Construction steps
1. Temporary utilities for construction
2. Clearing of site
3. Well
4. Excavation
5. Footing
6. Foundation
8. Sewer and water tap installation
9. Backfill
10. Slab
11. Framing, windows and exterior doors
12. Back out framing
13. Stairs
14. HVAC
15. Plumbing
16. Roofing
17. Electrical
18. Gutters and downspout
19. Exterior finishes
20. Interior doors and trim
21. Paint
22. Countertops
23. Tiles
24. Finish electrical
25. Finish Plumbing

26. Finish HVAC


27. Interior finish
28. Septic tank and drain filed

External construction

Shallow foundation
Light-frame construction
Domestic water system
Electrical wiring
Building envelope
Retaining walls

Internal construction

Ventilation
Plumbing
Air conditioning
Electrical wiring
Telephone wiring
Cable wiring
Ethernet wiring
Insulation
Flooring
Wall
Ceilings

Finishing construction

Cabinetry
Furnishings
Interior decorating
Painting
Fixtures
Appliances
Toiletry

You might also like