/s

Technical Specs
Kloofkamp , , (headrace),
(settling basin), (forebay), (penstock),
.
(headrace) (settling

basin)

(penstock) . 75m .
0.15m/s.
(penstock) 300m .
38cm 6mm (mild steel) .
115

1FOTUPDL 4QFDJGJDBUJPO

%FUBJM
welded roll pipe
mild steel St 37
380
mm
6
mm
300
m
 %FUBJM
0.162
M3/s
75.5
m
2
%
73.6
m
4.44
>= 2

Material
Diameter
Thickness
Length
-PDBUJPO %BUB
Designed volume
Gross-head
Head Losses
Net Head
Safety factor
Safety Factor requirements


5VSCJO UZQF  $SPTTGMPX

Basic Data
Gross head
Net head
Design volume
Diameter runner turbin
Assumption & Calculation
Optimal Efficiency
maximum Efficiency
Runner width
Turbine rotation
Turbine Design
Runner width
Optimal volume
turbine shaft
Turbine rotation
Run away speed
Eff.Gen.dan trans mekanik
Electrical output (power)

116

Hgross
m
Hnet
m
Qt ltr/second
Dt
m

75,1
73,6
162
0,30

etat opt
etat max
b0
nt

%
%
mm
rpm

74
75
79
1087

bow
Qopt
Ptw_opt

mm
l/s
kW

80,0
164,7
86,5

ntw_opt
ntw_max
eta_g
Pel

rpm
rpm
kW

1.087
1956
83%
72,04


5ZQF

4JODSPOJ[FE
86
85
1500
3
220 / 380
50
4

Minimum Rating
Efficiency
Nominal Rotation
Phase
Voltage
Frequency
No. of Pole

kVA
%
rpm
Phase
V
Hz
pole

- PLN 3km
- 9m 40m
- (synchronizer) Balla Load
ELC(Electronic Load Controller)


-
- IDR 1.7 billion (USD 280,000)
- 5.5, (IRR) 19%

'JOBODJOH
Development cost
4%
Other costs
6%
Working capital
6
Month
Engineering-Procurement-Construction
Electro mechanical
Component
Installation, commissioning, etc.
Civil construction
Component
Work Preparation
Subtotal
Contractors profit (10%)
Engineering
5%
Operators training
EPC cost before tax
Tax 10 %
Total project cost

225
169
66
2,817
1,029
176
1,000
31
2,236
224
101
30
2,561
256
3,278

Million
Million
Million
Million
Million
Million
Million
Million
Million
Million
Million
Million
Million
Million
Million

IDR
IDR
IDR
IDR
IDR
IDR
IDR
IDR
IDR
IDR
IDR
IDR
IDR
IDR
IDR

117

G

PT. Cipta Energy Lestari

Ms. Mila Viendyasari

Director

+62-21-71522956

+62-21-7991465

Mila.viendyasari@yahoo.com

Papua
,#$
  .

118

     #

# # #

41# #
G
10 7%
2010 973 KWh , 2015
12~16% .
- ,
PVN( ), EVN( )
.
- 2011~2015
4,000MW .
< 2001~2010 >
( : 10kWh)

: ,

121

G
38% ,
(32%), (18%), (5%) .
- 2015 40.42TWh ,

.
- , 2015
(40.2%) (28.3%) .
- EVN( ) 2020 17
,
.


( : MW)

1
2
3
4
5
6
7

(Hydropower)
(Gas turbines)
(Coal-fired power)
(Imported power)
(Oil-fired power)
(Gas-fired power)
(Renewable energy sources)

7,633
3,197
2,745
1,000
537
500
N/A

38%
32%
18%
5%
3%
2%
2%

51# # # #
G


122

- (MOIT : Ministry of Industry and Trade)


2025 2005 10 .
- BOT ODA

.
< 2005~2025 >
GWh
700,000
600,000
500,000
400,000
300,000
200,000
100,000
0
2005

2010

2015

2020

2025

G
EVN( , Electricity of Vietnam)
, EVN
70% .



EVN ()

52%

PVN ()

11%

EVN

18%

VINACOMIN ()

4%

12%

3%

123

EVN ,
.

.
- EVN EVN
,
.

G
EVN
.



G
2007 kWh U$ 0.055 , 2011 3
VND 1,304 . 2012 7.1 kWh
VND 1,369( U$ 0.066) . U$ 0.08
.

124

(IPP)
EVN
.
- ,
.
, ,
, ( )
.

61# # # #
G
5 ,
2011 7 (Power Master Plan VII)
EVN .
- 2004 (Electricity Law) 2006
(26/2006/QD-TTg) .
1(2005~2014) : EVN
2(2015~2022) :

3(2022~) :



125


, ,
EVN ,

5 ,
, , ,
.
- 1)

- 2)

- 3) PVN( ), VINACOMIN( )

- 4) 16,000MW 2020 55,000MW ,
10 4,000MW
- 5) 2020
2020 2030
,
- 2015 1,940-2,100 kWh
2020 3,300-3,620 kWh, 2030 695-834 KWh
- 3.5% 2020
4.5% 2030 6.0%
- 2020 19.6%, 46.8%,
24%, 4.5%, 2.1%, 3.0%

126


5ZQF


: 10,400 MW
( : 660 kWh)
: 36,000 MW
( : 1,560 kWh)
17,400 MW
500 MW
1,000 MW
1,800 MW
2,000 MW


: 11,300 MW

( : 731 kWh)
: 75,000 MW

( : 3,940 kWh)

2,000 MW

6,200 MW

5,700 MW
LNG
6,000 MW
: 10,700 MW

( : 705 kWh)
: Mayer Brown JSM

71# # # # #
G
7 (Power Master Plan VII) 2011 2030
U$ 1,238
U$ 817, U$ 421 .
2030 U$ 68 ,
EVN 20%
.
- EVN ,
8~9 95 ( 49,044MW) ,
EVN 44( 24,045MW) .
- 98 ( 59,444MW)
48 ( 33,245MW, U$ 396) EVN
.

127

_  
( : U$ )













5PUBM

EVN

1.74

2.21

2.36

2.72

2.35

2.51

13.89

Non-EVN

0.65

0.65

0.59

0.52

0.72

0.74

3.87

220 kv-500 kv

0.5

0.41

0.42

0.47

0.47

0.57

0.4

110 kv

0.95

0.78

0.81

0.84

0.87

0.94

5.19

3.84

4.05

4.16

3.66

4.41

4.76

24.88

: EVN

G
,
(, ,
) 41% , ODA 37%, 21%,
1% .
EVN, PVN
(), VINACOMIN() .
ODA (WB : World Bank), (ADB : Asia
Development Bank), (JBIC : Japan Bank for International
Corporation), (SIDA : Swedish International Development
Corporation Agency) .
- 3 JBIC (, ) , 500kV
, WB ,
EVN .

128

- ODA ADB ,
Mong Duong 1
Song Bung 4 .
- ADB 13 U$ 3.25
,
ADB
(U$ 60) .

"%#
( : U$ )

Vinh Tan thermal power project 1,540


Energy efficiency program in
45
the industry sector
Energy efficiency program in
105
the industry sector
250
2011 Power transmission sector
Rural renewable energy
25
O Mon 4 thermal power
600
O Mon 3 thermal power
370
Vinh Tan thermal power
180
Soc Trang thermal power 1
785
2012
O Mon 4 thermal power
660
Soc Trang thermal power 2
735
Lao-Viet power interconnection
94
) OCR : Ordinary Capital Resources
2010

"%#

0$3
-0"/

120
0

1,400

40

40

25

40

130
0
350
200
160
450
100
400
30

0
20
0
0
0
0
0
0
0

20
5
0
70
20
335
86
335
4

100
0
250
100
0
0
474
0
60

G
,
( ), , ,
BOT, BT, BTO, JV .

129

,
, , , ,
.

, ,

- ,
, ODA ,
.

, 2015
,
.
2017
.
,
.
- kWh U$ 0.09~0.10 EVN
U$ 0.066
- , , ,
Hidden Cost
- EVN
EVN ,
.
- BOT , , , ,
, ,
.

130

 # # #

41# #
G4805
Strength

Weakness

- ,

- ,

- ,

-
Opportunities

- ,
Threat

- ,


- 2020

- 2022

20%

21%,
23% )

G 
7 2015
14,329MW , EVN
IPP(Individual Power Producer)
.
EVN Song DA Construction Co.
, 20,600MW .

131

ADB WB ,

,
.
- ,
, Bitexco, REE, Hoang
Anh Gia Lai .

G
Trung Son Hydropower Plant (Thanh Hoa)
- Thanh Hoa 260MW , U$ 3.6
- EVN WB
2011 2016
Song Bung 2 Hydropower Plant (Quang Nam)
- 100MW 2010.3
, BNP U$ 1.8
( 80%)
Song Bung 4 Hydropower Plant (Quang Nam)
- 156MW EVN
ADB ( U$
2.67 ADB U$ 1.96 )
Lai Chau Hydro Power Plan Compelx (Lai Chau)
- 1,200MW .
- EVN 2017 ,
U$ 18.8 EVN 20%
132

Song Da Corporation Plants ( )


- 1 Song Da Corporation()
2,100MW 13 .
- 290MW 7 , 1,810MW 6
.
- Song Da-Viet Lao Power Development
Company(VLP) , Song Dark
60%, EVN 10%,
* 85% VLP BOT , 15%
Bitexco ( )
- 500MW 13 ,
Ta Trach(21MW), Nam Muc(46MW), Nho Que1(32MW),
Se San 3A(108MW), Eakrongrou(28MW), Nam Mu(12MW), Nam Ngan(14MW)
.
Hoang Anh Gia Lai ( )
- 420MW 17 2010-2012
. Daksong 3A, Dakpsi 2C, Dak Lo 2,
Buong Don, Buon Bra, Ba Thuoc 1, Ba Thuoc 2, Daksong 3B, Dakspi 2B
.

133

G
KRONGNO 2 & 3 HYDRO POWER PROJECT
-


a

KRONGNO 2 & 3 HYDRO POWER PROJECT


Trung Nam Construction Investment Corporation

Krongno Commune, Lak Dist,


- : 903
- : 1A 2km,
Dak Lak province & Da


Tong commune, Dam Rong
Cam Ranh 35km,
Dist., Lam Dong Province
Cam Ranh 30km
45MW,


40
e
2500
 
 & Vietnam
7,500

Development Bank

BOO (Build-Own-Operate)
 2014 ,



e
2013 1


,

( )


a




134

Trung Nam Construction Investment Corporation


Mr. Nguyen Tam Thinh
Mr. Dang Cong Chuan
General Manager
7A/80 Thanh Thai, Ward 14. Dist. 10, HCM
() +84-8-6264 5182, () +84-90-381-2047
+84-8-6264-5180
trungnamgroup.com.vn
congchuan@trungnamgroup.com.vn
&
: 2004, : 460, : 1.775

Da Dang 3 Hydropower Development


-


a

 

Da Dang 3 Hydropower Development


Mien Dong Joint Stock Company (MDC)

Ninh Gia, Duc Trong +



Dan Phuong, Lam Ha
12MW ( 5,660 kWh)


e

98 ha
40

Vietnam Development Bank




70%, 30%

BOO (Build-Own-Operate)
(2009), F/S(2010), (2012), (2013),
(2013)

1,970


2013 1
,
( )


a




Mien Dong Joint Stock Company (MDC)


Mr. Nguyen Van Khoa
Mr. Tran Anh Tuan
Member of Management Board cum Financial Director
Street No.1, Bien Hoa 1 Industrial Zone, Bien Hoa City, Dong Nai
Province, Vietnam
() +84-61-383-6371 () +84-90-393-5999
+84-61-383-6194
www.miendong.com.vn
tuan_53999@yahoo.com.sg
&
: 530, : 540, : 1,150
: , ,

135

Ia Grai 1 Hydropower Project


-


a

Ia Grai 1 Hydropower Project


Quoc Cuong Gia Lai JSC

Ia To commune, Ia Grai


56 ha
district, Gia Lai province


10.8 MW
30
e
 

U$ 1,221
30%, 70%

30%, 70%

BOO (Build-Own-Operate)



e


Project IRR = 9.34%, Bench mark = 13.46%, = 10



a
,

Quoc Cuong Gia Lai JSC

Nguyen Thi Nhu Loan

Ms. Thuy

Project Manager

Nguyen Chi Thanh Street. Pleiku City. Gia Lai Province

+84-59-382-0046, +84-59-382-0061

+84-59-3820 549

136

www.quoccuonggialai.com.vn
dangthuyqc@gmail.com
, , ,

Ta Loi 3 Hydropower Project


-


a

Ta Loi 3 Hydropower Project


Infrastructure Investment and Transportations Construction JSC

Muong Hum commune, Bat


28
Xat district, Lao Cai


7.5 MW
30
e
 

U$ 930
30, 70

BOO (Build-Own-Operate)
2011

,
2012
F/S
,
2013
2 ,


2015


e


F/S
,

2013 2
Project IRR: 7.73%, Benchmark: 13.47%, : 10
- ,


a

(
)
-




Infrastructure Investment and Transportations Construction JSC


Mr. Nguyen Thanh Viet
Mr. Nguyen Thanh Viet
Director
Lot C2F, Intracom Building, Cau Giay District. Hanoi
+84-4 3791 4111
+84-4-3791 4112
www.intracom.com.vn
vp.intracom@gmail.com
Nam Pung , Ta Loi 2 , Ta Loi 3 ,
Cam Thuy

137

BAO LAM HYDROELECTRIC POWER PLANT


-


a

BAO LAM HYDROELECTRIC POWER PLANT


Song Da Holdings Corporation

,
Bao Lac Dist., Cao Bang

840 ha
116 MW
Bao Lam 1 - 40MWW


31.4
e
Bao Lam 2 - 30 MW
Bao Lam3 - 46 MW
 

1.8
30%, 70%

BOO (Build-Own-Operate)
 2013-2017
 &


e
2013 3

NPV $51 mil, IRR = 13.5%, B/C = 1.35

- ,


a
( )
-




Song Da Holdings Corporation


Mr. Le Van Chau
Mr. Mai Van Luc
Vice Director of Planning and Investment Dept
Lot C2F, Intracom Building, Cau Giay District. Hanoi
() +84-4-3854-1161
+84-4-3854-1164
www.songda.vn
maidailuc@gmail.com

Song Da Holdings 1960


, , .
1 Tuyen Quang , Ry Ninh 2, Na Loi, Se
San 2A, Nam Mu .

138

SEKOONG 3 HYDROELECTRIC POWER PLANT


-


a

SEKOONG 3 HYDROELECTRIC POWER PLANT


Song Da Holdings Corporation

,
Sekong province, Laos

1,260 ha
205 MW

- Sekong : 105 MW

30
e
- Sekong : 100 MW)
 

2.75
30%, 70%

BOO
 2013-2016



e
2013.3 4

NPV = $700, IRR = 10.665%, B/C = 1.05

- ,


a
( )
-




Song Da Holdings Corporation


Mr. Le Van Chau
Mr. Mai Van Luc
Vice Director of Planning and Investment Dept
Lot C2F, Intracom Building, Cau Giay District. Hanoi
() +84-4-3854-1161
+84-4-3854-1164
www.songda.vn
maidailuc@gmail.com

Song Da Holdings 1960


, , .
1 Tuyen Quang , Ry Ninh 2, Na Loi, Se
San 2A, Nam Mu .

139

CAMTHUY 2 HYDRO POWER PLANT


-


a

CAMTHUY 2 HYDRO POWER PLANT


Infrastructure Development and Construction Corporation (LICOGI)

Cam Thuy Dist., Thanh Hoa

650

38MW, 161 kWh

50

6,000

30%, 70%

 




e



a

: 3 (2013-2016)
, ,

BOO



2013 3
NPV : 1100, IRR : 12,9%, B/C: 1.27, : 20
- ,

( )
-




Infrastructure Development and Construction Corporation (LICOGI)


Mr. Vu Tien Giao
Ms. Luong Hai Minh
Officer of Planning and Investment Dept.
G1 Building - South Thanh Xuan - Thanh Xuan Dist - Hanoi
+84-4-3854 2365
+84-4-3854 2655
www.licogi.com.vn
haiminh161080@yahoo.com

LICOGi ,
, .
1960 Thai Nguyen , Pha Lai , Hoa Binh,
Thac Mo, Yaly, Tri An, Vinh Son ; Bim Son, Hoang
Thach, Ha Tien, Hoang Mai ; Dap Cau ;
Lao Cai ; Orion - Hanel ; Cua Ong,
Hon Gai ; , , Ministry
Council ; UNDP .

140

51# #
G4805
Strength

Weakness

- 600MW

- , ,

- SO2, CO2, NOx

- -
-
-

-
Opportunities
- 10
2020

Threat
- 2020

46%,
24%
-
-

G
Vinh Tan Power Complex (Binh Thuan )
- Power Complex (Vinh Tan, Son My)
4,400MW 6 (
Vinh Tan I, II, III)
- Vinh Tan I : 1,200MW, , China Power Intl. Holdings,
VINACOMIN( ) . BOT 25
U$ 9

141

- Vinh Tan II : 600MW X 2, Shanghai Electric Corp. EPC


.
- Vinh Tan III : 660MW X 3, 2018 , EVN(, 29%),
China Light and Power(), (, 51%), Pacific Corp(,
20%)
- Vinh Tan IV : 660MW X 2, EVN Project Devlop (FS )
Son My Power Complex (Binh Thuan )
- 3,600MW 3 (Son My I, II, III) . U$ 49
, 2010-2018
- BOT BOO , Intl. Power PLC(),
(), Thai Binh Duong JSC()
Mong Duong Power Complex (Quang Ninh )
- 2,120MW 2 (Mong Duong I, II) (I), (II)
EPC
- Mong Duong I : EVN , EPC
1,000MW , ADB U$ 9.3(
85%), U$ 3( 5)
- Mong Duong II : AES VINACOMIN
() EPC 1,120MW(560MW X 2)
. 19.5 AES 51%,
30%, CIC() 19% ,
BOT 25.
76 kWh 2011.8-2015.6
.

142

Duyen Hai Power Complex (Tra Vinh )


- 4,400MW 3 (Duyen Hai I, II, III)
U$ 50
- Duyen Hai I : EVN 14
2010 Dongfang Electric Corp. EPC . 2014
- Duyen Hai II : 1,200MW
Janakuasa , BOT
- Duyen Hai III : EVN Chenda EPC
Long Phu Complex (Soc Trang )
- 4,400MW 4 (Long Phu I, II, III-1, III-2)
1,200MW I 2013 ,
1,200MW II 2013 ADB .
III-1 2 1,000MW 2015 16
.
- Long Phu II Song Da Group
, Long Phu I PTSC EPC
Vung Ang Complex (Ha Tinh )
- 4,800MW 3 (Vung Ang I, II, III) PVN
PV Power I 2019 , VAPCO II 2013
, III BOT 2026-2028 .
Nghi Son Power Complex (Nghe An )
- 1,800MW 2 (Nghi Son I, II) I EVN
300MW 2013 EPC
. BOT 1,200MW II
.
143

Nam Dinh Thermal Power Plant (Nam Dinh )


- 251ha 2,400MW(600MW X 4) 2
() . U$ 45 BOT
25 60% , 40%
< >

144

G 
O Mon Power Complex (Cantho )
- 2,800MW 4 EVN 3 , PVN
1 .
- O Mon I : EVN 330MW
U$ 3.45.
, U$ 2.85 .(, ,
)
- O MON II : 750MW BOT .
- O MON III : 750MW EVN
- O MON IV : 750MW EVN ADB U$ 15
, PVN U$ 10 ADB
.
Ca Mau Power Complex (Ca Mau )
- 750MW 2 PVN Lilama EPC .
Ca Mau I 2008, Ca Mau II 2009 100 kWh

Nhon Trach Power Complex (Dong Nai )
- PVN PV Power 462MW 2009 .
II Citibank
Hiep Phuoc Plant (Hochimin )
- 10ha 700MW Sembcorp
U$ 4. BOT 30
FS 2001 .

145

- Sembcorp Vung Tau


Phu My 3 30%

G
(EVN)

ELECTRICITY OF VIETNAM (EVN) :


Dr. Tran Viet Anh
Deputy Director, Department of International

Cooperation
+84-96-200-0295
anhtv@evn.com.vn
English, Vietnamese
Email
(Stated Owned Corporation)


, , , , ,
, , ,
, (ITS) ,
,

 
 
 

No. 18, Tran Nguyen Han Str., Hoan Kiem Dist., Hanoi, Vietnam
+84-4-2220-5079
+84-4-2220-1386
trungtamthongtindienluc@gmail.com, OR: ctv.evn@gmail.com
www.evn.com.vn

99,525

2006
1 (U$ 6)

 

146

EVN
,

.

- EVN (, , )

.8

Ban Ve hydro power plant

320

2010

Dong Nai 3 hydro power plant

180

2010

Song Tranh 2 hydro power plant

160

2010-2011

An Khe Kanak hydro power plant

173

2010-2011

Son La hydro power plant

2400

2010-2012

Uong Bi extension unit 2 thermal power plant

300

2011

Thuong Kon Tum hydro power plant

220

2011-2015

Dong Nai 4 hydro power plant

340

2012

Ban Chat hydro power plant

220

2013

10

Hai Phong II thermal power plant

600

2013-2014

11

Quang Ninh II, unit 2, thermal power plant

300

2013-2014

12

Nghi Son I thermal power plant

600

2013-2014

13

Vinh Tan II thermal power plant

1200

2014

14

Duyen Hai I thermal power plant

1200

2013-2014

15

O Mon I, unit 2 thermal power plant

300

2014

16

Vinh Tan III thermal power plant

3x600

2014-2015

17

Song Bung 2 hydro power plant

100

2014-2015

18

Huoi Quang hydro power plant

560

2014-2015

19

Mong Duong II, unit 1,2, thermal power plant

1200

2014-2015

20

Thai Binh I thermal power plant

600

2014-2015

21

Song Bung 4 hydro power plant

156

2014-2015

22

Ha Se San hydro power plant (Cambodia)

400

2015

23

Trung son hydro power plant

260

2015

24

Lai Chau hydro power plant

1200

2015

25

Lai Chau hydro power plant

400

2016

26

Trung Son, unit 1,2 hydro power plant

260

2016

147

27

Song Bung 4 hydro power plant

156

2016

28

Song Bung 2 hydro power plant

100

2016

29

Ha Se San 2 (Cambodia 50%) (BOT)

200

2016

30

Thai Binh I, unit 1 thermal power plant

300

2016

31

Mong Duong I, unit 1, thermal power plant

500

2016

32

Duyen Hai III, unit 2 thermal power plant

600

2016

33

O Mon IV gas-fired power plant

750

2016

34

Lai Chau hydro power plant, unit 2, 3

800

2017

35

Mong Duong I, unit 2 thermal power plant

500

2017

36

Thai Binh I, thermal power plant

300

2017

37

Vinh Tan VI, unit 1 thermal power plant

200

2017

38

Vinh Tan VI, unit 2 thermal power plant

600

2018

39

Bac Ai hydro power plant

300

2019

40

Duyen Hai III, unit 3, thermal power plant

600

2019

41

Bac Ai hydro power plant, unit 2,3

600

2020

42

Nam Mo I (in Nam Kan, Laos) hydro power plant

72

2020

43

Ninh Thuan I, (unit 1) nuclear power plant

1000

2020

44

Ninh Thuan II, (unit 1) nuclear power plant

1000

2020

45

Bac Ai, unit 4, hydro power plant

300

2021

46

Ha Se San 1 hydro power plant (Cambodia)

90

2021

47

Se Kong hydro power plant

150

2021

48

Nam Theun I (Laos) hydro power plant (BOT)

400

2021

49

Nuclear power plant III, unit 1

1000

2022

50

Nuclear power plant III, unit 2

1000

2023

51

Don Duong, (unit 1,2), pumped storage hydropower plant

600

2024

52

Don Duong, (unit 3,4), pumped storage hydro power plant

600

2025

148

(PVN)

PETRO VIETNAM (PVN) :

Ms. Le Thi Thu Huong


Deputy General Manager, Investment &

Development Dept

+84-90-344-2999

Huongltt@pvn.vn
English, Vietnamese
Email

(Stated Owned Corporation)

-
- ,

-
- ,

- , ,
- , ,
- , , , ,

 
 
 

No.18 Lang Ha Str., Ba Dinh Dist., Hanoi, Vietnam


+84-4-3825-2526
+84-4-3826-5942
trangvm@pvn.vn

www.pvn.vn, OR: www.petrovietnam.com.vn, OR: www.pvn.com.vn

55,000
1975
U$ 84.6

 

PVN
.
2011 U$ 42.5 U$ 320
GDP 20% .
,
,
.

149

- (, , )
   } )

: Song Hau 1 Coal-fired power plant


: Hau Giang Province
(U$ ) : 1,633

- License stage
1

- On-going works : Front end engineering design (FTED).


- Completed works : Site clearance, Water and electric for construction., FS
: Petrovietnam Technical Services Corporation (PTSC), a
member company of PVN was assigned by PVN to select
partners supplying main equipments and construction for this project.
Korean companies interested in business opportunities available in

this project should contact PTSC directly for further information.


: Hoa Thang 1 Wind Power plant
: Binh Thuan Province
(U$ ) : 83

- EPC or Equipment supplying partner selection is underway.


- On-going works : Geologic, geographical investigation, FS development
- Completed works : Pre-FS
: EPC contract in 2013, COD in Q4 2013., Currently looking for
the partner who can supply 135 high quality wind turbines.
: Thai Binh 2 Coal-fired Power Plant
: Thai Binh Province
(U$ ) : 1,656

- Construction started
- On-going works : Coal supply agreement., Construction, PPA
negotiation with EVN.
- Completed works : FEED, site clearance, EPC contractor
selection., Main equipment supply contractor selection
: Main EPC contractor - Petrovietnam Construction JSC (PVC).
Equipment supply : Sofitz Daelim contractor (SDC) with the

150

contract value of 826million USD. Consortium of SDC is also responsible


for a detailed design for the turbine and generator areas. The SDC
also made capital arrangement commitments to be offered by JBIC
and Koreas EXIM, through commercial banks BTMU, Mitzuho and
HSBC.
: Vung Ang 1 Coal-fired Plant
: Ha Tinh Province
(U$ ) : 1,595

- Construction started
- On-going works : Coal supply agreement, Construction, PPA in
4

negotiation with EVN


- Completed works : FS, FEED and cost estimate, Site clearance for
main plant area, Water and electricity for construction.
: Lilama Vietnam is the main EPC contractor of this project.
They are finishing up the last package M-lot5 including designing,
equipment, building and operation testing for the sulfur treatment
plant. Korean company looking for business opportunities available

for this project should contact Lilama directly for further information.
: Quang Trach 1 Coal-fired Power Plant
: Quang Binh Province
(U$ ) : 1,778

- Construction started
- Completed works : EPC contract sign, FS, FEED & cost
estimate, Land clearance and settlement for main plant area.
: The joint contractors of PVC and Lilama have just been
approved by the Prime Minister as the EPC contractor for this
project. Lilama will take charge implementing the basic infrastructure,
manufacture and assembling steel structure for the project. PVC, the
main contractor is selecting the foreign sub-contractors supplying
main equipments and negotiating financial arrangement with
investing firms and banks. Korean companies interested in the
business opportunities available in this project should contact PVC
directly for further information.

151

: Long Phu 1 Coal-fired Power Plant


: Soc Trang Province
(U$ ) : 1,595

- Construction started
- On-going works : EPC contract
- Completed works : FS, FEED & cost estimate, Land clearance and
settlement for main plant area
: In Dec 2010, the Petrovietnam Technical Services Corporation
(PTSC), a member company of PVN is appointed the EPC contractor
for this project. Korean companies seeking for business opportunities
available with this project should work directly with PTSC.

: DakDrinh Hydro Power Plant


: Quang Ngai Province
(U$ ) : 238

- Construction started
- On-going works : Site clearance, construction of main work items
of plants, PPA in negotiation with EVN
: PV Power, a member company of PVN, is responsible for
constructing and selecting the equipment supply partners for this
project. Korean companies should contact PV Power to check the
business opportunities.

: Hua Na Hydro Power Plant


: Nghe An Province
(U$ ) : 288
: Site clearance, Construction of main work items of
plants, PPA in negotiation with EVN
: PV Power, a member company of PVN, is responsible for
constructing and selecting the equipment supply partners for this
project. Korean companies should contact PV Power to check the
business opportunities available.

: Nhon Trach 1 Thermal Power Plant


: Dong Nai Province
(U$ ) : 322
: Project completed

152

( 8 )

10

: Nam Con Son No.2 Pipelines


: Ba Ria Vung Tau Province
(U$ ) : 1,300

- FEED and EPC is underway


- On-going works : FEED, additional geological survey for
FEED, Site clearance.
- Completed works : FS, Environmental impact assessment, Project
Management Contract
- (PMC) contractor selection.

