You are on page 1of 75

NVPILAR 2008

GENERAL GUIDELINES
THIS DEPARTMENT ORDER SETS THE FORMULATION OF POLICIES,
RULES AND PROCEDURES RELATIVE TO THE PREPARATION OF THE
APPROVED BUDGET FOR THE CONTRACT (ABC) ISSUED FOR THE
GUIDANCE OF ALL CONCERNED.
ALL THE ITEMS OF WORK TO BE USED SHALL BE IN ACCORDANCE
WITH DPWH STANDARD SPECIFICATIONS.

NVPILAR 2008

COST ESTIMATES
(D0 57 S.2002)

INDIRECT COST

DIRECT COST

A. OVERHEAD EXPENSES (6-7% CEILING)


DIRECT COST.
1. ENGINEERING & ADMINISTRATIVE
SUPERVISION
2. TRANSPORTATION ALLOWANCES
3. OFFICE EXPENSES (EQPT & SUPPLIES)
4. CONTRACTORS ALL RISK INSURANCE
5. FINANCING COST INCL.
-PREMIUM ON BID SECURITY
-PREMIUM ON PERFORMANCE SECURITY
-PREMIUM/CHARGES ON CREDIT LINES
-COST OF MONEY TO FINANCE THE PROJ.

A. COST OF MATERIALS

1. COST AT SOURCE, INCL. PROCESSING


ROYALTIES, LOCAL TAXES & ETC.
2. EXPENSES FOR HAULING TO PROJ. SITE
3. HANDLING EXPENSES
4. STORAGE
5. ALLOWANCE FOR WASTE/OR LOSSES

B. COST OF LABOR

1. SALARIES & WAGES AS AUTHORIZED


BY DOLE
2. FRINGE BENEFITS SUCH AS VACATION
& SICK LEAVES, GSIS & SSS CONTR.
ALLOWANCES, BONUSES AND ETC.

C. EQUIPMENT EXPENSES

1. RENTAL RATE SHALL BE BASED ON


ACEL RATE AS APPRVD BY DPWH .
OPERATED RENTAL RATE ARE
PREFERRED OVER BARE RENTAL RATE
2. MOB./DEMOB OF EQUIPMENT SHALL BE
ON CASE TO CASE BASIS BUT IN NO
CASE EXCEED 1% OF TOTAL CIVIL
WORK ITEMS.

B. CONTINGENCY 3-5% OF DC.


C. MISCELLANEOUS 1% OF DC.
INCLUDES LABORATORY TEST.
D. CONTRACTORS PROFIT
EST. DIRECT COST

OCM

PROFIT MOB/DEMOB MAX. TOTAL

UP TO P1M.

13

15

29

ABOVE P1M-5M

12

14

27

ABOVE P5M-10M

12

13

11

12

1
1

26

ABOVE P10M-20M
ABOVE P20M-50M

11

11

23

ABOVE P50M

10

10

21

VAT

24

3-5% PM Fee
NVPILAR 2008

THOSE WHO PREPARED/REVIEWED/CHECKED THE


ESTIMATES SHALL SEE TO IT THAT IN CASE THEY ARE
CALLED UPON TO MAKE GOOD THEIR ESTIMATES, THEY
CAN PERFORM THE JOB THEMSELVES AT THE COST THEY
HAVE GENERATED.

NVPILAR 2008

PURPOSE
THIS DEPARTMENT ORDER SETS THE GUIDELINES, RULES AND PROCEDURES, TO
BE FOLLOWED BY ALL CONCERNED IN THE IMPLEMENTATION OF DEPARTMENT OF
LABOR AND EMPLOYMENT D.O. No. 13(DOLE D.O. No.13), SERIES OF 1998
OTHERWISE KNOWN AS THE GUIDELINES GOVERNING OCCUPATIONAL SAFETY AND
HEALTH IN THE CONSTRUCTION INDUSTRY, WITH EMPHASIS GIVEN ON THE
METHODOLOGY TO BE USED IN ESTIMATING THE COST OF CONSTRUCTION SAFETY
AND HEALTH PROGRAM AS REQUIRED IN SECTION 17.
GENERAL GUIDELINES
IN COMPLIANCE WITH SECTION 17 OF DOLE D.O. No. 13, THE IMPLENTATION OF
CONSTRUCTION SAFETY SHALL BE CONSIDERED IN ALL STAGES OF PROJECT
PROCUREMENT ( DESIGN, ESTIMATE, AND CONSTRUCTION ) AND ITS COST SHALL
BE INTEGRATED TO THE OVERALL PROJECT COST UNDER PAY ITEM SPLCONSTRUCTION SAFETY AND HEALTH AS A LUMPSUM AMOUNT, TO BE
QUANTIFIED IN THE DETAILED ESTIMATE. LIKEWISE, ALL REQUIREMENTS,
PROVISIONS, AND INSTRUCTIONS PERTAINING TO THE IMPLEMENTATION OF
CONSTRUCTION SAFETY AND HEALTH IN EVERY PROJECT SHALL BE INCLUDED IN
THE PROJECT BIDDING DOCUMENTS SPECIFICALLY UNDER THE INSTRUCTION TO
BIDDERS.

NVPILAR 2008

CONCTRUCTION PROJECT
(D.O. No. 56 S. 2005)
CONSTRUCTION SAFETY AND HEALTH PROGRAM ( CSHP )
THE REQUIRED CSHP FOR SPECIFIC PROJECT SHALL INCLUDE BUT NOT LIMITED TO THE FF :
1. COMPOSITION OF SAFETY & HEALTH PERSONNEL RESPONSIBLE FOR THE IMPLENTATION OF CSHP;
2. SPECIFIC SAFETY POLICIES W/C SHALL BE UNDERTAKEN IN THE CONSTRUCTION SITE INCLUDING
FREQUENCY OF & PERSONS RESPONSIBLE FOR CONDUCTING TOOL BOX AND GANG MEETING;
3. PENALTIES AND SANCTIONS FOR VIOLATIONS OF THE CSHP;
4. FREQUENCY, CONTENT AND PERSONS RESPONSIBLE FOR ORIENTING, INSTRUCTING AND TRAINING
ALL WORKERS AT THE SITE WITH REGARD TO THE CSHP WHICH THEY OPERATE; &
5. THE MANNER OF DISPOSING WASTE ARISING FROM THE CONSTRUCTION.

MANPOWER

1. SAFETY ENGINEER / OFFICER


2. SAFETY MAN / OFFICER
-AS RECOMMENDED BY DOLE, FOR EVERY
CONST. PROJ. W 100 & ABOVE WORKERS, AN
ACCREDTED SAFETY OFFICER BY DOLE-BWC
SHALL BE EMPLOYED. ONLY THE COST FOR THE
CONST. SAFETY & HEALTH OFICER , WHETHER ON
FULL OR PART TIME BASIS ASSIGNED ON SITE
SHALL BE INCLUDED IN THE ESTIMATE.
3. HEALTH PERSONNEL
-ONLY THE MEDICAL AND DENTAL
PRACTITIONERS ACTUALLY ASSIGNED IN THE
PROJECT SHALL BE INCLUDED IN THE COST OF
SAFETY.

EQUIPMENT/FACILITIES

1. PERSONAL PROTECTIVE EQUPMENT (PPE)


-FOR GENERAL CONST. THE REQUIRED BASIC
PPE FOR ALL WORKERS SHALL BE SAFETY
HELMET, SAFETY GLOVES AND SAFETY SHOES.
SPECIALTY PPE SHALL BE PROVIDED IN ADDITION
TO OR IN LIEU OF THE CORRESPONDING PPE AS
THE WORK ACTIVITY REQUIRES.
2. SIGNAGES AND BARRICADES
-SHALL BE PROVIDED AS A PRECAUTION TO
ADVICE THE WORKERS & THE GENERAL PUBLIC OF
THE HAZARDS EXISTING AT THE WORKSITE.
3. FACILITIES
- W ADEQUTE SAFE DRINKING WATER; SANITARY
& WASHING FACILITIES: LIVING ACCOMODATIONS
FOR WORKERS.

