You are on page 1of 3

Document Number

Redis Construction Afrika (Pty) Ltd.

QMS-SMP-FOR-013
Revision Number / Date
00 / 02 DEC 2013
Page Number
Page 1 of 3

Quality Management Systems


PUNCH LIST

Client

DRA

Project

Asanko Gold Project

Contractors Job No
Equipment No
Item
no.

Contract No
Date

12-08-2015

233

Drawing No

S6206, SHEET 1. REV 0

WASH BAY STRUCTURE

Prepared By

Samuel Yeko/Edward Lotsi/Luane Wagner

Butt - Item

Category
1,2 & 3
1

Who to action

Paint hand railing to project


specification.

Complete installation of hand rails for


the structure.

E.Duodo

Install grating clips on third, fourth


and fifth floors.

E.Duodo

Tighten loose Bolt on structure.

E.Duodo

Install missing bracings on fourth


floor.

E.Duodo

Remove binding wires on second


floor.

E.Duodo

Fixed grating clips per manufacturers


requirement at first floor.

E.Duodo

233

Date
Completed

Actioner
Signature

Redis QC
Verify

Redis QC
Signature

E.Duodo

Copyright Redis Construction Afrika (Pty) Ltd. All Rights Reserved - This documentation is considered the intellectual property of Redis Construction Afrika (Pty) Ltd. Unauthorised reproduction or distribution of this documentation or any portion of it may result in severe civil
and criminal penalties, and violators will be prosecuted.

Document Number
QMS-SMP-FOR-013
Revision Number / Date
00 / 02 DEC 2013
Page Number
Page 2 of 3

Redis Construction Afrika (Pty) Ltd.


Quality Management Systems
PUNCH LIST

Fixed nuts on bolts at second floor.

E.Duodo

Install mixing bracing at first floor.

E.Duodo

10

Install Kick flat on gratings.

E.Duodo

Copyright Redis Construction Afrika (Pty) Ltd. All Rights Reserved - This documentation is considered the intellectual property of Redis Construction Afrika (Pty) Ltd. Unauthorised reproduction or distribution of this documentation or any portion of it may result in severe civil
and criminal penalties, and violators will be prosecuted.

Document Number
QMS-SMP-FOR-013
Revision Number / Date
00 / 02 DEC 2013
Page Number
Page 3 of 3

Redis Construction Afrika (Pty) Ltd.


Quality Management Systems
PUNCH LIST

Copyright Redis Construction Afrika (Pty) Ltd. All Rights Reserved - This documentation is considered the intellectual property of Redis Construction Afrika (Pty) Ltd. Unauthorised reproduction or distribution of this documentation or any portion of it may result in severe civil
and criminal penalties, and violators will be prosecuted.

You might also like