DKMAN NO

REVZYON NO
YAYIN TARH
SAYFA NO

TRANSMITTAL FORM
Owner

ODAC

Consultant

Assarh Engineering Consultancy Co.

Contractor

Anayurt Libya JointStock Co.

Date

8/11/2010

To

ANAYURT LBYA JOINTSTOCK CO.

Attention

SMAL BLENT ERDEM, GARUN New Buildings Group Leader

Transmittal No

TR-DE-000003

Sub Location
Subject :

SMALL WAREHOUSE CONSTRUCTION PROJECTS

We submit the following documents for the purpose indicated in the matrix below. Please confirm receipt by returning sig

Document No.

Documents Title / Description

GARNE-013-A-D-CD-000

ARCH. PROJECTS/W01-W02-W03-W04 DRAWING LIST

GARNE-013-A-R-000

ARCH. PROJECTS/W01-W02-W03-W04 SPECIFICATIONS

GARNE-013-A-D-CD-001

ARCH. PROJECTS/W01-W02-W03-W04 SITE PLAN

GARNE-013-A-D-CD-100

ARCH. PROJECTS/W01-W02-W03-W04 PLANS

GARNE-013-A-D-CD-200/300

ARCH. PROJECTS/W01-W02-W03-W04 SECT.&ELEV.

GARNE-013-A-D-CD-400

ARCH. PROJECTS/W01-W02-W03-W04 SYSTEM DETAIL

GARNE-013-A-D-CD-500

ARCH. PROJECTS/W01-W02-W03-W04 POINT DETAIL

GARNE-013-A-D-CD-501

ARCH. PROJECTS/W01-W02-W03-W04 POINT DETAIL

GARNE-013-A-D-CD-800/806

ARCH. PROJECTS/W01-W02-W03-W04 WINDOW&DOOR DET.

GARNE-013-A-R-001

ARCH. PROJECTS/W01-W02-W03-W04 BOQ

GARNE-013-E-D-CD-000

ELEC. PROJECT/W01-W02-W03-W04 DRAWING LIST

GARNE-013-E-D-CD-001/100

ELEC. PROJECT/W01-W02-W03-W04 LIGHTING&POWER PLAN

GARNE-013-E-D-CD-200

ELEC. PROJECT/W01-W02-W03-W04 LOW CURRENT FIRE ALARM PLAN

GARNE-013-E-D-CD-300

ELEC. PROJECT/W01-W02-W03-W04 SINGLE LINE DIAGRAM

GARNE-013-E-D-CD-500

ELEC. PROJECT/W01-W02-W03-W04 FOUNDATION EARTHING PLAN

GARNE-013-E-D-CD-700

ELEC. PROJECT/W01-W02-W03-W04 CABLE TRAY PLAN

GARNE-013-E-R WAREHOUSE
ELECTRICAL DESIGN PRONCIPLES
REPORT

ELEC. PROJECT/W01-W02-W03-W04 PROJECT REPORT

Purpose
For Information

For Review
and Comment

Sent
FATMA ERM, CORPUS Project Superintendent

For Approval

Received

. BLENT ERDEM, GARUN New Buildings Grou

DKMAN NO
REVZYON NO
YAYIN TARH
SAYFA NO

TRANSMITTAL FORM
Owner

ODAC

Consultant

Assarh Engineering Consultancy Co.

Contractor

Anayurt Libya JointStock Co.

Date

8/11/2010

To

ANAYURT LBYA JOINTSTOCK CO.

Attention

SMAL BLENT ERDEM, GARUN New Buildings Group Leader

Transmittal No

TR-DE-000003

Sub Location
Subject :

SMALL WAREHOUSE CONSTRUCTION PROJECTS

We submit the following documents for the purpose indicated in the matrix below. Please confirm receipt by returning sig

Document No.

Date, Stamp and Signature

Documents Title / Description

Date, Stamp and Signature

DKMAN NO
REVZYON NO
YAYIN TARH
SAYFA NO

FR.TG.03
00
7/28/2010
1/2

rm receipt by returning signed master.

Copy

Maste
r

CD

Quantity

R PLAN

RE ALARM PLAN

RAM

THING PLAN

R DET.