COSTING
PAY ITEM SPL CONSTRUCTION SAFETY AND HEALTH AS
A LUMP SUM AMOUNT, TO BE QUANTIFIED IN THE DETAILED
ESTIMATE.

NVPILAR 2008

SAFE CONDITION

CAUTION OR RISK

NOTE : DERIVED FROM CPES MANUAL

MANDATORY ACTION

TRAFFIC AND
HOUSEKEEPING

ALERT

STOP OR
PROHIBITION

RADIATION

NVPILAR 2008

REFERENCE :
SPECIFICATIONS
DPWH STD.SPECS., VOL. I, 1988, ED.
DPWH STD.SPECS.,VOL.II, 2004 ED.
DPWH STD.SPECS.,VOL.III, 1995 ED.

BOOKS
1. ESTIMATING BILL OF MATERIALS BY VICENTE TAGAYUN
2. SIMPLIFIED CONSTRUCTION ESTIMATE BY MAX B. FAJARDO JR.
3. HANDBOOK OF CONSTRUCTION ESTIMATE BY RHENO A. VELASCO
4. PLUMBING DESIGN & ESTIMATE BY MAX B. FAJARDO JR.
5. ELECTRICAL LAYOUT & ESTIMATE BY MAX B. FAJARDO JR.

NVPILAR 2008

OTHER CODES AND SPECIFICATIONS:


P.D.1096 NATIONAL BUILDING CODE
R.A. 7160 LOCAL GOVT. CODE OF 1991
DOLE D.O. 13 SERIES 1998 CONSTRUCTION SAFETY
DPWH D.O. 56 SERIES 2005 CONSTRUCTION SAFETY
B.P. 344 ACCESSIBILITY LAW
NATIONAL STRUCTURAL CODE OF THE PHILIPPINES
AMERICAN CONCRETE INSTITUTE ( ACI )
AMERICAN SOCIETY OF TESTING MATERIALS ( ASTM )
ELECTRICAL CODE OF THE PHILIPPINES
PLUMBING CODE OF THE PHILIPPINES
PHILIPPINE MECHANICAL ENGINEERING CODE
ALL MATERIALS QUALITY TESTING CODE

NVPILAR 2008

NATIONAL BUILDING CODE

( P.D. 1096 )
5 MAJOR DIVISIONS IN BUILDING PLANS SUBJECT TO ESTIMATE
ARCHITECTURAL
ARCHITECTURAL

AESTHETIC
AESTHETIC

ARCHITECT
ARCHITECT

STRUCTURAL
STRUCTURAL

STRENGTH
STRENGTH

CIVIL
CIVILENGR
ENGR

ELECTRICAL/
ELECTRICAL/
ELECTRONIC
ELECTRONIC

POWER,
POWER,LIGHTING
LIGHTING
&
COMMUNICATION
& COMMUNICATION

ELECTL
ELECTLENGR/
ENGR/
ELECTRONIC
ELECTRONICENGR
ENGR

SANITARY/
SANITARY/
PLUMBING
PLUMBING

HEALTH
HEALTHAND
AND
SANITATION
SANITATION

SANITARY
SANITARYENGR/
ENGR/
MASTER
MASTERPLUMBER
PLUMBER

MECHANICAL
MECHANICAL

NECESSITIES
NECESSITIES

MECHANICAL
MECHANICALENGR
ENGR

NVPILAR 2008

CLASSIFICATION OF BUILDING STRUCTURES


RESIDENTIAL SINGLE DETACHED DWELLINGS AND DUPLEXES FOR USE OF
OWNER, ON
CAMPUS DORMITORIES, RECTORIES, CONVENTS
AND MONASTERIES, RESIDENTIAL CONDOMINIUMS OWNED BY
OCCUPANTS, ARMY BARRACKS, ETC.
COMMERCIAL SINGLE DETACHED DWELLINGS AND DUPLEXES FOR LEASE,
BOARDING HOUSES, APARTMENTS, ACCESORIAS, HOTELS AND
INNS,
OFF
CAMPUS
DORMITORIES,
TRANSPORTATION
TERMINALS AND STATIONS, NIGHT CLUBS AND DANCE HALLS,
RESTAURANTS, MARKETS AND SHOPPING CENTERS, THEATERS,
SPORTS STADIA, GRANDSTANDS, GASOLINE SERVICE STATIONS,
PARKING GARAGES, FUNERAL PARLORS, ETC.
INDUSTRIAL FACTORIES, PLANTS, MILLS, ARSENALS, BREWERIES, PROCESSING
PLANTS, GAS GENERATING PLANTS, SHIPYARDS, AIRCRAFT
HANGARS, SLIPWAYS, DRYDOCKS AND PIERS, LUMBER MILLS,
WAREHOUSE, STORAGE TANKS, GRAIN AND CEMENT SILOS,
ETC.

NVPILAR 2008

INSTITUTIONAL

EDUCATIONAL INSTITUTIONS, LIBRARIES, MUSEUMS,


CLUBHOUSES, HOSPITALS, SANITARIA, ASYLUMS, HOMES
FOR THE AGED, JAILS, POLICE AND FIRE STATIONS, PLACES
OF WORSHIP, ETC.

RECREATIONAL

CINEMAS, BILLIARD
HOUSES, ETC.

HALLS,

DISCO

PADS,

AGRICULTURAL

BARNS, POULTRY HOUSES, HATCHERIES,


STABLES, GREENHOUSES, GRANARIES, ETC.

AMUSEMENT
PIGGERIES,

ANCILLARY GARAGES, CARPORTS, TANKS, TOWERS, SMOKESTACKS AND


CHIMNEYS, VAULTS, SWIMMING POOLS, PELOTA COURTS,
AVIARIES, AQUARIUMS, ZOO STRUCTURES, FIERE WALLS AND
FENCES OVER 1.8O METERS IN HEIGHT, ETC.
TEMPORARY FIELD OFFICES, LABORERS QUARTERS, CANOPIES AND
RAILINGS, PROTECTIVE FENCINGS, ETC.
OTHERS CEMETERY STRUCTURES AND MOUSOLEUMS, TOMBS, MULTI-LEVEL
NICHES, ETC.

NVPILAR 2008

TYPES OF CONSTRUCTION
( P.D. 1096, CHAPTER 4, SECTION 401 )

TYPE I - TYPE I BUILDING SHALL BE OF WOOD CONSTRUCTION. THE STRUCTURAL


ELEMENTS MAY BE ANY OF THE MATERIALS PERMITTED BY THIS CODE.
TYPE II - TYPE II BUILDING SHALL BE OF WOOD CONSTRUCTION WITH PROTECTIVE
FIRE RESISTANT MATERIALS AND ONE-HOUR FIRE RESISTIVE
THROUGHOUT: EXCEPT, THAT PERMANENT NON-BEARING PARTITIONS
MAY USE FIRE-RETARDANT TREATED WOOD WITHIN THE FRAMING
ASSEMBLY.
TYPE III TYPE III BUILDING SHALL BE OF MASONRY AND WOOD CONSTRUCTION,
STRUCTURAL ELEMENTS MAY BE ANY OF THE MATERIALS PERMITTED
BY THIS CODE: PROVIDED, THAT THE BUILDING SHALL BE ONE-HOUR
FIRE RESISTIVE THROUGHOUT. EXTERIOR WALLS SHALL BE
INCOMBUSTIBLE FIRE-RESISTIVE CONSTRUCTION
TYPE IV TYPE IV BUILDING SHALL BE OF STEEL, IRON, CONCRETE OR MASONRY
CONSTRUCTION. WALLS, CEILING AND PERMANENT PARTITIONS SHALL
BE OF INCOMBUSTIBLE FIRE RESISTIVE CONSTRUCTION: EXCEPT, THAT
PERMANENT NON-BEARING PARTITIONS OF ONE-HOUR FIRE RESISTIVE
CONSTRUCTION MAY USE FIRE RETARTANT TREATED WOOD WITHIN THE
FRAMING ASSEMBLY.
TYPE V - TYPE V BUILDING SHALL BE FIRE-RESISTIVE. THE STRUCTURAL
ELEMENTS SHALL BE OF STEEL, IRON, CONCRETE, OR MASONRY
CONSTRUCTION. WALLS, CEILING AND PERMANENT PARTITIONS SHALL
BE OF INCOMBUSTIBLE FIRE-RESISTIVE CONSTRUCTION.