11

: Ca Mau Gas Processing Plant


: Ca Mau Province
(U$ ) : 70

- FEED and EPC is underway


- On-going works : FEED bid finalization, Site clearance, EPC
selection preparation.
- Completed works : FS, Tender plan, Environmental impact
assessment (EIA) report

12

: Dung Quat Refinery (Expansion)


: Quang Ngai Province
(U$ ) : 1,212

- At the planning stage


- On-going works : Pre-FS was approved by the Vietnamese
Government, Use of imported crude oil, the expected commercial
operation in Q1/2018

13

14

: Long Son Refinery


: Ba Ria Vung Tau Province
(U$ ) : 7,000-8,000
: Financial feasibility is under and looking for strategic
foreign partners. Expected commercial operation: after 2020.
: Dung Quat Refinery (Existing)
: Quang Ngai Province
(U$ ) : 3,000

153

15

16

17

: Ca Mau Fertilizer Plant


: Ca Mau Province
(U$ ) : 900.2

: Petrovietnam Gas Corporation (PVGas) Construction
: Ho Chi Minh city
(U$ ) : 2,209

: Petrovietnam Petrochemical & Textile Fiber JSC


(PVTex) Construction
: Hai Phong city
(U$ ) : 324.85

: Joint contractors of Hyundai Engineering Corporation and


LG International Corp is the EPC contractor for this project.
   }

: Phuoc An Deep Seaport


: Dong Nai Province
(U$ ) : 979

- Finish license stage


18
- On-going works : Handover of the remaining land, Detailed
design& construction starts for Phase 1 (with total investment
capital of $100 million USD)
: Calling for investment in the phrase 2, 3, 4, and 5.
: Dung Quat Shipyard
: Quang Ngai Province
(U$ ) : 749
19 : At the operational stage
: Calling for investment of US$ 54 million for the capacity
expansion of stage 1
Stage 2: 2015-2020, calling for investment of US$ 471 million.
: Petrovietnam Tower
: Hanoi city
20 (U$ ) : 571
: F/S and site clearance is being carried out
: Looking for design and technical consultants as well as for investing firms

154

G
KIEN LUONG 1 THERMAL POWER PROJECT
-


a

KIEN LUONG 1 THERMAL POWER PROJECT


Tan Tao Group

Ba Hon hamlet, Kien Luong



27
town, Kien Luong, Kien Giang

1,200 MW
N.A
e

 

27 (1)
20%, 80%

20%


80%( )
 (2008), 2. (2008), 3. 2009


-
- PPA :
- EPC:
 - :
- :
- O&M :
-
- (MOIT)
- MOIT
 - EVN

- EIA MONRE
- Kien Giang
- ; EPC

- : 30 PPA
- Fixed capacity charges to compensate for capital, interest costs and O&M
- , ,
-

- ("GGU")
- KLPP
-
-

155




Tan Tao Group


Dang Thi Hoang Yen
Nguyen Van Tau

Member of Board of Management; Chief of Hanoi Representative Office

Lo 16, Tan Tao Industrial Zone, Tan Binh Dist., Ho Chi Minh City
() +84-8-7543-505, () +84-98-263-8080
+84-8-754-3505
www.itaexpress.com.vn
nvtau@itagroup-vn.com

Tan Tao Group ,


. , , , , ,
. Tan Tao Group
4.25
. Russell Vietnam Index 10 S&P Vietnam 10
Index .
4 : , , &
&

LONG PHU THERMAL POWER PLANT 2


-



LONG PHU THERMAL POWER PLANT 2


( Song Da Holdings Corporation '12.6 )

Soc Trang province

N.A

1200 MW (2x600MW)

 

18

N.A

: 15% (2.7)
: 85% (15.3)

1. : 2011-2019
2.
+ : 6 (2012 )
+ : 3
+ : 6

156

+ : 3
3.
- 2014 4:
- 2018 4: 1
- 2019: 2





2014




, Song Da Holdings
& .
()

EPC , & , O&M

-


Song Da Holdings Corporation ( )


Le Van Chau

Mr. Mai Van Luc

Vice Director of Planning and Investment Dept

Lot C2F, Intracom Building, Cau Giay District. Hanoi

() +84-4-3791-4111, () +84-91-324-9019

+84-4-3791-4112

www.intracom.com.vn

maidailuc@gmail.com

Nam Pung , Ta Loi 2 , Ta Loi 3


, Cam Thuy

157

QUYNH LAP 1 THERMAL POWER PROJECT 2x600 MW


-


a

QUYNH LAP 1 THERMAL POWER PROJECT 2x600 MW


Vinacomin Power Holding Corporation
(Under The Vietnam National Coal Mineral Industries Group)

Quynh Lap, Quynh Luu,



19
Nghe An province

 

1,200 MW (600 x 2)
19

e

,

2. (FS): 2012
4. : 2014
6. : 2016-2020


1. 2010
3. (PQ): 2013
5. : 2015

(Power Engineer Consulting JSC 1 - PECC1 )

2014

Vinacomin ; anthraxit (HG 6b)


EVN
; Vincomin

EPC , , & , ,
O&M ,

,
49%




158

Vinacomin Power Holding Corporation


(Under The Vietnam National Coal Mineral Industries Group)
Mr. Ngo Tri Thinh
Nguyen Duc Thao
Deputy General Director

2Fl.,Sannam Building, Duy Tan Str., Cau Giay Dist., Hanoi


() +84-4-3516-1610, () +84-91-328-1685
(84) 4 3516 1605
www.vinacomin.vn
thaond@vinacomin.vn
Vinacomin Power The Vietnam National Coal Mineral Industries
Group .
- Na Duong 2 (100 MW), Cam Pha 3 (2x135 MW)

Quynh Lap 1 (1200 MW), Cam Pha 3 (2400


MW), Hai Phong (1+2), Quang Ninh (1+2),
Nhon Trach 2 (750 MW) Vinh Tan 1
(1200 MW)

HAI PHONG THERMAL POWER CENTER 3 (4x600 MW)


-


HAI PHONG THERMAL POWER CENTER 3 (4x600 MW)


Vinacomin Power Holding Corporation

(Under The Vietnam National Coal Mineral Industries Group)
a

Thuy Nguyen Dist, Hai


Phong

4x 600MW
e

 

35




: 20%
: 80%

IPP

1. : 2010
3. (PQ): 2015

2. (FS): 2012
4. : 2016

5. : 2017

6. : + 1&2: 2018-2022;
+ 3&4: 2021-2025

159

2014 4
Vang Danh, Uong Bi, Cam Pha


CFB
Vincomin


a

EPC , , & ,
O&M ,
,
49%




Vinacomin Power Holding Corporation


(Under The Vietnam National Coal Mineral Industries Group)
Mr. Ngo Tri Thinh
Nguyen Duc Thao
Deputy General Director
2Fl.,Sannam Building, Duy Tan Str., Cau Giay Dist., Hanoi
() +84-4-3516-1610, () +84-91-328-1685
(84) 4 3516 1605
www.vinacomin.vn
thaond@vinacomin.vn
Vinacomin Power The Vietnam National Coal Mineral Industries
Group .
- Na Duong 2 (100 MW), Cam Pha 3 (2x135 MW)

Quynh Lap 1 (1200 MW), Cam Pha 3 (2400


MW), Hai Phong (1+2), Quang Ninh (1+2),
Nhon Trach 2 (750 MW) Vinh Tan 1
(1200 MW)

160

O MON III COMBINED CYCLE POWER PLANT


-


a

O MON III COMBINED CYCLE POWER PLANT


Electricity of Vietnam (EVN)

Thoi Loi, Phuoc Thoi,



8.1
O Mon, Can Tho city
: 750 MW

: 2-2-1 (250MW
2, HRSG 2, 250MW

25

ADB JICA

1)
  8.1




ADB, JICA

- 2014 1: EPC
- 2016 3: ( 1)
- 2016 4: ( 2)
- 2016 12:
- : 2014 6 - 2016 12



2013 1




EVN (Electricity of Vietnam)


Mr. Tran Viet Anh
Deputy head of international cooperation Dept
18 Tran Nguyen Han Str., Hoan Kiem Dist - Hanoi
() +84-4-2220-5079, () +84-96-200-0295
+84-43-2220-1386
www.evn.com.vn
anhtv@evn.com.vn
, 12,366 MW .

161

O MON IV COMBINED CYCLE POWER PLANT


-


a

O MON IV COMBINED CYCLE POWER PLANT


Electricity of Vietnam (EVN)

,
Phuoc Thoi & Thoi An, O

Mon, Can Tho city

750 MW

25

 

7.9

- ODA : 6.79(ADB
:3.09, KfW: 3.7)
- : 1.11

ODA

: 2010.10.8 - 2011.5.14
: 2011.3.1-4.13
: 2013 , 2015


EPC : 2012 1 30 - 2013 5 5
: 2012 6 8 - 2013 5 5
: 2013 5 6 - 2015 12 3
/ : N/A

ADB


a

EPC , ,




EVN (Electricity of Vietnam)

, 12,366 MW .

162

Mr. Tran Viet Anh


Deputy head of international cooperation Dept
18 Tran Nguyen Han Str., Hoan Kiem Dist - Hanoi
() +84-4-2220-5079, () +84-96-200-0295
+84-43-2220-1386
www.evn.com.vn
anhtv@evn.com.vn

Cong Thanh Thermal Power


-



Cong Thanh Thermal Power


Cong Thanh Thermal Power JSC

Thanh Hoa Province

63

600 MW

VND 13 (6.5)
 
1:
4

2: 2.5

10%, 90%

: 2015

10^%, 90%

IPP


, , & ,
, O&M
GE Energy Cong Thanh Group MOU
Cong Thanh Group

Cong Thanh Thermal Power JSC


Mr. Nguyen Cong Thanh
2/14 Ham Nghi, Ben Nghe Ward, Dist 1, HCMC
www.congthanhgroup.com
+84-8-3915 1604
www.congthanhgroup.com
contact@congthanhgroup.com

163

Thang Long Thermal Power Project


-



Thang Long Thermal Power Project


Thang Long Thermal Power JSC

Hoanh Bo, Quang Ninh

2x300MW

 

8.65

Kaiddi

: 10%
: 90%

IPP

2010-2014, 2011 3


;
;


EPC


a

, & , , O&M

Thang Long Thermal Power JSC (GELEXICO Group )

Mr. Lam

Director

De E hamlet, Le Loi commune, Hoanh Bo , Quang Ninh,


Vietnam

+84-903 126 892 ()

164

www.geleximco.vn
N/A

Vinh Tan 3 Project


-



Vinh Tan 3 Project


One Energy (Hong Kong) and EVN (Vietnam), Pacific (Vietnam)

Vinh Tan, Binh Thuan

28

2000 MW (3x660 MW)

 

28

e


25
10%, 90%

: 10%, : 90%

BOT

2013 2:
2014 8:

2013 4:
: 2014 9:
2018 9: 1 COD
2019 3: 2 COD
2019 9: 3 COD

2013

MOIT . 2011
9
  , , ,
a
, O&M


Vinh Tan 3 Thermal Power PMU


Mr. Phan Duong
Director
Bac Lieu, Vietnam
+84-903 436 338 ()
N/A
Duong.phan@vinhtan3.com

165

An Khanh 1 Project
-



An Khanh 1 Project
An Khanh Thermal Power JSC

An Khanh, Dai Tu, Thai


Nguyen

50

2x50 MW

 

2.15

10%, 90%

China Bank: 1.43


BIDV: 2,500
: 4,700
IPP

e


2013


a

, , ,
, O&M

An Khanh Thermal Power JSC

Mr. Trai

Deputy Director

Group 22, Quang Trung Ward, Thai Nguyen City, Thai Nguyen
Province, Viet Nam

() +84-280-625-2116, () +84-91-320-5292

+84-280-6252 111

166

www.nhietdienankhanh.com.vn
Intra.nhietdienankhanh@gmail.com.vn

Song Hau 1 Power Plant


-



Song Hau 1 Power Plant


Petro Vietnam

Phu Huu, Chau Thanh,


Hau Giang

115.2

30
e
 

16.33
PVN, ECA,

PVN, ECA,

EPC : 2011 9 - 2015 10



COD Unit 1: 2015 4

COD Unit 2: 2015 10





NPV: 2.4823, IRR: 12% : 16, : kWh

6.62




1,200 MW (2x600)

. 12
CIT 15% ( 25%) 4 , 9 5%,
2 10%

Petro Vietnam

Phung Dinh Thuc

Ms. Le Thi Thu Huong, Ms. Vu Mai Trang


Deputy General Director, Investment & Development Division
Specialist - Investment & Development Division
18 Lang Ha Street, Ba Dinh District, Ha Noi, Viet Nam

+84-4-3825-2526

+84-4-3826-9542

www.pvn.vn

huongltt@pvn.vn, trangvm@pvn.vn
1 ,

167

Long Phu 1 Power Plant Project


-



Long Phu 1 Power Plant Project


Petro Vietnam

Long Duc, Long Phu,


Soc Trang

115

 

15.95

PVN, BWBC, Sojitz





EPC : 2011 9 - 2015 10


COD Unit 1: 2015 4
COD Unit 2: 2015 10
, , EPC
, & ,
( )
NPV: 1.1474, IRR: 12%, : 15
: kWh 6.49
-


12 CIT 15% ( 25%)
4 , 9 50%




168

Petro Vietnam
Phung Dinh Thuc
Ms. Le Thi Thu Huong, Ms. Vu Mai Trang
Deputy General Director, Investment & Development Division
Specialist - Investment & Development Division
18 Lang Ha Street, Ba Dinh District, Ha Noi, Viet Nam
+84-4-3825-2526
+84-4-3826-9542
www.pvn.vn
huongltt@pvn.vn, trangvm@pvn.vn
1 ,

Vung Ang 1 Thermal Power Plant Project


-


a

Vung Ang 1 Thermal Power Plant Project


Petro Vietnam

Ky Loi, Ky Anh, Ha Tinh



Vung Ang

1,200 MW (2 x 600 MW)

 

15.95





,
189
25
PVN,
HSBC,
BTMU, Credit
JBIC, MBC

CDB,
Swiss,

EPC : 2009 4 - 2013 1


COD Unit 1: 2012 7
COD Unit 2: 2013 1
EPC , , , ,
/
NPV: 1.1672 , IRR: 12%, : 14,
: kWh 5.88
. 12
CIT 15% ( 25%) 4 , 9
50% .




Petro Vietnam
Phung Dinh Thuc
Ms. Le Thi Thu Huong, Ms. Vu Mai Trang
Deputy General Director, Investment & Development Division
Specialist - Investment & Development Division
18 Lang Ha Street, Ba Dinh District, Ha Noi, Viet Nam
+84-4-3825-2526
+84-4-3826-9542
www.pvn.vn
huongltt@pvn.vn, trangvm@pvn.vn
1 ,

169

61# ^`#
G4805
Strength

Weakness

- , , -

- ,

- -
,

Opportunities

Threat

- 2030 -
4 ,
10

- -

-

(
)

GG
2009
2025
- 2025
5% 4%
-

170



.
,

. , ,

.


( : MW)

 









  

1,195 1,222 1,402 1,594 1,721 1,930 1,988 2,684 3,249

157,7 167.7 167.7 172.7 177.7 180.7 212.7 267,7 307.7

89.5

89.5

89.5

18

36

51

15

7.4

11.9

11.9

15.4

15.9

15.9

20.4

57.4

232.4

0.5

3.5

1.654 1.654 1.654 1.654 1.654 1.654


109.5 109.5

11

12

2.65

3.25

3.25

217

484

556

214.1 259.1

1,371 1,496 1,703 1,922 2,104 2,348 2,603 3,859 4,790

171

G
Hoa Thang Wind Farm Project
-


a

Hoa Thang Wind Farm Project


Petrovietnam Power Corporation (PV Power)

Bac Binh, Binh Thuan

724,141 m2

202.5 MW
20
e
PV Popwer (20-30%)
 

8,500

ECA, (70-80%)

- 1: 38, : 57 MW - 2: 37, : 55.5 MW


- 3: 38, : 57 MW - 4: 22, : 33MW


- : 2008 2015 (2008 Binh Thuan


, 2013


,

e
2013 2
 IRR: 12%, : 16
Kwh U$ 7.8 ,


,
,
(PV Power 135 )

a
O&M




Petrovietnam Power Corporation (PV Power)


Mr. Vu Huy Quang
Mr. Nguyen Dinh Thi
Director of Investment & Development Department
8th- 9th Floor, VPI Building, Trung Kinh, Yen Hoa, Hanoi
() +84-4-2221-0288, () +84-94-390-3012
84-4 2221 0388
www.pv-power.vn
nguyendinhthi@pv-power.vn

PVN( ) PVP
,
.

172

Mien Dong Wind power Project


- .


a

Mien Dong Wind Power Project


Mien Dong Joint Stock Company (MDC)

Phan Ri Thanh, Bac Binh

1,240
Hoa Phu, Tuy Phong, Binh Tuan

120MW
20
e
 

8,274 (1 )
20%, 80%

BOO
- 1(28, 42MW) : F/S(2008), F/S(2010), PQ(2013.1 ),
(2013.2), (2013.3), (2013.3-2015 3)





e



a

- 2(29, 44MW) : PQ(2016.1), (2016.2),


(2016.3), (2016.3-2018 4)
- 3(23, 34MW) : PQ(2018.2), (2018.3),
(2018.4), (2019.1-2020 2)
1 PQ
1 F/S

2013 2( 1 )
Kwh U$ 7.8
,
, , O&M
( )




Mien Dong Joint Stock Company (MDC)


Mr. Nguyen Van Khoa
Mr. Tran Anh Tuan
Member of Management Board cum Financial Director
Street No.1, Bien Hoa 1 Industrial Zone, Bien Hoa, Dong Nai, Vietnam
+84-61-383-6371
+84-61-383-6194
www.miendong.com.vn
tuan_53999@yahoo.com.sg

850, US$ 5.4, US$ 7.3
: ,

173

Phu Lac 1 Wind Power Development Project


-



Phu Lac 1 Wind Power Development Project


Thuan Binh Wind Power Joint Stock Company

Phu Lac, Tuy Phong,


Binh Thuan

400

24MW
( 59 kWh)

20

 

5,330

KfW 4.7,
6.3

2013 , 2015
,

2013 2

Kwh U$7.8 ,
,
, & O&M (

. )


a




174

Thuan Binh Wind Power Joint Stock Company


Mr. Bui Van Thinh
Mr. Bui Van Thinh
CEO
A15 Le Quy Don St., Phu Thuy, Phan Thiet, Binh Thuan, Vietnam
() +84-62-382-2024
() +84-93-791-5799
+84-62-382-3024
quocthinh027@gmail.com

14, 2009, 1,200
: ,

Phuoc The Wind Power Development Project


-


a

Phuoc The Wind Power Development Project


Asia Development And Investment Green Energy Co., Ltd. (AGECO)

Phuoc The, Tuy Phong,

75
Binh Thuan

30MW
20-30
e
 

7,000
35%, 65%


2013-2015 (2009 )

 F/S


e
2013 1
 NPV 2210 7

Kwh U$7.8

,

, O&M
a




Asia Development And Investment Green Energy Co., Ltd. (AGECO)


Mr. Pham Dinh Trung
Mr. Pham Dinh Trung
CEO
117 Le Thi Rieng St., Ben Thanh Ward, Dist. 1, Ho Chi Minh City, Vietnam
+84-8-3925-2003
+84-8-3925-2003
agecowind@gmail.com

6, 2006, 500
: ,

175

BINH THUAN WIND FARM PHASE 2


-


a

BINH THUAN WIND FARM PHASE 2


Vietnam Renewable Energy JSC (REVN)

Tuy Phong., Binh Thuan

235ha


90 MW
25
e
 

1,690
20%, 80%

BOO

2013 - 2016

 ,


e
2013 4
 NPV: 3,800, IRR: 16.62%

Kwh U$ 7.8

, ,
& ,

, , &, .
a
,




176

Vietnam Renewable Energy JSC (REVN)


Mr. Nguyen Duc Thu
Mr. Nguyen Duc Thu
General Director
Fl.6, Building No. 9, Lang Ha, Hanoi
() +84-4-3514 7006, () +84-94-981-7374
84-3514 7006
www.revn.vn
info@revn.vn, vienchima@revn.vn

REVN . Binh
Thuan REVN
,
50, 2006, U$ 2,000

Binh Thuan Wind Power Plant


-



Binh Thuan Wind Power Plant


Saigon Invest Group (SIG Energy)

Hoa Thang, Bac Binh, Binh


Thuan

360ha

200 MW

 




e



a

U$ 5

e


80%, 20%

BOO

20

2014-2017

F/S,

2014 1
Kwh U$ 7.8
,
EPC , ,

Saigon Invest Group (SIG Energy)

Mr. Le Quoc Viet

Planning Manager of Energy Department

20 Phung Khac Khoan, Dakao Ward, Dist.1, HCM

() +84-8-3822-8290, () +84-93-343-8285

+84-8-3822-8291

www.saigoninvest.com
viet.lequoc@saigoninvest.com

SGI &, , IT&,


, , &, &,

2006, 6,000, U$ 20, U$ 3

177

Trung Nam Wind Power Project


-



Trung Nam Wind Power Project


Trung Nam Construction Investment Corporation

Loi Hai & Bac Phong,


Thuan Bac, Ninh Thuan

234,691 MWh

 

1.84




e




a

903, 1A
2km, Cam Ranh ,
35km

e


20
&

2011-2014
.


2014 1 ,
NPV = 2.68273, FIRR (%)= 12.92%, CER: 164.283 (Co2)
Kwh U$ 7.8
,
, , &




178

Trung Nam Construction Investment Corporation


Mr. Dang Thanh Tam
Mr. Dang Cong Chuan
General Manager
7A/80 Thanh Thai, Ward 14. Dist. 10, HCM
() +84-8-6264-5182, () +84-90-381-2047
+84-8-6264-5180
trungnamgroup.com.vn
congchuan@trungnamgroup.com.vn
&
2004, 460, U$ 1.8

Phuong Mai 1 Wind Power Plant


-


Phuong Mai 1 Wind Power Plant

Phuong Mai Wind Power JSC

Nhon Hoi Economic Zone,


Quy Nhon, Binh Dinh

143

e


30 MW

2013-2014

 
4,200


2013 (1 6 , 2 6 )




&

2013 2
Kw U$ 7.8 ,
,


a

, O&M

Phuong Mai Wind Power JSC

Mr. Nguyen Van Ban

Mr. Nguyen Van Ban

R. 1602, 71, Nguyen Chi Thanh St., D. Dong Da, Hanoi, Vietnam

() +84-4-6275-2596

+84-4-3758-2511

() +84-98-220-2709

ban.ng.nels@gmail.com, phuongmaibd@gmail.com

179

Phuong Mai 3 Wind Farm


-



Phuong Mai 3 Wind Farm


Central Wind Power JSC

Cat Chanh, Phu Cat, Binh Dinh

90 ha

21MW

 

4,000

e





e




a

25
20%, 80%
IPP
(Independent Power
Producer)

2013 1
&
14 FL/1500kW


: 91.2%
Kwh U$ 7.8
, ,
O&M ,




180

Central Wind Power JSC


Trinh Thi Hanh Phuc
Mr. Bui Quang Ngan
Vice President
31 Nguyen Cong Tru Road, Quy Nhon City, Binh Dinh province,
Vietnam
() +84-56-382-2565, +84-56-381-5555, +84-4-3783-1264
() +84-91-309-6688
+84-56-381-5555, +84-4-3783-1263
nganbq@gmail.com, cenwindcohn@vnn.vn
: Do Son Mast, Pha Rung Mast, Phuong Mai Mast
: Phuong Mai 3

Phuoc Dan Wind Power Plant


-


a

Phuoc Dan Wind Power Plant


Thuong Tin Energy JSC

Phuoc Huu, Phuoc Thai, Phuoc


Hau, Phuoc Dan, Ninh Phuoc,
Ninh Thuan
50MW

7.88


e

20

 
5.9




BOO

(1 12.5MW)


2014-2017

,

2014 2

Kwh U$ 7.8
, ,


a

EPC , ,




Thuong Tin Energy JSC


Mr. Ho Minh Hiep
Mr. Nguyen Van Phong
Business Plan Director
278, Nam Ky Khoi Nghia, W. 8, D.3m HCMC, Vietnam
+84-8-3824-9928 #679
+84-8-3824-9977
www.sacomreal.com.vn
phongvn@sacomreal.com
Sacom Bank ,
.

181

Tran De Wind Power Project


-



Tran De Wind Power Project


Lien Nghia Investment JSC

Trung Binh, Tran De,


Soc Trang
100MW
(1 30MW)

15

20

 

2.38

30% 70%

BOO

2014-2016

PPC ,

2013 3

Kwh U$ 7.8
, ,
EPC , ,


a




Lien Nghia Investment JSC


Tang Ngoc Minh
Mr. Nghiem Thanh
Assistant Director
No 7, Street55, Thao Dien, Dist 2, HCMC
() +84-98-959-2750
+84-8-3519-0523
www.liennghia.com
TNguyen@liennghia.com

,
. .

182

Bac Lieu Province Wind Power Plant


-


a

Bac Lieu Province Wind Power Plant


Cong Ly Construction - Trading - Tourism Co., Ltd

Vinh Trach Dong, Bac

484 ha
Lieu, Bac Lieu Province
99MW

25
e
(1 16MW)
 

2.14
35%, 65%

BOO
2013-2018, 1.6MW 62 .


1 80 10 , 2 52
 1
16 MW (10xGE 1.6-82.5 ): Bac Lieu


2 (2012 5)

e
2013 1
 Project IRR without CDM: 8.15%
Kwh U$ 7.8 .


,
EPC , ,

a

G

Cong Ly Construction - Trading - Tourism Co., Ltd

To Hoai Dan

Ms. Phan Tien

Officer at Administrative Dept

127A, Nguyen Tat Thanh Street, Ward 8. Camau Province

+84-781-383-7666

+84-781-383-7222

phantien1986@gmail.com

, ,

183

Thai Binh Duong 1 Wind Farm


-


a

Thai Binh Duong 1 Wind Farm


Pacific Corporation

Hoa Thang, Bac Binh,

Binh Thuan

150 MW
e
 

1.32




e



a

810 ha
20
20%, 80%
IPP
(Independent Power
Producer)

: 5 (2011-2015)
+ 2011-2013 , + 2014-2015

2013 2
Kwh U$ 7.8
, ,
EPC , ,

G

Pacific Corporation

Mr. Phan Van Quy

Ms. Phan Ban Mai

Head of Industry Development Dept.

8th Floor. 83A Ly Thuong Kiet Street. Hanoi

() +84-4-3941-3268

+84-4-3941-3269

184

() +84-98-331-1066

www.thaibinhduong.vn
mai.pb@thaibinhduong.vn, phanbanmai@yahoo.com
, .

Wind Farm of Construction Corporation No 1


-


Wind Farm of Construction Corporation No 1.

Construction Corporation No 1

Tien Thanh, Phan Thiet,


BInh Thuan

50MW

 

7400

2014-2016

315 ha

e


20
30%, 70%
BOT

F/S .

2014 1

Kwh U$ 7.8
, ,


a

EPC , ,




Construction Corporation No 1
Le Huu Viet Duc
Nguyen Hoang Hung
Head of International Partnership Development
8th-9th Floor Sailing Tower. 111A PASTEUR Street. Dist. 1. HCMC
() +84-8-3822-2059
() +84-90-390-7796
+84-8-3829-0500
www.cc1.net.vn
info@cc1.net.vn
Thu Thiem New Urban Area 3 , HCMC
Phu Quoc , Thu Thiem

185

 # # #

41# #
G
180,549km(2009 ) ,
48%

,
ODA


( : Km)

180,549
87,941
8,898
37,060
46,650

15,065
14,768
297
-


36,225
25,850
2,655
4,429
3,291


129,259
47,323
6,243
32,334
43,359

14,500km ( )
, 2020 Ben-Luc-Long Thanh, Da Nang-Ngai, Dau Giay-Phan Thiet
3,411km .
- () , 150km
, Hochimin-Trung Luong, Lang-Hoa Lac, Noi
Bai-Bac Ninh, Phap Van-Cau Gie .
- () ,
Hanoi-Hai Phong, Hanoi-Thai Nguyen, Hanoi-Lao Cai, Cau, Gie-Ninh Binh,
Sai Gon-Long Thanh-Dau Giay

186

ODA
, ODA ADB, WB, JICA, EDCF() .
- Ben Luc-Long Thanh (ADB, JICA), Danang-Quang Ngai
(JICA, WB), Noi Bai-Lao Cai (ADB), Hanoi-Lang Son
(ADB, EDCF)
(MOT : Ministry Of Transportation)
24,000km , U$ 144.2

- 2020 1,900km U$ 223.2
, 909km (U$ 121.5)
ODA



187

G

-
, ODA
.
- ODA
2011.1 71/2010/QD-TTg
(PPP : Public-Private Partnership)
, .
-
,

.

- 2008.1 1734/QD-TTg '2020
, 39 VND 766( U$ 376) 5,753km
.



- (14 )

 ,N


7/%

1,871

Cau Gie-Ninh Binh

50

9,300

Ninh Binh-Thanh Hoa

75

12,380

Thanh Hoa-Vinh

140

22,120

Vinh-Ha Tinh

20

4-6

2,580

Ha Tinh-Quang Tri

277

21,610

188

Quang Tri-Da Nang

178

18,160

Da Nang-Quang Ngai

131

17,820

Quang Ngai-Quy Nhon

150

23,700

Quy Nhon-Nha Trang

240

24,960

10

Nha Trang-Dau Giay

378

4-6

55,940

11

HCMC-Long Thanh-Dau Giay

55

6-8

18,880

12

Long Thanh-Nhon Trach-Ben Luc

45

6-8

12,340

13

HCMC-Trung Luong

40

13,200

14

Trung Luong-My Thuan-Can Tho

92

26,250

- (2 )

1,321

15

Doan Hung-Hoa Lac-Pho Chau

457

4-6

53,930

16

Ngoc Hoi-Chon Thanh-Rach Gia

864

4-6

96,770

(10 )

1,069

17

Lang Son-Bac Giang-Bac Ninh

130

4-6

12,220

18

Hanoi-Hai Phong

105

4-6

16,800

19

Hanoi-Lao Cai

264

4-6

15,580

20

Hanoi-Thai Nguyen

62

4-6

4,220

21

Thai Nguyen-Cho Moi

28

4-6

2,940

22

Lang-Hoa Lac

30

7,650

23

Hoa Lac-Hoa Binh

26

4-6

2,550

24

Bac Ninh-Ha Long

136

19,040

25

Ha Long-Mong Cai

128

4-6

13,820

26

Ninh Binh-Hai Phong-Quang ninh

160

13,760

(3 )

264

27

Hong Linh-Huong Son

34

2,450

28

Cam Lo-Lao Bao

70

4,900

29

Quy Nhon-Pleiku

160

12,000

189

(7 )

964

30

Dau Giay-Da Lat

189

19,280

31

Bien Hoa-Vung Tau

76

12,160

32

HCMC-Thu Dau Mot-Chon Thanh

69

6-8

20,010

33

HCMC-Moc Bai

55

4-6

7,480

34

Soc Trang-Can Tho-Chau Doc

200

24,200

35

Ha Tien-Rach Gia-Bac Lieu

225

27,230

36

Can Tho-Ca Mau

150

24,750

(2 )

181

37

Ring road No. 3

56

4-6

17,990

38

Ring road No. 4

125

6-8

34,500

6-8

20,750

(1 )
39

83

Ring road No. 3

83
5,753

766,220

: (VEC : Vietnam Expressway Corporation)

G
2020 1,900km
U$ 223.2 ,
.
- : 546km, U$ 45
- , : 452km, U$ 56
- ODA : 909km, U$ 121.5
ODA
,
(PPP) .

