design coordinates, inc.

Balai
Lot 1&2, Block 7, Balai Taal, Brgy. Sungay West, Tagaytay City

WEEKLY ACCOMPLISHMENT REPORT

General Contractor : Arcy Builders


27-Dec-15
STRUCTURES

% WT

QTY (pcs.) COMPLETED

% WT

ACCOMPLISHMENT (SUBSTRUCTURES & SUPERSTRUCTURE WORKS)

remarks

1.FOUNDATION
1.1 EXCAVATION OF COLUMN FOOTINGS

5.142

65.00

65.00

5.142

completed

2. RETAINING WALL
2.1 Excavation of Retaining Wall Footing
2.2 Concreting of Retaining Wall

0.554
0.554

7.00
7.00

7.00
6.55

0.554
0.518

4.0% BAL. BACKFILL

3. CONCRETING WORKS
3.1 COLUMN FOOTING
3.2 COLUMN PEDESTALS (1ST LIFT)
3.3 COLUMN PEDESTALS (LAST LIFT)

5.142
5.142
5.142

65.00
65.00
65.00

65.00
65.00
65.00

5.142
5.142
5.142

completed
completed
completed

4. STEEL COLUMN (installation)


4.1 ELEV.+000M (UGF)
4.2. ELEV. -3.50M (LGF)
4.3 ELEV.-7.125M
4.4. ELEV.-10.75M
4.5 ELEV.-14.375M
4.6 ELEV. -18.00M
4.7 BAHAY KUBO 2

4.193
5.142
5.142
5.142
5.142
5.142
0.475

53.00
65.00
65.00
65.00
65.00
65.00
6.00

5.00
65.00
65.00
65.00
65.00
65.00
6.00

0.396
5.142
5.142
5.142
5.142
5.142
0.475

BALANCE 48
completed
completed
completed
completed
completed
completed

5. FTB'S & Steel Beam (Wide flange) Installation


5.1 ELEV.+0.00M (UGF)
5.2. ELEV. -3.50M (LGF)
5.3 ELEV.-7.125M
5.4. ELEV.-10.75M
5.5 ELEV.-14.375M
5.6 ELEV. -18.00M

16.456
16.139
7.437
4.826
2.057
1.108

208.00
204.00
93.00
61.00
26.00
14.00

0.00
160.00
61.00
40.00
26.00
7.00

0.000
12.658
4.826
3.165
2.057
0.554

BALANCE 44
BALANCE 32
BALANCE 21
completed
BALANCE 7

TOTAL

Prepared by:
design coordinates, inc.
Construction Project Managers

100

71.48

completed

overall accomplishment based on quantity only