NVPILAR 2008

BURJ DUBAI ( DUBAI TOWER )


THE BURJ DUBAI IS A SUPERTALL SKYSCRAPER CURRENTLY UNDER CONSTRUCTION IN DUBAI, UNITED ARAB
EMIRATES. IT IS CURRENTLY THE TALLEST FREE STANDING STRUCTURES IN THE WORLD HAVING AN EXPECTED
HEIGHT OF 818 METERS BUT COULD REACH UP TO 940 METERS UPON THE SCHEDULED COMPLETION IN
SEPTEMBER 2009. THE BUILDING IS BEING BUILT BY A JOINT VENTURE OF THE SOUTH KOREAN COMPANY
SAMSUNG, THE BELGIAN COMPANY BESIX AND THE UAE COMPANY ARABTEC. IT WAS DESIGN BY ADRIAN SMITH
OF SKIDMORE, OWING AND MERRIL CONSULTANCY. THE TOTAL BUDGET FOR THE BURJ DUBAI PROJECT IS
ABOUT 4.1 BILLION DOLLARS.
*PICTURE & INFO FROM INTERNET

NVPILAR 2008

SCOPE OF WORKS IN BUILDING CONSTRUCTION


PART -

A-

MOBILIZATION

PART -

B-

EARTHWORKS

PART -

C-

TERMITE CONTROL & WOOD PRESERVATIONS

PART -

D-

FOUNDATION WORKS

PART -

E-

DAMP PROOFING / MOISTURE CONTROL

PART -

F-

CONCRETE WORKS

PART -

G-

MASONRY WORKS

PART -

H-

CARPENTRY WORKS

PART -

I -

FABRICATED MATERIALS AND HARDWARE

PART -

J-

ROOF FRAMING WORKS

PART -

K-

ROOFING WORKS

PART -

L-

FINISHES

PART -

M - PAINTING / VARNISHING

PART -

N-

WATER PROOFING

PART -

O-

SANITARY WORKS

PART -

P-

ELECTRICAL WORKS

PART -

Q-

MECHANICAL WORKS

PART -

R-

CONSTRUCTION SAFETY AND HEALTH (DO. 56)

NVPILAR 2008

PROJECT: ONE(1) STOREY (7X7 MODIFIED) CLASSROOM SCHOOL BUILDING

ARCHITECTURAL PLAN
1

GA 26 CORR. G I.
ROOFING

D-1
W-1

W-2

W-2

D-1

W-1

B
D-1

CORRIDOR

FLOOR PLAN
*PLANS BY BOD

W-2

CROSS SECTION
2

SCH. OF DOORS & WINDOWS

CLASSROOM
W-1

W-2
CLASSROOM

REAR ELEVATION

W-2

D-1

FRONT ELEVATION
1

GA 26 CORR. G I.
ROOFING

D-1
W-1

EXPOSED
STEEL C
PURLINS AND
RAFTERS

SLOPE

B
SLOPE

A
REFLECTED CEILING

D-1

FLUSH TYPE
HOLLOW CORE
DOOR W MARINE
PLYWOOD FACING
ON WOOD FRAME

W-1 & W-2

GLASS JALOUSIE
WINDOWS ON
ALUMINUM HOUSIG

ROOF PLAN
NVPILAR 2008

STRUCTURAL PLAN
B

RAFTER

ANGULAR
BRACE
CORR. GI
SHEETS
C1-F1

COL. FTG.

C1-F1

CLASSROOM
WELL COMPACTED
GRAVEL FILL

DETAIL CROSS SECTION

FGL
NGL

WF-1

CORRIDOR
DOWEL

W-2

SLAB ON FILL

WF-1

D-1

WF-1

LB

BASE PLATE W LONG


ANCHOR BOLTS
ROOF INSULATION CEILING
FIN. COMPRESSED BETWEEN
PURLINS AND RAFTER

WF-1

FFL

WALL FTG

*PLANS BY BOD

COLUMN

WF-1
C1-F1

C1-F1

C1-F1

FOUNDATION PLAN

LINTEL BEAM
FOOTING

WF-1

WF-1

WF-1

LB

C1-F1

C1-F1

C1-F1

C-PURLINS

WALL FOOTING

SPOT DETAIL
LINTEL BEAMS
NVPILAR 2008

PLUMBING AND SANITARY CYCLE


( ONE STOREY STRUCTURE )
HORIZONTAL
VENT PIPE

VENT PIPE
THRU ROOF

LAVATORY

WATER
CLOSET

KITCHEN
SINK

SHOWER

IN-HOUSE WATER
SUPPLY PIPE

ROOF
GUTTER

DOWNSPOUT

WATER METER

CATCH
BASIN

GATE
VALVE

SEPTIC
VAULT

METER SHUT-OFF
WATER PIPE
CONN. TO
WATER MAIN

TO DRAINAGE
CANAL/SEWER
CORPORATION COCK

CATCH
BASIN

CLEANOUT

SOIL/WASTE PIPE

STORM
DRAINAGE PIPE

WATER MAIN

*PICTURE FROM BOOKS OF TAGAYUN

NVPILAR 2008

PLUMBING SYSTEM

WATER LINE INCLUDING DRAINAGE, WASTE AND VENTILATION SYSTEM OF BUILDING


VENTILATION THROUGH ROOF ( VTR )
DRY VENT

SHOWER W/ ACCESORIES

MAIN VENT

BATH TUB

HOT WATER RETURN

LAVATORIES
FIXTURES

WATER CLOSET
FLOOR DRAIN

KITCHEN SINK
FIXTURES
COLD WATER LINE
W/ ACCESORIES
HOT WATER LINE
W/ ACCESSORIES
WATER HEATER

*PICTURE FROM BOOKS OF FAJARDO.

WET VENT

FITTINGS
CLEAN OUT
WASTE / SOIL PIPE

NVPILAR 2008

ELECTRICAL SYSTEM LAYOUT


( ONE STOREY STRUCTURES )

LIGHTING LAYOUT

CONVENIENCE OUTLET LAYOUT

PANEL BOARD & CABINETS

*PICTURE FROM BOOKS OF FAJARDO.

NVPILAR 2008

PREPARATION OF PROGRAM OF WORKS


CONST. OF ONE STOREY SCHOOL BUILDING
2

GA 26 CORR. G I.
ROOFING

GA 26 CORR. G I.
ROOFING

D-1

D-1

W-2

CLASSROOM

CROSS SECTION

W-2

CLASSROOM

CORRIDOR

FLOOR PLAN

2.29

6,870.00

III. SOIL POISONING

0.56

1,680.00

IV. DAMPROOFING WORKS

0.47

1,410.00

29.65

88,950.00

3.21

9,630.00

VII. CARPENTRY WORKS

3.54

10,620.00

VIII. FAB. MATERIALS & HARDWARE

9.08

27,240.00

IX. ROOF FRAMING WORKS

9.87

29610.00

X.

7.20

21,600.00

12.23

36,690.00

XII. PAINTING WORKS

6.50

19,500.00

XIII. SANITARY / PLUMBING WORKS

4.06

12,180.00

XIV. ELECTRICAL WORKS

5.34

16,020.00

XV. MECHANICAL WORKS

5.00

15,000.00

SLAB ON FILL
WF-1

C1-F1

WF-1

C1-F1

C1-F1

SCH. OF DOORS & WINDOWS

W-2

D-1 W-1 W-1 D-1

EARTHWORKS

P3,000.00

VI. MASONRY WORKS

FOUNDATION PLAN
1

II.

1.0

V.

C1-F1

MOBILIZATION / DEMOBILIZATION

AMOUNT

C1-F1
C1-F1
C1-F1
WF-1
WF-1
WF-1

REAR ELEVATION

WF-1

FRONT ELEVATION
A

W-2

W-2

WF-1

W-1

W-1

I.