190

- JBIC SE Corp.,
Sumitomo Mitsui, Chodai, Kmai Haltec

, ,
ENC, , , , , ,
.
- Gauxing, GRB, Gitec
, ITD Thailand (Quang Ninh)
MOU .


.
-
,
.

G
VEC( )

Vietnam Expressway Corporation (VEC)

Mr. Phan Viet Hung


Manager of Technology and Supervision of Highway
Dept.

+84-91-331-5674

phanviethung74@gmail.com

English, Vietnamese

Email

(Stated Owned Corporation)

191

, , ,
,
, (ITS) ,
,


Level 4,5,6 MITEC Building, Cau Giay new urban area, Yen Hoa, Cau

 
 
 

 

Giay, Hanoi, Vietnam


+84-4-3643-0266
+84-4-3643-0270
phanviethung74@gmail.com
http://www.expressway.com.vn/
450
2004
U$ 48
VEC ,
, , , , ,
, ,
.

VEC( ) ( )
1


Cau GieNinh Binh Expressway

Noi BaiLao Cai Expressway

Ho Chi MinhLong Thanh Dau Giay


Expressway

Ben LucLong Thanh Expressway

Da NangQuang Ngai Expressway

HanoiLang Son Expressway

7
8

192

Trung LuongMy ThuanCan Tho


Expressway
Noi BaiMai Dich Expressway

6
2-4 (1)
4-6 (2)
4-6
4 (1)
8 (2,
)
4 (1)
6 (2)
4 (1)
6 (2)
4 (1)
4-6 (2)
4-6

2012
2013
2014
2015
2016
2019
N/A
N/A

G
Lo Te - Rach Soi Expressway
-


Lo Te Rach Soi Expressway


Cuu Long Corporation for Investment Development and Project

Management of Infrastructure(Cuu Long CIPM)
a

&

Can Tho, Kien Giang



54km (22 )


(100km/h)
2013-2016
e
 

EDCF : 1.6
1 2.4

: 8179


2013.1 :

2013.3 :
 , EDCF 2012

2009 EDCF 1.6

e
2013.1( ), 2013.3()




EDCF , & ,
a




Cuu Long Corporation for Investment Development and Project


Management of Infrastructure(Cuu Long CIPM)
Mr. Duong Tuan Minh
Ms. Dao Thi Thuy Huong
Manager of Investment and Procurement Management Dept.
127B Dinh Tien Hoang street, ward 3, Binh Thanh District, Ho Chi
Minh city, Vietnam
() +84-8-3841-0088, () +84-98-902-2197
84-8-3841-1872
www.mythuan.vn
huongsmoke@gmail.com
Xa Xia - Ha Tien, Thu Bay - Ca Mau
( : 79km, ADB, AusAID, EDCF )
Can Tho (1.97), Minh Luong - Thu Bay ( :
22.8km, EDCF )

193

Tan Van - Nhon Trach Component Project (Ho Chi Minh Ring Road No.3)
-


Tan Van Nhon Trach Component Project (Ho Chi Minh Ring Road No.3)
Cuu Long Corporation for Investment Development and Project

Management of Infrastructure(Cuu Long CIPM)
a

&
19km

Dong Nai, Ho Chi Minh



Dong Nai 11.3km


1: 4 (15km)
2014-2017
e
EDCF : 1.5
 

: 6100
3.72

: 1.61
: 2.56
, : 5,500

PPP
: 2,400
: 3,700

: 2014-2017

 ADB


, / ,

(
+ ), PPP



, , O&M
a




194

Cuu Long Corporation for Investment Development and Project


Management of Infrastructure(Cuu Long CIPM)
Mr. Duong Tuan Minh
Ms. Dao Thi Thuy Huong
Manager of Investment and Procurement Management Dept.
127B Dinh Tien Hoang street, ward 3, Binh Thanh District, Ho Chi
Minh city, Vietnam
() +84-8-3841-0088, () +84-98-902-2197
84-8-3841-1872
www.mythuan.vn
huongsmoke@gmail.com
Xa Xia - Ha Tien, Thu Bay - Ca Mau
( : 79km, ADB, AusAID, EDCF )
Can Tho (1.97), Minh Luong - Thu Bay ( :
22.8km, EDCF )

My Thuan - Can Tho Expressway


-


My Thuan Can Tho Expressway


Cuu Long Corporation for Investment Development and Project

Management of Infrastructure(Cuu Long CIPM)
a

&

Vinh Long, Dong Thap

24.5km


120 km/h
)
e
EDCF U$ 2.54
 

4.54

U$ 2




e



a

PPP

2014-2016
F/S , ADB
, ADB

, / ,
( + ), PPP

ITS( )




Cuu Long Corporation for Investment Development and Project


Management of Infrastructure(Cuu Long CIPM)
Mr. Duong Tuan Minh
Ms. Dao Thi Thuy Huong
Manager of Investment and Procurement Management Dept.
127B Dinh Tien Hoang street, ward 3, Binh Thanh District, Ho Chi
Minh city, Vietnam
() +84-8-3841-0088, () +84-98-902-2197
84-8-3841-1872
www.mythuan.vn
huongsmoke@gmail.com
Xa Xia - Ha Tien, Thu Bay - Ca Mau
( : 79km, ADB, AusAID, EDCF )
Can Tho (1.97), Minh Luong - Thu Bay ( :
22.8km, EDCF )

195

Dau Giay - Phan Thiet Expressway


-


a

Dau Giay Phan Thiet Expressway


BITEXCO Group

Dong Nai, Binh Thuan


: 120km/h
1 4, 6

 




e



a

10
& : 5.52
& : 1
: 8,280
: 1.58
: 1.9

e


&
98.7km (
)
2014-2018
(10.6%)
WB, (11%)
(29.4%)
IBRD (49%)
PPP

2014-2018
2 ,
(Bitexco), 1 PPP

2014 1 2
, / ,
( + ), PPP

ITS( )




196

BITEXCO Group
Mr. Vu Quang Hoi
Mr. Vu Van Cao
Director General of Infrastructure Dept.
1st Floor, The Manor Towers, My Dinh, Me Tri, Tu Liem, Ha Noi
+84-4-3785-5588
+84-4-3785-5599
http://www.bitexco.com.vn
vuvancaoth@gmail.com
Thanh Hoa (80km/hour, 4),
(BT ), Chu Van An (BT )

Vi Thanh Bac Lieu Route


-


a


 




e



a

Vi Thanh Bac Lieu Route


Cuu Long CIPM

Hau Giang, Soc Trang,


Bac Lieu
2
1.36

e


&
60km (Vi Thanh
, Bac Lieu
1A )
2014-2017
EDCF 9,200
4,400

2013
EDCF

2014 3 4

, , ,
.
. (JICA )




Cuu Long Corporation for Investment Development and Project


Management of Infrastructure(Cuu Long CIPM)
Mr. Duong Tuan Minh
Ms. Dao Thi Thuy Huong
Manager of Investment and Procurement Management Dept.
127B Dinh Tien Hoang street, ward 3, Binh Thanh District, Ho Chi
Minh city, Vietnam
() +84-8-3841-0088, () +84-98-902-2197
84-8-3841-1872
www.mythuan.vn
huongsmoke@gmail.com
Xa Xia - Ha Tien, Thu Bay - Ca Mau
( : 79km, ADB, AusAID, EDCF )
Can Tho (1.97), Minh Luong - Thu Bay ( :
22.8km, EDCF )

197

Ben Luc Hiep Phuoc component project ( 4 )


-


a

Ben Luc Hiep Phuoc component project


Cuu Long CIPM

Long An

e


&
34.7km(Hochimin
Trung Luong

, Hiep Phuoc
)
2015-2018

  4.22
ADB,

: 2.93
, , : 4,400

PPP
: 4,700
: 3,800

2015

 ADB ,

e
2015 3 4



, , ,
.
a




198

Cuu Long Corporation for Investment Development and Project


Management of Infrastructure(Cuu Long CIPM)
Mr. Duong Tuan Minh
Ms. Dao Thi Thuy Huong
Manager of Investment and Procurement Management Dept.
127B Dinh Tien Hoang street, ward 3, Binh Thanh District, Ho Chi
Minh city, Vietnam
() +84-8-3841-0088, () +84-98-902-2197
84-8-3841-1872
www.mythuan.vn
huongsmoke@gmail.com
Xa Xia - Ha Tien, Thu Bay - Ca Mau
( : 79km, ADB, AusAID, EDCF )
Can Tho (1.97), Minh Luong - Thu Bay ( :
22.8km, EDCF )

TAN SON NHAT - TAN AN EXPRESS WAY


-


a

TAN SON NHAT - TAN AN EXPRESS WAY


Tan Tao Group

Long An, Hochimin



15km


: 80 - 120 km/h
2013-2017
e
 


7,300

BOT Turnkey

2013-2017





e
2013 4
Tan Tao Group


Tan Tao Group PMU



, , EPC
a
49% , .

,

-




Tan Tao Group


Dang Thi Hoang Yen
Nguyen Van Tau
Member of Board of Management; Chief of Hanoi Representative Office
Lo 16, Tan Tao Industrial Zone, Tan Binh Dist., Ho Chi Minh City
() +84-8-754-3505, () +84-98-263-8080
+84-8-754-3505
www.itaexpress.com.vn
nvtau@itagroup-vn.com
Tan Tao Group ,
. , , , , ,
. Tan Tao Group (
4.25), 4 : , ,
,

199

Da Nang - Quang Ngai EXPRESS WAY (Package A1~A5, 14B)


-


Da Nang - Quang Ngai EXPRESS WAY (Package A1-A5, 13B)

(VEC : Vietnam Expressway Corporation)

Da Nang - Quang Nam Quang Ngai

: 80 - 120 km/h

 

4.1

Package




e



a

200


e


139.5km
- 4 (1), 6 (2)
- : Km 0+000
(Hoa Vang, Da Nang)
- : Km 131 + 129.26
(Quang Ngai)
2013-2015
WB
BOT Turnkey

2013-2015
- Package A1 (Km 065+000 - Km 081+150): 76.85 mil. US$ (PQ
announcement and contract award : 2013.1-7)
- Package A2 (Km 081+150 - Km 099+500): 81.25 mil. US$ (PQ
announcement and contract award : 2013.3-9)
- Package A3 (Km 099+500 - Km 110+100): 69.22 mil. US$ (PQ
announcement and contract award : 2013.2-8)
- Package A4 (Km 110+100 - Km 124+700): 82.45 mil. US$ (PQ
announcement and contract award : 2012.10-2013.6)
- Package A5 (Km 124+700 - Km 131+500 & Km 131+500 - Km
139+204): 83.32 mil. US$ (PQ announcement and contract
award : 2012.12- 2013.7)
- Package 14B (Traffic safety/Lighting): 16.37 mil. US$
(PQ announcement and contract award : 2015.1-7)
JICA 2012 PQ : 5.2


2012 10 Package

-


Vietnam Expressway Corporation (VEC)

Mr. Mai Tuan Anh

Mr. Viet

Deputy Manager of Project Dept.

Level 4, 5, 6 MITEC Building, Cau Giay, New Urban Area, Yen Hoa
Ward, Cau Giay, Hanoi

() +84-4-3643-0266 () +84-16-7912-5389

+84-4-3643-0270

http://www.expressway.com.vn/
nvietvec@gmail.com
VEC
.
, ITS
.
Ben Luc - Long Thanh (16), Cau Gie - Ninh Binh

201

Hanoi - Lang Son Expressway


-


a

Hanoi - Lang Son Expressway


(VEC : Vietnam Expressway Corporation)

Lang Son - Bac Ninh



130km
Bac Giang - Hanoi
80 - 120 km/h


2013-2017
e
1 4, 2 7
 
 ADB 8, 2
14

, 4

 2014-2018

2013 1

(Oriental Consultant-)

(ADB)

e
2014




a

-




202

Vietnam Expressway Corporation (VEC)


Mr. Mai Tuan Anh
Mr. Viet
Deputy Manager of Project Dept.
Level 4, 5, 6 MITEC Building, Cau Giay, New Urban Area, Yen Hoa
Ward, Cau Giay, Hanoi
() +84-4-3643-0266 () +84-16-7912-5389
+84-4-3643-0270
http://www.expressway.com.vn/
nvietvec@gmail.com
VEC
.
, ITS
.
Ben Luc - Long Thanh (16), Cau Gie - Ninh Binh

51# #
G

- 1885 Hochimin My Tho
,

* 75
(
)
- 3,143km (main line) 2.632km
, (station line) 403km, (branch line) 18km.
- 35 (1,726km) Nhat
Trang, Danang, Thanh Hoa .
- Hanoi
Lao Cai ( )
Lang Son( )

203

- ,
( 1,435 X 1,000mm) 16%
.
*
.



Hanoi Ho Chi Minh city


Hanoi Hai Phong
Hanoi Lao Cai
Hanoi Dong Dang
Hanoi Quan Trieu
Kep Uong Bi Ha Long
Kep Luu Xa

 LN

1,726
102
296
162
75
106
57

 NN

1,000
1,000
1,000
(1,435x1,000mm)
(1,435x1,000mm)
1,435mm
1,435

: (Vietnam Railway Corporation)


- 1% (7.9)
,
.
* , 5-25km/h ,
57km/h, 40km/h
.




9,019
135,282.8


8,387
137,176.8


8,247.5
137,714.5

403,361.8

443,294.5

513,629.9

129.6
48,976.7
596,769.9

129.7
59,653.6
648,641.6

139.6
55,790.9
640,247.4

:
204



7,980.2 (1%)
144,324.8 (18%)
585,024.5
(72.96%)
186.0 (0.04%)
64.714.4 (8%)
802,232.9

G

- 2009 1436/QD-TTg 2020
2030 ,
.
- 84%
.

_

- (2020)


14%
- (2030) 20%

- ()

- ()

- (2020)

()-()-

- ( )

()-()

- ,



- (2030) ,

- (2020) , ,

- 5,000KW ,

- 50,000-53,000

- (2030)

- , ,

: (Vietnam Railways)
205

- 2020
U$ 650 2030 U$ 500

- PPP
,
ODA .

- Hanoi-Lao Cai , 2013
50% .
- Nha Trang-Hochimin
(Project bridge 44) , .
- ,
2011 Yen Vien-Lao Cai 2
10 526 .
* 2012.8 GS 1 2( 17.2km,
2.6km, 11, 21 ) 4.2
- (VNR)
( , , ) ,
, ,
.
- ODA
FS

- ODA

2 3~4 .

206

- ADB ODA ,
ADB ,
.

G
VNR( )

 
 
 

 

Vietnam Railway Corporation (VNR)

Ms. Pham Kim Dung

Project Manager

+84-91-212-5179

phanviethung74@gmail.com
English, Vietnamese
Email
(Stated Owned Corporation)
- , , ,
-
- , , ,
- ,
118 Le Duan, Cua Nam ward, Hoan Kiem Dist., Hanoi, Vietnam
+84-4-3822 4307
+84-4-3942 2866
phanviethung74@gmail.com
http://www.vr.com.vn
41,526
2003
U$ 78 ( U$ 5.02)
VNR ,
, GS ,
, .

- VNR - ( )
1
2
3
4
5
6


Yen Vien - Lao Cai Railway Upgrading Project
Yen VienNgoc Hoi (Hanoi Metro Line 1)
Hai Van Railway tunnel
Dong DangHanoi Railway
Lao CaiHanoiHai Phong
HanoiHo Chi Minh high speed railway
(HanoiVinh and Nha Trang - Ho Chi Minh)

 ,N

285
15.36
7.8
156
381

2015
2017
2020
2020
2020

F/S

2020

207

G
Ha Noi Metro Line 2 - Project 1: Southern Thang LongTran Hung Dao section
-


Ha Noi Metro Line 2 : Southern Thang LongTran Hung DaoThuong Dinh

Project 1: Southern Thang LongTran Hung Dao section


Hanoi Metropolitan Rail Transport Project Board - HRB

/
Tu Liem, Tay Ho, Ba
11.5km
Dinh, Cau Giay, Hoan Kiem,


- 3.5km , 8.5km
Hai Ba Trung
- 10 , 1
 
 JICA 1.1049 JPY
1.31 (JPY)


2009-2017

 OC

, 2008 11 13 Decision 2054/QD-UBND

e
2012 9


PMU , ,




a

a

JICA ,
- 16 Flr., 360 Kim Ma St., Ba Dinh, Hanoi, Vietnam
- T) +84-4-3831-5005
- : Ms. Hoang Thi Tuat, Program Officer, ext: 143




208

Hanoi Metropolitan Rail Transport Project Board - HRB


Mr. Pham Tuan Son
Ms. Dang Thi Kim Thanh
Chief of Planning Division
No.8 Ho Xuan Huong
+() +84-4-3944-6613, () +84-98-909-9010
84-4-3943 5126
N/A
Dangkimthanh.hrb@gmail.com

Hanoi Metro Line 3 - Project 1: Nhon - Hanoi Station section


-


a




e



a

(Hanoi Metro Line 3: Nhon Hanoi station Hoang Mai)


Project 1: Nhon Hanoi Station section
Hanoi Metropolitan Rail Transport Project Board - HRB

/
Tu Liem, Cau
12.5km (4km , 8.5km )

Giay, Ba Dinh, Dong
12 1
Da, Hoan Kiem
ODA: 2.5
AFD: 1.1
 ADB: 2.2
7.83

EIB: 7300
: 1.3

: 2009-2015
3: () (1.92 )
7: 2
8: 3
1: ()
2: ()
4 & 5:
6 & 9: ()
( 6 & 9 )
3: 2012 10 PQ
7: 2013 5
8: 2013
IRR = 12.7%, NPV = 6710

PMU , ,
,




Hanoi Metropolitan Rail Transport Project Board - HRB


Mr. Pham Tuan Son
Ms. Dang Thi Kim Thanh
Chief of Planning Division
No.8 Ho Xuan Huong
+() +84-4-3944-6613, () +84-98-909-9010
84-4-3943 5126
N/A
Dangkimthanh.hrb@gmail.com

209

Metro Line 1, Ben Thanh - Suoi Tien


-


a

 




e



a

Metro Line 1, Ben Thanh Suoi Tien


The Management Authority for Urban Railways (MAUR)


19.7km ( 2.6km, 17.1km)
500,000 .


e
40km
24

ODA : 22 (83%)

: 2

2013-2017 3
I) , II) , III)
Sumitomo, Cienco 6 F/S ,


2013
(Package 1-3 Package 2 ,
Package 1,3 )

ODA
MAUR

ODA 60%
.
nippon Koei Co Alstom .
2
11 24

210

The Management Authority for Urban Railways (MAUR)


Nguyen Do Luong
Nguyen Van Quoc
Project manager
29 Le Quy Don Street, Ward 7, District 3, Ho Chi Minh City
() +84-8-3930-9495, +84-8-3930-9496, () +84-90-370-8005
+84-8-3930-9496

nvanquoc@gmail.com

Metro Line 4 , Thanh Xuan-Nguyen Van Linh


-



Metro Line 4 , Thanh Xuan-Nguyen Van Linh


The Management Authority for Urban Railways (MAUR)

District 1,4,7,12, Go Vap,


Phu Nhuan, Nha Be

24km( 19Km, 4km)




25

ODA

ODA

1 : Ben Thanh Tham Luong 11km


2 : Tham Luong Cu Chi 8km
F/S

F/S

2014 1 2


a

ITS ,




The Management Authority for Urban Railways (MAUR)


Nguyen Do Luong
Mr. Nguyen Van Quoc
Project manager
29 Le Quy Don Street, Ward 7, District 3, Ho Chi Minh City
() +84-8-3930-9495, +84-8-3930-9496, () +84-90-370-8005
+84-8-3930-9496
N/A
nvanquoc@gmail.com

211

Metro Line 5, New Can Giuoc Bus Terminal - Saigon Bridge


-


a

Metro Line 5, New Can Giuoc Bus Terminal - Saigon Bridge


The Management Authority for Urban Railways MAUR

,
1: 11.2km
(Tan Son Nhat )


2: 14.8km
(7.4km , 7.4km )
1:
10.31

 
 1: ODA

2: 11
2: ODA

1: 9 , 4 Nga Bay Hien - Saigon (2010-2015)


2: 13, Falls 4 Bay Hien - Guic Binh
Chanh (2015)

e



a

ODA

Idom Ingenieria Ardanuy Ingenieria


2014


ITS ,




212

The Management Authority for Urban Railways (MAUR)


Nguyen Do Luong
Mr. Nguyen Van Quoc
Project manager
29 Le Quy Don Street, Ward 7, District 3, Ho Chi Minh City
() +84-8-3930-9495, +84-8-3930-9496, () +84-90-370-8005
+84-8-3930 9496
N/A
nvanquoc@gmail.com

Metro Rail Line 2, Tay Ninh Bus Station - Thu Thiem


-


a

Metro Rail Line 2, Tay Ninh Bus Station - Thu Thiem


Mien Tay Terminal (Line No.3)


19km
1(13)
:
ADB, KfW, EIB
 

22

2(9) : ODA

ODA

2011:
2012: F/S
2013:
2013-2017 :
F/S


2013 1 2


a

ITS ,

The Management Authority for Urban Railways (MAUR)

Nguyen Do Luong

Mr. Nguyen Van Quoc

Project manager

29 Le Quy Don Street, Ward 7, District 3, Ho Chi Minh City

() +84-8-3930-9495, +84-8-3930-9496, () +84-90-370-8005

+84-8-3930 9496

N/A
nvanquoc@gmail.com

213

Upgrading of Hanoi - Noi Bai Railway


-



a

 

e



a

Upgrading of Hanoi Noi Bai Railway


Vietnam Railways Corporation (VNR)

Ngoc Hoi~

Noi Bai

6.81

1: 2014

,
47km ( 130km, AC 25Kv,
1435mm )
JICA ODA
ODA

2: 2015
1: Ha Dong - Bac Hong Bac Hong - Noi Bai

( 120km, 8 : 6 , 2 )
itchu Group


, , ,

ITS ,




214

Vietnam Railways Corporation (VNR)


Mr. Nguyen Dat Tuong
Mr. Nguyen Ngoc Hung
Manager-Strategic Projects Dept
118 Le Duan, Hoan Kiem District, Hanoi
() +84-4-3942-5972, () +84-91-327-5561
+84-4-3942 2866
www.vr.com.vn
dsvn@vr.com.vn
Yen Vien - Lao Cai , Thong Nhat
: 1881, : 41,526, : 7800, 2011 : 5.02

61# #
G
2007 WTO
,

6% 'China+1' ,


,

- 2007 33km, 1.8
, 2 2009 2007 11%
2 3km 36km
.


( : )

: (2009)

215

2009 36km 49 166


, 40km 330 .
-
(20 ),
.




23

U$ 9.8

65

(Sai Gon SeaPort)

U$ 6.7

25

(Hai Phong SeaPort)

17

U$ 9.6

10

(Quy Nhon Seaport)

: (VMA : Vietnam Marine Administration)



()

127,300

()

267,456

Ben Nghe
Cat Lai
()

, ,

, ,

322,000

Tan Cang

160,000
400,000

Saigon

5,000,000

VICT

200,000

()

64,000

()

316,373

: (VMA : Vietnam Marine Administration)

216



G

- 2009 2190/QD-TTg 2020
2030 , 2015 5
4~5 .
* 2015 5~6 => 2020 9~11 => 2030 16~21
217

- 8 2030
, .



( : T/)







8690

118163

242313

6980

132152

212248

4146

81104

154205

63100

142202

271384

185200

265305

495650

5474

132156

206300

VII (Western South Island)

N.A

N.A

N.A

VIII (Condao Resort Group)

N.A

N.A

N.A

I (Northern seaport)
Quang Ninh - Ninh Binh
II (Northern Central seaport)
Thanh Hoa - Ha Tinh
III (Middle Central seaport)
Quang Binh - Quang Nagi
IV (Southern Central seaport)
Binh Dinh - Binh Thuan
V (Eastern South seaport)
Condao, Soai Rap, Tien Giang
VI (Mekong delta seaport)
Phu Quoc,

: (VMA : Vietnam Marine Administration)


- (VMA)

, VMA 2011~2015
.

218

_
( : VND)

/P

I ODA Projects (2)


Building 4 ships for researching & rescuing
1 (length of 115m)
2 Hai Phong Int'l Port
II Projects funded by the State bond (5)
1 An Thoi Port , Phu Quoc Island
2 Draughts for big load ships to Hau River
3 Improving draughts into Quy Nhon Port
Improving shipping draught
4 30000DWT-50000DWT to Dung Quat Port
5 Improving draughts to Cua Viet port
III Domestic Projects (16)
1 * Wharf No 3, Vung Ang
2 * Improving draughts 10000DWT to Cua Lo Port
* Construction draughts 30.000 DWT from Quy
3 Nhon Port to Nhon Hoi Economic Zone
4 Gate draught Bo De, exploiting Nam Can Port
* Shipping Draught dredging 5000DWT5 10.000DWT through Dinh An Gate to Hau River
6 The Middle Intl Gate Seaport
* Construction management center on
7
transportation & data shipping
8 Dredging marine draughts
9 Invest 02 ships for dredging services
Invest Long reached and identification
10 transponder system installation
Improving jet liner Sai Gon Vung Tau for
11 30,000 DWT ship
Upgrading & amending VTS for Sai GonVung
12 Tau jet
13 Setting up VTS for Hai Phong Quang Ninh jet
* Investment & development Automatically
14 identification system in Vietnam
15 Construction No 4 wharfs, Vung Ang Port
16 Upgrading some key jets

6,660,000



6,550,000

2,000,000

2,000,000

4,660,000
3,665,000
150,000
3,149,000
75,000

4,550,000
2,006,000
26,000
1,819,000
20,000

70,000

20,000

221,000
7,735,000
805,000
250,000

121,000
5,933,000
605,000
200,000

400,000

300,000

250,000

150,000

250,000

150,000

3,000,000

2,000,000

27,000

10,000

500,000
400,000

400,000
200,000

40,000

30,000

300,000

300,000

60,000

60,000

60,000

60,000

120,000

100,000

900,000
120,000

900,000
120,000

) *
: (VMA : Vietnam Marine Administration)

219


VMA( )

Vietnam Marine Association (VMA - VINAMARINE) :


Mr. Le Tuan Anh

Director, International Cooperation Department

anhlt@vinamarine.gov.vn

English, Vietnamese

Email

()

- ,
-

 

No. 8 Pham Hung, Cau Giay Dist, Ha noi, Viet Nam

 

+(84)-4-3768 3065

 

+(84)-4-3768 3058

cuchhvn@vinamarine.gov.vn

www.vinamarine.gov.vn

130

1964


VMA
.

