You are on page 1of 1

- All dimension in meters unless otherwise indicated

Note:

- Elevation of embankment stage 1 shall be measured from the bottom seperation geotextile.
- Fsg : Elevation of seperation geotextile.
- FG : Finish grade
- Ht : is total settlement minus the residual settlement
- The sand used for sand bad shall be the same permeability as CSB's sand.

- (*) : actual treament depth, measured from the bottom seperation geotextile.

6.90

SD
ging ct

2.20

15.0(*)

- The expected settlement width at slope toe design according to the document'PMB
No 120315.06/PMB HNHP-TKDA2 date 15/03/2012 shall be L = 0.4xS (S: settlement calculated)

- Tt c cc kch thc trong bn v l mt, tr khi c ch dn trn bn v.

Ghi ch:

- Fsg : Cao vi a k thut ngn cch.

- Chiu cao p nn giai on 1 c tnh t y vi a k thut ngn cch.

- FG : Cao thit k hon thin.


- Ht : Bng tng ln c hot ti tr i ln d.

- Ct trong bao ti ct c cng tiu chun thm vi ct m CSB.

- (*) : Chiu su x l tnh t y vi a k thut ngn cch.

100

- B rng phng ln chn mi dc nn ng thit k theo vn bn ca Ch u t


s 120315.06/PMB ngy 15/03/2012 s l L=0.4xS ( S :l ln tnh ton)

KM0+280 -:- KM0+380

60

Biu p

FILLING DIAGRAM

03

TYPICAL CROSS SECTION - MT CT NGANG IN HNH


SECTION - ON: KM0 + 280 - KM0 + 380

SD ARRANGEMENT

b tr ging ct

142.14

Typical cross section


mt ct ngang in hnh

12.64

As shown

IC392-RB-tp-003

006

You might also like