C1-F1

D-1

SCOPE OF WORKS

WF-1

D-1

W-1 & W-2

FLUSH TYPE
GLASS JALOUSIE
HOLLOW CORE
WINDOWS ON
DOOR W MARINE ALUMINUM HOUSING
PLYWOOD FACING
ON WOOD FRAME

CONCRETE WORKS

ROOFING WORKS

XI. FINISHES

TOTAL

100.00

300,000.00

NVPILAR 2008

BUILDING CONSTRUCTION METHODOLOGY


( BY PERT/CPM DIAGRAM)

PROJECT: ONE(1) STOREY (7m X 7m) MODIFIED SCHOOL BUILDING


PROCUREMENT/DELIVERY OF CONSTRUCTION MATERIALS

26
ELECTRICAL/SANITARY ROUGH-IN

14

16

INST. ELECT/
MECH/SANITARY
FIXTURES

12

CARPENTRY WORKS

MOVEIN

EARTH
WORKS

CONCRETE
WORKS

WAIT

MASONRY
WORKS

WAIT

ROOF FRAMING

SOIL
POISONING

INST. OF PURLINS
WAIT

ROOFING

BACKFILL

13

1O

15

FINISHES
WAIT

WAIT

WAIT

PAINTING

17

MOVE
OUT

INST. FAB. MATLS &


HARDWARE

INST. GUTTER &


FLUSHING

14

11

DAMPROOFING/SLAB ON FILL

10

LEGEND:
NETWORK -

ES

LS

EF

11

12

13

14
15 16
17
CALENDAR DAYS

18

19

20

21

22

23

24

25

26

27

28

29

30

LF

ACTIVITY EVENT -

ES

LS

DUMMY CRITICAL PATH -

NVPILAR 2008

SCOPE OF WORKS

WT.(%)

AMOUNT
(PHP)

I. MOBILIZATION/DEMOB

1.00

3,000.00

II. EARTHWORKS

2.29

6,870.00

III. SOIL POISONING

0.56

1,680.00

IV. DAMP PROOFING WORKS

0.47

1,410.00

V. CONCRETE WORKS

29.65

88,950.00

VI. MASONRY WORKS

3.21

9,630.00

VII. CARPENTRY WORKS

3.54

10,620.00

VIII. FAB. MATLS & HWARE

9.08

10,620.00

IX. ROOF FRAMING WORKS

9.87

27,240.00

X. ROOFING WORKS

7.20

29,610.00

12.23

21,600.00

XII. PAINTING WORKS

6.50

36,690.00

XIII. SANITARY WORKS

4.06

19,500.00

XIV. ELECTRICAL WORKS

5.34

16,020.00

XV. MECHANICAL WORKS

5.00

15,000.00

100.00

300,000.00

XI. FINISHES

TOTAL

CALENDAR DAYS
5

10

15

20

25

30

PROJECTED CASH FLOW (P)


PROJECTED ACCPLMENT (%)
CUMMULATIVE CASH FLOW(P)
CUMMULATIVE ACCPLMNT(%)
- CRITICAL ACTIVITY
- PARALLEL ACTIVITY

NVPILAR 2008

SCOPE OF WORKS

WT.(%)

CALENDAR DAYS

AMOUNT
(PHP)

I. MOBILIZATION/DEMOB

1.00

3,000.00

1,500.00

II. EARTHWORKS

2.29

6,870.00

3,435.00

III. SOIL POISONING

0.56

1,680.00

1,680.00

IV. DAMP PROOFING WORKS

0.47

1,410.00

10

15

20

25

30
1,500.00

3,435.00
1,410.00

88,950.00 11,118.75 44,475.00 33,356.25

V. CONCRETE WORKS

29.65

VI. MASONRY WORKS

3.21

9,630.00

VII. CARPENTRY WORKS

3.54

10,620.00

10,620.00

VIII. FAB. MATLS & HWARE

9.08

10,620.00

13,620.00 13,620.00

IX. ROOF FRAMING WORKS

9.87

27,240.00

17,766.00

11,844.00

X. ROOFING WORKS

7.20

29,610.00

16,200.00

5,400.00

12.23

21,600.00

XII. PAINTING WORKS

6.50

36,690.00

XIII. SANITARY WORKS

4.06

19,500.00

676.67

3,383.33

3,383.33

3,383.33

1,353.34

XIV. ELECTRICAL WORKS

5.34

16,020.00

890.00

4,450.00

4,450.00

4,450.00

1,780.00

XV. MECHANICAL WORKS

5.00

15,000.00

833.33

4,166.67

4,166.67

4,166.67

1,666.66

100.00

300,000.00

XI. FINISHES

TOTAL

3,210.00

6,420.00

36,690.00
19,500.00

PROJECTED CASH FLOW (P)

17,733.75 53,520.00

PROJECTED ACCPLMENT (%)

30.06
17.84
17.73
15.32
13.14
5.91
17,733.75 71,253.75 124,440.00 170406.00 260,580.00 300,000.00

CUMMULATIVE CASH FLOW(P)


CUMMULATIVE ACCPLMNT(%)

5.91

23.75

53,186.25 45,966.00 90,174.00 39,420.00

41.48

56.80

86.86

100.00

NVPILAR 2008

SCOPE OF WORKS

WT.(%)

AMOUNT
(PHP)

I. MOBILIZATION/DEMOB

1.00

3,000.00

II. EARTHWORKS

2.29

6,870.00

III. SOIL POISONING

0.56

1,680.00

IV. DAMP PROOFING WORKS

0.47

1,410.00

V. CONCRETE WORKS

29.65

88,950.00

VI. MASONRY WORKS

3.21

9,630.00

VII. CARPENTRY WORKS

3.54

10,620.00

VIII. FAB. MATLS & HWARE

9.08

10,620.00

IX. ROOF FRAMING WORKS

9.87

27,240.00

X. ROOFING WORKS

7.20

29,610.00

12.23

21,600.00

XII. PAINTING WORKS

6.50

36,690.00

XIII. SANITARY WORKS

4.06

19,500.00

XIV. ELECTRICAL WORKS

5.34

16,020.00

XV. MECHANICAL WORKS

5.00

15,000.00

100.00

300,000.00

XI. FINISHES

TOTAL

CALENDAR DAYS
5

10

15

20

25

30

100%

86.86
75%

ACTUAL
ACCOMPLISHMENT
56.80

50%
41.48

TIME ELAPSED

SCHEDULED
ACCOMPLIHMENT

25%

23.75

5.91

PROJECTED CASH FLOW (P)

17,733.75 53,520.00

PROJECTED ACCPLMENT (%)

30.06
17.84
17.73
15.32
13.14
5.91
17,733.75 71,253.75 124,440.00 170406.00 260,580.00 300,000.00

CUMMULATIVE CASH FLOW(P)


CUMMULATIVE ACCPLMNT(%)

5.91

23.75

53,186.25 45,966.00 90,174.00 39,420.00

41.48

56.80

86.86

100.00

NVPILAR 2008

MANPOWER
RES. ENGINEER
CONST. FOREMAN

RATE/DAY

TOTAL
AMOUNT

CALENDAR DAYS
10
15

25

30

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

CARPENTER

1 1 1 1 1 1 1 1 1 1
1 1
2 2 2 2 2

MASON

1 1

LEADMAN

20

STEEL MAN

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2

2 2

2 2 2 2 2 2 2 2 2 2
2 2

2 2 2

2 2 2 2

2 2
2 2 2 2 2

WELDER
TINSMITH

2 2 2 2
2 2 2

PAINTER

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

PLUMBER

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

ELECTRICIAN
LABORER

3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

SAFETY OFFICER
FIRST AIDER
NURSES
TOTAL

8 8 6 6

131313 1314 10 10 10 1616 101010 10 10 101012121212121210 8 6

NVPILAR 2008

EQUIPTMENT
MINOR TOOL ACC.
C0NCRETE MIXER

RATE/DAY

TOTAL
AMOUNT

CALENDAR DAYS
10
15

30

1 1 1 1

CONC. VIBRATOR
BAR BENDER

1 1 1 1 1 1 1 1 1

WELDING MACHINE

25

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1

BAR CUTTER

20

1 1 1

1 1 1 1 1

TOTAL

NVPILAR 2008

MANPOWER REQUIREMENT

TECHNICAL

PROJECT ENGINEER
RESIDENT ENGINEER

SAFETY & HEALTH


(DO 56 S.2005)

SAFETY ENGINEER
SAFETY OFFICER
FIRST AIDER
NURSES

SKILLED / UNSKILLED

CONST. FOREMAN
LEADMAN

ELECTRICAL ENGINEER

CARPENTER
MASON
STEEL MAN
WELDER
TINSMITH

MECHANICAL ENGINEER

INSTALLER

MTQC ENGINEER
QTY./COST ENGINEER
SANITARY ENGINEER

PAINTER
PLUMBER
ELECTRICIAN
LABORER

NVPILAR 2008

NVPILAR 2008

PILE FOUNDATION DRILLING, DRIVING, BORING, GRABBING EQUIPMENT

SMALL DRILLING EQPT.