 

220

G
Cua Lo Deep Seaport Expansion Development Project
-


a

Cua Lo Deep seaport Expansion Development project


International Transportation Investment & Development JSC (ITID)

,
Nghi Tan ward. Cua Lo

Town, Nghe An

222 ha
province
30,000 - 50,000 DWT

55
e

 

4.82

- 1: (2015): 30,000 DWT ,


50,000 DWT (35ha, 1.44)
2:
(2010-2015): 30,000 DWT 4, 50,000


DWT 2 (77ha, 1.72)


- 3 (2015-2020): 30,000 DWT 8, 50,000
DWT 4 (110ha, 1.66)
 ,

Japan Port Consultants, Ltd


e
2013





, ,
a




International Transportation Investment & Development JSC (ITID)


Mr.Thai Doan Giap
Mr.Thai Doan Giap
General Director
47 Nguyen Sinh Cung, Vy Da Ward, Hue City
+84-54-362 4105
+84-54-384 6189
www.itid.vn
itid.jsc@gmail.com
Dong Lam , Cua Lo

221

Dong Lam Cement Port


-


a

Dong Lam Cement Port


International Transportation Investment & Development JSC (ITID)

,
:
: 500m : +6.5m
: 13m
My Hoa, Dien Loc,
: Sloping Caisson

Phong Dien, Thua Thien,
Hue
: Dophin-type pile structure
:
: 1,000m , 5m
1: 2000

60
e
2: 4000

 

55

1 : 2013 3, 2014 2
2 F/S

, , : 2011 3 ()

e



2013 3 (2 )


a

, ,




222

International Transportation Investment & Development JSC (ITID)


Mr.Thai Doan Giap
Mr.Thai Doan Giap
General Director
47 Nguyen Sinh Cung, Vy Da Ward, Hue City
+84-54-362 4105
+84-54-384 6189
www.itid.vn
itid.jsc@gmail.com
Dong Lam , Cua Lo

Cai Cui Port Project - Phase II


-



a




e



a

Cai Cui Port Project Phase II


Vinalines

,
: 39,924 m2
: 3,024 m2
: 36,900 m2
( 26,700 m2)

No.02 Phu Thang zone,


Tan Phu, Cai Rang,
Can Thoy

20,000

50

2: VND 2100
(1,050)

2014-2017
5( )
2

2013 4


, ,




Vietnam National Shipping Lines (VINALINES)


Mr. Lam Tien Dung
Mr. Vu Manh Hung
vmhung0528@gmail.com
Ocean Park Bldg., No.01 Dao Duy Anh Str., Dong Da District., Hanoi City
() +84-4-3577 0825~29, () +84-91-335-3265
vinalines.com.vn, www.vinalines.vn
vnl@vinalines.com.vn

: Cai Lan, Dinh Vu, Lach Huyen


: Van Phong INternational Transshiptment Hub
: Cai Mep, Thi Vai, Ben Dinh-Sao Mai (Vung Tau ),
Hiep Phuoc

223

Con Dao transshipment port


-



Con Dao transshipment port


Trai Thien Sea Transport Investment and Development JSC

Con Dao, Ba Ria Vung


Tau

300

1,000


e

N/A




2014-2017

2013


a

, ,

Trai Thien Sea Transport Investment and Development JSC

Nguyen Quoc Khanh

Nugyen Quoc Khanh

Director

253 Khuong Viet, Phu Trung Ward, Tan Phu Dist, HCMC

+84-8-3975 3070

+84-8-3975 3067

www.traithien.com

gdtc@traithien.com

224

My Thuy Deep Water Port


-


a

My Thuy Deep Water Port


( Maritime Building JSC - Quang Tri )

,
Hai An Commune, Hai
Dang Dist, Quang Tri

995
Province

50,000DWT
N/A
e




9.9
(1 5.8, 2 4.1)

e



a

1( ) : 2012-2013
2(1 ) : 2014-2020
3(2 : 2020
(BOT, PPP BT )
2008 10

2013 4 2014 1
IRR : 15.5%, : 16


, ,

( Quang Tri )

Quang Tri

Mr. Nguyen Quoc Tuan

34 Hung Vuong, Dong Ha, Quang Tri, Vietnam

() +84-53-385-2030

+84-53-385-1760

www.quangtri.gov.vn

quoctuanodi@vnn.vn

() +84-91-400-1316

225

Nam Du Deep Sea Port Project


-


a

Nam Du Deep Sea Port Project


Tan Tao Group

,
642 ha, 80,000DWT (1),
50, 12

Nam Du, Kien Giang

1 : 12
( 6)
2 : 24
( 6)
3 : 50
( 12)


e

N/A

5-6 (1)

80% , 20%

 

e



a


1 : (2013), (2014), (2014), (2015)




2014 3 4
Nam Du

, ,
49% , ,
, /




226

Tan Tao Group


Ms. Dang Thi Hoang Yen
Mr. Nguyen Van Tau
Member of Board of Management; Chief of Hanoi Representative Office
Lo 16, Tan Tao Industrial Zone, Tan Binh Dist., Ho Chi Minh City
() +84-8-7543-505, () +84-98-263-8080
84-(08) 7543 505
www.itaexpress.com.vn
nvtau@itagroup-vn.com
, , ,
Tan Tao Group , , , , ,
. Tan Tao Group
(: ITA)
4.25 . Russel Vietnam Index 10
S&P Vietnam 10 Index

Lach Huyen Port (Phase II)


-



Lach Huyen Port (Phase II)


MARINE PROJECTS MANAGEMENT AGENT No.1 (under Vinalines)

Lach Huyen, Cat Hai,


Hai Phong city

1,046 ha

3500


e

50

  5(1 : 2.6, 

2 : 2.4)


JICA ODA 2.6


,

2010-2020
2011 4 2012 1

2015 (2 )


a

, ,

MARINE PROJECTS MANAGEMENT AGENT No.1 (under Vinalines)

Mr. Nguyen Canh Viet

Mr. Ngo Bac Ha

Project director

7th Floor, Ocean Park Bldg, 1 Dao Duy Anh St., Dong Da District

() +84-4-3577-2406, +84-4-2218-9686, () +84-91-385-9953

+84-4-3577 2407

N/A
mpmu1@vinalines.com.vn

227

Vung Tau International Container Port


-


a

Vung Tau International Container Port


Vietnam National Shipping Lines (VINALINES)

,
Ba Ria, Vung Tau

200
80,000DWT,

60
e
2.2 TEU
Vinalines CMG ()
(Vinaliens 51%,
CMG 49% )
2011 , 2012 , 2013
,2014-2016
2012 4
. JV

 
5




e



a

2013 3 4


, ,




228

Vietnam National Shipping Lines


Mr. Nguyen Canh Viet
Mr. Bui Quang Dao (1)
Mr. Vu Manh Hung (2)
Vice Director (Business Department) (1)
Head of Investment Dept (2)
01 Cai Lan St., Bai Chay ward, Ha Long City, Quang Ninh Province
() +84-33-3825-627, +84-33-3625-889, () +84-33-826-312
+84-33-3826 118
www.quangninhport.com.vn
vmhung0528@gmail.com
: Cai Lan, inh Vu, Lach Huyen
: Van Phong International Transshipment Hub
: Cai Mep, Thi Vai, Ben Dinh - Sao Mai (Vung Tau), Hiep
Phuoc (

Van Phong International Transshipment Hub (Phase II)


-


a

Van Phong International Transshipment Hub (Phase II)


Vietnam National Shipping Lines (VINALINES)

Nha Trang, Khanh Hoa


530 ha
Van Phong
200,000DWT,


N/A
17 TEU
e
 

35
PPP

1 (2010-2015): 118-125 , : 1680-2260m


- , 2013 A

Vinawaco 690m 2 ( 6b1)

2 (2020): 405
- , , ( 6b2)
 1

2


e
2014 1 2




, ,
a




Vietnam National Shipping Lines


Mr. Nguyen Canh Viet
Mr. Bui Quang Dao (1)
Mr. Vu Manh Hung (2)
Vice Director (Business Department) (1)
Head of Investment Dept (2)
01 Cai Lan St., Bai Chay ward, Ha Long City, Quang Ninh Province
() +84-33-3825-627, +84-33-3625-889, () +84-33-826-312
+84-33-3826 118
www.quangninhport.com.vn
vmhung0528@gmail.com
: Cai Lan, inh Vu, Lach Huyen
: Van Phong International Transshipment Hub
: Cai Mep, Thi Vai, Ben Dinh - Sao Mai (Vung Tau), Hiep
Phuoc (

229

71# # #
G
3 19 22
, (ACV : Airports Corporation
of Vietnam) .
, , 2012
ACV




Noi Bai

Da Nang

Tan Son Nhat

Vinh, Dien Bien, Na San, Cat Bi, Dong Hoi


Phu Bai, Phu Cat, Cam Ranh, Tuy Hoa,
Pleiku, Nha Trang, Chu Lai
Buon Ma Thuot, Lien Khuong, Rach Gia,
Con Son, Phu Quoc, Ca Mau, Can Tho

: (ACV)


, 2005~2010 U$ 13
- Noi Bai 2 , Na San, Don Hoi,
Cam Ranh, Chu Lai 10
.
2009 2020 2030
U$ 205
.

230

- ,
2020 U$ 56, 2030 U$ 78
20% , ODA

G

- BOT, BOO, PPP
, Long
Thanh (Dong Nai) Chu Lai (Quang Nam)
.
- 2010 71/2010/QD-TTg PPP
2011 PPP
,

2030 10 26



Noi Bai, Cat Bi, Phu Bai,


Da Nang, Chu Lai,
Cam Ranh, Tan Son Nhat, Long Thanh, Can Tho,
Phu Quoc
Dien Bien Phu, Na San,
Lao Cai, Quang Ninh,
Gia Lam, Vinh, Dong Hoi,
Phu Cat, Tuy Hoa, Pleiku, Buon Ma Thuot, Lien Khuong,
Rach Gia, Ca Mau,
Con Son, Vung Tau
231



232


- Long Thanh International Airport (Dong Nai, )

Tan Son Nhat


,
2015-2020

4 ICAO 1

- () Hochiminh-Long Thanh-Dau Giay
- () Bien Hoa-Vung Tau , Hochiminh 4
, Hochiminh-Nha Trang , Bien Hoa-Vung Tau
- (1) 2018-2020
, 25 , 1 2
,

- (2) 2020-2030
, 52 , 1
5 ,
- (3) 2030-2035

U$ 60.4
- U$ 43.4, U$ 4.3, 4.8, U$ 7.9
- , ODA : , ,

, ,
- PPP : , , , ,
,

- 2011-2014 :
- 2015-2020 : 1

233

- Chu Lai International Airport (Quang Nam, )

Chu Lai ,
Ky Ha Dung Quat
,

- (1) 2015 : 7 , 20
, 2.24 , 1.5
2 (,
), 25 ,

- (2) 2025 :
, 4.1 ,
5 , 46

U$ 5.5
- 2015 U$ 2.36, 2025 U$ 3.16

- Phu Bai International Airport (Thua Thien Hue, )

234

Phu Bai 4
, ,

- ( ) Airbus A320, A321, Boeing 767, 777-200LR

- () 2020 1 3,048m X 45m
2030 3,800m X 45m
- () 2020 6
- () 2020 2,000, 2030 4,000
- () 202 10, 2030 20
- ()
U$ 6.05
- 2015 U$ 2.93, 2030 U$ 3.12

G
ACV( )

 
 
 

 

Airports Corporation of Vietnam (ACV) :

Ms. Nguyen Thu Huong

Officer at the International Cooperation Dept

+84-90-472-8899

thuhuong227@gmail.com
English, Vietnamese
Email
(Stated Owned Corporation)
,
58 Truong Son Str., Ward 2, Tan Binh District, Ho Chi Minh
city, Vietnam.
+84-8-3848 7288/ 3848 5966
+84-8-3844 5127
huongnguyenthu@sac.vn
www.sac.vn
4,000
1995 ( , , , ACV 2012
, )
U$ 2.05 ( U$ 5.02)
ACV , ,

- ( )


1

Chu Lai International Airport

Long Thanh International Airport

Upgrading Phu Bai International Airport

Expand Cat Bi International airport

Expand Da Nang International airport

Upgrade Cam Ranh International airport

Upgrade Can Tho International airport

F/S

235

G
Van Don International Airport
-


a

Van Don International Airport


QUANG NINH Planning and Investment Department

,
Doan Ket, Van Don,


400
Quang Ninh


N/A
50
e
 
 & ,
12

100%

BOT, BT, BTO


( + )


 IRR 16%, NPV 1.6, 35


- BOT
- 15 10% 4 ,
9 50%

- / 50%

-

- , ,

- BOT
a

236

QUANG NINH Planning and Investment Department


Mr. Pham Hong Bien
Vice Manager of Foreign Economic Relation Division
1st Floor, Office Complex block, No 2, Nguyen Van Cut, Hong Ha,
Quang Ninh
() +84-33-383 5693, () +84-90-418-0282
+84-33-3838 071
www.investinquangninh.vn
Phambien.dpi@gmail.com, investinquangninh@gmail.com

Chu Lai International Airport


-


a

Chu Lai International Airport


Airports Corporation of Vietnam (ACV)

-
Quang Nam

4

 

5.52

- 2015: 2.36

- 2025: 3.16
 2011-2015

N/A
BOT, PPP

2009 Garuda Group()


Airis International Holdings Chu Lai

N/A
,
,


a

, ,

Airports Corporation of Vietnam (ACV)

Mr. Nguyen Nguyen Hung

Ms. Nguyen Thu Huong

Officer at the International Cooperation Dept

58 Truong Son Str., Ward 2, Tan Binh District, Ho Chi Minh city

() +84-8-3848-7288/ 3848-5966, () +84-90-472-8899

+84-8-3844 5127

www.sac.vn
huongnguyenthu@sac.vn, thuhuong227@gmail.com

237

Long Thanh International Airport


-



Long Thanh International Airport


Airports Corporation of Vietnam (ACV)

Dong Nai

4F
: 5,000

 

60.482

ODA, , ,




- : 43.465
- : 4.347

BOT, PPP

: 2011-2014, :2015-2020, 1 : 2020



FIRR: 4.1%, EIRR: 21.1%

,
,


a

, ,

Airports Corporation of Vietnam (ACV)

Mr. Nguyen Nguyen Hung

Ms. Nguyen Thu Huong

Officer at the International Cooperation Dept

58 Truong Son Str., Ward 2, Tan Binh District, Ho Chi Minh city

() +84-8-3848-7288/ 3848-5966, () +84-90-472-8899

+84-8-3844 5127

238

www.sac.vn
huongnguyenthu@sac.vn, thuhuong227@gmail.com

Upgrading of Phu Bai International Airport


-


a

Upgrading of Phu Bai International Airport


Airports Corporation of Vietnam (ACV)

-
4D 4E

Thua Thien Hue



(ICAO )
 

6.05
,

2020:VND 6.087

BOT, PPP
2020-2030: VND 6.484
 2011-2015



N/A

e
N/A
,



, , ,

a
(2008 Changi MOU )

Airports Corporation of Vietnam (ACV)

Mr. Nguyen Nguyen Hung

Ms. Nguyen Thu Huong

Officer at the International Cooperation Dept

58 Truong Son Str., Ward 2, Tan Binh District, Ho Chi Minh city

() +84-8-3848-7288/ 3848-5966, () +84-90-472-8899

+84-8-3844 5127

www.sac.vn
huongnguyenthu@sac.vn, thuhuong227@gmail.com

239

 #

G5"/)0"-0(0.8"45&8"45&353&"5.&/54:45&.



a

TAN HOA - LO GOM WASTE WASTER TREATMENT SYSTEM


MekongRenewable Resources Fund (MRRF), Indochina Capital Corporation (ICC)




20, 10km


300,00 m3
30
e

, &
  2.2


- : 2012 5
- : 2012 6 - 2013 6

- (PQ): 2013 7-9 - : 2013 9-12

- : 2014 1




e
2012 4
 IRR: 15%, : 10, : 30

, : 10%,


, EPC , O&M
a
.





240

INDOCHINA CAPITAL CORPORATION (ICC), Mekong Renewable


Resources Fund (MRRF)
Mr. Nguyen Dang Anh Thi
Director of Environmental Services
10th Fl., 6 Thai Van Lung Str., Dist 1, Hochiminh
() +84-8-3910-4855, () + 84-91-839-3767
+ 84-3910-4860
www.indochinacapital.com
thi.a.nguyen@indochinacapital.com
Con Dao Six Senses -
Mekong Renewable Resources Fund
1) (, , , )
2) (, , , )
3) : : 1.5, : 4,000

G4PVUIFSO#JOI%VPOH8BUFSUSFBUNFOUQSPKFDU




Southern Binh Duong Water treatment project


Binh Duong Water Supply - Sewerage - Environment Co., Ltd. (BIWASE)

Thu Dau Mot, Binh Duong

N/A

JICA: 2.463
Binh Duong

 
3.37

2012-2018

2012 3 -

2013 3

,
,


a

, EPC , O&M

Binh Duong Water Supply - Sewerage - Environment Co., Ltd.(BIWASE)

Mr. Vo Van Long

Deputy Project Director

11 Ngo Van Tri St., Phu Loi Ward, Thu Dau Mot Town, Binh
Duong Province,

+84-650-382-7789

+84-650-382-7738

www.biwase.com.vn
ctyctnbd@hcm.vnn.vn;, binhduong@biwase.com.vn

: 800, : 1975, : 5250, : 2400


:

241

G#JFO)PBDJUZ8BUFS5SFBUNFOU1SPKFDU




Bien Hoa city Water Treatment Project


Construction Department of Dong Nai People CProvince

Bien Hoa, Dong Nai

 

6.674

JICA (5.647), Dong


Nai (1.27)

2013-2018

1,072

JIFCA, Dong Nai

ODA

2013

,
,


a

, ,

242

Construction Department of Dong Nai Province


Mr. Le Ngoc Hoang
Planning & Economic Manager
38 Phan Chu Trinh St., Quang Vinh Ward, Bien Hoa City, Dong Nai
Province, Vietnam
+84-61-384-6283
+84-61-384-7795
http://sxd.dongnai.gov.vn
hlengochoang@yahoo.com.vn
Dong Nai ,
: 71, : 1976, :

G%BOBOHT8BUFS5SFBUNFOU$POTUSVDUJPO1SPKFDU



a








Danangs Water Treatment Construction Project


Danang Priority Infrastructure Investment Projects Management Unit (Danang PIIP)




N/A
2.42

IBRD, IDA,

IBRD: 4000
IDA: 1.325

: 6,970
2013-2016

N/A


2013 6
,
,


a

, ,

Danang Priority Infrastructure Investment Projects Management Unit


(Danang PIIP)

Mr. Hong Vinh Hien

Vice Director

54 Thai Phien St., Hai Chau Dist., Da Nang City, Vietnam

+84-511-356-2677

+84-511-3562678

www.piip.danang.gov.vn
danangpiip@vnn.vn, vinhhienpiip1@yahoo.com.vn
, &

243

G%",'0$".8BTUFXBUFSQSPKFDU

DAKFOCAM Wastewater project
Daklak Agricultural Materials and Food Joint Stock Company
(DAKFOCAM)

Quang Ngai Agricultural Products and Foodstuff Stock Company
(APFCO)
a


Dang Kang Krong


12
Bong, Daklak Province
43,000,


N/A
e
12,000

  VND 28.314


(14.15)

: 30% : 70%



2008 9 18 DAKFOCAM APFCO

e



2013 2
CER IRR: 12%, CER IRR: 32%,
: 21%
CDM ,


a




244

Quang Ngai Agricultural Products and Food stuff Stock


Company (Quang Ngai APFCO)
Vo Van Danh
Vo Van Danh
Chairman, Director
48 Pham Xuan Hoa, Quang Ngai Province
() +84-55-827-308/819-741/822-536, () +84-91-347-0248
+84-55-822-060
www.apfco.com.vn
apfcoqng@dng.vnn.vn

G8BTUFXBUFS5SFBUNFOUBOE.FUIBOF3FDPWFSZ



a

Wastewater Treatment and Methane Recovery


Green Field JSC


Dai Tan industrial zone,

16 km2
Dai Loc, Quang Nam

N/A


e

20

 

680

: 45% : 55%

Green-field

2011-2020


2014 2

Dai Tan Ethanol Plant




a

, , ,




Green Field JSC


Nguyen Van Khanh
Mr. Luu Quang Thai
Chairman of management board
137 Truong Nu Vuong. Tam Ky City. Quang Nam Province
() +84-510-381-3217, () +84-98-709-0909
510 3813 217
www.ethanolgfc.vn
greenfieldtk@vnn.vn

245

G5IBOI7V5BZ/JOI8BTUFXBUFS5SFBUNFOUBOE.FUIBOF3FDPWFSZ1SPKFDU



a

Thanh Vu Tay Ninh Wastewater Treatment and Methane Recovery Project


Thanh Vu Joint Stock Company

Chau Thanh, Chau Thanh,


120
Tay Ninh
4,600 m3


e
5,712 MWh
  VND 563.72 (280)


: 40% : 60%


: 2009 12
 FSR CDM : 2009 12 14

: 2011 1 10 (Thanh An )
: 2012 12 15




e
2012 11
 IRR : CDM : 8.62%, CDM : 24.67%, : 12%
,


,

, ,
a




246

Thanh Vu Joint Stock Company


Ho Cong Cang
Ho Cong Cang
General Director
57 Bau Cat 7 Street, Ward14, Tan Binh District. HCMC
+84-8-849-0175, +84-8-849-3362
+84-8-849-2540
tvstarch.com.vn
thanhvuco@yahoo.com, thanhvu@tvstarch.com.vn, congcang@tvstarch.com.vn

G8BTUFUP&OFSHZ1SPKFDUPG463&7/JO#JOI%VPOH1SPWJODF



a

Waste to Energy Project of SURE VN in Binh Duong Province In Viet Nam


Solutions Using Renewable Energy (SURE) Vietnam Joint Stock Company


Cau Sat, Lai Hung, Ben

122,610
Cat, Binh Duong
13,140 MWh

35
e

4,237
1. : (2300)
  2. (100)


3. &
(108)

: 30% : 70%




,


e
N/A
 CDM IRR: 3.49%, CDM IRR: 26.31%
,


,

,
a

Solutions Using Renewable Energy (SURE) Vietnam Joint Stock Company

Mr Paul T. Puthenpurekal

Mr Paul T. Puthenpurekal

Chairman, Board of Management

Cau Sat hamlet, Lai Hung village, Ben Cat district, Binh Duong province

() +84-8-848-9170, +63-2-634-7945, () +63-92-098-1632

+84-8-848-9174, +63-2-6347945

N/A
vietnam@sure.com.ph, paul@sure.com.ph

247

.FUIBOF3FDPWFSZBOE6UJMJ[BUJPO1SPKFDUPG%BJ7JFU$P-UE



a

Methane Recovery and Utilization Project of Dai Viet Co. Ltd, Vietnam
Dai Viet Company Limited

Tam Thang, Cu Chi,


23
Dak Nong


2,250 m3
15
e
 

3500

: 50% : 50%



2011-2014





e
2013 3
 NPV = 5,340

,

,

, ,
a

Dai Viet Company Limited

Nguyen Trong Toan

Nguyen Trong Toan

Director

Lot CN5, Tam Thang Industrial Zone, Tam Thang, Cu Jut, Dak Nong

() +84-501-224-0528, () +84-98-906-0666

+84-501-368-2025

248

N/A
daivietdaknong@yahoo.com.vn

G8"45&53&"5.&/54:45&.'034-"6()5&3)064&*/$6$)*%*45




WASTE TREATMENT SYSTEM FOR SLAUGHTERHOUSE IN CU CHI DIST


SaiGon Agriculture Investment Corporation (Sagri, state-owned Corp)

Tan Thanh Tay, Cu Chi,


Hochiminh city

3000 m3

 

600

2011-2014

, ,

2012 4

,
,


a


: , ,
,

Green Power Technology &Investment, JSC

Mr. Tran Ngoc Uynh

Mr. Tran Ngoc Uynh

Director

93 Cong Ho, Ward 4, Tan Binh Dist., Hochiminh

+84-8-6275-1898

+84-8-3811-7098

N/A
infonangluongxanh@gmail.com

249

G-0/("/8"5&31-"/5130+&$5



a

LONG AN WATER PLANT PROJECT


Tan Tao Group

Long An

N/A


100,000 m3
N/A
e

 

6000

80% 20%


2011-2015

 Long An Water Supply Company


Long An Tan Tao Group Long An
 Duc Hue , MONRE EIA , Long An

Long An -Long An

e
2013 4

,
a

 , /
, : 49%




250

Tan Tao Group


Dang Thi Hoang Yen
Nguyen Van Tau
Member of Board of Management; Chief of Hanoi Representative Office
Lo 16, Tan Tao Industrial Zone, Tan Binh Dist., Ho Chi Minh City
() +84-8-754-3505, () +84-98-263-8080
+84-8-754-3505
www.itaexpress.com.vn
nvtau@itagroup-vn.com
Tan Tao Group , , , , ,
. Tan Tao Group
(: ITA)
4.25 . Russel Vietnam Index 10 S&P
Vietnam 10 Index , 4 : , ,
,

G-B(J5PXOT%SBJOBHF 8BTUFXBUFS$PMMFDUJPOBOE5SFBUNFOU4ZTUFN



a

La Gi Town's Drainage, Wastewater Collection and Treatment System


Provincial People Committee of Binh Thuan

,
1 (2015): 6,000m3/

Binh Thuan

2 (2025): 12,000m3/
 
 ODA: 1883.7
3,181.9

: 273




ODA: 1883.7
: 273

N/A

1: 2011-2015, 2: 2015-2025


2013
,
,


a

, ,

Provincial People Committee of Binh Thuan

Mr. Tran Anh Tuan

Project Management Unit Binh Thuan Department of Construction

No.3 Nguyen Tat Thanh Road Phan Thiet City, Binh Thuan Province

() +84-62-382-8133, +84-62-382-7411, () +84-98-902-0898

062 3827058

N/A

N/A

Binh Thuan

251

G5IFESBJOBHFTZTUFNJO1IBO3BOH5IBQ$IBN$JUZ



a




e



a

The drainage system in Phan Rang- Thap Cham City


Peoples Committee of Ninh Thuan province

,
Phan Rang - Thap Cham
Phan Rang Thap Cham,
12 3

Ninh Thuan
(2,578 ha)
2020 , 2025

- ODA ( -
VND1.189
): 70%
 - : 30%
(5,700 4000

)
- ODA: 50%
- Referent ODA: 30%
- :20%
ODA 5



2014
,
,
, ,

252

Peoples Committee of Ninh Thuan province


Ms.Pham Thi Thao Nguyen (1), Mr. Nguyen Thanh Phu (2)
Project Manager
Ninh Thuan Economic Development Office Manager (1)
Manager of Construction Department-Peoples Committee of Ninh
Thuan province (2)
() +84-68-383-2922, +84-68-392-2103, +84-68-389-1676
() +84-98-454-0707, +84-91-906-1064
+84-68-382-3730, +84-68-389-1674
N/A
nguyenskh@yahoo.com
Ninh Thuan

G1IVD:FO5PXOESBJOBHF 8BTUFXBUFS5SFBUNFOUBOE$PMMFDUJPO4ZTUFN



a

Phuc Yen Town drainage, Wastewater Treatment and Collection System


Vinh Phuc Water Supply, Sewerage and Environment Company No. 2


Phuc Yen, Vinh Phuc
: 12,500 m3
: 17,500 m3

 




3,181.9

1: 12,500 m3
2: 17,500 m3


e

N/A

ODA: 2594.8
(VND 5420.54)
: 587.1
(VND 1226.45)

2011-2020

,

2014

,
,


a

, ,

Peoples Committee of Vinh Phuc province (1)


Vinh Phuc Water Supply, Sewerage and Environment Company No. 2 (2)
Mr. Duong Canh Ngan
Director of Vinh Phuc Water Supply, Sewerage and Environment
Company No 2
(1) Nguyen Trai Street, Dong Da Dist., Vinh Phuc province
(2) Road No. 317, Phuc Yen town, Vinh Phuc province
() +84-211-384-5298, +84-211-386-9364, () +84-91-328-4096
+84-211-382-3453, +84-211-386-8663
N/A
N/A
Vinh Phuc

253

 # # # #

41# # #
GG

.

.

G 
- ODA, ,
1 ,
.
-
,



- ADB WB ,
.
*
,
WB 2012-2016 (CPS)
78 50 .
* ODA

.

254

G 
- PVN, EVN 1, 2
,
.
-
,

. ( )
-
,
.
*
,

G 
- (Developer)
,
.
*
,

*


-

255

G 
- ,


* 2010 Vinashin( ), 2012 Vinalines(
)
,
-
,

- ,
,
,
-
,

-


.

G 
-
,
,

256

* ,



-


*
,

.

G 0%"
- , ODA ,
, ODA

- ,
ODA

, ,

- JICA, JBIC
,

* , ,
,
,

257

G
G 
-


- , , ,


-

.
- ODA
,

.

G 
-
,


- PVN, EVN 10

, 5

- ,

258


- (VIP)1) (MAVINS)2)


.

G '4
-
F/S .
* ,
F/S
,


- F/S ,
F/S
, .
-

.

G 
- (Quan He : )
,


1)G VIP : Vietnam, Indonesia, Phillipin
2) MAVINS : Mexico, Australia, Vietnam, Indonesia, Nigeria, South Africa
259

* ,

.
-

G "%# 8# &%$'


- ADB WB ODA
,


- ,
, ODA
F/S
.
- K-EXIM KOICA

,
*

260

51# # # #
G  

1&$$
/BNF
$PVOUSZ
3FWFOVF
$MBTTJGZ
"EESFTT
1*$
5&MJE&."*-

Power Engineering
&TU ZS
1982
Consulting JSC 1
,#$
Vietnam
Hanoi
FNQMPZFF
5,500 (US$ Thousands)
1,375
8FCTJUF
PublicxPrivate
www.pecc1.com.vn
Km 9 + 200, Nguyen Trai Str., Thanh Xuan Dist., Hanoi, Vietnam
General Directors
1PTJUJPO
Mr. Le Dang Chan
Assistant
'"9
84-4-3854 4270
84-4-3854 1208
%FQU
chanld@pecc1.com.vn

G-JTUPG.BKPS1SPKFDUT QBTU QSFTFOU GVUVSF

/BNF

$BQJUBM
"NPVOU

Son La

VND

Hydropower

42,476.9

Plant

billion

Lai Chau

VND

Hydropower

35,700

Plant

billion

4UBUVT

Finished

Construction

,FZ )JHIMJHIU

- PECC1s offered services:


engineering
consultancy
&
supervision, pre-project survey
- Son La Hydropower Plant is
the largest hydropower plant in
the South-East Aisa
- Location: Muong La, Son La
- Capacity: 2,400 MW (6 units);
estimated output: 9,429 billion
kwh/year
- PECC1s offered services:
engineering
consultancy
&
supervision, pre-project survey,
investment
&
project
management

261

Thai Binh 2
Thermal
Power Plant

Song Bung
5
Hydropower
Plant

262

- Lai Chau Hydropower plant


project is one of the national
priority programs
- Location: Muong Te, Lai Chau
- Capacity: 1,200 MW (3 units),
estimated output: 4,670.8 million
kwh/year
- Schedule: 2011-2017
- PECC1s offered services:
engineering
consultancy
&
supervision, pre-project survey,
investment & project management
- EPS contractor (responsible for
design,
procurement
&
construction
schedule
control
-Financing
services):
Sojitz
&
Daelim
sources
Industrial
detailed
US$ 1.7
- Location: Thai Thuy, Thai Binh
finalization
billion
- Capacity: 1,200 MW (2 units);
-Sub-contract
(approx)
Estimated output: 7.2 billion
ors selection Kwh/year
- Financing source: PV, ECA and
commercial loans
- Schedule:
COD Unit 1: Sep, 2015
COD Unit 2: March, 2016
- NPV: US$ 301.8 million; IRR:
12%
Construction, - PECC1 is the project owner in
form of BOO
Estimated
VND 1,372
- Location: Quang Nam
commissionin
- Capacity: 57 MW; estimated
billion
g by the end
output: 230.34 million kwh/year
of 2012
- Schedule: 2010-2012

G3FNBSLT
1. Overview: PECC1 originated from an institute specialized in electricity
engineering. The company was established based on a merger of Power
Designing

Institute,

Hydropower

Research

&

Design

Center

and

Geolo-Hydropower Investigation Company in 1982. In 2008, PECC1 went


public with initial chartered capital of VND 100 billion in which
Vietnam Electricity Corporation (EVN) held 54.34%. Currently, PECC1 has
28 subsidiaries.
2. Market Position: PECC1s business areas include engineering consultancy
& supervision, pre-project survey, research laboratory and investment &
project management. Its main expertise are in technical and constructional
consultancy for electricity generation projects and irrigation projects.
Currently, PECC1 is the leading power engineering consulting firm in
Vietnam power sector. The company has carried out the whole package
of engineering consultancy, investigation, testing, etc. and has been a
main consultant for numerous important, large-scaled and complicated
projects (hydropower projects, thermal power projects & transmission line
projects) in Vietnam as well as in Laos and Cambodia namely Son La
hydropower plant, Lai Chau hydropower plant, Song Bung 4 hydropower
plant, Quang Ninh 1&2 thermal power plant, Mong Duong 2 thermal
power plant, Thai Binh 1 thermal power plant, Thai Binh 2 thermal
power plant, etc.
3. Strategy: PECC1 will continue to focus on its core business with an aim
to modernize, differentiate and enhance quality of engineering consultancy
services. In March, 2012, PECC1 has added some items related to the
companys business in its charter. Notably, PECC1s business now is
expanded to offering planning, engineering services for nuclear power
projects, renewable energy projects (beside its traditional expertise in
hydropower

and

thermal

power

projects)

and

offering

planning,

263

engineering services for rivers & sea diversion projects & port projects.
The company is also accelerating investment

in power projects;

specifically, PECC1 is the project owner of Song Bung 5 Hydropower


Plant in form of BOO. The project is expected to be in full operation in
Quarter IV, 2012. In 2008, PECC1s Board of Management decided to
invest in Thanh Son Hydropower Plant in Thanh Hoa; however,
disbursement is yet to be carried out as this project is waiting for
investment license. In the future, it is expected that PECC1 will invest in
more power projects as the company has stated that this will be its
sustainable developing strategy.
4. Partners: PECC1s partners are mainly local large companies such as
EVN, Lilama, PetroVietnam, etc. The company also had partnership with
AF Colenco (Switzerland) in Son La Hydropower Plant project and
Zhongnan-Zhefu (China) in Song Bung 5 Hydropower Plant project.