For Distribution

Received

RUN New Buildings Group Leader

DKMAN NO
REVZYON NO
YAYIN TARH
SAYFA NO

FR.TG.03
00
7/28/2010
1/2

rm receipt by returning signed master.

mp and Signature

Copy

Maste
r

CD

Quantity

DKMAN NO
REVZYON NO
YAYIN TARH
SAYFA NO

TRANSMITTAL FORM
Owner

ODAC

Consultant

Assarh Engineering Consultancy Co.

Contractor

Anayurt Libya JointStock Co.

Date

8/11/2010

To

ANAYURT LBYA JOINTSTOCK CO.

Attention

SMAL BLENT ERDEM, GARUN New Buildings Group Leader

Transmittal No

TR-DE-000003

Sub Location
Subject :

SMALL WAREHOUSE CONSTRUCTION PROJECTS

We submit the following documents for the purpose indicated in the matrix below. Please confirm receipt by returning signe

Document No.

Documents Title / Description

GARNE-013-M-D-CD-000

MECH. PROJECTS/W01-W02-W03-W04 DRAWING LIST

GARNE-013-M-D-CD-001

MECH. PROJECTS/W01-W02-W03-W04 FIRE FIGHTING SCH.

GARNE-013-M-D-CD-400

MECH. PROJECTS/W01-W02-W03-W04 FIRE FIGHTING SCH.

GARNE-013-M-D-CD-401

MECH. PROJECTS/W01-W02-W03-W04 FIRE FIGHTING %HYDRANT


LAYOUT PLAN

GARNE-013-M-D-CD-500

MECH. PROJECTS/W01-W02-W03-W04 A/C PIPING PLAN&SCH.

GARNE-013-M-D-CD-600

MECH. PROJECTS/W01-W02-W03-W04 A/C VENTILATION PLAN&SCH.

GARNE-013-M-R REP.&CALCULATIONS

MECH. PROJECTS/W01-W02-W03-W04 PROJECT REPORT&CALCULATIONS

GARNE-013-CS-D-CD-000

STR. PROJECTS/W01-W02-W03-W04 DRAWING LIST

GARNE-013-CS-D-CD-001

STR. PROJECTS/W01-W02-W03-W04 FORMWORK&FOUNDATION PLAN

GARNE-013-CS-D-CD-002

STR. PROJECTS/W01-W02-W03-W04 SLAB ON GRADE PLAN

GARNE-013-CS-D-CD-300

STR. PROJECTS/W01-W02-W03-W04 FOUNDATION DETAILS 1

GARNE-013-CS-D-CD-301

STR. PROJECTS/W01-W02-W03-W04 FOUNDATION DETAILS 2

GARNE-013-CS-D-CD-302

STR. PROJECTS/W01-W02-W03-W04 EXCAVATION PLAN

GARNE-013-CS-D-CD-400

STR. PROJECTS/W01-W02-W03-W04 COLUMN DETAILS

GARNE-013-CS-D-CD-500

STR. PROJECTS/W01-W02-W03-W04 BEAM DETAILS AT ELEV. '+15.40

GARNE-013-CS-D-CD-700

STR. PROJECTS/W01-W02-W03-W04 REINFORCEMENT PLAN AT ELEV.


'+15.40

GARNE-013-CS-C

STR. PROJECTS/W01-W02-W03-W04 PROJECT REPORT

Purpose
For Information

For Review
and Comment

Sent
FATMA ERM, CORPUS Project Superintendent

For Approval

Received

. BLENT ERDEM, GARUN New Buildings Group

Date, Stamp and Signature

Date, Stamp and Signature

DKMAN NO
REVZYON NO
YAYIN TARH
SAYFA NO

FR.TG.03
00
7/28/2010
2/2

rm receipt by returning signed master.

Copy

Maste
r

CD

Quantity

SCH.

SCH.

AILS 1

AILS 2

%HYDRANT

N&SCH.

N PLAN&SCH.

RT&CALCULATIONS

NDATION PLAN

PLAN

ELEV. '+15.40

PLAN AT ELEV.

For Distribution

Received

RUN New Buildings Group Leader

mp and Signature