USE FOR MICRO PILES

EXCAVATOR-USE IN
LARGE DIMENSION
EXCAVATION & DIGGING

DROP HAMMER DRIVING HEAVY BORING RIG W/ VIBRO


RIG FOR PRE CAST PILES HAMMER FOR BORED PILES

TRUCK MIXER TANDEM WITH


PUMPCRETE USE IN POURING OF
HEAVY FOUNDATIONS.

WHEEL LOADER TANDEM W/ DUMP TRUCK -USE


FOR HAULING & DISPOSAL OF DEBRIS AND
OTHER EXCAVATED MATERIALS.

HEAVY CABLE GRAB


FOR BARRETTE PILES

TRUCK MOUNTED/CRAWLER CRANE


-USE TO CARRY & MANEUVER PRE CAST
PILE & STEEL CAGES.

GENERATOR SET / WELDING MACHINE


USE
AS
CONNECTORS
ON
HEAVY
STRUCTURAL STEEL MEMBERS.
NVPILAR 2008

MOBILE CRANES USE TO


MANEUVER AROUND & OUTSIDE
THE
BUILDING
TO
HOIST
MATERIALS & EQUIPMENT FROM
VARIOUS LOCATIONS

WHEEL LOADER TANDEM W/ DUMP TRUCK-USE


FOR HAULING & DISPOSAL OF DEBRIS AND
OTHER MATERIALS WITHIN THE PERIPHERAL
OF THE BUILDINGS

TRUCK MIXER TANDEM WITH PUMPCRETE USE


IN POURING OF HEAVY
SUPERSTRUCTURE
MEMBERS.

TOWER CRANE
USE AS
CIRCUMFERENTIAL LIFTING
MECHANISM TO TRANSPORT
VITAL
CONSTRUCTION
MATERIALS & EQUIPMENT

FORMS & SCAFFOLDING USE


AS GUIDE & SUPPORT SYSTEM
IN FORMING & CHECKING
ALIGNMENT OF STRUCTURAL
MEMBERS IN & AROUND THE
BUILDINGS.

GENERATOR SET / WELDING MACHINE


USE
AS
CONNECTORS
ON
HEAVY
STRUCTURAL STEEL MEMBERS.

NVPILAR 2008

WHEEL LOADER

ROLLER

EXCAVATOR/BREAKER

TRUCK MIXER

BULLDOZER

TRAILER TRUCK

GRADER

DUMP TRUCK

NVPILAR 2008

SAMPLING MOLD

BAR CUTTER

1- BAGGER
CONCRETE MIXER

2 BAGGER
CONCRETE MIXER

PLATE COMPACTOR

CONCRETE VIBRATOR

TAMPING RAMMER

PORTA LIFT

RING AND BAR BENDER

HOLLOW BLOCK MACHINE

WALK BEHIND ROLLER

SUBMERSIBLE PUMP
NVPILAR 2008

NVPILAR 2008

LABOR COST DISTRIBUTION


(BUILDING ESTIMATE)

SCOPE OF WORKS

A. MOBILIZATION / DEMOB.
B. EARTHWORKS
a) Excavation / Backfill

%LABOR OF MATLS.
(APPROXIMATE)

MANDAYS

1% OF DC

b) Earth fill

30 %

c) Gravel

30 %

C. TERMITE CONTROL /
WOOD PRESERVATION
a) Soil Poisoning

30 %

b) Wood Preservation

30 %

NVPILAR 2008

LABOR COST DISTRIBUTION


(BUILDING ESTIMATE)

SCOPE OF WORKS

%LABOR OF MATLS.
(APPROXIMATE)

MANDAYS

D. FOUNDATION WORKS
1. SHALLOW FOUNDATION
a) Spread

30 %

b) Mat

30 %

c) Raft

30 %

2. DEEP FOUNDATION
a) Micro Piles

30 %

b) Pre-Cast Driven Piles

30 %

c) Bored Piles

30 %

d) Barrette Piles

30 %

NVPILAR 2008

LABOR COST DISTRIBUTION


(BUILDING ESTIMATE)

SCOPE OF WORKS

E. DAMP PROOFING /
MOISTURE CONTROL
a) On Ground
b) Below Ground
F. CONCRETE WORKS
a) Concrete
a.1) Ready Mix
a.2) Job Mix

%LABOR OF MATLS.
(APPROXIMATE)

MANDAYS

30 %
30 %

10 15 %
30 %

b) Re-bars

30 %

c) Formworks

30 %

NVPILAR 2008

LABOR COST DISTRIBUTION


(BUILDING ESTIMATE)

SCOPE OF WORKS

%LABOR OF MATLS.
(APPROXIMATE)

G. MASONRY WORKS
a) Concrete Hollow Blocks

30 %

H. CARPENTRY WORKS
a) Ceiling

30 %

b) Partitions

30 %

c) Wooden Framing

30 %

d) Stairs

30 %

e) Cabinets

30 %

MANDAYS

NVPILAR 2008

LABOR COST DISTRIBUTION


(BUILDING ESTIMATE)

SCOPE OF WORKS

H. FABRICATED MATLS
AND HARDWARES
a) Doors
b) Windows

%LABOR OF MATLS.
(APPROXIMATE)

MANDAYS

30% Fab. + 10% Inst.


30% Fab. + 10% Inst.

c) Hardware Accessories 30%


I. ROOF FRAMING WORKS
1. Timber Trusses

30%

2. Steel Trusses
a) Fabrication

30%

b) Installation/Erection

20%

c) Equipment

10 - 25 %

d) Consumables
e) Painting

8%
7%

NVPILAR 2008

LABOR COST DISTRIBUTION


(BUILDING ESTIMATE)

SCOPE OF WORKS

%LABOR OF MATLS.
(APPROXIMATE)

K. ROOFING WORKS
a) Roofing Matls & acc.

30 %

L. FINISHES

30 - 35 %

MANDAYS

M. PAINTING / VARNISHING
a) Masonry Paint

30 %

b) Wooden Paint

30 %

c) Metal Paint

30 %

d) Varnishing

30 %

NVPILAR 2008

LABOR COST DISTRIBUTION


(BUILDING ESTIMATE)

SCOPE OF WORKS

N. WATERPROOFING
a) Cement Base (Integral)

%LABOR OF MATLS.
(APPROXIMATE)

30 %

b) Membrane Waterproofing

30 %

c) Liquid Waterproofing

30 %

d) Hydrolithic Waterproofing

30 %

O. SANITARY WORKS
a) Plumbing Lines

MANDAYS

30 %

b) Drainage, Waste & Vent

30 %

c) Fixtures & Accessories

15 %

NVPILAR 2008

LABOR COST DISTRIBUTION


(BUILDING ESTIMATE)

SCOPE OF WORKS

%LABOR OF MATLS.
(APPROXIMATE)

MANDAYS

P. ELECTRICAL WORKS
a) Wires & wiring

30 %

b) Conduit works

30 %

c) Panel boards & Cabinets

5%

d) Fixtures & Accessories

10 %

NVPILAR 2008

LABOR COST DISTRIBUTION


(BUILDING ESTIMATE)

SCOPE OF WORKS

%LABOR OF MATLS.
(APPROXIMATE)

MANDAYS

Q. MECHANICAL WORKS
a) Airconditioning &
Refrigeration System

10% - Labor(Acc.)
15% - Inst. of units

b) Water Pump

30% - Labor (Pipes & fit.)