1&$$
/BNF

Power Engineering
Consulting JSC 2

&TU ZS

1985

,#$

Hanoi

$PVOUSZ

Vietnam

3FWFOVF

13,679 (US$ Thousands


2011 approx)

FNQMPZFF

807

$MBTTJGZ

PublicxPrivate

8FCTJUF

www.pecc2.com

"EESFTT

No.32 Ngo Thoi Nhiem, Ward 7, District 3, Ho Chi Minh city,


Vietnam

1*$

Mr. Nguyen Tai Anh

1PTJUJPO

General Director

5&-

84-8-2221 1057

'"9

84-8-2221 0408

&."*-

264

%FQU

G-JTUPG.BKPS1SPKFDUT
/BNF

Dong Nai 3
Hydropower
plant

$BQJUBM
"NPVOU

VND 3,598
billion
(approx)

Dong Nai 4 US$ 4,696


Hydropower billion
plant
(approx)

Duyen Hai 2
US$ 2.0
Thermal
billion
Power Plant

Mong Duong
US$ 2.1
2 Thermal
billion
Power Plant

4UBUVT

Finished

,FZ )JHIMJHIU
- PECC2s works: Pre F/S &
F/S, Technical design &
tender documents, Working
Drawing Design &
Supervision
- Project Owner: EVN
- Location: Lam Dong Dak
Nong
- Capacity: 180MW (2 units)

- PECC2s works: Pre F/S &


F/S, Technical design &
tender documents, Working
Drawing Design &
Finished
Supervision
- Project Owner: EVN
- Location: Lam Dong Dak
Nong
- Capacity: 340 MW (2 units)
- PECC2s works: Technical
design & Tender documents
- Project Owner: Janakuasa
BOT contract
(Malaysia)
negotiation
- Location: Duyen Hai district,
Tra Vinh province
- Capacity: 1,200 MW
- PECC2s works: construction
Completed
supervision
workload
- Project Owners: AES (USA),
(until
Posco (Korea), CIC (China)
August,
- Location: Cam Pha town,
2012): 40%
Quaang Ninh province
- Capacity:1,200 MW

265

G3FNBSLT
1. Overview: PECC2 went public in 2007 with Vietnam Electricity
Corporation (EVN) holding 51.26%. The companys current charter
capital is VND 44.4 billion.
2. Market position: PECC2s main expertise is in mechanics, transmission
line, hydropower plant & thermal power plants. The company has
involved in numerous large projects namely Ham Thuan Da Mi
hydropower plant, Dong Nai (3, 4, 5, 6, 8) hydropower plants, Phu My
(1, 2, 3) thermal power plants, O Mon (1, 3, 4, 5) thermal power plants, etc.
3. Strategy: PECC2 is aiming to accelerate its investment activities; the
company has finished investing in Srepok 4A hydropower plant with the
investment amount equaling 5% of Buon Don hydropower JSC (the
project owner)s charter capital. PECC2 is looking for a small-scaled
hydropower (around 20MW) to make investment. The company also has
increased its share in EVN International company.
Besides, PECC2 is trying to expand its business areas to providing
engineering & consulting services in irrigation and civil construction and
expand its market to Laos and Cambodia.
4. Partners: PECC2 has a wide network of partners including both domestic
and international ones. Regarding local partners, PECC2 has cooperated
with established names such as PV Power, Vinacomin, Tan Tao Group,
Construction Corporation No. 1 (CC1), etc. Regarding foreign partners,
the company has cooperated with Taekwang Vina Industrial JSC, Korea
Plant Service & Engineering Co., Ltd (Korea); Nippon Koei, J-Power,
TEPSCO (Japan), Janakuasa, Sinclair Knight Merz Sdn, Bhd (Malaysia),
Guangdong Electricity Power Design Institute (GEDI), East China
Investigation & Design Institute (ECIDI) (China); BP (UK), EDF (France), etc.

266

1&$$
/BNF
$PVOUSZ
3FWFOVF
$MBTTJGZ
"EESFTT
1*$
5&&."*-

Power Engineering
&TU ZS

Consulting JSC 3
,#$
)BOPJ
Vietnam
10,150 (US$ Thousands
FNQMPZFF

2011 approx)
8FCTJUF
XXXQFDDDPNWO
PublicxPrivate
No.32, Ngo Thoi Nhiem, Ward 7, District 3, Ho Chi Minh city,
Vietnam
1PTJUJPO
Mr. Le Van Thanh
Deputy Manager
'"9
84-4-3930 7157
84-8-3930 7938
Transmission Line
%FQU
thanh.ld@pecc3.netnam.vn
Project

G-JTUPG.BKPS1SPKFDUT
/BNF

$BQJUBM
"NPVOU

4UBUVT

,FZ )JHIMJHIU
- Project Owner: PV Power
- PECC3 was the consultant
on wind turbine

Phu Quy

VND 335

Wind Power

billion

Plant

(approx)

foundation design
Finished

- Location: Phu Quy island,


Binh Thuan
- Capacity: 6MW (2x3MW);
estimated output: 25
million kwh/year
- Schedule: 2010-2012
- Project owner: Vietnam
Electricity corporation (EVN)

Song Bung
2

VND 3,661

Hydropower

billion

Plant

Construction

- PECC3 is the engineering


consultant
- Location: Nam Giang,
Quang Nam

267

/BNF

$BQJUBM
"NPVOU

4UBUVT

,FZ )JHIMJHIU
- Capacity: 100 MW;
estimated output: 425
million kwh/year
- Financing source: Sumitomo
Mitsui Banking

Corp

(SMBC), BNP Paribas,


Societe Generale (80%);
other sources (20%)
- Schedule: 2010-2014

O Mon IV
Thermal

US$ 793.5

Power Plant

Signed
contract with
Can Tho
Thermal
Power
One-Member
Ltd in May,
2012 on
consultancy
for EPC
main factory
package

- Location: Can Tho


- Capacity: 750 MW
- Financing sources: KfW
Bankengruppe, ADB, EVN
& governments fund
- PECC3 will associate with
AF Colenco (Switzerland)

- PECC3s works: EPC


supervision
- Project Owner: EVN
Duyen Hai
3 Thermal
Power Plant

US$ 1.3
billion

- EPC Contractor:
Construction

Chengda-Dec-Swepdi-Zepc
(China)
- Location: Duyen Hai, Tra Vinh
- Capacity: 1,245 MW
- Scheduled Operation: 2015

268

/BNF

$BQJUBM
"NPVOU

Duyen Hai
3 Coal-fired
Thermal
Power Plant
- extension

USD 870
million

4UBUVT

,FZ )JHIMJHIU

Signed
contract
between the
Projects
- Location: in Duyen Hai
Board of
Electricity Center, Tra Vinh
Management
- Capacity: 600 MW
& PECC3 on
- Projected operation: 2019
investment
plan
consultancy
in August,
2012

G3FNBSLT
1. Overview: PECC3 originated from Power Design Department belonged to
Southern Power Company. The company went public in 2007.
2. Market Position: PECC3 is a subsidiary of EVN along with three other
engineering companies PECC1, 2 & 4. The company is also considered
one of the most prestigious local firms offering engineering consultancy
services for electricity generation and transmission. Compared with PECC1
& PECC2, PECC3s scale is not as large; however, the companys business
areas seems to be more diversified as the company has expanded to
renewable energy and nuclear power projects.
3. Strategy: PECC3 will continue to enhance quality of its core businesses.
Besides traditional power like hydropower and thermal power, it seems
that PECC3 is paying increasing attention to new sources of energy like
nuclear power and wind power. In the April, 2012, in the resolution of
PECC3s annual shareholders meeting; the company added some items in

269

its lists of business areas, notably including survey & design consulting
services for nuclear power plant. In 2011, the annual shareholders
meeting approved of the companys investment in two JSCs: EVN
International JSC and Thuan Binh Wind Power JSC. However, the
investment in Thuan Binh JSC has not been processed as planned as
Thuan Binh JSC and EVN could not reach a final PPA yet.
4. Partners: PECC3 has associated with numerous foreign partners in
various projects such as AF Colenco (Switzerland), Fichtner

(Germany),

PB Power (New Zealand), ECIDI, KHIDI (China), SMEC (Australia),


EPDC J Power (Japan), etc.

1&$$
/BNF

Power Engineering Consulting


JSC 4

&TU ZS

1976

$PVOUSZ

Vietnam

,#$

Hanoi

FNQMPZFF

538 (2011)

8FCTJUF

www.pecc4.com

3FWFOVF
$MBTTJGZ
"EESFTT

6,980 (US$ Thousands


2011 approx)l
PublicxPrivate

No.11, Hoang Hoa Tham, Nha Trang city, Khanh Hoa province,
Vietnam

1*$

Mr. Bui Van Tien

1PTJUJPO

5&-

84-058 222 0405

'"9

&."*-

buivantien@gmail.com

%FQU

270

Manager
84-058 222 0400
84-058 3824 208
Thermal Power &
New Energies Design

G-JTUPG.BKPS1SPKFDUT
$BQJUBM
"NPVOU

/BNF
Dak

Mi

Hydropower
Plant

4UBUVT

,FZ )JHIMJHIU
- PECC4s works: Appraisal

VND

4,547

billion

Finished

- Location: Quang Nam


- Capacity: 190 MW
- Schedule: 2007-2012
- PECC4s works: Investment

Received

Report
approval by - Project Owner: Lien Nghia
62
Tran
De US$
Soc
Trang
Investment JSC
Wind Power m i l l i o n
p r o v i n c i a l - Location: Tran De, Soc
(approx)
Plant
Trang
authority in
Capacity:
100 MW
March, 2012
- Scheduled operation: 2013
- PECC4s works: F/S
- Project Owner: EVN
D u y e n
Hai

3 US$

T h e r m a l billion
Power Plant

1.3

Construction

- EPC Contractor:
Chengda-Dec-Swepdi-Zepc
(China)
- Location: Duyen Hai, Tra Vinh
- Capacity: 1,245 MW
- Scheduled Operation: 2015

G3FNBSLT
1. Overview: PECC4 originated from the Southern Power Planning and
Designing Sub-institute. The company went public in 2007 and has just
increased its charter capital to more than VND 61 billion.
2. Market Position: Besides traditional field such as hydropower, thermal
power or transmission line, PECC4s main expertise also include nuclear

271

power and renewable energy. The company has been assigned by


Vietnam Electricity Corporation (EVN) to be in charge of consulting on
infrastructure investment of Ninh Thuan 1 & 2 nuclear power plants.
Regarding renewable energy project, the company has participated in such
wind power plants as Tu Bong wind power plant, Phu Lac wind power
plant, Lien Nghia Tran De wind power plant, etc. Also, PECC4 has
involved in large national projects such as Vinh Tan thermal power
center, Duyen Hai 3 thermal power plant, Vung Ang 2 thermal power
plant, Srepok 3 hydropower plant, etc.
3. Strategy: in the short term, there seems to be no significant change in
PECC4s current operational strategy. Besides its core business (engineering
services), the company has invested in EVN International JSC and Buon
Don hydropower JSC (project owner of Srepok 4A hydropower plant). The
company is considering investing in Son Giang hydropower plant.
4. Partners: PECC4s foreign partners include Korea Power Engineering
Company (KOPEC Korea), Nippon Koei, J-Power, Sumitomo, TEPSCO
(Japan),

East China Investigation & Design Institute (ECIDI) (China),

COLENCO (Switzerland), EDF (France),

SUEZ Energy International

(Belgium), etc.

1&$$
$PVOUSZ
Vietnam
,#$
Hanoi
3FWFOVF
(US$ Thousands)
FNQMPZFF
25,000
$MBTTJGZ
PublicxPrivate
8FCTJUF
www.lilama.com.vn
"EESFTT No. 124, Minh Khai Str., Hanoi, Vietnam
1*$
Mr. Hoang Minh Khoi
1PTJUJPO
Vice General Manager
5&84-4-3863 3067
'"9
84-4-3863 8104
&."*-

272

minhkhoiktkt@lilama.com.v
n

%FQU

Business &
Construction
Management

G-JTUPG.BKPS1SPKFDUT
/BNF

$BQJUBM
"NPVOU

4UBUVT

,FZ )JHIMJHIU
- Current Ownership: PV

Nhon
Trach 1
Thermal
Power Plant

Power (100%)
- LILAMA was the EPC

VND 761
billion (US$

Finished

322 million)

contractor together with CC1


- Location: Nhon Trach, Dong Nai
- Capacity: 450 MW
- Schedule: 2007-2009
- LILAMA & PVC are EPC
contractors
- The project won the Gold

Nhon
Trach 2

US$ 706

Thermal

million

Award for Fast-Track


Finished

Power Plant of the year in


Asian Power Awards 2012

Power Plant

- Location: Nhon Trach, Dong Nai


- Capacity: 750 MW
- Schedule: 2009-2011
- Project owner: PetroVietnam
(PVN)

Vung Ang
1 Thermal
Power Plant

US$ 1,595
million

- LILAMA is the EPC


Construction

contractor
- Location: Ky Anh, Ha Tinh
- Capacity: 1,200 MW (2 units)
- Schedule: 2009-2013
- LILAMA & PVN are two

Hua Na
Hydropower
Plant

founding shareholders of
US$ 288
million

Construction

Hua Na hydropower JSC


the project owner of Hua
Na hydropower plant
- Location: Que Phong, Nghe An

273

- Capacity: 180 MW (2 units)


- Financing Source: PetroVietnam
Power Corporation (PV Power,
Vietnam Development Bank
(VDB) & commercial loans
- Schedule: 2008-2013

G3FNBSLT
1. Overview: LILAMA is a state-owned corporation under the govern of
Ministry of Construction. The corporation currently has nearly 20
subsidiaries, 05 project management boards, 01 welding technology
institute and 02 technical training colleges.
2. Market Position: LILAMA is the dominant firm specialized in mechanical
equipment manufacture and machinery installation in Vietnam. The
corporation is also an experienced construction contractor with active
involvement in numerous factory construction projects. In addition,
LILAMA is a considered a leading local EPC contractor; the company has
been assigned as an EPC contractor for numerous national power projects
such as Uong Bi thermal power plant - extension, Ca Mau 1&2 combined
cycle power plant, Nhon Trach 1 thermal power plant, Nhon Trach 2
thermal power plant, etc. EPC contractor LILAMA is well-known for its
ability to complete the projects earlier than scheduled; the corporation has
just received the golden award in Asian Power Awards 2012 for Nhon
Trach 2 thermal power plant in the category of Fast-Track Power Plant
of the Year.
3. Strategy: LILAMA will continue to enhance its competence as an EPC
contractors; the corporation will also accelerate its activities in mechanical
equipment manufacture and consulting, engineering & project management
with an aim to provide a full package from engineering to construction
for partners.

274

4. Partners: besides large local partners, LILAMA has cooperated with


established foreign partners such as Alstom (France), Siemen AG
(Germany), ABB (Switzerland), Toshiba, Marubeni, JGC, Kurihalant (Japan),
Hyundai Engineering (Korea), etc.

5SBOTQPSU&OHJOFFSJOH%FTJHO*OD
/BNF
$PVOUSZ
3FWFOVF
$MBTTJGZ
"EESFTT
1*$
5&&."*-

Transport Engineering

&TU ZS
1962
Design Inc (TEDI)
Vietnam
,#$
Hanoi
$ 30 million US$
FNQMPZFF
Approx. 2000
PublicxPrivate
8FCTJUF
www.tedi.com.vn
No. 278, Ton Duc Thang Str., Dong Da Dist., Hanoi, Vietnam
Head of Tendering
Mr. Vu Huu Hoang
1PTJUJPO
Dept
+84-4-3851 4431
'"9
+84-4-3851 4980
OR:
%FQU
Tendering Dept.
hoangvh71@gmail.com

G-JTUPG.BKPS1SPKFDUT
/BNF

$BQJUBM
"NPVOU

4UBUVT

,FZ )JHIMJHIU
- Location: in Hai Van
mountain, 16km from the
center of Da Nang
- Total length: 12,182m (6,255m

Hai Van

US$

Tunnel

133,082,000

of tunnel; 8 bridges of
Finished

1,635m, 4,273m of way)


- The project won an
Engineering Excellence
Award issued by American
Council of Engineering
Companies (ACEC)

275

Nghi Son

Finished

Port

- Location: Tinh Gia, Thanh Hoa


- Includes two bridges, a shore
storage of 2,880 m2, a
container storage of 12,350 m2

G3FNBSLT
1. Overview: TEDI originated from the Institute of

transportation design.

The company now operated as a one member limited

liability company

belonging to Ministry of Transport. TEDI has 14

subsidiaries and

affiliates.
2. Market Position: TEDI currently is the leading consulting

firm on

transportation construction. The company is active in all fields of


transportation namely tunnel, bridge, highway, railway, ports, etc and
provide a full package of consulting & engineering including: site
investigation

&

environment

survey;

planning

&

formulation

of

investment project; detailed design & shop drawing design; tender


documentation

&

assessment;

construction

supervision

and

quality

assessment of transport project.


3. Strategy: the company will stick to its core

business and continuously

enhances the services quality.


4. Partners: TEDI has partnered with foreign consulting firms in previous
projects such as Nippon Koei, ltd (Japan); Louis Berger International Inc.
(USA), etc.

$0/*/$0

/BNF

276

Consultant & Inspection


JSC of Construction
Technology & Equipment
(CONINCO)

&TU ZS

1979

$PVOUSZ

Vietnam

,#$

3FWFOVF

(US$ Thousands)

$MBTTJGZ

PublicxPrivate

"EESFTT

No. 4, Ton That Tung Str., Dong Da District, Hanoi, Vietnam

1*$

Ms. Tran Kim Ngan

5&-

84-4-3852 3706 (ext 293)

Hanoi

FNQMPZFF

700

8FCTJUF

www.coninco.com.vn
International

1PTJUJPO

Cooperation Officer

'"9

84-4-3574 1231
International

&."*-

%FQU

Cooperation &
Consultancy Center

G-JTUPG.BKPS1SPKFDUT
/BNF

$BQJUBM
"NPVOU

4UBUVT

,FZ )JHIMJHIU
-

Sesan 3
Hydropow
er Plant

VND 4,000
billion

CONINCOs

works:

Quality

Verification
Finished

- Project owner: Song Da Corporation


- Location: Chu Pah, Gia Lai Kon Tum
- Capacity: 260 MW
-

CONINCOs

works:

Design Appraisal,
construction
Dakrtih
Hydropow
er Plant

VND 4,300
billion

&

Technical

Consulting of
equipment

installation, Supervision Consultant


Finished

- Location: Dak Nong


- Capacity: 144 MW
-

Financing

Source:

VDB

(70%),

owners equity and other sources (30%)


- Schedule: 2007-2011

277

G3FNBSLT
1. Overview: CONINCO is a subsidiary of Vietnam National Construction
Consultants Corporation (VNCC). The company went public in 2007
and has 8 franchising companies, one subsidiary and one JV.
2.

Market

Position:

CONINCO is

mainly specialized in providing

engineering & consulting services, notably planning scheme, project


formulation, preliminary design, technical design, execution drawing
design, quality control of construction components & materials, project
manag1ement consultancy, etc. The companys expertise areas include
both civil and industrial construction. CONINCO has been involved in
numerous projects such as Tan Son Nhat airport, Can Tho airport, Vinh
Tuy bridge, Thanh Tri bridge, Dakrtih hydropower plant, Sesan 3
hydropower plant, etc.
3. Strategy: CONINCO stated to put its focus on such services as planning
scheme,

design,

quality

assurance,

and

focus

on

such

area

as

transportation construction, bridges & ports.


4. Partners: CONINCO has many international partners namely HEERIM
Architects & Planner Co., Ltd, Dong Il Engineering Consultants, Samyang
System Group (Korea), Nihon Sekkei Inc, SEC, Nikken Sekkei Company
(Japan),

China

Shanghai

Corporation

for

Foreign

Economic

&

Technological Corporation (China), INFRATECH Management Consultants


Pty,

Ltd

(Australia),

LOESCHE

(Germany),

Hammes

Consultancy

Engineering Internation Ptc, CPG Consultant Group (Singapore), etc.

171&
PetroVietnam Power

/BNF
$PVOUSZ

278

Engineering Consulting
JSC (PVPE)
Vietnam

&TU ZS

2007

,#$

Hanoi

3FWFOVF
$MBTTJGZ
"EESFTT
1*$
5&&."*-

1,200 1,500 (US$


FNQMPZFF
86
Thousands)
PublicxPrivate
8FCTJUF
www.pvpe.vn
No. 198, Nguyen Tuan Str., Thanh Xuan District, Hanoi
Mr. Van Xuan Anh
1PTJUJPO
Managing Director
84-4-6285 8432
'"9
84-4-6285 8433
vanxuananh@pvpe.vn
%FQU

G-JTUPG.BKPS1SPKFDUT
/BNF

$BQJUBM
"NPVOU

4UBUVT

,FZ )JHIMJHIU
- PVPEs works: design
drawing for site leveling
- LILAMA & PVC are EPC
contractors

Nhon
Trach 2
Thermal
Power

US$ 706
million

- The project won the Gold


Finished

Award for Fast-Track Power


Plant of the year in Asian
Power Awards 2012

Plant

- Location: Nhon Trach, Dong Nai


- Capacity: 750 MW
- Schedule: 2009-2011
- PVPEs works:
+ Detailed survey &
engineering design for
Quang
Trach I
Thermal
Power
Plant

US$ 1,78
billion

Ground breaking
ceremony in July,
2011

buildings of the projects


management board and
access road to the plant
+ Technical design review,
total cost estimate & EPC
dossier
+ Project management
consultant (consortium
Poyry PVPE)

279

- EPC: PVC & Lilama


- Location: Quang Trach,
Quang Binh
- Capacity: 1,200 MW (2
units), estimated output:
8.43 billion Kwh/year
- Schedule:
COD Unit 1: Jan, 2016
COD Unit 2: June, 2016
- PVPEs works:
+ Technical design, total cost
estimate & EPC dossier
(consortium of Worleyparsons
PECC1 PVPE)
+ Detailed design of BOP
(balance of plant) &
electrical system
- Financing sources
Thai

detailed

Binh 2

US$ 1.7

Thermal

billion

Power

(approx)

Plant

finalization
- Sub-contractors
selection

(sub-contractor for
Worleyparsons)
- EPS contractor (responsible
for design, procurement &
construction schedule
control services): Sojitz &
Daelim Industrial
- Location: Thai Thuy, Thai
Binh
- Capacity: 1,200 MW (2
units); Estimated output: 7.2
billion Kwh/year
- Schedule:
COD Unit 1: Sep, 2015
COD Unit 2: March, 2016

280

The Ministry of
Industry & Trade
of Vietnam
approved the
inclusion of Hoa
Thang wind farm

Hoa
Thang

US$ 85

Wind

million

Farm

project into the


Master Plan of
Binh Thuan
province, Vietnam.

- PVPEs works: investment


planning
- Project Owner: PV Power
- Location: Bac Binh, Binh
Thuan
- Capacity: 50 MW; estimated
output: 121.8 Gwh/year

The project is in

- Target COD: Quarter 4, 2013

F/S establishment
phase

G3FNBSLT
1. Overview: PVPE is a subsidiary of PetroVietnam Power Corporation (PV
Power) a member of PetroVietnam (PVN). The company has a charter
capital of VND 20 billion with PVN holding 51% share. The other major
share holder is PECC2.
2. Market Position: PVPE is specialized in providing consultancy in the
field of both civil and industrial constructions, specifically, transportation,
infrastructure, power (hydropower, thermal power, renewable energy),
transmission line & substation. As a subsidiary of PV Power (a member
of PVN), PVPE had an advantage to be in charge of consulting for
projects of these two large owners. PVPE has been involved in numerous
large power projects in Vietnam namely: Thai Binh 2, Quang Trach 1,
Long Phu 1, Nhon Trach 2 (thermal power plants); Hoa Thang, Thuan
Bac (wind power plants); as for hydropower plants, most of projects that

281

PVPE participated are small-scaled and environmental-friendly such as


Nam Nghe (7.5 MW), Nam Pay (7.5 MW), Nam Cha 3 (6 MW), etc.
3. Strategy: PVPE is trying to expand its business areas. The company has
just added some items on the companys business areas in its charter
notably

consulting

on

materials

purchasing,

technology

transfer;

construction & installation of projects of small & medium scale;


consulting on investment & investment in small & medium scaled
electricity projects.
4. Partners: several foreign partners of PVPE are Worley Parsons (USA),
Poyri (Finland), Fitchner (Germany), Sogreah (France), Moscow institute of
hydraulic engineering (Russia), Ukraine institute of hydraulic engineering
(Ukraine), etc.

17&
/BNF
$PVOUSZ
3FWFOVF
$MBTTJGZ
"EESFTT

PetroVietnam Engineering
Corporation (PVE)
Vietnam
32,800 (US$ Thousands
2011 approx)
PublicxPrivate

&TU ZS

1998

,#$

Hanoi

FNQMPZFF

654 (2011)

8FCTJUF

www.pve.vn

10th Floor, PV Gas Tower, No. 673, Nguyen Huu Tho, Nha Be
District, Ho

Chi Minh city, Vietnam

1*$

Mr. Le Hong Hai

1PTJUJPO

5&-

84-8-3781 6111

'"9

&."*-

hailh@pvn.vn

%FQU

282

Deputy Head of
Commercial Contract
84-8-3781 7111
Department of Market
Development

G-JTUPG.BKPS1SPKFDUT
/BNF

$BQJUBM
"NPVOU

4UBUVT

,FZ )JHIMJHIU
- PVEs works: design of wellhead
platform; design of pipeline
connecting Hai Su Den & Hai Su

Hai Su
Den
Field
Developm

Trang platform
US$ 300
million

On-going

- Project Owner: Thang Long JOC


- Location: Ba Ria Vung Tau
- Several parameters of Hai Su Den

ent

field:
+ Area: 2,832 km2
+ Water depth: < 50 m
- PVEs works: geographic, geologic &

Nam Con
Son 2

hydrometeorology survey; FEED

Pipeline

design
- PVEs works: Engineering General
Contractor

Quang

Ground

Trach I

breaking

Thermal
Power

US$ 1,78
billion

ceremony
in July,
2011

Plant

- EPC: PVC & Lilama


- Location: Quang Trach, Quang Binh
- Capacity: 1,200 MW (2 units),
estimated output: 8.43 billion
Kwh/year
- Schedule:
COD Unit 1: Jan, 2016

COD Unit 2: June, 2016


- Financing - PVEs works: F/S & technical

Thai
Binh 2

US$ 1.7

Thermal

billion

Power

(approx)

Plant

sources
detailed

design of several items of the plant


- EPS contractor (responsible for

finalization

design, procurement & construction

schedule

Sub-contrac

& Daelim Industrial

control services): Sojitz

283

- Location: Thai Thuy, Thai Binh


- Capacity: 1,200 MW (2 units);
tors

Estimated output: 7.2 billion

selection

Kwh/year
- Schedule:
COD Unit 1: Sep, 2015
COD Unit 2: March, 2016

G3FNBSLT
1. Overview: PVE was established from a restructure of PetroVietnam
Investment Construction Consultancy Company (PVICCC) and a merger
of a several engineering companies in PetroVietnam (PVN). The company
was equitized in 2005 and listed in 2008. PVEs current charter capital is
VND 250 billion and the company has four member units including:
PVE Oil & Gas Survey Consultancy (PVE-SC), PVE Oil & Gas Project
Management

Consultancy

(PVE-PMC),

PetroVietnam

Construction

Investment Consultant JSC (PCIC) and PVE Design Engineering Center


(PVE-DEC).

