3
M.A
22.12.14
5466
Gamma=17.0 kN/m 3
GSat=20.00 kN/m 3
Phi=30 degrees
Delta=11 degrees
H*------------+
H *
l1
+
L1
H
*
+
H
* anchor
>F
+
water table H P1
*
+
L
H
*
H
*
L2
H
*
H <
P
*
dredge line H
P2
*
H
*
_
L3
H
*
z
H *
*
D
* H
L4
*
H
Pressure
*
H
************H
diagram
+
P8
COHESIONLESS PASSIVE SOIL : GROUND ANCHOR PROVIDED
Height L1 above water-line
Height from dredge to water-line
Depth to ground anchor
Passive-resistance safety factor
Coulomb coefficients:
If we take:
Moment
+
+ diagram
+
+
+
+
Mmax
+
+
+
+
+
+
L1=4.56 m
L2=6 m
ADepth=2.06 m
SF1=1.5
CRP=COS(RPhi)=0.86603
SRP=SIN(RPhi)=0.5
TRD=TAN(RDelta)=0.19438
and CRD=COS(RDelta)=0.98163
SPD=SIN(RPhi+RDelta)=0.65606
For active pressure:
KAct=(CRP/(SQR(SRP*(SRP+CRP*TRD))+1))^2
=0.30117
For passive resistance (unfactored):
KPas=((CRP/(1-SQR(SRP*SRP/CRD))))^2
=3.0567
Taking account of specified factor of safety:
Page:
Made by:
Date:
Ref No:
4
M.A
22.12.14
Office: 5466
KPas=KPas/SF1=2.0378
Submerged density of soil
GPrime=GSat-9.81=10.19 kN/m 3
Calculate values for pressure diagram:
Pressure at level of water table P1=Gamma*L1*KAct=23.346 kN/m 2
Pressure at dredge line
P2=(Gamma*L1+GPrime*L2)*KAct
=41.76 kN/m 2
Depth of point of zero pressure below dredge line:
L3=P2/(GPrime*(KPas-KAct))=2.3598 m
Total active pressure:
P=0.5*P1*L1+P1*L2+0.5*(P2-P1)*L2+0.5*P2*L3=297.82 kN per metre run.
Height z of centroid of pressure above point X on diagram:
If Z=0.5*P1*L1*(L1/3+L2+L3)+P1*L2*(L2/2+L3)+0.5*(P2-P1)*L2*(L2/3+L3)
=1517.5
z=(Z+0.5*P2*L3*L3*2/3)/P=5.3557 m
Now to find height L4 it is necessary to solve the cubic equation
(L4)^3+A2*(L4)^2-A3=0, where
A2=1.5*((L1-ADepth)+L2+L3)=16.29
and
A3=3*P*(L1+L2+L3-(z+ADepth))/(GPrime*(KPas-KAct))=277.9
Repeated iteration gives a value of L4 of 3.727 m.
Then
Passive pressure at base of sheet-piling
P8=GPrime*L4*(KPas-KAct)=65.953 kN/m 2
Min.penetration length required
Dm=L3+L4=6.0868 m
Actual penetration depth adopted D=6.0868 m
Tensile force in anchor
Force=P-((KPas-KAct)*GPrime)*L4^2/2
=174.92 kN per m