15% - Inst. of units

c) Automatic Water
Sprinkler System

30% - Labor (Pipes & fit.)


15% - Inst. Of units

d) Electric Elevators

30%

e) Electric Dumbwaiter

30%

NVPILAR 2008

SCOPE OF WORKS IN BUILDING CONSTRUCTION


PART -

A-

MOBILIZATION

PART -

B-

EARTHWORKS

PART -

C-

TERMITE CONTROL & WOOD PRESERVATIONS

PART -

D-

FOUNDATION WORKS

PART -

E-

DAMP PROOFING / MOISTURE CONTROL

PART -

F-

CONCRETE WORKS

PART -

G-

MASONRY WORKS

PART -

H-

CARPENTRY WORKS

PART -

I -

FABRICATED MATERIALS AND HARDWARE

PART -

J-

ROOF FRAMING WORKS

PART -

K-

ROOFING WORKS

PART -

L-

FINISHES

PART -

M - PAINTING / VARNISHING

PART -

N-

WATER PROOFING

PART -

O-

SANITARY WORKS

PART -

P-

ELECTRICAL WORKS

PART -

Q-

MECHANICAL WORKS

PART -

R-

CONSTRUCTION SAFETY AND HEALTH (DO. 56)

NVPILAR 2008

DPWH STD. SPECS., VOL. I, 1988, ED.


DPWH STD.SPECS.,VOL.II, 2004 ED.
DPWH STD.SPECS.,VOL.III, 1995 ED.

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS


ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

PART A MOBILIZATION
- M0VING IN OF MANPOWER, EQUIPTMENT & MATERIALS AT THE
PROJECT SITE
PART A FACILITIES F0R THE ENGINEER
A.1.1- OFFICES & LABORATORIES

- L.S.

A.1.2- VEHICLES FOR THE ENGINEER

- MO./ EACH

A.1.3- ASSISTANCE TO THE ENGINEER

- MONTHS

A.1.4- PHOTOGRAPHS

- EACH

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS


ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

PART B - EARTHWORKS
ITEM 800 CLEARING & GRUBBING

- CU. M.

ITEM 801 REMOVAL OF STRUCTURES & OBSTRUCTIONS

- CU. M.

ITEM 802 EXCAVATION

- CU. M.

ITEM 803 STRUCTURE EXCAVATION

- CU. M.

ITEM 804 EMBANKMENT

- CU. M.

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS


ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

PART C TERMITE CONTROL & WOOD PRESERVATION


ITEM 1000(A) SOIL POISONING

- LITER

ITEM 1000(B) WOOD PRESERVATION

- LITER

ITEM 1000(C) POWDER TERMICIDE

- KILOGRAMS

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS


ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

PART D FOUNDATION WORKS

ITEM 400(1) UNTREATED TIMBER PILES, FURNISHED

- METER

ITEM 400(2) TREATED TIMBER PILES, PRESERVATIVE, FURNISHED

- METER

ITEM 400(3) STEEL H-PILES, FURNISHED

- METER

ITEM 400(4) PRECAST CONCRETE PILES, FURNISHED

- METER

ITEM 400(5) PRECAST, PRESTRESSED CONCRETE PILES, FURNISHED

- METER

ITEM 400(6) STRUCTURAL STEEL SHEET PILES, FURNISHED

- METER

ITEM 400(7) PRECAST CONCRETE SHEET PILES, FURNISHED

- METER

ITEM 400(8) UNTREATED TIMBER PILES, DRIVEN

- METER

ITEM 400(9) TREATED TIMBER PILES, DRIVEN

- METER

ITEM 400(10) STEEL H-PILES, DRIVEN

- METER

ITEM 400(11) STEEL PIPES PILES

- METER

ITEM 400(12) STRUCTURAL STEEL SHEET PILES, DRIVEN

- METER

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS


ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

ITEM 400(13) PRECAST CONCRETE SHEET PILES, DRIVEN

- METER

ITEM 400(14) PRECAST CONCRETE PILES, DRIVEN

- METER

ITEM 400(15) PRECAST, PRESTRESSED CONCRETE PILES, DRIVEN

- METER

ITEM 400(16) TEST PILES, FURNISHED AND DRIVEN

- METER

ITEM 400(17) CONCRETE PILES CAST IN DRILLED HOLES

- METER

ITEM 400(18) CONCRETE PILES CAST IN STEEL SHELLS

- METER

ITEM 400(19) CONCRETE PILES CAST IN STEEL PIPES

- METER

ITEM 400(20) PILE SHOES

- METER

ITEM 400(21) SPLICES

- METER

ITEM 400(22) LOAD TEST

- METER

ITEM 400(23) BORED PILES (DIA___ M)

- METER

ITEM 400(24) PERMANENT CASING (DIA___M)

- METER

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS


ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

PART E DAMP PROOFING/MOISTURE CONTROL


SPL (1) POLYETHELENE SHEETS

- SQ. M.

SPL (2) HYDROLITHIC WATER PROOFING

- SQ. M.

NVPILAR 2006

COST ESTIMATION SYSTEM FOR BUILDINGS


ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

PART F - CONCRETE WORKS


ITEM 404

REINFORCING STEEL

- KGS.

ITEM 406(1) PRE STRESSED STRUCTURAL CONC. MEMBERS - EACH


ITEM 406(2) PRE STRESSED CONCRETE
ITEM 900
R. C. CONCRETE***

- L.S.
-CU.M.

***- Such prices and payment shall be full compensation for furnishing all
materials, including
metal water stops, joint fillers, weep holes, and rock
backing and timber bumpers; for all form and false work; for mixing, placing,
furnishing, and curing the concrete; and for all labor, materials, equipment, tools
and incidentals necessary to complete the item

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS


ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

PART G MASONRY WORKS

ITEM 506(1)A- MASONRY UNIT (CHB)

- SQ. M.

PART H CARPENTRY AND JOINERY WORKS


ITEM 1OO3(A) WOODEN CEILING

- BD. FT.

ITEM 1OO3(B) WOODEN PARTITION

- BD. FT.

ITEM 1OO3(C) WOODEN CABINETS

- BD. FT.

ITEM 1OO3(D) WOODEN STAIRS & OTHERS AS


SPECIFIED ON PLANS

- BD. FT.

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS


ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

PART I FABRICATED MATERIALS & HARDWARE

ITEM 1004 HARDWARE

ITEM 1004.2.1 ROUGH HARDWARE

- PCS/KILO

ITEM 1004.2.2 FINISHING HARDWARE

- PCS/SET

ITEM 1005 STEEL WINDOWS


ITEM 1005(A) RESIDENTIAL CASEMENT

- SQ.M.

ITEM 1005(B) HEAVY DUTY SIDE HINGED VENTILATOR - SQ.M.


ITEM 1005(C) PROJECTED VENTILATOR

- SQ.M.

ITEM 1005(D) AWNING VENTILATOR

- SQ.M.

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS


ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

ITEM 1006 STEEL DOORS AND FRAMES


ITEM 1006(A) HOLLOW STEEL DOORS

- SQ.M./SET

ITEM 1006(B) FLUSH DOOR

- SQ.M./SET

ITEM 1006(C) GRILLE DOOR

- SQ.M./SET

ITEM 1006(D) STEEL LOUVER DOOR

- SQ.M./SET

ITEM 1007 ALUMINUM GLASS DOORS

ITEM 1007 ALUMINUM GLASS DOOR, SLIDING TYPE,


DESIGNATED AS D ON THE SCHEDULE

- SQ.M.