2. Market Position: PVE has a more advantageous position compared with


other engineering companies as currently the company is the only
engineering company specialized in oil & gas sector. The company also
has large corporations as shareholders such as PetroVietnam (PVN) and
Hyundai Engineering (Korea), thus, it stands a high chance of getting
involved in numerous projects that these corporations are owners of. PVE
has participated in large projects of different fields including: field
development, piping & storage, gas processing & condensate plant,
power

plant

and

petrochemical

&

bio

ethanol

plant.

Several

representative projects can be named are: Chim Sao field, Hai Su Den

284

field, Hai Su Trang field, Te Giac Trang field (field development); Nam
Con Son 2 pipeline, Block B O Mon (piping & storage); Quang Trach
1, Thai Binh 2 (power plant);

Phu My condensate plant, Binh Phuoc

bio-ethanol plant, Dung Quat polypropylene plant, etc.

3. Strategy: PV Engineering will focus on its main business areas including


consultancy, engineering, EPC contractor and offshore services; notably,
the company is aiming to expand its activities in offshore sector. Of all
projects fields, oil & gas is still the companys priority.

4. Partners: large partners of PV Engineering mainly are PetroVietnams


members such as PV Oil, PV Pipe, PV Gas. Other partners are Thang
Long JOC, Vietsovpetro, CNG Vietnam, etc.; notably, as Hyundai
Engineering is PV Engineerings shareholder, the company also get to
participate in projects of Hyundai Engineering.
10. CDC
Vietnam Investment

/BNF

Consulting & Construction

&TU ZS

1991

$PVOUSZ

Designing JSC (CDC)


Vietnam
13.5 million US$ in 2011

,#$

Hanoi

3FWFOVF

16 million

FNQMPZFF

250

$MBTTJGZ

(estimated)
PublicxPrivate x
8FCTJUF
www.cdc.biz.vn
CIC-CDC Building, No.37, Le Dai Hanh, Hai Ba Trung district,

"EESFTT
1*$
5&&."*-

Hanoi,

US$ in 2012

Vietnam
84-4-3976 0402

1PTJUJPO
'"9
%FQU

84-4-3976 3122

285

G-JTUPG.BKPS1SPKFDUT
/BNF

$BQJUBM
"NPVOU

4UBUVT

,FZ )JHIMJHIU
- CDCs works: sub-contractor; scope
of works include detailed planning,

Sai Dong
A
Industrial

US$ 152
million

soil & water survey, electricity


Finished

engineering
- Project Owner: Daewoo Corporation

Plant

- Location: Sai Dong, Gia Lam, Hanoi


- Scale: 407 ha

Bai Chay

US$ 1

Bridge

billion

- CDCs works: technical design


Finished

- Total length: 903m; Total width: 25.3 m


- CDCs works: soil survey, technical

Urban

design, tender documents

upgrading
&sanitation US$ 4.33
of Tan

- Location: Bai Chay, Quang Ninh

million

Finished

- Location: Tan Hoa Lo Gom, Ho


Chi Minh city

Hoa Lo

- Scale of urban upgrading area: 20 km2

Gom canal

- Scale of sanitation area: approx 100 km

G3FNBSLT
1. Overview: CDC is under Ministry of Construction; the company was
privatized in 2007.
2. Market Position: CDC is active in a wide range of engineering such as
civl & industrial construction, transportation, irrigation, industry plants
infrastructure, urbanization construction, environment-related construction,
etc. The company is recognized as a Level I consulting firm classified by
Ministry of Construction. Several representative projects of CDC include: Sai
Dong A industrial plant, Thien Tan water supply plant,

Bai Chay bridge,

Water supply system in the west side of Day river, Urban upgrading &

286

sanitation of Tan Hoa Lo Gom canal, etc.


3. Partners: Hyder Consulting, Foster Wheeler (England), Nikken Sekkei,
Japan Bridge & Structure Institute (JBSI), etc.

7&$$

/BNF

Vietnam Energy
Consulting Center
(VECC)

&TU ZS

2001
Hanoi
24 (2011)
www.tuvannangluong-ve
cc.com.vn

$PVOUSZ
3FWFOVF

Vietnam
N/A

,#$
FNQMPZFF

$MBTTJGZ

PublicPrivatex

8FCTJUF

"EESFTT
1*$
5&&."*-

401-403, Office building, No.87, Lang Ha Str, Ba Dinh


Dist.,
Hanoi Vietnam
To Quoc Tru (Mr.)
1PTJUJPO
Director
84-4-3514 6943
'"9
84-4-3514 6943
quoctru.vecc@gmail.com
%FQU

G-JTUPG.BKPS1SPKFDUT
/P

1SPKFDU /BNF  7&$$T $POTVMUJOH "DUJWJUZ

$BQJUBM "NPVOU
64 NJMMJPO

Hydropower plant Thai An on River Song Mien, Ha


Giang province, 30-45 MW.
- Appraisal Investigation Plan for Feasibility Study
Report and Technical Design

37.00

Hydropower plant Song Cho 1, Khanh Hoa province,


2x3.5 = 7MW
-Appraisal on Feasibility Study Report

8,14

Hydropower plant Song Cho 2, Khanh Hoa province,


2x2.8 = 5.6MW
- Appraisal on Feasibility Study Report

6.92

Hydropower plant A Roang, 2x3 = 6 MW


- Appraisal on Feasibility Study Report

7.03

287

/P

1SPKFDU /BNF  7&$$T $POTVMUJOH "DUJWJUZ

$BQJUBM "NPVOU
64 NJMMJPO

Rural Infrastructure Development and Living


Standard Improvement Project
Electricity Sector, allocated by the Japanese OECF
Loan, for 54 provinces, under OECF-GOV
Agreement No. VN II-4 (SPL-I)
1996 Inception ReportSurvey Report Intermediate
Monitoring Report Completion Report for OECF
allocation

11.692

Small scale Pro-poor Rural Infrastructure


Development Project
- Electricity
Sector,allocatedbyJBICLoan,underJBIC-MPIAgreementV
N-X(SPL-IV),for15provinces:349.4kmMVL+ 19,546.5
kVA + 761.5km LVL + 3,900 Service drops 2003
Project Survey Activity for total investment fund
Project Intermediate Monitoring Activity, Training
Seminar
Capacity Building Lectures on Participatory
Community in Project development
Final Monitoring Report.

7.933

Guo Hua Electrical Equipment and Material


Manufacturing Plant
- To establish Investment Opportunity Report

23.1

Coal fired Thermal Power Plant Ninh Binh 2 1x330 MW


- Appraisal on Total Investment Fund Amendment
Report

402.3

10

Coal fired Thermal Power Plant Ninh Binh 2


Enlargement 1x330 MW
- Appraisal on Total Investment Fund Estimation
Practical Training Shop and Modular Lectures of
Thermal Technology Teaching for EVN Soc Son
Electricity School
- To establish Platform content summary and
Technico-economic Report

288

381.3

0.528

/P

1SPKFDU /BNF  7&$$T $POTVMUJOH "DUJWJUZ

$BQJUBM "NPVOU
64 NJMMJPO

11

Thermo-mechanical practical training shop of


Electricity Superior School (inpreparationto upgrade
in 2006 year into the Electricity University of EVN)
- To establish basic content summary, Investment
Report and Technico-economic Report

0.482

12

Cam Pha Cement Plant, Quang Ninh


ProvinceSubstation 110/6 kV
- Appraisal on Technical Design

2.201

13
14

Hydropower station Nam Gion, Son La Province, 20 MW


- Appraisal on Investigation general plan
Hydropower plant Nam Man, Son La province, 5 MW
- Appraisal on Investigation general plan

15

Coal fired Thermal Power Plant Vung Ang II, Ha


tinh province, 2x600 MW
- Compilation of initial data for Project Study

16

35 kV Line feeding the Iron Ore Enriching Plant of


Song Lo Company, Ha Giang province
- To establish Investment Project, Technico-Economic
Report, Bidding Documen

18.9
4.5

1,000.0

0.19

G3FNBSLT
1. Overview: VECC has the main activities as follows:
Consultation on the investment project preparation (Preparation
of
Pre-Feasibility Study Report, Feasibility Study Report) for:
+) The Hydropower Stations having the output up to 30 MW.
+) The thermal power plants using conventional technology
+) Design and bidding for the electrical lines and transformer stations
having the voltage up to 220 kV.

ppraising the investment projects of energy sector including:


Development Master Plan, Investment Report, Investment Project,
Technical-economic Report, Basic Design, Technical Design, Detail Design
and orking drawings preparation, Total Investment Cost Estimation,

289

Bidding ocuments, Unit


Procedures, Regulations.

Prices,

Norms,

Standards,

Management

Coordinating, on behalf of VEA, the inland and foreign investors in the


development of energy projects and to help them to complete the
investment procedure in compliance with Vietnams legal regulations.
Evaluating the impact on environment of the energy facilities &
supervising the quality of construction and installation of energy project
implementation.
Organizing scientific seminars, technology transfer conference, training
programs.
2. Market Position:
VECC is the most well-known private energy consulting agent in
Vietnam. Mr Tru, the director of VECC has had more than 30 years of
working in energy industry in Vietnam before founding VECC. He has
built a strong connection with many governmental energy related bodies
as well as state-owned corporations through his technical consulting
works at PECC1 and taking charge as head of International Cooperation
Dept of EVN. He is now teamed up with many other experts in
Vietnam Energy Association to adjust the national development plan and
suggest development strategies to the Ministry of Trade and Industry,
and the Government office.
3. Strategy:
In the coming years, VECC will focus more on the renewable energy
projects, since Mr. Tru is the frontline expert in
the renewable energy
field in Vietnam and this new sector also receives lots of attentions from
foreign investors, due to Vietnams high natural potential
as well as
governments encouragement.
4. Partners:
VECC has provided both domestics clients such as Song Da corporation,
Petrovietnam, EVN and foreign companies including Sumitomo Corporation,
Shanghai Electric, Electricity de France.

290

*OTUJUVUFPG&OFSHZ
/BNF
$PVOUSZ
3FWFOVF
$MBTTJGZ
"EESFTT
1*$
5&&."*-

Institute of Energy (IE)


Vietnam
N/A (Governmental

&TU ZS
,#$

1989
Hanoi

FNQMPZFF
180
Organization)
PublicxPrivate
8FCTJUF
www.ievn.com.vn
06 Ton That Tung, Dong Da, Hanoi, Vietnam
Hoang Tien Dung (Mr.)
1PTJUJPO
Director
84-4-38523730
'"9
84-4-3852 3311
bbt@ievn.com.vn
%FQU

-JTUPG.BKPS1SPKFDUT
*&T *OUFSOBUJPOBM $PPQFSBUJPO 1SPKFDUT

*NQMFNFOU
BUJPO ZFBS

1BSUOFST

Research on policies for renewable energy


and cooperation projects on renewable
energy

2009-2010

IEEJ Japan

Research, analysis, situation of production


and use of rice husks, wind and renewable
energies in Vietnam

2009-2010

Japan

Energy consulting services for Korean


Embassy

2009

Korea

Research on policy mechanism for wind


power development in Vietnam

2009-2010

GTZGermany

Preparation of PIN & PDD for CDM project


of Dak Me 1 hydropower station

2009-2010

HEPCOJapan

Carbon market for the poor

2008

United
Kingdom

Energy conservation and energy efficiency


master plan

2008-2009

JICA

Investment project report of rice husk


power plant 6MW in Dong Thap

2008

KEPCO Korea

Research, design, manufacture and


installation of coal supply system for power
plant of Bai Bang paper company

/P

291

/P
10

11

*&T *OUFSOBUJPOBM $PPQFSBUJPO 1SPKFDUT


Research, design of soot blower system for
boilers of Uong Bi thermal power plant
Research, design, manufacture and
installation of UD burners for boilers of Ha
Bac TPP
Feasibility report and technical design for

12

shifting mechanical workshop of Ninh Binh


TPP
Planning of small and medium HPPs with

13

capacity of 100kW 50,000 KW for Ha


Giang province
Planning of small and medium HPPs with

14

capacity of 100kW 30,000 KW for Gia


Lai province

15

16

Planning of small and medium HPPs with


capacity of 100kW 30,000 KW for Kon
Tum province
Planning of small and medium HPPs with
capacity of 100kW 30,000 KW for Dak
Lak province

17

Planning of small and medium HPPs with


capacity of 100kW 30,000 KW for Dak
Nong province

18

Studies on hydraulic modeling


Hoa Binh hydropower plant:
Modeling scoring hole and downstream

19

side of the dam, 1998


Modeling for reinforcement of dam, 2001
Modeling on discharge capability of
spillway when dam crest is increased
higher, 2002

292

*NQMFNFOU
BUJPO ZFBS

1BSUOFST

/P

*&T *OUFSOBUJPOBM $PPQFSBUJPO 1SPKFDUT

*NQMFNFOU
BUJPO ZFBS

1BSUOFST

Modeling serving design for clearing score


bank in downstream, 2003
Modeling on case of spillway gates
sticking, 2004
Modeling serving reinforcement of both
downstream river banks, 2005

20

Son La hydropower project


Modeling serving technical design stage 1,
2004
Modeling serving technical design stage 2,
2005

21

Binh Dien hydropower project


Modeling for technical design: model of
cross section of overflow; model of river
diversion; model of operation overflow,
2005.

22

Power Transmission Line and Substation


Projects

23

Dong Hoa - Dinh Vu 220kV line, ACSR


450/40, 2 x 20km + two 220kV feeders

24

Dinh Vu 220kV substation, 1 x


(220/110/22kV - 250MVA),
1x(110/22kV63MVA)

25

110kV substation and 110kV line supplying


electricity to Cat Ba island ,
1x50km - AC185, +1x(110/35/22kV-25MVA

26

110kV line supplying power to Dinh Vu


steel plant , 4 -circuit line with 2 circuits
on one pole row, 4 x AC300 - 8km

27

Extension of 110 kV Thuy Nguyen 1


substation, 1 x 25 MVA, Technical and
detailed designs

293

*NQMFNFOU
BUJPO ZFBS

1BSUOFST

Prefeasibility report of extension Uong Bi


TPP

Finished

300MW

Feasibility report of extension Uong Bi TPP


Prefeasibility report of Hai Phong TPP
Feasibility report of Hai Phong TPP

Finished
Finished
Finished

300MW
600MW
600MW
CFB,
50MW
300MW

/P

*&T *OUFSOBUJPOBM $PPQFSBUJPO 1SPKFDUT

28

Song Cong 110kV substation


and 110kV
accessing branch, F/S : 2 x 40 MVA
+6kmAC185

29
30
31
32
33

Feasibility report of Thang Long TPP

Finished

34

Prefeasibility report of Ninh Binh II TPP

Finished

35

Prefeasibility report of the first


power plant in Vietnam

Finished

nuclear

36

Feasibility report of Ninh Binh II TP

Finished

37

Technical design, total cost estimation


for Hai Phong TPP

Finished

38

Preparation of EPC tendering


documents, carried out bidding and
negotiation on EPC contract for Hai
Phong TPP project

Finished

39

Technical design, total cost estimation


for Ninh Binh II TPP

Finished

40

PQ documents, bidding documents for EPC,


carried out bids evaluation and
negotiation on EPC contract for Ninh
Binh II TPP project

Finished

41

Construction - investment report of Mao


Khe TPP project.
Rehabilitated, upgraded equipment/systems
of thermal power plants

Finished

294

300MW

CFB,
220MW

G3FNBSLT
Institute of Energy, under the Ministry of Trade and Industry

(MOIT), is

a leading state organization in energy sector in Vietnam.


1. Functions and Tasks:
- Formulation of national strategies and policies on energy and electricity
development.
- Carry out research, planning of national power development, prepare
Master Plan on Electric Power Development for Vietnam.
- Carry out pre-feasibility and feasibility studies of power generation,
transmission projects.
- Carry out technical - scientific cooperation and research programs with
international organizations.
2. Organization Structure:
The Institute has the hydraulic laboratory, high voltage power and
insulation laboratory, lightning research center, testing instrument for
renewable energy research.
3. Research Area:
- Hydraulic Model
- Lightning
- Renewable Energy
- Solar Energy
- Small Hydro-Power Resource Planning
- Wind Energy
- Biomass and Rural Energy
- Biogas Energy
4. Market Position:
IE mainly plays the role as the Governments think tank, in term of
mapping out the sector development target and strategies. IE creates the

295

national development master plan every 5 year and set investment priority
as well as the operational schedule for the power plants, basing on their
research and industry situation. Conducting almost all Pre-F/S and F/S to
initiate the projects and develop the major power complex across country,
IE hold important technical information for most projects listed on the
Master Plan. IE is also responsible for supervising

and evaluating the

technical proposal from any foreign investors who apply to

MOIT for

investment license in large-scale power projects.

G 

1FUSP7JFUOBN$POTUSVDUJPO+4$
/BNF
$PVOUSZ
3FWFOVF
$MBTTJGZ
"EESFTT
1*$
5&&."*-

PetroVietnam Construction
JSC (PVC)
Vietnam
586,100 (US$ Thousands
2012f)
PublicxPrivate

&TU ZS

1983

,#$

Hanoi

FNQMPZFF

8,227 (2011)

8FCTJUF

www.pvc.vn

6thFloor,SANNAMBuilding,
DichVongHauWard,CauGiayDist.,
Hanoi,Vietnam
Mr. Vu Duc Thuan
84-4-3768 9291
thuanvd@pvc.vn

1PTJUJPO
'"9
%FQU

President & CEO


84-4-3768 9290

G-JTUPG.BKPS1SPKFDUT
/BNF

$BQJUBM  
"NPVOU

4UBUVT

Dung Quat US$ 2.7


Finished
Refinery
billion (est)

296

,FZ   )JHIMJHIU
- Project Owner: PetroVietnam
(PVN)
- Location: Binh Son, Quang Ngai
- Construction items by PVC:
cast-in-place concrete pile,
pipe rack, table top, waste
water treatment facilities &
break water

/BNF

$BQJUBM  
"NPVOU

4UBUVT

,FZ   )JHIMJHIU

Nam Con
Son 2
Pipeline
GPP2
Factory

Quang
Trach 1
Thermal
Power
Plant

Thai Binh
2 Thermal
Power
Plant

- EPC: PVC & Lilama


- Location: Quang Trach, Quang
Binh
- Capacity: 1,200 MW (2 units),
estimated output: 8.43 billion
Kwh/year
- Financing source: PVN, ECA,
commercial loans
- Schedule:
COD Unit 1: Jan, 2016
COD Unit 2: June, 2016
- NPV: US$ 246 million; IRR: 12%

US$ 1,78
billion

Ground
breaking
ceremony
(started in
July, 2011)

US$ 1.7
billion
(approx)

- EPS contractor (responsible for


design, procurement &
construction schedule control
- Financing
services): Sojitz & Daelim Industrial
sources
- Location: Thai Thuy, Thai Binh
detailed
- Capacity: 1,200 MW (2 units);
finalization
Estimated output: 7.2 billion Kwh/year
- Financing source: PV, ECA and
-Sub-contra
commercial loans
ctors
- Schedule:
selection
COD Unit 1: Sep, 2015
COD Unit 2: March, 2016
- NPV: US$ 301.8 million; IRR:
12%

297

G3FNBSLT
1. Overview: PVC is a subsidiary of PetroVietnam (PVN holds 53.26%
stake). The company originated from an Oil & Gas Construction
Conjugate Factory in 1983. In 2009, in accordance with the governments
direction, the company equitized and become PetroVietnam Construction
JSC. In 2012, PVC increases its charter capital to 5,000 billion

(approx

US$ 242 million).


2. Market position: currently, PVC is the second largest player in the overall
construction market and the biggest construction company specialized in
gas & oil industry in Vietnam. The company has been the EPC contractor
of many petroleum projects namely Thi Vai LPG storage, GPP2 factory in
Nam Con Son 2 Pipeline project, etc.; the company is also a construction
contractor of numerous large projects such as Dung Quat refinery, Nghi
Son refinery, etc. PVC is expected to maintain its stable position as one
of the biggest construction corporations in Vietnam as the

company has

a strong connection with the government and PetroVietnam; thus, the


company has privileged access to projects of the government and
PetroVietnam.
3. Strategy: beside construction in oil & gas sector, PVC has expanded its
activities to other fields such as industrial construction and civil
construction as well. The

company has been assigned as EPC of large

power plant construction projects such as Nhon Trach 2 Thermal Power


Plant, Quang Trach 1 Thermal Power Plant, Thai Binh 2 Thermal Power
Plant, etc. The company is trying to increase the scale of projects that it
participates in as an EPC contractor.
4. Partners: the company has numerous partnership with large Korean firms
such as POSCO, Sam Sung Engineering, Hyundai, Hanshin
Daewoo, etc.

298

E&C,

5SVOH/BN$POTUSVDUJPO*OWFTUNFOU$PSQ
&TU ZS

2004

$PVOUSZ
3FWFOVF

Trung Nam Construction


Investment Corp (TNG)
Vietnam
56,000 (US$ Thousands)

,#$
FNQMPZFF

$MBTTJGZ

Public Privatex

8FCTJUF

Hanoi
2,500
www.trungnamgroup.co
m.vn

/BNF

"EESFTT

Trung Nam Tower 7A/80 Thanh Thai Str., Ward 14, District
10, Ho Chi Minh city, Vietnam

1*$

Mr. Dang Cong Chuan

1PTJUJPO

5&-

84-4-6264 5178
congchuan@trungnamgrou
p.com.vn

'"9

&."*-

Deputy General
Director
84-8-6264 5180

%FQU

G-JTUPG.BKPS1SPKFDUT
/BNF

$BQJUBM  
"NPVOU

4UBUVT

,FZ )JHIMJHIU
- Location: Di Linh, Lam Dong
- Capacity: 70 MW; estimated

Commissio
Dong Nai 2 VND
Hydropow 2,000
er Plant

billion

ning is

output: 290 million kwh/year


- Schedule: Start-up in Dec, 2007;

expected

estimated commissioning by the end

to start by

of 2012

the end of - The project received VND 916


2012

billion sponsorship from the


government in 2009
- Payback period: 10 years

Krong No
2&3
Hydropow
er Plant

- Location: Dam Rong, Lam Dong


VND
1,150
billion

Constructi
on

- Capacity: 46 MW, estimated


output: 170 million kwh/year
- Schedule: Start-up in July, 2010;
estimated commissioning in 2013

299

$BQJUBM  
"NPVOU

/BNF

4UBUVT

,FZ )JHIMJHIU
- Location: Thuan Bac, Ninh
Thuan

US$
Trung
Nam

500
million
(total)

Wind
Power
Plant

US$
181
million

- Scale: 903 ha

Finished
wind

- Average ouput: 234,691

surveying

- Funding source: owners capital &

&

other funding sources


- NPV = US$ 268.273 million; FIRR = 12.92%

pre

F/S stage;
the F/S
and fund
arrangeme

(2011-2014)
nt is
- 35MW
underway

Mwh/year

- Bidder Selection Method:


International open bidding
- Bid Deadline: From Jan to March, 2013
- Korean companys possibility of
entering tender:
+ Engineering consulting companies
+ Equipment & machinery supplier

Dong Cam VND


Hydropow 2,300

Initial
study &

er Plant

design

billion

- Location: Tuy Hoa, Phu Yen


- Capacity: 50 MW

G3FNBSLT
1. Overview: TNGs a private firm with a registered capital of VND 300
million. The corporation currently has 10 member companies that operates
in different provinces in Vietnam.
2. Market Position: TNG is a professional investor in numerous fields such
as real estate, energy, household electronic appliances, financial investment,
etc. However, the companys two strategic businesses are real estate and
energy. TNG is among the first local private companies to participate in
hydropower projects in Vietnam. Although compared with several
state-owned construction companies, TNGs still a newcomer in the field

300

of power projects investment; the company is judged to have good


financial capacity and transparency which are two advantages hinting the
companys positive growth in the future. TNG has been a project owners
of numerous power projects namely Dong Nai 2 hydropower plant, Krong
No 2&3 hydropower plant, Trung Nam Wind power plant in Ninh Thuan
province, etc.
3. Strength/Weakness: TNG has limited experience in power plant
construction and compared with state-owned firms, the firm has more
limited access to financing funds. Thus, Korean firms that are capable of
fund arrangement and contribution; engineering firms; construction
contractors; and equipment suppliers would probably stand a high chance
of having partnership with TNG.
4. Strategy: TNG is aiming to be a large corporation with diversified
portfolio and total assets of US$ 3 billion in 2020. It is expected that the
company will possibly accelerate its investment in power projects notably
hydropower plants and wind power plants as these projects ensure a
stable revenue for TNG while real estate market hints numerous risks. In
2012, TNG is aiming to invest in hydropower project in Cambodia and
expand its activities to Granite exploitation.
5. Partners: TNG has partnership with Chongquing Water Turbine Works
Co., Ltd, Guangxi Electric Power Industry Investigation Design & Research
Institute GXED (China) in power plant projects. The company had a
deal with MooYoung Architecture & Engineering Co. in which the
Korean firm is the design contractor for TNGs eco-township project of
Quan Nam Thuy Tu in Da Nang city.

301

$POTUSVDUJPO$PSQPSBUJPO/P
/BNF
$PVOUSZ
3FWFOVF
$MBTTJGZ
"EESFTT

Construction Corporation
&TU ZS
1979
No.1 (CC1)
Vietnam
,#$
Hanoi
432,275 (US$ Thousands
 FNQMPZFF
476
2010 approx)
PublicxPrivate
8FCTJUF www.cc1.net.vn
Sailing Tower, No. 111 Pasteur Str., District 1, Ho Chi Minh
city, Vietnam

1*$

Mr. Nguyen Hoang Hung

1PTJUJPO

5&-

84-8-3822 2059

'"9

&."*-

hung.nguyen@cc1.net.vn

%FQU

Head of International
Partnership
Development Research
+84-4-3829 0500
Development &
Investment
Department

G-JTUPG.BKPS1SPKFDUT
/BNF

$BQJUBM  
"NPVOU

4UBUVT

,FZ   )JHIMJHIU
- Project Owner: Mitsubishi Corporation

Phu My 1

- CC1 was the construction contractor

Thermal

VND

Power

435 billion

Finished

- Location: Tan Thanh, Ba Ria


Vung Tau
- Capacity: 1,050 MW

Plant

- Schedule: 2002-2005
Nhon
Trach 1
Thermal
Power
plant
DakrTih

- Current Ownership: PV Power (100%)


VND
761 billion
(US$ 322

Finished

together with LILAMA


- Location: Nhon Trach, Dong Nai
- Capacity: 450 MW

million)

- Schedule: 2007-2009
VND

Hydropow 4,300

302

- CC1 was the EPC contractor

Finished

- CC1 is the project owner


- Location: Dak Nong

- Capacity: 144 MW
er Plant

- Financing Source: VDB (70%),

billion

owners equity and other sources (30%)


- Schedule: 2007-2011
- Project owner: Vietnam Electricity
Group (EVN)
- CC1 is the sub-contractor
Finished
installing

Nghi Son
1 Thermal

US$

Power

million

990

steam
drum no.1
in March,

Plant

2012

- Location: Tinh Gia, Thanh Hoa


- Capacity: 600 MW (2 units);
estimated output 3.6 billion
kwh/year
- Financing source: ODA from Japan
(85%); other sources (15%)
- Schedule:
+ Q4, 2013: Unit 1s operation
+ Q2, 2014: Unit 2s operation

G3FNBSLT
1. Overview: CC1 is a state-owned corporation under Ministry of
Construction. The company has 23 subsidiaries and affiliates.
2.

Market

Position:

CC1s business areas are diversified including

construction, design consultancy, project investment & management, real


estate trading, building material production & trading and import &
export. Regardless, construction is CC1s traditional and core business.
The company is active in both civil and industrial construction and has a
very long-term experience in constructing national priority power projects
such as Tri An hydropower plant, Ham Thuan Da Mi hydropower
plant, Phu My 1&2 thermal power plant, Nhon Trach 1 thermal power
plant, etc. CC1 is considered among the largest and most long-standing
construction companies in Vietnam, notably in the south of Vietnam.

303

3. Strategy: the company is expected to keep involving actively in


construction sector as both contractor and project owner.
4. Partner: CC1 has a close relationship with large

local companies such

as Lilama, Licogi, etc. The company was also contractor

in projects,

owners of which are Japanese firms such as Mitsubishi corp (Phu

My 1

thermal power plant); EDF & Sumitomo TEPCO (Phu My 2-2 thermal
power plant).

