COMPARASION SUBCONTRACTOR

MECHANICAL

CLIENT

PT. SINDABAD MARINE PIONEER

PROJECT

HACCP FACTORY

LOCATION

PASURUAN - EAST JAVA

Currency : IDR
PT.PURNAMA KREASI SEJAHTERA

No.

Description

Material

QTY
Unit

Unit Price

Install

Amount (IDR)

Unit Price

PT. XXX
Material

TOTAL
Amount (IDR)

(Material + Install)

Remarks

Unit Price

Amount (IDR)

Install
Unit Price

TOTAL
Amount (IDR)

(Material + Install)

MECHANICAL
V

Ground Water Tank

Sparing Pipa GWT

Pipa PVC,D 6" AW

Wavin

1,00

Ea

Knie(L bow 90) PVC,D 6" AW

Wavin

2,00

Ea

Pipa PVC,D 4" AW

Wavin

1,00

Ea

Knie(L bow) PVC,D 2" AW

Wavin

1,00

Ea

Pipa PVC,D 3" AW

Wavin

1,00

Ea

Bakrie, Spindo (PT.Sigma)

30,00

m'

Kits ANSI 150

2,00

Ea

Check Valve 2''

Kits ANSI 150

1,00

Ea

Water Meter 2''

AMICO

1,00

Ea

1,00

Ea

1,00

Ls

1,00

Ls

INSTALATION WATER PDAM


Pipa GIV 2'' Medium A
Gate Valve

2''

Suporting Material (including piping Flange Elbow,elbow 90, Pondation,etc)


C

1 PUMP TRANSFER
Packed Pump VERTICAL MULTISTAGE IN LINE PUMPS (1 PUMP)
Merk

Grounfos

Type

CR 5-5

Model

Vertical multistage

Cap

5,8 m3/h

Head

24,1

Shaft seal

Mechanical

Motor Rated

2 x 0,75 Kw ; 380 V/ III Phase/ 50 Hz

Base Frame

Cast Iron or Stell

Speed

3000 rpm

Effisiensi

Minimum 80%

Accessories & Instalation Service


Panel Control ,Flexible, Chek Valve, Gate Valve, Presssure Switch
Presssure Gauge, Hide Pipe Discharge, Basframe, Inlet and Outlet Headers, Cabling
Safety Valve, Flow Switch, System Grounding,Pondation
D

1 PUMP BOOSTER
Packed Pump VERTICAL MULTISTAGE IN LINE PUMPS (1 PUMP)
Merk

Grounfos

CBD-PT.Sindabad Marine Pioneer-M/E

Page : 1 of 2

PT. Multi Konstruksi Utama

Remarks

COMPARASION SUBCONTRACTOR
MECHANICAL

CLIENT

PT. SINDABAD MARINE PIONEER

PROJECT

HACCP FACTORY

LOCATION

PASURUAN - EAST JAVA

Currency : IDR
PT.PURNAMA KREASI SEJAHTERA

No.

Description

Material

QTY
Unit

Type

CR 5-5

Model

Vertical multistage

Cap

Unit Price

Install

Amount (IDR)

Unit Price

PT. XXX
Material

TOTAL
Amount (IDR)

(Material + Install)

Remarks

Unit Price

Amount (IDR)

Install
Unit Price

TOTAL
Amount (IDR)

(Material + Install)

Remarks

5,8 m3/h

Head

24,1

Shaft seal

Mechanical

Motor Rated

2 x 0,75 Kw ; 380 V/ III Phase/ 50 Hz

Base Frame

Cast Iron or Stell

Speed

3000 rpm

Effisiensi

Minimum 80%

Accessories & Instalation Service


Panel Control ,Membrant Tank 100L ,Flexible, Chek Valve, Gate Valve, Presssure Switch
Presssure Gauge, Hide Pipe Discharge, Basframe, Inlet and Outlet Headers, Cabling
Safety Valve, Flow Switch, System Grounding,Pondation
E

INSTALATION PUMP TRANSFER


Pipa GIV 2'' Medium A
Gate Valve

3''

Foot Valve 3''


Strainer 3''

Bakrie, Spindo (PT.Sigma)

18,00

m'

Kits ANSI 150

1,00

Ea

Mizu

1,00

Ea

Mueller

1,00

Ea

1,00

Ls

Suporting Material (including piping Flange Elbow, elbow 90,strainer,etc)


F

INSTALATION PUMP BOOSTER


Pipa Galvanis GIV 2'' Medium A

Bakrie, Spindo (PT.Sigma)

90,00

m'

Gate Valve Diameter 2''

Kits ANSI 150

1,00

Ea

Gate Valve Diameter 1 1/2''

Kits ANSI 150

8,00

Ea

Check Valve 2''

Kits ANSI 150

2,00

Ea

Plampung Radar capasity 10 Bar

1,00

Ea

Supporting material (incluiding piping support, flange, hider pipe, reducer ,strainer, tee, etc)

1,00

Ls

Include: Finishing & cleaning , Hidro Test comisioning Safety


TOTAL ( A ) + ( B ) + ( C ) + ( D ) + ( E ) + ( F )

CBD-PT.Sindabad Marine Pioneer-M/E

0,00

Page : 2 of 2

#REF!

Prepared, By

Checked, By

Div, By

Approved, By

Waris S

Heri S & Nuris

K.So Young

Choe Byoung Woo

20/01/2016

20/01/2016

20/01/2016

20/01/2016

PT. Multi Konstruksi Utama