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS


ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

ITEM 1008 ALUMINUM GLASS WINDOWS


ITEM 10O8(1) ALUMINUM SLIDING WINDOWS

- SQ.M.

ITEM 1008(2) ALUMINUM CASEMENT WINDOWS

- SQ.M.

ITEM 1008(3) ALUMINUM AWNING WINDOWS

- SQ.M.

ITEM 1009 JALOUSIE WINDOWS

ITEM 1009(1) GLASS JALOUSIE WINDOWS

- SQ.M.

ITEM 1009(2) WOOD JALOUSIE WINDOWS

- SQ.M.

ITEM 1010 WOODEN DOORS AND WINDOWS

ITEM 1010(A) FRAMES(JAMBS, SILLS, HEAD, TRANSOMS


AND MULLIONS
- SET
ITEM 1010(B) DOOR(FLUSH OR PANEL)

- SQ.M.

ITEM 1010(C) WINDOW SACHES

- SQ.M.

ITEM 1010(D) DOOR LOCKS

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS


ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

ITEM 1011 ROLLING UP DOORS

ITEM 1011(A) ROLLING UP DOOR(INDICATE METAL


SIZE AND TYPE OF CURTAIN SLATE)
ITEM 1012 GLASS AND GLAZING

- UNIT/SET
-

ITEM 1012(A) FLOAT GLASS

- SQ.M.

ITEM 1012(B) ORDINARY WINDOW & SHEET GLASS

- SQ.M.

ITEM 1012(C) PLATE GLASS (MIRROR)

- SQ.M.

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS


ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

PART J ROOF FRAMING WORKS


ITEM 402(1) TIMBER STRUCTURES

- SPAN

ITEM 402(2) TIMBER TRUSSES

- BD. FT.

ITEM 403(1) STRUCTURAL STEEL ,FURNISHED,


FABRICATED AND ERECTED

- KGS

ITEM 403(2) STRUCTURAL STEEL ,FURNISHED,


FABRICATED AND ERECTED

- KGS

ITEM 403(3) STRUCTURAL STEEL ,FURNISHED & FABRICATED

- KGS

ITEM 403(4) STRUCTURAL STEEL ,FURNISHED & FABRICATED

- KGS

ITEM 403(5) STRUCTURAL STEEL ,ERECTED

- KGS

ITEM 403(6) STRUCTURAL STEEL ,ERECTED

- KGS

ITEM 403(7) STRUCTURAL STEEL ,FURNISHED,


FABRICATED AND ERECTED

- KGS

* - Where separate payment is to be made for certain metals or for certain particular components,
other than under the general provision for structural steel, designations of those particular cases
shall be inserted in the space provided in the pay names for Item 403(2), 403(4) or 403(6), as the
case may be.

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS


ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

PART K ROOFING WORKS


-

ITEM 1013 CORRUGATED METAL ROOFING


ITEM 1013(A) ROOF INSULATION
ITEM 1013.2.1 CORRUGATED ROOFING GAUGE 26

- SQ.M.
- SQ.M .

ITEM 1013.2.2 FABRICATED METAL ROOFING ACCESSORIES


(A) RIDGED/HIP ROLLS, FLASHING, GUTTER
& DOWNSPOUT GAUGE 26

- L.M.

(B) VALLEYS, COUNTER FLASHING GUTTER


& DOWNSPOUT GAUGE 24
ITEM 1013.2.3 ROOF VENTILATORS

- L.M.
- EACH

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS


ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

ITEM 1014 PRE-PAINTED METAL SHEETS


ITEM 1014(A) PRE-PAINTED METAL SHEETS
ITEM 1015 CLAY ROOF TILES

- SQ.M.
-

ITEM 1015(A) CLAY ROOF TILES

- SQ.M.

ITEM 1017 ROOF DRAINS WITH STRAINERS

- PCS/SET

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS


ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

PART L - FINISHES
ITEM 1018 CERAMIC TILES
ITEM 1018.2.1.1 GLAZED TILES AND TRIMS

- SQ.M.

ITEM 1018.2.1.2 UNGLAZED TILES


ITEM 1019 WOOD TILES

- SQ.M

ITEM 1019(A) NARRA WOOD TILES

- SQ.M.

ITEM 1019(B) TANGUILE WOOD TILES

- SQ.M.

ITEM 1019(C) OTHER SPECIES AS SPECIFIED

- SQ.M.

ITEM 1020 VINYL FLOOR TILES

- SQ.M. OR L.M OR # OF PCS.

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS


ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

ITEM 1021 - CEMENT FLOOR FINISH


ITEM 1021(A) PLAIN CEMENT FLOOR FINISH

- SQ.M.

ITEM 1021(B) COLORED CEMENT FLOOR FINISH

- SQ.M.

ITEM 1021(A) CEMENT FLOOR FINISH W/FLOOR HARDINER

- SQ.M.

ITEM 1022 - STUCCO FINISH


ITEM 1022(A) - STUCCO FINISH
ITEM 1023 GRANOLITHIC MARBLE WORKS
ITEM 1023(A) CORRIDORS
ITEM
ITEM
ITEM
ITEM

1023(B) STAIRS LANDING, RISERS, ETC.


1023(C) ROOMS AND OTHERS
1024 PEA GRAVEL WASHOUT FINISH
1024(A) PEA GRAVEL WASHOUT FINISH

- SQ.M.
- SQ.M.
- SQ. M. OR L.M.
- SQ.M.
- SQ.M.
- SQ.M.

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS


ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

ITEM 1025 BUSH HAMMERED FINISH


ITEM 1025(A) BUSH HAMMERED FINISH
ITEM 1025(B) FLUTED BUSH HAMMERED FINISH

- SQ.M.
- SQ.M.

ITEM 1026 PEBBLE WASHOUT FINISH


ITEM 1026(A) PEBBLE WASHOUT FINISH

- SQ.M.

ITEM
ITEM
ITEM
ITEM
ITEM

1027 CEMENT PLASTER FINISH


1027(A) CEMENT PLASTER FINISH
1027(B) SIMULATED RED BRICKS, pn. 142
1028 SYNTHETIC ADOBE
1028(A) BUSH HAMMERED SYNTHETIC ADOBE FINISH

ITEM 1028(B) FLUTTEDBUSH HAMMERED SYNTHETIC ADOBE FINISH

ITEM 1028(C) - PIQUETA TOOL FINISH / SYNTHETIC FINISH

- SQ.M.
- SQ.M.
- SQ.M.
- SQ.M.

- SQ.M.

NVPILAR 2006

COST ESTIMATION SYSTEM FOR BUILDINGS


ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

ITEM
ITEM
ITEM
ITEM

1O29 GRANATITE WASHOUT FINISH


1O29(1) GRANATITE WASHOUT FINISH
1030 ACCOUSTICAL CEILING
1030(A) ACCOUSTICAL CEILING PANEL

- SQ.M., LM
- SQ.M OR # OF PCS.

ITEM 1031 ACCOUSTICAL TREATMENT


ITEM 1031.2.1 ACCOUSTICAL TILE/BOARD/PANEL
ITEM 1031.2.2 SPRAYED-ON ACCOUSTICAL MATERIALS

- SQ.M.
- SQ.M.

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS


ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

PART M PAINTING, VARNISHING & OTHER RELATED WORKS


ITEM
ITEM
ITEM
ITEM
ITEM

1032
1032
1032
1032
1032

A PAINTING WOKS
A(1) PAINTING WOKS (MASONRY PAINT)
A(2) PAINTING WOKS (WOOD PAINT)
A(1) PAINTING WOKS (ROOF PAINT)
B VARNISHING

ITEM 1032 C SEA-MIST FINISH


ITEM 1032 D DUCCO FINISH
ITEM 1032 E TEXTURE FINISH

- SQ.M.
- SQ.M.
- SQ.M.
- SQ.M.
- SQ.M.
- SQ.M.
- SQ.M.

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS


ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

PART N WATERPROOFING WORKS


ITEM 1016 - WATERPROOFING
ITEM 1016(A) CEMENT BASE WATERPROOFING

- SQ.M.