1BDJGJD(SPVQ$PSQPSBUJPO
/BNF
$PVOUSZ
3FWFOVF
$MBTTJGZ
"EESFTT
1*$
5&&."*-

Pacific Group Corporation


&TU ZS
2001
Vietnam
,#$
Hanoi
2,500 (US$ Thousands)
FNQMPZFF
62
Public Privatex
8FCTJUF www.thaibinhduong.vn
8thFloor,No.83A,LyThuongKietStr.,TranHungDaoWard,HoanKiem
Dist.,Hanoi,Vietnam
Ms. Phan Ban Mai
1PTJUJPO
Manager
84-4-3941 3268
'"9
84-4-3941 3269
phanbanmai@yahoo.com
%FQU
Industrial Department

G-JTUPG.BKPS1SPKFDUT
/BNF

$BQJUBM  
"NPVOU

4UBUVT

- Pacific Group Corporation is


the project owner; Investment
form: IPP
investment
Location:
Tuy Phong, Binh
report approval
Thuan
- Capacity: 52.5 MW; Scale: 810
- Drawing up
ha (approx)
plans for
- Financing source: Owners
compensation
equity (30%); others (70%)
& site clearance - Schedule: 2011-2014
- Bid deadline: civil works and
- Waiting for

VND
Thai

2,306

Phong

billion

Wind

(approx

Farm

US$ 115
million)

304

,FZ   )JHIMJHIU

/BNF

$BQJUBM  
"NPVOU

4UBUVT

,FZ   )JHIMJHIU
procurement of equipment
bidding: around June, 2013
- Bidder Selection Method: Open
Tender or Assigned Tender,
depending on the qualifications,
ECA or financial support offered
by partners

VND
Thai Hoa
Wind
Farm

3,529.3
billion
(approx
US$ 176
million)

- Pacific Group Corporation is


the project owner; Investment
form: IPP
- Working on
- Location: Bac Binh, Binh Thuan
land
- Capacity: 82.5 MW; Scale: 1,170
compensation
ha (approx)
& site clearance - Financing source: Owners equity
(30%), others (70%)
- Schedule: 2011-2015
-Finding
- Bid deadline: to be decided in 2013
co-investors &
- Bidder Selection Method:
equipment
Open Tender or Assigned
suppliers
Tender, depending on the
qualifications, ECA or financial
support offered by partners

G3FNBSLT
1. Overview: Pacific Group Corporation now has a registered capital of
VND 1,029 billion with 16 subsidiaries and affiliates.
2. Market Position: Pacific Group Corporation is considered a large-scaled
private corporation in Vietnam. The companys original core business was
civil construction and real estate; however, the company now has
expanded its business areas into industrial construction and mining

305

exploitation. Within its current business areas, power plant construction is


occupying the largest

share. Pacific Group Corporation is the project

owner of Thai Hoa & Thai Phong wind farms and has invested in other
power projects such as Vinh Tan 3 thermal power plant, Son My 1
thermal power plant, etc. The company has an

operating network

spreading all over the north, the center and the south of

Vietnam.

3. Strategy: Pacific Group Corporation aims to be a large corporation with a


diversified investment portfolio while maintaining its main business areas.
4. Partners: Pacific Group Corporation is a co-investors with Sojitz (Japan),
International Power
IP (UK) in Son My 1 thermal power plant project; with OneEnergy (a JV
between CLP Holdings HongKong & Mitsubishi Corporation) in Vinh Tan
3 thermal power plant.

*OGSBTUSVDUVSF%FWFMPQNFOU$POTUSVDUJPO$PSQPSBUJPO
Infrastructure

/BNF

$PVOUSZ
3FWFOVF
$MBTTJGZ
"EESFTT
1*$
5&&."*-

306

Development &
Construction Corporation
(LICOGI)
Vietnam
308,134 (US$ Thousands

&TU ZS



,#$

)BOPJ

FNQMPZFF
 
approx 2010)
PublicxPrivate
8FCTJUF
XXXMJDPHJDPNWO
G1
Building, Thanh Xuan Nam, Thanh Xuan Dist., Hanoi,
Vietnam

1PTJUJPO
'"9
%FQU

G-JTUPG.BKPS1SPKFDUT
/BNF

$BQJUBM  
"NPVOU

Estimated

Ban Chat

commissionin

Hydropow

g by the end

er Plant
Dakdring

of 2012
VND

Hydropow 1,900
er Plant

Construction

billion
- Capital

Cam Thuy
2 Hydro

US$

Power

million

Plant

4UBUVT

60

arrangement
& site
clearance

,FZ )JHIMJHIU
- LICOGI is the EPC contractor
- Location: Than Uyen, Lai Chau
- Capacity: 220 MW, estimated
output: 1,158 billion kwh
-

LICOGI is the EPC contractor


Location: Son Tay, Quang Ngai
Capacity: 125 MW
Schedule: 2006-2013

- LICOGI is the project owner


- Location: Cam Thuy, Thanh Hoa
- Scale: 650 ha, estimated output:
161 million kwh/year
- Schedule: 2012-2015

G3FNBSLT
1. Overview: LICOGI is a state-owned corporation with more than 30
subsidiaries and affiliates. The company has a registered capital of VND
370 billion (2010).
2. Market Position: LICOGI is active in many business areas including
contractors of civil & industrial constructions; consulting & engineering;
manufacture, import & export mechanical equipment, building materials;
investment in real estates, trading transportation services, etc.
3. Strategy: in LICOGIs orientation plan during 2007-2010, the company
aimed to maintain a relatively equivalent growth rate among its different
business areas. It is expected that the company still follow this strategy
in the next period.
4. Partners: LICOGI has partnership with numerous large local companies
namely VINACONEX, LILAMA, Truong Son Corporation, etc. The
company is also a reliable partner to many foreign firms such as
Keangnam, Doosan, Hyundai(Korea), Sumitomo, Nishimatsu (Japan), Hong
Leong Industry (Malaysia) etc.

307

$JWJM&OHJOFFSJOH$POTUSVDUJPO$PSQPSBUJPO/P
Civil Engineering

/BNF

Construction Corporation

&TU ZS

1964

,#$

Hanoi

FNQMPZFF

11,000

No.1 (CIENCO 1)

$PVOUSZ
3FWFOVF

Vietnam
301,435 (US$ Thousands
approx 2011)

$MBTTJGZ

PublicxPrivate

"EESFTT

CIENCO1 Building, No.623, La Thanh, Ba Dinh, Hanoi, Vietnam

1*$
5&&."*-

Mr. Can Hong Lai


84-913 203 439

8FCTJUF
1PTJUJPO

www.cienco1.com
General Director

'"9

84-4-3835 0098
cienco1@hn.vnn.vn

84-4-3772 1232

%FQU

G-JTUPG.BKPS1SPKFDUT
/BNF

$BQJUBM  
"NPVOU

4UBUVT

- Location: Quang Ngai

Export
Port at

US$

63

Dung Quat million

- Include one main bridge (850m), a


Finished

Trung Luong
Highway

terminals
US$
million

Dragon

US$

Bridge

million

308

service road,and three branch


bridges (220m/each) and 6

Oil Refinery
Sai Gon

,FZ   )JHIMJHIU

45

- Location: Ho Chi Minh city, Long


Finished

An, Tien Giang


- Scale: 61.8 km

35 Constructio
n

- Location: Da Nang city


- Total length: 666.54m
- Scheduled operation (estimated): 2013

G3FNBSLT
1. Overview: CIENCO 1 belongs to Ministry of Transport; the company has
more than 40 member units with registered capital of VND 220 billion.
2. Market Position: CIENCO 1 is a leading company specialized in
transportation

infrastructure

construction.

The

company

has

been

responsible for many national prioritized works such as Noi Bai airport,
Phu Bai airport, Sai Gon port, Nghi Son port, Vinh Tuy bridge, etc.
Besides construction, the company is also active in engineering &
consulting and manufacturing construction materials.
3. Strategy: CIENCO 1 aims to diversify its business to increase profits
along with enhancing quality of its core business to maintain its leading
position in transportation infrastructure construction.

#BDI%BOH$POTUSVDUJPO$PSQPSBUJPO
/BNF
$PVOUSZ
3FWFOVF

Bach Dang Construction


Corporation (BDCC)
Vietnam
182,919 (US$

Thousands

2010 approx)

&TU ZS

1958

,#$

Hanoi

FNQMPZFF

6,381

8FCTJUF

www.bachdangco.com

$MBTTJGZ

PublicxPrivate

"EESFTT

No.286, Tran Nguyen Han, Le Chan District, Hai Phong city,


Vietnam

1*$
5&&."*-

1PTJUJPO

Manager

84-913 240 661


84-0313-782 513

'"9

84-0313 856 451

kt@bachdangco.com

%FQU

Department of Market
Economy

Mr. Pham Quang Tuong

309

G-JTUPG.BKPS1SPKFDUT
/BNF

$BQJUBM
"NPVOU

4UBUVT

,FZ )JHIMJHIU

Pha Lai 2
Thermal Power
Plant

VND 9,600
billion

Finished

- Project Owner: EVN


& Hyundai
- Location: Chi Linh,
Hai Duong
- Capacity: 600 MW

Uong Bi
Thermal Power
Plant extension

US$ 220
million

Finished

- Project Owner: EVN


& LILAMA
- Location: Quang Ninh
- Capacity: 330 MW

Vung Ang I
Thermal Power
Plant

US$ 1,250
million

Construction

- BDCC is in charge
of coal supply
system, oil supply
system, fuel storage,
substations, etc.
- Project Owner: PVN
- Location: Ky Anh,
Ha Tinh
- Capacity: 1,200 MW
(2 units)
- Scheduled Operation:
2013

310

 

#SJUJTI1FUSPMFVN
/BNF
$PVOUSZ
3FWFOVF
$MBTTJGZ
"EESFTT
1*$
5&&."*-

BP
Russia UK (JV)

&TU ZS
,#$
 FNQMPZFF

1989
Hanoi
700
www.bp.com
Public Privatex
8FCTJUF
www.tnk-bp.ru
BP Exploration Operating Co. Ltd: Villa A15, An Phu Compound,
District 2, HoChiMinh City, Vietnam
1PTJUJPO
+84-8-3899 9375
'"9
+84-8-3899 9391
%FQU

-JTU PG .BKPS 1SPKFDUT QBTU  QSFTFOU  GVUVSF

/BNF
$BQJUBM "NPVOU
4UBUVT

Block 06.1
N.A
Development & Production Phase
,FZ )JHIMJHIUT

- PSC between BP (TNK-BP), PetroVietnam(PVN) & ONGC lasts for 35 years and
will expire in 2023. Theres a potential to extend it for additional five years
upon mutual agreements by contracting parties.
- The block locates in the Nam Con Son basin, 370km off the southern coast of
Vietnam.
- The block includes two gas condensate fields: Lan Tay (in production phase) &
Lan Do (in development phase) containing 2 tcf of natural gas. The fields
together are capable of producing 106 bcf per year for approx 15 years.
- In September, 2012, TNK-BP announced that they would produce the first fuel
from the offshore Lan Do natural gas field this year. The field was expected to
bring two billion cubic meters of gas annually.

/BNF
$BQJUBM "NPVOU
4UBUVT

Nam Con Son Pipeline & Terminal (NCSP)


N.A
Finished

311

,FZ )JHIMJHIUT
- A BCC for 35 years, expiring in 2036 with possibility of extension upon
partners & local government between BP (TNK-BP), PetroVietnam (PVN) &
ConocoPhillips. PetroVietnam (PVN) is the main operator
- NCSP system includes 370km & 26 inches in diameter offshore two phase and
29km & 30 inches in diameter onshore single-phase pipelines; Dinh Co Gas
Processing Terminal in Ba Ria-Vung Tau province and a metering station at
Phu My Industrial Park
- Estimated capacity is around 650 mmscfd which annually brings to the
company approx US$ 50-60 mln

/BNF
$BQJUBM "NPVOU
4UBUVT

Phu My 3 Power Plant


US$ 412 million
Finished
,FZ )JHIMJHIUT

- A BOT of 20 years, expiring in 2024 was signed between BP (TNK-BP),


Sembcorp & Kyushu/Sojitz
- The plants capacity is 743 MW, locating 70 km from HoChiMinh city in Ba
Ria-Vung Tau province
- The power plant purchases all of its gas from Block 06.1 to generate electricity.
The power plant is a very important part of Vietnams power generation
system as it accounts for approx 5% of the countrys total power output

3FNBSLT
1. Overview: BP is among the first international oil

companies entering

Vietnam and puts its emphasis on gas rather than oil. In

July, 2010, BP

announced its divestment plans for its assets in Vietnam after


of oil leak in US Gulf of Mexico Macondo. In October, 2010, the

the incident
company

announced that it had agreed to sell assets to its Russian JV TNK-BP

for

US$1.8 bn.
2. Market Position: BP is active in gas E&P, the
lubricants and LPG, crude supplies for

production and distribution of

refining industry. The company also

involves in power industry. BP currently

has a 3% share of Vietnams LPG

market and is the countrys largest gas

supplier. Before divestment, the

312

company also had 32.67% stake in the Nam Con

Son Pipeline & Terminal

and 33.3% stake in Phu My 3 power plant (these

stakes were later

transferred to TNK-BP)
3. Strength & Weakness: the company is a key gas supplier with

active role in

both upstream and downstream segment, the company is even an ownership


of gas distribution infrastructure. However, the companys weakness is its
great absence in oil sector with no upstream oil exposure and no retail fuels
interests. The companys recent asset divestment may also hint a diminishing
exposure and role in Vietnam market.
4. Strategy:

BP aims to develop its gas-to-power assets while supporting

downstream segment. The company decided to reduce its Vietnamese


upstream exposure significantly

in 2009 by withdrawing two offshore blocks

(Block 5-2, in which it owns 55.9% stake & Block 5-3, in which it holds 75%
stake). It is expected that the maritime conflicts between Vietnam and China
may partly lead to this decision. Such divestment also put an end to an
investment of US$2bn pipeline linking Hai Thach & Moc Tinh fields (which
locate in the blocks) to Nam Con Son gas project.
5. Partners: BP (TNK-BP) involves in various

segments, thus, its partners also

varied accordingly. The company has partnership with PetroVietnam (PVN) &
ONGC (an Indias state-owned Oil & Natural Gas Corp) in gas E&P;
ConocoPhillips (USA) & PetroVietnam (PVN) in Nam Con Son pipeline and
Sembcorp (Singapore) & Kyushu/Sojitz(Japan) in Phu My 3 power plant.

1FUSPOBT$BSJHBMJ
/BNF
$PVOUSZ
3FWFOVF
$MBTTJGZ
"EESFTT
1*$
5&&."*-

Petronas Carigali Vietnam Ltd


(PCVL)
Malaysia

&TU ZS

1991

,#$
Hanoi
 FNQMPZFF ~250
PublicxPrivate
8FCTJUF
www.petronas.com.vn
Petronas Tower, Royal Center, No. 235 Nguyen Van Cu, District 1,
Ho Chi Minh city, Vietnam
+84-8-3830 9966

1PTJUJPO
'"9
%FQU

+84-8-3830 9955

313

-JTU PG .BKPS 1SPKFDUT QBTU  QSFTFOU  GVUVSF

/BNF
$BQJUBM "NPVOU
4UBUVT

Block 01 & 02
N.A
Production phase
,FZ )JHIMJHIUT
PSC was signed in 1991 with PetroVietnam (PVN)
The blocks locate entirely in the northeast portion of Cuu Long Basin, offshore
Vung Tau
Water depth varies from 20-70 meters
Current producing fields are Ruby (October,1998), Pearl & Topaz (November,
2010)
Suggested output: 1,700b/d (Topaz) & 2,500b/d (Pearl)
/BNF
$BQJUBM "NPVOU

Blocks 102 & 106


US$ 85 million (exploration activities)
Development phase
4UBUVT
(in progress of Field Development Plant FDP
preparation)
,FZ )JHIMJHIUT
The PSC was signed in 2000, PCVL farmed and took over the operatorship
from ATIP since Feb, 2003
The blocks locate in the northwest part of Song Hong Basin, offshore north of
Vietnam
Water depth ranges from 25-30 meters
Suggested output: 6,300b/d of oil & 0.22Mcm/d of gas

/BNF
$BQJUBM "NPVOU
4UBUVT

Blocks 10 & 11.1


N.A
Development phase
(in progress of Field Development Plant FDP
preparation)
,FZ )JHIMJHIUT

- PSC was signed in 2002 with Con Son JOC (the main operator)
- The blocks locate in Nam Con Basin on the south eastern offshore Vietnam
- Water depth ranges from 50 to over 1000 meters

314

/BNF
$BQJUBM "NPVOU
4UBUVT

Blocks 01 & 02/97


N.A
Development phase
,FZ )JHIMJHIUT
- PSC signed with Lam Son JOC, the main operator, entered development since
2009
- The blocks locate in Cuu Long basin and are the integration from three
relinquishment areas of Blocks 01&02 PSC
/BNF
$BQJUBM "NPVOU
4UBUVT

Blocks 103 & 107


US$ 58 million (exploration activities estimated)
Exploration phase
,FZ )JHIMJHIUT
- PSC signed with PetroVietnam (PVN) became effective in 2007
- The blocks locate adjacent to Blocks 102 & 106 in Song Hong Basin
- Water depth ranges from 30-50 meters
- Proven reserve: 55bcm of gas reserves & 45mn bbl of condensate
/BNF
$BQJUBM "NPVOU
4UBUVT

Block 46/02

/BNF
$BQJUBM "NPVOU
4UBUVT

Block 46 Cai Nuoc

Production phase
,FZ )JHIMJHIUT
- PSC signed with Truong Son JOC in December, 2002
- Production phase started since 2008 (Son Doc field; other two fields were
expected to produce by 2011)
- Proven reserves of Son Doc field: 3 mn bbl

Production phase
,FZ )JHIMJHIUT
- Talisman is the main operator
- The block locates in the overlapping zone btw Malaysia & Vietnam water

3FNBSLT
1. Overview: PCVL is a subsidiary of Petronas
operating its exploration & production
was awarded a Production Sharing

Malaysia, the company started

(E&P) activities in Vietnam since it

Contract (PSC) for two Blocks 01& 02 in

Cuu Long Basin on 9th,September,1991.

315

2. Current market position: PCVL is currently active in both Vietnams upstream,


downstream and chemical sectors. The company is exploring and developing
oil & gas at 13 blocks in Vietnam, in which PVLC operates four blocks
(01,02,102,106) and has interest in nine blocks (10, 11.1, 103 & 107, 01/97,
02/97, 46, 46/02, 122,). Also, PCVL operates two LPG bottling plants in
Vietnam; one in Hai Phong (which it owns through its 71.2% interest in
Thang Long LPG company) and the other in Dong Nai (through its
wholly-owned subsidiary Petronas Vietnam Co. Ltd). In addition, the firm has
a 93.1% interest in Phu My Plastics and Chemicals Co. Ltd, a JV with Vung
Tau Shipyard Co. , which operates a 100,000 tpa PVC plant in Vung Tau.
3. Strength & Weakness: the company is judged to have substantial downstream
fuels involvement and a key player in petrochemicals segment. However, it
has limited direct role in gas development.
4. Strategy: the company has involved in numerous exploration activities for years
in Vietnam and some of its blocks has entered development and production
phase. It is expected that the company is
focusing on the development of
production capacity.
5. Partners: PCVL mainly has PSC with local
companies notably PetroVietnam
(PVN). The two companies have cooperated with
each other in developing
numerous blocks namely Blocks 01, 02, 102, 106, 103 & 107. The companies
also have collaboration in tackling LPG retail market while jointly operating
Thang Long LPG JV. Aside from local partners, PCVL has other foreign
partners such as Singapore Petroleum, Talisman (Canada) and Chevron (USA)

;BSVCF[IOFGU
/BNF
$PVOUSZ
3FWFOVF
$MBTTJGZ
"EESFTT
1*$
5&&."*-

316

Zarubezhneft
&TU ZS
1981
Russia
,#$
Hanoi
3 million
6,500
 FNQMPZFF
(U$ Thousands 2008e)
(Vietsovpetro JV)
PublicxPrivate
8FCTJUF
www.zarubehneft.ru
Room 302, Daeha Business Center, Daewoo Hotel, No. 360 Kim Ma
Str., Ba Dinh Dist., Hanoi, Vietnam
1PTJUJPO
+84-4-3771 9990
'"9
+84-4-3771 9993
nestrohn@viettel.vn
%FQU

-JTU PG .BKPS 1SPKFDUT QBTU  QSFTFOU  GVUVSF

/BNF
$BQJUBM "NPVOU
4UBUVT

Block 09.1
N.A
Production phase
,FZ )JHIMJHIUT
- Zarubezhneft develops this block through Vietsovpetro JV
- The block contains large commercial fields namely Bach Ho (White Tiger) and
Rong (Dragon)
- Bach Ho (White Tiger) field started commercial oil production in 1986
- Original recoverable reserves in Bach Ho (White Tiger) field were 191.1 million
tons and in Rong (Dragon) field were 20 million tons
/BNF
$BQJUBM "NPVOU
4UBUVT

Blocks 09.3
N.A
Production phase
,FZ )JHIMJHIUT
- PSC was signed in 2002 between three sides: Zarubezhneft (50%), PVEP
a subsidiary of PetroVietnam (PVN) (35%) and Idemitsu (15%)
- The block locates on South Vietnam shelf, 150km from HoChiMinh city &
120km from Vung Tau Port
- Doi Moi (Sea Turtle) field in Block 09.3 & Nam Rong (South Dragon) field in
Block 09.1 were decided to unitize for joint development by both Vietsovpetro
JV & VRJ Petroleum with cumulative oil reserves of 56 million tons. Expected
commerical production from Nam Rong-Doi Moi (South Dragon-SeaTurtle) oil
field is 4,500b/d

/BNF
$BQJUBM "NPVOU
4UBUVT

Blocks 12.11
N.A
Exploration phase
(in progress of Field Development Plant FDP preparation)
,FZ )JHIMJHIUT

- In the middle of 2012, PetroVietnam (PVN) announced that Zarubehneft won


the tender for developing the gas block 12.11 on the basis of a PSA (the
company submitted application bid in 2011)

317

- The company is planning to drill 3 wells and conduct 3D seismic survey on


the total area of 1000 sq.km
- The block locates in Nam Con Son basin, 200km south to Bach Ho (White
Tiger) & Rong (Dragon) fields

3FNBSLT
1. Overview: Zarubezhneft is a Russia state-owned company, the company mainly
operates through its JV with PetroVietnam (PVN) called Vietsovpetro. The JV was
established under Inter-Government Agreement in 1981 with each party had 50%
stake. The agreement was re-signed in 2010; according to this agreement
PetroVietnam (PVN)s share was 51% while Zarubezhneft shared 49% and the JVs
term would be extended to another 20 years until 2030. Zarubezhneft is also a
major shareholder in VRJ Petroleum (Vietnam-Russia-Japan Petroleum) with a 50%
stake along with PetroVietnam (PVN) (35%) and Idemitsu Kosan (15%).
2. Market Position: JV Vietsovpetro is a major domestic oil producer which
accounts for more than 60% of Vietnams total output. The

company still

remains the key to current oil supply and there have been no signs of any
change in commitment between two countries: Vietnam & Russia. Vietsovpetro
JV operates seven fields, among its main producing assets are Bach Ho (White
Tiger), Mo Rong (Dragon) and Gau Lon (Big Bear) fields. Since the output in
old fields, notably Bach Ho (White Tiger) has declined steadily and the
company has shown little sign of involving in gas sector or refinery projects, it
is expected that, in the future, the role of Zarubezhneft in Vietnam will
possibly diminish.
3. Strength & Weakness: Zarubezhneft has subtantial exploration portfolio.
However, the company has limited developing projects, limited gas involvement
and no role in proposed refinery projects
4. Strategy: Zarubezhneft is trying to maintain its preferred partner status with
PetroVietnam (PVN) by offering equity in Russian upstream assets. Rusvietpetro
JV was established (Zarubezhneft: 51%; PetroVietnam (PVN): 49%) to develop
four blocks in the Nenets region. The blocks consist of 13 fields and have
estimated reserves of about 572 mn bbl. In July, 2010, it was reported that the
company was considering acquiring Blocks 05.2 & 05.3 in Nam Con Son Basin
off southern Vietnam either via Vietsovpetro or as a minority partner.

318

1SFNJFS0JM7JFUOBN
/BNF
$PVOUSZ
3FWFOVF
$MBTTJGZ
"EESFTT
1*$
5&&."*-

Premier Oil Vietnam

&TU ZS

2004

United Kingdom

,#$
Hanoi
 FNQMPZFF
Public Privatex
8FCTJUF
www.premier-oil.com
18thFloor,KumhoAsianaPlazaSaigon,No.39,LeDuanStr.,District1,HoChiMin
hCity,Vietnam
Ms. Nguyen Thi Hong Hanh

1PTJUJPO

+84-8-3910 5788
nhanh@premier-oil.com

'"9
%FQU

Executive

Secretary

to Country Manager
+84-8-3910 5799

-JTU PG .BKPS 1SPKFDUT QBTU  QSFTFOU  GVUVSF

/BNF
$BQJUBM "NPVOU
4UBUVT

Block 02W
N.A
Production & Development phase
,FZ )JHIMJHIUT
- The block is operated by Premier Oil, Santos and PVEP
- The block is said to have similar geology to Indonesias West Natuna Sea area
where Premier Oil is an operator of part of the West Natuna gas project
delivering gas to Singapore
- Dua & Chim Sao are two discoveries in the block. Chim Sao has reached
production phase with 25,000-30,000 bopd and gas production of 25 mmcfd
while first production from Dua is anticipated to be in 2014.
/BNF
$BQJUBM "NPVOU
4UBUVT

Blocks 07-03
Appraisal phase
,FZ )JHIMJHIUT

- The block is operated by Premier Oil & Vietnam American Exploration


Company (VAMEX) since 2006
- A well on Ca Rong Do encountered oil & gas in May, 2009 while a well on
Ca Rong Vang did not encounter hydrocarbon in Dec, 2009
- Premier Oil has been invested more in Ca Rong Do field since early 2012

319

/BNF
$BQJUBM "NPVOU
4UBUVT

Blocks 104-105/9
N.A
Exploration phase
,FZ )JHIMJHIUT

- The block is operated by Premier Oil and MOEC since 2008


- The block has 9,087 km2 with water depth of 20-60m
/BNF
$BQJUBM "NPVOU
4UBUVT

Blocks 121
N.A
Exploration phase
,FZ )JHIMJHIUT

- The block is operated by Premier Oil and Origin Energy since July, 2012
- Location: in the northern part of the frontier Phu Khanh basin

3FNBSLT
1. Overview: Premier Oil Vietnam is a wholly owned subsidiary of Premier Oil
plc. The company gained its first investment license in Vietnam in September,
2004 as an operator of PSC 12W block in the Nam Con Son basin.
2. Market Position: Premier Oil is considered one of the most active explorers in
Vietnam. The company currently holds equity in four

blocks including Block

12W (53.1%), Block 07-03 (30%), Block 104-105/9 (50%) and Block 121 (40%).
3. Strategy: Premier Oil will continue to actively assess new production and
exploration opportunities in Vietnam. Besides its particular focus on the core
area of the Nam Con Son basin, the company has expanded its geological
operating areas to Phu Khanh basin with an agreement to farm into Block 121
in July, 2012.
4. Partners: PetroVietnam Exploration & Production Corporation (PVEP), Vietnam
American Exploration Company (VAMEX). Santos, Origin Energy, Pan Pacific
Petroleum (Australia), Delek Energy (Israel), Pearl Energy (Singapore), Mitsui
Oil Exploration Company (MOECO Japan), etc.

320

$IFWSPO7JFUOBN-UE
/BNF
$PVOUSZ
3FWFOVF
$MBTTJGZ
"EESFTT
1*$
5&&."*-

Chevron Vietnam Ltd


USA

&TU ZS
1996
,#$
Hanoi
 FNQMPZFF
Public Privatex
8FCTJUF
www.chevron.com
Suite B-128, No. 27 Ly Thai To, Hanoi, Vietnam
Ms. Le Thi My Hanh
1PTJUJPO
Manager
84-913 526 585
'"9
84-4-3935 1701
Policy Government &
myhanh.le@chevron.com
%FQU
Public Affairs

-JTU PG .BKPS 1SPKFDUT QBTU  QSFTFOU  GVUVSF

/BNF
$BQJUBM "NPVOU
4UBUVT

Block 8/95 & Block B


N.A
Exploration phase
,FZ )JHIMJHIUT
- Chevron is the operator in partnership with PTTEP
- Area: 11,780 km2
- Location: in the northern part of the Malay Basin
/BNF
$BQJUBM "NPVOU
4UBUVT

Blocks 52/97

Exploration phase
,FZ )JHIMJHIUT
- Chevron is the operator in partnership with PTTEP
- Area: 2,060 km2
- Location: in the northern part of the Malay Basin
/BNF

$BQJUBM "NPVOU

4UBUVT

Blocks B - Gas Project


- Total: US$ 7.3 billion
+ Offshore development & pipeline installation:
US$ 4.3 billion
+ Four power plants construction: US$ 3 billion
Completed front-end engineering & design

321

,FZ )JHIMJHIUT
- Designed to supply the natural gas from Chevrons two PSCs in Malay Basin
to existing & proposed power plants in Southern Vietnam
- Financing source: Chevron, MOECO, PTTEP, PetroVietnam (PVN), Vietnam
Electricity Corporation (EVN), others
- Include three components:
+ Offshore gas supply
+ Construction of 400 km pipeline
+ Construction of four power plants
- Targeted daily production : 490 million cubic feet of gas & 4,000 barrels of
condensate

3FNBSLT
1. Overview: Chevron has been entered Vietnam since

1996 and expanded

its assets portfolio through the acquisition of Unocal in 2005.


2. Market Position: Chevron puts its main focus on gas and is both active in
upstream, midstream, downstream and chemical sectors.

Chevron is an

operator of two PSCs in Vietnam; specifically, the company has 42.4% interest
in the unitized Blocks B & 48/95 and a 43.4% interest in Block 52/97. Chevron
used to have a 50% interest in Block 122 in Phu Khanh Basin, however, after
an evaluation, the company decided to exit the block. The company are
working with PetroVietnam (PVN), Vietnam Electricity Corporation (EVN), the
government of Vietnam and others to develop an offshore gas project and
transportation pipeline known as Block B Gas Project. Besides, Chevron also
has two subsidiaries and affiliates in Vietnam operating in lubricants and
asphalt businesses. Chevron Lubricants Vietnam Ltd manufactures and sells
motor oils & marine, industrial and specialty products via 55 distributors to
more than 12,000 retail outlets nationwide. Chevrons lubricating oil blending
plant is in Hai Phong, Vietnam. The company owns 49% of a JV Chevron
Bitumen Vietnam Ltd importing, storing and distributing asphalt. Chevrons
northern terminal (in Hai Phong) has a storage capacity of 5,000 metric tons
while its southern terminal (in Ho Chi Minh city) has a storage capacity of
6,000 metric tons. There has been information around July, 2012 that Puma
Energy, a branch of Trafigura corporation (Geneva) has disclosed its intention
to acquire Chevron Bitumen Vietnam, however, the specific information has not

322

been available yet.