ITEM 1016(B) LIQUID WATERPROOFING

- SQ.M.

ITEM 1016(C) BUILT-UP AND PREFORMED MEMBRANE

- SQ.M.

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS


ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

PART O SANITARY WORKS


ITEM 1001 STORM DRAINAGE AND SEWERAGE SYSTEM
ITEM
ITEM
ITEM
ITEM
ITEM
ITEM
ITEM

1001.2(A) PIPE (KIND AND SIZE)


1001.2(B) FITTINGS (KIND AND SIZE)
1001.2(C) CONCRETE GUTTER
1001.2(D) CONCRETE CANAL
1001.2(E) W.I. GRATING
1001.2(F) CATCH BASIN
1001.2(G) JUNCTION BOX

- METER
- EACH
- METER
- METER
- METER
- EACH
- EACH

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS


ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

PART P ELECTRICAL WORKS

ITEM 1100 CONDUITS, FOXES & FITTINGS


(1)-RSC CONDUIT PIPE- MM DIA W/ COUPLING
(2)-LOCKNUT & BUSHING
(3)-CONDULET TYPE
(4)-CONDUIT PIPE ELBOW
(5)-CONNECTOR
(6)-CONDUIT CLAMP
(7)-PVC ADAPTER
(8)-G.I. WIRE G.A. #14
(9)-HACKSAW BLADE
(10)-PVC TAPE 19MM DIA X 18MM
(11)-RUBBER TAPE 19MM DIA X 227G
(12)-PVC SOLVENT CEMENT @ 400 CC.
(13)-PVC END BALL
(14)-OCTAGONAL JUNCTION BOX
(15)-UTILITY BOXES
(16)-METAL PULL BOX
(17)-SQUARE BOX
(18)-TELEPHONE CABINET
(19)-REINFORCED CONCRETE PEDESTAL POLE
(20)-RED LEAD PAINT
(21)-WEATHER HEAD W/ TYPE F CONDULET
(22)-GROUNDING ROD COPPERWELD 20MM DIA. X 3.00M
(23)-APITONG OR APPROVED EQUAL CRESOTED WOOD POLE
(24)-ANCHOR ROD__ MM DIA
(25)-ANCHOR LOG__ MM DIA
(26)-POWERLOAD STUDS WITH NUTS

- LENGTH
- PAIRS
- PIECES
- PIECES
- PIECES
- PIECES
- PIECES
- KILOS
- PIECES
- ROLLS
- ROLLS
- CANS
- PIECES
- PIECES
- PIECES
- PIECES
- PIECES
- SET
- LOT
- LOT
- PIECES
-LENGTH
- PIECES
- PIECES
- PIECES
- PIECES
NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS


ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

ITEM 1101 WIRES AND WIRING DEVICES


(1)- ELECTRIC WIRE
- METER OR
ROLLS
(2)- SINGLE POLE TUMBLER SWITCH
- PIECES
(3)- TWO-GANG TUMBLER SWITCH
- PIECES
(4)- THREE-GANG TUMBLER SWITCH
- PIECES
(5)- THREE-WAY TUMBLER SWITCH
- PIECES
(6)- DUPLEX CONVENIENCE RECEPTACLES
- SET
(7)- HEAVY DUTY CONVENIENCE RECEPTACLES
- SET
(8)- STD. TELEPHONE OUTLET BAKELITE COVER W/ 9.52 CENTER HOLE - PIECES
(9)- WDO TYPE AIRCONDITIONING OUTLET 3- PRONG POLARIZED TYPE - PIECES
(10)- BARE COPPER WIRE
METERS
(11)- GROUNDING CLAMPS FOR ELECTRIC WIRES
- PIECES
(12)- MESSENGER WIRE
METERS
(13)- GUY WIRE
METERS
(14)- VIBRATING BELL
- SET
(15)- TRAFFIC LIGHT CONTROL PANEL
- SET
(16)- TRAFFIC LIGHT METAL ENCLOSURES COMPLET WITH RED &
GREEN LIGHT PROVIDED WITH REFLECTORS & 152MM
DIAMETER VIBRATING BELL
- SET
NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS


ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

ITEM 1102 POWER LOAD CENTER, SWITCHGEAR & PANEL BOARDS


(1)- PANEL BOARD (CIRCUIT BREAKER TYPE)
(2)- PANEL BOARD (SAFETY SWITCH TYPE)
(3)- LOW-VOLTAGE SWITCHGEAR (LVS) COMPLETE W/ METERING
DEVICES AND ACCESSORIES
(4)- POWER FUSES
PIECES
(5)- LIGHTING ARRESTERS
(6)- AIR BREAK SWITCH
(7)- ENCLOSED ACB NEMA TYPE 1
(8)- ENCLOSED ACB NEMA TYPE 3R
(9)- AUTOMATIC TRANSFER SWITCH
(10)- MANUAL TRANSFER SWITCH WITHOUT FUSES
(11)- MOTOR CONTROLLER

- SET
- SET
- SET
- PIECES
- SET
- SET
- SET
- SET
- PIECES
- SET

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS


ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

PART Q MECHANICAL WORKS


ITEM 1200 AIR CONDITIONING AND REFRIGERATION SYSTEM
(A)- COMPRESSOR, CONDENSER AND EVAPORATOR
(B)- DIFFUSSER, GRILLES AND VALVES
(C)- PIPES
(D)- DUCTS AND INSULATIONS
(E)- PIPE INSULATIONS

ITEM 1201 WATER PUMPING


(A)(B)(C)(D)-

PUMP AND WATER TANK


AIR COMPRESSOR
PIPES
VALVES AND FITTINGS

- SET
- PIECES
- LENGTH
- SQ.M.
- METER

- SET
- SET
- LENGTH
- PIECE

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS


ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

ITEM 1202 AUTOMATIC WATER SPRINKLER SYSTEM


(A)- FIRE AND JOCKEY PUMPS
(B)- SPRINKLER HEAD, VALVES AND FITTINGS
(C)- PIPES

ITEM 1203 ELECTRIC ELEVATOR

(A)- TRACTION OR HYDRAULIC MACHINE AND CAR


(B)- HOISTWAY DOORS, COUNTER WEIGHT, GUIDE RAILS,
ANNUNCIATORS, AND HALL POSITION INDICATORS
(C)- ELECTRICAL WIRES AND CONDUITS

ITEM 1204 ELECTRIC DUMPWAITER


(A)- MACHINE
(B)- CAR, DOOR AND CABLE
(C)- ELECTRICAL WIRES AND CONDUITS

- SET
- PIECE
- LENGHT
- SET
- PIECE
- LENGTH
- SET
- PIECE
- LENGHT

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS


ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

ITEM 1205 OXYGEN, NITROUS OXIDE, VACUUM & FUEL GAS SYSTEM
(A)- OXYGEN, NITROUS OXIDE, GAS MANIFOLD AND
DUPLEX VACUUM PUMP
(B)- HUMIDIFIER, VACUUM TRAP BOTTLE, OUTLETS, VALVES
(C)- PIPES AND TUBINGS
LENGHT

- SET
- PIECE
-

ITEM 1206 HEATING SYSTEM

(A)- BOILERS, FUEL PUMP, STORAGE TANKS AND FUEL DAY TANK
INCLUDING FOUNDATION
(B)- PIPES
(C)- VALVES AND FITTINGS

- SET
- LENGTH
- PIECES

ITEM 1207 - BOILERS

(A)- STEAM BOILERS, AIR COMPRESSOR, HEAT EXCHANGER


AND FUEL PUMP
(B)- PIPES WITH INSULATION
(C)- VALVES AND FITTINGS

- SET
- LENGTH
- PIECE

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS


ITEMS OF WORKS IN BUILDING CONSTRUCTION
(BASED ON DPWH STD. SPECS.)

PART R- CONSTRUCTION SAFETY AND HEALTH (DO 56)


SPL -1 PERSONAL PROTECTIVE EQUIPTMENT (PPE)

- PCS.

SPL -2 SAFETY AND HEALTH PERSONNEL

- NOS.

SPL -3 SIGNAGES AND BARRICADES

- PCS.