3. Strategy: Chevron will still maintain its focus on the companys active sectors.
If the acquisition is processed successfully, it seems that Chevron may direct
more concentration to gas exploration and production.
4. Partners: Chevron has partnership with large state-owned companies such as
PetroVietnam (PVN), Vietnam Electricity Corporation (EVN). Other foreign
partners can be named are Mitsui Oil Exploration Co., Ltd (MOECO - Japan),
Petronas Carigali (Malaysia), PTT Exploitation & Production (PTTEP
Thailand), GS Caltex (Korea), etc.

"MTUPN7JFUOBN-UE
/BNF
$PVOUSZ
3FWFOVF
$MBTTJGZ
"EESFTT
1*$
5&&."*-

Alstom Vietnam Ltd


&TU ZS
2004
France
,#$
Hanoi
(US$ Thousands)
 FNQMPZFF 75
Public Privatex
8FCTJUF
www.alstom.com
Capital Tower, Suite 20.01, No.109, Tran Hung Dao Str., Hanoi,
Vietnam
+84-4-3824 3053

1PTJUJPO
'"9
%FQU

+84-4-3824 7450

-JTU PG .BKPS 1SPKFDUT QBTU  QSFTFOU  GVUVSF

/BNF
$BQJUBM "NPVOU
4UBUVT

Son La Hydropower Plant


VND 42,476.9 billion
Finished
,FZ )JHIMJHIUT

- Alstoms works:
+ Design, Engineering, Manufacturing & delivery of six 400 MW Francis
turbines & generators, BOP (balance of plant)
+ Training & supervision of installation, testing & commissioning
- Son La Hydropower Plant is the largest hydropower plant in the
South-East Aisa
- Location: Muong La, Son La
- Capacity: 2,400 MW (6 units)

323

/BNF
$BQJUBM "NPVOU
Status

Phu My 4 Combined Cycle Power Plant


238 million
Finished
Key Highlights
- Alstoms works: in consortium with Marubeni Corp (Japan), and LILAMA
(Vietnam); Alstom as awarded a turnkey contract to build the plant (Alstom
was the consortium leader share: 165 million)
+ Alstom supplied two GT13E2 gas turbines including generators; the Heat
Recovery Steam Generators (HRSG) & the steam turbine generator
- Location: Ba Ria Vung Tau
- Capacity: 450 MW
/BNF
$BQJUBM "NPVOU
4UBUVT

Railway Signaling System Hanoi Vinh (Phase I)

Finished (Schedule: 2002-2006)


,FZ )JHIMJHIUT
- Alstoms works: Design, supply & installation, commissioning & warranty of
modern signaling & telecommunication system
+ Leader of consortium with Alcatel
- Scale: 320 km + 3 stations
/BNF
$BQJUBM "NPVOU
4UBUVT

Railway Signaling Systems Hanoi Vinh (Phase II)

Contract awarded in Dec, 2008


,FZ )JHIMJHIUT
- Alstoms works: EPC contractor for modernization of telecommunication &
signaling system on Hanoi Vinh section of Thong Nhat line

3FNBSLT
1. Overview: Alstom is large French group specialized in power generation
infrastructure, power transmission and rail transport. The group is present in
100 countries and has 93,500 employees

worldwide. Alstom Vietnam was

established since the early 90s with office in both Hanoi & Ho Chi Minh city.
2. Market Position: Alstom Vietnam is also active in all three

business areas of

its mother company and has made strategic partnerships with major local
players to get involved in numerous large projects in Vietnam. Specifically
Power: Alstom has been a key player in Vietnam power market for 20 years. The

324

company has participated in around 20 projects and many of them are


national priorities. Several representatives are Phu My power complex (Phu
My 2.1, Phu My 2.1 add-on & Phu My 4), Vinh Tan 2 thermal power plant,
Duyen Hai 1 thermal power plant, Nhon Trach 1 combined cycle power plant,
Son La hydropower plant, Hoi Quang hydropower plant, etc.
Rail Transport: Alstom Transport has been present in Vietnam since 1998 when it
was a supplier of machinery, equipment & technical assistance for Vietnam
Railways (VNR)s workshops. In 2002, the

company was chosen as a

supplier of the first modern mainline signaling system in Vietnam for 3


stations and in 2009, VNR chose Alstom to modernize full 320 km with 36
stations of 1,700 km line of Hanoi Ho Chi Minh city (Thong Nhat line).
Grid: Alstom Grid has been the main contractor of Vietnam Electricity Group
(EVN) since 1995. The company has actively contributed to the reinforcement
of the existing 500kV Transmission network, supplying all the 500 kV
substations along the second new transmission line linking the North to the
South of Vietnam. Several projects can be named are: 500kV Pleiku-Da Nang
substation (2003), 500kV Phu My substation (2009), Hiep Hoa substation (2009),
220kV Nhon Trach 2 substation + eBOP (2009), 220kV Nghi Son 1 + eBOP
(2010), etc.

&MFDUSJDJUZ%F'SBODF
/BNF
$PVOUSZ
3FWFOVF
$MBTTJGZ
"EESFTT
1*$
5&&."*-

Electricity De France (EDF)


France
65 billion Euros

&TU ZS
,#$

Hanoi

 FNQMPZFF 6
(EDF Groups revenue in 2010)
Public Privatex
8FCTJUF
www.edf.com
17th Floor, Hanoi Central Office Building, Suite 1705, No.44B, Ly
Thuong Kiet Str., Hanoi
Philippe Le-Canut
+84-4-3934 5591

1PTJUJPO
'"9
%FQU

Representative

Office

Manager
+84-4 3934 5593

325

-JTU PG .BKPS 1SPKFDUT QBTU  QSFTFOU  GVUVSF

/BNF
$BQJUBM "NPVOU
4UBUVT

Phu My 2.2 Power Plant


US$ 480 million
Finished
,FZ )JHIMJHIUT

- Phu My 2.2 is the first IPP project launched in Vietnam


- Location: Ba Ria Vung Tau; in Phu My power complex
- Capacity: 715MW; accounting for 6% of power generation in Vietnam
- Financing source: World Bank, Asia Development Bank (ADB), Japan Bank for
International Cooperation (JBIC), Proparco (a branch of Frenche Development
Agency), Vietnams government, other sources

3FNBSLT
1. Overview: EDF Group is an energy market leader in Europe operating in all
branches of the industry including generation,

transmission, distribution &

trading energy. In Vietnam, since 1995, EDF has cooperated with Vietnamese
Government and Ministry of Industry (currently Ministry of Industry & Trade)
to carry out energy development projects. The group has stated to be
committed to investing in Vietnams energy sector in the long run.
2. Market Position: EDF has a longstanding presence in Vietnam as a technical
advisor in 1990s. The most established project of EDF in Vietnam is Phu My
2.2 in which the group marked its new position in Vietnams power market as
an investor. The plant is currently owned by Mekong Energy Ltd (MECO), an
affiliated company of EDF Group. The group holds 56% stake of MECO and
the other shareholders are Sumitomo Corporation (28%) and

326

TEPCO (15%)

7FPMJB8BUFS4PMVUJPO5FDIOPMPHJFT
/BNF
$PVOUSZ
3FWFOVF
$MBTTJGZ
"EESFTT
1*$
5&&."*-

Veolia

Water

Technologies
French
34.8 billion

Solution

&

&TU ZS
,#$

Euros

(mother

company 2010)

1975
Hanoi

 FNQMPZFF

Public Privatex

8FCTJUF

www.veoliawaterst.

com.vn
E-town Building, 9th Floor, Unit 9.2B, No.364, Cong Hoa Str., Tan
Binh District, Ho Chi Minh city, Vietnam
Ms. Nguyen Thi Xuan Hanh
1PTJUJPO
+84-8-3812 7757
'"9
Txh.nguyen@veoliawater.com
Dept.

Solutions Manager
+84-8-3812 7759

-JTU PG .BKPS 1SPKFDUT QBTU  QSFTFOU  GVUVSF

/BNF
Ha Giang Water Treatment Plant
Yen Bai Water Treatment Plant
Thai Nguyen Wastewater Treatment Plant
Hue Water Treatment Plant
Kontum Water Treatment Plant
Pleiku Water Treatment Plant
Nha Trang Water Treatment Plant
Da Lat Water Treatment Plant
Phan Thiet Water Treatment Plant
Tan An Water Treatment Plant
Long Xuyen Water Treatment Plant
Vung Tau Wastewater Treatment Plant

$BQBDJUZ
7,600 m3/day
11,500 m3/day
8,000 m3/day
27,500 m3/day
12,000 m3/day
20,000 m3/day
29,000 m3/day
25,000 m3/day
10,000 m3/day
15,000 m3/day
34,000 m3/day
22,000 m3/day

3FNBSLT
1. Overview: Veolia Water Solutions & Technologies is the worlds leader in
engineering, design, project management and execution of construction projects
for turnkey facilities and water & wastewater treatment plants. The company
entered Vietnam via a subsidiary called Kruger; its first project was Suoi Vang
water plant with capacity of 25,000 m3/day in Da Lat city.

327

2. Market Postion: Veolia Water Solution & Technology has been building more
than 29 water and wastewater treatment plants

spreading all over three main

regions of Vietnam and is expected to get more active in the future.

4PMJU[
/BNF
$PVOUSZ

3FWFOVF

Sojitz Corporation
Japan
54,807,769 (US$ Thousands)
Sojitz Groups net sales in
financial year ended March,

&TU ZS
,#$

 FNQMPZFF

1986
Hanoi
19,626

(Sojitz

Group

July, 2010)

31, 2012
$MBTTJGZ
"EESFTT
1*$
5&&."*-

Public Privatex

8FCTJUF

www.sojitz.com

Unit 403, 4th Floor, Sunred River Building, No.23, Phan Chu Trinh,
Hanoi, Vietnam
Ms. Trinh Thi Thu Huong
+84-903 436 200
+84-4-3933 3087
trinh.huong@sea.sojitz.com

1PTJUJPO
'"9

Solutions Manager
+84-4-3933 3085

%FQU

-JTU PG .BKPS 1SPKFDUT QBTU  QSFTFOU  GVUVSF

/BNF
$BQJUBM "NPVOU
4UBUVT

Phu My 3 Power Plant


US$ 412 million
Finished
,FZ )JHIMJHIUT
- A BOT of 20 years, expiring in 2024 was signed between BP (TNK-BP),
Sembcorp & Kyushu/Sojitz
- Location: Ba Ria Vung Tau
- Capacity: 743 MW
- The power plant is a very important part of Vietnams power generation
system as it accounts for approx 5% of the countrys total power output

328

/BNF
$BQJUBM "NPVOU
4UBUVT

Vung Ang 1 Thermal Power Plant


US$ 1,250 million
Construction
,FZ )JHIMJHIUT

- Sojitz Corporation & Toshiba Corporation is the supplier of two 600 MW steam
turbine generators worth approximately 11 billion
- Project Owner: PVN; EPC Contractor: LILAMA
- Location: Ky Anh, Ha Tinh
- Capacity: 1,200 MW (2 units)
- Scheduled Operation: 2013
/BNF
$BQJUBM "NPVOU
4UBUVT

Thai Binh 2 Thermal Power Plant


US$ 1.7 billion (approx)
- Financing sources detailed finalization
- Sub-contractors selection
,FZ )JHIMJHIUT

- EPS contractor (responsible for design, procurement & construction schedule


control services): Sojitz & Daelim Industrial
- Location: Thai Thuy, Thai Binh
- Capacity: 1,200 MW (2 units); Estimated output: 7.2 billion Kwh/year
- Financing source: PV, ECA and commercial loans
- Schedule:
COD Unit 1: Sep, 2015
COD Unit 2: March, 2016
- NPV: US$ 301.8 million; IRR: 12%

3FNBSLT
Sojitz Group was formed through a merger of Nichimen Corporation and Nissho
Iwai Corporation in 2003. The corporation is active in five overseas geographic
segments including The Americas; Europe. Russia & NIS; China; Asia & Oceania
and Middle East & Africa). Sojitz currently has nearly 100 of both domestic and
overseas branches & offices and more than 500 domestic and overseas subsidiaries
& affiliates. Sojitzs business areas is divided into 4 division: Machinery; Energy &
Metal; Chemical & Functional Materials and Consumer Lifestyle Business. As of
March, 2010, the corporation has a capital of 160,339 million.

329

In Vietnam, Sojitz which was then Nissho Iwai, was the first foreign company to
get a Representative License in 1986. Until now, in Vietnam, Sojitz has already
had over 30 joint ventures conducted in a wide range of business areas namely
grain & feed stock; fertilizer; woodchip; industrial plants; LPG & chemical tank
operation, telecommunication, construction, BOT power project, etc.
In 1989, Sojitz began exporting crude oil from Bach Ho oil field to Japan which
marked the very first oil exporting business in Vietnam. Sojitz also has
participated in several notable projects such as Phu My 3 power plant, Vung Ang
1 power plant and recently Thai Binh 2 power plant. Sojitz has successfully
invested in Long Binh Techno Park (LOTECO industrial park) in Dong Nai and
has recently invested in Long Duc industrial park together with Daiwa House
Industry, Kobelco Eco-Solution and a local company Dong Nai Import Export
Processing Agricultural Products & Foods Company (DONAFOODS). Sojitz will
hold the major stake of 57.3%; the plant is near LOTECO industrial park with a
total area of 270 ha and infrastructure is

scheduled to be completed in the

summer of 2013.

.BSVCFOJ
/BNF
$PVOUSZ

3FWFOVF

$MBTTJGZ
"EESFTT
1*$
5&&."*-

330

Marubeni Corporation
Japan
51,484,000 (US$ Thousands)
- Marubeni Corporations
total revenue of financial

&TU ZS
,#$

1991
Hanoi

 FNQMPZFF

> 6,000

year ended on March, 2012


Public Privatex
8FCTJUF
www.marubeni.com
10th Floor, Sun City, No. 13, Hai Ba Trung Str., Hoan Kiem District,
Hanoi, Vietnam
Ms. Tran Ngoc Dung
+84-903 402 835
+84-4-3826 5333/5
hanpwr@han.marubeni.co.jp

1PTJUJPO
'"9
%FQU

Directors Assistant
+84-4-3826 5336
+84-4-3824 0305

-JTU PG .BKPS 1SPKFDUT QBTU  QSFTFOU  GVUVSF

/BNF
$BQJUBM "NPVOU
4UBUVT

Phu My Power Complex


238 million
Finished
,FZ )JHIMJHIUT
Phu My Power Complex is one of the largest power generation complexes in
Vietnam. The complex locates in Ba Ria Vung Tau province with combined
capacity of 3,900 MW, providing about

40% of Vietnams total electricity.

- Marubenis works: EPC contractor with Alstom


- Capacity: 450 MW
- Marubenis works: EPC contractor with Alstom & LILAMA
- Capacity: 450 MW
/BNF
$BQJUBM "NPVOU
4UBUVT

Hai Phong Thermal Power Plants


US$ 1.2 billion (2 plants)
Finished Construction (estimated completed works: 65% as
in Nov, 2012)
,FZ )JHIMJHIUT

- Marubenis works: engineering, supply of equipment, construction &


installation on a full-turnkey basis with Dongfang Electric Corporation (China)
- Location: Thuy Nguyen, Hai Phong
- Capacity:
+ Hai Phong 1:600 MW
+ Hai Phong 2:600 MW
/BNF
$BQJUBM "NPVOU
4UBUVT
-

Nghi Son I Power Plant


US$ 990 million
Finished installing steam drum no.1 in March, 2012
,FZ )JHIMJHIUT

Marubenis works: EPC contractor


Project Owner: EVN
Location: Tinh Gia, Thanh Hoa
Capacity: 600 MW
Financing source: Japans ODA (85%)
Scheduled operation: 2014

331

3FNBSLT
Marubeni is one of the largest companies in Japan; the group is in Fortune Global
500 Top Companies. Marubeni is active in a wide range of business areas
including energy, metals & mineral resources, infrastructure, food products, real
estate, transportation machinery, etc.
Marubeni opened 2 representative offices in Hanoi and Ho Chi Minh city in 1991
and 1 representative office in Quang Ngai province in 2009. In Vietnam, the
group is active in such fields as foods, chemicals, metal mines, machineries as
well as infrastructure and power plants. In 2011, after 20 years operating in form
of representative office, Marubeni officially became Marubeni Vietnam Ltd.
Marubeni enjoys a successful record in power plant construction projects in
Vietnam; before Nghi Son 1 - the most recent power project that Marubeni has
involved, the corporation has been awarded 9 projects before. The total power
generation capacity of Marubenis supplied facilities in Vietnam is over 3,400 MW
which represents about 20% of Vietnams total power generation capacity. Several
notable previous projects of the group in Vietnam is Phu My power complex
(Phu My 2.1; Phu My 2.1 add-on; Phu My 4); Hai Phong 1& 2 power
Nghi Son 1 power plants, etc. Notably, there is an unofficial

plants;

information that a

consortium of Marubeni and Korea Electric Power Corp (KEPCO) has been
selected as the only qualified bidder for Nghi Son 2 power plant project. Besides
power projects, Marubeni has also involved in several road & railway projects in
Vietnam.

4'$7JFUOBN
/BNF

SFC Vietnam

$PVOUSZ
3FWFOVF

Vietnam

$MBTTJGZ

Public Privatex

"EESFTT

332

&TU ZS
,#$
 FNQMPZFF
8FCTJUF

1919
(mother company)
Hanoi
>100
www.sfcvietnam.com.vn

10 Floor, Phu Dien Company Building, No. 83A, Ly Thuong


Hanoi, Vietnam

Kiet,

1*$
5&&."*-

1PTJUJPO
+84-4-3974 7298
+84-948 224 466 (Hotline)
wastewater@sfcvietnam.com.vn

'"9

+84-4-3974 7299

%FQU

-JTU PG .BKPS 1SPKFDUT QBTU  QSFTFOU  GVUVSF

/BNF
$BQJUBM "NPVOU
4UBUVT

Waste Water Treatment Plant for Vinh city


Finished

,FZ )JHIMJHIUT
- SFC Vietnams works: EPC contractor (together with SFC & Constrexim)
- Location: Vinh city, Nghe An
- Financing source: ODA of KfW Bank
- Capacity: 50,000 m3/day
/BNF
$BQJUBM "NPVOU
4UBUVT

Landfill Leachate Treatment Plant of South Binh Duong


VND 28 billion (approx)
Finished
,FZ )JHIMJHIUT
- SFC Vietnams works: EPC contractor (together with SFC Austria)
- Financing source: Finlands ODA
- Capacity: 480 m3/day
- This plant is the first plant that receive the highest quality standard of
Vietnam: TCVN 7733 2007 Type A.
/BNF
$BQJUBM "NPVOU
4UBUVT

Tham Luong Ben Cat Waste Water Treatment

Site Clearance
,FZ )JHIMJHIUT
- SFC Vietnams works: EPC contractor
- Capacity: 250,000 m3/day
- Scale: waste water treatment for Go Vap District, District 12 & Binh Chanh
District

3FNBSLT
1. Overview: SFC Vietnam belongs to SFC Multinational Corporation, a leading
corporation specializing in water treatment & waste water and renewable

333

energy. The corporation has a wide operating network with various branches
spreading all over the Europe, America, North Africa, Middle East. In Asia,
SFC has set its foots in India, China, Malaysia, Vietnam, etc.
2. Market Position: SFC Vietnam is the leading EPC and one of the biggest
investor in waste treatment plant in Vietnam. The company has

been in

charge of numerous waste water treatment plants with capacity ranging from
5,000 to 250,000 m3/day in form of BT, BOT or BOO.
3. Strategy: it is expected that SFC will getting more active in Vietnams waste
water treatment sector.

+BOBLVBTB4EO#IE
/BNF
$PVOUSZ
3FWFOVF
$MBTTJGZ
"EESFTT
1*$
5&&."*-

Janakuasa Sdn Bhd


&TU ZS
2009
Malaysia
,#$
Hanoi
(US$ Thousands)
 FNQMPZFF 03
Public Privatex
8FCTJUF
N/A
Suite 18-04, 18th Floor, HCO Building, No.44B, Ly Thuong Kiet,
Hanoi, Vietnam
Mr. Le Lam Phong
+84-4-3939 3305
phong.lelam@janakuasa.com.vn

1PTJUJPO
'"9

Project Manager
+84-4-3939 3304

%FQU

-JTU PG .BKPS 1SPKFDUT QBTU  QSFTFOU  GVUVSF

/BNF
$BQJUBM "NPVOU
4UBUVT

Duyen Hai 2 Thermal Power Plant


US$ 2 billion
Detailed BOT contract negotiation
,FZ )JHIMJHIUT
- Location: Duyen Hai, Tra Vinh
- Capacity: 1,200 MW
- Financing source: a guarantee to pay US$ 1.59 billion from Huadian
Engineering Co., Ltd (China)

334

3FNBSLT
Janakuasa Sdn Bhd is a Malaysian power generation company and is among a
few Malaysian power companies that are currently active in Vietnam. The
company began venturing into Vietnams power industry in January, 2009 when it
was awarded Duyen Hai 2 project by the Vietnamese government. This project is
a part of the governments Power Development Master Plan No. VI and also the
first project with Janakuasas involvement in Vietnam. It is said that Janakuasa
spent about two years pursuing the Duyen Hai 2 plant and won against many
much bigger rivals like Frances EDF. Janakuasa singed an MOU with Ministry of
Industry and Trade of Vietnam in April, 2011.

335

(7 )
7'$&"
/BNF
$PVOUSZ
"EESFTT

Vietnam Federation of Civil


Engineering Associations
Vietnam
No. 625A, La Thanh, Ba

1*$

Mr.

5&-

84-4-3831

&."*-

Nguyen Dang Son


4734

&TU ZS

1982

,#$
Hanoi
Dinh, Hanoi, Vietnam
Vice General Secretary
1PTJUJPO
& Chief of Staff
'"9
84-4-3831 4735

tonghoixdvn@yahoo.com.vn

8FCTJUF

www.tonghoixaydungvn.org

3FNBSLT
1. Overview: VFCEA is a non-profit association, member of the Vietnam Union of
Science & Technology Association (VUSTA), member of Asian Civil Engineering
Coordinating Council (ACECC)
2. Members:
- 11 specialized associations
- 44 associations of provinces & cities
- 50 collective associations
3. Main activities:
- Enhance members expertise & offer necessary assistance to members operation
- Carry out consultancy, social opponency, supervision regarding policy, law,
master plan about construction
- Carry out in-depth scientific research and projects on construction
4. Periodic Meetings:
- Standing members of presidium have meeting every 3 month
- Presidium has meeting every 6 month
- Executive committee has meeting every 1 year
- The General Meeting is held every 5 year (in 5, October, 2012; VFCEA had the
7th General Meeting)

336

5. Cooperation with international organizations:


VFCEA has relationship with:
- Japan Society of Civil Engineers (JSCE)
- Korean Society of Civil Engineers (KSCE)
- Engineers Australia (EA)
- China Civil Engineering Society (CCES)
- China Institute of Civil & Hydraulic Engineering (CICHE Taiwan)
- American Society of Civil Engineers (ASCE)
- Association Lao of Architects and Civil Engineering (ALACE)
- Others

7&"
/BNF

Vietnam Energy Association

&TU ZS

$PVOUSZ

Vietnam

"EESFTT

No.87, Lang Ha, Ba

Dinh District, Hanoi, Vietnam

1*$

Mr. Tran Viet Ngai

1PTJUJPO

5&-

84-963 209 590

&."*-

,#$

2004

'"9

hiephoinangluong@gmail.com

8FCTJUF

Hanoi
Chairman
84-4-3514 7193
www.nangluongvietnam.vn

3FNBSLT
1. Overview: Vietnam Energy Association is previously known as Vietnam Energy
Construction Investment Association (VECIA). The associations activities is
governed by Ministry of Industry & Trade. VEAs main focus is on Vietnams
energy sector including all available types of energy namely electricity, coal, oil
& gas, renewable energy, etc.
2. Members: 250 members which are corporations, companies operating (
exploration & production, construction, engineering, consulting, investment, etc.)
in energy sector
3. Main activities:
- Assist members in operation

337

- Act as a bridge connecting VEAs members to the governmental authorities


- Act as a consultant to the government regarding energy policy, energy master
plans, energy projects, etc.
4. Periodic Meeting:
- Executive Committee has meeting every 6 month
- General Meeting is held every 5 year

7"$$
/BNF
$PVOUSZ
"EESFTT
1*$
5&&."*-

Vietnam Association of

&TU ZS
1999
Construction Contractors
Vietnam
,#$
Hanoi
1 Fl, 17T8 Building, Trung Hoa, Nhan Chinh, Thanh Xuan, Hanoi, Vietnam
Officer of Administration
Ms. Ninh Toan
1PTJUJPO
& External Affairs
84-976 144 850
'"9
84-4-3558 9924
www.vacc.vn
8FCTJUF
www.buildviet.info

3FNBSLT
1. Overview: VACC is one of the most prestigious associations in Vietnam. All the
largest state-owned and private construction companies are members of VACC.
2. Members:
- 700 local members
- 22 affiliated foreign members
3. Main activities:
- Publish specialized magazine and directory (Contractors & Construction Market
Magazine and Contractors Directory)
- Hold scientific conferences (2-4 conferences per year)
4.
-

Hold event to promote cooperation between local contractors and foreign ones
Periodic Meetings:
Regular Meeting is held every 6 month
General Meeting is held every 5 year

338

7&$"4

/BNF
$PVOUSZ
"EESFTT

Vietnam Engineering

Vietnam

,#$

1995
Hanoi

6 Floor, Tri Thuc Thanh Pho Hall, Lot D25, Tran Thai Tong, Dich
Vong Hau Ward, Cau Giay District, Hanoi

1*$

Mr. Nguyen Dang Can

5&-

84-913 205 318

&."*-

&TU ZS

Consultant Association

1PTJUJPO
'"9

vecas95@gmail.com

8FCTJUF

Chairman
84-4-3974 0109
www.vecas.org.vn

3FNBSLT
1. Overview: VECAS include all established local engineering companies with
expertise ranging from civil construction, transportation construction to irrigation
construction, energy construction, etc. The association is an official representative
of FIDIC (International Federation of Consulting Engineers) in Vietnam. VECAS
is sponsored by Ministry of Construction.
2. Members: 200 local and affiliated members
3. Main Activities:
- Assist members in operation
- Offer suggestions (e.g: about legal documents, tax, tender, etc.) to the
government
- Hold seminar, conference about engineering
- Organize training courses and issue certificates of international organizations
such as FIDIC, ADB.
4. Periodic Meeting:
- The Association Council has a meeting every 6 month
- The General Meeting is held every five years

339

7"'*&

/BNF

Vietnam

Association

of

$PVOUSZ

Vietnam

"EESFTT

No.65, Van Mieu, Hanoi, Vietnam

5&&."*-

&TU ZS

Foreign Invested Enterprises

84-4-3843 7925
hiephoifdi@vafie.org.vn

2003

,#$

Hanoi

'"9

84-4-3823 2786

8FCTJUF

www.vafie.org.vn

3FNBSLT
1. Overview: VAFIE includes FDI enterprises that are operating in Vietnam. The
association originated from the FDI Club.
2. Members: 373 members
- 247 official members
- 126 honor members
3. Main Activities:
VAFIE has several unit members notably:
- FDI Magazine
- Center of Support & Promotion for Enterprises
- Center of Training & Management Technology Transfer
- Vietnam Korea Business Center (VKBC) newly established in March, 2012
VAFIE is responsible for:
- Involve in making policy & institution related to foreign investment
- Investment promotion
- Support & promote members of the association
- Publish specialized magazine & directory
4. Periodic Meeting:
- Executive Committee has meeting every 3 month
- General Meeting is held every 5 year

340

71"
/BNF
$PVOUSZ
"EESFTT
5&&."*-

Vietnam Seaports Association


&TU ZS
1993
Vietnam
,#$
Hanoi
No.3, Nguyen Tat Thanh, District 4, Ho Chi Minh city
84-8-3940 1030
'"9
84-8-3940 0168
vpa@hcm.vnn.vn
8FCTJUF
www.vpa.org.vn

3FNBSLT
1. Overview:
- VPA includes all the large and important ports in Vietnam
- VPAs activities are governed by Ministry of Transportation.
2. Members: VPA has 60 members which are port operators all over three
regions: North, Central and South of Vietnam.

7"#.
/BNF
$PVOUSZ
"EESFTT
5&&."*-

Vietnam

Association

for

&TU ZS
1984
Building Materials
Vietnam
,#$
Hanoi
Lane 235, Nguyen Trai road, Thanh Xuan District, Hanoi, Vietnam
84-4-3858 4949
'"9
84-4-3557 6902
hoivlxdvn@fpt.vn
8FCTJUF
www.hoivlxdvn.org.vn

3FNBSLT
1. Overview: VABM is a member of Vietnam Federation of Civil Engineering
Associations (VFCEA) and a member of Vietnam Union of Science and
Technology Associations (VUSTA).
2. Members: VABM has nearly 120 organization members and around 150
individual members. Organization members include manufacturers of various
types of building materials namely cement, ceramics, glass, concrete, stones, etc.;
associations & institutes specialized in building materials research. Individual
members includes managers, researchers, lecturers, etc. that are working

in

building materials field.

341

 
# #

# #

# #

# #

# #

5345# 45

# # # #

# # # 46
+# 46:0:7<,

# # # #

35, 67930:447+,

zzz1nrwud1ru1nu#

Copyright 2012 by KOTRA. All rights reserved.


KOTRA .

.